Skip to main content

Undergraduate Internship Portfolio_Omkar Lele

Page 1

SELECTED WORKS - 2018-2022

ARCHITECTURE

PORTFOLIO OMKAR R LELE


OMKAR R LELE

ARCHITECTURE STUDENT

Hello! I am Omkar Lele, a fourth year architecture student from Aayojan School of Architecture and Design , Pune. I am interested in hands on works, alternate construction materials , design , detailing , landscape , documentation and illustrations. I am curious to know how the practical constraints of the field can use my skillset whilst expanding my practical knowledge in the field of architecture.

+91 8080134621

omkarlele13@gmail.com

Flat No.6/4 Vishranti Nagar,Vitthalwadi Road,Near HDFC Bank,Vitthalwadi,Pune- 411051 13/10/2000

https://www.linkedin.com/in/omkar-lele-684235233 @omkarrrrr1310


Education 2016 : New English School , Ramanbaug , Pune (SSC) 2018 : New English School And Junior College Ramanbaug , Pune (HSC) 2018-2023 : Aayojan School Of Architecture And Design , Pune (Pursuing)

Workshops And Participations : Aspirations and Inspirations-Online Design Program (Conducted by Landconcern Initiatives) Z-Axis:You and Your Neighbourhood Webinars (Conducted by Charles Correa Foundation) Neuro-Architecture Workshop 2020-21 : Design Conversations (Design United) 2021 : Sustainable Architecture Week (Ugreen_US) Cob Workshop (Volunteering at URVEE Public Trust,Pune) Heritage and Conservation Workshop (Conducted by kaarwan) 2020

2018-2021 : FEED Pune Member

Competitions Photography 2020 : Pawzography Contest (Participation) Architecture 2020 : Kaarwan’s National Design Competition (Participation) 2021 : Archmello Masterpeace (Participation) Griha Trophy ,NASA (Participation)

Experience 2020 : On Site Work at Kuber Imperia-Kuber Construction Company,Pune (Dec.2020) 2021 : Internship at 100 Ants Design Studio,Pune (Sept.2021-Dec.2021)

Documentation 2021 : Documentation For Academic Purpose 1. Kodit , Saswad, Maharashta 2. Pissavare , Bhor , Maharashtra 3. Kadus , Rajgurunagar , Maharashtra

2022 : Documentation for Studio UGAM,Pune 1. Yeshaji Kank Wada , Bhutonde , Maharashtra 2. Karve House , Pune 3. Patvardhan House , Pune

Languages Marathi(Native) English Hindi

Skills And Interests Team Work Hand Drafting Model Making Illustrations 3D Visualizations Concept Development

Sketching Travel Trekking Photography

Elective

Softwares

Semester 6 : Interior Design Semester 7 : Concept And Geometry:Form And Space Semester 8 : Building Approval Systems

Autodesk Autocad Sketchup Lumion Adobe Illustrator

Adobe Photoshop Adobe Indesign Microsoft Word Microsoft Power Point


CONTENTS

01.

HILLDORADO

02.

LEARNING CENTRE

Semester-5

Semester-6

03. EXHIBITION AND TRAINING CENTRE Semester-8

04. YOGA AND MEDITATION CENTRE Competition Entry

05.

WORKING DRAWINGS Semester-5

06. INTERNSHIP WORKS 100 Ants Design Studio

07. MISCELLANEOUS

Model Making , Photography , Illustrations

08. DOCUMENTATION Studio UGAM


06-09

10-15

17-21

22-25

26-27

28-29

30-32

33


Portfolio 2022

HILLDORADO Location : Mohammed Wadi,Pune Site Area : 12,940 sq.m Built Area : 5,675 sq.m A company owns a parcel of land in a prime location in Pune, but the development potential of this property is restricted because it is located on a hillside, large parts of which have a gradient exceeding the permissible limit of 1:5. Not inclined to bend the rules, they have opted instead to develop a small campus using pre-fabricated structures that can be dismantled when required. Unsure about the many possible uses of such a venue in the future, flexibility is an important component of their design brief, but to start with they are looking to construct two types of spaces: a serviced, multipurpose pavilion and a series of modular units. In addition to this they wish to create a vibrant landscape centred around an amphitheatre. They plan to call the place “HILLDORADO”, a reference to the mythical golden city of El Dorado and the uniqueness of this project in an otherwise overbuilt suburb. PROCESS :

01

Nature Trail

Natural Streams

03

Nature Trail Open Air Seating

Banyan Tree Waterbody

Pedestraian Circulation Main Road

Main Road

Site And Existing Features

02

Builtup And Pedestrian Movement

Nature Trail

04 Modules Open Air Seating Pavilion

Pedestraian Circulation Main Road

Circulation

6

Proposed Builtup


Portfolio 2022

3 1 2

1

2 1

3

1

2

2 2

1

1

1

GROUND FLOOR PLAN

3

2

1

2 1

1 3

2

2

2

1

1

FIRST FLOOR PLAN LEGEND:

1.Module 2.Courtyard 3.Bridge 4.Green Area

N

7


Portfolio 2022

SECTION AT AA’

SECTION AT BB’

SECTION AT CC’ 8


Portfolio 2022

View From Entrance

As the specific functions of the spaces remains undefined, several programs may be imagined: an urban resort, a concert or wedding venue, a space for workshops and exhibitions, a weekly market, a neighbourhood school, or even a quarantine centre for travellers during the pandemic; the possibilities are endless. It is left to the designer to ensure that the layout affords the required flexibility. the open air seating is accessible by the natural trail as well as by main road ,it is designed in a way such that it can accomodate pople of different age groups.

Exhibition Space

View From First Floor

Covid Facility

Marketplace

Storage Units

PREFABRICATED MODULE - AXONOMETRIC VIEW 9


Portfolio 2022

LEARNING CENTRE

Location : Site Area : Built Area : Area For Playground : Area For Farmlands :

Pune-Bangalore Highway,Pune 21,615 sq.m 8570 sq.m 6070 sq.m 4046 sq.m

18

18

5

13

14

14

20

4

10

20

11 20

4

20

The idea was to create shared learning spaces and space which merge with the surrounding.The idea was to utilise natural light and use traditional 4 elements of the architecture to enhance the spaces. The materials used are in 6 15 their exposed condition without any finishes so that students can experience the textures and colours.Campus is connected with the existing campus of DLRC and having view of fruit orchards and farmlands

6

4

6 5 6

6

7

6

9

17

N

GROUND FLOOR PLAN

“The first principle of true teaching is that nothing can be taught” -sir aurobindo The drive change learning and resource centre (DLRC) believes in facilitating the holistic development of children and currently runs classes for age group 6 to 9 years on the outskirts of pune. They propose to expand the campus to include age group 10 to 13 (middle school) and age group 14 to1 7 years(high school)with 20 stusents per class. 10


Portfolio 2022

01 Classroom Module

02

Subtractive Form

03

Inward Looking Roof

04 3

2

1

Central Coutyard Shared ByTwo Classrooms

4

6

Grid Formation 4

05 6

12

9

8 19

Cluster Derived From The Grid Classrooms With Adjacent Green Spaces

06

Existing DLRC Site

LEGEND: 1.Admin Office 2.Faculty Room 3.Rest Room 4.Courtyard 5.Sand Pit 6.Classrooms 7.Sports Room

Proposed Extension

8.Canteen 9.Toilets 10.Library 11.Computer Lab 12.Seminar Hall 13.Art Room 14.Music Room

15.Playground 16.Basket Ball Ground 17.Farmlands 18.Fruit Orchard 19.Service Entry 20.Physics,Chemistry,Maths Lab

Internal Access Road

Main Road

FORM DEVELOPMENT 11


Portfolio 2022

COURTYARD MOUND

SECTION AT

View From Canteen

Courtyard View

12

The idea was to create shared learning spaces and space which merge with the surrounding. The idea was to utilise natural light and use traditional elements of the architecture to enhance the spaces. The materials used are in their exposed condition without any finishes so that students can experience the textures and colours.Campus is connected with the existing campus of DLRC and having view of fruit orchards and farmlands.classrooms have vertical louvers on the southern side which will control the harsh light.small square windows have tinted glass which creates the different colour pattern due to sunlight. internal layout of the classrooms is kept flexible so that two classes can be combined.windows are designed according to the anthropometry of the students and it can be used in a multiple ways. .


Portfolio 2022

MM THICK GRANITE MM CEMENT SLURRY TRUCTURAL SLAB

OOTING

STRUCTURAL SLAB

500

R.C.C PRECAST SEATING

310

25MM THICK GRANITE

150

COURTYARD

350MM DEEP SAND PIT15MM CEMENT SLURRY NOSING

25MM THICK G 15MM CEMEN STRUCTURAL

300

SEATING AREA DETAILS

450

SCALE-1:20

380

G

150

180

BOULDERS INSTALLED WITHIN SAND TO BE SUNKEN THIRD OF THEIR SIZE INTO SURROUNDING MATERIAL 180

20MM THICK SHAHABAD TILE

GRAVEL

500

AA’

FOOTING

PLASTIC SHEET ROOFING

100

SAND PIT DETAILS 100X100MS HOLLOW SECTION SCALE-1:20

100

GRAVEL COARSE R.C.C SLAB CONCRETE BLOCK

100X100MS POST

120

2270

SLOPE

200

120

20MM THICK SHAHABAD TILE 15MM CEMENT SLURRY

20

150

NOSING

STRUCTURAL SLAB

300

FOOTING

150

300

1000

PATHWAY EDGE DETAIL STRUCTURAL SOIL

SCALE-1:10

PLANTING SOIL MIX AS SPECIFIED

R.C.C COPING

100

Courtyard COURTYARDDetail DETAIL SCALE-1:20

230

980

230MM THICK BRICK WALL

LIGHT STANDARD WITH STEEL FLANGE

300

STRUCTURAL SLAB

150

SLOPE 170

PLANTING MEDIUM PROTECTIVE SLAB

600

DEAD MAN FOOTING

380

15MM CEMENT SLURRY

WATERPROOF MEMBRANE

Construction Details

20MM THICK SHAHABAD TILE

Seating And Pathway Detail

WINDOW SEAT AND PATHWAY DETAIL SCALE-1:20

13


Portfolio 2022

CLASSROOM

COURTYARD

SECTION AT

View From Classroom

14


Portfolio 2022

COURTYARD

PHYSICS LAB

BB’

R.C.C. Roof

Fiberglass Precast Concrete Gutter

Tinted Glass

Red Oxide Flooring

T.W .Window Shutters

R.C.C . Plinth Exposed Brick Wall

T.W .Vertical Louvers

CLASSROOM - AXONOMETRIC VIEW

15


Portfolio 2022

EXHIBITION AND TRAINING CENTRE Location : Site Area : Built Area : Reserved Forest Area : Future Development :

Mitra Mandal Chowk,Pune 10,200 sq.m 4,120 sq.m 24,595 sq.m 15,748 sq.m Pune Metro Existing Greens Proposed Site Mitra Mandal Chowk

01

Site And Pedestrian Connection

Built Site Area Reserved Forest Built Site Area

02

Builtup Orientation

Workshops,Training Center,Library, Seminar Hall,Canteen Exhibition Spaces, Restaurants,Cafe

03

Public And Semi-Public Buildings

Future Development

Green Area

04

Builtup And Pedestrian Connection

Accessible Rooftop

05 FORM DEVELOPMENT 16

Accessible Roof And Amphitheatre


Portfolio 2022

N SITE PLAN

17


Portfolio 2022

GROUND FLOOR PLAN

FIRST FLOOR PLAN

SECOND FLOOR PLAN 18


Portfolio 2022

Temporary Exhibition Space

Exhibition Spaces And Pedestrian Pathway

Site is located in the prime location andn surrounded by the residential and commercial area of sahakarnagar and swargate.The core area of the pune city is developing and tall buildings started coming up.Patil plaza is a commercial building which is not maintained and after covid major shops are shut down.The green area behind patil plaza is used as garbagre dumping yard,this area has potential to connect residential area of sahakarnagar with the public transport by means of pedestrian walkways which will reduce the distance between two locations and also reduce the use of vehicles in this aera. Green forest will be reserved area and act as a transition space for public. N

19


Portfolio 2022

SECTION AT

SECTION AT

SECTION AT CC’

Galleries have artificial lighting and two of them have openable walls , they can open up into the spillover space and open exhibitions can happen. These temporary structures are prefabricated structures which are used accoeding to need. amphitheatre will act as public gathering space and used for events. accessible roof is connected with the second floor of the building where one can access cafes and restaurants. shops are provided on rental basis. another building has workshops, seminar halls for public as well as students.

20


Portfolio 2022

AA’

BB’ View From Rooftop

21


Portfolio 2022

YOGA AND MEDITATION CENTRE

Location Site Area Built Area

: Alappuzha,Kerala : 42,869 sq.m : 10,230 sq.m

The challenge is to design a meditation & yoga center catering its 1000 people. The center should have open & enclosed areas for

services to max. 500meditation and yoga.

FORM DEVELOPMENT

01

Temple is oriented to east-west and the axis divides the yoga and meditation units into two parts facing towards the temple.

03

Yoga meditation units are further divided into three parts according to occupancy and having different space experience and light quality due to the different volumetric proportions

22

02

Yoga and meditation units are staggered to allow natural light inside the units and spillover spaces are created on east side. Amphitheater is oriented towards the temple and connected by the physical axis.

04

Kund is derived from the step wells of south India which is acting as a transition between temple and yoga units. Pavilions serve as a covered space for yoga.


Portfolio 2022

16

7

16

7

17

7

15

17

9 6 17 3

13

6

6

12

8

10 9

11

17

19

18 19 4 3

1

14

SITE PLAN

LEGEND: 1.Admin Office 2.Pantry 3.Toilet 4.Office 5.Staff Working Space

2

6.Meditation Hall 7.Yoga Hall 8.Library 9.Amphitheatre 10.Painting Workshop

11.Pottery Workshop 12.Kitchen 13.Dining Hall 14.Parking 15.Temple

16.Community Farm 17.Waterbody 18.Changing Rooms 19.Gardens

N

23


Portfolio 2022

Space for Yoga

The main idea has been used as 8 pause points and they connect all the spaces and leads towards the temple . Still water body has been used at many different places keeping in mind that it induces a feeling of relaxation and calmness in the space and a large water body is provided in between the yoga space and the temple for concentration during meditation. The yoga and meditation unit has been aligned in east-west direction to receive maximum morning sun- positive energy and evening sun – end of the day and also body cycle relation. Main axis has been formed between the yoga units and lead towards the temple to depict direct relation between the space and the soul.

View From Pathway

24


Portfolio 2022

AMPHITHEATRE

YOGA HALL WATERBODY

TEMPLE

COURTYARD KUND

SECTION AT AA’

Metal sheet Roofing METAL SHEET ROOF

Purlins Warren Truss

50x75mm T.W.Window Frame 12mm Thick Glass

WARREN TRUSS

25mm Thick External Plaster 250mm Thick CSEB Walls 50x35mm Thick Wooden Batten 150x100mm T.W.Beam

CSEB WALLS

T.W.Panel Door 150mm Thick R.C.C Slab T.W.ROOFING

600mm Deep Waterbody Waterproofing Layer

T.W.COLUMN

Dry Rubble Soling Murum Filling R.C.C . Footing

CONCRETE PLINTH

Exploded View Of Yoga Unit

Construction Detail

25


Portfolio 2022

WORKING DRAWINGS

4000

3770

230

CURATORS CABIN

PRODUCTION MANAGER

4000X3770

W1

3 2 1

9770

D1

D1

D

6000X6000

1050

20

22 21

WOODEN RAILING

1400

C40

COURTYARD BELOW

C32

19 18 17

16 15

14 13

T=300 R=150

4150

C36

UP

C48

MEETING ROOM

12 11 10 9 8

7540X5540

4115

D3

D3

GREEN AREA 2650

V1

PANTRY

W1

2000X3770

DUCT

G

L V1 1735

LVL +1500

500

1095

500

500

115

7 6 5 4 3 2 1

265

C

C52

2000

C44

LVL +3900

230

V1

DUCT

1925

W2

D1

W5

1425

L

V1 C28

WOODEN RAILING

UP

1950

WATER BODY BELOW

1850

770

FFL +750

G

E

4000X9770

C49 320

LVL +0.0

BUFFER

W5

C45

GREEN AREA BELOW

1200

C33

TERRACE BELOW

C53

TERRACE GARDEN /STUDY AREA

LVL +4350

C41

F

W1

8000X7770

C37

D2

D2

C54 4000

MAIN WORKSTATION

W1

3770X3770

D2

C29

WOODEN RAILING

230

8000

750

685

2080X4000

eq

eq

230

1

C50

W1

eq

1770

BALCONY

3540

2

C46

W1 eq

150

2080

C42

C38

W1

3

1995

C30

4

315

C34

W1 WOODEN RAILING

5

6

247

7

8

B

C31

W3

C35

W3

W3

C39

W3

C43

500

C51 C27

WOODEN RAILING

C47

W4

GL +0.0

7

8

B'

6

5

4

3

A

W4

2

1

FIRST FLOOR PLAN

3770X3770

4000X3770 4000

230

D2

C33

C37

C41

COURTYARD FFL +900

D1

L

W5

SIZE

TOTAL WINDOWS

W1

FIXED GLASS WINDOW

2400X1200

16

2

W2

FIXED GLASS WINDOW

1200X1200

8

3

W3

T.W.LOUVRE WINDOW

1200X1200

16

4

W4

FIXED GLASS WINDOW

500X1000

4

PARTICULAR

1

OPENABLE GLASS WINDOW

W5

W1 eq

C54

eq

V1

MOVABLE LOUVERS

7 6 5 4 3 2 1

WOODEN RAILING

C53

REPHRO. AND MEDIA ROOM eq

1920

D2 D

D2 C48

2000

C44

C52

4000

D1

FFL +1350

D3

UP 1095

W3

C39

W3

W3

500

DUCT 1360

W4

W1

V1 1735

C43

500

PANTRY

2000X3770

L V1

W3

750

C47

W4

B C51

W4

GL +0.00

8

7

6

5

4

N GROUND FLOOR PLAN

26

C

D2

G

500

W4

SERVER ROOM 3770X1770

C36

C35

E

W1

3770X3620

FFL +1350

D3

ENTRY

4

F

W3

C49

WOODEN RAILING

265

500X450

500X850

eq

5

WATER BODY

A.V.ROOM

FFL +450

3 2 1

C31

DOOR

1

UP

6000X4000

LVL +1500

C27

NO.

3850x1695

7540X5540

D1

1

3770

1770

3 2 1

WAITING AREA

9 8

3000X1950

985

D1

C32

UP

ROLLING SHUTTER

4000

1850

T=300 R=150

150

V1 DUCT

RS

3770X3770

D2

UP

1350

V1

18

4

DOCUMENTS LIBRARY

C40

C28

750X2100

3850

G

TOILET DOOR

C45 LVL+1050

1950

1425

W5

D3

D3

D2

D2

LVL +0.0

3 2 1

D3

FFL +750

21

3

4000X3770

230

1925

TERRACE

14

900X2100

1

STAFF WORKSPACE

3770

3540

6000X6000

eq

3770X3770

W1

C50

eq

ACCOUNTS MANAGER

W1

3770

D2

D2

C29

eq

TOTAL DOORS

2000X2100

T.W.PANELLED DOOR

685

150

eq

SIZE

T.W.SLIDING FOLDING DOOR

D2

eq

FACILITY MANAGER

GREEN AREA

C42

W1

C46

W1

eq

2

PARTICULAR

D1

2

500

1850X3770 1850

eq

STAFF WORKSPACE

CHANGING ROOM

3

C38

W1

eq

3770

eq

230

C30

C34

W1 eq

4

1770

W2 eq

5

6

DOOR

1

eq

7

8

NO.

3

2

1

A

22


Portfolio 2022

RIDGE LEVEL

+10630 RIDGE LEVEL

+10630

MANGALORE TILES

+6590

EVES M.S.GUTTERLEVEL FASCIA BOARD

+6590

EVES LEVEL

1040

PRODUCTION MANAGER

D1

W1

1200

W1

D1

1200

W1

D2

2100

+0.00

GROUND LEVEL

P.C.C BED

DRY RUBBLE PACKING

+450

PLINTH

+0.00

600 GROUND LEVEL

+900

PLINTH

750

750

+450

PLINTH PROTECTION PLINTH

D1

600

900

+900

PLINTH

+3900

G+1 LEVEL

WAITING AREA

COURTYARD

W1

750

150

775

FACILITY MANAGER

750

WAITING AREA

75

900 150

G+1 LEVEL

2550

750

150

WOODEN RAILING

+3900

HARD STRATA

EXISTING SOIL

SECTION AT BB’ SECTION AT BB' RIDGE LEVEL

+11080

0

0

187

187

GLASS

GLASS MANGALORE TILES

MANGALORE TILES

M.S.GUTTER

M.S.GUTTER

MAIN WORKSTATION

1200

1200

D1

D2

2100

W1 +2550 SILL LEVEL 900

1200

GRANITE PARTITION

QUEENS WALL MIXER-JAQUAR

W4

450 300

D2

STOP 600COCK

CERAMIC WASH BASIN JAQUAR-FLORENTINE DRY RUBBLE PACKING

+0.00 EUROPEAN W.C. JAQUARBIDSPA-ITS-WHT-89851S300PP GROUND LEVEL

HARD STRATA

PLINTH BEAM

EXISTING SOIL

12 MM THICK CEMENT SCREED

SECTION A

300

PLINTH BEAM

HARD STRATA

FLOOR MOUNTED

EXISTING SOIL

CURTAIN

SECTION CC’ SECTION ATATCC'

BASIN MIXER TAP JAQUAR-ASPIRE ESSCO

JAQUAR-FLORENTINE PLINTH PROTECTION

HEALTH FAUCET

DRY RUBBLE PACKING

WATER BODY

BASIN MIXER TAP

JAQUAR-ASPIRE +1350 ESSCO PLINTH CERAMIC WASH BASIN

SOAP HOLDER

PLINTH PROTECTION

600

STAFF WORKSPACE

MIRROR

1200

700

1000 750

900

WATER BODY

D2

2400

D2

W2

W1

+4350 PLASTERED WALL G+1 LEVEL +3750 LINTEL LEVEL

500

V1

CERAMIC FLOOR TILES KAJARIA -AQUARIOUS SKY BLUE (300X450)

MAIN WORKSTATION

W1 +5550 SILL LEVEL

MOVABLE GLASS LOUVERS

D2

+6550

750

STAFF WORKSPACE

+7040

900 150

1000

W4 500

25MM THICK GRANITE

750 1200

D2

D1

2100

W1

2400

W2

W1

LINTEL LEVEL

V1

900 150

W1

FASCIA LEVEL EVES 1040 BOARD

FALSE CEILING

750

450

M.S.TRUSS

1040

1200

FASCIA BOARD

S

SECTION AT A SCALE-1:20

25MM THICK GRANITE

500

PLASTERED WALL

40MM THICK T.W.DOOR

MOVABLE GLASS LOUVERS MAZE SHOWER-JAQUAR

700

MIRROR

40MM THICK T.W.DOOR PLASTERED WALL

EUROPEAN W.C. JAQUARBIDSPA-ITS-WHT-89851S300PP FLOOR MOUNTED CISTERN-JAQUAR WALL HUNG NANHI TRAP R.C.C COLUMN(600X230)

450

HEALTH FAUCET

230MM THICK BRICK WALL

MOVABLE GLASS LOUVERS

EUROPEAN W.C. JAQUARBIDSPA-ITS-WHT-89851S300PP FLOOR MOUNTED

CURTAIN

450

DUCT

CERAMIC WASH BASIN JAQUAR-FLORENTINE

CERAMIC WALL TILES KAJARIA HD MATT FINISH

GRANITE PUTTA

12 MM THICK CEMENT SCREED

D

2500

A C

B

CERAMIC FLOOR TILES KAJARIA -AQUARIOUS SKY BLUE (300X450) 25MM THICK GRANITE

CERAMIC FLOOR TILES

12 MM THICK KAJARIA CEMENT-AQUARIOUS SCREED SKY BLUE (300X450)

230MM THICK BRICK WALL

CERAMIC FLOOR TILES KAJARIA -AQUARIOUS SKY40MM BLUETHICK (300X450) T.W.DOOR 300

STOP COCK

CERAMIC WALL TILES KAJARIA HD MATT FINISH 300

CERAMIC WASH BASIN JAQUAR-FLORENTINE

SOAP HOLDER

1800

QUEENS WALL MIXER-JAQUAR

BASIN MIXER TAP JAQUAR-ASPIRE ESSCO

CERAMIC WASH BASIN JAQUAR-FLORENTINE

300

150MM THICK BRICK WALL

BASIN MIXER TAP JAQUAR-ASPIRE ESSCO

300

300

CERAMIC FLOOR TILES KAJARIA -AQUARIOUS SKY BLUE (300X450)

300

450

SECTION AT B PLAN PLAN

SECTION SECTION AT A

25MM THICK GRANITE

SE

SCALE-1:20 SCALE-1:20

SCALE-1:20

TOILET DETAILS SHEET NO - 11 EUROPEAN W.C. JAQUARBIDSPA-ITS-WHT-89851S300PP FLOOR MOUNTED MAZE SHOWER-JAQUAR

CISTERN-JAQUAR WALL HUNG NANHI TRAP

NOTES:

27

THE DRAWING IS SOLE PROPERTY OF A CIRCUMSTANCES THE DRAWING FULL PR MODIFIED AND OR USED FOR ANY OTHER PR


Portfolio 2022

INTERNSHIP WORKS

3000

: Santosh Bakery,Pune : 100Ants Design Studio,Pune : Omkar Lele

3900

Project Name Designed By Elevation Development

+14.95M

+11.5M

PARAPET LEVEL

A

B

1112

+10.6M

810

1160

1160

TERRACE LEVEL

+7.4M

6250

1160

810

SECOND FLOOR

C

1112

2395

D

40

40

960 1000

+4.2M

FIRST FLOOR

110

6010

110

1700

2380

960 1000

150

EAST GENERAL SIDE NOTES ELEVATION

WEST SIDE ELEVATION

1. Drawings and specifications as instruments of service remain the property of the Architects and are pro

by the Ownership of Copyright regulations and under the rules of the Council of Architecture, and the Arc Act 1972. They are not to be reused except by written agreement and with the agreed compensation

Architect. If reused without permission, the Architect shall be indemnified and held harmless from all li

legal exposure, claims, damages, losses and expenses. Drawings shall not be used for multiple or pro development without the written authorization from the Architect.

2. The Architect shall not be responsible where the construction deviates from these drawings, or from writte

instructions/ recommendations. Changes to the drawings, by the owner and/or contractor shall b

responsibility of the person making such changes. The owner and/or contractor shall hold the Ar

+0.60M

2380

PLINTH LEVEL

'C' CHANNEL 75MMX40MM

75

EQ

2MM THICK M.S.SHEET 'C' CHANNEL 75MMX40MM

+0.00 M

T.W.FINS 18MMX150MM

EQ

GROUND LINE

SOUTH SIDE ELEVATION

75

150

requirements of the authorities having jurisdiction, and applicable current standards and specifications a

Indian Standards and all other relevant international standards. Except where specified, requirements are

recommendations and standards. Installing of products must be under appropriate environmental con

(air temperature, surface temperature, relative humidity etc.) to ensure quality durability, maintain p protection during drying/ curing.

any unsatisfactory work before proceeding with the further work. He shall verify that substrate and base

are compatible with the new work; Notify the Architect promptly of any modifications required. Work perf

150

1160 75

SD1

1200

5. This drawing shall be verified on site prior to start of any work, any discrepancy shall be brought to the no the Architects and all concerned. 6. This drawing shall not be scaled, only written dimensions shall govern.

noticed shall be brought to the attention of the Architects and all concerned within seven (7) working d

DRY BALC. GENERAL NOTES 2380X1090 GENERAL NOTES

the receipt of this drawing, but always prior to procurement/ execution of works. 8. Project Managers/ Client's Representatives to revert back within seven (7) working days of receipt

drawing on co-ordination and buildability issues. If otherwise, it would be deemed that they have unde

1. Drawings and specifications as instruments of service remain the property of the Architects and are protected

and accepted the drawings/ design and own full responsibility for the works to be carried out accordingly.

by the of Copyright regulations and under thethe rules of theofCouncil of Architecture, the Architects 1. Drawings andOwnership specifications as instruments of service remain property the Architects and areand protected Act 1972. They are notregulations to be reused by written with the agreed compensation by the Ownership of Copyright andexcept under the rules ofagreement the Counciland of Architecture, and the Architects to the

650

2MM THICK M.S.SHEET

Architect. If reused permission, Architect shall beand indemnified and held harmless from all liability, Act 1972. They are not to without be reused except bythe written agreement with the agreed compensation to the legal claims, damages,the losses and expenses. Drawings and shallheld not be used for multiple or prototype Architect. If exposure, reused without permission, Architect shall be indemnified harmless from all liability, development without the written authorization from Drawings the Architect. legal exposure, claims, damages, losses and expenses. shall not be used for multiple or prototype

2MM THICK M.S.SHEET

300

1160

thereon.

DETAIL AT 'E'

7. The drawings shall be read in conjunction with relevant structural and utility service drawings. Any discre

300

LIFT

'C' CHANNEL 75MMX40MM

development without the written authorization from the Architect.

'C' CHANNEL 75MMX40MM

2. The Architect shall not be responsible where the construction deviates from these drawings, or from written site

instructions/ recommendations. Changes to the drawings, the owner and/ororcontractor 2. The Architect shall not be responsible where the construction deviatesby from these drawings, from writtenshall site be the

2380

1000

DETAIL AT 'B'

responsibility of the person makingto such changes. The owner and/or contractor shallshall holdbethetheArchitect instructions/ recommendations. Changes the drawings, by the owner and/or contractor harmless and against all claims, damages, losses andand/or expenses including, not the limited to, attorney's responsibility of from the person making such changes. The owner contractor shallbuthold Architect

150

fees arising of, orall resulting the performance the work including, by the contractor. The Architect shall not have harmless from and out against claims, from damages, losses andofexpenses but not limited to, attorney's control of, andfrom shall be responsible theby construction means, sequence, fees arising outorof,charge or resulting thenot performance of thefor, work the contractor. Themethod, Architecttechniques, shall not have

E

1160

F

DETAILAT AT'A' 'A' DETAIL

6310

2MM THICK M.S.SHEET 2MM THICK M.S.SHEET 'C' CHANNEL 75MMX40MM 'C' CHANNEL 75MMX40MM T.W.FINS 18MMX150MM T.W.FINS 18MMX150MM

500

G

500

for safety precautions and programs in connection with the work, for the acts ofsequence, omissions of the control or or procedures, charge of, and shall not be responsible for, the construction means, method, techniques,

'C' CHANNEL 75MMX40MM 'C' CHANNEL 75MMX40MM

75

over any surface constitutes acceptance of that surface for the specified quality of the work being perf

1050

D2

D1

ENTRANCE LOBBY 6010X1690

6250

the contract documents and drawings.

3. All works, materials and equipment shall meet the latest requirements of all applicable codes, regulation

4. Prior to performing any work, the contractor shall examine the applicable conditions and substrates and c

2050

contractor, or lack of due diligence of project andthe site supervisors, or of forthe any other or procedures, for sub-contractor, safety precautions and programs in connection withmanagers the work, for acts of omissions

persons performing or anylack of the work, or for the of any of them to carry out the work accordance with contractor, sub-contractor, of due diligence of failures project managers and site supervisors, or forinany other the contract documents and drawings.

3. All works, materials and equipment shall meet the latest requirements of all applicable codes, regulations, the

FIRST FLOOR PLAN

requirements of the authorities having and applicable current standards and specifications 3. All works, materials and equipment shall meetjurisdiction, the latest requirements of all applicable codes, regulations, the as per requirements of the authorities jurisdiction, and applicable current standards and specifications as per Indian Standards and all having other relevant international standards. Except where specified, requirements are more

Indian Standards other relevant international where specified, requirements are more stringent. and All all products products shall be standards. installed Except in accordance with the manufactures instructions,

1112

150 'C' CHANNEL 150 75MMX40MM

1:100@A4

DETAIL AT 'F'

4. Prior to performing any work, the contractor shall examine the applicable conditions and substrates and correct

4. Prior toany performing any work, thebefore contractor shall examine applicable and substrates and and correct unsatisfactory work proceeding with thethe further work. conditions He shall verify that substrate base work any unsatisfactory work before proceeding with the work. He shall verify that substrate and base work are compatible with the new work; Notify the further Architect promptly of any modifications required. Work performed are compatible the new work; Notify the Architect required. over anywith surface constitutes acceptance of thatpromptly surface of forany themodifications specified quality of theWork workperformed being performed over any surface constitutes acceptance of that surface for the specified quality of the work being performed thereon.

75 1160

thereon.

5. This drawing shall be verified on site prior to start of any work, any discrepancy shall be brought to the notice of 5. This drawing shall be and verified on site prior to start of any work, any discrepancy shall be brought to the notice of the Architects all concerned. the Architects and all concerned.

8MM THICK METAL BOX FRAME

6. This drawing shall not be scaled, only written dimensions shall govern. 6. This drawing shall not be scaled, only written dimensions shall govern. 7. The drawings shall be read in conjunction with relevant structural and utility service drawings. Any discrepancy 7. The drawings in conjunction with relevant structural and service drawings. Any discrepancy noticedshall shallbe beread brought to the attention of the Architects and utility all concerned within seven (7) working days of noticedthe shall be brought to the attention of the Architects and all concerned within seven (7) working days of receipt of this drawing, but always prior to procurement/ execution of works. the receipt of this drawing, but always prior to procurement/ execution of works.

8. Project Managers/ Client's Representatives to revert back within seven (7) working days of receipt of this 8. Project Managers/ Client's Representatives to revert back within seven (7) working days of receipt of this drawing on co-ordination and buildability issues. If otherwise, it would be deemed that they have understood drawing on co-ordination and buildability issues. If otherwise, it would be deemed that they have understood and accepted the drawings/ design and own full responsibility for the works to be carried out accordingly. and accepted the drawings/ design and own full responsibility for the works to be carried out accordingly.

150MM THICK BRICK WALL

2MM THICK M.S.SHEET 2MM THICK M.S.SHEET

2MM THICK M.S.SHEET CHANNEL 75MMX40MM 'C' CHANNEL 75MMX40MM 'C''C' CHANNEL 75MMX40MM

75

500 500

1160

DETAILAT AT'B' 'B' DETAIL

CHANNEL 'C''C'CHANNEL 75MMX40MM 75MMX40MM

75MMX40MMRAILING RAILING 75MMX40MM JALI AND FRAMING MEMBER DETAIL MEMBER M.S.FLAT BALUSTERS M.S.FLAT BALUSTERS 1:50@A4

8MM THICK METAL BOX FRAME

8MM THICK METAL 8MM THICK METAL BOX FRAME BOX FRAME

2MM THICK M.S.SHEET

ISSUE OF PRINTS REVISIONS REV. NO.

REFERENCES

110

ABBREVIATIONS

PROJECT:

M.S.FLAT BALUSTERS M.S.FLAT BALUSTERS

BUNGALOW EXTENSION AT SANTOSH BAKERY, PUNE.

DETAIL AT 'F' DETAIL AT 'D' DETAIL AT 'F'

MRS. GAYATRI PAWAR

CLIENT: DATE

06.12.2021

CHECKED

DEALT

APPROVED

PROJ. NO A/2021/01/GP

BLDG. ID.

STRUCTURAL CONSULTANT :

2MM THICK M.S.SHEET 2MM THICK M.S.SHEET

REVISIONS REVISIONS

REV. DATE OF REV. REV. NO.NO. DATE OF REV.

DRG.

MEP CONSULTANT

: -

PROJECT MANAGEMENT

: G D INFRASTRUCTURE

CONTRACTOR

: G D INFRASTRUCTURE

ISSUE PRINTS ISSUE OF OF PRINTS

150MM THICK BRICK WALL 150MM THICK BRICK WALL

T.W.FINS18MMX150MM 18MMX150MM T.W.FINS

DESCRIPTION

DETAIL AT 'G'

2MMTHICK THICKM.S.SHEET M.S.SHEET 2MM 8MMTHICK THICKMETAL METAL 8MM BOXFRAME FRAME BOX

28

DATE OF REV.

'C' CHANNEL 75MMX40MM

40

T.W.FINS 18MMX150MM

75

2MMTHICK THICKM.S.SHEET M.S.SHEET 2MM CHANNEL75MMX40MM 75MMX40MM 'C''C'CHANNEL

N

(air temperature, surface temperature, protection during drying/ curing. relative humidity etc.) to ensure quality durability, maintain proper protection during drying/ curing.

75MMX40MM RAILING MEMBER

DETAIL AT 'C'

M.S.FLAT BALUSTERS

stringent. All products products shall be installed in accordance theappropriate manufactures instructions, recommendations and standards. Installing of products must bewith under environmental conditions

recommendations and standards. Installing of products must be etc.) undertoappropriate environmental (air temperature, surface temperature, relative humidity ensure quality durability,conditions maintain proper

M.S.FLAT BALUSTERS

DETAILAT AT'C' 'C' DETAIL

8MM THICK METAL BOX FRAME

contract documents and drawings. personsthe performing any of the work, or for the failures of any of them to carry out the work in accordance with

DETAIL ATM.S.SHEET 'E' DETAIL 2MM AT THICK 'E'

75

fees arising out of, or resulting from the performance of the work by the contractor. The Architect shall no

persons performing any of the work, or for the failures of any of them to carry out the work in accordanc

stringent. All products products shall be installed in accordance with the manufactures instruc

1:100@A4

DETAIL AT 'A'

harmless from and against all claims, damages, losses and expenses including, but not limited to, atto

control or charge of, and shall not be responsible for, the construction means, method, techniques, sequ

or procedures, for safety precautions and programs in connection with the work, for the acts of omissions

contractor, sub-contractor, or lack of due diligence of project managers and site supervisors, or for any

4, AKASH, 24 KEWALANAND SOCIETY, ANANDNAGAR, SINHAGAD ROAD PUNE- 411051 TEL:(+91) 99708-51011

E-MAIL: chaitanya@100ants.in

WEBSITE:

DESCRIPTION DESCRIPTION TITLE:

FACADE ELEVATION AND DETAILS

PAG

2


Portfolio 2022

GENERAL NOTES 1. Drawings and specifications as instruments of service remain the property of the Architects and are protected by the Ownership of Copyright regulations and under the rules of the Council of Architecture, and the Architects Act 1972. They are not to be reused except by written agreement and with the agreed compensation to the Architect. If reused without permission, the Architect shall be indemnified and held harmless from all liability, legal exposure, claims, damages, losses and expenses. Drawings shall not be used for multiple or prototype

N

development without the written authorization from the Architect. 2. The Architect shall not be responsible where the construction deviates from these drawings, or from written site instructions/ recommendations. Changes to the drawings, by the owner and/or contractor shall be the responsibility of the person making such changes. The owner and/or contractor shall hold the Architect harmless from and against all claims, damages, losses and expenses including, but not limited to, attorney's fees arising out of, or resulting from the performance of the work by the contractor. The Architect shall not have

SP 03

SP 02

SP 02

control or charge of, and shall not be responsible for, the construction means, method, techniques, sequence,

SP 03

or procedures, for safety precautions and programs in connection with the work, for the acts of omissions of the contractor, sub-contractor, or lack of due diligence of project managers and site supervisors, or for any other persons performing any of the work, or for the failures of any of them to carry out the work in accordance with the contract documents and drawings. 3. All works, materials and equipment shall meet the latest requirements of all applicable codes, regulations, the

EQ.

EQ.

EQ.

EQ.

EQ.

EQ.

EQ.

EQ.

requirements of the authorities having jurisdiction, and applicable current standards and specifications as per Indian Standards and all other relevant international standards. Except where specified, requirements are more stringent. All products products shall be installed in accordance with the manufactures instructions, recommendations and standards. Installing of products must be under appropriate environmental conditions

980

C 01

EQ. EQ.

C 02

EQ.

EQ.

protection during drying/ curing.

350

EQ.

350

350

350

(air temperature, surface temperature, relative humidity etc.) to ensure quality durability, maintain proper

EQ.

EQ.

4. Prior to performing any work, the contractor shall examine the applicable conditions and substrates and correct any unsatisfactory work before proceeding with the further work. He shall verify that substrate and base work are compatible with the new work; Notify the Architect promptly of any modifications required. Work performed

EQ.

C 03

over any surface constitutes acceptance of that surface for the specified quality of the work being performed

C 04

C 01

thereon.

C 02

C 03

C 04

C 07

C 08

1000

EQ.

EQ.

EQ.

5. This drawing shall be verified on site prior to start of any work, any discrepancy shall be brought to the notice of

1000

1000

the Architects and all concerned.

1000

6. This drawing shall not be scaled, only written dimensions shall govern. 7. The drawings shall be read in conjunction with relevant structural and utility service drawings. Any discrepancy noticed shall be brought to the attention of the Architects and all concerned within seven (7) working days of

1850

the receipt of this drawing, but always prior to procurement/ execution of works. 8. Project Managers/ Client's Representatives to revert back within seven (7) working days of receipt of this drawing on co-ordination and buildability issues. If otherwise, it would be deemed that they have understood

EQ.

LEGEND:

EQ.

EQ

EQ.

EQ

550

C 05

SURFACE LIGHTS

EQ.

C 10

CEILING LIGHT

250 1000

1000

VIDEO DOORBELL SB-1 1300

SB-9 SWITCH BOARD 1300

CONNECTIVITY

EQ

EQ

C 15

SB-3 600

SB-2 C 16 600

NAME

DATE

NOS.

C 13

PURPOSE

SB-8 600

EQ.

REFERENCES

C 17

C 15

SB-3 600

SB-2 C 16 600

ABBREVIATIONS

C 18

C 17

2000

PROJECT:

SP 04

SP 01

MRS. NISHA SUDHIR WALIMBE

DATE

21.09.2021

DEALT

CHAITANYA

CHECKED

CHAITANYA

APPROVED CHAITANYA

SP 04

BLDG. ID.

PROJ. NO A/01/2018

STRUCTURAL CONSULTANT : MAYUR PISE

N

GROUND FLOOR PLAN-ELECTRICAL CONNECTIVITY LAYOUT

C 18

BUNGALOW AT PLOT NUMBER 14,YOGI PARK,PHASE -2,BANER,PUNE

CLIENT:

SP 01

GENERAL NOTES

DRG. NO.

1. Drawings and specifications as instruments of service remain the property of the Architects and are protected

MEP CONSULTANT

: -

PROJECT MANAGEMENT

:G D INFRASTRUCTURE

CONTRACTOR

:G D INFRASTRUCTURE

by the Ownership of Copyright regulations and under the rules of the Council of Architecture, and the Architects

E-301

Act 1972. They are not to be reused except by written agreement and with the agreed compensation to the Architect. If reused without permission, the Architect shall be indemnified and held harmless from all liability, legal exposure, claims, damages, losses and expenses. Drawings shall not be used for multiple or prototype development without the written authorization from the Architect. 2. The Architect shall not be responsible where the construction deviates from these drawings, or from written site instructions/ recommendations. Changes to the drawings, by the owner and/or contractor shall be the responsibility of the person making such changes. The owner and/or contractor shall hold the Architect harmless from and against all claims, damages, losses and expenses including, but not limited to, attorney's fees arising out of, or resulting from the performance of the work by the contractor. The Architect shall not have control or charge of, and shall not be responsible for, the construction means, method, techniques, sequence, or procedures, for safety precautions and programs in connection with the work, for the acts of omissions of the

4, AKASH, 24 KEWALANAND SOCIETY, ANANDNAGAR, SINHAGAD ROAD PUNE- 411051

GROUND FLOOR PLAN 1:75@ A3

TEL:(+91) 99708-51011

1

E-MAIL: chaitanya@100ants.in

contractor, sub-contractor, or lack of due diligence of project managers and site supervisors, or for any other persons performing any of the work, or for the failures of any of them to carry out the work in accordance with

WEBSITE:

the contract documents and drawings.

SWITCH BOARD PAGE NO

TITLE:

ELECTRICAL CONNECTIVITY LAYOUT

SB1

SB2

Project Name Designed By Electrical Layout

SB-7 600 C 14

2000

EQ.

C 12

DESCRIPTION

REVISIONS ISSUE OF PRINTS

250

250

SB-7 600 C 14

SB-8 600

DATE OF REV.

2000

250

250

SB-1 1300

SB-4 1300 C 11

1000 REV. NO.

C 13

C 10

SPOT LIGHT

EQ

C 12

UP

DOWN LIGHTER

150 EQ. EQ

550

250

SB-4 1300

C 11

1000

SB-6 1300

C 09

2000

SB-9 1300

C 06

UP LIGHTER

EQ.

UP

550

SB-5 1300

UPDOWN LIGHTER C 08

550

EQ EQ

SB-6 1300

EQ. C 07

1000

C 09

250 SB-5 1300

C 06

250

C 05

EQ.

EQ.

EQ.

EQ.

and accepted the drawings/ design and own full responsibility for the works to be carried out accordingly.

: Walimbe Bungalow : 100Ants Design Studio,Pune : Omkar Lele

1/2

3. All works, materials and equipment shall meet the latest requirements of all applicable codes, regulations, the

GROUND FLOOR PLAN

HEIGHT

FIXTURES

1300

4 SURFACE LIGHTS - 2 SWITCHES 4 UP-DOWN LIGHTERS - 1 SWITCH 1 DOWN LIGHTER- 1 SWITCH 4 FOOTLIGHTS - 1 SWITCH 1 SWITCH

6 SWITCHES+1 5A SOCKET

2 SWITCHES

2 SWITCHES+2 5A SOCKETS

requirements of the authorities having jurisdiction, and applicable current standards and specifications as per stringent. All products products shall be installed in accordance with the manufactures instructions,

recommendations and standards. Installing of products must be under appropriate environmental conditions (air temperature, surface temperature, relative humidity etc.) to ensure quality durability, maintain proper

protection during drying/ curing.

600

1:75@ A3

any unsatisfactory work before proceeding with the further work. He shall verify that substrate and base work are compatible with the new work; Notify the Architect promptly of any modifications required. Work performed over any surface constitutes acceptance of that surface for the specified quality of the work being performed thereon. 5. This drawing shall be verified on site prior to start of any work, any discrepancy shall be brought to the notice of the Architects and all concerned. 6. This drawing shall not be scaled, only written dimensions shall govern. 7. The drawings shall be read in conjunction with relevant structural and utility service drawings. Any discrepancy noticed shall be brought to the attention of the Architects and all concerned within seven (7) working days of the receipt of this drawing, but always prior to procurement/ execution of works. 8. Project Managers/ Client's Representatives to revert back within seven (7) working days of receipt of this drawing on co-ordination and buildability issues. If otherwise, it would be deemed that they have understood and accepted the drawings/ design and own full responsibility for the works to be carried out accordingly.

SB3

600

2 SWITCHES

2 SWITCHES+2 15A SOCKETS

SB4

1300

1 SURFACE LIGHT - 1 SWITCH 4 CEILING LIGHTS - 2 SWITCHES 1 DOWN LIGHTER- 1 SWITCH 1 SPOTLIGHT - 1 SWITCH 1 SWITCH

6 SWITCHES+1 5A SOCKET

SB5

1300

3 SURFACE LIGHTS - 2 SWITCHES 7 UP-DOWN LIGHTERS - 2 SWITCHES 4 UP LIGHTERS- 1 SWITCH 1 SWITCH

7 SWITCHES+1 5A SOCKET

3 SURFACE LIGHTS - 2 SWITCHES 2 SWITCH

2 SWITCHES+2 5A SOCKET 2 SWITCHES+2 5A SOCKETS

REV. NO.

SB6

1

Indian Standards and all other relevant international standards. Except where specified, requirements are more

4. Prior to performing any work, the contractor shall examine the applicable conditions and substrates and correct

1300

DATE OF REV.

DESCRIPTION

REVISIONS ISSUE OF PRINTS DATE

NAME

NOS.

REFERENCES

SB7

600

2 SWITCHES

SB8

600

2 SWITCHES

2 SWITCHES+2 5A SOCKETS

SB9

1300

2 SWITCHES

2 SWITCHES+2 15A SOCKETS

PROJECT:

PURPOSE

ABBREVIATIONS

BUNGALOW AT PLOT NUMBER 14,YOGI PARK,PHASE -2,BANER,PUNE

MRS. NISHA SUDHIR WALIMBE

CLIENT: DATE

21.09.2021

DEALT

CHAITANYA

CHECKED

CHAITANYA

APPROVED CHAITANYA

BLDG. ID.

PROJ. NO A/01/2018

STRUCTURAL CONSULTANT : MAYUR PISE

DRG. NO.

MEP CONSULTANT

: -

PROJECT MANAGEMENT

: G D INFRASTRUCTURE

CONTRACTOR

: G D INFRASTRUCTURE

E-301

4, AKASH, 24 KEWALANAND SOCIETY, ANANDNAGAR, SINHAGAD ROAD PUNE- 411051 TEL:(+91) 99708-51011

E-MAIL: chaitanya@100ants.in

WEBSITE:

TITLE:

ELECTRICAL CONNECTIVITY LAYOUT

Project Name Designed By

: Interior Design For Mr. Hemchandra Shrotri : Omkar Lele

WARDROBE AND DRESSING UNIT

STUDY AND LIBRARY UNIT

10" 10" 10"

3'-6"

2'-6"

POSTER WALL

3"

DRAWER

DRAWER

DRAWER

3" 5'-84

DRAWER

EXTERNAL ELEVATION

DRAWER

INTERNAL ELEVATION

DRAWER

6'

INTERNAL ELEVATION

3'-7"

POSTER WALL

ELEVATION

1" 2'-62

6'

2'

4'-6" 1" 1'-112

2'-9"

1'-33 4"

1" 1'-84

PLATFORM BED

7'-1"

1'-2"

7" 7"

1" 94

DRAWER

1'-103 4"

1'-1"

DRAWER

DRAWER

SOFTBOARD

3"

DRAWER

1'-10"

1'-7"

DRAWER DRAWER

2'

1'-1"

5'-53 4"

3'-11"

1'-10"

5"

DRAWER

10" 10" 10"

3" 8" 8" 10" 6"

7'-03 4"

3'-6"

3'

1'

1'-103 4"

1'-13 4"

1'-13 4"

1" 2'-54

1" 2'-114

1'

1" 10'-72 3'-83 4"

3" 3'-84

SOFTBOARD

1" 2'-24 3"

DRAWER

1'

DRAWER

2'-4"

DRAWER

3'-6"

6'-53 4"

EXTERNAL ELEVATION

PLAN

FURNITURE INTERIOR UNIT DETAILS PROPOSED DESIGN FOR MR. SHROTRI

FURNITURE LAYOUT

GRID-2'X2'

DATE: 17.12.2021

29

PAGE NO

1/1


Portfolio 2022

MODEL MAKING

Project : Museum Design

House On Stream,Alibaug

Courtyard House

Elective-Concept And Geometry : Form And Space

30


Portfolio 2022

PHOTOGRAPHY 2018

2019

2022

2021

2018

2019

31


Portfolio 2022

ILLUSTRATIONS Illustrator Workshop Conducted By Architecture Candy

Illustrator Workshop Conducted By Architecture Candy

Illustrations- 100 Ants Design Studio Pune.

32


Portfolio 2022

DOCUMENTATION

Studio UGAM , Pune Documentation Team : Ar. Priyanka Dapodikar , Omkar Lele

Karve House , Pune

Ground Floor Plan

Internal Elevation From Courtyard Kank Wada , Bhutonde

Karve House , Pune Patwardhan House , Pune

33


OMKAR R. LELE +91 8080134621

omkarlele13@gmail.com


Turn static files into dynamic content formats.

Create a flipbook
Undergraduate Internship Portfolio_Omkar Lele by Omkar Lele - Issuu