Skip to main content

2016 nr 1 Sjøfartstidene

Page 1

SJ FARTSTIDENE MAGAZINE | ØSTENSJØ REDERI | NR. 1 – 2016

CHANGE OF WATCH IN THE MIDST OF THE STORM KENNETH WALLAND TAKES OVER THE HELM OF ØSTENJØ REDERI IN THE MIDDLE OF THE WORST CRISIS FOR THE OFFSHORE FLEET

GAS IN THE TANK HEADING NORTHWARDS ØSTENSJØ REDERI IS GOING TO USE GAS-POWERED TUGS FOR THE FIRST TIME WITH COURSE SET FOR MELKØYA


EDITORIAL Dear reader, In March this year, I was given the opportunity of­ taking over the helm of Østensjø Rederi from Johan Rokstad. I’ve been lucky enough to have worked with him for 23 years, and have been part of an incredibly exciting development at the ­shipping company during this time. J­ ohan will still hold an extremely important position in the ­company, now as leader of his baby, Edda ­Accommodation. I think that this is an ­appropriate ­opportunity to thank him for his fantastic efforts for a period of almost 40 years, and would like to praise his role as a leader and mentor. He handed over the Ø ­ stensjø Rederi company in particularly good condition, something all of us are proud of, and will be one of our strengths in today’s market situation. I also want to express my gratitude towards Johannes Østensjø and the board for the ­confidence they show me in this appointment. As readers know, our business is currently experiencing a market situation that we have ­ not been in the vicinity of since the 1980s. Considerably larger values are i­ ­ nvolved compared to then, and which are now at ­ stake for s­everal shipping companies. This situation a ­ ­ffects Ø ­ stensjø Rederi as it does very many other shipping companies, and we have had to implement ­ measures which have major ­ ­ consequences for many. We have had to w ­ ithdraw vessels from the market, as loss­ es are lower than with continued operation. ­Unfortunately, we’ve had to resort to laying-off and making skilled staff redundant, both offshore and onshore, thus letting go of skills which we have used ­considerable resources on building up. The owners have had to accept lower day rates, often resulting in several vessels ­operating at a loss. In turn, this ­contributes to weakening our ­solidarity and ability for further development and new v­ entures. Stricter cost control and more challenging budgets have been introduced, both at sea ­ and on land. Many have done a very good job and we clearly see that this is helping. A ­ usterity measures were act of necessity after several good years. We think that the potential for further savings are there and have signalled this in this year’s ­planning. But finding the right balance to secure good and steady operation is i­mportant. 2

ØSTENSJØ REDERI

­ aining control of the costs is one of our most G ­important tasks ahead so that we can also be ­competitive with e ­ xpected vessel rates after the ­market has picked up again. Forgetting the positive sides in the current ­situation is often easy, so allow me to mention some. Most of our fleet has been in operation until October, and has achieved earnings ­higher than if they were laid up. In the course of the next six months, we shall be taking delivery of three new escort tugs, two new mooring vessels, and take over the Statoil contract at Melkøya. In the autumn, we shall be taking ­ delivery of a new build for Dong Energy, which will operate out of ­Grimsby, as well as a sister ship in the ­autumn of 2019. We will also be embarking upon a new eight-year contract with an extension option at Statoil’s Sture terminal. Here we have tak­ en d ­ elivery of two new mooring vessels in the ­autumn, as well as ensuring assignments for the three current Tugs at Sture. This means that we will be operating vessels within four fleet segments, thus spreading ­ our Tug, ­ offshore service, offshore wind and accommodation a ­ ­ctivities. We also have the advantage of having a much lower debt ratio ­ than our competitors, as well as not having any bonds. My belief is that we have the best vessels and people obtainable, and I can assure all of you that the shipping company is still looking for new possibilities. That is why we shall endure this situation with determination and collaboration, and look ­ ­forward once again to the day where all of our vessels are back in operation, operated by ­highly-qualified crew. Finally, I would like to mention that one goal-­ ­ oriented effort within our safety work on board and ashore has now resulted in a positive trend for our statistics. It is very important that we do not rest on the good results, but maintain focus and act with good attitude, so that this may continue and that accidents are avoided. I now wish both you and your families a happy and peaceful christmas and a happy new year.

Kenneth Walland

Kjære leser, I mars i år fikk jeg gleden av å overta sjefs­ stolen i Østensjø Rederi (ØR) etter Johan Rokstad. Jeg har vært så heldig å få jobbe sammen med han i 23 år og har i denne perioden fått være delaktig i en utrolig ­ spennende utvikling i rederiet. Johan vil ­ fortsatt bekle en svært viktig posisjon i ­ rederiet, nå som leder av sin ”baby”, Edda Accommodation. Jeg synes likevel dette er et passende sted å takke ham for en ­fantastisk innsats i nærmere 40 år, og jeg vil berømme hans rolle som leder og lære­ mester for mange av oss. Han overleverte ­Østensjø-skuta i særdeles god stand, noe vi alle er svært stolte av, og som blir en av våre styrker i dagens markedssituasjon. Jeg ønsker også å uttrykke min takk­ nemlighet overfor Johannes Østensjø og styret for tillitten de viser meg i utnevnelsen. Som leserne vet, opplever vår næring nå et marked som vi ikke har vært i nærheten av siden 1980-tallet. Sammenlignet med den gang er det i dag betydelig større verdier som er involvert og som nå står for fall i flere rederier. Denne situasjonen preger ­Østensjø, som svært mange andre rederier, og vi har vært nødt til å iverksette tiltak som har store konsekvenser for mange. Vi har måttet ta fartøy ut av markedet, da det gir mindre tap enn videre drift. Dessverre har vi måttet gå til permitteringer og oppsigelser av dyktige ansatte, både på sjø og land, og dermed gi slipp på en kompetanse som vi har brukt store ressurser på å bygge opp. Eierne våre har måttet akseptere lavere dagrater, ofte med den følge at fartøyer går med tap. Dette igjen bidrar til å svekker vår soliditet og evne til videreutvikling og nysatsing. Strengere kostnadskontroll og mer utfor­ drende budsjetter er innført, både på sjø og land. Mange har gjort en veldig god jobb og vi ser klart at dette nytter. Sparetiltakene var en dyd av nødvendighet etter endel gode år. Vi mener at vi har potensiale for ytterligere besparelser og har signalisert dette i årets planlegging. Men det er viktig å finne den rette balansen for å sikre en god og sikker drift.


CONTENT Å få kontroll på kostnadene er en av våre viktigste oppgaver fremover, slik at vi kan bli konkurransedyktige med de fartøyrater vi kan forvente også etter at markedet tar seg opp igjen. I dagens situasjonen er det ofte lett å glemme de positive sidene, så la meg få lov å nevne noen. Vi har frem til oktober stort sett hatt hele flåten i arbeid og o ­ ppnådd ­inntjening som har vært bedre enn opplag. I løpet av det neste halvåret skal vi ta levering av tre nye eskortetaubåter og to fortøyningsbåter og overta Statoil-kontrakten på Melkøya. Til høsten skal vi ta levering av et nybygg til Dong Energy, som skal operere ut fra Grimsby, samt et søsterskip høsten 2019. Videre starter vi på en ny åtte-års kontrakt med mulighet for forlengelse ved Statoils terminal på Sture. Her har vi fått levert to nye fortøyningsbåter i høst, i tillegg til at det sikrer beskjeftigelse for dagens tre taubåter ved Sture. Dette gjør at vi fremover vil operere fartøy innen fire flåtesegmenter og dermed spre vår aktivitet på taubåt, offshore-service, offshore-vind og accommodation. Vi har og fordelen av langt lavere gjeldsgrad enn våre konkurrenter, samt at vi ikke har obligas­ jonsgjeld. Min påstand at vi har de beste fartøyene og folkene som er å oppdrive og jeg kan forsikre alle om at rederiet fortsatt er på leit etter nye muligheter.

Editorial 2 Gas in the tank heading northwards

4

A potential Norwegian Tug record on Sture

7

Towage in one of Europe’s busiest ports

9

Edda Freya has taken and passed many exams

14

A futuristic galley

18

From Lofoten to new adventures

20

In hope of sailing the way the wind blows

24

Pioneering Edda Fjord: A guinea pig amongst the turbines

28

Change of watch in the midst of the storm

30

Vessels in operations

34

“We must adapt”

36

Spot the Hazard

38

Offshore Renewable Award to Østensjø Rederi

39

British state medal to “our man” in Southampton

40

Photo Contest

42

On the social side

44

Ships & Crew

46

Med pågangsmot og samarbeid skal vi der­ for stå av denne situasjonen og se frem til dagen da vi igjen har alle fartøyer tilbake i drift og operert av høyt kvalifiserte beset­ ninger. Til slutt har jeg lyst å nevne at en målrettet innsats innen vårt sikkerhetsarbeid om bord og i land nå resulterer i en positiv trend på våre statistikker. Det er veldig viktig at vi ikke hviler på de gode resultatene, men holder fokus og viser gode holdninger, slik at dette fortsetter og ulykker unngås. Med dette ønsker jeg deg og din familie en god og fredelig jul og et riktig godt nyttår.

Kenneth Wallan d

Editor: Journalist: Editorial staff: Translator: Front cover photo: Design: Print:

Liv Johanne Snare Thomas Førde Tore Vidar Jensen, Hilde Svendsen and Sveinung Zahl Michael Sandelson Haakon Nordvik Carbon14 Nils Sund Boktrykkeri SJØFARTSTIDENE

|

NR. 1 – 2016

3


BY THOMAS FØRDE

GAS IN THE TANK HEADING NORTHWARDS

Østensjø Rederi is going to use gas-powered Tugs for the first time. Three modern and powerful Tugs with spherical LNG tanks are u ­ nder ­construction in Spain, and are due to set course for Melkøya outside ­Hammerfest in the first half of 2017. Photo: Harald Pettersen/Statoil

The approach to the Melkøya gas facility and the town of Hammerfest at the edge of the B ­ arents Sea are new waters for Ø ­ stensjø Rederi’s Tugs. In 2014, Statoil put Tug ­operation to secure incoming and outgoing gas tankers at the Melkøya production facility out to tender. Østensjø Rederi won the bid, meaning the shipping company has the contract to o ­ perate three gas-powered Tugs for the next 10 years, with the option of a further five-year e ­ xtension. Work on building the three new Tugs to be used at Melkøya started after Østensjø Rederi was awarded the contract. Spanish yard ­Gondan, of which the shipping company has been an important customer for over ten years, was chosen to construct the three ships. The Tugs are developed in partnership with Canadian designer Robert Allan. Sveinung Zahl Photo: Øyvind Sætre

4

ØSTENSJØ REDERI

Østensjø Rederi has been collaborating with him for over 15 years. Wärtsilä supplies the

machinery, which can use both LNG (Liquefied Natural Gas) and diesel as fuel. Three large and powerful Tugs are now b ­ eing constructed in Spain. The 48-metre-long ­vessels can tow 100 tons unassisted, and will get steering forces equivalent to 160 tons. Sveinung Zahl has headed the shipping ­company’s Tug department for the last year. He says that construction in Spain has gone well, but we expect a slight delay. “We’ll tackle this by putting one of our existing Tug as a forerunner

Will Tug operations at Melkøya be d ­ ifferent to those that the company has carried out previously?

“Gas engines are certainly new for us. Their response time is slightly slower, but they have high performance and create a lot less soot and dirt on board. The crew who will be


FACTS ABOUT MELKØYA Type of facility: A gas processing plant that receives natural gas via a 143 km-long pipeline from the Snøhvit and Albatross fields in the Barents Sea. Separates gas for the production of condensate and propane as well as dry gas, which is mainly ­methane. The dry gas is cooled to minus 163 degrees and liquefied ready for export as LNG, via tankship. Owners: Statoil 36.79%, Petoro 30%, Total 18.4%, Engie 12%, and RWE-DEA 2.81% Ship traffic Approximately 70 shipments a year via five different LNG tankers, each ­measuring 290 metres in length with a load capacity of about 140,000 cubic metres. Some smaller product tankers which load condensate and a few LPG tankers that pick up liquefied gases such as propane and butane also arrive there.

­ perating the Tugs will have to be trained in gas o engines. He also remarks that the large LNG ­tankers which serve Melkøya also behave ­ slightly ­differently to most of the ships that the ­shipping company has towed and assisted at quays in other harbours. The density of the Liquified natural gas (LNG) loads’, which the tankes pick up is relatively low. This is why tankers lie quite high in the water, thus serving as a large wind­ breaker. Three Tugs have to be ­available each time a tanker enters or leaves the ­harbour. The large LNG tankers, which can load 140,000 cubic metres of LNG, will generally call at Melkøya once a week. Some slightly small­ er tankers will also arrive to load ­condensate (light oil) and LPG (mostly liquefied petroleum gases such as butane and propane). The large LNG tankers will generally arrive at Melkøya once a week Photo: Harald Pettersen/Statoil

SJØFARTSTIDENE

|

NR. 1 – 2016

5


FACTS ABOUT THE THREE MELKØYA TUGS Names: Dux, Pax, and Audax Measurements: 40.2 metres long, a 15-metre beam, and six metres deep. Propulsion system: Wartsila Dual Fuel 2x3000kW Construction yard: Astilleros Gondan Crew: Six crew allotted to two shifts will be ­assigned to each boat. Mooring vessels: The two new ones that are to be sent to Melkøya will be constructed at the Poltramp Yard in Szczecin in Poland. Measurements: 12 metres long, a 4.8-metre beam, and 2.2 metres deep.

MED GASS PÅ TANKEN OG KURS MOT NORD For første gang skal Østensjø Rederi ta i bruk gassdrevne taubåter. Tre råsterke moderne taubåter med kuletanker for drivstoffet LNG, er nå ­under bygging i Spania og skal i løpet av første halvår 2017 sette kursen mot Melkøya ved Hammerfest. ­ Innseilingen til gassanlegget på Melkøya og til byen Hammerfest i kanten av ­Barentshavet, er et nytt farvann for rederiets taubåter. I 2014 lyste Statoil ut konkurranse om drift av taubåtene som skal sikre trygg inn- utseiling for gasstankskip ved produksjonsanlegget på Melkøya. Østensjø Rederi vant konkurransen om å operere tre gassdrevne taubåter i 10 år framover, med mulighet for at kontrakten kan bli forlenget med ytterligere fem år.

ligger ganske høyt i vannet og utgjør dermed et stort vindfang. Tre taubåter må være tilgjengelig hver gang et LNG-tankskip kommer eller forlater h ­ avna. De store tankskipene, som kan laste 140 000 kubikkmeter LNG (nedkjølt flytende naturgass), vil komme en gang i uka til Melkøya. I tillegg kommer det noen litt mindre tankskip for å laste kondensat (lettolje) og LPG (hovedsakelig flytende gasser som butan og propan).

Tre store og kraftige taubåter bygges nå i Spania. De blir 48 meter lange, kan ved hjelp av egen maskinkraft trekke 100 tonn og vil få styrekrefter tilsvarende 160 tonn. Gassmotorer monteres inn i de nye taubåtene og representerer noe nytt for rederiet. — Slike motorer reagerer litt tregere, men har stor yteevne og skaper mye mindre sot og skitt om bord. Mannskapet som skal drive de nye taubåtene må på gassmaskinkurs, sier Sveinung Zahl, som leder rederiets taubåtavdeling. Han sier videre at de store LNG-tankskipene, som taubåtene skal a ­ ssistere ved Melkøya,

Three large and powerful Tugs are under construction at the Spanish yard Gondan. This photo was taken early in September this year. Photo: Østensjø Rederi

The 3rd Melkøya tug,C467, successfully launched December 13th at Astilleros Gondan. Photo: Astilleros Gondan

6

ØSTENSJØ REDERI


BY THOMAS FØRDE

A POTENTIAL NORWEGIAN TUG RECORD ON STURE Østensjø Rederi could set a record in 2031 if given the opportunity. Completing the newest Statoil Tug contract for the oil terminal at Sture in Øygarden would see 42 ­consecutive years’ Tug operations in the same ­harbour using the same company.

Østensjø Rederi has manned the Tugs at Sture oil terminal since it was put into operation in 1988. Two years ago, the company won the bid for being in charge of Tug operations for a further eight years, with the option of extending the contract by a further seven until 2031. This means that their three Tugs, Ajax, Velox, and Tenax, will c ­ ontinue to assist oil tankers when they travel to and from the oil terminal, ­further assuring 28 seamen’s jobs on board. Moreover, both Rex and Fox mooring vessels at Sture are to be replaced with two brand new ones, which will also carry their ­ ­predecessors’ names. The new mooring vessels are built at Szczecin in Poland. “We’re so pleased about this,” says Tug Captain Svein Algrøy on board the Velox.” He is veteran in this game, having worked at Sture since 1997. The seaman, who used to sail for Bergen-based company Sea Trans, lives just three quarters of an hour’s drive from Sture. “Many think that those of us who work on the Tugs live at home and only work during the day. But we’re on emergency preparedness watch and live on board the Tug for three weeks at a time before an ­extended period of time off,” he says.

Photo: Velox

SJØFARTSTIDENE

|

NR. 1 – 2016

7


A crew of five is on board Velox and Tenax at any one time: the Captain, the Chief Engineer, and three AB´s. Four personnel are normally on board Ajax.

the Tug that met the crude oil tanker ­farthest out at sea are ­ usually detached, with the ­vessel helping push the tanker from the side in ­towards the quay.

“The three AB´s must know how to cook. If they don’t, they certainly can after they start working on board,” says Algrøy jokingly. He adds that popular dishes on the dinner ­table are cod, which they fish themselves, and fresh­ ly-caught crab. “We get local fringe ­benefits, with top-quality, self-made dishes,” says ­Captain Algrøy.“

“I’ve been on the job for almost 20 years, and we’ve never had a serious accident in time,” says Svein Algrøy, who adds that it can often be hairy during the winter in fresh weather.

But the AB’s on board have other tasks in ­addition to their galley and mess duties. Two of the Tug crew man one of the mooring v­ essels when the tankers are to berth at the quayside. This is a smaller vessel which is barely 12 ­metres long and which pulls up alongside the tanker. Here, they can pick up the mooring line which they bring in towards the quay, where the assisting crew takes over and winches the line inwards to the quay, attaching it securely to the right bollard. One of the Tugs goes out to meet the t­anker at the Fedje Vessel Traffic Service C ­ entre, gets towlines on board, and follows the ship in to­ wards the harbour. The two ­other ­Tugs then meet the vessels and get t­owlines on board at each end of the tanker. Then the ­towlines from

Svein Algrøy is Captain on board Velox and one of the veterans in this game having worked from Sture since 1997. Photo: Velox

“The maximum recommended wind speed to be able to get a larger tanker berthed is 14 ­metres per second. But this is also ­slightly dependent on the wind direction, says Tug ­ Captain Svein Algrøy.

Ajax is one of three Tugs on Sture. Photo: Østensjø Rederi

KAN BLI NORSK TAUBÅTREKORD PÅ STURE Hvis Østensjø Rederi får ­anledning til å fullføre den nyeste taubåtkontrakten som er inngått med Statoil for olje­ terminalen på Sture i Øygarden, vil det i 2031 bli norsk rekord med 42 års sammenhengende taubåtdrift, i samme oljehavn, med ett og samme rederi. Helt siden oljeterminalen på Sture ble tatt i bruk i 1988, har Østensjø Rederi hatt ansvaret for taubåtdriften. For to år siden vant rederiet anbudskonkurransen om å ha ansvaret i nye åtte år, med anledning til å forlenge kontrakten med ytterligere sju år fram til 2031. Dette betyr at de tre taubåtene Ajax, ­Velox og Tenax skal fortsette å assistere oljetankskipene når de skal til og fra oljeterminalen og at 28 sjøfolk er sikret fortsatt jobb om bord. Dessuten skal de to fortøyingsbåtene Rex og Fox på Sture, byttes ut med to flunkende nye som også skal overta navnene til de gamle. De to nye båtene er nettopp ferdig bygget i Stettin i Polen. Om bord i taubåtene Velox og Tenax er det til enhver tid et mannskap på fem, kaptein, maskinsjef og tre matroser, mens det om bord i Ajax vanligvis er fire. —De tre matrosene må være koke­ kyndige. Hvis de ikke er det når de begynner i jobben, så blir de det, sier taubåtkaptein på Velox, Svein Algrøy, spøkefullt. Han er en av veteranene i dette gamet, med erfaring fra Sture siden 1997. Algrøy legger til at matrosene også har andre oppgaver enn å stelle i bysse og messe. Når tankbåter skal inn til kai, ­bemanner to av matrosene på taubåten en av fortøyningsbåtene. De går ut og tar imot fanglina til fortøyningene på tankbåten. Den ene av taubåtene går ut og møter tankskipet ved trafikkstasjonen på Fedje. Her får de sleper om bord og følger skipet inn mot havn, hvor de to ­ ­andre taubåtene også får sleper om bord i hver sin ende av tankskipet. —Vi har aldri hatt noe alvorlig uhell i de snart 20 årene jeg har vært med, sier Svein Algrøy, som legger til at det ofte kan røyne på vinterstid i friskt vær.

8

ØSTENSJØ REDERI


BY THOMAS FØRDE

Southampton is currently the busiest port in UK. Østensjø Rederi has its most comprehensive tug activity here, where three escort tugs and two small tugs assist tankers going to and from Exxon’s Fawley Refinery.

Port of Southampton is the most important port for cruise ships in UK. 1,7 million passengers are passing through annually. Here is Harmony of the Seas departing Southampton on its maiden voyage. Lomax is welcomming her. Photo: Østensjø Rederi

TOWAGE IN ONE OF EUROPE’S BUSIEST PORTS

SJØFARTSTIDENE

|

NR. 1 – 2016

9


Paul Murton and David Conroy. Photo: Østensjø Rederi

Garry Read, Gary East and Gareth Roman. Photo: Østensjø Rederi

Southampton, which is also Europe’s ­second largest container port, gets extensive traffic from cruise ships, and bulk ships too. Two tugs, Apex and Phenix, serve Exxon’s oil ­terminal and refinery located in Fawley, on the south­ west side Southampton Water. The third tug, the Lomax, uses 50 percent of her c ­ apacity at Fawley. The rest of Lomax’s capacity is offered on the spot market, working in the dock area in Southampton and occasionally regarding off­ shore casualty recovery. Østensjø Rederi, through its British ­subsidiary Solent Towage, has been under contract with Exxon Fawley since 1993. The contract reached its end in 2008, but a new period was secured up until 2023. This is the longest fixed tug contract in the company’s history. Fawley is located at the entrance to the big port of Southampton and is the largest oil refinery in the UK, where its nine berths ­ are ­ occupied most of the time. The Fawley ­Refinery p ­ rocesses 270,000 barrels of crude oil every day. This is equivalent to 14 per cent of all N ­ orwegian oil production. 2,000 vessels visit Fawley annually. VLCCs (very large crude carriers) of up to 320,000 tons deadweight come here to unload. Product carriers and other tankers, and gas carriers of various sizes load and discharge at Fawley as well. Solent Towage is the sole provider of waterborne services at Fawley, holding the ­ Waterborne Services Contract. This includes oil spill response and firefighting, which comes in ­addition to their ship handling, escort, and line handling duties.

After Exxon Valdez

Lisa Vail, Keith Pickett and Nick Jeffery on ­occasion of Keith’s ­retirement.

“The challenges are innumerable and no two days are the same for our crews,” says Ø ­ stensjø Rederi’s Nick Jeffery, who c ­oordinates tug ­operations at Solent Towage and who is also area manager of Towage in the UK.

Photo: Østensjø Rederi

Jeffery says that Østensjø Rederi got their first tug c ­ontract in Southampton in 1993 when E ­ xxon had recently had been through a ­ major oil d ­ isaster when tanker the Exxon ­Valdez ­grounded off the coast of Alaska. The oil c ­ ompany wished to implement measures that could prevent such loss in the future. They looked to Norway, where tankers were ­escorted in and out of terminals by tugs. Exxon wanted to introduce a similar ­system at all its facilities. It was under these ­circumstances that Østensjø Rederi secured their first full escort tug contract linked to ­Fawley in Southampton.

Michael Janes, Marcus Burt, Bob Ivanov, Colin Ralston and Jordan Hooper. Photo: Østensjø Rederi

Captain Michael Janes and Chief Engineer Colin Ralston Photo: Østensjø Rederi

10

ØSTENSJØ REDERI

Preventing groundings Today, one of the three Solent Towage escort tugs sails out to meet all tankers larger than


60,000 tons deadweight. The rendezvous takes place 26 nautical miles from Fawley, beyond the coasts of the mainland and the Isle of Wight. There, the tug secures in the escort p ­ osition at the stern of the tanker by means of a 500-ton synthetic towline, to control the tanker if necessary in the event of a power or steering failure.

Ibex is one of the smaller tugs, but deals with tankers of up to 16 000 tons. Photo: Østensjø Rederi

“We have to prevent groundings in the narrow shipping lane between Southampton’s inner harbour and the Isle of Wight,” Nick Jeffery says, adding that the area contains vulnerable natural and residential areas. “Moreover, a large tanker running aground in these narrow waterways could block passage for all traffic entering or leaving the busy port of Southampton,” says Jeffery.

The most-used vessels Unlike tug operations run by Østensjø Rederi in Norwegian ports, Solent Towage’s mooring vessels Ibex and Oryx are dedicated to the towing tasks at Fawley. This can be very demanding work.

Apex one of three Tugs in Port of Southampton. Photo: Østensjø Rederi

“We have many experienced seamen among our crews. Some have been with us since the very beginning in 1993,” says Jeffery, who adds that this is why they do not have to recruit new personnel very often. “But we always place emphasis on thorough training and an extensive familiarisation process. This is especially important for the crews of the two small tugs, Oryx and Ibex,” Jeffery says, continuing, “Oryx is ­normally towing smaller tankers of up to 10 000 tons, while Ibex deals with tankers of up to 16 000 tons.” “There are two people on board each tug during such operations, one fully-trained coxswain, and one man on the deck. The crews must know exactly what to do, as this is very difficult and dangerous operation. The larger of the two mooring vessels is only 16 meters long and weighs 60 tons, but nevertheless handles relatively large tankers.”

Text Photo: The tugs are assisting tanker at Exxons oil refinery at Fawley. Photo: Østensjø Rederi

SJØFARTSTIDENE

|

NR. 1 – 2016

11


Oryx and Ibex are the vessels that are used the most in ­ Østensjø Rederi’s entire fleet. They perform about 3,000 assignments a year. ­Besides t­owing, they handle mooring lines of every vessel at Fawley, and are also used by Exxon for other tasks.

built car freighters, while the area also has a large container port – in fact, currently the busiest in the UK with 1.7 million containers being handled annually. Southampton also has important bulk terminals for handling of grain, minerals, raw materials for animal feed, fertilizer, sand, salt, and various biomass products.

UK-wide crew

Maersk-controlled company Svitzer provides services to many berths with tugs of their own, but has entered into a agreement with Solent Towage to engage their tugs when they have spare capacity. M ­ oreover, Svitzer assists Solent with towage at Fawley, where four tugs are ­required for tankers over 275,000 tons deadweight.

The crew of the five vessels are recruited from all over the UK, from the Isle of Wight in the south to Yorkshire in the north, to Grimsby in the east, and west to North Wales. The crew list also includes one member who is resident in Ireland. The rotation schedule is two weeks at work and two weeks off. Most of the crew members stay on board the tugs during their duty periods. The tugs have single berth cabins on board, but the company also has a couple of barges moored in the harbour in order to offer everyone these. The vessels serve as a base for the self-contained operation.

A buzzing Southampton Southampton has approximately 250,000 inhabitants and is situated on the south coast of England, about 120 kilometres (some 75 miles) from London where the rivers Test and Itchen meet. These and the r­ iver ­Hamble flow into Southampton Water. There is a big difference ­between high and low tide, about 4.5 meters. The manmade dock facility in Southampton is extensive so ships can remain safely alongside while loading or unloading because of this. Southampton is one of Europe’s most important ports for cruise liners, with 1.7 million cruise passengers passing through the port annually. Each year, more than 850,000 cars are brought ashore from specially

Solent also provides escort towage for Svitzer’s tug operation at BP Hamble in much the same way as the service is provided to Exxon.

Rescue operations Tugs and mooring launches from Solent Towage have also been a ­ ssisting in more demanding and acute operations, such as during the Hoegh Osaka car carrier incident in January 2015. The vessel is ­operated by Oslo-located shipping company Hoegh Auto Liner. The ship capsized and was deliberately beached at the entrance to Southampton. Solent Towage’s tugs assisted Svitzer Salvage during the rescue and got the car carrier back into the harbour. The tugs have also been in action twice so far this year when the huge container ships APL Vanda and ‘CMA CGM Vasco De Gama’ ran aground on a sandbank in the narrow approach to Southampton. Both operations entailed towing and pushing to re-float the vessels and then escorting them into Southampton

FACTS ABOUT ØSTENSJØ REDERI IN SOUTHAMPTON:

Phenix escorts Mathilde Maersk on her first visit to Port of Southampton. Photo: Østensjø Rederi

12

ØSTENSJØ REDERI

Tug contract with Exxon:

Through its subsidiary Solent Towage

Duration:

Until 1st July 2023

Vessels:

Three escort tugs: Apex, Phoenix, and Lomax. Two small tugs / mooring ves­ sels: Oryx and Ibex

Staff in Southampton

40 sea staff, 2 shore staff


FACTS ABOUT SOUTHAMPTON: Inhabitants:

Graphics: Sunniva Sandvik Førde

250,000

Distance from London: 120 kilometres (some 75 miles) Exxon’s oil refinery at Fawley

2,000 tankships arrive annually

Southampton port:

1.7 million cruise passengers annually, 1.7 million containers (TEU) and 850,000 new vehicles brought ashore.

Difference between high and low tide:

About 4.5 metres

TAUBÅTER I EN AV EUROPAS TRAVLESTE HAVNER Southampton er i dag den travleste havna i Storbritannia. Her driver Østensjø Rederi sin mest omfattende ­slepebåtvirksomhet med tre eskortetaubåter og to små taubåter eller fortøyningsbåter som assisterer tankskip til og fra Exxons oljeraffineri. Den store havna i Southampton har også omfattende trafikk av cruiseskip, og bulkskip, og er dessuten Europas nest største ­ ­containerhavn. To slepebåter, Apex og Phenix, er engasjert av E ­ xxon ved selskapets oljeterminal og raffineri, som ligger i Fawley, på sørvestsiden av innseilingen til Southampton havn. Den tredje slepebåten, Lomax, bruker 50 prosent av sin kapasitet ved Fawley, mens resten tilbys i spotmarkedet. Dette markedet utspiller seg hovedsakelig i dock-området i Southampton. Noen ganger assisterer taubåtene også ved grunnstøtinger og redningsaksjoner lenger ute i havneområdet. Siden 1993 har Østensjø Rederi, gjennom sitt britiske datterselskap Solent Towage, hatt kontrakt med Exxon Fawley. I 2008 utløp ­kontrakten, men ble fornyet, og vil vare frem til 2023. Dette er den lengste faste kontrakten i selskapets historie.

s­årbare naturområder og boligområder. — Hvis et stort tankskip går på grunn i dette trange sjøområdet, kunne det blokkere for all ­skipstrafikk inn og ut av den travle havnen i Southampton, sier Jeffery.

De mest brukte fartøyene I motsetning til taubåtoperasjoner i regi av Østensjø Rederi i norske havner, er fortøyningsbåtene til Solent Towage, Ibex og Oryx, også ­dedikert til slepeoppgaver ved Fawley. De to fartøyene er de mest brukte fartøyene i hele flåten til Østensjø Rederi og de utfører nærmere 3000 oppdrag i året. Foruten tauing, håndterer de to båtene fortøyningene til alle fartøyer ved raffineriet og brukes også av Exxon til andre oppgaver.

Raffineriet Fawley er det største oljeraffineriet i Storbritannia. 2000 fartøyer besøker Fawley årlig og VLCC (Very Large Crude operatører) på opp til 320 000 tonn dødvekt kommer hit. Solent Towage er den eneste leverandøren av taubåttjenester ved Fawley. Kontrakten med Exxon omfatter oljevern og brannslukking, i tillegg til assistering av tankskip. — Utfordringene er utallige, og ingen dager er like for våre mannskaper, sier Nick Jeffery, som koordinerer driften av taubåter på Solent ­Towage. Han er også områdesjef i Storbritannia for Østensjø Rederis taubåtvirksomhet.

Forhindre grunnstøting En av de tre eskortetaubåtene til Solent Towage seiler ut for å møte tankskip som er større enn 60 000 tonn dødvekt. Møtet finer sted 26 nautiske mil fra Fawley. Taubåten får festet sleper i akterenden av ­skipet, er med og styrer og er klar til å holde igjen under resten av reisen inn til raffineriet. — Vi må hindre grunnstøting i den smale leia mellom Southamptons indre havn og Isle of Wight, sier Nick Jeffery, og legger til at her er Photo: Østensjø Rederi

SJØFARTSTIDENE

|

NR. 1 – 2016

13


EDDA FREYA HAS TAKEN AND PASSED MANY EXAMS

BY THOMAS FØRDE

The ship has lifted heavy anchors in place, changed riser pipes in the Norwegian Sea, laid cables on the seabed, and flushed the interior of pipes and valves clean. Removing oil and gas installations from the Varg field is now on the agenda.

Photo: Geir Magne Kvinnesland og Atle Skau/DeepOcean

14

ØSTENSJØ REDERI


Østensjø Rederi’s newest and one of the most advanced and expensive ships the Edda Freya has really been able to trial in her first months at sea. “The ship has passed all the tests. Apart from a few minor ­teething problems, which have been corrected underway, the ship and ­ ­equipment function extremely satisfactorily,” says one of the ship’s two Captains, Harald Osland, who adds that he hopes that both the ship and crew will continue to be given many and varied tasks to solve. Edda Freya is a construction support vessel made for different types of under­water operations and is on a five-year contract with DeepOcean. Østensjø Rederi’s crew, which includes trainee positions, numbers 32. The ship has cabin capacity for 140 people.

Laying cables Edda Freya is the first ship in Østensjø Rederi’s fleet to be equipped with a large tower on deck for laying cables, umbilicales and flexible pipes. A large hole, known as a ­moonpool, has been made in the deck. The tower stands above the moonpool, while the cable runs from the on board cable drum towards the seabed via the tower and through the moonpool. The ship is also fitted with a large cable carousel below deck which is used for installing long cables. This drum can store 3,000 tons of cable. There are also huge cranes on board, the largest of which can lift up to 600 tons. The ROVs (remotely operated vehicle), which are loaded in on board hangars, are used for inspection and surveys on the seabed, as well as in connection with various other underwater tasks. “We tested all the cable laying equipment as soon as we got the ship. We hoisted on board drums with used cable at Stord that we utilised ­testing,” says Captain Harald Osland, who adds that all the equipment is in order.

SJØFARTSTIDENE

|

NR. 1 – 2016

15


‘Environmentally-conscious’ fuel-saving equipment

Edda Freya and DeepOcean are going to remove installations and equipment from the Varg field in the North Sea. Photo: Østensjø Rederi

Osland also highlights the ship’s slightly special propulsion system, which includes a newly-developed diesel-electric hybrid designed by Siemens in cooperation with Østensjø Rederi. One of its features ­allows energy to be stored in batteries and drawn on when the ship and ­machinery are exposed to heavy loads and need extra power, for ­example in difficult wind and wave conditions. “This new system works well in practice and shows that we can save considerably fuel using the new diesel-electric hybrid system,” says ­Osland.

Heavy lift and large pipes DeepOcean rents the ship and consequently obtains the assignments. Olaf Alexander Hansen, project leader at DeepOcean, relates examples of tasks that have involved the Edda Freya. “We’ve brought pumps and tanks with chemicals on board; fresh ­water for internal cleaning of pipelines and valves at installations in the ­Norwegian and Barents Seas. We’ve used large cranes to lift 170-­ton anchors in place and a new riser pipe at the Heidrun field.” “In August and September, we changed and installed riser pipes at the Heidrun and Kristin platforms in the Norwegian Sea, which are part of the connection of the Maria field to Heidrun and Kristin. We use the ­tower on deck when installing the riser pipes and allow the pipe to d ­ escend towards the bottom via the moon pool. The riser pipes’ outer diameters are up to 40 centimetres, and they are about one kilometre in length. These pipes are stored and ready for use on deck,” explains Hansen. He adds that they have also laid a 19-kilometre-long fibre optic cable with the Edda Freya while using the cable carousel below deck.

Fulfils expectations “The ship functions very well and has fulfilled expectations,” says ­Hansen, who adds that all the equipment comes from known suppliers and is of good quality. Hansen also says that the boat has good sea­ keeping capabilities, making it a stable working platform on the waves.

TV, a library and an extremely well-equipped galley where a lot of good food can be made.

“The advanced DP system (DP3, dynamic position control) holds us in precise working position. Statoil and our other customers have given us good feedback for jobs well done,” says Olaf Alexander Hansen at DeepOcean.

Varg field clearance plans

“It is equipped in a way intended to allow everyone to be comfortable on board. There is a cinema, a gym, a large mess, several living quarters,

“The assignment includes removing five riser pipes and two control ­cables. All of this is to be coiled up on the cable drum that the Edda

One project for Edda Freya in the near future is to remove installations and equipment from the Varg field in the North Sea.

Edda Freya is especially equipped for cable laying. Photo: Geir Magne Kvinnesland og Atle Skau/DeepOcean

16

ØSTENSJØ REDERI

Photo: Tore Bjørn Viksøy/DeepOcean

Photo: DeepOcean


EDDA FREYA HAR BESTÅTT MANGE EKSAMENER Skipet har løftet på plass tunge anker, byttet ut ­s tigerør i Norskehavet, lagt kabler på havbunnen og spylt rør og ventiler rene innvendig. Nå venter ­fjerning av olje- og gassinstallasjoner fra Varg-feltet. Det nyeste og et av Østensjø Rederis mest avanserte og dyreste fartøyer, Edda Freya, har virkelig fått prøvd seg i sine første ­måneder på havet. Edda Freya er et konstruksjonsskip til bruk ved ulike typer undervannsoperasjoner og er leid ut til Deep Ocean på en femårskontrakt. Østensjø Rederi har et mannskap på 33 personer om bord, ­inkludert o ­ pplæringsstillinger og skipet har lugarkapasitet til i alt 140 ­personer. Edda Freya er det første i rederiets flåte som er ­utstyrt med et stort tårn på dekk til bruk ved kabellegging. Skipet har også montert en stor kabelkarusell under dekk til bruk ved installasjon av lange kabler. Om bord er også digre kraner, den største kan løfte inntil 600 tonn. ROV’er (fjernstyrte undervanns­ farkoster) plassert i hangarer om bord, er virksomme ved inspeksjon og overvåkningsarbeid på havbunnen og i forbindelse med ymse andre arbeidsoppgaver under vann. — Skipet har bestått alle prøver. Bortsett fra småfeil, som blir rettet opp etter hvert, fungerer skip og utstyr svært tilfredsstillende, sier en av skipets to kapteiner, Harald Osland.

«Grønt» anlegg sparer drivstoff Framdriftsystemet består blant annet av en nyutviklet dieselelektrisk hybrid. Dermed kan energi lagres på batterier og hentes fram når skip og maskineri blir utsatt for stor belastning og trenger ­ekstra energi. — Vi kan spare betydelige mengder drivstoff med det nye ­dieselelektriske hybridsystemet, sier Osland.

Nye stigerør og fjerning av gammelt Freya has below deck,” says DeepOcean project leader Sverre Horgen. He adds that DeepOcean will also be using ROVs at the Varg field equipped to cut riser pipes at the Varg A fixed installation there.

Ved hjelp av Edda Freya skiftet Deep Ocean i august og september stigerør på plattformene Heidrun og Kristin i Norskehavet, dette som en del av oppkoblingen av Maria-feltet til Heidrun og Kristin.

“We’re also going to cut anchor chains on a buoy located 40 metres ­below the surface, a so-termed mid-water arch, which the riser pipes between Varg A and the Petrojarl Varg have rested on. This buoy will shoot up to the surface like a projectile when the chain is cut,” says Horgen, who adds that the buoy is to be towed to land. The remaining equipment to be collected from the Varg field will be loaded on board the Edda Freya. All discarded material will then be transported to AF ­Decom’s breaking and recycling base at Vats.

Med Edda Freya har DeepOcean også lagt en 19 kilometer lang fiberoptisk kabel, mens kabelkarusellen under dekk ble brukt. — Vi har fått gode tilbakemeldinger for vel utført arbeid fra ­Statoil og fra våre andre kunder, sier Olaf Alexander Hansen i Deep Ocean. I nær framtid skal Deep Ocean benytte Edda Freya ved fjerning av installasjoner og utstyr fra Varg-feltet i Nordsjøen. Alt ­utrangert materiell skal deretter fraktes til AF Decoms opphoggings- og gjenvinningsbase i Vats.

Another heavy lifting assignment at the field will be to hoist on board the anchors that have held the riser pipes in place. These anchors weigh between 40 and 200 tons.

Photo: Geir Magne Kvinnesland og Atle Skau/Deep Ocean

“The entire job at the Varg field is calculated to take 15 to 20 days and could be completed by Christmas,” says project leader Sverre Horgen.

SJØFARTSTIDENE

|

NR. 1 – 2016

17


The galley on board Edda Freya is ­ developed with support from The Research Council of Norway. Photo: Østensjø Rederi

A FUTURISTIC GALLEY BY THOMAS FØRDE

“The galley on board the last ship called Edda Freya was just slightly larger than the bakery on board the New Edda Freya.” Chief Steward Endre Dommersnes has helped plan the design of the new ­galley. It is divided into a bakery, a warm and hot section, vegetable ­section, and a general laundry. Its design means those who work there do not have to get under each other’s feet carrying different types of food. The size of the galley also helps work run more smoothly.

Rational storage

Large portholes on the starboard side let in a lot of daylight. “This gives us a different experience to looking straight into a wall,” says Endre Dommersnes. He adds that those who worked in the galley used to be accustomed to small portholes, so that the view and daylight were almost absent.

“The cherry on the cake is definitely the storage space and how we receive supplies.” The landing space for these is right outside the storage areas, enabling them to be wheeled right in to be stored on the shelves. “The time it takes to receive and store supplies is halved in compared to how it was, and we should remember that Østensjø Rederi also used to be among the best in this regard,” says Dommersnes, who adds that his staff in the galley is able to receive and push at least 20 crates of provisions in place per hour.

He also points out that the works urfaces can be raised and lowered, meaning that everyone can find the right working position, thus reducing unnecessary strain.

“On some occasions, we’ve received supplies for 100 people to last for between 50 and 60 days. The strain on us catering staff is now ­noticeably less thanks to the new set-up,” he says.

18

ØSTENSJØ REDERI


Research money for the galley What is on the Edda Freya is a development of the original project for the Edda Fortis hotel ship. Construction of this ship was cancelled but the galley project, which received money from The Norwegian Design Council, was continued and transferred to the planning of Edda Freya. “The main purpose of the project was to come up with a solution for a galley which focused on HSE, an easy set-up for personnel, and that would be one of the North Sea’s best galleys,” says Dommersnes.

BYSSA ER EI MESSE VERDT

Eker Design and Katinka von der Lippe led the project together with Tim Lake and Britt Lund who work at Loipart. Several of Østensjø Rederi’s own stewards and ship consultant Carl Johan Amundsen also provided input. “Things have really moved forward when we think back to the days of the previous Edda Freya in the 1990s and beginning cooperation with ­DeepOcean. The galley was slightly larger than our bakery and we only had 24 seats in the mess. But we also served between 50 and 100 ­people there,” says Endre Dommersnes, who adds that the mess on board the Edda Freya has 66 places, with another 10 at the bar.

FACTS ABOUT EDDA FREYA Ship type:

Offshore construction ship

Length:

149.8 metres

Beam:

27 metres

Deck area:

2,300 square metres

Byssa om bord i det forrige skipet med navnet Edda Freya var bare litt større enn bakeriet om bord i Nye Edda Freya. Det er Endre Dommernes som sier dette. Han er stuert om bord og har vært med å planlegge utformingen av den nye byssa.

Cabin capacity: For 140 people Propulsion system:

Newly-developed diesel-electric hybrid. The system (Siemens BlueDrive+C) is developed by Siemens in cooperation with Østensjø Rederi

Yard:

Kleven in Ulsteinvik

Design:

Salt Ship Design AS

Client:

On five-year contract with DeepOcean

Byssa er delt inn bakeri, kald og varm avdeling, grønnsaksavdeling, samt grovt vaskeri. Det gjør at de som jobber der slipper å gå oppi hverandre med ulike matvarer. Størrelsen på byssa gjør også sitt til at arbeidet går mye lettere. Store ventiler på styrbord side slipper inn mye dagslys. — Vi får dermed andre opplevelser enn å se rett inn i en vegg, sier Dommersnes. Han peker videre på at arbeidsbenker som kan heves og senkes gjør sitt til at ansatte kan finne rett arbeidsstilling og reduserer dermed unødig slitasje. — Rosinen i pølsen er definitivt lagerplass og løsninger som er valgt for mottak av proviant. Tidsbruken her er halvert, sier ­Dommersnes. Utvikling av ny bysseløsning har vært et prosjekt som er blitt støttet av blant annet Norges Forskningsråd. — Hovedmålet var å lage en bysseløsning som hadde fokus på HMS og på lette løsninger for de som skulle jobbe der. Samtidig skulle dette bli en av Nordsjøens beste bysser, sier Dommernes.

Photo: Østensjø Rederi

Photo: Østensjø Rederi

Photo: Østensjø Rederi

SJØFARTSTIDENE

|

NR. 1 – 2016

19


Edda Fides served during summer as a hotel and service ship during filming of “Downsizing”, with stars on board. including Matt Damon. Photo: Østensjø Rederi

The galley is perhaps the most crucial department aborad a hotel ship. Photo: Østensjø Rederi

20

ØSTENSJØ REDERI


The accommodation vessel Edda Fides became a media darling in the summer which saw her make the world’s first tourist voyage to oil and gas installations. The ship also served as a film celebrities’ hotel and floating base. Edda Fides is now seeking new assignments.

FROM LOFOTEN TO NEW ADVENTURES BY THOMAS FØRDE

The ship was named the Edda Fides and started service in 2011. In addition to the actual hotel, the ship has a helicopter deck, cranes, ­advanced dynamic position control (DP), plenty of storage space, and an on board workshop. It also has an advanced telescopic gangway and wave m ­ otion compensation system. This enables on board guests and ­passengers to walk safely from the hotel ship over to either their place of work on an offshore oil or gas installation, or while visiting the facility.

Many fish in the sea Edda Fjord is the real pioneer in the fleet of Edda Accomodation. Photo: Østensjø Rederi

It all started in 2004 off the coast of western Africa’s Nigeria. The Edda Fjord, one of the world’s largest supply ships, had accommodation modules placed on deck and travelled to African waters to anchor up at the Bonga field. Shell, the world’s second-largest oil and gas firm, was the client. The first assignment as a accommodation vessel ship was so success­ ful, that it left the shipping company wanting more and an economic reason to ­continue in the offshore floating accommodation market. In 2007, Østensjø Rederi decided to build an accommodation vessel with 600 beds, a ship which became the world’s first purpose built monohull accommodation vessel for services at oil and gas installations in the open sea.

Which assignments await the both Edda Fides and Edda Fjord are ­currently unknown. “There are many fish in the sea, now it’s about catching some of them, whether they are large or slightly smaller,” says Østenjø Rederi’s Johan Rokstad, who underlines that the competition for accommodation ships and platforms is tough, and assignments relatively few. “But our opportunities are still in view, interesting, and realistic. Our ­biggest competitors are accommodation rig companies such as ­Prosafe or Flotel International. Many actors are struggling in today’s market. But I believe we at Edda Accommodation are still in a better position than many of our other competitors are,” Johan Rokstad comments.

Rig Spotting in the North Sea Edda Fides was used for something surprisingly novel in the summer. The vessel was made ready as a passenger and cruise ship, picked up passengers in Haugesund and Stavanger, and went on an expedition enabling guests to experience Norwegian oil and gas installations up close.

SJØFARTSTIDENE

|

NR. 1 – 2016

21


Johan Rokstad Photo: Øyvind Sætre

Edda Fides is looking for further qauy ­assignments as the floatel had at Mongstad. Photo: Thomas Førde

The summer weather on the North Sea voyage was tranquil, the sea shimmering. The ship and passengers stopped by the new Edvard Grieg installation, and then went on to the new, gigantic Johan Sverdrup field currently under development. The Edda Fides then stopped by the Balder and Ringhorn fields, Oseberg, Troll A, Troll C, and Gjøa, before the hotel ship berthed in Molde on the third day. The cruise continued on from there to Svolvær. Several installations in the Norwegian Sea were visited on the way northwards.

Film and media in Lofoten “Media coverage was like no other we’d ever experienced, and the ­project went very well, technically, practically, and quality-wise,” says Johan Rokstad. The expedition, or so-termed rig spotting voyage, ­ ­ended up in Lofoten. The ship had another assignment there, ­specifically as a hotel and service ship during filming of “Downsizing”, with stars on board including Matt Damon. “The ship functioned very well during filming in Trollfjorden too. We used the helideck, put out our own floating dock alongside the ship, and ­carried out all the service work that the film team asked for,” recounts Johan Rokstad, who does not rule out the possibility of participating in more filming later on. It has not yet been decided whether rig spotting in the North Sea will be presented to the general public in the summer of 2017. “We’re not discounting it, but we’ll have to do something similar to what Hurtigruten has provided previously, if so, such as combining a trip in the North Sea and docking at a foreign harbour – the Shetland Islands or Scotland, for example. This will also bring ex tax advantages. This makes some difference to the company’s economy in these tight times.”

Keeping the cruise ship equipment He also says that the shipping company did not earn money on its rig safari this summer, but it helped keep the wheels turning. They will give themselves slightly better preparation time should there be any ­expeditions next summer. This year saw just six weeks of preparation before the public was let on board. “It should actually take longer than that. But we even managed to make changes on board such as fixing up a bar in one of the salons, where ­alcohol was served for the first time in Edda Fides’ history,” Rokstad says.

22

ØSTENSJØ REDERI

Key personnel One of the biggest challenges in difficult times with few assignments is being able to retain key personnel on board, according to the head of the shipping company. “It’s absolutely essential that we have experienced and skilled people on alert when operating the hotel ships. This includes people who know the dynamic positioning control’s navigation system, as well as others who can man the advanced gangway to ensure the safety of everyone on board. We can take on assignments at short notice when we have key personnel on alert,” says Rokstad. He refers to an assignment which came up a few weeks after filming in Lofoten. The shipping company mobilised between 70 and 80 people to man the ship and hotel for berthing at Mongstad in the course of three days. The Edda Fides hotel and canteen were in position for three weeks for several hundred workers during an extended shutdown for maintenance at the refinery.

Oil cruising in the North Sea. Olav Aleksander Snare jumps into the pool on the deck of Edda Fides. Photo: Liv Johanne Snare


Further quay assignments in Norway possible 2017 will be a demanding year with major challenges regarding keeping the wheels turning, but there could be several similar assignments at quays located in Norway. Rokstad confirms that the shipping company is talking with some of the major supply companies that are going to be carrying out extensive construction assignments at their yards, and that will likely need more sleeping and canteen capacity than they have at their own disposal. There’s also much to indicate that operating companies are modifying their maintenance and reconstruction contracts on the continental shelf. The contracts will probably be changed from long-term framework ones to specific contracts confined to each individual assignment or project. “This will mean having to mobilise larger numbers of people to work offshore for every single project. Thus, the subject of needing more hotel services at sea will come up,” says an optimistic Johan Rokstad.

The whole world as a market The Edda Accommodation director also comments that the ­shipping company is marketing itself worldwide, and they see there are ­possibilities for several long-term assignments in 2018 and 2019 – both in the North Sea and off the coast of the US. Two years ago, the shipping company subcontracted a second specially-built hotel ship, the Edda Fortis, from the Hyundai yard company in South Korea. But the dramatic changes in the market led to the deal being cancelled. The shipping company has recently entered an agreement with Hyundai regarding repayment of the advance on the cancelled hotel ship. “We still retain a small hope that the market will turn around, and that we’ll need a brand new hotel ship because we’ll get so many and ­long-term assignments,” says Johan Rokstad.

FRA LOFOTEN TIL NYE EVENTYR I sommer ble hotellskipet Edda Fides en yndling i media ved å gjennomføre verdens første t­ uristseiling til olje- og gassinstallasjoner. I tillegg tjente s­ kipet som hotell- og flytende base for kjendispreget film­ innspilling i Lofoten. Nå jakter hotellskipet på nye oppgaver. Det vakte oppsikt da Edda Fides i sommer ble klargjort som passasjer-/ cruiseskip, hentet passasjerer i Haugesund og ­ ­Stavanger og dro på tokt med gjester som fikk oppleve norske ­oljeog gassinstallasjoner på nært hold. — Vi fikk en mediedekning som vi aldri før har opplevd maken til og prosjektet gikk veldig bra, både teknisk, praktisk og kvalitetsmessig, sier Johan Rokstad, administrerende direktør i Edda Accomodation. Toktet, eller den såkalte riggspottingsferden, endte opp i ­Lofoten. Her hadde skipet et annet oppdrag, nemlig å være hotell- og ­serviceskip under innspilling av filmen «Downsizing» med stjerner som Matt Damon om bord. — Skipet fungerte veldig bra også under filminnspillingen i Trollfjorden. Helidekket ble benyttet, vi la ut egen flytebrygge ­ langs skipssiden og gjorde alt servicearbeidet som filmteamet ­etterspurte, forteller Rokstad, som ikke utelukker deltagelse i flere filminnspillinger. Om tilbudet med riggspotting i Nordsjøen vil bli presentert for ­publikum også sommeren 2017, er ikke avgjort ennå. Men ­Rokstad utelukker det ikke. Han peker likevel på at rederiet ikke tjente penger på riggsafarien denne sommeren, men at det bidro til å ­holde hjulene i gang.

FACTS ABOUT EDDA ACCOMMODATION Nøkkelpersonell Type of business and company:

Established in the course of 2016 as a ­separate shipping company and independent ­organisation specialising in accommodation operation.

Ships:

The Edda Fides with space for 600 beds and the Edda Fjord which can be fitted with 200 beds in an accommodation rig on deck relatively quickly.

CEO:

Johan Rokstad

Owner:

The largest owners in Edda Accommodation are Johannes Østensjø Dy with 78%, and Mass Capital with 18%.

Å kunne beholde nøkkelpersonell om bord er, ifølge rederisjefen, en av de største utfordringene i tider med få oppdrag. — For driften av fotelskipene er det helt avgjørende at vi har ­erfarne og dyktige folk i beredskap. Da kan vi ta på oss oppdrag på kort varsel, sier Rokstad. Han viser til at i løpet av tre dager i ­sommer mobiliserte rederiet mellom 70 og 80 personer for å ­ bemanne skip og hotell som kunne klappe til kai på Mongstad. I tre uker betjente Edda Fides flere hundre arbeidsfolk under en større ­ ­vedlikeholdsstans ved raffineriet. I følge Rokstad kan det bli flere lignende oppdrag ved kai i Norge. Rederiet er i dialog med store leverandørbedrifter som skal gjennomføre omfattende byggeoppdrag ved sine verft og som ­ trolig vil ha behov for mer overnattings- og kantinekapasitet. Med omlegging av kontrakter for vedlikehold og ombygging offshore, ser Rokstad at det også vil melde seg behov flere hotelltjenester til havs.

Hele verden som marked

Typical position of Edda Fides, connected with the flexible gangway to an installation in the sea. Photo: Østensjø Rederi

Rederiet markedsfører seg rundt om i hele verden og ser på muligheter for flere langvarige oppdrag i 2018 og 2019, både i ­Nordsjøen og utenfor kysten av USA. For to år siden ble det ­kontrahert et spesialbygget flotellskip nummer to, Edda ­Forties, fra verftkonsernet Hyundai i Sør- Korea. Men den dramatiske ­endringen i markedet gjorde at avtalen ble kansellert. Nylig i­nngikk rederiet en viktig avtale med Hyundai om tilbakebetaling av ­innbetalt forskudd på det kansellerte flotellskipet. — Vi har fortsatt et lite håp om at markedet skal snu og at vi får så mange og langvarige oppdrag at vi får bruk for et flunkende nytt hotellskip, sier Johan Rokstad.

SJØFARTSTIDENE

|

NR. 1 – 2016

23


BY THOMAS FØRDE

IN HOPE OF SAILING THE WAY THE WIND BLOWS

The wind farm Westermost Rough, outside the east coast of UK, is run by Dong Energy. Photo: Dong Energy

24

ØSTENSJØ REDERI


Østensjø Rederi can be happy about the contracts for ­construction and o ­ peration of two large service operation vessels for offshore wind at an e ­ xtremely ­demanding time for oil and gas service providers. The shipping ­company at Smedasundet in Haugesund now begins p ­ reparations to operate a completely new type of ship. Alf Helge Lyngholm is Fleet Manager O ­ ffshore and in charge of all offshore service ship operations. The offshore department is also ­ responsible for operating the service operation vessels (SOV) for the wind power industry. Lyngholm has been Captain on s­ everal type of ships in the company’s fleet for a long time. “My heart is on board a supply ship. I’ve worked on board this type of ship the most,” remarks Lyngholm. He has been in the ­ company’s ­onshore organisation for the past five years. His previous tasks before becoming head of the offshore fleet have included being part of a group which developed and led operations for the shipping company’s former new venture accommodation vessels. “We can draw on a lot of knowledge from ­operating accommodation vessels when we’re going to start with the new type of ship for ­offshore wind,” says Lyngholm. Both of the new SOV-classified ships are to be built at ­ Astilleros Gondan located in the ­Principality of Asturias in north-western Spain. This brings the number of ships the yard has delivered to Østensjo since 2005 up to 13. The offshore wind service vessels will be 81.10 metres in length with a beam of 17 ­ metres and are designed by Rolls-Royce in close ­cooperation with Østensjø Rederi. The first of the two ships is scheduled to be ready for use on 1st September 2017.

How did the shipping company’s wind p ­ ower industry ship venture start?

“It’s often Østensjø Rederi’s characteristic mix of luck and skill which lies behind this. It’s about seeing possibilities and using our back­ ground and experiences to pursue new areas,” says Lyngholm. He points out that the company’s development of hotel ships has given them experience ­using gangways on the open seas. These gangways have built-in, automatic compensation for waves so that the crew can safely be moved between the firm’s service and accommo­ dation ships and offshore installations. Local Karmøy-based company Marine Aluminium will be supplying the advanced gangway for both SOV´s. The shipping line’s organisation has long been assisting customers and their requirements when their personnel are on board. “It’s especially our subsea vessels which have given us our experience, where customers have many professionals on board who man subsea tools and equipment from our ships. At the same time, we offer these crews different types of working and living quarters, not least catering,” says Lyngholm. Crew Transfer Vessels (CTVs) have been used in the offshore wind industry for several years. But these are intended for transporting ­service personnel from land out to the offshore wind

The skill of operating gangways and advanced dynamic positioning control, will be very important in the offshore wind service industry. Animation: Østensjø Rederi

SJØFARTSTIDENE

|

NR. 1 – 2016

25


farms in the morning, returning to c ­ ollect and bring them back to land after the working day is over.

Alf Helge Lyngholm is the fleet manager offshore, including the wind segment. Photo: Thomas Førde

Companies which develop and operate ­offshore wind farms now want to link up with shipping companies that can o ­ perate l­arger ships on which service p ­ ersonnel can live for several days while the vessel remains offshore. At the same time, the larger a ­ ccommodation and SOV´s like the ones that ­Østensjø Rederi are c ­ onstructing will also be able to transport various kinds of equipment and ­supplies out to the field, ­equipment that can be transferred to the wind turbines as r­ equired. “Offshore wind industry companies also see cost-­ saving opportunities by having a boat ­stationed at the field, a vessel which can c ­ arry double the amount of crew as the smaller ­vessels can,” says Alf Helge Lyngholm, who adds that the new boats under construction have single cabin capacity for up to 60 people. The company needs 20 for its own maritime crew on board. “Our skills manning gangways and long ­experience of operating offshore vessels and using advanced dynamic positioning control (DP) systems will come in handy in the offshore wind market,” says Lyngholm.

who made it to the final round,” Lyngholm ­comments.

He adds that Danish energy company Dong invited them to submit a proposal for ­construction and operation of the new SOV´s. “We were shortlisted as suppliers and were picked from amongst three suppliers

Both the new vessels are going to serve the wind farms, Race Bank and Hornsea One. Both are operated by Dong Energy and the base will be in Grimsby. Graphics: Dong Energy

26

ØSTENSJØ REDERI

How innovative will these two new boats be?

“Dong, as an operating company within the offshore wind sector, is a new type of custom­ er for us. They have been in this industry for

a long time and know how they want things done. We’ve primarily discussed maritime and operational considerations with our client.” “Our subsea market clients have also given us experience and knowledge of best practice regarding fitting and design. The ship should primarily be practical and functional for the customer and should cover their needs,” says


Lyngholm, who points out that the wind service vessels on board cranes are smaller than those found on board subsea vessels. “Lifting requirements will normally be between 500 and 1,000 kilos. But the cranes also have to be designed to be operated in an ­extremely manoeuvrable and flexible way, and with equipment which compensates for the motion of the sea (motion compensated crane).” “Workshops, meaning small facilities where parts can be made and repaired as needed, can be fitted to the new boats. You’ll also need to be able to move goods and stock via the gangway instead of using cranes.”

VIL BLI TATT AV VINDEN I en svært krevende tid for leverandører til olje- og gassindustrien, kan Østensjø Rederi glede seg over kontraktene for bygging og drift av to større serviceskip til bruk blandt offshore vindfarmer. Nå starter rederi­ organisasjonen ved Smedasundet i Haugesund forberedelsene til å drive en helt ny type skip.

Det første av de to vindservicefartøyene skal være klart til bruk i September 2017. Animasjon: Østensjø Rederi

“The new SOV´s will be able to transport 12 containers, six of which are placed in the loading compartment below deck, and six on deck.”

Is there a major difference between the demands of customers in the offshore wind industry and those in the oil and gas sector?

“There’s greater focus on keeping costs down than there has been in the oil and gas indus­ try. It’s natural, since the wind power industry ­operates in a subsidised market. There’s a lot of continual technical development to make solutions as cost-effective as possible.”

Will there be major changes in the onshore organisation when the SOV´s are put into commission?

“We gained certain experiences when we ­entered the offshore accommodation m ­ arket. We subsequently established a ­ project group. We’ve then c ­onducted a reorganisa­ tion based on ­ experiences from the Edda ­Accommodation model. This led to a certain degree of s­ pecialisation, with one department for ­Tug operation, one for hotel ships, as well as an o ­ffshore department. The SOV´s will ­initially be part of the offshore fleet. Both ships will be based at Grimsby in ­England,” says Lyngholm, adding that the first ship to be used will service the Race Bank wind farm off the coast of Norfolk and Lincolnshire. This offshore wind farm will have an installed effect of 580 megawatts, a considerably larger one than the gas power plant at Kårstø was constructed with. The other ship is to operate in waters a little further east where the Horn Sea wind farm is located. The Grimsby base is also new and is currently being developed by Dong Energy.

De to nye fartøyene, som har fått b ­ etegnelsen SOV (Service Operation Vessel), skal bygges ved det spanske verftet Astilleros Gondan. Vindservicefartøyene blir 81,10 meter lange og 17 meter brede og er designet av Rolls Royce i nært samarbeid med Østensjø Rederi. Det første av de to skipene skal være klart til bruk 1. september 2017. For begge vindservicefartøyene er det inngått langsiktig kontrakt med det danske energiselskapet Dong Energy.

med, sier sier Alf Helge Lyngholm, sjef for offshoreflåten i Østensjø Rederi. — Vi har kunnskap om bruken av gangveier som har innebygget automatisk kompensasjon for bølger, slik at mannskap trygt kan flyttes fra rederiets service- og boligskip og over til en installasjon i havet. Dessuten har vi mangeårig erfaring med ­operasjon av offshorefartøyer generelt og med bruk av ­ avanserte systemer for d ­ ynamisk posisjons­ kontroll (DP), sier Lyngholm.

I vindkraftindustrien har man gjennom flere år benyttet såkalte «crew transfer vessel» (CTV). Disse fartøyene er beregnet på å frakte servicepersonell fra land og ut til vindmøllefeltene i havet om morgenen og bringe personell tilbake til land etter endt arbeidsdag.

— Er det stor forskjell på kundens krav i ­vindkraftindustrien i forhold til kunder i olje og gass?

Fleksible gangveier Nå vil selskapene som bygger ut og driver vindkraftparker til havs, knytte til seg rederier som kan drive større skip hvor service­ personell kan oppholde seg som bord i flere dager mens skipet ligger på feltet. Samtidig vil disse større losji- og serviceskipene, med lugarplass til 60 personer, også kunne frakte med seg utstyr og forsyninger av ymse slag, utstyr som kan flyttes over til vindmøllene etter behov. — Når vi skal inn i vindkraftmarkedet k ­ ommer vår erfaring med betjening av gangveier godt

SJØFARTSTIDENE

|

NR. 1 – 2016

27


BY THOMAS FØRDE

Edda Fjord has this autumn served as a mothership during maintenance and service work at the gigantic wind farms, Borkum Riffgrund 1 and Gode Wind in the German sector of the North Sea. Photo: Østensjø Rederi

PIONEERING EDDA FJORD:

A GUINEA PIG AMONGST THE TURBINES

“We’re like a guinea pig both for Østensjø Rederi and our client Dong Energy,” says Captain Pål Fredrik Hjelmeland on board the Edda Fjord. Edda Fjord, who was also a pioneer ship when the ­shipping ­company first entered the hotel ship market, is now anchored in the German part of the North Sea. It is serving as a mothership during ­maintenance and service work at the gigantic Borkum Riffgrund 1 and Gode Wind ­offshore wind farms. Hjelmeland is witness to the size of the vast wind farms which contain 78 and 97 huge wind turbines, respectively, that are to be visited by technicians who sleep and eat on board the Edda Fjord. “We’ve got over 50 technicians living on board in addition to the ship’s crew of 20. Most live in cabins in the superstructure, while some live in containers or temporary accommodation on deck,” Hjelmeland e ­ xplains, adding that the technicians on board come from several d ­ifferent ­companies. Most work for Siemens – the company that p ­ roduced and supplied the wind turbines – or for Dong Energy, who is the d ­ eveloper and operator responsible for running both wind farms.

have 14 days off, while Dong’s employees’ shifts are one week on and one week off. Hjelmeland explains that smaller passenger or crew boats (CTV, crew transfer vessel) arrive every day from land whilst Edda Fjord is at the wind farm. Reasons include transporting technicians from the base ship out to where they work on board the wind turbines. “How technicians are put on board the wind turbines varies a bit, which Edda Fjord. is either via CTVs, or by Edda Fjord lowering its gangway onto a small Photo: Østensjø Rederi platform on the wind turbine to allow technicians to walk from the ship to it. The method chosen depends on weather and sea conditions,” says Hjelmeland. He adds that the weather is not always suited to putting the technicians on board the wind turbines. Hjelmeland reckons that ­technicians might have to wait several days during late autumn and ­winter before they can start work at the wind turbines. 24-hour shifts are usually split into 12 hours working there and 12 hours on board the Edda Fjord.

Passenger ship or gangway Edda Fjord visits the harbour in Emden biweekly to pick up new s­ upplies and change crew. Siemens employees work 14 days on board then 28

ØSTENSJØ REDERI

Different gangway use


Earlier this year, the Edda Fjord was assigned to a similar task at the wind farm off the coast of England. “But we were used as a pure accommodation ship there and hadn’t put a gangway in place on board,” explains Captain Pål Fredrik Hjelmeland. He also says that using the gangway at the wind turbine farms is one thing that differs from tasks that the ship and crew have previously ­performed for the oil industry, where the vessel could be connected to an installation at sea via a gangway for several days at a time.

FACTS ABOUT THE EDDA FJORD

“That’s why it’s primarily those working on the bridge on board the Edda Fjord who notice this is a new and unfamiliar operation,” says Hjelmeland, who adds that this is also a new procedure for both the

Yard:

Flekkefjord slip og Maskinfabrikk

Registered:

Marshall Islands

Ship type:

Multipurpose vessel and supply ship (MPSV)

Length:

98.16 metres

Beam:

22 metres

Construction year: 2002

PIONERSKIPET EDDA FJORD, PRØVEKLUT BLANT OFFSHORE VINDFARMER — Vi er som en prøveklut både for Østensjø Rederi og for kunden vår Dong Energy, sier kapteinen om bord i pionerskipet Edda Fjord, Pål Fredrik Hjelmeland. Det allsidige skipet har denne høsten utført oppdrag for Dong ­Energy i tysk del av Nordsjøen. Edda Fjord er moderskip ­under ­vedlikeholds- og servicearbeid i de gigantiske offshore v­ indfarmene Borkum Riffgrund 1 og Gode Wind.

Edda Fjord is operating the gangway in the wind farm. Photo: Edda Fjord/Østensjø Rederi

ship’s and ­company’s client. Dong has been in the wind power ­business for a long time, but has used small passenger ships – CTVs – to ­transport the technicians. The company has never had a mothership with a hotel, workshop, and storage space out at the field before. Edda Fjord can also assist technicians by using the ship’s cranes to lift bags of equipment from the mother ship over to where they are working on the wind turbines. “The working day at the wind farms is nice and varied, all in all,” says Hjelmeland

Learning from the Edda Fjord Edda Fjord has previously been used both as a mother ship for ­undersea work and as a supply ship. The ship has been used as a accommoda­ tion vessel with a large accommodation module fixed to the deck. Her pioneering days as a accommodation vessel were off the coast of Africa and in the Gulf of Mexico.

— Vi har jevnt over 50 teknikere boende om bord i tillegg til ­skipets mannskap på 20. Bruken av gangveien er noe av det som ­skiller o ­ perasjonen i vindmølleparker fra oppgaver som skip og mannskap tidligere har utført for oljeindustrien. I vindparkene blir det oppkobling til installasjoner i havet flere ganger for dagen, mens i olje- og gassindustrien kunne fartøyet være oppkoblet til samme installasjon flere dager i strekk, forteller Hjelmeland.

Høster lærdom fra Edda Fjord Edda Fjord har tidligere vært benyttet som moderskip for undervannsarbeid og som forsyningsskip. Skipet har vært benyttet som hotellskip med en stor boligrigg fastmontert på dekk. Pionertiden som hotellskip ­hadde Edda Fjord utenfor Afrika og dernest i ­Mexico-gulfen. — Operasjoner i vindparker til havs gir oss innblikk i hva vi har i vente for de nye spesialskipene til vindkraftindustrien, sier flåte­ sjef Alf Helge Lyngholm. Han sier videre at rederiet gjennom Edda Fjords operasjon får erfaring med å ha Dong som kunde og ­samtidig samle erfaringer rundt hvordan mannskapet om bord i de nye vindservicefartøyene må organiseres og settes opp.

“This operation at the offshore wind farm gives us a preview of what is in store for us regarding the new special ships for the wind pow­ er i­ndustry,” head of fleet Alf Helge Lyngholm says. He also remarks that having Dong as a customer using Edda Fjord for this operation both gives the ­shipping company experience, and gathers indications for how the crew on board the new wind service vessels should be ­organised and rostered.

SJØFARTSTIDENE

|

NR. 1 – 2016

29


“The business must also take much of the blame for the difficult situation due to an overly expansive new-build programme. Says the new CEO, Kenneth Walland. Photo: Haakon Nordvik

30

ØSTENSJØ REDERI


BY THOMAS FØRDE

Kenneth Walland takes over the helm of Østenjø Rederi in the middle of the worst crisis for the offshore fleet. The former sea Captain aims to steer the shipping company through the storm and make it more competitive.

CHANGE OF WATCH IN THE MIDST OF THE STORM “The market has not been as bad for our business since the 1980s,” says Walland, who adds that the seriousness of today’s situation is even more evident than it was about 30 years ago. “Considerably larger values are involved today in comparison with the 1980s, which will mean the drop will be even larger. Debt ratio is also very high. The proportion of equity is greatly reduced, and partly gone. Shipping companies are at risk of sinking,” says Walland. He points out that there are several reasons behind today’s difficult situation and that low oil prices obviously form an important part of this.

Business must take a lot of the blame “But the business must also take much of the blame due to an overly expansive new-build programme. This has driven up the debt ratio, and as the market collapses, which it is doing so now, this fall in fleet value leads to either a weakened, or at worst lost company equity ratio,” says the new Østensjø Rederi CEO, also pointing out that far too many ships have been built in certain sectors, generally-speaking. “It’s extreme regarding supply vessels (PSVs). While activity has ­declined, there’s been substantial growth in the number of modern and expensive ships in many shipping companies. Consequently, removing vessels from the industry becomes difficult when very many of them constitute a modern tonnage with high debt,” says Walland.

The farmer’s son who went to sea The new CEO began his career at the company in 1994 when he was employed as HSEQ-Manager by Johan Rokstad, who was CEO at that time. Both men have remarkably similar backgrounds. Both have sailed as Captains and both are sons of farmers. Having grown up on the farm, they then went on board their respective boats and went to sea at a young age. Rokstad grew up in Hundsnes in Tysvær, while Walland comes from a farm in Åkrerhamn on the western side of the island of Karmøy. The family were dairy farmers and Kenneth had to learn farm work early. Choosing a maritime role is not unnatural on the western side of Karmøy. Walland explains that he had uncles and brothers who went to sea. He took an examen artium because he wanted something to fall back on. He started training to be a Navigation Officer some years after he began his c ­ areer on board a ship. His examen artium meant he could finish his Navigation Officer´s training at the seamen’s school in Oslo in a shorter time. Then he got a job at the Oslo-based Ditlev Simonsen shipping company. Walland sailed worldwide, travelling round the world on board tankships, chemical ships, and bulk carriers. He spent a period of time on shore for Master Mariner education in Haugesund. But when the downturn came and the bottom fell out of the tanker ­market, he did his military service, attended the Royal Norwegian Naval Academy, and subsequently served on board coastguard vessels.

SJØFARTSTIDENE

|

NR. 1 – 2016

31


Cruising He then worked at the Norwegian Petroleum Directorate in S ­ tavanger for a couple of years in their safety and emergency preparedness ­department. But the call of the sea still sounded. Between 1990 and 1994, he sailed as a staff Captain on board Royal Caribbean Cruise Line ships in ­pleasant and tourist-friendly waters including the Caribbean Sea and the Pacific Ocean. He was also hired as construction supervisor at a yard in France, taking a newly-constructed cruise ship out, which was the world’s l­argest at that time. It was while Kenneth Walland was serving on board a cruise ship that someone pointed out an advert from Østensjø Rederi, who were l­ooking for a head of quality assurance. Walland sent in an application, was called to interview with incumbent operational Chief at the company, Johan Rokstad, and was hired shortly afterwards. There were 10 employees at the company’s office in Haugesund back then. They were in charge of operating Tugs and four supply ships. The onshore organisation has grown to almost 50 employees today. When Rokstad became CEO in 1998, Walland was given the job of ­responsibility for fleet operations. He [Walland] held the post, which had various role descriptions, until he assumed Rokstad’s top job at the company in March.

Selling is difficult in times with extremely few buyers, that’s why scrapping must also be considered

“The industry must put its own house in order regarding the v­ essel surplus. This job has already started, with companies taking ­ boats off the market, laying them up, and trying to sell off older ones. But selling is difficult in times with extremely few buyers, that’s why scrapping must also be considered,” says Walland. He also points out another challenge in the industry. “There are many small shipping companies, while getting a coordinated reduction of the fleet would have been easier if there were fewer and larger shipping companies. But that’s quite a target to attain, what with the restructuring that the industry has already begun doing.”

How does Østensjø Rederi save costs in demanding times?

All parties are ­dependent upon the shipping ­companies remaining afloat. ­Otherwise, oil ­companies will be hoisting themselves on their own p­ etard when there are fewer suppliers and ­providers, and fewer who set the price for vessel services.

“We’ve done a fair bit to lower costs at sea and on land. But we have the potential to do more. This is some­ thing we are working on c ­ ontinually regarding staff, crew, the fi­nancial side, and within operations. It’s about finding smarter ways of ­working. This is absolutely ­essential in order to survive the crisis, as well as to be competitive when the market picks up again. We laid-off about 50 seamen and had to make several people redundant on board and ashore,” says Walland. He adds that “while several of our vessels are laid up, we have to work even harder at the office to get ­assignments for ships and crew.” “Furthermore, we can use the downtime to perform ship mainte­ nance. We must continually assess whether we’re using personnel and crew resources correctly.”

Kenneth Walland also says that company management will discuss and identify further cost-cutting measures with union representa­ tives and employees using this year’s pay negotiations as a basis. “This will undoubtedly be extremely demanding for all parties, but nevertheless an absolute necessity to get us through the next few ­ years,” he says.

How can the number of offshore vessels match demand again? Can publicly-funded scrappage schemes be a suitable measure?

“We’ll certainly accept stimulation measures from the public ­sector, but I don’t think that this can e ­ ither be expected or that it is easy to achieve. It will also be an easy ­solution to ask authorities to put things in or­ 32

ØSTENSJØ REDERI

der after shipping companies have built too many vessels. Authorities can make a much more import­ ant ­ contribution by facilitating ­increased continental shelf activity within exploration, maintenance, development of fields, plugging, and removing ­ decommissioned ­installations.”

It’s been suggested that all ships constructed before 2000 should be taken off the market. Is this a good one?

“The suggested age-limit isn’t wrong. There’s a critical limit when a ship passes 20 years. Then it has to undergo an expensive 20-year classi­ fication, and ships constructed before 2000 will be about 20 years old when the crisis in the offshore market is over. But taking ships out of this branch to find new uses for them will have the same effect. Those who need ships for other tasks should use the chance to get good q ­ uality, high-specification ships now, and for a sum slightly higher than the value of the steel. Many of these vessels could be given a good and long life outside the oil industry,” says Walland.

How much of the responsibility would you place on the oil companies or the charterers for this crisis?

“All parties are dependent upon the shipping companies remaining afloat. Otherwise, oil companies will be hoisting themselves on their own petard when there are fewer suppliers and providers, and fewer who set the price for vessel services. Day rates have been too low recently. We see charterers who offer 30,000 per 24-hour rental period for a supply ship which requires 75,000 kroner to cover operational costs. We can’t survive on those kinds of rates. Then it’s better to take the boats off the market.”

What’s your experience of Statoil’s role as charterer in today’s ­difficult market?

“Statoil is neither better nor worse than other operator companies. But at the same time, Statoil has achieved a position on the Norwegian ­Continental Shelf which is unique, and which has obligations. Statoil must be willing to pay rates which are financially viable. I’m talking about rates that should at least cover short-term operation and crew costs, but finance costs in the slightly longer-term too.”

Windy Kenneth Walland, his wife, and two children lived in Førresfjorden in Tysvær for a long time. The family has now moved to Haugesund, and also built a house just south of Åkrehamn near Åkresanden. It is a pretty spot. The Wallands have a view of the sea from their house near the beach and plenty of opportunities for lovely walks. From his living room,


he has a view of what is currently the world’s only floating wind turbine – Statoil’s pioneering project called Hywind. This could have inspired the shipping company’s focus on SOV´s for the offshore wind industry. In the course of the next two years, Østensjø Rederi will incorporate two, brand new specially-constructed ships into their fleet which will provide services for the wind industry in the North Sea. “We’ve submitted offers for several similar tasks,” says Walland, pointing out that Østensjø Rederi is in a better situation than many other shipping companies similar to them.

Several feets to stand on “We’ve got several feets to stand on with our tugs, accommodation ­vessels, offshore vessels, and soon several new SOV´s for the wind power sector. Our equity situation is also good, as is our liquidity, there are no bonds, and company is not listed on the stock exchange. But our company and the entire branch faces a tough winter. We must ­implement the right measures in our own company, and we reckon on being able to land some contracts which will contribute to covering some of our operating and finance costs. This will mean we’ll be able to pull through this,” says Østensjø Rederi’s new CEO.

VAKTSKIFTE MIDT I STORMEN Midt i den verste krisen for offshoreflåten, overtar Kenneth Walland som toppsjef i Østensjø Rederi. Den tidligere sjøkapteinen har som mål å lose rederiet gjennom stormen og gjøre det enda mer konkurransedyktig. — Vår næring opplever et så dårlig marked som vi ikke har vært i nærheten av siden 1980-tallet, sier Walland, som legger til at alvoret i dagens situasjon blir enda mer tydelig enn det var for ca. 30 år siden. — Sammenlignet med 1980-tallet er det i dag betydelig større verdier involvert, og dermed vil fallhøyden bli desto større. Gjeldsgraden er dessuten veldig høy. Andelen av egenkapital er sterkt redusert og til dels borte, rederier står for fall, sier han og peker på at årsakene til dagens vanskelig situasjon er flere og at lav oljepris selvfølgelig er en viktig del. — Men næringen må også ta mye av skylden. Generelt sett er det bygd altfor mange skip i visse segmenter, sier den nye topp­sjefen, som begynte i Østensjø Rederi i 1994, da han ble ansatt som kvalitetssikringssjef. Walland er oppvokst på en gård nær Åkrehamn, på Karmøys vestside, hvor det slett ikke var unaturlig å velge et maritimt yrke. Han har seilt som styrmann i utenriksfart, reist jorda rundt om bord i tank-, ­kjemikalie- og bulkskip. Senere gikk han på Sjøkrigsskolen og tjenestegjorde om bord i kystvaktfartøy. En periode jobbet han på land i Oljedirektoratet i Stavanger, før sjømannslivet lokket igjen. Fra 1990 til 1994 seilte han som «Staff-Captain» om bord i cruisebåter som tilhørte Royal Caribbean Cruiseline.

rydde opp selv. Den jobben er påbegynt ved at rederiene tar båter ut av markedet og legger de i opplag og at eldre blir forsøkt solgt, sier Walland, som peker på at det ville vært lettere å få til en samordnet reduksjon av flåten hvis rederiene var færre og større. Konsekvensene av ubalansen i markedet viser seg ved at dagratene har vært altfor lave. — Vi opplever at befraktere tilbyr 30 000 kroner i døgnleie for et forsyningsskip som trenger 75 000 kroner for å dekke sine driftskostnader. Med slike rater kan vi ikke overleve. Da er det bedre å ta båtene ut av markedet, sier han. Fra stuevinduene i familiens nybygde hus nær Åkrasanden har rederi­ sjefen utsikt til verdens foreløpig eneste flytende havvindmølle, ­Statoils pionerprosjekt kalt Hywind. Dette kan ha gitt inspirasjon til rederiets satsing på serviceskip til havvindindustrien. To slike n ­ yutviklede fartøyer er under bygging og skal inn på langtidskontrakt for Dong Energy. — Rederiet har utarbeidet tilbud på flere liknende oppgaver, sier ­Walland, som peker på at Østensjø Rederi på mange måter er i en bedre situasjon enn mange andre lignende rederier. — Vi skal komme oss gjennom dette, sier den nye toppsjefen.

Da Kenneth Walland ble ansatt var det 10 ansatte på rederikontoret i Haugesund. I dag har denne organisasjonen på land vokst til nærmere 50 medarbeidere. Da Johan Rokstad i 1998 overtok rollen som ­administrerende direktør, fikk Walland ansvaret for driften av flåten. Denne oppgaven har han hatt under ulike stillingsbetegnelser, inntil han i mars overtok toppjobben etter Rokstad. Kostnadskutt og innsparinger har preget bransjen de siste par årene. — Vi har gjort en god del, både på land og på sjø med å senke ­kostnadene. Men vi har potensiale til å gjøre mer. Det gjelder om å finne smartere måter å jobbe på. Dette er et «must» for å overleve krisen, men også for å være konkurransedyktig når markedet tar seg opp igjen. Vi har permittert ca. 50 sjøfolk og i tillegg måtte vi i vår gjennomføre oppsigelser, både om bord og på land, sier rederisjefen. På spørsmål om hvordan balansen i markedet for offshoreserviceskip kan gjenopprettes, svarer han at myndighetene kan yte viktige bidrag ved å legge til rette for økt aktivitet på sokkelen innen leting, vedlikehold, feltutbygging, plugging og fjerning av utrangerte installasjoner. — Men når det gjelder overskuddet av fartøyer, må næringen må

Kenneth Walland Photo: Haakon Nordvik

SJØFARTSTIDENE

|

NR. 1 – 2016

33


VESSELS IN OPERATIONS

Silex Felix escorting Glen Lyon. Photo: Astrid Hagland Gjerde

Towage spotting from Edda Flora

34

ØSTENSJØ REDERI


Edda Freya working for DeepOcean. Photo taken from Edda Fauna

Laying flexible pipe, Edda Freya and Edda Fauna Photo: DeepOcean

Thorax and Vortex rig move

Silex and Vortex

Thorax arriving Tallin after her last voyage for Østensjø Rederi

DeepOcean vessels Edda Freya and Edda Fauna - Maria ­installation project - at Kristin field. Photo: DeepOcean

Silex and Velox assisting Submarines

SJØFARTSTIDENE

|

NR. 1 – 2016

35


“Shipping companies must be more cost conscious and efficient. Those who don’t manage to adapt to this will fall behind and ultimately lose,”says CFO Håvard Framnes. Photo: Østensjø Rederi

BY THOMAS FØRDE

“WE MUST ADAPT” “This is serious. We can’t believe that today’s difficult situation will pass by simply continuing as we have done. We must adapt. This applies to both the branch in general and for our shipping company,” says Håvard Framnes, Østensjø Rederi’s CFO. He underlines that the entire industry must examine itself. “Operation must become more efficient and the actual boats must be built to suit the needs that they will be filling. We must come up with more standardised solutions. For many years, the customer has been willing to pay for many types of innovations and for equipment that it’s nice to have, but we must be careful assuming that this will continue,” says Framnes.

“But innovations must first and foremost now promote efficiency. At the same time we’ll have to work hard to remove all procedures, routines, and customs which have contributed towards creating a disproportion­ ately high cost level,” says Framnes.

He does add, however, that innovations and technical solutions that Norwegian industry has developed have been a major benefit up until now, as the solutions have been exported and contributed towards de­ veloping the Norwegian supply industry.

“Shipping companies must follow up and be more cost conscious and efficient. Those who don’t manage to adapt to this will fall behind and ultimately lose.”

36

ØSTENSJØ REDERI

He also points out that there must be increased focus on efficiency in work on creating new types of boats.


Østensjø Rederi’s situation The CFO also points out that the shipping company has relatively low debt and no bonds. Companies’ liquidity is generally also good. “This means that we’re still lord of the manor and can have a sensible dialogue with the banks. Getting an agreement with Hyundai and pay­ ing installments on accommodation vessel that we cancelled was im­ portant. That’s why we’re in a better situation, with more flexibility to be able to finance our new build pro­ gramme, which consists of three new Tugs, four mooring vessels, and two s­ ervice boats for the off­ shore wind i­ndustry,” says Håvard Framnes.

Østensjø Rederi has several advantages in today’s situation, ­including that we’re diversified

“Østensjø Rederi has several advantages in today’s situation, ­ ­including that we’re diversified. We operate Tugs, supply ships, subsea vessels, construction ships, and ­ accommodation vessels. This means that we have several feets to stand on. It’s a major advantage in this market,” says CFO Framnes. He also points out that Østensjø Rederi’s commitment to the offshore wind market will diversify the shipping company further, including ­outside the oil and gas market. According to Framnes, this will make the shipping company even better-prepared for the future.

The bank and the owners Framnes indicates several measures on the financing front that have been necessary to implement in the brutally weak market. The ship­ ping company has negotiated postponed capital payment deals with the banks for some of the shipowning companies. “We’ll probably have to complete several rounds of negotiations with the banks to change the loan conditions,” says the CFO, who points out other measures on the ownership side: “We’d like get ownership partners when we’ll be taking over the new wind service vessels. This has been the plan ever since we entered this segment.” “We’ve just completed a reorganisation of the Tug fleet where all the various shipowning companies are to be placed under one common holding company. Afterwards, it might be appropriate for us to divest or obtain new equity via a share issue.” “This type of reorganisation will probably make refinancing the fleet ­easier, as well as getting the banks to agree to finance new projects. We also believe that this organisation will make it simpler to draw up and implement a common strategy for the Tug segment,” says Håvard Framnes.

The offshore fleet struggles to find assignments Today’s market is extremely demanding for the shipping company’s fleet of offshore service vessels. Two of the shipping company’s four supply boats (PSVs) are laid up. “It’s difficult to perceive a light at the end of the tunnel for now. Several boats must be taken off the market first. Our shipping company has a supply boat for sale,” says Framnes, who adds that the situation is also extremely demanding for the vessels in the subsea segment. Two of the subsea vessels are hired out to Reach Subsea and DeepOcean,

respectively. Both charterers have short horizons when it comes to ­assignments that are waiting. “We’re extremely satisfied that DeepOcean recently announced that they were going to carry out a capital increase. It’s also good for ­Østensjø Rederi,” says Håvard Framnes. He adds that 2017 will be more demanding than 2016, but the outlook for 2018 or 2019 might be brighter, especially for the subsea segment.

“VI ER NØDT TIL Å TILPASSE OSS” — Dette er alvor. Vi kan ikke tro at dagens v­ anskelige situasjon skal gå over, bare ved å fortsette som før. Vi er nødt til å forandre oss. Det gjelder både for bransjen generelt og for vårt rederi, sier finans­ direktøren i Østensjø Rederi, Håvard Framnes. Han understreker at hele bransjen må gå i seg selv. — Driften må bli mer effektiv og båtene må bygges konkret e ­ tter det behovet de skal dekke. Vi må komme fram til mer standar­ diserte løsninger. Nå må nyvinninger i første rekke fremme effektivitet. Samtidig må vi jobbe hardt for å fjerne alle prosedyrer, rutiner og vaner som har bidratt til å skape et uforholdsmessig høyt kostnadsnivå, sier Framnes. Om Østensjø Rederis egen situasjon sier finansdirektøren at ­selskapene har relativt lite gjeld, ingen obligasjonsgjeld og er i en god likviditetssituasjon. — Dette gjør at vi fremdeles er herre i eget hus og kan ha en fornuftig dialog med bankene, sier Framnes, som peker på at Østensjø Rederi har flere fortrinn i dagens situasjon: — Vi er diversifiserte ved at vi opererer taubåter, forsyningsbåter, subsea-fartøy, konstruksjonsfartøy og boligfartøy. Satsingen på vindmøllemarkedet vil bety enda flere bein å stå på. Blant tiltak, finansielt og organisatorisk, peker Framnes på at rederiet har forhandlet fram avtaler med bankene om utsatt ­ ­betaling på avdrag for enkelte av de skipseiende selskapene. — Vi må trolig gjennomføre flere forhandlingsrunder med bankene. Når vi skal overta de nye vindservice-fartøyene, ønsker vi å få med partnere på eiersiden. Vi gjennomførte nylig en omorganisering av taubåtflåten og alle de ulike skipseiende selskapene skal legges inn under ett felles holdingselskap. I etterkant kan det bli aktuelt at vi selger oss ned i taubåtselskapene eller at vi kan få tilført ny egenkapital gjennom emisjon, sier Håvard Framnes. Dagens marked er svært krevende for rederiets flåte av ­offshore-servicefartøyer. — For øyeblikket er det vanskelig å skimte lyset i enden av ­tunnelen. Først må flere båter tas ut av markedet. 2017 vil bli mer krevende enn 2016, men det kan bli en lysning i 2018 eller i 2019, spesielt for subsea-segmentet, sier finansdirektøren.

SJØFARTSTIDENE

|

NR. 1 – 2016

37


Team Leader Björn Richter received the award at P&I Scandinavia’s head office in Gothenburg. The team divided the award equally within the group.

SPOT THE HAZARD Edda Fonn engine crew winners of the ­international safety ­competition BY BJÖRN RICHTER

In late 2015, The International Chamber of Shipping and The Standard Club arranged a worldwide competition called the “Spot the Hazard Competition”. 2nd Engineer Björn Richter on board PSV the Edda Fonn picked up on the competition and gathered a group of competitors from his department. The participants received pictures of five ­different areas on board a ship with various dangers, had to highlight the prospective ­dangers, and come up with a proposal on how to improve safety and work environments in each area from an HSE perspective. Richter immediately fell for the idea of using a competition to promote HSE discussions and raise awareness regarding onboard safety. “I think HSE is an interesting and important area, so I put together a group of my engine room colleagues on board the Edda Fonn to take part in the competition,” says 2nd ­Engineer Björn Richter. The Edda Fonn group was announced as the winners of one of the five areas in the competition, namely “Safety in the Galley”. ­ The award was USD 2000, which team leader

38

ØSTENSJØ REDERI

Richter a ­ dmits was a great incentive for joining the competition.

COMPETITION FACTS Number of seafarers who entered: Number of posters generated:

590 1300

Over 70 companies represented amongst the entrants. The winning team from Edda Fonn consisted of: Gunnar Ljostveit (Chief Engineer), Björn Richter (2nd Engineer and team leader), Roger Sørvaag (Electrician), and Nicolay Andersen (Motorman Apprentice)


100 YEARS OF SERVICE This year we reached a total of 100 years in service when four of our employees each celebrated 25 years with Østensjø Rederi. Well done! From left: Chief Engineer Hans Inge Mannes, CEO Kenneth Walland, Chief ­Engineer Paul Inge Kolbjørnsen, Chief Steward Endre Dommersnes and AB/Crane Operator Einar Tjøsvoll.

Håkon Vevang receiving the price from Roman Grebe, Managing Partner, F3O Offshore Brokers. Photo from Annual Offshore Support Journal Conference, Awards & Exhibition 2016

OFFSHORE RENEWABLE AWARD TO ØSTENSJØ REDERI Our new offshore support vessel won this year’s ­offshore renewable award at the Annual Offshore Support Journal Awards in London. The OSJ Offshore Renewable Award recognizes companies, projects, or products that have made a significant contribution to the development of the offshore renewables market during the previous year. This year’s award ceremony was held on February 4th and ­gathered 400 professionals. By winning this award, we believe we are recognized for our focus on building vessels optimized for their operational use. Our charterer, Håkon Vevang, had the honor of receiving the award on the company’s ­behalf. This is the second prize that OSJ has awarded Østensjø Rederi. In 2013, we won the ­Environmental Award for our platform supply vessel the Edda Ferd – a vessel that was the most environmentally-friendly vessel in the world upon delivery.

A purpose-built offshore support vessel This amazing new vessel is one of the first in the world to be purposely designed and built for work at offshore wind farms. Its hull design and heave-compensated gangway makes for an optimal and safe walk-to-work experience for the wind farm technicians. This particular vessel will work for DONG Energy at the Race Bank Offshore Wind Farm situated off the coast of Lincolnshire, UK. The vessel is designed by Rolls-Royce, and can accommodate up to 40 wind turbine ­technicians in addition to a marine crew of 20. The vessel is 81.1 m in length and has a beam of 17 m. The ship is designed with a high focus on seakeeping capabilities, excellent station keeping performance, high accommodation standard, and reduced fuel consumption. You can find more information regarding the vessel and our contract with DONG energy on our webpage at www.ostensjo.no

CELEBRATING 50 år: 14.03.2016 05.06.2016 06.09.2016 21.09.2016 03.10.2016 27.10.2016 17.12.2016 28.12.2016 13.04.2017 30.07.2017 29.10.2017

60 år: 10.04.2016 13.07.2016 21.11.2016 23.11.2016 02.12.2016 13.12.2016 13.12.2016 07.01.2017 05.04.2017 10.04.2017 18.05.2017 04.06.2017 31.08.2017 01.09.2017 11.09.2017 16.09.2017

Charlie Tasker Garry Read Alf Ivar Vestvik Jone M. Holm Roald Inge Pedersen Steinar Hindal Inge Brekke Vidar Svendsen Christopher Rice Ole A. Kjørlien Kjell Inge Dirdal

Christopher Sladovich Arne J. Vestre Timothy Hooper Søren Sødergrann John Einar Edvardsen Bjørn Atle Kalland Terje Rostad Josef Malec Harald Aarbø Arne Lygre Frank Aasnes Roy Arne Gaustad Jan Arne Solberg Lars Arve Varne Odd Kåre Alvestad Jarl Idar Haraldseid

SJØFARTSTIDENE

|

NR. 1 – 2016

39


BRITISH STATE MEDAL TO “OUR MAN” IN SOUTHAMPTON BY THOMAS FØRDE

Østensjø Rederi’s Southampton-based Area Towage Manager UK, Nick Jeffery, has been given the Merchant Navy Medal for Meritorious Service. Her Royal Highness Princess Anne handed out the industry state award to 13 selected winners during a ceremony in London in November. “It was a very special day for me,” says Nick Jeffery, adding that the Princess took the time to talk with medal winners and their families. “She was well-prepared and knew a little about my maritime career. She asked about how recruitment and training of seafarers today compares to when I first went to sea,” Jeffery recounts.

Nick Jeffery with the Merchant Navy Medal. Photo: Østensjø Rederi

Nick Jeffery received the medal for his notable efforts in promoting the seaborne career path aimed at young seamen and officers, helping many of them develop within their trade. Jeffery has held maritime jobs for 43 years. He started as a cadet in P&O in 1973. Some ten years later, he took the leap into the oil age, getting a job on offshore service vessels with Star Offshore in Aberdeen. His ranks have spanned from a deck officer on anchor handling vessels and supply boats to Master in 1988. When Østensjø Rederi secured their first UK tug contract in S ­ outhampton in 1993, Nick Jeffery was appointed as one of the first Masters, also playing a key role in developing the company’s new business. Jeffery worked for other companies from 2000 to 2006, before returning to Østensjø Rederi’s tug business, where he now serves as UK area manager of Østensjø Towage. Jeffery’s maritime career has included the benefit of education and safe­ ty training for seafarers, in addition to recruiting. He has been very active in leading positions in various maritime organisations for many years. Amongst these was at non-profit organisation the Ship Safe Training Group (SSTG). Another leading position has been at The British Tug Owners ­Association (BTA) – the association for companies engaged in tug operations in the UK. One of its main goals is to improve safety by spreading knowledge of best practices in the industry. Jeffery is also heavily involved in the local shipping association, the Southampton Shipowners’ Association, where he has been Chairman for several years. It is through the association that Nick has helped ­secure funding for organising visits from students and schoolchildren on board various types of vessels. Their purpose is to promote e ­ mployment 40

ØSTENSJØ REDERI

opportunities in the maritime industry. Funding has also been made available to local maritime charities. Some years ago, both Solent Towage and Østensjø Rederi helped sponsor the construction of a new vessel designed to take handicapped passengers on trips in local waters.


HEDERSMEDALJE TIL “VÅR MANN” I SOUTHAMPTON I november ble Østensjø Rederis leder av slepebåtoperasjonen i South­ ampton, Nick Jeffery, tildelt hedersmedalje for fortjenestefull innsats i den britiske handelsflåten. Det er britiske myndigheter som deler ut medaljen Prinsesse Anne sto for utdelingen av hedersmedaljer til 13 utvalgte vinnere under seremonien i London. — Det var en veldig spesiell dag for meg, sier Nick Jeffery, som legger til at prinsessen tok seg tid til å snakke med medaljevinnerne og deres familier. — Hun var godt forberedt og visste litt om min maritime karriere. Hun spurte om ­rekruttering og opplæring av sjøfolk i dag sammenlignet med da jeg først dro til sjøs, sier Jeffery. Han mottok medaljen spesielt for sin innsats med å fremme karriereveien til sjøs overfor

ungdom og for å ha hjulpet mange av dem til å utvikle seg innenfor sitt fag. Jeffery har hatt maritime jobber i 43 år. Han startet som en kadett i P & O i 1973. I 1983 tok han spranget inn i oljealderen, og fikk jobb på offshore servicefartøyer med Star Offshore i Aberdeen. Her gikk han fra jobb som dekks­ offiser på ankerhåndteringsfartøy og supplybåter til kaptein i 1988. Når Østensjø Rederi sikret sin første taubåt­ kontrakt i Southampton i 1993, ble Nick Jeffery utnevnt til en av de første taubåtkapteinene. Han har dessuten hatt en sentral rolle i ­utviklingen av selskapets virksomhet på dette området.

Nick Jeffery sammen med kolleger og familie etter medaljesermonien i London i november. Foto: Østensjø Rederi

THE NUMBER ONE ISO 9001:2015 – The first shipping company in Norway On December 1st 2015, DNV GL represented by Arne Willy Skarstein visited our office in Haugesund to perform the ISM renewal, the ISO 14001 renewal, and the ­initial ISO 9001 audit. The result was that as of January 25th 2015, we could proudly present ourselves as being the first Norwegian shipping company to be ­certified with the latest edition of the ISO 9001 standard. In addition, we are the first shipping company in the world to be certified by DNV GL. The ISO 9001 standard is a quality manage­ ment standard that helps organisations to be­ come more efficient and to improve customer satisfaction. The standard is based on the idea of continual improvement. We assess the overall context of the organisa­ tion in order to define who is affected by our work and what they expect from us. This helps us state our objectives clearly and identify new business. The new revised ISO 9001 standard is focusing more on risk and opportunities.

When successfully implemented, the ISO 9001 standard will help increase productivity and efficiency by aligning our work tasks in ­processes. At the same time, we also renewed and upgraded our ISO 14001 certificate to the ­ ­latest edition of this standard. Both the 9001 and 14001 are now aligned with a high level structure (HLS), making it easier to implement other standards with the same structure. When the International Standard Organisation (ISO) implements OHSAS 18001 as an ISO standard, the ISO 45001, it will be using the same HLS. The expected release date has been postponed until June 2017. As a result, we have decided that we are going for OHSAS 18001 certification prior to upgrading to ISO 45001, which will be at a later stage. SJØFARTSTIDENE

|

NR. 1 – 2016

41


PHOTO CONTEST COMPETITION RULES

PRIZES

Do you have pictures of our company, our employees or our vessels?

1ST PLACE: 2ND PLACE: 3RD PLACE:

Send your photos to post@ostensjo.no. Enter the name(s) of the person(s) and place displayed in the picture and/or its theme in the subject field. Include your full name and contact information in the e-mail. Enter as many pictures as you want. Photos must be at least 1 MB. We publish the winning photos in our next issue. Østensjø Rederi reserves the right to use all submitted photos.

42

ØSTENSJØ REDERI

AND THE WINNERS ARE NOK 1500,NOK 1000,NOK 500,-

SUBMISSION DEADLINE 1st November 2017

JURY Photographer Øyvind Sætre in collaboration with the editorial staff.

1. Frode Eineberholm – Edda Ferd Working Regalia and Brent Charlie 2. Christopher Poulton – Fire drill at Fawley Marine Terminal 3. Marcus Konstantin Hoel Jacobsen – Sleipner A Photos: The winner and a sample of the pictures that entered the competition


2

3

1

SJØFARTSTIDENE

|

NR. 1 – 2016

43


ON THE SOCIAL SIDE Roald Larsen and Tore Velde, along with over 110 other ­swimmers participated in 5 km Gozo-Malta open Water ­Swimming Competition in Malta August 2016. Sporty Account department, from left: Håvard Framnes, Lisa Vail, Anett Underhaug Våge, Doreen Gatt, Rodianne Spiteri

Hans Magnar Engeset is practicing his golf swing on the m ­ obile driving range located on the helideck, Edda Fonn.

44

ØSTENSJØ REDERI


Team Østensjø at Nordsjøcup May 2016, front from left: Andreas Strand, Liv Johanne Snare, Knut Rogne, Miriam Hanson, Marcus Jakobsen, Freddy Hauge, behind from left: Thomas Wiig, Tore Velde, Robert Jensen, Eirik Tjorven Halleland, Camilla Fjell, Katrine Hustvedt. Not present Andre Hatleskog.

Advis sponsorcup i Vardhallen February 2016. from left: Liv Johanne Snare, Katrine Hustvedt, Vivian Steinsvik, Tore Velde, Miriam Hanson, Roald Larsen, Camilla Fjell og Thomas Wiig.

Magnus Storesund is inspecting the equipment during a golf tournament on helideck, Edda Fonn.

Thomas Wiig, earned third place in the National Triathlon Championship in his class August 2016 with the time: 1:11:05.

Triathlon in UK – Olympic distance (1,5 km swim, 40km cycle and 10km rum) Andy Read

Poul Vestergard from Dong Energy participating in IronMan 70.3 Haugesund July 2016 in Østensjø Rederi colors.

Camilla Fjell receiving the honorable award for best Sportsmanship under Nordsjøcup 2016, from left Camilla Fjell Østensjø Rederi and Per Erik Nielsen Sjøfartsdirektoratet.

Andy Read & Colin Ralston with friends. Back in January Andy Read (Master Lomax) & ­Colin Ralston (ex C/E Vortex) and friends entered the Dumball Rally 2016 ‘It’s a Goa’. A crazy light hearted charity event based on the Infamous American G ­ umball Rally. This year’s event took place in India, where teams entered the rally to raise money for the UK Charity ‘Teenage Cancer Trust’. Each team took ownership of an old Hindustani Ambassador taxi which had to be decorated to any whacky theme. The challenge was to drive from the Eastern City of Chennai through the Indian ‘road’ (if you can call them that!) network, through the mountains and j­ungles to the Western city of Goa. Along the way we completed team ­challenges, met the locals and embraced the Indian Culture. (All this whilst trying not to get lost, break down or being eaten by ­tigers J) Over the 10-day excursion we travelled over 1500km – quite a challenge driving a heap of junk!

Clients and marine crew gathered on Edda Fonn ­helideck for an 18-holes golf tournament. Hans Magnar Engeset in action with Gunnar Ljostveit as his caddie

We received sponsorship from friends, family, colleagues and a kind donation from OR in support of our adventure, with all the proceeds going directly to charity. As a team, ‘The fab 4’ (based on the Beatles) in their decorated taxi as the Yellow Submarine raised over £6500 for the Teenage Cancer Trust.

Thank you to everyone who supported us! Andy Read SJØFARTSTIDENE

|

NR. 1 – 2016

45


SHIPS & CREW PR. 10.12.2016

PLATFORM SUPPLY VESSEL

EDDA FRAM

EDDA FRENDE

Flag

NOR

Built

2007

Deck area Deadweight

EDDA FERD

Flag

NOR

Flag

NIS

Built

2009

Built

2013

910 m

Outside deck area

910 m2

Outside deck area

1038 m2

4100 T

Deadweight

4012 T

Deadweight

5122 T

2

Shift 1 Skrede Oddmund Steinsland Jan Atle Slåke Knut Fredrik Holm Jone Marvin Olsen Kjell Arne Bernardini Gabriele Husteli Marius Strand Thomas Karlsen Kurt André Sørensen Stein Hugo Henriksen Jan Magne Nyborg Jan Egil Hald Frits Kuse Sven Normann Shift 2 Gjessing Eirik Berger Lukas Hagen Terje Gherasim George Bognøy Bjørn Ove Lund Jan Arve Varpe Kjell Bjarte Kvandal Håkon Harkestad Øystein Sterri Kevin Mittet Rune Jacobsen Even D.

Master Master Chief Officer 2nd Officer 2nd Officer A/B A/B A/B A/B Chief Eng. 2nd Eng. Electrician Chief Steward Engine Cadet Master Chief Officer 2nd Officer 2nd Officer A/B A/B A/B A/B Chief Eng. Electrician Chief Steward Engine Cadet

Shift 1 Konradsen Karl Petter Bjøringsøy Espen Aaland Per Kåre Maraas Finn Siem Tommy Hansen Atle Johansen Ronny Martinussen Jonas Sjøen Øystein Talge Børge Olsen Thomas Granhei Daniel Andersen Nikolay Shift 2 Egeland Torvald Matre Malvin Andersen Søyland Stein Øyvind Drågen Erling Hauge Freddy Halleland Eirik Sørensen Thomas Sørensen Johnny Vea Helge Johannessen John Andre Simonsson Markus Torbergsen Odd Tode

Master Chief Officer 2nd Officer 2nd Officer 2nd Officer A/B A/B A/B A/B Chief Eng. 2nd Eng. Electrician Motorman App. Master Master Chief Officer 2nd Officer 2nd Officer A/B A/B A/B A/B Chief Eng. 2nd Eng Electrician

Shift 1 Røksund Jarle Master Øyre Joar Andre Master Jensen Sølvi Elise Chief Officer Cataloctocan Edsel Ray Biera 2nd Officer Villanueva Ryan Jay A/B Silava Eric A/B Sabile Julius Cesar G. A/B Molland Cato Chief Eng. Tranaas Morten 2nd Eng. Zabate Jefferson 3rd Eng. Ponce Erwin Motorman/Oiler Liland Egil Electrician Almazan Jonas Bartolome Chief Steward Medrano Edgardo Manalo jr. Catering Assistant Dyregrov Sjur Deck Cadet Lexander Mads Engine Cadet Shift 2 Einebærholm Frode Master Waage Ronny Chief Officer Cabaya Ronie 2nd Officer Belotindos Alfredo 2nd Officer Sagsagat Jomar A/B Villanueva Apolinario Arthur Aloria A/B Sasis Dallas Ilona A/B Sævik Øyvind Chief Eng. Halsbog Øystein 2nd Eng. Rodrigo Sairel Motorman/Oiler Gjerde Trond Electrician Halvorsen Herstein Electrician Jamero Rommel Chief Steward Oma Oddbjørn Motorman App. Fagerland Lars Emil Deck Cadet

EDDA FRIGG

46

ØSTENSJØ REDERI

Flag

NOR

Built

1997

Deck area

906 m2

Deadweight

4200 T


Please note that the size of the icons are not proportionally correct in relation to each other.

MULTIPURPOSE VESSELS

EDDA FJORD

ROV/SUBSEA VESSEL

EDDA FONN

EDDA FAUNA

Flag

Marshall Island

Flag

NIS

Built

2002

Built

2003

Outside deck area

1270 m

Outside deck area

Offshore crane

100/200 T AHC

Accommodation

90 persons

2

Shift 1 Melvær Håvard Master Mæhle Anders Chief Officer Dugaduga Wilmor 2nd Officer Cachuela Marlon 2nd Officer Myklestad Terje A/B Crane Rasmussen Arne A/B Crane Tamanio Romeo A/B Intes Abbraham A/B Kolbjørnsen Paul Inge Chief Eng. Johnsen Are 2nd Eng. Fjell Børge 2nd Eng. Alcantara Romeo 3rd Eng. Almeron Edgar Motorman Lervik Sindre Salhus Electrician Torkildsen Fredrik Electrician App. Kaspersen Svein Arne Chief Steward Landicho Maximo Cook Tugano David Jr. Cook Giron Ma. Cecilia Catering Ass. Iiao Michael Catering Ass. Valcos Joart Santos Catering Ass. Shift 2 Hjelmeland Pål-Fredrik Master Stokken Jarle Chief Officer Cercvales Marcos 2nd Officer Johansen Arvid Inge A/B Crane Hopland Kjell Arve A/B Crane Kolskår Magnar A/B Crane Belardo Juanito A/B Breidfjord Rune Chief Eng. Gorman Kevin Chief Eng. Gjellestad John Steinar 2nd Eng. Belsnes Cato 2nd Eng. Santilan Jose 3rd Eng. de la Cruz Sedrick Motorman Glærum Marius Electrician Junge David Chief Steward Ozoa Rito Cook So Caren Catering Ass. Aguirre Valle Gerardo Catering Ass. Wiltshire Daril Catering Ass.

Flag

NIS

Built

2008

700 m

Outside deck area

610 m2

Offshore crane

50/100 T AHC

Offshore crane

100 T AHC

Accommodation

66 persons

Accommodation

90 persons

2

Shift 1 Djupevåg Nikolai Kvalvik Dag Erik Odland Tore Braun Sebastian Steffensen Kjell Holger Alvestad Odd Kåre Hermansen Nils Are Mellemsæther Arne Bø Kristoffer Jensen Kim Solberg Jan Arne Fjellanger Camilla Lunde Benedicte Sævik Tor Sindre Shift 2 Engeseth Hans Magnar Maurangsnes Olav Johansen Hallvard Mjånes Stefan Håvik Hans Christian Lunde Arnt Ove Hustveit Tor Arne Vestre Arne Ljostveit Gunnar Richter Bjørn Gaustad Roy Arne Åsheim Erik Haukø Nils Rikard Lauritzen Trond Haugvaldstad Ivar Sjøen Andreas

Master Chief Officer 2nd Officer 2nd Officer A/B Crane A/B Crane Chief Eng. 2nd Eng. 3rd Eng. Electrician Chief Steward Cook/Night Cook Motorman App. Deck Cadet Master Chief Officer Chief Officer 2nd Officer 2nd Officer A/B Crane A/B Crane A/B Chief Eng. 2nd Eng. 3rd Eng. Electrician Chief Steward Cook/Night Cook Motorman App. A/B App

Shift 1 Østensen Lorentz Worren Kaare Gangåssæter Rune Fridriksson David Dahl David G. Lothe Johan Andreas Arntsen Ståle Færøvik John Helge Merour Per Sebastien Håkonsen Thomas Baldershage Lukasz Åsnes Frank Alvsvåg Jens Shift 2 De Jager Arnt-Olav Lund Øyvind Eliasson Johan Kainulainen Mikael Andersen Øyvind Maudal Jarle Aarbø Harald Sandanger Per Atle Sällman Henrik Sylstad Thomas Thomas Neil Erik Sundgot Oddgeir Andersson Elias Baretto Catherine Tofte Kristian Brunes Svein Magne

SJØFARTSTIDENE

|

at 2000 m water depth

Master Chief Officer 2nd Officer 2nd Officer A/B Crane A/B Crane Chief Eng. 2nd Eng. 3rd Eng. Electrician Chief Steward Cook/Night Cook Motorman App. Master Chief Officer 2nd Officer 2nd Officer 2nd Officer A/B Crane A/B Crane Chief Eng. 2nd Eng. 2nd Eng. 3rd Eng. Electrician Chief Steward Cook/Night Cook A/B App Motorman App.

NR. 1 – 2016

47


SHIPS & CREW PR. 10.12.2016

ROV/SUBSEA VESSEL

EDDA FLORA Flag

NIS

Built

2008

Outside deck area

750 m

Offshore crane

50/100 T AHC

Accommodation

70 persons

2

Shift 1 Brekke Inge Hansen Tøvik Ståle Furali Ruben Vesterås Bjarte Stensrud Magne Breivik Christian Borg Martin Eikeland Bjørnar Veka Richard Stødle John Harald Østensen Mikal Shift 2 Snyen Carl Inge Ravnås Svein Andersson Johan Helgesen Fredrik Rostad Terje Bø Per Gunnar Mikalsen Øyvind Ravn Snorre Malec Josef Brattsti Kai Victor Syre Stig Bjarte Botn Iver Bondhus Gunhild

Master Chief Officer 2nd Officer A/B Crane A/B Crane Chief Eng. 2nd Eng. Electrician Cook/Night Cook A/B App Electrician App. Master Chief Officer 2nd Officer 2nd Officer A/B Crane A/B Crane Chief Eng. 3rd Eng. Electrician Chief Steward Cook/Night Cook A/B App. Engine Cadet

CONSTRUCTION SUPPORT VESSEL

EDDA FREYA Flag

NIS

Built

2016

Outside deck area

2250 m2

Offshore crane

400/600 T AHC

Accommodation

140 persons

Shift 1 Dirdal Sømnes Lackner 48

Kjell Inge Endre Stian ØSTENSJØ REDERI

Master Chief Officer 2nd Officer

Raae Britt Helen 2nd Officer Danielsen Arild 2nd Officer Sabuero Christopher 2nd Officer Pacificar Jeffrey 2nd Officer Rogne Knut A/B Crane Mannes Karstein A/B Crane Tjøsvoll Ole Thomas A/B Crane Vatnaland Kjetil A/B Crane Serranilla Dexter General A/B Habbestad Odd Helge Chief Eng. Skogøy Odd Jarle 2nd Eng. Edvardsen Frode Vea 3rd Eng. Camacho Francisco 3rd Eng. Tubongbanua Arthur 3rd Eng. Penohermoso Raul Motorman Håheim Vidar J. Electrician Mangalit Bryson Electrician Ass. Kreinbihl Jurgen Chief Steward Myren Atle Cook Fernando Alvin Cook Flores Agnes Catering Ass. Lazaga Marian Catering Ass. Irava Rhodamel Catering Ass. Ortiz Ediezen Catering Ass. Aquino Ritchel Catering Ass. Vestvik Eyvind Deck Cadet Hollund Lars Marius Engine Cadet Bøthun Lucas B. Engine Cadet Shift 2 Osland Harald Master Berg Jim Ivar Chief Officer Måløy Ole Gunnar 2nd Officer Hinderaker-Hansen Harald A. 2nd Officer Jensen Robert 2nd Officer Acaso Fabian 2nd Officer Sunde Håkon A/B Crane Larsen Bjørn Erik A/B Crane Dørheim Sten S. A/B Crane Legario Ivon Chiva A/B Tidor Lauro Tupino A/B Landmark Øyvind Chief Eng. Malin Remi 2nd Eng. Thomsen Jan Erik 3rd Eng. Drilon Reynan 3rd Eng. Canonio Raul Motorman Ingebrigtsen Frode Electrician Fernandez Frank Joey Electrician Ass. Dommersnes Endre Chief Steward Wiik Jan Inge Cook Mataganas Jerome Cook Manio Edgardo Cook Iiao Catherine Catering Ass. Labado Donabella Catering Ass. Bravo Ester Catering Ass. Acain Maridel Catering Ass. Tvedt Hanne Deck Cadet Erstad Erlend Deck Cadet Bu Vegard H. Engine Cadet

ACCOMMODATION VESSEL

EDDA FIDES Flag

Malta

Built

2011

Deck area

1400 m2

Offshore crane

60 T

Accommodation

600 persons

Shift 1 Kjørlien Ole Master Olsen Gert Trygve Chief Officer Småvik Sven Roger 2nd Officer Johnsen Einar Gangway Operator Huttinga Hugo Gangway Operator Haasdijk Michel Gangway Operator Johannessen Berent A/B Crane Hochheim Torbjørn A/B Crane Fernandez Jeffrey O/S Edvardsen John Einar Chief Eng. Valdal Victor 2nd Eng. Wilhelmsen Knut Øyvind 2nd Eng. Riveta Armichaeljo Motorman Mortel Melvin Fitter Kristiansen Tore Accommodation Maintenance Engineer Sørvaag Roger Electrician Zapatero Sonia Salinas Adm.rep. Södergrann Sören Medic Buchanan James Accommodation Service Manager Mananzanares Ayala Johnny Cook Shift 2 Linga Einar Master Sørenes Leif Arne Chief Officer Guldhav Silje 2nd Officer Tjøsvoll Einar Gangway Operator Johannessen Kjell Magne Gangway Operator Coops Ronnie Gangway Operator Leirbakk Ken-Ronald A/B Crane Lanuzo Henry O/S Fiskerstrand Oddgeir Chief Eng. Henriksson Lars 2nd Eng. Nailes Jose Aryel Motorman Patco Rodelio Fitter Hägglund Nicklas Acc Maintenance Eng. Tufteland Oddbjørn Electrician Paulsson Martin Safety Officer Rueda Velez Inigo Adm.rep. Snickars Anette Medic Main Donald Accommodation Service Manager Baiden Philip Cook Diaz Ruiz Johnny Cook New build Nyseter Tommy Turøy Ove H. Lackner Henrik

Chief Officer Chief Eng. Electrician


Please note that the size of the icons are not proportionally correct in relation to each other.

VSP TRACTOR TUGS

AJAX

TENAX

APEX

Flag

NOR

Flag

NOR

Flag

UK

Built

2000

Built

2006

Built

2008

Bollard pull

93 T

Bollard pull

67 T

Bollard pull

68 T

Length

41,6 m

Length

37 m

Length

37 m

Power

7600 kW

Power

5040 kW

Power

5040 kW

Shift 1 Algrøy Helge Selnak John Arne Johansen Jan Inge Totland Stig Anders Shift 2 Sørensen Vidar Totland Bjørn Petter Kalland Bjørn Atle Pedersen Fritjof Einarsson Geir

Master A/B A/B Chief Eng. Master A/B A/B A/B Chief Eng.

VELOX

Shift 1 Alden Bernt Master Vestvik Alf Ivar A/B Solheim Edgar A/B Wikstrøm Roy A/B Madsen Aksel H. A/B Torsvik Terje Chief Eng. Shift 2 Kvalheim Frank Master Hagenes Kristoffer A/B Hetlevik Heine A/B Sandhåland Albert A/B Tellnes Hans-Erling A/B Nesheim Ivar Chief Eng.

Shift 1 Hooper Timothy Cook Dean Read Garry Langford James Hayes Nikolas Pole-Evans Ian Shift 2 Janes Mick Ivanov Bob Burt Marcus Hooper Jordan Nicholls John Morris Alyn

PHENIX

VORTEX

Master Chief Officer A/B A/B A/B Chief Eng. Master Chief Officer A/B A/B A/B Chief Eng.

Flag

NOR

Flag

UK

Flag

NOR

Built

2005

Built

2007

Built

2010

Bollard pull

65 T

Bollard pull

68 T

Bollard pull

73 T

Length

37 m

Length

37 m

Length

38,7 m

Power

4900 kW

Power

5040 kW

Power

5400 kW

Shift 1 Hauge Ove Master Golmen Johannes Master Aase Johannes A/B Alden Odd Kenneth A/B Høvring Steinar A/B Lygre Arne A/B Sørensen Anders Chief Eng. Shift 2 Algrøy Svein Strand Svein Magnar Neverdal Magnar Varne Lars Arve Dommersnes Endre H. Saltskår John Heine Hansen Jarle

Master A/B A/B A/B A/B A/B Chief Eng.

Shift 1 Tasker Charlie Sladovich Chris Young Steve Moody Luke Marshall Paul Gofton Danny Dudley Martin Shift 2 Pearson Graham Amil Olivier Couzins John Casey Alan Fowler Adam Stringer Howard Adams Mark

Master Master Chief Officer A/B A/B A/B Chief Eng. Master Chief Officer A/B A/B A/B Chief Eng. Chief Eng.

Shift 1 Olsen Peder Varne Aksland Dag Bygnes Jostein Boman Johan Shift 2 Knædal Olaf Karlsen Frank Ove Nordgård Øyvind Noel William Huse Steven

SJØFARTSTIDENE

|

Master Chief Officer A/B Chief Eng. Master Chief Officer A/B A/B Chief Eng.

NR. 1 – 2016

49


SHIPS & CREW PR. 10.12.2016

AZIMUTH REVERSE TRACTOR TUGS

SILEX

FELIX

VIVAX

Flag

NOR

Flag

NOR

Flag

NOR

Built

1994

Built

1995

Built

2008

Bollard pull

62 T

Bollard pull

50 T

Bollard pull

80 T

Length

35,11 m

Length

30,8 m

Length

32 m

Power

3700 kW

Power

3000 kW

Power

4800 kW

Shift 1 Jakobsen Stig Arve Knudsen Leif Hansson Carl Anton Tobias Shift 2 Bye Bjørnar Pedersen Roald Inge Gjerde Jostein

Master A/B Chief Eng. Master A/B Chief Eng.

THRAX

Shift 1 Sjøen Hallgeir Johnsen Svein Arild Kjellevold Tormod Shift 2 Robberstad Kjell Inge Nygård Bjarne Frank Hillbo Rudi

Master A/B Chief Eng. Master A/B Chief Eng.

Shift 1 Eide Stig Gule Frank Buskas Krister

Master A/B Chief Eng.

Shift 2 Oddøy Odd-Morten Master Johnsen Nils Eirik A/B Aasmul Raymond Chief Eng.

LOMAX

ALEX

Flag

Isle of Man

Flag

Republic of Ireland

Flag

UK

Built

1994

Built

1995

Built

2013

Bollard pull

62 T

Bollard pull

50 T

Bollard pull

80 T

Length

35,11 m

Length

30,8 m

Length

28 m

Power

3700 kW

Power

3000 kW

Power

4700 kW

Shift 1 Gouldsmith Rob Kelly Morgan Hillerstrøm Henrik Shift 2 Fredriksen Frode O’Driscoll Kevin Fjell Kåre

50

ØSTENSJØ REDERI

Master A/B Chief Eng. Master A/B Chief Eng.

Shift 1 Fitzgerald Brian McElhone James Shift 2 Forde Martin O’Mahony Finbarr Butler Ambrose

A/B Chief Eng. Master A/B Chief Eng.

Shift 1 Moody Alan Mignot Roly Murton Paul East Gary Spink Roger Shift 2 Read Andy Evans Steve Spencer-Fleet Russel Conroy Dave Poulton Chris Rice Chris

Master A/B A/B A/B Chief Eng. Master Chief Officer A/B A/B A/B Chief Eng.


Please note that the size of the icons are not proportionally correct in relation to each other.

NEW BUILDING

NEW BUILDING

NB470/471

NB 465/466/467 Kalvø Jostein Sørvik Alf Ronny

Master Chief Eng.

Nes Orvik

Bjørn Jarle Ståle

Master Chief Eng.

SJØFARTSTIDENE

|

NR. 1 – 2016

51


Returadresse / Return address: Østensjø Rederi, P.O. Box 394, N-5501 Haugesund, Norway

24

1

ØMERKE T ILJ

Smedasundet 97, P.O. Box 394, N-5501 Haugesund, Norway Phone: +47 5270 4545 | Fax: +47 5286 6740 | post@ostensjo.no | www.ostensjo.no

Trykkeri

52

M

8


Turn static files into dynamic content formats.

Create a flipbook
2016 nr 1 Sjøfartstidene by Østensjø Rederi - Issuu