Goodrich Consulting - Enabling & Infrastructure Experience

Page 1


OUR ENABLING & INFRASTRUCTURE EXPERIENCE

1.

OVERVIEW OF GOODRICH

FOR OVER 30 YEARS, GOODRICH CONSULTING HAS BEEN DELIVERING EXCEPTIONAL CONSTRUCTION CONSULTANCY TO CLIENTS ACROSS THE UK

Founded in 1992, the company has grown from strength to strength, seeing the team expand at its Northampton headquarters, and the acquisition of a Birmingham and Bristol office The ownermanaged firm is led by seven Partners, supported by an experienced team of project managers, project surveyors, building surveyors, and technical administrators.

Our team is what sets us apart, alongside our commitment to delivering an outstanding service on every project we work on. With expertise from client and contractor backgrounds, our workforce ranges in experience levels, enabling us to fit the right team for your job.

We aim to provide our clients with dedicated experts to support the smooth and successful delivery of your vision, from conception to completion and beyond, through the following core service lines:

• Project Management

• Employer’s Agent

• Quantity Surveying

• Building Consultancy

• Principal Designer

Reliability and flexibility are key to any successful project, which is why we adopt a forwardthinking, proactive approach to our work, supported by our industry knowledge, ongoing research and benchmarking of current market trends.

In addition to our core services noted above, we also offer the following supplemental services:

• Dilapidations

• Building Survey

• Licence to Alter

• Party Wall

• Clerk of Works, or Quality Monitoring

• Fund Monitoring

• Facilities and Property Management

We are proud to have developed strong repeat partnerships with our clients, some of which span over the 30 years we have been in business. Our enviable position as experts in industrial, commercial, and education sectors has enabled us to enter new areas such as retail, retirement living, infrastructure, hotel, life science, and occupier fitout. Our people and portfolio of work allow us to provide invaluable insight across a variety of industry sectors.

2.

OUR CORE OFFERING

Project Management

We have an incredibly strong team of experienced project managers, who are responsible for the successful delivery of your construction project. Working closely with our clients, the team are well equipped to organise, control, and monitor ongoing construction operations. In addition to our project management team, we have a strong and capable technical administration department, which ensures all crucial paperwork is completed. We pride ourselves on the hands-on leadership and guidance we offer, from pre-commencement to completion.

Quantity Surveying

The quantity surveying team’s strengths lie in their diverse backgrounds within client organisations, professional practice and contracting. This breadth of exposure enables us to offer broad skillsets and experience on all projects across our sectors.

Our technical administration department provides additional support to the surveying team, ensuring the work produced is issued promptly and of the highest quality

With our team’s collective industry expertise, combined with a wealth of benchmarking data we acquire from our live projects, we can provide our clients with recommendations that accurately align with the changing business landscape.

In addition, we have access to RICS Membership, BCIS data, CostX measurement software and JCT online, whilst actively supporting quantity surveying apprenticeships with Nottingham Trent University, allowing us to continue onboarding new talent for the future of construction.

WE UNDERSTAND OUR CLIENT’S REQUIREMENTS, WORKING SEAMLESSLY TO PROVIDE PROACTIVE ADVICE ON A RANGE OF TECHNICAL ISSUES

Employer’s Agent

As employer’s agent, we ensure the project is structured correctly and that the investment value of the scheme is protected. As well as representing our client, we will administer the contract and complete all appointments, warranties, and other key legal documents, alongside organising, chairing, and recording meetings / key events.

We are there to support, advise and organise our clients. Depending on the requirement the role will be fulfilled by one of our senior project managers or project surveyors, with backup support from the wider technical team.

Principal Designer

As a business, we have invested heavily in training key members of the project management team as principal designers. As members of the APS, Association for Project Safety, we are competent in influencing how risks to health and safety are managed throughout the project.

When appointed as project managers on a scheme, we can extend our appointment to include principal designers where required.

Building Consultancy

The breadth of experience within our professional team means that we have worked across all property sectors, which allows us to provide our clients with detailed and reliable advice across the full property life cycle.

We understand our client’s requirements, working seamlessly to provide proactive advice on a range of technical issues, including acquisition surveys and fund monitoring reporting, technical due diligence, landlord and tenant dilapidations claims, planned preventative maintenance, party wall matters, together with building refurbishment and fit out project management and contract administration services for projects of all shapes and sizes.

It is our professional team’s experience, knowledge, understanding and logical, lateral thinking that affords us the ability to provide the accurate, timely and focused advice our clients expect.

WITH THE BUSINESS LANDSCAPE CONSTANTLY CHANGING, WE UNDERSTAND THE IMPORTANCE OF PROVIDING OUR CLIENTS WITH ACCURATE COST PROJECTIONS

Data Analysis

Goodrich’s benchmarking data is solely based on contract data, thereby ensuring that only realworld information is used when compiling the benchmark ranges. The use of ‘real life’ contract data, rather than estimates or contractors’ cost plans, better reflects the fluctuations in materials, labour and rates. The data is continuously updated; this is undertaken on each contract sum analysis and only once the contract is awarded.

We understand that accurate cost information is paramount to allow our clients to have the confidence to make informed decisions throughout key project stages We have collated over 6 years of detailed I&L cost data, encompassing 13.33 million sq ft and just over £1 billion in combined value.

We have provided cost advice on a wide variety of building types ranging from £100k to £100m, and everything in between.

3.

ADDITIONAL SERVICES

Dilapidations

We work for both Landlords and Tenants, preparing schedules of dilapidations for Landlords and responding to schedules on behalf of Tenants. Our experienced team reviews all the legal documentation in preparing/responding to schedules, inspecting the demise for breaches under the terms of the lease and conducting negotiations to conclude the claim in accordance with the lease terms.

We also provide consultancy advice on dilapidation strategies including assessment of liability and obligations in preparation of lease events.

Building Survey

Our team of building consultants can carry out a detailed inspection and report on the structure and fabric of the property together with comments on the condition of the services, predominantly for the owner/occupiers. The report will also recommend additional specialist inspections and reports as required, i.e. services, environmental, deleterious materials, DDA, etc.

Licence to Alter

We will conduct a technical review of a tenant/occupier’s proposed works to assess the suitability of information received and compliance with Lease Terms or Covenants. Comment upon the impact on the structure and fabric of the property, and on the statutory and legal compliance of the proposed works. The report will also provide advice on reinstatement requirements to be considered for inclusion with any formal Licence to Alter.

Party Wall

We will manage negotiations on behalf of the building owner or adjoining owner of the terms and conditions applicable where works are affecting a party wall, having due regard to the Party Wall etc. Act 1996.

Quality Monitoring

We recognise the importance of quality when it comes to building. That’s why we have a mix of experts, many with building surveying and on-site backgrounds, who are placed to provide a constructive view on the quality and appropriateness of your built asset as the works progress.

Fund Monitoring

We have provided fund monitoring services to Barwood Capital, NatWest, Octopus and Handelsbanken for a variety of building projects. We are practical and realistic, providing guidance and advice as the project progresses from the agreement of funding through to completion.

Facilities and Property Management

We can care for your asset as part of our facilities and property management services, in a way that suits your business.

Covering all services from a soft-landing handover to operators and occupiers, management and provision of all hard and soft facilities services to the asset and occupiers, management of all operational health and safety compliance, budget and financial management, and reactive services management.

Our consultative services available include property operating budgets, services charge advice, operating lifecycle plans and operational best practice advice.

OUR CLIENTS 4.

5. Environmental Social Governance

At Goodrich, we understand the importance of being strategic in our approach to social responsibility We’re committed to raising awareness of both our individual and collective impact on the planet.

In partnership with Planet Mark, we gather and analyse key data across our business to gain valuable insight into our carbon footprint. This helps us identify the areas where change is most needed and where we can make the biggest difference With this knowledge, we can make informed decisions that drive meaningful improvements, not just within our business, but in the wider community too.

Reducing our environmental footprint is a responsibility we take seriously We are focused on taking proactive, forward-thinking steps that support positive change for the planet and society, helping to build a more sustainable future for all.

As our business continues to grow, we recognise that balancing progress with sustainability presents its challenges. However, we remain committed to exploring new initiatives that help us meet our carbon reduction goals.

Each year, we report on our performance across the following key categories:

Scope 1

The emissions from sources that a company creates directly.

Scope 2

The emissions a company creates indirectly, associated with the energy it purchases

Scope 3

The emissions that are not produced by the company itself, but by those within the company’s value chain.

Our teams also play a vital role in driving our CSR efforts. Every year, each team is encouraged to support their local communities, schools, and charities by organising at least two CSR events to encourage a culture inspired by involvement and impact.

6.

Sector overview

Enabling & Infrastructure

We understand the important and integral part infrastructure plays when unlocking a plot of land for development. The systems and services being installed need to be efficient to enhance business operations and maximise site utilisation.

Requirements vary on each scheme, which is why our team are proficient in supporting and advising during the implementation of infrastructure to ensure the system accommodates your current and future business needs.

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Contract Duration:

Key Facts:

SmartParc, Infrastructure

SEGRO

The scheme involves the construction of 9 new building plots totalling two million sq ft across a brown field site of over 100 acres. The works involved extensive road infrastructure, footpaths, below ground services including utilities, drainage and DH&C pipework and various forms of highway works.

Spondon, Derby DE21 7BS

125 weeks

• The infrastructure includes the installation of District Heating and Cooling to provide energy efficiencies to all plots on the park

• Significant offsite utility reinforcement works

• Significant Highways works including liaising with Highways England

CASE STUDY

Project Name:

Client Name:

Project Details:

SmartParc Energy Centre

SmartParc Spondon Ltd

Construction of an 8000 sq ft energy centre providing efficient energy distribution across SmartParc. This includes the distribution of centralised site wide PV energy via a micro grid and centralised heating and cooling to each plot via a below ground network of insulated pipework.

Project Address:

Project Value:

Contract Duration:

Key Facts:

Collaboration Way, Spondon, Derby, DE21 7HW

£2,976,625,35

39.3 weeks construction phase

• No BREEAM

• No EPC

• No Net Zero

SEGRO

CASE STUDY

Project Name:

Project Details:

Project Value:

Contract Duration:

Key Facts:

Enabling and Infrastructure, Bristol

The site is a new industrial/distribution development located in Bristol, extending to 65 acres.

£10-£15 million

15 months

The works aim to secure viability for future development. The site will offer a variety of unit sizes ranging from 133,438 - 584,361 sq ft within three separate phases. Future development to achieve BREEAM rating ‘Excellent’.

Goodrich was appointed to commission and manage the early-stage enabling works. These include:

• Ecology Mitigation: Reptile clearance and establishment of a suitable receiver zone

• Public Right Of Way (PRoW) Diversion: Management of the design and application process

• Archaeological Investigations: Archaeological geophysical survey and follow-on evaluation that comprised 112no trenches. The survey work identified a significant level of interest and required a programme of strip, map and sample excavation across the site to remove any future development constraint within the boundary

• Rhine Diversion and Water Vole Translocation: Diversion of a surface water flood rhine to maximise the developable area, including securing permissions from Natural England and translocation of water voles

• Electrical Infrastructure Upgrade: Management of the application process and provision of a new 10MVA primary sub-station

• Foul Water Pump Station and Rising Main: Management of the S104 technical and legal applications to secure a new foul water connection for the development site

• Site Clearance and Upfilling: Procuring civil design and contractor appointment to undertake a package of site strip, disposal and upfilling to provide a suitable load-bearing plateau for future development

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Project Value:

Contract Duration:

Key Facts:

Integra 61, Durham

Integra 61 (Durham) Limited

New infrastructure works

Durham

£7 million

48 weeks

• S278 and S38 works

• Formation of development plots

• Services diversion

• New services to site from 3.5 miles away

• Footpath diversions

• Maintenance of 24/7 access for Water Authority

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.