Skip to main content

Projects Brochure

Page 1


PRE-PREP ROAD UPGRADE

ThePre-PrepareaisakeyareaofOrwell andisinurgentneedofdevelopment.

Toensuresafeaccessforfamiliesand staff,weplantoresurfaceandredesign thePre-Preproad.

Thissupportwill:

Improvetrafficflowduringbusy drop-offandpick-uptimes

Enhancedrainagetoreduceflooding andsurfacewaterissues

Providesaferpedestrianroutesfor thoseaccessingtheschool

ESTATE LIGHTING IMPROVEMENTS

Maintainingsafevisibilityacross suchalargeestateisachallenge.

Weaimtoinstalmodern,energyefficientlightingthatimproves safetywhilereducing environmentalimpact.

Thissupportwill:

increasesafetyforpupils,staff andvisitors

reduceenergyconsumption andcarbonfootprint

illuminatekeypathways,car parksandboardingroutes

POOL REFURBISHMENT

PAVILION RESTORATION

Toensurethepavilionremainsfitfor purpose,weplantorestorethe structure,andcreateamore useablespaceformatchesand events.

Thissupportwill:

Restoreandpreserve thepavilionforfuture generationsofpupils

Provideaccessto runningwaterand essentialamenities

Createamorepractical spaceformatchesand eventswithchanging facilities

BOILER & HEATING

Thissupportwill:

Muchofourheating infrastructureisageingand inefficientandthemain boileriscurrentlyservicedby atemporaryreplacement.

Upgradingtheboilersystem isessentialtoensure boardinghouses,bathrooms andcommunalspacesare comfortable.

Replaceageingandinefficientheatinginfrastructure

Installareliable,long-termboilersolutionfortheschool

Enhancethewellbeingandcomfortofpupils,staffandvisitors

BURSARIES: CHANGING LIVES

Everyyear,talentedandhardworkingpupilsfromavarietyof backgroundsseekthechancetojoinOrwellPark.Ourbursary programmeprovideslife-changingopportunitiesforchildrenwho couldnototherwiseaccessanOrwelleducation.

Thissupportwill:

Providelife-changingeducationalopportunitiesforgiftedand talentedpupils.

Freeupothersourcesofincomeforcapitalprojects.

SPORTS HALL STAGE CURTAINS

Theoriginalstagecurtainsareno longerfitforpurposeandmustbe replaced.

Thisisastatementspaceinthe schoolandthevisualimage underminestheexcellenceofour dramaandmusicproductions.

Thissupportwill:

Enhancetheappearanceof oneoftheschool'skey performancespaces

Createamoreprofessional settingfordramaproductions, concertsandevents

Turn static files into dynamic content formats.

Create a flipbook
Projects Brochure by Orwell Park School - Issuu