P AIGE B ILLINGS INTERIOR DESIGN PORTFOLIO
1
TABLE OF CONTENTS HOSPITALITY ............................................................3-22
COMMERCIAL ............................................................23-56
RESIDENTIAL ............................................................57-72
OTHER WORKS ..........................................................73-84
2
3
HOSPITALITY
4
Location: LoDo, Denver Year: Senior year fall semester Type: Individual Length: 12 weeks Programs: Project Responsibilities: schematics, researching the site, space planning, revit work, three dimensional modeling, finish selection, packaging. Project Description: Design a boutique hotel in a warehouse space located in LoDo, Denver. The hotel should reflect the historical elements and culture of the area, yet, it should remain true to the original building. The floorplan of the space was given, and the programming document required a lobby with grab and go area, a restaurant and bar space, back of house offices, a retail space, and several guest rooms, one being ADA accessible.
5
THE HOTEL WAZEE
6
7
HOTEL FLOORPLAN
8
9
LOBBY SELECTIONS & FLOORPLAN
LOBBY & RESTAURANT FF&E
10
11
LOBBY RENDERING 1
LOBBY RENDERING 2
12
Cottonwood Restaurant and Bar will incorporate the mid-century modern feel from the hotel lobby throughout the space. It will have low, warm lighting that will evoke a comfortable and relaxing atmosphere as if inviting guests to stay longer. A mix of multiple textures such as quartz, wooden beams and dropped wood ceilings, exposed brick walls, and brass will add to the feedling of warmth when combined with the rich textiles integrated throughout the space.
13
RESTAURANT & BAR CONCEPT & FLOORPLAN
SELECTIONS & BAR ELEVATION 14
15
RESTAURANT RENDERING
BAR RENDERING
16
17
SHOP FLOORPLAN & SPECS
SHOP VIEW
18
19
SUITE FLOORPLAN
SUITE MATERIALS
20
21
ADA SUITE FLOORPLAN
ADA ACCESSIBILITY
22
COMMERCIAL 23
24
Location: Houston, Texas Year: Junior year spring semester Type: Individual Length: 12 weeks Programs:
Project Responsibilities: schematics, researching the site, space planning, revit work, three dimensional modeling, finish selection, packaging. Project Description: To design an architecture firm that will be located in the Pennzoil Building of downtown Houston, Texas. The firm will take up two floors of the building, and the programming document required open office benching spaces for each team.
GREENFIELD & EAVES ARCHITECTURE FIRM 25
26
27
14TH FLOOR FLOORPLAN
14TH FLOOR RCP
28
29
LABELED 14TH FLOORPLAN
14TH FLOOR FURNITURE SPECS
30
31
LOBBY RENDERING
CONFERENCE RENDERING
32
33
15TH FLOOR FLOORPLAN
15TH FLOOR RCP
34
35
LABELED 15TH FLOORPLAN
15TH FLOOR FURNITURE SPECS
36
37
BENCHING RENDERING
QUIET ROOMS RENDERING
38
39
BREAK AREA RENDERING
COLLABORATION SPACE RENDERING
40
Location: Laurel, MS Year: Junior year fall semester Type: Individual Length: approx. 4 weeks 2
Programs:
LEVEL 2N 3/16" = 1'-0"
Project Responsibilites: space planning, construction documents Project Description: Re-Design an older building in Laurel, MS to contain an art gallery on the first floor, and airbnb spaces on the second floor.
---
UP
-
---
313 CENTRAL AVE, 41
LAUREL, MS RENOVATIONS
-
13' - 4 1/2"
A700
105
106
104
-
108A
SERVICE SINK
108
SERVICE SINK
SALVAGED 48"W DOOR W/GLASS
REF.
-
COFFEE
24' - 4"
106
1' - 2 7/8"
M/W
-
H20 ONLY -
STOCK RM/BREAK
21' - 9 1/2"
105
102
17' - 0 15/16"
-
WOMEN
CORR.
12-0 WIDE VIEW WINDOW
72' - 5 3/4"
MEN
5-0 WIDE 120 SF
36' - 6 5/16"
101
A700
-
109
22' - 2 15/16"
ELEV
P. SH'S
4
11' - 9 21/32"
5' - 11 1/4"
LOCKERS
11' - 6 1/4"
5' - 0"
103
110
16"
9' - 9 3/4"
7 A700
GALLERY
FRT DRY WASH
REAR STAIRS
20"X60" DISPLAYS
-
-
-
8' - 5 5/8"
-
8' - 6"
5
104
14' - 0 5/8"
14' - 0 5/8"
OFFICE
-
4' - 0"
4' - 10"
4' - 0"
102
215
3 A101
18' - 3"
WET BAR
6' - 2 7/16"
8' - 9 9/16"
12' - 3"
24"X72" DISPLAY
8' - 9 9/16"
212
12' - 4"
1' - 0 1/2"
BED
ELEV
8' - 1 3/8"
207
203C
12' - 9 15/16"
BED
202C
213
16"X72" DISPLAY
9 A700
203B
6' - 11 1/2"
203A
202B
UNIT 3
24' - 6 1/4"
211 6' - 4"
12' - 9 15/16"
202A
---
30' - 7
206 6' - 5"
5'
CLOSET
5
12
CLOSET
42
209
212
UNIT 3
213
12' - 3"
13' - 4 1/2"
8' - 5 5/8"
FRT DRY WASH
ENTRY
? Not Enclosed
LEVEL 1 AND 2 FLOORPLANS
103
-
-
SERVICE SINK
LOBBY
107 7' - 6 7/8"
1' - 2 7/8"
106
A700
STOCK RM/BREAK
21' - 9 1/2"
5' - 0"
H20 ONLY -
STUDIO
EXIST STAND PIPE
---
24' - 4"
7' - 9"
A700 3
-
COFFEE
M/W
-
REF.
-
72' - 5 3/4"
SALVAGED 48"W DOOR W/GLASS
101
-
108
102
17' - 0 15/16"
-
---
SERVICE SINK
105
CORR.
12-0 WIDE VIEW WINDOW
GALLERY
106
104
5-0 WIDE 120 SF
36' - 6 5/16"
UP
105 103
11' - 9 21/32"
-
108A
5
7 A700
A700
WOMEN
4
MEN
-
109
3 ENLARGED RESTROOM 1/4" = 1'-0" 22' - 2 15/16"
ELEV
108 8' - 5 5/8"
16" DP. SH'S
4
-
-
5' - 11 1/4"
LOCKERS
11' - 6 1/4"
20"X60" DISPLAYS
9' - 9 3/4"
110
8' - 9 9/16"
-
5
8' - 6"
REAR STAIRS
8' - 1 3/8"
104
14' - 0 5/8"
OFFICE
-
102
14' - 0 5/8"
WET BAR
4' - 0"
4' - 10"
4' - 0"
DEMOLITION DRAWINGS
6' - 2 7/16"
215
3 A101
---
:38:33 PM
ELEV
24"X72" DISPLAY
LEVEL 2N 3/16" = 1'-0"
18' - 3"
43
21' - 9 1/16"
1' - 0 1/2"
203C
BED
RENOVATIONS TO 313 CENTRAL AVE
203B
202C
12' - 4"
2
2' - 3 3/4"
211 6' - 4" 203A
204
5' - 0"
208
16"X72" DISPLAY
207
UNIT 2
8' - 9 9/16"
---
12' - 9 15/16"
BED
210 CLOSET
202B
9 A700
13' - 2 1/2" 2 A700
8' - 9 9/16"
206 6' - 5"
3' - 11" 6 5/8"
203D
6' - 11 1/2"
CLOSET
2' - 7 3/8"
W.C.
24' - 6 1/4"
5' - 5"
30' - 7 1/16"
---
202A
204A
19' - 5 3/4"
5' - 8 5/8"
1
12' - 2"
205 3' - 1"202D
12' - 3 1/2"
---
3' - 9 3/4"
203
DW
12' - 3 3/4"
W.C. 5' - 5 1/4"
203E
214
13' - 4 9/16"
-
-
203
18' - 0 15/16"
36' - 6 5/16"
FRT DRY WASH
UNIT 1
W.C.
DW
202E
12' - 9 15/16"
5' - 5 5/8"
204
FRT DRY WASH
8' - 4"
LRY
5' - 6 1/2"
DW
5' - 5 1/4"
8' - 6 1/4"
LRY
5' - 5 3/8"
202
201
-
201
8' - 1 5/16"
202
LOFT
-
5' - 0"
CORR DN
6' - 2 7/16"
SHEET TITLE: FLOOR PL
NEW EXIT DOOR
PROJECT NO: DATE: SCALE: DRAWN BY: CHECKED BY: REVISIONS:
SHEET NO.:
A1
3' - 6"
PARTITION
MIRROR 36" GRAB BAR
WATER CLOSET
2' - 6" 1' - 8 1/2" 2' - 0"
2' - 0"
4"
1/2" 2' - 0"1' - 7 1/8" 3' - 4 3/8"
13' - 2 1/2"
2
2' - 6" 6 3/4"
3' - 0" 3' - 6"
5' - 0 3/4"
UNIT 2 KITCHEN ELEVATION 1 1/4" = 1'-0"
1
SINK
48" GRAB BAR
2' - 3"
3' - 0"
RANGE/OVEN
9' - 0"
6' - 0"
3' - 0"
REF.
PAINTED GYP BOARD
PAINTED GYP BOARD
4"
DISHWASHER
10' - 8"
1' - 6 1/4"
2' - 10"
10' - 7 7/32"
1' - 6"
PAINTED GYP. BOARD
2' - 8"
SINK
MICRO.
STAIN GRADE ADJ. SHELVING UNITS TYP.
1' - 6"
PAINTED GYP. BOARD
UNIT 2 KITCHEN ELEVATION 2 1/4" = 1'-0"
4
3' - 4"
2' - 8 1/2" 1' - 0"
2' - 10"
2' - 0 1/2" 2' - 8 1/4" 2' - 0 1/4" 2' - 6"
3' - 2"
8 / A700 3"
3' - 0"
STAIN GRADE ADJ. SHELVING UNITS TYP.
2' - 8"
3' - 1 7/32"
0"
1' - 0"
7' - 7 3/4"
WOMEN RESTROOM ELEVATION 2 1/4" = 1'-0"
5
WOMEN RESTROOM ELEVATION 1 1/4" = 1'-0"
NATURAL BRICK WALL
BENCH
10' - 10 3/8"
12' - 0"
12' - 6"
12' - 2"
ARTWORK
5' - 6"
POINT OF SALE
3' - 0 1/2"
4' - 9"
13' - 8"
ART DISPLAY
1' - 5 1/4" 4' - 1 3/8"
6' - 9"
5' - 11"
6' - 1"
6' - 1"
6' - 5"
6' - 3"
5' - 11"
5' - 11"
FAUCET
WINE STORAGE
2' - 0"
14' - 0 3/8"
CHANDELIER
2 1/4" 1' - 3 3/4" 2 1/4"
8' - 11"
6' - 5 3/4"
NATURAL BRICK WALL
ORIGINAL WINDOW
1' - 0"
2' - 8" 1' - 6"
8' - 1 3/8"
1' - 6"
3' - 3"
1' - 6"
3' - 0"
17' - 10 1/4"
61' - 6 3/4"
3 GALLERY WALL ELEVATION 1/4" = 1'-0"
7 WET BAR ELEVATION 1/4" = 1'-0"
1' - 1" 1" 1"
3/4" PLYWOOD W/PLAM FINISH 1x4 BLOCKING
10" 3/4" PLYWOOD SHELVES W/PLAM FINISH 1/4" MELAMINE BACK
5' - 0" 14' - 7 3/8"
LOVESEAT COFFEE TABLE
SHEE INT ELE
1x4 BLOCKING 3/4" PLYWOOD W/PLAM FINISH U/C LIGHTING, SEE ELEC.
2 1/4"
DEMOLITION DRAWINGS 35 PM
9' - 7 3/8"
LOUNGE CHAIR
3/4" PLYWOOD DOOR W/PLAM FINISH
3' - 0"
6' - 10 5/32"
SYSTEM HOLES
7' - 5"
13' - 8"
3' - 1 15/16"
6 27/32"
11 17/32"
3' - 3 7/16"
1 1/2"
1/4" MELAMINE BACK
3/4"
1/8"
1' - 0 1/8"
3/4" PLYWOOD W/PLAM FINISH, TYP.
PROJE LOUNGE CHAIR
DATE
1' - 1"
SCALE
6 STAIR SECTION 1/4" = 1'-0"
8 UPPER CABINETS 1 1/2" = 1'-0"
9 LOFT CALLOUT 1/4" = 1'-0"
DRAW
ELEVATIONS
CHEC
REVIS
44
SHEE
Door Schedule
H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M. H.M.
DOOR LEGEND:
LIGHT LEGEND: 2"
AS SCHED.
2"
3"
3' - 0"
3"
1"
2' - 10"
1"
3"
2' - 8"
3"
3"
DOOR AS SCHED.
C
HOLLOW METAL FRAME
DOOR AS SCHED.
DOOR AS SCHED.
D
E
LIGHT LEGEND:
MOBILE MODERN CHANDELIER
WET BAR
BRICK
103
STUDIO
104
OFFICE
105
MEN
106
WOMEN
107
LOBBY
PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD
108 109
201
ELEV STOCK RM/BREAK REAR STAIRS LOFT
PAINTED GYP BOARD PAINTED GYP BOARD BRICK
202
CORR
BRICK
203
UNIT 1
204
LRY
205
W.C.
206
CLOSET
207
BED
PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD PAINTED GYP BOARD
UNIT 2
209
LRY
210
W.C.
211
CLOSET
212
BED
213
UNIT 3
214
W.C.
215
ELEV
STAINED CONCRETE
WD
STAINED HARDWOODS STAINED HARDWOODS STAINED HARDWOODS STAINED HARDWOODS TILE
WD
STAINED HARDWOODS STAINED HARDWOODS STAINED HARDWOODS STAINED HARDWOODS TILE
WD
STAINED HARDWOODS STAINED HARDWOODS STAINED HARDWOODS TILE
WD
WD WD WD WD WD WD WD
GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD
72-0X35-4
24-0X16-4 8-6X13-2
MOBILE MODERN CHANDELIER
X X 1
7-0X8-0
LEVEL 1N 1/8" = 1'-0"
RECESSED CAN LIGHT
MOBILE MODERN CHANDELIER
WD WD WD WD
WD WD WD WD
WD WD WD
GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD LEVEL 1N 1 GWB ON MTL 1/8" = 1'-0" STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD GWB ON MTL STUD
X 5-0 WIDE
5-0 WIDE X
SHEET TITLE: DOOR SCHEDULES AND ELEVATIONS
PROJECT NO:
X
X
X
DEMOLITION DRAWINGS
208
WD
LEVEL 1N 1 1/8" = 1'-0"
N DRAWINGS
17-9362
DATE:
JUNE 2017
SCALE:
3/8" = 1'-0"
DRAWN BY: CHECKED BY:
RECESSED CAN LIGHT
PENDANT LIGHT
SHEET TITLE: REFLEC CEILING
PROJECT NO DATE:
Author
SCALE:
Checker
DRAWN BY:
REVISIONS:
CHECKED BY REVISIONS:
SHEET NO.:
A301
SHEET NO.:
A1 2 LEVEL 2N 1/8" = 1'-0"
FINISH SCHEDULES, RCPS, AND CORRESPONDING LEGENDS TION DRAWINGS
PENDANT LIGHT
RENOVATIONS TO 313 CENTRAL AVE -
102
STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE STAINED CONCRETE
Comments
LAUREL, MISSISSIPPI
BRICK
Ceiling Finish
7' - 9 3/4"
BRICK
WET BAR
Base Finish
7' - 9 3/4"
GALLERY
102
Floor Finish
12/5/2018 8:38:34 PM
DEMOLITION DRAWINGS 12/5/2018 8:38:34 PM
Wall Finish
101
110
45
Name
PENDANT LIGHT
LIGHT LEGEND:
FINISH SCHEDULE Number
RECESSED CAN LIGHT
LAUREL, MISSISSIPPI RENOVATIONS TO 313 CENTRAL RENOVATIONS AVE TO 313 CENTRAL AVE
DOOR AS SCHED.
B
HOLLOW METAL FRAME
RENOVATIONS TO 313 CENTRAL AVE -
A
HOLLOW METAL FRAME
7' - 9 3/4"
DOOR AS SCHED.
3"
1"
HOLLOW METAL FRAME
6' - 8"
HOLLOW METAL FRAME
7' - 0"
4' - 0"
3"
3"
7' - 0"
4' - 0" 3' - 0" 3' - 0" 3' - 0" 3' - 0" 4' - 0" 5' - 0" 3' - 0" 3' - 0" 3' - 0" 2' - 10" 2' - 10" 2' - 10" 2' - 8" 2' - 10" 3' - 0" 2' - 10" 2' - 10" 2' - 10" 2' - 8" 2' - 10" 3' - 0" 2' - 8"
FRAME COMMENT MATERIAL S
2"
7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 6' - 8" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 7' - 0" 6' - 8" 7' - 0" 7' - 0" 6' - 8"
WIDTH
7' - 0"
A C C C C A B C C C D D D E D C D D D E D C E
HEIGHT
3"
102 103 104 105 106 108 108A 173 201 202 202A 202B 202C 202D 202E 203 203A 203B 203C 203D 203E 204 204A
DOOR TYPE
7' - 0"
DOOR NUMBER
SHEET TITLE: REFLECTED CEILING PLAN
PROJECT NO:
SHEET TITLE: REFLEC CEILING 17-9362
DATE:
JUNE 2017
SCALE:
As indicated DATE:
PROJECT NO
DRAWN BY:
Author SCALE:
CHECKED BY:
DRAWN BY: Checker
46
4' - 8"
Location: Collins, MS
A
Year: Junior year summer semester
12' - 6"
Type: Individual Length: 4 weeks
MAIN ACTIV
Programs:
100
A202
2
Project Responsibilities: Construction documents ---
Project Description: Recreate a set of construction documents for the Collins Senior Citizen Center.
6' - 4"
-
48' - 0"
11' - 6 5/8"
9' - 9"
100
12' - 6"
6' - 3"
102
ELEC./COMM.
102
SITTING
47
4' - 8"
COLLINS SENIOR CITIZEN CENTER
14' - 4"
101
A
STORAGE
103
QUILTING
12' - 11"
2' - 8" 3' - 4"
2' - 0"
C
111D
2' - 0"
111
2
2' - 8"
C
4' - 8"
VITY
CORRIDOR 22' - 7 1/4"
112
112
104
2' - 0"
113A
109
C
20' - 8"
9' - 10"
48' - 0"
2' - 6"
3' - 4"
5' - 0"
2' - 8"
4' - 9"
5' - 5"
111A
104 C
1' - 4"
MECH. JAN.
113
107
108
MEN'S
WOMEN'S
107
108
1' - 4"
C
C
12' - 11"
105
113D
1' - 4"
GAME ROOM
2' - 8"
CORRIDOR
3
3' - 4"
109
106
2' - 8"
106
2' - 8"
1' - 4"
STOR.
48
OVERALL SCORE:
COLLINS SENIOR CITIZEN CENTER
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
PROJECT INFORMATION:
AEC 234 SUMMER 2018 FINAL PROJECT
SHEET TITLE: TITLE SHEET
SCALE:
7/27/2018 10:33:26 PM
DRAWN BY:
49
COVER SHEET
W957136 Project Status SHEET NO.
T101
A201 1
OVERALL SCORE:
20' - 8" 3' - 11 7/8"
23' - 8"
22' - 8"
1
3' - 4"
4' - 8"
3' - 4"
4' - 4"
16' - 0"
A401
3' - 4"
3' - 4"
1' - 4"
1' - 0 1/8"
-
3' - 4"
110
4' - 8"
C
3' - 4"
2' - 0"
12' - 11"
A
QUILTING
1
2' - 8"
3' - 8"
KITCHEN
0' - 9"
B
10' - 1"
B
0' - 8"
110 B
5' - 4"
3' - 4"
5' - 4"
---
111D
C
2
2' - 8"
12' - 6"
2' - 0"
111
MAIN ACTIVITY 4' - 8"
100 111A
9' - 10"
CORRIDOR 22' - 7 1/4"
100
112
112
102
104
2' - 0"
113A
109
C
20' - 8"
2' - 6"
3' - 4"
5' - 0"
48' - 0"
4' - 9"
5' - 5"
9' - 9"
2' - 8"
6' - 4"
---
48' - 0"
11' - 6 5/8" -
C
1' - 4"
109
C
MEN'S
WOMEN'S
107
108
1' - 4"
103
3 A401
C
103B
B
B
4' - 8"
B
4' - 8"
B
D
1' - 0 1/8" PARTITION LEGEND
4' - 0"
3' - 4"
5' - 7 7/8"
6' - 4"
0' - 4"
20' - 8"
NON-RATED SOUND PARTITION 2X4 OR 2X6 STUDS @ 16" O.C. WITH (1) LAYER 5/8" GYP. BD. ON BOTH SIDES AND 3-1/2" OR 6" BATT. INSULATION - EXTEND TO BOTTOM OF TRUSS ABOVE.
0' - 9"
2' - 8"
3' - 8"
103A
20' - 8 1/2"
C
B
6' - 4"
2' - 0"
SHEET TITLE:
D
6' - 8"
2' - 0"
4
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
14' - 4"
108
STORAGE
A
3
1' - 4"
113
105 107
4' - 8"
113D
GAME ROOM
CORRIDOR
12' - 11"
106
3' - 4"
106
101
2' - 8"
SITTING
2' - 8"
12' - 6"
MECH. JAN.
PROJECT INFORMATION:
102
2' - 8"
104
ELEC./COMM.
6' - 3"
1' - 4"
STOR.
6' - 8"
2' - 8"
3' - 4"
3' - 4"
3' - 4"
23' - 8"
22' - 8"
22' - 1 1/2"
22' - 8"
3' - 4"
3' - 4"
3' - 4"
FLOOR PLAN
A SCALE: 1/4" = 1'-0"
NON-RATED STUD PARTITION
7/27/2018 10:33:20 PM
A202
2
2X4 STUDS @ 16" O.C. W ITH ONE (1) LAYER 5/8" GYP. BD. ON BOTH SIDES - TO BOTTOM OF TRUSS ABOVE. (2X6 STUDS W HERE INDICATED)
DRAWN BY: W957136 ---
Project Status SHEET NO.
1
Level 1 1/4" = 1'-0"
A101 FLOORPLAN
50
OVERALL SCORE: 69' - 0"
ASPHALT SHINGLES OVER #15 FELT
RIDGE
22' - 8"
5' - 4"
25' - 8"
5' - 4"
20' - 8"
[No Slope]
[No Slope]
ASPHALT SHINGLES OVER #15 FELT
5 1/4" / 1'-0"
5 1/4" / 1'-0"
50' - 0"
60' - 0"
4 7/8" / 1'-0" 4 7/8" / 1'-0"
4 7/8" / 1'-0"
50' - 0"
60' - 0"
4 7/8" / 1'-0"
ASPHALT SHINGLES OVER #15 FELT
RIDGE
OUTLINE OF BUILDING BELOW
5 1/4" / 1'-0"
5 1/4" / 1'-0"
4' - 8"
[No Slope]
4' - 8"
[No Slope]
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
OUTLINE OF BUILDING BELOW
PROJECT INFORMATION:
RIDGE
SHEET TITLE: ROOF PLAN
RIDGE
20' - 8"
25' - 8"
22' - 8"
SCALE: 1/4" = 1'-0"
51
7/27/2018 10:33:20 PM
DRAWN BY:
ROOF PLAN 1 ROOF PLAN 1/4" = 1'-0"
W957136 Project Status 69' - 0"
SHEET NO.
A102
OVERALL SCORE:
FIBERGLASS SHINGLES
A
B
C
FACE BRICK #1
ROOF PLAN 10' - 0"
11' - 2"
ROOF PLAN 10' - 0"
2 A501
FACE BRICK #2
Level 1 0' - 0"
Level 1 0' - 0" 1
North 1/4" = 1'-0" 1
TRANSVERSE SECTION EAST 1/4" = 1'-0"
FIBERGLASS SHINGLES
A
ROOF PLAN 10' - 0"
12' - 3"
FACE BRICK #2 FACE BRICK #1
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
B
PROJECT INFORMATION:
C
ROOF PLAN 10' - 0"
---
OVERALL SCORE:
Level 1 0' - 0"
SHEET TITLE:
Level 1 0' - 0"
EXTERIOR ELEVATIONS 3
7/27/2018 10:33:23 PM
South 1/4" = 1'-0"
FIBERGLASS SHINGLES
4
3
2
1
LONGITUDINAL SECTION NORTH 1/4" = 1'-0"
SCALE: 1/4" = 1'-0" DRAWN BY: W957136 Project Status
FACE BRICK #1
SHEET NO.
A201
ROOF PLAN 10' - 0"
10' - 11"
FACE BRICK #2
Level 1 0' - 0" East 1 1/4" = 1'-0"
STEM MOUNTED LETTERS
3
4
ROOF PLAN 10' - 0" FACE BRICK #1
FACE BRICK #2
FINISH GRADE
PROJECT INFORMATION:
2
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
FIBERGLASS SHINGLES
1
11' - 2 31/32"
2
FACE BRICK #1
SHEET TITLE: EXTERIOR ELEVATIONS
Level 1 0' - 0" 2
West 1/4" = 1'-0"
SCALE: 1/4" = 1'-0" DRAWN BY: W957136 Project Status
EXTERIOR ELEVATIONS
52
OVERALL SCORE:
FINISHES SCHEDULE NAME
NO.
FLOOR
BASE
WALLS
WAINSCO T
Door Schedule CLG.
CLG. HT.
REMARKS
Mark
Type
Width
Height
Frame Material
Frame Type
Fire Rating 6' - 4"
103
VCT
4" RUBBER
PAINTED
PAINTED GYP.
12' - 0"
STORAGE 103 STOR. 104
VCT
4" RUBBER
PAINTED
LAT.
8' - 0"
STOR. CORRIDO R CORRIDO R JAN.
104 105
JAN. MENS
106 107
103B
104 VCT
4" RUBBER
PAINT
LAT.
9' - 0"
CERAMIC TILE
CERAMIC
PAINT
LAT.
8' - 0"
CERAMIC TILE
CERAMIC
PAINT
LAT.
9' - 0"
CERAMIC TILE
CERAMIC
PAINT
LAT.
9' - 0"
105 106 106
MEN'S 107 WOMENS 108 WOMEN'S 108 MECH 109
SEALED CONCRETE
4" RUBBER
PAINTED
PAINTED GYP.
12' - 0"
MECH. 109 KITCHEN 110
VCT
4" RUBBER
PAINT
LAT.
9' - 0"
KITCHEN 110 QUILTING 111
VCT
4" RUBBER
PAINT
LAT.
9' - 0"
VCT
4" RUBBER
PAINT
LAT.
9' - 0"
VCT
4" RUBBER
PAINT
LAT.
9' - 0"
QUILTING CORRIDO R CORRIDO R GAME ROOM GAME ROOM
111 112
107
108
109
110
111A
112 113
111D
113 112
113
113A
113D
114
116
118
120
122
3' - 0"
6' - 8"
6' - 0"
7' - 0"
3' - 0"
6' - 8"
3' - 0"
6' - 8"
0' - 2" 0' - 2"
VIEW WINDOW W/ 1/4" TEMPERED GLASS IN WOOD FRAME
A
PRE-HUNG WOOD DOOR AND FRAME
6' - 8"
3' - 0"
6' - 8"
3' - 0"
6' - 8"
3' - 0"
7' - 0"
3' - 0"
6' - 8"
3' - 0"
7' - 2"
ALUMINUM 3' - 0" STORE FRONT ENTRANCE SYSTEM ALUMINUM 3' - 0" STORE FRONT ENTRANCE SYSTEM
7' - 2"
PRE-HUNG 3' - 0" WOOD DOOR AND FRAME ALUMINUM 3' - 0" STORE FRONT ENTRANCE SYSTEM
6' - 8"
B
PRE-HUNG WOOD DOOR AND FRAME
PRE-HUNG 3' - 0" WOOD DOOR AND FRAME ALUMINUM 3' - 0" STORE FRONT ENTRANCE SYSTEM
6' - 8"
6' - 0" HOLLOW METAL DOOR AND FRAME PRE-HUNG 3' - 0" WOOD DOOR AND FRAME 3' - 0" HOLLOW METAL DOOR AND FRAME
7' - 0"
7' - 2"
7' - 2"
7' - 2"
C
SHEET TITLE: SCHEDULES
6' - 8"
SCALE: DRAWN BY:
7' - 0"
W957136 Project Status SHEET NO.
A301
53
SCHEDULES AND DOOR DETAILS
0' - 2"
0' - 2"
6' - 0"
3' - 0"
0' - 2"
1/4" TEMPERED GLASS
1/4" TEMPERED GLASS
1 DOOR DETAILS 1/4" = 1'-0" 3' - 0"
3' - 0"
0' - 2"
3' - 0"
HOLLOW METAL DOOR AND FRAME
D
HOLLOW METAL DOOR AND FRAME
7' - 2"
103A
0' - 2"
7' - 4"
12' - 0"
3' - 4"
2' - 0"
7' - 2"
PAINTED GYP.
0' - 6"
0' - 4"
PAINT
6' - 8"
0' - 2"
3' - 4"
7' - 4"
4" RUBBER
102
3' - 0"
PRE-HUNG WOOD DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME HOLLOW METAL DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME HOLLOW METAL DOOR AND FRAME PRE-HUNG WOOD DOOR AND FRAME ALUMINUM STORE FRONT ENTRANCE SYSTEM
6' - 0"
0' - 2"
7' - 0"
VCT
102
3' - 0"
0' - 4"
10' - 8"
0' - 2"
6' - 8"
LAT.
0' - 2"
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
PAINT
7' - 2"
PROJECT INFORMATION:
4" RUBBER
ALUMINUM 3' - 0" STORE FRONT ENTRANCE SYSTEM
0' - 4"
VCT
100
7' - 4"
10' - 8"
7' - 0"
LAT.
0' - 4"
PAINT
2' - 6 1/4"
101 102
4" RUBBER
6' - 8"
SITTING ELEC./CO MM. ELEC./CO MM. STORAGE
VCT
7/27/2018 10:33:24 PM
MAIN 100 ACTIVITY MAIN 100 ACTIVITY SITTING 101
E
ALUMINUM STORE FRONT ENTRANCE SYSTEM
F
ALUMINUM STORE FRONT ENTRANCE SYSTEM
OVERALL SCORE
0' - 6"
ASPHALT SHINGLES ON #15 FELT
ASPHALT SHINGLES ON #15 FELT
WOOD TRUSS
0' - 6"
2X6 CONT.
0' - 8 7/8"
ASPHALT SHINGLE OVER #15 FELT
2X4 @ 24" O.C.
WOOD TRUSS GABLE END FRAMING
2X6 CONT.
2X6 @ 24" O.C.
GABLE END FRAMING
RAFTER VENT
0' - 6"
1' - 0"
WOOD TRUSS
2X4 @ 24" O.C.
2-2X6 TOP PLATE
2-LAYERS OF 6" BATT INSULATION
GABLE END FRAMING
10' - 8 3/32"
2 LAYERS 6" BATT INSULATION
2 LAYERS OF 6" BATT INSULATION
1X4 @ 30" O.C.
FACE BRICK #1
2-LAYERS OF 6" BATT INSULATION
3' - 9 3/4"
2X6 TOP PLATE 5/8" GYP BOARD
VAPOR BARRIER
1/2" SHEATHING
FACE BRICK #2
10' - 1 25/32"
6' - 11 5/16"
8' - 5 11/16"
ASPHALT SHINGLES OVER #15 FELT
5/8" GYP BOARD 1/2" OSB SHEATHING
5/8" GYP BOARD
3 A602
2-LAYERS OF 6" BATT INSULATION
0' - 6"
2X6 FRAMING @16" O.C. WITH BRIDGING AT 1/3" POINTS
0' - 4 1/4" 0' - 6"
0' - 6"
VAPOR BARRIER
FACE BRICK #1 FACE BRICK #1
1 A602
1/2" OSB SHEATHING
2' - 6 7/16"
FACE BRICK #2
6" BATT INSULATION
FACE BRICK #2
2-2X6 TOP PLATE
6" BATT INSULATION
4' - 11 1/4"
AIR SPACE
VAPOR BARRIER
2' - 7"
2X6 FRAMING
2 A602
12' - 0"
2' - 0"
12' - 0"
GLASS BLOCK INSERT
4' - 11 11/32"
12' - 0"
1/2" OSB SHEATHING
FACE BRICK #2
VAPOR BARRIER
6" BATT INSULATION
0' - 4 1/4" 0' - 6" 4' - 1"
ALUMINUM ENTRANCE SYSTEM
1
WALL SECTION 2 3/4" = 1'-0"
3
WALL SECTION 3 3/4" = 1'-0"
0' - 6"
WALL SECTION 1 3/4" = 1'-0"
2' - 3"
2
OVERALL SCORE:
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
FINISH FLOOR
FINISH FLOOR
PROJECT INFORMATION:
FINISH FLOOR
5/8" GYP. BOARD
12' - 0"
2' - 3"
TREATED 2X6
FACE BRICK #1
2' - 3"
ANCHOR BOLT TREATED 2X6 SILL PLATE
0' - 6"
TREATED 2X6 SILL PLATED
ANCHOR BOLTS
2' - 3"
5/8" GYP BOARD
0' - 6"
0' - 6"
0' - 6"
ANCHOR BOLTS
SHEET TITLE:
WALL SECTIONS
1/2" O.S.B.
4
FACE BRICK #1
0' - 3 5/8"
GLASS BLOCK WINDOW, SEE SCHEDULE
CULTURED MARBLE SILL
2-2X6'S AT SILL
6" BATT INSULATION
1
DETAIL 1 1 1/2" = 1'-0"
SCALE: 3/4" = 1'DRAWN BY: W957136
VAPOR BARRIER
GLASS BLOCK WINDOW AS SCHEDULED
Project Status
1/2" OSB SHEATHING
FACE BRICK #1
5/8" GYP. BOARD
SHEET NO
0' - 5 9/16" FACE BRICK #1
6" BATT INSULATION
MEMBRANE FLASHING
3-2X6'S WITH 1/2" PLYWOOD SPACERS
A50
TREATED WOOD BLOCKING
SEALANT
CULTURED MARBLE TRIM
WALL SECTION 4 3/4" = 1'-0"
0' - 3 5/8"
5/8" GYP. BOARD
0' - 0 1/2" 0' - 8 7/16"
7/27/2018 10:33:24 PM
0' - 6"
PAINTED STEEL LINTEL
WINDOW AS SCHEDULED
PAINTED STEEL LINTEL
VAPOR BARRIER
0' - 8 7/16"
FACE BRICK #1
0' - 5 1/2" 0' - 3 9/16"
1/2" OSB SHEATHING
0' - 3 5/8"
3
DETAIL 2 1 1/2" = 1'-0"
0' - 8 9/16"
0' - 0 1/2"
2
DETAIL 3 1 1/2" = 1'-0"
WALL SECTIONS AND DETAILS 54
OVERALL SCORE:
PAINTED GYP BOARD
PAINTED GYP BOARD
PAINTED GYP. BOARD TOILET PARTITION SEE SPECS
2' - 0"
TOILET PARTITION SEE SPECS
FM 24X36
3' - 0"
DOOR AND FRAME AS SCHEDULED
URINAL 36" GRAB BAR 48" GRAB BAR
BRADLEY CORP SINK
48" GRAB BAR
36" GRAB BAR
2' - 9"
BASE AS SCHEDULED
WATER CLOSET
WATER CLOSET
5
ELEVATION 1 1/2" = 1'-0"
3
ELEVATION 4 1/2" = 1'-0"
ELEVATION 8 1/2" = 1'-0"
2
PAINTED GYP. BOARD
PAINTED GYP. BOARD
PAINTED GYP. BOARD
2' - 0" FM 24X36
3' - 0"
DOOR AND FRAME AS SCHEDULED
BRADLEY CORP SINK
FM 24X36 FM 24X36 BRADLEY CORP SINK
2' - 9"
2' - 9"
BASE AS SCHEDULED
2' - 9"
BRADLEY CORP SINK
ELEVATION 5 1/2" = 1'-0"
6
1' - 2"
3' - 2"
2' - 0"
2' - 6"
2' - 6"
3' - 0"
ELEVATION 6 1/2" = 1'-0"
8
BASE AS SCHEDULED
ELEVATION 2 1/2" = 1'-0"
PROJECT INFORMATION:
4
3' - 2"
MICRO.
PLASTIC LAMINATE COUNTERTOP, EDGE, AND SPLASHBACK
REF.
SHEET TITLE:
16" DIAMETER HOLE W PLAM EDGE BAND
INTERIOR ELEVATIONS
PLASTIC LAMINATE COUNTERTOP, EDGE, AND SPLASHBACK
STAIN GRADE ADJ. SHELVING UNITS, TYP.
SINK
3' - 0"
1' - 5" 3' - 0"
7' - 3"
2' - 10"
STAIN GRADE ADJ. SHELVING UNITS, TYP.
AEC234 FINAL PROJECT 118 COLLEGE DRIVE HATTIESBURG MS 39402 JULY 27, 2018
BASE AS SCHEDULED
SCALE: 1/2" = 1'-0"
7/27/2018 10:33:26 PM
DRAWN BY:
55
W957136 BASE, AS SCHEDULED
DISHWASHER
OPEN SPACE FOR TRASH
RANGE/OVEN
BASE AS SCHEDULED
3' - 0"
1' - 6"
2' - 10"
1' - 0"
Project Status SHEET NO.
ELEVATION 9 1 1/2" = 1'-0"
INTERIOR ELEVATIONS
ELEVATION 10 7 1/2" = 1'-0"
A701
56
57
RESIDENTIAL
58
Location: Hattiesburg, MS Year: Senior year fall semester Type: Groupwork in teams of 2, assigned exterior porch area and sitting area by the pool Length: 4 weeks Programs: Project Responsibilities: Preliminary sketches and layouts, selecting furniture, creating cost spreadsheet Project Description: Network with vendors in the area to furnish and stage the outdoor space for the University of Southern Mississippi’s Interior Design Show House.
59
SENIOR SHOW HOUSE
60
61
62
63
64
w
Location: Hattiesburg, MS Year: Sophomore year spring semester Type: Individual Length: 4 weeks
, MS Programs:
Project Responsibilities: Research, schematics, revit modeling, rendering, presentation board Project Description: Remodel a outdated kitchen in order to create a more modern space for a young couple living in the home.
eate an updated modern kitchen.
FOREST VIEW KITCHEN REMODEL
65 will evoke a sense of calmness and
M
Main Perspective
66
67
KITCHEN FLOORPLAN
15 1/2" CL
15 1/2" CL
CL 54 1/2" CL
3D
D
CL
CL
54 1/2"
69"
75 1/2"
15 1/2"
120"
15 1/2"
CL
LIGHTING LEGEND
CL
THREE WAY SWITCH WITH DIMMER
SINGLE POLE SWITCH DIMMER
GFI
D
CL
CL
CL
WALL WASHER
GFI
GFI
80"
66"
66"
M
CL 22"
22"
MICROWAVE OUTLET
O
OVEN OUTLET
R
RANGE OUTLET
GFI
O
CL
M
S
GFCI OUTLET
Drawn By: Paige Cunningham
3D
R
68 1/2"
68 1/2"
GFI
SINGLE POLE SWITCH
Project Number: 2
CL
CL
THREE LIGHT TRACK SPOT LIGHT
Checked By: Checker
D
GFI
3D
UNDERCOUNTER MOUNTED ON METAL BAR
A102
RECESSED CAN LIGHT (ADD BRAND, ETC)
LIGHTING PLAN
28 1/2"
Date: April 23, 2016
DECORATIVE LIGHT
CL
77"
SHEET NO.
CL
3D
45 1/2"
REFLECTED CEILING PLAN
68
Main Perspective
69
KITCHEN RENDERING 1
KITCHEN RENDERING 2
70
71
RENDERED KITCHEN FLOORPLAN
WestWest Elevation Elevation
EastEast Elevation Elevation
West Elevation
East Elevation
North North Elevation Elevation
North Elevation
RENDERED KITCHEN ELEVATIONS
72
73
OTHER WORKS
74
the kiosk warmth and additional style. The structure of the kiosk brings a sense of innovativeness to
sign asLocation: it is a small shipping MS container that has been modeled to fold open on the side creating a small Hattiesburg, area which allows customers to sit and snack. The kiosk will have one to two employees working for Year: Junior year fall semester
hift, and will serve pre-made hummus in the same flavors carried at the restaurant. It will also carry Type: Individual
ged ready-to-eat salads as well as several different selections of gyros, a variety of sauces, and a selection Length: 3 weeks
tled teas.
Programs: The kiosk meets several WELL standards, the first of which being the hand washing supplies. A hand
ng station, complete with fragrance free liquid soap in a sealed soap cartridge, is provided in addition
osableProject paper Responsibilities: towels for the employees dry theirpresentation hands. Theposter basin of the provided sink is at least 9 shematics,tomodeling, widthProject by length to meet Use the appropriate sink dimension requirements. items satisfy the handDescription: sketchup to create a kiosk for a local businessThese in Hattiesburg.
ng WELL building standard. The next WELL standard met is glare avoidance in the kiosk. To meet the standard for a low-glare
ation, none of the lighting fixtures in the building are aimed directly at the point-of-sale computer which will prevent the employees from having trouble seeing. The kiosk also meets the WELL standard for pest reduction as all refrigerated food is stored in closed
aled containers in the cooler. The garbage can, which will be less than 30 gallons and located in a
t under the point-of-sale, will have a lid. It will also be accessible via a handle on the outside of the
GLORY BOUND KIOSK t, preventing the employees from having to touch the garbage can itself. 75
76
KIOSK DESIGN Project Statement and Info Glory Bound is a restaurant located in Hattiesburg, MS, with other locations in Ocean Springs, MS and Tuscaloosa, AL. The menu is mainly Greek food such as gyros, hummus, pita bread, and many different varieties of salads including the Greek salad. The atmosphere of the location in Hattiesburg has an industrial feel, yet clean as the bar area contains glossy white subway tiles lining the back wall. The Glory Bound kiosk will retain the main restaurant location’s sense of modernism with the simple finishes and sleek, open metal design. It will also incorporate similar industrial aspects of the restaurant via the lighting choices, which mimic the restaurant’s fixtures, the natural wood at the point-of-sale area, and the rusty red color of the structure. The wooden columns also add an industrial feel as well, in addition to giving the kiosk warmth and additional style. The structure of the kiosk brings a sense of innovativeness to the design as it is a small shipping container that has been modeled to fold open on the side creating a small dining area which allows customers to sit and snack. The kiosk will have one to two employees working for each shift, and will serve pre-made hummus in the same flavors carried at the restaurant. It will also carry packaged ready-to-eat salads as well as several different selections of gyros, a variety of sauces, and a selection of bottled teas. The kiosk meets several WELL standards, the first of which being the hand washing supplies. A hand washing station, complete with fragrance free liquid soap in a sealed soap cartridge, is provided in addition to disposable paper towels for the employees to dry their hands. The basin of the provided sink is at least 9 inches width by length to meet the appropriate sink dimension requirements. These items satisfy the handwashing WELL building standard. The next WELL standard met is glare avoidance in the kiosk. To meet the standard for a low-glare workstation, none of the lighting fixtures in the building are aimed directly at the point-of-sale computer station which will prevent the employees from having trouble seeing. The kiosk also meets the WELL standard for pest reduction as all refrigerated food is stored in closed and sealed containers in the cooler. The garbage can, which will be less than 30 gallons and located in a cabinet under the point-of-sale, will have a lid. It will also be accessible via a handle on the outside of the cabinet, preventing the employees from having to touch the garbage can itself. Kiosk Deign Goals: Modern, Innovative, Industrial
Rendered Perspective View
PROJECT STATEMENT AND RENDERED VIEW 77
Views of Kiosk Views of Kiosk
A A
Front View Scale 1/4” = 1’
B
Left View Scale 1/4” = 1’
C Front View Scale 1/4” = 1’
Left View Scale 1/4” = 1’
C
B
C
Floorplan View Scale 1/4”C= 1’
B
C
A B
Floorplan View Scale 1/4” = 1’
A A A A B B
Right View Scale 1/4” = 1’
C Right View Scale 1/4” = 1’
C - Bristow Barstool in Antique Metal
Back View Scale 1/4” = 1’ C
Back View Scale 1/4” = 1’
B - Square Sta
C - Bristow Barstool in Antique Metal
VIEWS OF KIOSK 78
Location: Fictitious location Year: Junior year fall semester Type: Individual Length: 4 weeks Programs: Project Responsibilities: Brainstorming drawings, photoshop wedding scenes Project Description: Create a wedding designed around the Greek culture while incorporating their history and traditions.
79
GREEK CULTURAL WEDDING
80
A Gree Cultur Weddin
Concept Statement The wedding will incorporate the Greek culture by h will feature modern elements. Blue will be used througho and airy design elements. Delicate flowers and greenery spersed olive branches and various herbs.
81
CEREMONY AND CAKE RENDERING
Research The Greek’s cultural weddings of today still follow m that were implemented many years ago. The Greek bride that is loose and has a draped appearance (“Greek Wedd brides often wore red or yellow veils, but nowadays the bri Traditions”). The Greeks believe they need to ward off evi the color that they use to keep it away (“Greek Wedding Tr The traditional Greek wedding is separated into tw is called the “betrothal” (“Our Wedding Ceremony”). Du changes their rings with each other. During the second “crowning”, the bride and groom each receive their crown ribbon. The crowns are a very important part of the Greek mony”). The guests are also allowed to pray for them durin choose to, and the couple walks around a center table which and the Holy Gospel. Each time they circle around the tabl reason for repeating the walk three times is that it symboli new (“Our Wedding Ceremony”) After they finish walking around the table, their crow removed from their heads (“Greek Wedding Traditions”, 2
A Greek Cultural Wedding Concept Statement The wedding will incorporate the Greek culture by having a traditional ceremony yet will feature modern elements. Blue will be used throughout the space, in addition to light and airy design elements. Delicate flowers and greenery will also be included, with interspersed olive branches and various herbs. Research The Greek’s cultural weddings of today still follow many of the traditional elements that were implemented many years ago. The Greek bride typically wears a wedding dress that is loose and has a draped appearance (“Greek Wedding Traditions”). Ancient Greek brides often wore red or yellow veils, but nowadays the bride wears white (“Greek Wedding Traditions”). The Greeks believe they need to ward off evil during the wedding, and blue is the color that they use to keep it away (“Greek Wedding Traditions”, 2014) The traditional Greek wedding is separated into two separate ceremonies, the first is called the “betrothal” (“Our Wedding Ceremony”). During the betrothal the couple exchanges their rings with each other. During the second part of the ceremony, titled the “crowning”, the bride and groom each receive their crown which are tied together with a ribbon. The crowns are a very important part of the Greek wedding (“Our Wedding Ceremony”). The guests are also allowed to pray for them during this part of the ceremony if they choose to, and the couple walks around a center table which holds two white candles, a cross, and the Holy Gospel. Each time they circle around the table the couple kisses the cross. The reason for repeating the walk three times is that it symbolizes the old becoming something new (“Our Wedding Ceremony”) After they finish walking around the table, their crowns are blessed and then they are removed from their heads (“Greek Wedding Traditions”, 2014). During the ceremony, the bride and groom do not exchange any vows with each other (“Greek Wedding Traditions”, 2014). After the ceremony, the Greeks like to celebrate by smashing plates and dancing (“Greek Wedding Traditions”, 2014). They also believe that odd numbers are lucky, and therefore give out almonds in groups of five as favors after the wedding (“Greek Wedding Traditions”, 2014). Rice is also thrown at the couple as they are leaving after the wedding.
1. 2. 3.
Design goals: To design an event space that meets the needs of the Greek cultural wedding ceremonies. To design an event space that reflects the historical traditions of the Greek culture. To design an event that incorporates the traditional Greek colors, for example blue which they believe “wards off evil”.
CONCEPT, GOALS, AND RECEPTION RENDERING
82
Location: Not applicable Year: junior year fall semester Type: individual Length: 4 weeks Materials: colored pencil, prismacolor marker Awards: 2019 ASID Gold
83
HAND RENDERING
84
Thank you, Paige Billings