SYNAPSYE SPRING 2025 ARC-3320A ENVIRONMENTAL CONTROLS STUDENT: CHRISTOPHER NOROÑA INSTRUCTOR: TIM KOHUT
PROJECT LOCATION ADDRESS:610 N. SANTIAGO STREET, SANTA ANA, CA 92701
CHOSEN PATH PARALLEL TO ESTABLISHED GRID 20' CLEAR PATH (TO BE HARDSCAPE*)
ALL BUILDING ELEMENTS MUST BE PLACED ACCORDING TO THE GRIDLINES PICTURED
GRIDLINES ARE ORIENTED TO ALIGN WITH THE SUN PATH, BUILDING FORM AND ORIENTATION SHOULD FOLLOW THIS GRID TO ACCOMODATE LIGHTING CONDITIONS
EVERY PARCEL IS TO HAVE A HARDSCAPE WALKWAY THAT PASSES THROUGH THE ENTIRE PARCEL WITHOUT INTERRUPTION. THIS WALKWAY MUST FALL PARALLEL TO ONE OF THE GRIDLINES PICTURED HERE
T²
0F
850
BUILDING FOOTPRINT (8500 FT²) GREENSCAPE (33% REMAINING SITE)
²
850
T 0F
T²
0F
850 T²
0F
850
EXAMPLE WALKWAY PLACEMENT. MINIMUM OF 10' ON EITHER SIDE OF CHOSEN PATH IS REQUIRED.
CHOSEN WALKWAY
TERRACES ON NORTH FACADE
BUILDINGS
TERRACES ON SOUTH FACADE
BUILDING
T²
0F
850 T²
0F
850
T²
0F
850 T²
0F
850
BUILDING FOOT PRINT NOT TO EXCEED 8500 FT² ON GROUND FLOOR 33% OF REMAINING SITE TO BE GREENSCAPE AT MINIMUM
PARCELS MUST HAVE TWO BUILDINGS ARRANGED AS DEMONSTRATED ACCORDING TO CHOSEN WALKWAY.
TERRACES TO MAKEUP 15% OF FLOOR AREA (EXCLUDING GROUND FLOOR). TERRACES TO BE LOCATED ON NORTH AND SOUTH FACADES FOR AMPLE SUNLIGHT AND SHADING.