BELINGTON WELLNESS CENTER

1-2

FAIRMONT PUBLIC LIBRARY

3-4

ADAPTIVE REUSE AND DEVELOPMENT

5-6

TABLE OF CONTENTS


The Belington Community Wellness Center weaves together careful material choice, sustainable practices, and intentional community interactions to craft an engaging and reliable place to enhance human experiences. Designed for the residents of Barbour County and its visitors, this wellness center was organized around three proportional data that direct users through the public and private spaces in a simplified and efficient method. Due to the site’s location in a flood zone, the building was raised three feet above the highest point in the elevation and held in place with thick retaining walls. Featuring multiple community gardens, gathering spaces, and public amenities, the Wellness Center provides a central location for local meetings, places to host events, and offices for on site staff.

TERTIARY

SECONDARY

PRIMARY

View

The materials were sampled from the existing historical context and paired wiuth modern sustainable concepts such as a graywater system, solar panels, and gardens to create a low-impact building that seamlessly merges with downtown Belington. Overall, the design of both the bulding and the site itself is engaging to users, accessible to all generations and walks of life, and respectful of the small town charm of Belington, West Virginia.

DATUM ORGANIZATION

PARTI DIAGRAM

EXPERIENTIAL VIEW

1/Quinn Arzt • Undergraduate Fall 2024 ■ Professor Philip Freeman

SOUTH FACADE AND GARDEN

View

BELINGTON WELLNESS CENTER


BRIDGE STREET

33

1

19 14

15

32

2

1

13

27 28

3 31 17

4

2 3

5

6 7

18 9

ADA DROP-OFF LOOP

23

36

18 7

CRIM AVENUE

KANE STREET

POOL SPACE

30

6 18

9 12

10

8 14

9

10

12 13

11

22 15

35

11

35

21 17

19

19

16 18 19

8 19

MULTIPURPOSE SPACE

PARKING LOT ACCESS

BELINGTON WELLNESS CENTER

SITE PLAN 1. GRAYWATER CISTERN ACCESS TANKS 2. MAIN ENTRANCE 3. EGRESS STAIRS 4. RAINWATER CISTERN ACCESS TANKS 5. DROP-OFF ADA RAMP 6. FLAGPOLE PLAZA 7. DROP-OFF LOOP 8. MAIN PARKING ACCESS 9. HANDICAPPED PARKING 10. BIKE RAKES 11. PARKING LOT STAIRCASE 12. PARKING LOT RAMP

21

20

19

0’

5’

TRUE NORTH

KANE STREET

OUTDOOR SPACE

25 24

5

16 4

29

26

0’

10’

TRUE NORTH

40’

20’

PROJECT NORTH

13. PLAYGROUND 14. OUTDOOR SPACE 15. OUTDOOR PAVILION 16. SOLAR PANELS 17. SKYLIGHT 18. COMMUNITY GARDENS 19. TREES AND LANDSCAPING

20’

10’

PROJECT NORTH

FLOOR PLAN

35

21

34

1. COVERED PAVILION 13. WOMEN’S LOCKER ROOM 2. KITCHEN 14. EMPLOYEE LOCKER ROOM 3. NUTRITION OFFICE 15. FITNESS OFFICE 4. MEP ROOM 16. POOL 5. JANITOR CLOSET 17. SEMI-PRIVATE WORKOUT 6. LOBBY 18. EMPLOYEE LOCKER 7. MANAGER’S OFFICE 19. POOL STORAGE 8. FAMILY RESTROOM 20. POOL MECHANICAL 9. STORAGE 21. STUDIO 10. COMPUTER LAB 22. MAIN WORKOUT SPACE 11. ENTERTAINMENT SPACE 23. CONFERENCE ROOM 12. MEN’S LOCKER ROOM 24. MEN’S RESTROOM

25. WOMEN’S RESTROOM 26. CHILDCARE SPACE 27. CHILDCARE OFFICE 28. ADA RESTROOM 29. STORAGE 30. BREAKROOM 31. MULTIPURPOSE ROOM 32. PLAYGROUND 33. OUTDOOR SPACE 34. GARDEN SHED 35. COMMUNITY GARDEN 36. CIRCULATION

Professor Philip Freeman • Fall 2024 • Undergraduate • Quinn Arzt/2


The Fairmont Public Library was conceived as both a senior capstone project and an introduction to an alternative method of architectural design. Rather than beginning with traditional site analysis and programming, the project was driven by two randomly assigned action verbs and exploratory diagramming. Using the words “entangle” and “interact”, the library was designed to reconnect the Fairmont community to learning, nature, and one another. Materials common to the town’s vernacular, paired with the pervasive inclusion of flora, entangle the building within the natural environment and the broader context of the site. Exterior multi-tiered public spaces and expansive window walls promote interaction with the landscape, while the open floor plan and balcony encourage community building and interpersonal exchange. The primary space is organized around a central column of light created by a massive skylight, providing clear views of the sky above. Mirrored L-shaped wings house library stacks and meeting rooms, forming rounded bump-outs that contain public study spaces, a café, rooftop gardens, and outdoor gathering areas. While hidden, the water collection system and stack vents help to sustainably care for the visitors and the plant life. Together, these elements establish the library as a civic space rooted in interaction, connection, and place.

DIAGRAMS

PARTI

SOUTHERN PATIO RAMP AND GARDENS ONE-WAY ACCESS STREET

GEOMETRY

MONROE STREET

CLEVELAND AVENUE

HEIRARCHY

HUNGTINGTON BANK

TRUE TRUE PROJECT PROJECT NORTH NORTH NORTH NORTH

ENTRANCE FACADE

REPETATIVE TO UNIQUE

3/Quinn Arzt•Undergraduate•Spring 2025 •Professor Stacey Bowers

SITE PLAN

ADAMS STREET

0’

10’

20’

40’

FAIRMONT PUBLIC LIBRARY


FLOOR PLAN LEGEND

BB

CHILDREN’S SECTION

AA

1. CAFE 2. ELEVATOR MECHANICAL 3. ELEVATOR 4. LOBBY 5. VESTIBULE 6. INDIVIDUAL STUDY 7. COMPUTER LAB 8. MECHANICAL ELECTRICAL 9. BREAK ROOM 10. DATA 11. GROUP STUDY 12. EMPLOYEE RESTROOM 13. STORAGE 14. OFFICE 15. WOMEN’S RESTROOM 16. MEN’S RESTROOM 17. CHILDREN’S SECTION 18. MAKER SPACE 19. ROOFTOP GARDEN 20. GARDEN STORAGE 21. BALCONY WITH STUDY AREA 22. OUTDOOR GATHERING 23. RESEARCH SECTION 24. CONFERENCE ROOM 25. TEEN SECTION 26. RAIN BARRELS

AA (OPEN TO BELOW)

BB

WOODEN SLATTED CEILING AND SKYLIGHT

ROOFTOP GARDENS

SECOND FLOOR BB

SPACE USAGE PRIVATE ACCESS CIRCULATION

26

PATIO GARDEN NOISE MONITERED PUBLIC ACCESS AA

AA

TRUE NORTH

BB

MAIN LOBBY

FAIRMONT PUBLIC LIBRARY

FIRST FLOOR

0’

5’

PROJECT NORTH

10’

Professor Stacey Bowers•Spring 2025•Undergraduate•Quinn Arzt/4


Adaptive reuse and development projects make up a large portion of architectural work, and thanks to the growing interest in sustainable building choices, the trend is predicted to continue gaining popularity. This project proposes the revitalization of a site along the Monongahela River by Palatine Park, promoting the exploration of new materials, modeling methods, and community engagement. Currently standing as an overgrown and abandoned hillside, the site presented multiple challenges, including a crumbling existing structure, drastic topographic changes, and a large drainage ditch cutting through the upper half of the property. The existing warehouse has been adapted to feature a small café, rentable offices, and a community makerspace with an attached display gallery and market space. A small eight-unit apartment building reflects the makerspace on the west boundary of the site, and a reimagined green space hosts fire pits, seating areas, and a rail-trail rest stop for the community to enjoy.

MAKERSPACE GARDENS FROM THE STEPPED BRIDGE NEW STREET

COMMUNITY GARDEN AND APARTMENT STAIRWELL

5/Quinn Arzt•Graduate•Fall 2025 •Professor Jason Miller

SITE PLAN

EET AUBURN STR

The site has been developed into a sprawling community garden, connecting the three primary areas through angular pathways, specific plant choices, and statement-piece bridges. Careful consideration was given to the existing ecosystem through the green roof, water managment systems, solar panels, and preservation of native growth. To encourage engagement with the garden, the partially demolished patio was reintroduced along with rooftop terraces, balconies, and new seating areas integrated directly into the landscape. A true test of problem-solving, this revitilization project pushed the envelope of creativity and presented the challenge to think beyond the existing structure to design something impactful.

NEW STREET

uu

EAST PARK AVENUE

ADAPTIVE REUSE AND DEVELOPMENT


METAL PARAPET CAP

T. O. WALL 46' - 0"

T. O. WALL 46' - 0"

STEEL PLATE FLASHING

METAL PARAPET CAP

NAILING BOARD STANDARD REUSED YELLOW BRICK

1" PAC METAL PANEL STEEL STUD

2 A402

MORTAR

3 1/2" JM CLADSTONE 45 WATER & FIRE BLOCK INSULATION

BRICK TIE

PAC UNDERLAYMENT & VAPOR RETARDER

GREEN ROOF CONSTRUCTION (SEE CALLOUT)

4" GREENROOF PLASTIC EARTH CONTAINER

5/8" ORIENTED STRAND BOARD

3/4" DRAINAGE

Z-GIRT

C-CHANNEL

ROOT BARRIER

STEEL PLATE FLASHING

2" POLYISOCYANURATE

3 5/8" MINERAL WOOL WITH STEEL STUD

300 HV PRROTECTIVE FABRIC EPDM

5/8" ORIENTED STRAND BOARD

CONCRETE CEILING SUPPORT

1/2" DENSDECK COVERBOARD WITH VAPOR BARRIER

B. O. Upper Roof 38' - 6"

5/8" ORIENTED STRAND BOARD C-CHANNEL

MAKERSPACE PARAPET AND ROOF CALLOUT

B. O. Office Roof 36' - 6"

1" PAC METAL PANEL

2' X 2' ACT CEILING

METAL CEILING TRACK

3 1/2" JM CLADSTONE 45 WATER & FIRE BLOCK INSULATION

2" X 2" ACT PANEL

PAC UNDERLAYMENT & VAPOR RETARDER

STANDARD REUSED YELLOW BRICK

5/8" ORIENTED STRAND BOARD

3 A402

FLOATING LINTEL YELLOW BRICK

Z-GIRT STEEL PLATE FLASHING

STEEL ANGLE

3 5/8" MINERAL WOOL WITH STEEL STUD

CAULKING

ALUMINUM WINDOW HEADER ALUMINUM PICTURE WINDOW

BACKER ROD

ALUMINUM WINDOW MULLION

5/8" ORIENTED STRAND BOARD STEEL STUD ALUMINUM WINDOW HEADER ALUMINUM WINDOW MULLION

APARTMENT GARDENS FROM THE PARKING LOT

APARTMENT TO GREENSPACE ADA BRIDGE

INSULATED GLASS

MAKERSPACE WINDOW HEADER CALLOUT INSULATED GLASS

ROMAN BRICK SILL

ALUMINUM WINDOW SILL

T. O. Upper Slab 25' - 6"

3/8" MORTAR

1" PAC METAL PANEL

STANDARD REUSED YELLOW BRICK

3 1/2" JM CLADSTONE 45 WATER & FIRE BLOCK INSULATION

4 A402

EXISTING 6" CONCRETE SLAB

PAC UNDERLAYMENT & VAPOR RETARDER

EXISTING W-BEAM

T. O. Upper Slab 25' - 6"

5/8" ORIENTED STRAND BOARD

STEEL STUD

3 5/8" MINERAL WOOL WITH STEEL STUD

5/8" ORIENTED STRAND BOARD

STEEL PLATE FLASHING

EXISTING SITE AND STRUCTURE

METAL PANEL AND GYPSUM CONSTRUCTION (SEE CALLOUT)

Z-GIRT 2" EXTRUDED POLYSTYRENE

5/8" ORIENTED STRAND BOARD

INSULATION AND INTERIOR FACADE CONSTRUCTION (SEE CALLOUT)

METAL SUBGRIT

EXISTING CONCRETE WALL

5/8" FIBER CEMENT BOARD

MAKERSPACE GROUND LEVEL CALLOUT

EXISTING CONCRETE WALL 5/8" ORIENTED STRAND BOARD 2" EXTRUDED POLYSTYRENE METAL SUBGRIT 5/8" FIBER CEMENT BOARD Z-GIRT T. O. G. Slab 12' - 0"

EXISTING 6" CONCRETE SLAB EXISTING CONCRETE WALL

VAPOR BARRIER

GRAVEL DRAINAGE

EXISTING GRAVEL UNDERLAYER

EXISTING CONCRETE SLAB

5 A402 T. O. G. Slab 12' - 0"

1" EXTRUDED POLYSTYRENE WITH DRAINAGE PLANE

FOOTING DRAINAGE

WATERPROOF MEMBRANE

4" PERFORATED DRAINAGE PIPE

RAIL TRAIL BIKE STOP

LOFT OFFICE OCCUPIED ROOF PATIO

ADAPTIVE REUSE AND DEVELOPMENT

GRAVEL DRAINAGE

T. O. Footing 9' - 6"

FILTER FABRIC

EXISTING CONCRETE FOOTING T. O. Footing 9' - 6"

EXISTING CONCRETE FOOTING

B. O. Footing 8' - 6"

B. O. Footing 8' - 6"

MAKERSPACE FOOTING CALLOUT

MAKERSPACE WALL SECTION

Professor Jason Miller•Fall 2025•Graduate•Quinn Arzt/6