Skip to main content

Construction Project Management Question Bank - 960 Verified Questions

Page 1


Construction Project Management

Question Bank

Course Introduction

Construction Project Management introduces students to the essential principles and practices required to effectively oversee construction projects from inception through completion. The course covers topics such as project planning and scheduling, contract administration, cost estimation, resource allocation, risk management, quality control, and safety regulations. Emphasis is placed on the integration of project management tools and techniques to ensure successful delivery within time, budget, and scope constraints. Through case studies and practical applications, students develop the skills needed to manage personnel, coordinate with stakeholders, and navigate the challenges unique to the construction industry.

Recommended Textbook

Project Management Process Technology and Practice 1st Edition by Ganesh Vaidyanathan

Available Study Resources on Quizplus

12 Chapters

960 Verified Questions

960 Flashcards

Source URL: https://quizplus.com/study-set/2154

Page 2

Chapter 1: Projects and Project Management

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42931

Sample Questions

Q1) An investigation of available resources is undertaken during the A)planning phase.

B)design phase.

C)conceptualization phase.

D)implementation phase.

Answer: C

Q2) List the six project life span phases.For each phase,identify one task completed during that phase.

Answer: Conceptualization,planning,design,implementation,closure,and post-implementation are the six phases.Respectively,the tasks are developing a project proposal,establishing a SOW,executing a project plan,monitoring scope,conducting a project audit,and soliciting feedback from stakeholders.Additional examples are provided in Table 1-6.

Q3) Projects relying on mature technologies for all industries to have equal access are classified as

A)Type A projects.

B)Type B projects.

C)Type C projects.

D)Type D projects.

Answer: A

To view all questions and flashcards with answers, click on the resource link above. Page 3

Chapter 2: Process and Methods

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42932

Sample Questions

Q1) At which CMMI level are software processes documented,standardized,and integrated into a standard "to-be" practiced process for an organization?

A)Level 7

B)Level 0

C)Level 1

D)Level 3

Answer: D

Q2) Identify five benefits of process improvements.

Answer: Benefits include improvements in project quality,increase in internal and external customer satisfaction,increase in project value,better customer satisfaction,and improvement in productivity.Additional benefits are provided in the textbook.

Q3) PMBOK knowledge areas include

A)project quality management.

B)project communication management.

C)project procurement management.

D)all of the above.

Answer: D

To view all questions and flashcards with answers, click on the resource link above. Page 4

Chapter 3: Project Management Tools

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42933

Sample Questions

Q1) Affinity diagram procedures include each of the following <b>except</b>

A)make sure that the problem statement is a full sentence and unambiguous to team members.

B)construct the affinity questionnaire and interview customers.

C)brainstorm an exhaustive list of ideas or issues.

D)sort ideas or issues into as many natural groups as possible.

Answer: B

Q2) Which of the following Kano Model requirements suggests that the customer will be extremely dissatisfied if the basic project requirements are not fulfilled?

A)must-be requirements

B)one-dimensional requirements

C)attractive requirements

D)indifferent requirements

Answer: A

Q3) According to the Kano model,there is no feeling of dissatisfaction if the attractive requirements are not met.

A)True

B)False

Answer: True

To view all questions and flashcards with answers, click on the resource link above.

Page 5

Chapter 4: Project Initiation

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42934

Sample Questions

Q1) Assuming a discount rate of 8 percent,what is the present value of $800,000 three years from now?

A)635,065.79

B)685,871.06

C)740,740.74

D)None of the above is correct.

Q2) Stakeholder analysis does not include the ability to help mitigate the project risks.

A)True

B)False

Q3) Which of the following reviews various points where two or more systems interact with each other?

A)prototyping

B)mind maps

C)interface analysis

D)use case analysis

Q4) Generally speaking,the IRR should be lower than the hurdle rate.

A)True

B)False

Q5) Identify five objectives that must be achieved for a project.

To view all questions and flashcards with answers, click on the resource link above. Page 6

Chapter 5: Project Planning

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42935

Sample Questions

Q1) The WBS is created by decomposing a project into smaller pieces of manageable work.

A)True

B)False

Q2) The structure of the WBS should consider and reflect A)project scope.

B)quality and other performance criteria.

C)reporting and other communication methods.

D)all of the above.

Q3) When using a lifespan-based structure,the highest-level entries in the WBS correspond to the major phases of the lifespan.

A)True

B)False

Q4) Decisions made at the beginning stage of a project life cycle have less influence than those made at later stages.

A)True

B)False

Q5) What is a contract? List six types of contracts.

Q6) What are the five stages in a procurement cycle?

Q7) What is the WBS dictionary? What does it contain?

To view all questions and flashcards with answers, click on the resource link above. Page 7

Chapter 6: Risk Management

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42936

Sample Questions

Q1) The likelihood that an event will occur times the impact of that occurrence best defines

A)risk score.

B)risk percentage.

C)threat level.

D)weakness assessment measure.

Q2) What are the outputs of risk monitoring and control?

Q3) Risk factor refers to the overall risk or exposure of the project at a particular timeframe.

A)True

B)False

Q4) Quantitative risk assessment methods include

A)quantitative risk analysis.

B)data gathering and representation techniques.

C)expert judgment.

D)all of the above.

Q5) Accepting risk,transferring risk,and avoiding risks are ways of managing risk.

A)True

B)False

Q6) How can qualitative risk assessment be accomplished?

To view all questions and flashcards with answers, click on the resource link above. Page 8

Chapter 7: Quality, Performance and Value

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42937

Sample Questions

Q1) Which of the following types of reviews is conducted to evaluate the status of a project in order to understand and allocate resources?

A)formal reviews

B)walk-through reviews

C)management reviews

D)process reviews

Q2) A statistical method for identifying which factors influence specific variables of a product or process and which variable has the greatest effect best describes

A)process capability.

B)statistical control process.

C)design of experiments.

D)statistical sampling.

Q3) Crosby,Deming,and Juran suggest achieving outstanding quality requires A)quality leadership from senior management.

B)a customer focus.

C)continuous improvement based on rigorous analysis of processes.

D)all of the above.

Q4) Describe the process for peer reviews.

Q5) Identify five reasons why scope changes are forced into projects.

To view all questions and flashcards with answers, click on the resource link above. Page 9

Chapter 8: Project Scheduling

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42938

Sample Questions

Q1) In PDM,a project will have one start activity and at least two finish activities.

A)True

B)False

Q2) The standard deviation of the critical path is computed by summing the standard deviations of the activities.

A)True

B)False

Q3) In PDM,an activity can have successors with no predecessors.

A)True

B)False

Q4) The amount of time that an activity in a project network can be delayed without causing a delay to subsequent activities or project completion best defines A)restricted flow.

B)task obstruction.

C)capacity.

D)slack.

Q5) What is negative slack? Why does it occur?

Q6) Identify five benefits of networking project activities.

To view all questions and flashcards with answers, click on the resource link above. Page 10

Chapter 9: Resources, Costing, and Control

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42939

Sample Questions

Q1) If cost variance is positive,it means that performing the activity cost more than the planned or budgeted cost.

A)True

B)False

Q2) A method to flatten the schedule when resources are over-allocated with a general idea to prevent team members from becoming over extended best describes

A)fast tracking.

B)resource-leveling heuristic.

C)crashing.

D)thought process mapping.

Q3) Which of the following provides a rough estimate of what a project costs before the actual project has started?

A)AHE

B)ROME

C)DE

D)PARETO

Q4) Describe three common methods employed in estimating costs.

Q5) Identify five metrics for monitoring project cost and schedule.

Q6) Identify three opportunities created by embracing scope creep.

Page 11

To view all questions and flashcards with answers, click on the resource link above.

Chapter 10: Project Closure

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42940

Sample Questions

Q1) Project audits help the organization to determine whether the project controls are functioning as expected and show the true status of the project.

A)True

B)False

Q2) Epistemological barriers to learning from post-project reviews include

A)the inability to reflect.

B)difficult to generalize.

C)time constraints.

D)reluctance to blame.

Q3) The success of future projects depends not only on past successful projects,but also on how unsuccessful projects were treated by an organization and its stakeholders.

A)True

B)False

Q4) Which of the following PMBOK knowledge areas are included in an audit?

A)risk management

B)procurement management

C)quality management

D)All of the above are included.

Q5) Identify five benefits of project audits.

To view all questions and flashcards with answers, click on the resource link above. Page 12

Chapter 11: Project Organizational Structures

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42941

Sample Questions

Q1) Which of the following roles asks for clarification of the values pertinent to what the team is undertaking or of values involved in a suggestion?

A)initiator-contributor

B)opinion seeker

C)elaborator

D)energizer

Q2) Under what conditions will the department structure work well?

Q3) Decentralized organizations have uniformity of policies,practices,and procedures and usually use area experts better.

A)True

B)False

Q4) An organizational structure where employees are grouped according to products,projects,customers,or geographic locations best defines

A)virtual structure.

B)matrix structure.

C)department structure.

D)functional structure.

Q5) Describe four ways that knowledge transfer occurs in virtual and global teams.

Q6) Identify nine reasons organizations outsource projects.

To view all questions and flashcards with answers, click on the resource link above. Page 13

Chapter 12: Project Success

Available Study Resources on Quizplus for this Chatper

80 Verified Questions

80 Flashcards

Source URL: https://quizplus.com/quiz/42942

Sample Questions

Q1) The type of power where the targeted persons comply to gain the project manager's approval is called A)referent power.

B)reward power.

C)legitimate power.

D)expert power.

Q2) When a listener moves closer to the speaker,this shows aggressiveness. A)True

B)False

Q3) Identify five success variables for a project manager.

Q4) An individual who is concerned about how work is completed and tries to get people to work together and perform better best describes A)customer.

B)leader.

C)manager. D)sponsor.

Q5) What is knowledge management? Identify five benefits of knowledge management.

Q6) Managers need to understand that technology makes projects successful. A)True B)False

Page 14

To view all questions and flashcards with answers, click on the resource link above.

Turn static files into dynamic content formats.

Create a flipbook