Mississippi Emergency Work Plan The purpose of this plan is to make effective help quickly available to any system in emergency need of help because of natural or man-made disasters. This book is to provide a standard operating procedure for associations seeking assistance from other associations, as recommended by the Safety and Loss Control Committee, and approved by Statewide Board of Directors, and to provide other information which may be helpful in time of need. The emergency work plan applies to Mississippi electric power associations. Agreements between contractors and individual systems should be arrived at by negotiations. This agreement supercedes any state or federal laws pertaining to contracting services. CONTACT INFORMATION STATEWIDE OFFICE Weekdays 601-605-8600 FAX: 601-605-8601 NIGHTS AND SUNDAYS (CELL) Michael Callahan, 601-572-6048 Gerald Gordon, 601-718-7340 Ron Stewart, 601-906-9306 (H) 601-856-7604 Chad Crockett, 601-214-3145 Paul Purnell, 601-497-5145 Donna Richmond, 601-832-9368

Mississippi Statewide Safety & Loss Control Committee Brian Hughey, Chairman Barry Rowland, Vice-Chairman Kevin Bonds Shawn Edmondson Eddie Howard Chuck Howell Darrell Smith Tim Smith Joe Miller– 4-County EPA Wes Lee – Southern Pine Electric Jim McClure – North East MS EPA

Procedure for Securing Help When Disaster Strikes 1. Survey the extent of damage and determine as nearly as possible the outside personnel and equipment needed. 2. Consult this manual for information on other systems, their manpower, equipment, tools, telephone number or ham radio connections and probable ability to help you. 3. Alert the statewide office (Ridgeland, 601-605-8600), which will keep a dispatcher on duty around the clock throughout such emergency as it may develop.This dispatcher will enlist, route, move and release help on the basis of information secured from affected managers by telephone, Highway Patrol, radio ham, messenger or other means. 4. When calling for help, give the following information:

A. Number and type of trucks needed. B. Other equipment and tools needed. C. Personnel and classification needed. D. Materials needed. E. Weather and road conditions F. Where the crews should report, and to whom. G. How to contact your association. H. Name of person to receive this information. I. Telephone numbers other than normal usage. 5. To facilitate giving of above information over substandard communications media, or when the message must be relayed through persons unfamiliar with the terms used, use of the Form For Requesting Assistance by managers is requested. Suggested form follows. 6. In event of emergencies striking Mississippi and/or nearby states, EPAs of Mississippi will coordinate requests for assistance from Mississippi systems directly with those statewides affected.

-1-

AUGUST 2020


SAMPLE BILLING FORMAT For the sample billing, we have assumed the following hourly rates

Foreman Lineman A Lineman B Apprentice Lineman Groundman Truck Driver

$21.00 $18.00 $16.00 $12.00 $10.00 $12.00

per per per per per per

hour hour hour hour hour hour

The charge per hour for the foreman would be calculated by the following: In/Out of state work $21.00 per hour plus 50% = $31.50 x 1.5 = $47.25

The same type calculations would be followed for the remainder of the crew.

XYZ Electric Power Association Emergency Work During Storm January 2018

Foreman Lineman A Lineman B Apprentice Lineman Groundman Truck Driver Total Labor Derrick Truck Bucket Truck Miscellaneous Materials

Hours Worked 100 100 100 100 100 100

Rate $47.25 40.50 36.00 27.00 22.50 27.00

80 Hours @ $37.50 80 Hours @ $35.00

Amount $ 4,725.00 4,050.00 3,600.00 2,700.00 2,250.00 2,700.00 $ 20,025.00 $3,000.00 2,800.00 300.00

$26,125.00

Total Bill

-2-

AUGUST 2020


State System Plan of Action

He will immediately reduce this information to writing. The person receiving the original message will start immediate action to enlist appropriate help and get it to the desired place with the equipment and materials needed.

The person at statewide receiving any call for help will attempt to learn:

All calls and assignments will be logged in such manner that relief dispatchers can immediately determine what has been done.

1. The nature of the emergency and its apparent severity:

Should the need develop, statewide will act as messengers, maintaining contact between dispatcher and distressed systems. The dispatcher must always be kept informed as well as possible, as to who is where and what is needed, when. Too, he should know how the visiting crews are fairing, what they need and, as soon as possible, about how much longer it appears they will be needed. It is important this information be relayed to the home base currently as changes may occur.

2. What has been done; 3. Who has already been contacted; 4. What help the system needs; 5. Where he wants help to report, and to whom; 6. What equipment and materials are needed first;

NOTE: The statewide will keep on file an up-to-date list of qualified contractors, active radio amateurs and other possible sources of assistance for possible use in emergency situations.

7. A rough guess as to how long help may be needed; 8. What means of communication seems likely to serve best.

Uniform Method of Reimbursement

The following hourly rates will be charged: One Half Ton Pickup $16.00 /Hour Three Quarter Ton pickup $18.00 /Hour One Ton Truck $20.00 /Hour 40 foot or less Bucket Truck $25.00 /Hour 60 foot or less Bucket Truck $35.00 /Hour More than 60 foot Bucket Truck $40.00 /Hour $37.50 /Hour Digger Derrick $8.00 /Hour Pole Trailer $8.00 /Hour Four Wheeler and Trailer Tractor Truck with Lowboy $70.00/Hour* Go Track / Skidder Bucket $100.00 /Hour* Go Track / Skidder with Derrick $100.00 /Hour* Up to D-4 Dozer $55.00 /Hour* D-5 Dozer $65.00 /Hour* Backyard Digger Derrick $45.00/Hour Chainsaws (Actual Usage) $2.00 /Hour

1. Each manager shall pay his own men under his own payroll policies and in conformity to wage and hour laws and contractor’s obligations, except that distressed systems will pay assisting systems time and one half for travel time and time and one half for all hours worked. Upon arrival at a distressed system, all charges will be made on an hourly basis (labor and vehicle). When possible, distressed system managers should inform assisting crews as to when the work day begins and ends. 2. Actual living expenses of men incurred by the assisting association are to be invoiced in the actual amount. Food and sleeping accommodations should be a top priority and where feasible, secured by the distressed system.

* 3 HOURS PER DAY MINIMUM

3. The distressed system will be responsible for all fuel used, supplied or purchased. Rates charged on vehicles and equipment will be on an hourly basis. Charges will apply for all hours used, beginning when a system leaves their home location to go to a distressed system.

-3-

• Cooperative Energy, the generation and transmission cooperative, will have a separate rate sheet due to the exclusive nature of the equipment used for transmission facilities. • Overhead rate will apply to labor charges and will be at the rate of 50%. • Special vehicles shall be billed at applicable market rates. • If items such as tires, batteries, etc. are provided by the distressed system,the distressed system should counter invoice those items so used or credit his system an appropriate amount of final settlement. AUGUST 2020


Cooperative Energy Statewide Equipment Rates Description

Rate

Unit

1/2 Ton 4X4 Pickup Truck

$

0.65

Mile

Digger Derrick

$ 40.00

Hour

1 Ton 4X4 Crew Truck

$

77’ Bucket Truck

0.70

$ 40.00

105’ Bucket Truck

$100.00

38 Ton Telescopic Crane

$ 97.00

Track Carrier w/Aerial Bucket

$100.00

Lowboy Trailer for Track Bucket

$ 25.00

Mack/International Tractor Truck

$ 25.00

Track Carrier w/65’ General Derrick

$103.00

Triple Axle Lowboy Trailer for Track Derrick $ 25.00 4 Wheeler

$

Telescopic Platform Trailer (Float)

$ 15.00

Utility Trailer

$

Go-Trac Personnel Carrier

5.00 1.00

$ 30.00

Tote-em-all Trailer for Go-Trac

$ 15.00

John Deere Dozer

$ 20.00

Tandem Axle Tag Along Trailer

$ 10.00

Tandem Pole Trailer

$ 10.00

Caterpillar Forklift

$

5.00

Mile

Hour

Hour

Hour

Hour

Hour

Hour Hour Hour

Hour Hour

Hour

Hour

Hour

Hour

Hour

Hour

Hour

40 Ton Mantis Crane

$110.00

Hour

Carrier with Trailer

$ 75.00

Hour

Hydratek Amphibious Personnel

37’ Bucket

$ 25.00 $ 55.00

Trencher

-4-

Hour Hour

AUGUST 2020


Cooperative Energy Statewide Equipment Rates

Description

Rate

Unit

Bobcat w/Trailer

$60.00

Hour

UTV/ATV w/Trailer

$8.00

Hour

Backhoe w/Trailer

$40.00

Hour

These are each with a 3 hour per day minimum charge. Any additional equipment/personnel sent with a crew must be agreed upon before the assisting system departs from their location. A request for a construction crew will be considered to be one digger derrick, one large bucket, and a pickup truck with up to 6 employees. A request for a service crew will be considered one small bucket truck and two employees. A per diem of $20/employee/day will be billed for each day of travel to and from the requesting system. This will cover any expense incurred by employees during travel including meals or snacks. The requesting system will cover the expense of meals while assisting system is performing work.

-5-

AUGUST 2020


In the event of vehicle damage due to extraordinary circumstances, it is suggested that the distressed system pay for the majority of the damage repaired. In all cases, repair payments should be arrived at by negotiation. Normal wear and tear on equipment is included in the mileage and hourly charges.

single use should be billed at actual costs.

Note: Prices are subject to change based on economic conditions.

6. It is not expected that any charge will be made for use of tools and working equipment, but such supplies as sleeves, fuses, connectors, conductor and insulators are to be invoiced at actual cost.

4. Items of equipment and clothing not used by crews at home, but bought by or for them for this

SAFETY

5. Changes to be made for such items of special equipment as portable generators, boats, tractors, etc., shall be arrived at by negotiation in each case.

All work done shall be done in accordance with all applicable state and federal safety regulations.

INFORMING YOUR MEMBERS

Unopened food freezers can maintain stored frozen foods safely from 36 to 48 hours depending upon the amount of food stored, capacity of the freezer and the normal temperature of operation of the freezer. Sources of dry ice, quantities available and prices will be supplied by your statewide if requested. During prolonged outages, dry ice can save thousands of pounds of stored food in a disaster area. Power suppliers can supply a real service during disasters by knowing where dry ice can be secured and even making arrangements in advance for it to be sent to a central location,whereby local radio stations can inform people of its availability. Experience during Hurricane Katrina points out the necessity of assigning some member of your staff now who will handle member relations during times of disaster. It is important that he make arrangements with radio stations to keep them informed of your system’s plan for re-establishing service. When telephone services are available, a regular schedule should be set up with a direct circuit from the co-op office to the radio station which will enable the manager to maintain contact with members. There are many cases where members are iso-

lated due to road conditions, and they should be warned about energized lines which are down. They should be encouraged to notify the co-op office when they notice broken lines, poles down, etc. They should be informed how your method of re-establishing service is progressing. Members cannot be expected to know when service to your substation has caused their outage. By keeping them thoroughly informed, you will be performing a vital member service and one which can pay handsome dividends for years to come. In every association area, there are dairies, hatcheries, etc. which must have electric service; certainly during part of the outage, therefore, it is recommended that a survey be made to determine the availability of portable generators of 5kwh and above. For example: In certain portions of Mississippi, the National Guard has available portable generators for providing emergency service of this nature. In emergencies, these units are moved from diary to dairy to provide power for milking. Continuous power is necessary for hospitals or in houses where someone is seriously ill. These portable generators, therefore, are most important.

-6-

AUGUST 2020


Geographic and Power System Information For Emergency Events Certain geographic and power system information needs to be shared to allow outside assistance the knowledge of where service points are located. Within this geographical information three key data points need to be shared which are the unique meter number, map number, and the service address (911 address). The meter number is a serial number for the meter that is assigned to each meter and unique to each member. This number is a searchable number, so if the hosting cooperative provides a meter number as a reference, the assisting company can navigate to this location. The same goes for the map number. The meter serial number and map location number are fundamental pieces of all cooperatives geographic data. The service address is the geographic data used by 911 emergency firstresponders. It is commonly used for directions by anyone using a cell phone. The service address should be included to allow assisting personnel access to information to relay to a 911 operator in the event of an electrical contact requiring emergency personnel. Other information needed for power restoration includes details on the electrical network including substations, primary lines, secondary lines, equipment, etc. Information which is not shared is a member’s name and any sensitive information associated with a member. A mailing address is not included unless it is the same as the 911 service address. However, there is no name associated with an address. The geographic and power system information is to be electronically stored by each cooperative in a secure location. This information is to only be accessed and utilized during a mutual assistance event. This allows ECM the ability to coordinate access of the hosting cooperative’s geographical information to the assisting cooperative during early stages of an event. Only the assisting cooperative shall be privy to the hosting cooperative’s information, and this information is to only be utilized during the mutual assistance event. This information shall follow the standard symbology.


Substation

•

All Other (Pole)

M ! (

Consumer

! (

Pole

Ç Ù

Switch Open

{ +

JunctionCabinet

Ù0 

Switch Closed

{ ,

Pedestal

Ù0 

GOAB Closed

All Other (Primary Line)

Ç Ù

GOAB Open

OH SINGLE PHASE

V E

Fuse

UG SINGLE PHASE

OpenPoint

OH TWO PHASE

B V

Recloser

UG TWO PHASE

# *

All Other

OH THREE PHASE

#2 *

Two Phase

UG THREE PHASE

#3 *

Three Phase

All Other (Secondary Line)

1 # *

Single Phase

OHSecondary

1 # * " )

UG Single Phase

UGSecondary

3 # * " )

UG Three Phase

Guys

2 # * " )

UG Two Phase

Road

* V

¸

Regulator

Hydro

Capacitor

SubBoundary

E

" )

V ]

Standard Symbology

County


Operating Procedures When a Major Disaster Strikes

F. Inform them as to the authorized persons who will be in charge of operations and dispatching. G. Secure agreement from them that minimum safety practices are understood and will be complied with.

1. Each system will prepare and have ready its plan and organization setup for handling a major disaster on its system. This plan shall consist of complete details for handling the work assignments and arrangements.

H. Make work assignments and make sure they are understood.

2. Extra help reporting to affected systems. Crews which have been hit by a major disaster will, if they are on the same radio frequency as the affected system, report in to the affected system’s office as soon as they are within good communication range for orders from the person in charge of directing operations. Crews not on the same radio frequency as the affected system will report directly to the person in charge of operations at the affected system’s headquarters.

I. Maps must be kept up-to-date and copies available in order to expedite work assignments. J. It must be understood by all concerned that as soon as emergency repairs have been made and service restored to all members on the affected system, the help, which has been called in, will be released to return to their home system.

3. Any crews called in to help a system affected by a major disaster will be fully informed of the following matters before they are given their assignment of work:

Before releasing these crews, however, check with Electric Cooperatives of Mississippi to determine whether they are needed for emergency work elsewhere. ECM then will clear with their home system and notify you as to instructions for them. ECM should be notified an hour or two before you plan to release them, if possible.

A. Where food and lodging is available. B. Where they are to get gasoline, oil and equipment serviced; system’s policy relative to the landing of invoices in connection with such service.

4. Only one person shall be authorized to direct operations during emergency work. All orders and dispatching shall be done by this authorized person. When authorized person is relieved by another person who is qualified to direct operations, and if outside crews have not been informed that he will be relieved by such person, they will be so notified at the time the relief man takes over.

C. Length of time they will be expected to work continuously and length of rest period. D. Reach an understanding relative to handling expenses. E. Check on proper tools and materials for work assigned to them.

Planning for a Disaster on a Local System

In the interest of reducing outage time, improving member relations and promoting public relations on your system, the following operational procedure, based on experience of systems who have experienced major system damages from sleet storms, tornados, hurricanes and other disasters is submitted for your information and guide.

to be used for planning outages. 2. Air break switches at substations to be listed, and repair parts kept on hand at all times. 3. If there is a complete substation burn-out, transfer load to other substations. On all transfer of loads, if at all possible, the consulting engineer should be contacted and his advice followed.

1. Planned outage reports to be given to telephone operator who is to notify telephone exchanges in the area that lines will be out. A form of a different color

4. Power supplier to be notified if load is switched

-7-

AUGUST 2020


from one substation to another, in case of substation failure.

E. Have small crew to restore individual service and handle special hazards.

5. For trucks and equipment, make prior arrangements for 24-hour service for gasoline, repair service and parts.

F. Assign local man with outside crew where possible. 8. Member and public relations; dry ice program.

6. Eating facilities: arrangements with local restaurants for hot meals around the clock.

9. Identification cards, available through ECM.

7. Restoring service: A. Establish priorities for establishments affecting community health and safety. B. Assign crews to a definite area. C. Avoid pressure from individuals. D. Concentrate on feeder circuits.

A local plan, well organized in advance, will facilitate the restoration of power and avoid confusion in the event of a disaster on your system.

Practical suggestions for managers during emergency situations

When disaster strikes your system, you will do what seems best to you, and the rest of us will help as you think best. But here are some observations growing out of our experience.

6. If you are sending crews to help a neighbor, be sure to give your head man enough money to make your men feel secure. 7. One of the big mistakes sometimes made is to yield to pressure from individuals for special attention. Little progress can be made in cleaning up major damage when crews are required to run from one end of the system to the other trying to satisfy individuals who demand special attention without justification.

1. There is a limit to the length of time men can work effectively and safely without rest in bed. 2. Around-the-clock work, in shifts, is logical in a situation expected to be cleared up within two or three days, but if it looks like a longer pull, daylight-to-dark probably will pay better for all concerned.

8. Experience has proven the wisdom of giving a crew responsibility for work on a given feeder and letting them work it out to the end or to be a sectionalizing point, then coming back and restoring service on single phase lines or taps off the feeder.

3. Truck and equipment service may be a problem. Filling stations may be unable to pump gasoline. Maybe you will need to make arrangements with gasoline and oil distributors to make tank truck deliveries direct to your vehicles at convenient locations.

9. Some associations feel that it is good to have one or more two-man crews for dispatching to locations where special hazards may exist or where especially critical loads should be given special attention. When not on such work, they can be used to repair individual services.

4. Mechanics should be kept on stand-by duty to service and repair trucks. Garages at convenient locations should be kept open, with repair parts available. 5. Arrange with certain restaurants to stay open as may be necessary during emergency work. Your men may need hot food at odd hours. Chances are you will lose fewer meals to “free loaders” if each foreman or crew chief pays for the meals eaten by his men.

10. From a member relations and public relations standpoint, it is important that every means of communication be used to keep members of the general public informed as to what is being done to repair damage and restore service. A specific person should be designated this responsibility.

-8-

AUGUST 2020


11. In view of the fact that areas hit by a major storm may be isolated by the police and none but authorized persons admitted, it is recommended that each system issue to its authorized personnel means of identification which will be provided by statewide. This identification will have the further value of identifying authorized persons to filling stations, restaurants, etc.

crews and provide assistance and liaison with the system being aided.

12. We recommend that each system have a written emergency plan for their system’s use. Attached is a sample form which to start in developing such a plan.

17. An information sheet should be filled out and carried by visiting crews and given to the person in charge at the distressed system.

13. We recommend that crews be rotated periodically when working in extreme emergency conditions over an extended period of time.

18. In order to cut down on transportation and travel time, we recommend that where practical, lunches be served to visiting crews in the field.

14. The system requesting help should see that housing is provided for the visiting crews.

19. We recommend that an engineer or operations supervisor come with the visiting crew. In this way a given feeder or substation can be more effectively worked.

16. We recommend that systems responding to a call for help be given full responsibility of work in a designated area rather than moving from outage point to outage point.

15. Each system responding to a call for help should provide a person to coordinate the activities of their

Check List for Requesting Assistance 1. Nature of disaster. 2. Weather and road conditions. 3. What has been done prior to calling. 4. Who has already been contacted. 5. What type help the distressed manager feels he will need. 6. To where and to whom he wants help to report. 7. What equipment and materials are needed first. 8. An estimate on how long the help may be needed. 9. Whether help is needed to set up charge accounts for equipment service, restaurants, motels, etc. 10. Whether additional petty cash is needed. 11. Secure a work order number for all charges.

12. Records as to when first call was received and when service was restored. 13. A method to compile information for customer hour outage. 14. What means of communication would be most beneficial due to radio system being used for dispatch or being without power. 15. Have a method of logging calls and assignments in such a manner that relief dispatchers can immediately determine what has been done. 16. Keep informed of the locaton of all crews and when and where what type materials are needed. Keep advised of the status of the visiting crew, what assistance they need, approximately how much longer they will be needed, and keep their managers informed at all times.

-9-

AUGUST 2020


SYSTEM EMERGENCY CREW REQUEST FORM Date

Association

Time

System Person Making Request CREWS NEEDED

______ ______ ______ ______

Construction Crew Digger/Derrick Bucket Truck Service Truck Pick-up

Other:

NUMBER OF METERS OUT OF SERVICE ___________________________________

LENGTH OF STAY ___________________________________

ACCOMMODATIONS __________ WHERE __________________________________ Sleeping bags or other accessories needed? ____________________________

ARRANGING FOR MEALS __________________________________

WHERE TO REPORT ____________________________________________________ ____________________________________________________

WHOM TO REPORT ____________________________________________________ ROAD CONDITIONS ____________________________________________________ ____________________________________________________

WEATHER CONDITION __________________________________________________ SPECIAL EQUIPMENT OR MATERIAL NEEDED ______________________________ _______________________________________________________________________ _______________________________________________________________________ _______________________________________________________________________ -10-

AUGUST 2020


Emergency Assistance Form Storm Name and Date: Affected System: Address: City, State, Zip: #1 Contact

Main Number

Alternate Number

#2 Contact

Main Number

Alternate Number

#3 Contact

Main Number

Alternate Number

#1 Contact

Main Number

Alternate Number

#2 Contact

Main Number

Alternate Number

#3 Contact

Main Number

Alternate Number

Assisting System: Address: City, State, Zip:

Departure Date and Time: Arrival Date and Time: Release Date and Time: Equipment

#

Employee

Title

Phone

Pickup Bucket Truck Digger Derrick Pole Trailer 4 Wheeler & Trailer Truck with Lowboy Skidder Bucket Skidder Digger Dozer Additional Equipment:

-11-

AUGUST 2020


SAMPLE SYSTEM EMERGENCY AID PROGRAM I.

Table of contents

II.

Objectives

III.

List: Employee, position, address, phone number

IV.

Local emergency contacts (location and phone number) Police, sheriff, highway patrol, doctors, fire, ambulance, radio and TV, supervisors, CB radio club, ham operator, telephone company, municipality, gas company, county coroner, county schools and others as needed.

V.

System base and mobile unit call numbers

IV.

Procedure for securing help

VII.

Crew make-up for emergency aid A. Detail outline for men and equipment, each crew B. Dispatchers and controllers for each area.

VIII. IX.

Practical suggestions for area manager in time of disaster Check list for requesting assistance.

Suggested Organizational and Personnel Assignments in Case of Major Storm or Disaster For the best possible service to all members at all times, the ___________ System will be assigned to the following responsibilities during an emergency.

sonnel are to be on duty to receive calls.

When a Disaster Strikes

4. The responsibility of keeping extra up-todate circuit diagram maps is delegated to ___________ .

1. The ___________ is responsible for the securing of lodging, board, gas and repair of trucks and tires for all help from other systems. 2. Only people dispatching work should be in the radio room. All unauthorized personnel are to stay out of the radio room. This is not a place to loaf or visit. All people reporting outages in person must come to the front office. No visitors are to be allowed in the radio room. Office per-12-

3. ___________ to delegate work to all help secured from other systems.

5. The ___________ is responsible for all incoming calls on major outages and the receiving of outage reports by consumers calling in person. A list of all office personnel who can handle the switchboard should be on file. 6. A list of systems that have the same radio frequency shall be kept on file at all times. AUGUST 2020


7. ___________ should be notified in case of major outages and his advise followed in regard to switching of load, etc. This telephone number and location should be on file with each supervisor.

These boxes are made of waterproof plywood to fit a regular pickup bed. It is the responsibility of the ___________ to see that these boxes are at all times ready for instant duty for use on trucks not equipped with regular line bodies.

8. Dispatching should be worked by two employees, one to be a supervisor, and they shall work 12 hour shifts on dispatching. It is generally recognized that 12 hours should be the maximum for a dispatch team to operate efficiently.

12. Contact trucks to haul transformers from other substations. A complete list of available truckers who are equipped to handle such loads as substation transformers shall be kept on file at all times. It is the responsibility of the ___________ to make sure that this list, along with the truckers’ telephone numbers and location of such transformers, type and size, is kept current and up-to-date at all times.

The following personnel are qualified for dispatching: Dispatchers

Helpers 13. ___________ is responsible for problems, such as securing dry ice for freezers, generators for dairies, etc. 14. Radio trucks equipped for handling outages:

9. The ___________ is responsible for issuing all material and keeping accurate records concerning its use. He also is responsible for keeping an ample supply of material on hand to take care of unforeseen emergencies. 10. The ___________ is responsible for keeping adequate tree-cutting tools. He also is responsible for securing help from local farmers, if needed. He is responsible for delegating work of employees from outside sources to the place where saws are needed. 11. Emergency tool boxes are to be kept available at all times, completely equipped with sufficient tools to handle outages. This would include the following: Hoists, Nicopress tools, grounding cables, hand lines, grips, folding hot sticks, sleeves, hot line clamps, bolt cutters, brace and bit. -13-

Numbers: ___________________ ___________________ 15. Assign ___________ the responsibility of maintaining and keeping updated a system of readily locating each crew. 16. Assign ___________ to the responsibility of making sure each crew is aware of source of all power being fed into the area to be worked.


!"#$%&'()*+,-')'./%&'0+(,')'./-% 12./,34/%&'0+(,')'./-% % If a cooperative’s contracts do not comply with federal grant requirements, it runs the risk that FEMA will declare the costs of the contracts ineligible for federal assistance. Contracts must be of reasonable cost, must be competitively bid, and must comply with Federal, State, and local procurement standards. FEMA finds four methods of procurement acceptable: •

Small purchase procedures: an informal method for securing services or supplies that do not cost more than $100,000 by obtaining several price quotes from different sources

•

Sealed bids: a formal method where bids are publicly advertised and solicited, and the contract is awarded to the responsive bidder whose proposal is the lowest in price (this method is the preferred method for procuring construction)

•

Competitive proposals: a method similar to sealed bid procurement in which contracts are awarded on the basis of contractor qualifications instead of on price (this method is used for procuring architectural or engineering professional services)

•

Non-competitive proposals: a method whereby a proposal is received from only one source, because the item is available only from a single source; there is an emergency requirement that will not permit delay; or the competition is inadequate to seek additional sources. If these conditions exist, FEMA may find this method acceptable. Otherwise, noncompetitive proposals generally are ineligible.

FEMA provides reimbursement for three types of Contracts: •

Lump sum: contract for work within a prescribed boundary with a clearly defined scope and a total price

•

Unit price: contract for work done on an item-by-item basis with cost determined per unit

•

Cost plus fixed fee: either a lump sum or unit price contract with a fixed contractor fee added into the price

Time and materials contracts should be avoided, but may be allowed for work that is necessary immediately after the disaster has occurred when a clear scope of work cannot be developed. Generally, FEMA will accept time and materials contracts with work duration of 70 hours immediately after a disaster. Applicants must carefully document contractor expenses, and a cost ceiling or “not to exceed” provision must be included in the contract. As noted, you can protect yourself by encouraging at least an informal competition among potential contractors, or better yet, by entering into pre-disaster agreements for recovery work, when conditions!are conducive to normal business procedures.

-14-


Disaster Declaration Ensure that your damage is included in FEMA’s preliminary damage assessment (PDA) process. Several factors could allow FEMA inspectors to overlook damage to a cooperative: •

Damage may be geographically dispersed.

•

The cooperative may already have made major repairs before the FEMA team gets there.

•

The value of overall damage to the county may not have reached the requisite level of $3.26 per capita, even though your co-op is devastated.

•

Whenever a cooperative incurs significant damage, but the damage is not in a county that has been declared a federal disaster area, the cooperative should follow the PDA process and be sure that its documented damage has been included in the information provided to FEMA.

•

And when the devastated co-op is in a county where damage hasn’t reached the $3.26 per capita level, the co-op should argue that the “extraordinary concentration of damage” to “critical facilities” justifies a declaration.

Footnote: This is the reason for a system to get their damage estimates, per county, completed and turned into the statewide as soon as possible. The statewide immediately reports these estimates to the Mississippi Emergency Management Agency (MEMA). MEMA will add all the damage estimates in an affected county to see if the county meets the prerequisites of a disaster declaration.

Mutual Aid A Mutual Aid Agreement is an agreement between jurisdictions or agencies to provide services across boundaries in the event of an emergency. The conditions of the agreement can be to provide reciprocal services or direct payment for services. FEMA will reimburse mutual aid costs provided that: • • • • • •

The agreement is written and was in effect prior to the disaster The assistance is requested by the Applicant The work performed is directly related to the disaster and is otherwise eligible for FEMA assistance The entity that received the aid was charged for that aid. The agreement is not contingent upon declaration of a major disaster or emergency The entity can provide documentation of rates and payment for services, if requested

The employees of the entity providing supplemental assistance are considered as extra hires or contract labor; therefore, both regular and overtime labor are eligible.

-15-


Identifying Costs The most common legal issues in dealing with emergency service reimbursements are determining whether certain costs are really incurred in connection with a disaster—and sorting out actual costs from donated resources. In a disaster, the whole community takes part in the recovery effort. Neighboring communities, too, send people, equipment, and materials. FEMA tries to determine which of these resources generated “costs” the co-op is responsible for. • •

•

If FEMA considers the mutual aid a charitable donation, it will not reimburse the cooperative for it. A cooperative should keep track of donated resources, not only so that it can separate them from its eligible expenses, but also because they count toward the 10 to 25% cost-sharing that FEMA requires. Such donated resources can add up quickly and go far to help a co-op meet its cost-sharing obligation.

In sorting out recovery costs for eligibility, FEMA distinguishes between emergency measures and permanent projects. •

“Emergency measures”—which reduce imminent threats to life, safety, and property—are clearly eligible for reimbursement. Restoration of power to businesses and residences is generally considered an emergency measure.

•

“Permanent projects”—which repair, reconstruct, or replace the public infrastructure—are not so clear-cut. Frequently, emergency measures to restore power are also permanent projects: damaged poles and transformers are replaced, and lines are restrung. Such measures, too, are eligible for reimbursement.

The restoration of power is of course a critical emergency measure for a cooperative and the community it serves—but it frequently also amounts to a “permanent” repair or replacement of damaged poles, lines, and transformers. Cooperatives should be alert, when working with FEMA, to disallowance of straight time labor by FEMA as an “emergency measure” in circumstances where great federal assistance would be available if the work in fact constituted a permanent repair and is so treated by FEMA. Keep in mind that FEMA funds only the cost to repair or replace damaged facilities; it does not reimburse cooperatives for lost revenue during the recovery period. Nor does it consider increases in operating costs (such as the cost of purchasing more expensive power to replace power that would have been supplied by a damaged generating plant). However, the cost of establishing temporary emergency services in the event of a utility shutdown may be eligible. For example, the cost of renting and operating a portable generator that can supply power to a cutoff part of the system is likely to be eligible for assistance.

-16-


Labor Costs The Labor Costs associated with conducting eligible work may be claimed at an hourly rate. Labor rates can include actual wages paid plus fringe benefits paid or credited to personnel.!"#$$!%&$!#'()*$!+,**,-.! /01('%!,-!%&$!234!2($1.$-56!7018!3*'-!9008:;!The terms of an Applicant’s employment and pay will be determined according to the Applicant’s pre-disaster written policies. An Applicant’s own labor forces are known as force account. For permanent work performed by an Applicant, both regular time and overtime are eligible for all employees. Overtime may be credited in actual wages or in compensatory time off. For emergency work, only overtime labor is eligible for: • • •

Permanent employees Reassigned employees Seasonal employees used during the season of anticipated employment.

Both regular time and overtime labor are eligible for non-budgeted employees assigned specifically to perform emergency work, including: • • •

Temporary employees Essential employees called back from administrative leave Permanent employees funded from an external source such as grants

The labor costs for employees sent home or told not to report due to emergency conditions are not eligible.

Equipment Rates The costs for using Applicant-owned (force account) equipment while conducting eligible work may be claimed on the basis of Equipment Rates. These rates typically include operation, depreciation, fuel and maintenance, but do not include operator labor. FEMA recognizes the rate of FEMA, State or local equipment rates as follows: • •

•

FEMA rates: FEMA maintains a national schedule of equipment rates for the operating costs associated with force account equipment. State rates: Applicants that use equipment rates established under State guidelines in their normal day-to-day operations may use State rates for rates up to $75 per hour upon FEMA approval of the cost development methodology. (Rates over $75 per hour may be approved by FEMA on a case-by-case basis.) Local rates: For Applicants that use rates developed by a local government in their normal dayto-day operations, reimbursement is based either on the local rates or the FEMA national schedule, whichever is lower. If the local rate is lower and the Applicant certifies that the!local rate does not reflect actual costs, the FEMA rate may be used.

The Electric Power Associations have established their own equipment rates. These rates do not include the price of fuel. These rates are found under Uniform Method of Reimbursement in the EPA Emergency Work Plan book. Equipment rates are applied only to the time equipment is actually working. Standby time and idle time are not eligible.

-17-


System Improvements What if a cooperative wants to make improvements or include mitigation measures—steps that will protect its facilities if a similar disaster strikes later on. Those permanent measures may or may not be eligible. FEMA is flexible enough to support post-disaster improvements in several ways: • •

•

Damaged electric systems must be updated in accordance with the building codes in their community that were in effect at the time of the disaster. If improvements will directly reduce the possibility of future disaster damage, FEMA is likely to fund them if their cost adds up to less than 15% of the cost of simply repairing or replacing the facility. In fact, FEMA will fund as much as 100% of the cost of such measures as elevating padmounted transformers in flood-prone areas or burying them in high-wind areas, replacing wood poles with poles made of spun concrete, anchoring mechanical and electrical equipment in critical facilities, and bracing overhead pipes and electrical lines in earthquake areas. FEMA recognizes that a co-op may want to make improvements even if they are not eligible for federal funding. In these situations, FEMA will estimate the cost of restoring a facility to its predisaster condition (including upgrades required by applicable codes and standards), and allow the co-op to use these funds for construction of the improved structure.

FEMA may approve mitigation measures—beyond those required by applicable codes—instead of a mere repair and return to pre-disaster condition if they meet the following requirements: •

• • •

The measure must be related to eligible disaster-related damages, in the sense that the proposed mitigation work must relate to the damaged elements for which restoration work on a facility is performed. The measure must directly reduce the potential of future, similar disaster damages to the eligible facility. The measure must not increase risks or impair the facility’s operation. The measure must meet existing legal requirements and standards of good professional judgment. The measure must be “cost-effective.” While an applicant can provide its own analysis to demonstrate the cost-effectiveness analysis of a mitigation measure, the following measures are deemed to be cost-effective if the combined cost of the repair and mitigation measure either costs less than 115% of the cost of the eligible repair alone on a “particular project” or costs less than 200% of the cost of the eligible repair alone on a “particular project” and is one of the eight types of mitigation measures listed below: ! ! ! ! ! ! ! !

Pad-mounted transformers—elevating above the base!flood elevation, or lowering them or burying them in non-flood, high-wind areas Using multiple poles to support transformers Burying lines Anchoring or otherwise protecting fuel tanks from movement in a disaster Replacing damaged poles with higher-class pole, or with a different material pole such as replacing wood poles with spun concrete Adding guy wire or other additional support to power lines Removing large-diameter communication lines from power poles Providing looped distribution service or other redundancies in the electrical service to critical facilities [Note: although it remains in its written Policy, FEMA has indicated that it may remove this category from the Policy because it does not involve repair of a particular facility.]

-18-


• Anchoring of mechanical and electrical equipment in critical facilities • Bracing of overhead pipes and electrical lines to meet seismic loads The cost used in the calculations includes equipment and labor costs. It also includes the costs incurred under any mutual aid agreement and the cost charged under repair/restoration contracts. Proposed projects must be approved by FEMA prior to funding. They will be evaluated for costeffectiveness, technical feasibility, and compliance with statutory, regulatory, and executive order requirements.

Documentation You are responsible for establishing and maintaining accurate records of events and expenditures related to disaster recovery work for which you request FEMA assistance. The documentation required describes the “who, what, when, where, why and how much” for each item of cost. These records become the basis for recovering your final project costs, and, for small projects, will be used to sample and validate your estimated project costs. Most States require you to submit documentation on costs before they will disburse any funds to you for your large projects. Proper documentation will help you justify cost overruns or time extensions. You also need cost information to develop your projects, show alternatives considered when an environmental or historic assessment was required, show that there has been no duplication of benefits, and prepare for audits or other program reviews. Incomplete or improper records can lead to either partial or total loss of assistance.

There are many ways to maintain your records. FEMA provides some forms that will help you. However, you may use your own records systems to replace the FEMA forms and to record other information. What is important is that you have the necessary information tied to each specific project readily available and in a usable format. Because work may be done before a Subgrant Application (Project Worksheet) is written, you should immediately establish a file for each site where you identify damage. This may involve opening a file for each building, vehicle, location and type of work. Depending on the type of damage, you may need to keep: • • • • • • • • • • • • • • • •

Records that demonstrate the presence of an immediate threat Drawings, sketches, and plans of pre-disaster facility design (to scale) Drawings and sketches of disaster-related damages (to scale) Drawings and sketches of completed or proposed repair (to scale) Calculation sheets detailing specific dimensions and quantities of damage Force account labor records (i.e., payroll information, timesheets, and administrative policies) Temporary hire labor records (i.e., work for which the labor was needed, payroll information, and timesheets) Fringe benefit calculations Force account equipment usage information and rate schedules Records of materials from inventory Rental and lease agreements Photographs of site, overall facility, specific damage, and repairs Subgrant Applications (Project Worksheets) Site location maps Flood Insurance Rate Maps Facility maintenance records (e.g., for roads or debris basins)

-19-


• • • • • • • • • • • • • • •

Facility inspection/safety reports (as may be available for bridges and dams) Engineering/technical reports and specifications for repair Codes and standards governing repairs/replacements Insurance information (i.e., policies, proof of loss statements from insurance company, deductible information, etc.) Documents supporting compliance with environmental and historical preservation issues Hazard mitigation proposals (as allowed under Section 406 of the Stafford Act) Justification for requests for a relocation, improved, or alternate project Records of donated labor, materials, and equipment, including location, description of work, name of worker, hours worked, value per hour, and certification Contracts or contractor bids (including invoices and copies of payments) Inspection logs for work included in Subgrant Applications (Project Worksheets) Permits Correspondence Invoices/warrants/checks Job orders Mutual aid agreements and records of mutual aid requests and receipt

The following steps should help the reimbursement process: •

• •

•

• •

Maintain accurate disbursement and accounting records to document the work performed and the costs incurred. You are responsible for substantiating all costs and your records must be complete and organized. Designate a person to coordinate the accumulation of records. Some applicants also use the services of an internal auditor. Establish a file for each project where work has been or will be performed. For projects that include more than one physical site, maintain records showing specific costs and scopes of work by site. File all of the documentation pertaining to a project with the corresponding Subgrant Application (Project Worksheet) and maintain the files as the permanent record of the project. Ensure your documentation can be retrieved by the project number assigned on your Subgrant Application (Project Worksheet). Examine the FEMA forms to see if they will be of use to you in recording your information. Keep all financial and program documentation for three years beyond the date of the State’s Final Status Report (FSR), or longer if required by the State’s record retention policies. If an FSR is not required (find out from your State PA Representative), records must be maintained for three years from the date of the final certification of completion of your last project or as required by the State. Records are subject to audit by State auditors, FEMA, and the U.S. Department of Homeland Security’s Office of Inspector General.

All forms used for public assistance can be found at www.fema.gov/government/grant/pa/forms.shtm

A Few More Thoughts 1. There is nothing more satisfying than knowing that you are helping your community and its citizens overcome tragedy and what will seem to be unimaginable devastation. You will work harder, and be under more pressure, than ever before, but it will be an experience of a lifetime. 2. Failure to properly follow and document the procedures required by FEMA rules can jeopardize the FEMA funding that your cooperative is eligible for—and which will allow recovery and rebuilding to occur. 3. Prepare in advance. Review your cooperative’s mutual aid agreements. Make sure that your

-20-


cooperative’s insurance is adequate. Develop contracting strategies that can readily be followed in the disaster environment. Identify programs that will help your cooperative identify and address its vulnerability to disaster events—and minimize the likelihood that failure to address known risks will trigger a reduction in federal assistance.

-21-


Alcorn County Electric Power Association

P.O. Box 1590 Corinth, MS 38835-1590 1909 S. Tate Street Corinth, MS 38834 662-287-4402 CEO: Eddie Howard

Home 662-287-8524

Nights, Sunday & Holidays: 662-287-4402 Unlisted Number: 662-286-3303 Fax Number: 662-286-4358 Cell 662-284-9129

n Name and phone number of alternate contacts: Paul McNair

Jason Grisham

662-284-9130

662-287-5419

662-415-0329

n Radio Information:

Regular Operating Frequency: 158.625 KHz Alternate Frequency:

Call Letters: KKA979

n System Information:

System Voltages: 12.5 KV, 46 KV, 161 KV Primary Conductor: #4 - 795 ACSR Splicing Sleeves Used: Compression & Automatic Sleeving Tools: Burndy Y35 & Y45 Personnel: Union: Yes (IBEW)

-22-

AUGUST 2020


Alcorn County Electric Power Association

n Equipment Available:

Service Trucks Heavy Trucks

n Special Facilities:

Chain saw Spotlights Walkie-talkie sets Generator

Number 2

Personnel on each 1 lineman, 1 groundman

Number 3 1 1 1 1

Special Equipment Digger Derrick 65 ft. bucket truck 42 Ft. bucket (Material handler) 46 Ft. bucket (Material handler) 55 Ft. bucket (Material handler)

9 12 2 2

Hot line trailer sets Pole trailers Size 3.5, 5KW

n System’s definition of the following: Service crew Line crew Construction crew Line truck Bucket truck Trimming Crew

Number of Men 2 5 5 2-3 2-3 2-3

-23-

1 3

Type of Equipment Bucket (material handler) Bucket, digger derrick and pickup Bucket, digger derrick and pickup Digger derrick Bucket truck Ft. Bucket Truck with dump bed

AUGUST 2020


P. O . Box 477 Carthage, MS 39051 601-267-5671

Central Electric Power Association

Manager: Brian Long

Nights, Sunday & Holidays: CEPA Dispatcher: 601-267-6041 Unlisted Number: 601-267-4530 Fax Number: 601-267-6032 Home 601-267-9413

Cell 601-416-5172

Direct Office 601-267-6016

601-506-6665

601-416-5190

601-267-6042

n Name and phone number of alternate contacts: Mike Stewart Greg Barrett Jerrell Scott

n District Offices:

601-562-9514 601-267-2050

Rankin:

Mike Stubbs, District Manager Radio Information:

Regular Operating Frequency:

n System Information:

601-267-6043 601-267-6004

Phone

Office

Fax

769-274-8633

601-625-7422

601-625-8265

601-625-8714

601-416-5280

601-829-1201

601-829-1203

601-829-9448

Philadelphia: Danny Burnett, District Manager 601-416-5623 Sebastopol: Tim Stewart, District Manager

601-741-0637 601-253-6850

601-656-2601

601-656-7231

Direct Office 601-656-1853

153.545 MHZ RX Call Letters: Carthage 159.540 MHZ TX Philadelphia & Sebastopol 152.420 MHZ RX • 157.680 MHZ TX Rankin

System Voltages: 7.2/12.470 and 14.4/24.940 KV Primary Conductor: 4ACSR thru 336.4 MCM ACSR; 6,4,2, Cu. Splicing Sleeves Used: Blackburn, Reliable, Fargo Sleeving Tools: Burndy Y35

Personnel: Public Relations Personnel Available Union: No

-24-

AUGUST 2020


Central Electric Power Association

n Equipment Available: Service Trucks Heavy Trucks Number of:

Chain saws Pole trailers

Number 4 2 2

Personnel on each 2 men each 3 men each 2 men each 10 (size: 390 & 440 Stihl) 2

n System definition of the following: Service Crew Construction Crew Bucket Truck

Special Equipment Hi-Ranger Material Handler 40’ Digger DerrickTelelect 4047 High Ranger Material Handler 55’

Number of Men 1 lineman; 1 groundperson or apprentice lineperson

Type of Equipment Hi-Ranger Material Handler 40’

1 foreman, 3 linepersons, 1 apprentice lineperson

Digger Derrick - Telelect 4047 Hi-Ranger Material Handler 55’

1-2 lineperson or 1 lineperson & 1 apprentice lineperson

-25-

2 ton High Ranger bucket trucks Hi-Ranger Material Handler 55’

AUGUST 2020


Coahoma Electric Power Association

P.O. Box 188 Lyon, MS 38645 662-624-8321 Manager:

W. Keith Hurt

Nights, Sundays & Holidays: 662-902-7551/662-902-7552 Unlisted Number: Fax Number: 662-624-8327 Cell 662-902-1921

n Name and phone number of alternate contacts: Branch Office:

Joe Correro

Tunica, Ken Melton

662-902-2371

Cell 662-902-2373

Number 662-363-2931

Nights, Sundays & Holidays: 662-363-5202 662-363-5203

n Radio Information: Motorola LCP

Regular Operating Frequency: 47.98

Fax Number 662-357-9733

Call Letters: KKC289

n System Information:

System Voltages: 7200 - 7620 Primary Conductor: 4 7/1, 2 6/1, 1/06/1, 4/06/1, 336 Splicing Sleeves Used: Automatics

Personnel: 25

Secondary Conductor: Mostly triplex #2 & #4 & 1/0 Sleeving Tools:

Union: No

-26-

AUGUST 2020


Coahoma Electric Power Association Spare Substation Transformers: None

n Equipment Available: Service Trucks Heavy Trucks

Number 4

Number 3 4

Personnel on Each 2 Size 2 1/2 ton 2 1/2 ton

Special Equipment Const. w/digger Bucket

n Special Facilities:

Number of: Chain Saws Spotlights Generators Portable fuel tanks

8 (size 16”) 5 2 (Size: 1.5KW) 1

Pole trailers 4-Wheeler

n System’s definition of the following: Service Crew Line Crew Construction Crew Bucket Truck Digger Derrick Dozer - D3

Number of Men 2 4 4 2-3 2-3 1

2 2

Type of Equipment

Pickup and 2 Service Buckets Basket and/or digger truck Basket and/or digger truck 55’ Hi-Ranger & ALTEC Telelect

-27-

AUGUST 2020


Coast Electric Power Association

P.O. Box 2430 Bay St. Louis, MS 39521-2430 228-363-7351 Manager:

Nights, Sundays & Holidays: 800-624-3348, 877-769-2372 Unlisted Number: 228-255-0991 Fax Number: 228-363-7167 Cell

Ron Barnes

n Name and phone number of alternate contacts: Scott Brown

228-831-3379

228-216-7611 228-493-2214

Kiln Control Center (Headquarter Building) 228-363-7371 228-363-7372 District Offices:

Harrison County (Gulfport) Pearl River County (Picayune) Hancock County (Kiln) Branch Offices: Biloxi Poplarville

n Radio Information: Southern Linc

Southern Linc ID 1*573*91 1*573*90 Control Center FAX: 228-363-7319 Fax Number 228-831-1025 601-798-3161 228-255-0963

Number 228-539-5704 228-889-5151 228-363-7241

877-769-2372 877-769-2372

Regular Operating Frequency: 900 MHz Alternate Frequency: - -

228-392-3262 601-795-2349

Call Letters: - -

n System Information:

System Voltages: 12.47/7.2 kv and 24.94/14.4 kv Primary Conductor: #4, #2, 1/0, 3/0 and 336 ACSR, 477 ACSR Splicing Sleeves Used: Automatics Sleeving Tools:

Personnel: 6-5 man Overhead Construction Crews; 3-5 man Underground Construction Crews 22 Servicemen

Union: No

-28-

AUGUST 2020


Coast Electric Power Association

n Spare Substation Transformers:

Mobile Substation: A-C (SMEPA) Delta-Star

n Equipment Available: Service Trucks Heavy Trucks

n Special Facilities:

Voltage: 115KV/12.47-24.9KV 115KV/12.47-24.9KV

Size: 10 MVA 20 MVA

Number 3

Number 3 6

Personnel on each 2 Size 2 1/2 ton 2 ton

Special Equipment Digger derrick Hi-Ranger bucket (55’ Material Handler)

Number of: Boat with motor 1 (16 Ft. Shallow Draft Aluminum Boat - 50 HP) Chain saws 9 (Size: XL-12) Pole trailers 3 Spotlights 4 (Size: 400 W) Portable water tank Generator 1 (Size: 30 KW) Portable fuel tank 210 gallon Crawl tractor 1 (J.D. 450) Track Machine Digger Derrick (1) Track Machine Bucket (1) Backyard Digger Derrick (2)

n System’s definition of the following:

Service Crew Construction Crew

Number of Men 2 3 or 5

Type of Equipment Service bucket (37’ or 40’ Material Handler) Digger derrick & (2) 55’ Material Handlers (if 5 man crew)

-29-

AUGUST 2020


Delta Electric Power Association

P.O. Box 9399 Greenwood, MS 38930-8999 662-453-6352 Manager:

David O’Bryan

Nights, Sundays & Holidays: 662-453-6352 Unlisted Number: 662-453-5294 Fax Number: 662-453-6359 Cell 662-417-7388

Home 662-283-4662

n Name and phone number of alternate contacts:

Harold Pittman - Assistant General Manager and Chief Engineer 662-455-5824 662-392-2133

James Kenwright - Manager, Human Resources and Secretary/Treasurer 662-455-3572 662-392-9768

District Offices:

Cleveland, Les Dixon Greenwood, Larry Walker Indianola, Barry Cassidy Winona, Tim McBride

n Radio Information:

Regular Operating Frequency: R158.130 R158.205 R158.160 R158.235

Phone Number

662-843-5441 or 662-843-4723 662-453-6352 or 662-299-1473 662-887-1652 or 662-207-2079 662-283-2544 or 662-283-3776

Call Letters: Call Letters: Call Letters: Call Letters:

T153.455 T153.545 T153.650 T153.500

CD Net - has emergency power source

Fax Number

662-843-8147 662-453-6359 662-887-1611 662-283-3036

KKA 987 Greenwood KKA 988 Cleveland KKA 989 Indianola KKA 990 Winona

n System Information:

System Voltages: 7620/13200 & 14400/24940 Primary Conductor: #4 thru 477 MCM ACSR Secondary Conductor: Same Splicing Sleeves Used: Automatic & single compression Sleeving Tools: Kearney & Burndy

Personnel: Union: No

-30-

AUGUST 2020


Delta Electric Power Association

n Spare Substation Transformers:

Mobile Substation - WH Mobile transformer Size: 10MVA Voltage: 115,000 to 13200/24940

n Equipment Available:

Service buckets Heavy trucks

n Special Facilities: Boats without motor Chain saws Spotlights Craw l tractor (John Deere 650) Power Source Pole Trailers

Number 14

Personnel on each 1

Number 5 8 1

Size 2-ton 2-ton 2-ton

Number 1 3 5 1 1 4

System’s Definition of the following: Service crew Line crew Construction crew Line truck Bucket truck Digger derrick

Special Equipment Digger Derricks 48’ Buckets Material Truck

Number of Men 2 3 6

-31-

Type of Equipment 1 ton service buckets Wire or gin truck Digger, and/or bucket & foreman truck Foreman Truck 2-ton 48’ Buckets 2-ton digger derrick

AUGUST 2020


Dixie Electric Power Association

Mailing: P.O. Box 88 Laurel, MS 39441 601-425-2535 Physical: 1863 Highway 184 Laurel, MS 39441 Manager:

Nights, Sundays & Holidays: 601-425-2535 Unlisted Number: 601-422-4298 (Rings Intercom Bells) CRC: 888-285-5774 (Answering Service) Satellite Phone: 877-792-7350 (Regular Number) Satellite Phone to Satellite Phone Number: 500-180-3926

Randy Smith

Home 601-428-1174

Cell 601-340-1851

601-425-2846 601-422-9428 601-616-7414

601-369-0576 601-422-9428 601-422-7714

n Name and phone number of alternate contacts:

Operations Manager: Pat McCarthy Systems Engineers: Jeremy McAndrew Blake Remy District Offices:

Phone Number Petal, Jerry Gibson 601-583-1605 601-433-4383 601-583-1131 Waynesboro, 'DQ :RRWHQ 601-735-2072

n Radio Information:

Call Letters: KLM 384

System Type: MotoTrbo DMR

Dispatch Talk Group ID: 3001000 Dispatch Talk Group ID: 3001111 Mobile Receive of each site Laurel Petal Waynesboro

Repeater Transmit Receive 153.192500 158.437500 153.485000 157.470000 153.342500 159.817500

n System Information:

Mobile Transmit Receive 158.437500 153.192500 157.470000 153.485500 159.817500 153.342500

System Voltages: 7200/12470Y and 14400/24940Y Primary Conductor: 477, 336.4 4/0,1/0,4 7/1 ACSR and #6HD Splicing Sleeves Used: VERSA CRIMP Personnel: Union: No

-32-

CC 15 15 15

Sleeving Tools: Anderson & Burndy AUGUST 2020


Dixie Electric Power Association

n Equipment Available: Bucket Trucks Heavy Trucks

Special Mobile Equipment Service Trucks

Number 2

Number 2 2 1 2

Personnel on each 2

Size F700 F700 10MVA HR40 Bucket

Special Equipment Bucket 50’ Digger Mobile transformer 69 KV-12470 YX24940Y

n Special Facilities:

Number of:

Chains Saws Spotlights

8 (Size: 18”) 6

Pole Trailers 2

n System’s definition of the following: Service Crew Line Crew Line Truck Bucket Truck Digger Derrick

Number of Men 2 5 2 2 2

-33-

Type of Equipment Bucket 40’ Crew truck F350 truck Altec (Material Handler) Telelect

AUGUST 2020


East Mississippi Electric Power Association

Mailing: P.O. Box 5517 Meridian, MS 39302 Shipping: 2128 Hwy 39 N Meridian, MS 39301 601-581-8600

Nights, Sundays & Holidays: 601-581-8783 (Dispatch) Voice Mail Number: 601-581-8783 (Dispatch) Fax Number: 601-482-0701 (Dispatch) Emergency: 601-581-8783 (Dispatch Direct)

Manager: Randy Carroll

Home 601-482-8108

Cell 601-527-2928

n Name and phone number of alternate contacts: Bryce Nester Pat Williams

601-626-0122

District Offices:

District Manager DeKalb, 100 Veterans St. Mike Hull Louisville, 86 EMEPA Rd. Patricia Stokes 0HULGLDQ +Z\ 1 Quitman, 1905 Hwy 513 Steve Helms

n Radio Information:

Regular Operating Frequency: Old Radio System (Back Up):

Local Amateur Operator: Steve Sampley (Retiree) Ronald L. Wright (Retiree) Charlie White

Radio Frequencies (Mobiles):

n System Information:

601-527-4884 601-616-9042

Phone Number 601-581-8684 601-581-8660

601-581-8703

Direct Line Voice 601-581-8601

601-581-8787 601-581-8720 Cell 601-527-5052 601-416-1595

601-527-5053

MSWIN P25 700/800 MHz (High Band, 153-160) Call Letters: WNMH-636

Transmit 158.205 159.570 158.130 159.675

Phone 601-693-5048 601-483-0172 601-479-2991 Receive 153.455 153.650 153.530 153.575

DPL 047

Station Call Sign: KD5CHD KD5CHE KF5CCI Talk-Around 153.455 153.650 153.530 153.575

System Voltages: 115 kv, 46 kv, 7.2/12.47 Grd.Y, 14.4/24.9 Grd.Y Primary Conductor: 4, 2, 1/0, 3/0, 4/0, 336.4 MCM, 477 MCM Splicing Sleeves Used: GL-402A, GL-4042A, GL-406A, GL-408, GL-409A, YDS32R, YDS361R, 33014, 33020 (# represent catalog #’s), GL-Hubbell; YDS-Burndy Electrical OH Others ALCOA Sleeving Tools:12HA Compressor, 30A Hydraulic Compressor, Y35, BAT 35, BAT750, 60A, 60A-FT (Alcoa and Burndy Electrical)

-34-

AUGUST 2020


East Missisippi Electric Power Association

Personnel: Public relations personnel available to help other systems during emergency. Communications Manager is Julie Boles. Total employees available are one or two. Union: None Total “outside type employees” available for emergency work 60 to be rotated on a weekly basis, in some scheduled manner.

Spare Substation Transformers: Mobile Substation:

Mobile Auto Transformer: Equipment Available:

Service Bucket Trucks Digger/Derrick Trucks Bucket Trucks (Line Const.) Bucket Trucks (special) Digger/Derrick (track) Bucket Trucks (ROW) ROW Crew Trucks Pick-up Trucks - (Const.Crews) 4 X 4 ROW Tractors Mechanic Truck Special Facilities:

Chain Saws (16” bar) Spotlights Spare Radio units (inc hand-held) 50kw Generator (1ph or 3 ph) Pole Trailers Pole Trailers (for long poles) 4 X 4 UTV (W/Trailers)

System definition of the following:

G.E.

G.E.

Size: 10 MVA Voltage: High Side = 67kV & 43.8 kV Low Side = 7.9/13.8Y kV 10 MVA High Side = 14.4/24.9Y kV Low Side -= 7.2/12.47Y kV

Number 10 8 13 3 2 4 3 6 2 1

Number 30 One/truck 10 1 9 2 2

Serviceman Crew Line Construction Crew

No. of Men 2 5

Line Truck Bucket Truck ROW Crew Damage Assessment Team

2-3 2-3 4-5 1-2

Heavy Construction Crew

6

-35-

Size or Equipment Description 37-40' 42'-50' 48’, 52’ & 55’ - M.H. 55’ skidder, 75’ truck, 105’ MH truck 47' & 50' - Tracked Crawler Equip. 48’ & 55’ Right-of-Way Bucket trucks 1 Ton Crew Cab 1/2 Ton, 3/4 Ton & 1 Ton - 2 WD & 4WD 95 to 100 HP 1 Ton flat bed w/welder unit & air/comp.

Other Services: 5 Engineers 1 Const. Supervisor 1 Safety Coordinator 3 Mechanics 2 Warehouse/Mechanic 2 Warehouse (Only)

Type of Equipment 1 ton truck (small bucket -37’) Digger derrick, 2 bucket trucks, Ex-cab pickup, pole trailer Tandem Digger derrick, 2 bucket trucks, crew cab pickup, and pole trailer Digger derrick (35’ - 45’ reach) Hi-Ranger & Altec 48’ - 55’ models 1 Ton crew-cab, 55’ bucket truck 1/2 ton pickup - some 4 X 4’s AUGUST 2020


4-County Electric Power Association

P. O. Box 351 Columbus, MS 39703-0351 5265 South Frontage Road Columbus, MS 39701 Manager:

Cell

Phone Number: Toll Free Number: Outage Reporting: Unlisted Number: Fax Numbers:

662-386-7298

Brian Clark

n Name and phone number of alternate contacts:

Anthony Miller, Manager of Operations Brian Clark, CEO/General Manager

662-386-7299

Call Center 1-800-431-1544

662-386-7221 662-243-7679 662-386-7258

Cliff Wall, Manager of Consumer Service Branch Offices and Locations:

662-327-8900 800-431-1544 800-431-1544 662-327-4177 662-327-8790 662-245-0782

Phone Starkville: 662-245-0717 662-245-0713

Ivy Davenport Cell: 662-386-7227

Gary Johnson Cell: 662-386-7257

n Radio Information:

Regular Operating Frequency:

450 mhz band Trunking system

Call Letters: N/A

Vehicles equipped with emergency frequency: N/A All vehicle radios are configured with 6 talk groups. These talk groups are: Ackerman Columbus Corporate Macon Starkville

n System Information:

System Voltages: 69 KV, 46 KV, 12.47 KV Primary Conductor: 4, 2, 1/0, 3/01 477 KCMIL ACSR 4/0, 6A, 8A, 3-12 Copperweld 6, 4 BHD Copper Splicing Sleeves Used: Automatics, Copper Crimp

Personnel: Union: No

-36-

West Point

Secondary Conductor: 6, 4, 2, 1/0,

336 KCMIL Multiplex Aluminum

Sleeving Tools: Blackburn, Nico-Press

AUGUST 2020


4-County Electric Power Association

n Spare Substation Transformers:

Mobile Transformer: 1

n Equipment Available:

Service Trucks Small Buckets

Size: 20 MVA Number 12 8

Special Equipment

Number 8 10 1 1 1 2 3 1 5 2

Service Crew Line Crew Construction Crew Bucket Truck Digger Derrick

Number of Men 2 4 7-8 2 2

Heavy Trucks

Voltage: 161/13

Size 2 ton 2 ton D-5 2 ton 2 ton

35 ton

n System's definition of the following:

-37-

Personnel on each 1-man 2-men

Special Equipment Digger Derricks Bucket Trucks Track Mounted Digger Dozer Off Road Digger Off Road Bucket Trailer Polaris Ranger Tractor Truck & Lowboy Pole Trailer Mini Track Digger

Type of Equipment Small Bucket Bucket and digger, Service Truck 2-Bucket digger, service truck 2 ton truck with bucket 50' boom 2 ton truck with digger and derrick

AUGUST 2020


Magnolia Electric Power

P.O. Box 747 McComb, MS 39649 601-684-4011

Manager:

Nights, Sundays & Holidays: 601-684-4011 Unlisted Number: 601-250-2424 Fax Number: 601-684-5535

Darrell Smith

Cell 601-395-6407

Home 601-249-2688

n Name and phone number of alternate contacts: Home 601-835-2222

Aaron Achord

n Radio Information:

Regular Operating Frequency: 159.570 Transmit Alternate Frequency: 153.695 Receiver

n System Information:

System Voltages: Primary Conductor: Splicing Sleeves Used: Personnel:

7620/13200 CU & AL Compression Automatic

Cell 601-754-1806

Call Letters: KKB779

Sleeving Tools: Comp. Hydraulic Burndy

Union: Yes - Outside Workers

-38-

AUGUST 2020


n Equipment Available:

Magnolia Electric Power

Service Buckets

Number 8

Heavy Trucks

Number 14

n Special Facilities:

Chain Saws Spotlights

20 20

Personnel on each 2 Size 2 l/2 ton

Pole trailers

n System’s definition of the following: Service Crew Construction Crew Bucket Truck

Number of Men 2 4 2

-39-

Special Equipment 7 Derricks, 7 Buckets

7

Type of Equipment 1 Ton Bucket Bucket & Digger derrick Bucket

AUGUST 2020


Monroe County Electric Power Association

P.O. Box 300 Amory, MS 38821 662-256-2962 Manager’s Name:

Nights, Sundays & Holidays: 662-256-2962 Unlisted Number: 662-256-2971 Fax Number: 662-257-9909

Barry Rowland

Home 662-256-5445

n Name and phone number of alternate contacts: Keith Myatt

Radio Information:

Regular Operating Frequency: 157.635 T, 152.375R Alternate Frequency: 153.47000

Cell 662-315-8508

662-305-5723

Call Letters: KKC 796

n System Information:

System Voltages: 13KV & 26 KV Primary Conductor: #4ACSR, #2ACSR, 1/0ACSR, 2/OACSR, 336ACSR, 397ACSR, 4/0ACSR, #6 COOPER, 477ACSR Splicing Sleeves Used: Burndy & Anderson Sleeving Tools: Burndy Personnel: Ryan Payne - Director of Accounting & Finance Keith Myatt - Operating Superintendent

Union: No

-40-

AUGUST 2020


Monroe County Electric Power Association

n Equipment Available: Service Trucks Heavy Truck

Service Bucket Truck

Number 3

Personnel on each 1 (2 during emergency)

Number 2 3 1

Size 2 ton 3 ton 1 ton

Special Equipment Bucket Trucks Digger Derrick Trucks Material Handler

12 (Size: 16”) 12 2 2 1 3/4 ton GMC

Air Compressor 2 Power Source 12 volt Pole trailers 2 Crawl tractor 1 (Size: D4K LGP CAT)

n Special Facilities:

Number of: Chain Saws Spotlights Walkie-talkie sets Generators Vehicles

n System’s definition of the following:

Service Crew Line Crew Line Truck Bucket Truck

Number of Men 1 -2 4-5 2-3 2-3

-41-

Type of Equipment Pickup Digger derrick bucket 2 ton digger derrick 2 ton bucket truck

AUGUST 2020


Natchez Trace Electric Power Association

P.O. Box 609 Houston, MS 38851 662-456-3037 Manager:

Nights, Sundays & Holidays: 662-456-3037 Unlisted Number: 662-456-3106 Fax Number: 662-456-2086

Shawn Edmondson

n Name and phone number of alternate contacts:

Miller Dendy

662-542-1505

662-414-1531

Daryl Love District Offices:

Calhoun City Eupora Radio Information:

Cell 662-414-0123

Phone Number 662-628-5175 662-258-2941

Regular Operating Frequency: 153.425 DPL026 Alternate Frequency:

n System Information:

System Voltages: 7200/12470x14400/24940 Primary Conductor: 2,4,6 Cu, 4,2,1/0,3/0,336 ACSR Splicing Sleeves Used: Automatics & ACSR Personnel:

Fax Number 662-628-5989 662-258-8991 Call Letters: KKG 341

Sleeving Tools: Burndy & Blackburn on ACSR. Nicopress on small cu.

Union: No

-42-

AUGUST 2020


Natchez Trace Electric Power Association

n Equipment Available: Service Trucks Heavy Trucks

n Special Facilities:

Chain Saws Spotlights Walkie-Talkie Sets Crawl tractor Portable fuel tank All digger derricks are 4 wheel drive Track Machine

Number 2

Personnel on each 2

Number 2 2

Size 2 ton 2 ton

23 (Size: 14” - 30”) 15 (Size: 300K cp) 4 1 (Size: D4 cat) 150 gal.

n System’s definition of the following: Service Crew Line Crew Construction Crew Line Truck Bucket Truck

Number of Men 2 4-5 4-5 2 2

-43-

Special Equipment 4 WD digger derrick 50’ buckets

Air Compressor 2 Power Source 12V DC Pole trailers 3 Wire trailer 4

Type of Equipment Pickup 3/4 ton Pickup, bucket truck, digger derrick 3/4 ton Pickup, bucket truck, digger derrick Commander II Hi-Ranger or TECO

AUGUST 2020


North East Mississippi Electric Power Association

P.O. Box 1076 Oxford, MS 38655-1076 662-234-6331 Manager:

Nights, Sundays & Holidays: 662-234-6331 Unlisted Number: 662-234-6090, 662-234-7218, 662-234-1888 Fax Number: 662-234-0046

Keith Hayward

Cell 662-816-8070

Home 662-236-1837

n Name and phone number of alternate contacts: Randall Abel

662-236-5169

662-816-3506

n Radio Information:

Regular Operating Frequency: 48.50/47.80 Alternate Frequency:

Call Letters: KKD 374

n System Information:

System Voltages: 7.2/12.47 KV & 14.4/25 KV Primary Conductor: #4 - 336.4 ACSR Splicing Sleeves Used: Same Personnel: Union:

Pager 662-805-5537

Sleeving Tools: Automatic

Arlin Spence, Office Manager John Alexander, Purchasing Agent Jason Long, Operations & Construction Engineer

-44-

AUGUST 2020


North East Mississippi Electric Power Association n Equpment Available: Service Trucks Heavy Trucks Special Mobile Equipment

n Special Facilities:

Chain Saws Spotlights 4-wheel drive vehicles 2

Number 3

Personnel on each 1 Size 50’, 55’, 60’ 35’, 40’ 5 & 2 1/2 ton

Number 3 3 3 1 1

15 (Size: 4.0cc) 12 (Size: 100,000 cp)

n System’s definition of the following: Service Crew Construction Crew Line Truck Bucket Truck Digger Derrick

Number of Men 2 5 2 2 2

Special Equipment 2-man buckets (2 six-by) 1-man buckets Digger derrick (six-by) Ditch witch Chipper

Pole trailers 4

Type of Equpment

Small bucket Digger and bucket Ton 1 Lineman, 1 apprentice 1 Operator, 1 groundman

-45-

AUGUST 2020


Northcentral Electric Power Association

P.O. Box 405 Byhalia, MS 38611-0405 662-895-2151 Manager:

Nights, Sundays & Holidays: 800-325-8925 Unlisted Number/Satellite Phone 800-382-1683 Fax Number 662-892-4966 Cell Home Kevin Doddridge 662-895-2981 901-626-5355

n Name and phone number of alternate contacts: 901-494-2640 662-895-0661 866-438-2642

Larry Johnson Darin Farley CRC

District Office:

Phone Number 662-895-2151

Olive Branch

n Radio Information:

901-389-0125 901-262-2725 866-390-5964 Fax Number 662-892-4966

Regular Operating Frequency: Local Private Truncated Radio System Alternate Frequency:

n System Information:

System Voltages: 14400/24900 Primary Conductor: 4 ACSR to 636 ACSR Splicing Sleeves Used: Ampac Compression

Sleeving Tools: Burndy Hydraulic

Personnel: Union: No

-46-

AUGUST 2020


Northcentral Electric Power Association

n Equipment Available: Service Trucks Heavy Trucks

n Special Facilities:

Chain Saws Pole trailers Spotlights Walkie-talkie sets Generator

Number 3

Size

Number 3 3

Special Equipment Digger Bucket

10 2 1 2 1 (Size: 300 W)

n System’s definition of the following: Service Crew Line Crew Construction Crew Bucket Truck

Personnel on each 1 or 2 (whichever is needed)

Number of Men 1-2 4 6 2-3

-47-

Type of Equipment Service truck 2 linemen, a groundman, digger truck driver Digger truck, ton truck, bucket truck 2 lineman, 1 groundman

AUGUST 2020


Pearl River Valley Electric Power Association

1422 Highway 13 North Columbia, MS 39429 601-736-2666 or 800-320-0312 Manager:

Nights, Sundays & Holidays: 601-731-3755 Voice Mail Number: 601-731-7899 Fax Number: 601-736-9702 & 736-1271 Emergency: 601-731-7664 Cell 601-441-1311

Home 601-441-1311

Randy Wallace

n Name and phone number of alternate contacts:

0DWKHZ :DUH Mgr. of Operations

(ULN /DYLQH Engineer

-DFRE 0RUJDQ, Engineer 01- - 01-441- Cody Smith, Engineer 601-441-3953 District Offices: Cell Home District Manager Phone 2865 Highway 49, Wiggins Billy McCrary 601-476-8301 601-441-3416 601-582-3447 799 North Main St., Purvis George Cutrer 601-348-3201 601-441-0438 601-441-0438 6803 Hwy. 98, Hattiesburg Anthony Harris 601-726-3401 601-441-1122 601-264-3573 1422 Hwy. 13N, Columbia Shane Coleman 601-731-7740 601-441-9437 601-736-1400

n Radio Information:

Regular Operating Frequency: (high band, 153-160) Call Letters: KGY 504 All radios are programmable and frequencies may be changed prior to being dispatched to other systems. Location: Columbia, MS Local Amateur Operator: Elmo Robinson Phone: 736-2919 Station Call Sign: K5IQ0 Willie Deal 736-6180 K5UAK Charles Harrison 736-9002 Radio Frequencies (Mobiles) Columbia

Hattiesburg

Purvis

Wiggins

Transmit 158.130 159.810

158.235 158.430

158.265 159.795

Receive 153.530 153.680

153.185 153.560

153.410 153.650

159.510 160.125

153.470 153.590 -48-

DPL 026 026

026 026

026 026

026 026

Talk-Around 153.530 153.680

153.185 153.560

153.410 153.650

153.470 153.590

AUGUST 2020


Pearl River Valley Electric Power Association

n System Information:

Explanation:

System Voltages: Primary Conductors: Splicing Sleeves Used:

7.2/12.5 & 14.4/24.9 #4, 1/0, 3/0, 4/0, 336, 477 ACSR & 927 ACAR Automatics

Union: No

Available Personnel to other systems, provided PRVEPA is not affected by disaster: Personnel: Construction Crew Engineer Member Service Office Serviceman Staking Warehouse

Qty 1-4 1-2 1-2 1-4 1-4 1-4 1-2

Description typical: 5 men, derrick, 37’ & 55’ MH buckets

Vehicles: Service Buckets, 37’ Service Trucks, spare Trucks, heavy 1-ton Derricks Buckets, 37’ Buckets, 50-55’ Pole Trailer Dozer Boat with motor Chain Saw Generator UTV

Qty 12 4

Description Material Handlers

n Equipment Available:

n Special Equipment: Radio, Portables

2 11 10 8 11 1 1 40 10 4

Qty

100

typical: 2 men, 37’ MH Bucket

Material Handlers Material Handlers CAT D4G-LGP80 10 HP

Description Motorola, XPR 6550 VHF Portables w/ Connect Plus and GPS

-49-

AUGUST 2020


Pontotoc Electric Power Association P.O. Box 718 Pontotoc, MS 38863-0718 662-489-3211 Shipping: 930 Hwy 41 Pontotoc, MS 38863

Manager: Asst Manager:

Chuck Howell Frankie Moorman

Nights, Sundays & Holidays: 662-489-6711 Unlisted Number: 662-489-7929 or 662-489-6308 Fax Number: Warehouse - 662-488-8512 Office - 662-489-5156 Home

662-489-4531

662-419-3829

n Name and phone number of alternate contacts: James Elzie, Gen. Foreman District Office:

125 South Newberger St. Bruce, MS 38915 Ben Hogan

Phillip Brackett

n Radio Information:

Regular Operating Frequency: Alternate Frequency: Pontotoc Line Crew Repeater Mobile transmit 158.130 MHz Mobile receive 153.560 MHz PL Tone 114.8 Hz or 2A

n System Information:

662- 419-0606

Branch Number 662-983-2727

Home Number 662-983-0033 662-983-2649

Cell

662-489-9610

662-687-0083

662-266-1064

Fax Number 662-983-1335

Cell 662-927-0982

662-927-0983 Call Letters: KKG-750

Bruce Repeater Mobile transmit 159.990 MHz Mobile receive 153.635 MHz PL Tone 114.8 Hz or 2A

System Voltages: 7200/12470 14400/24940 Primary Conductor: #2 ACSR, #2/0 ACSR, 336 ACSR Splicing Sleeves Used: Mostly automatic splices Anderson & Utilco Secondary Connectors -50-

Pontotoc Office Repeater Mobile Transmit 158.220 MHZ Mobile Receive 153.620 MHZ PL Tone 114.8 HZ or 2A

Sleeving Tools: Anderson Versa Crimp

AUGUST 2020


Pontotoc Electric Power Association

n System Information: (Continued)

Personnel: Home Phone Mark Patterson, Director of Accounting & Finance 662-489-7771 Tom Hill, Purchasing Agent 662-419-3909 Union: No

Cell Phone 662-488-5951 662-419-3902

n ROW Equipment (3)

Bandit 12xP Chippers

(1)

Split Dump Bucket Track

(2)

55' Bucket Trucks

(1)

Chipper Dump Truck

n Equipment Available:

Service Trucks

Heavy Trucks

n Special Facilities:

Number Personnel on each 2 One lineman and one groundman Number Size Special Equipment 3 Bucket trucks 55’ 1 Bucket Truck 65’ 1 Bucket Truck 77’ 1 Bucket Truck 56’ 1 Bucket Truck 46’ 1 Bucket Truck (4-wheel drive) 41’ 3 DC47BB and 2045 Altec Digger derrick trucks

Chain Saws (one per vehicle) Pole Saws 3 (gasoline powered) Walkie-talkie sets (one per vehicle) Portable fuel tanks 2 4-wheel drive vehicles 3 (Heavy trucks equipped to haul poles and material) with winch

n System definition of the following:

Service crew Line Crew

Line trucks Digger derrick

Number of Men 2 7 2 2

Type of Equipment 37’ Bucket truck Digger derrick, bucket trucks, pole hauling truck, and pickups 4-wheel drive equipped to haul poles and material Altec DC47BB and Altec 2045T -51-

AUGUST 2020


Special Equipment: 1996 year model 80 KW generator mounted on a trailer with fuel tank, 3-phase, 120/208Y, 120/240 Delta, and 277-480Y. This unit is complete with cables - ready to roll. 2006 year model 100 KW generator mounted on a trailer with fuel tank, 3-phase 120/208Y, 277/480Y, and 120/240 single phase. This unit is complete with cables – ready to roll. (1) (2) (2) (1) (1)

4,000 W Light Plant Skid steer machines with grapple buckets and pole setting attachment Honda 1000 Pioneer side by side TSE DP104H Cable Puller Bobcat E50 Track Hoe

AUGUST 2020 -52-


Prentiss County Electric Power Association

P.O. Box 428 Booneville, MS 38829-0428 Shipping: 302 West Church Street Booneville, MS 38829 Manager:

Ronny Rowland

Nights, Sundays & Holidays: 662-728-2549 Unlisted Number: 662-728-0133 Fax Number: 662-728-4059 Home

662-728-4643

Cell

662-416-4540

n Name and phone number of alternate contacts:

Fax

662-728-4059

Robert Dodson, Engineer

Home 662-728-2218

Cell 662-416-3893

Baldwyn, Danny Hodges

Phone Number 662-365-7161

Fax Number

Branch Office: 106 E. Clay Street, Baldwyn, MS 38824

n Radio Information:

Regular Operating Frequency: 153.65 Trans. Alternate Frequency: 158.325 Rec.

Call Letters: KKD 383

Personnel: Union: No

-53-

AUGUST 2020


Prentiss County Electric Power Association

n Equipment Available:

Service Trucks Heavy Trucks

Number 2

Personnel on each 2

Size F-800 C-80

Number 1 1

Special Equipment Bucket Digger derrick

n Special Facilities:

Chain Saws 2 Spotlights 2 Generator 1 (Size: 2.2KW) 4-wheel drive vehicle bucket and digger

n System’s definition of the following:

Service Crew Construction Crew Bucket Truck Digger Derrick

Number of Men 2 3-6 2 2

-54-

Type of Equipment 1/2 ton pickup Varies with the size of the job Hand tools Hand tools

AUGUST 2020


P.O. Box 767 Lucedale, MS 39452 601-947-4211 Manager:

Singing River Electric Cooperative

Brian Hughey

Nights, Sundays & Holidays: 601-947-4211 Unlisted Number: 601-947-8123 or 601-947-6301 Fax Number: 601-947-3171

Name and phone number of alternate contacts: Buck Williams Tom Davis

Home 228-588-9047 —

601-947-1704

Jeff Catlett

_

Cell 228-217-1370 601-770-0049

601-508-0278

228-990-9897

Branch Offices & Locations: Lucecdale Office: 11187 Old 63 South, Lucedale, MS 39452 Phone: 601-947-4211

Gautier Office: 500 HWY 90, Gautier, MS 39553 Buck Williams Office: 228-497-1313, Ext 2362 Chad Cochran Office: 228-497-1313, Ext 2338

Sand Hill Office: 39276 HWY 63 N, Richton, MS 39746 Contact Jeff Catlett Office: 601-989-2345, Ext 2496

Phone: 228-497-1313 Cellular: 601-770-0049 Cellular: 228-217-4997

Phone: 601-989-2345 Cellular: 228-990-9897

n Radio Information:

Regular Operating Frequency: Rx 158.205, 158.190, 159.540 Call Letters: KKC 680, KKI589 Tx 153.545, 153.665, 153.725 WNKS 237

n System Information:

System Voltages: 7620/13200 & 14400/24940 Primary Conductor:#6 Cu. #4 ACSR-477MCM ACSR Splicing Sleeves Used: Anderson & Automatic for emergency

Secondary Conductor: All types Sleeving Tools: Ampac Anderson

Personnel: Public Relations personnel available to help other systems during emergency: Union: No.

-55-

AUGUST 2020


Singing River Electric Cooperative n Spare Substation Transformers: Mobile Transformer:

Number Voltage 110/13.2KV 69/13.2KV Have spares in all of the above voltages 1

n Equipment Available:

Service Trucks Heavy Trucks

Size: 7500 KVA

Number 6 or more Number 3 3

Capacity Both are 20KVA Transformers

Voltage: 110KV-69KV/13.2KV

Personnel on each 2 or 3 as needed

Size 2 1/2 ton 2 men

Special Equipment Derrick Bucket

Special Mobile Equipment: Tractor, low boy and pole trailer, dozer, backhoe, digger derrick mounted on a timber jack, Track Digger Derrick

n Special Facilities:

Boat with motor Chain Saws Walkie-Talkie Sets Generator Portable fuel tank

1(H.P. 40), 1 (H.P. 25) 30 (Sizes: all) 4 2 (Size: 300W/150) 500 gal./1,000 gal.

Pole trailers Crawl tractor

6 JD-550

Other materials which may be helpful: 2-ton store room truck 1 back hoe 2 trenchers

n System’s definition of the following:

Service Crew Line Crew Bucket Truck

Number of Men 2 2 2

Type of Equipment 1/2 ton or 3/4 ton service truck Digger derrick with working foreman Bucket truck with 2 linemen

AUGUST 2020 -56-


P.O. Box 60 Taylorsville, MS 39168-0060 601-785-6511 Manager:

Southern Pine Electric

Nights, Sundays & Holidays: 601-785-6511 800-231-5240 Unlisted Number: 601-785-6521 Fax Number: 601-785-4980 Cellular 601-259-7801

Jason Siegfried

n Name and phone number of alternate contacts: Chad Lewis

601-527-6491

Jim Jordan

601-214-0271

District Offices:

Taylorsville Newton, Jamie Baucum New Hebron, Becky Williamson Brandon, Eddie Mitchell

n Radio Information: Ferguson Magee Morton Newton Paulding Pineville Rawlsprings Shivers Star Taylorsville

n System Information:

Phone Number 601-785-6511 - 1-800-231-5240 601-683-2200 - 1-800-698-9573 601-694-2711 - 1-800-698-9571 601-506-7229 - 1-800-698-9574

151.5725T 151.7825T 153.3875T 153.3875T 151.6025T 151.9175T 153.7175T 153.7325T 153.5675T 153.5225T

Fax Number 601-785-4980 - Warehouse 785-2031 601-683-2010 601-694-2716 601-824-7077

159.9675R 159.9075R 159.9225R 159.8775R 159.6075R 159.8325R 159.5625R 159.6825R 159.2425R 159.7725R

System Voltages: 7620/13200 - 14.400/24900 Primary Conductor: #4, 2, 1/0, 336.4, 477 ACSR Splicing Sleeves Used: Compression & automatic Personnel: Union: No

-57-

Sleeving Tools: Kearney, Blackburn, Burndy

AUGUST 2020


Southern Pine Electric n Spare Substation Transformers:

Number 1 1

Voltage 67/13.2 67/13/2x25KV

Mobile Substation:

Yes

n Equipment Available:

Construction, Service, & ROW

n

Special Facilities:

Chain Saws Generators Portable fuel tank

Capacity 5 MVA 3phase 12/16/20MVA

Mfg. WESCO GE

Polarity

Size: 20 MVA Voltage: 115 x 69/13.2 x 26.4 KV Number 16 14 21 15 12 4 1 8 5 5 2

35 4 (Size: 3500 watt) 1

n System’s definition of the following:

Service Crew Construction Construction - Line Crew Bucket Truck Digger Derrick

Impedence 7% 7%

Number of Men 1-2 4-5 2 2

-58-

Special Equipment Size F150/F250 (4x4) Digger derricks Int7300 Bucket-material handler(55'-65') Int7300 Service Bucket (37'-40') Ford F550 (4x4) Small Bucket (37'-40') Ford F550 (4x4) Small track machines w/pin on bucket Large track machines w/pin on bucket Tractor UTV Trencher Backhoe Air Compressor 5 Pole trailers 15

Type of Equipment 4x4 Service Bucket 3/4 ton pickup, bucket truck & digger derrick Altec and Terex - 40', 55’, 60', 65’ Altec and Terex -

AUGUST 2020


Lorman, MS 39096-0005

Southwest Electric 601-437-3611

800-287-8564

Fax Number: Manager:

601-437-8736

Home

Kevin Bonds

n Name and phone number of alternate contacts:

(o) 601-437-1319 (o) 601-437-1357 (o) 601-437-1310

Operations Mgr Kevin Cotten Safety & Loss Mitchell Smith Const. Supv. David Strittman

n Radio Information: Mototrbo Digital

Regular Operating Frequency:

153-485

Cell 601-431-8054

601-443-7354 (c) 601-443-7240 (c) 601-669-1479

Call Letters: KNIA 404

n System Information:

System Voltages: 34.5 KV, 7.2/12.47 KVY, 14.4/24.9 KV Y Primary Conductor: Cu and Alum Secondary Conductor: Cu and Alum Splicing Sleeves Used: 1 piece Compression Sleeving Tools: Nicopress, Burndy Fargo Automatic Personnel: Union: None

-59-

AUGUST 2020


Southwest Electric

n Spare Substation Transformers:

Number 1

Voltage 115/24.9

Mobile Substation: 1

n Equipment Available:

Service Trucks Heavy Trucks

Capacity 10,000

Impedence 7.89%

Size: 10,000 KVA Number 6

Size 2 ton 2 ton

1(H.P. 30) 12

1 Skid Steer w/attachments 1 Trencher Mini-escavator w/attachments 1 n System’s definition of the following: Service Crew Maintenance Crew Construction crew Bucket truck

Voltage: 115/13.2/7.620

Personnel on each 1

Number

n Special Facilities: Number of: Boat with motor Chain Saws

Mfg. Waukesha

Number of Men 2 3 5 2

-60-

Special Equipment Digger-derrick Bucket

Air Compressor 1 Portable Welder 1 Small Generator 1 Track Digger Derrick 1

Type of Equipment

3/4 ton pickup and tools Digger derrick and bucket truck Digger derrick and 3/4 ton truck Bucket trucks

AUGUST 2020


Tallahatchie Valley Electric Power Association P.O. Box 513 Batesville, MS 38606-0513 1-662-563-4742 Manager:

Nights, Sundays & Holidays: 662-934-6227 Fax Number: 662-563-8615 Home

Brad Robison

n Name and phone number of alternate contacts: Jamie Barnett Operations Director

Regular Operating Frequency: Direct Call Letters: KKA-645

662-934-6227 662-934-6635

Derek Cobern Construction Supv.

n Radio Information:

Cell 662-609-0808

456.025 Repeater, 451.025 456.225 Repeater, 451.225

n System Information:

System Voltages: 12.47KV/7.2KV, 24.94/14.4 KV Primary Conductor: #4ACSR, #2ACSR, #1/0ASCR, #3/0ACSR, 336.4 ACSR Splicing Sleeves Used: Reliable Automatic Sleeving Tools: Burndy MD-6, Milwaukee 2678-22BG Personnel: Engineering Staff Available:

Union: No

Jamie Barnett, P.E. Kerry Davis Derek Cobern

-61-

AUGUST 2020


Tallahatchie Valley Electric Power Association n Equipment Available: Service Trucks

Number 6

Personnel Each 2 or 3

Number 4 4 2 2

Heavy Trucks

Size 2 ton 2 ton 2 1/2 ton 2 ton

n Special Facilities:

Chain Saws Walkie-talkie sets Generator

12 12 2 (Size: 3.5 KW)

Pole trailers Crawl tractors

Special Equipment Digger derrick (42’) Aerial basket (55’) Tractor & 36’ flat trailer Aerial Basket - ROW (57’)

4 2 (Track digger derrick) 3 (Caterpiller D3)

1 (Track Bucket 50')

n System’s Definition of the following: Service Crew Line Crew Construction Crew Line Truck Bucket Truck Digger Derrick

Special Equipment Aerial Basket (37’)

Number of Men 2 5 5 2 3 2

Type of Equipment 1 ton truck 2/aerial basket (37’) 1 3/4 ton pickup, 1 aerial basket, 1 digger derrick 1 3/4 ton pickup, 1 aerial basket, 1 digger derrick 2 ton digger derrick 2 ton aerial basket 2 ton digger derrick

Equipment:

Crew:

2-Track Diggers 1-Track Bucket 4-Bucket Trucks (55') 4-Digger Derricks (42') 4-Foreman Trucks (Pickups) 3-Bulldozers

4-Five (5) Man Construction Crews 3-Two (2) Man Service Crews

-62-

AUGUST 2020


Tippah Electric Power Association

P.O. Box 206 Ripley, MS 38663-0206 662-837-8139 Manager:

Tim Smith

Dispatcher: 662-837-8139 Nights, Sundays & Holidays: 662-837-8139 Fax Number: 662-837-8818

Home Cell 662-512-8784

n Name and phone number of alternate contacts: Danny Caples, Engineer Cell 662-837-6887 Jamie Hill, Adm. Asst. Cell 662-512-8438

Rob Holditch, Operations Supt. Cell 662-837-1960 Brenda Storey, Office Manager Home 662-837-9903 Cell 662-512-8828

n Radio Information: State Radio System Regular Operating Frequency: 153.71 Alternate Frequency: Talk Around 159.885

Kerry Cockrell, Accountant Home 662-837-0100 Cell 662-587-0838

Call Letters: KKE-800

n System Information:

System Voltages: 12.5KV Primary Conductor: 795-4ACSR Splicing Sleeves Used: Auto &Compression

Sleeving Tools: Hyd. Compression

Personnel: Operations Supt. Climbing Supervisors Working Foremen Lineman Right of way

Union: Yes

-63-

AUGUST 2020


Tippah Electric Power Association n Equipment Available:

Number 2 3 3 2 1

AWD Service Bucket Trucks AWD 55’ Bucket Trucks AWD Digger Derrick 50” Bucket Trucks Digger Derrick

n Special Equipment:

Dozer - Komatzu - D31sx 4 Wheeler & Trailer

n System’s definition of the following:

Number of Men

Service Bucket Crew Line Crew Construction Crew Line Truck

Type of Equipment

Working Foreman & Apprentice Lineman 1 Working Foreman and the 4 lineman Necessary combinations of line crew Line trucks are digger derrick trucks

-64-

AUGUST 2020


Tishomingo County Electric Power Association

P.O. Box 560 205 Constitution Drive Iuka, MS 38852-0560 662-423-3646 Manager:

Tim Wiggington

Nights, Sundays & Holidays: 662-423-3646 Unlisted Numbers: 662-423-9615; 662-423-3384; 662-423-3378 Fax Number: 662-423-1763 Home 662-423-1920

Cell 662-423-8536

n Name and phone number of alternate contacts: Loss Control/Safety Director Office

Jerry Gray

662-423-3646

Cell 662-279-1109

Kerry Tennison

662-423-3646

662-660-0243

Jerry White

662-423-3646

662-279-9999

Operations Engineer General Foreman n Radio Information:

Regular Operating Frequency: 158.25 Local Amateur Radio Operator: Leon Johnson Location: Iuka Phone: 423-6503

n System Information:

Call Letters: KKE 576

Station Call Sign: KBS 1HN

System Voltages: 12.4 Secondary Conductor: #4 TX up to 4/0 TX Primary Conductor: #4 Copper, ACSR to 477 MCM 500 MCM serv. 2 AL up to 4/0 AL Splicing Sleeves Used: Automatics Sleeving Tools: Compression Hydraulic Personnel: Public relations personnel available to help other systems during emergency: Manager

Union: Yes

-65-

AUGUST 2020


Tishomingo County Electric Power Association

n Equipment Available: Service Trucks Heavy Trucks

n Special Facilities:

Number of: Chain Saws Spotlights Walkie-talkie sets Generator

Number 2

Personnel on each 2

Number 2 3 1

Size 2 ton 2 1/2 ton 2 ton

10 8 15 3 (1350 watts)

Pole trailers Portable water tank Crawl Tractor

Special Equipment Bucket trucks - material handlers Line trucks with augers Bucket truck-personnel lift

1 N/A 1 (Case 850E)

n System’s definition of the following:

Service Crew Line Truck Bucket Truck Bucket Truck

Number of Men 2 3 3 3

Type of Equipment 1 ton trucks with service bodies & personnel lift With digger derricks Material handler booms Personnel lift

-66-

AUGUST 2020


Tombigbee Electric Power Association

P.O. Drawer 1789 Tupelo, MS 38802 662-842-7635 Manager:

Nights, Sundays & Holidays: 662-842-7635 Unlisted Number: 662-844-2242 Fax Number: 662-795-4261

Bill Long

Home 662-869-2704

Cellular 662-678-3809

662-963-3883 662-282-4848

662-401-2453 662-213-5368

n Name and phone number of alternate contacts:

David Riley, Operations Manager David Kelso, Branch Manager Branch Offices: Tupelo Office: 1346 Auburn Road Tupelo, MS 38804 662-842-7635 662-795-4261

n Radio Information:

Fulton Office: 813 West Main Fulton, MS 38843 662-862-3146 662-862-4089

Regular Operating Frequency: Tupelo RX 464.5250 TX 469.5250 Fulton RX 463.3375 TX 468.3375

Call Letters: WQQK364

n System Information:

System Voltages: 13KV Primary Conductor: #2,2/0, 336.4, 477,795 Splicing Sleeves Used: Anderson Personnel: Bruce Williams David Riley Stevie Tarpley Cindy DeVaughn Tom Pitts Toby Mask Alex Carden Gerald Harmon

Union: No

Secondary Conductor: #2,1/0, 2/0,4/0 Sleeving Tools: Anderson & Automatics

Office Manager Operations Manager, Tupelo Member Service Director Executive Secretary/Insurance System Engineer System Engineer System Engineer Safety/Environmental Coordinator -67-

bwilliams@tepa1.com driley@tepa1.com starpley@tepa1.com cdevaughn@tepa1.com tpitts@tepa1.com tmask@tepa1.com acarden@tepa1.com gharmon@tepa1.com AUGUST 2020


Tombigbee Electric Power Association

n Equipment Available: Service Trucks

Line Crews

Number 6

Personnel on each 2

5 1 2 1 1

3 3 3 3 3

3

Bucket Trucks

Digger Derricks

Construction Crews R.O.W. Crew U.G. Crew

5

6

3 3

3

Same as Above 9

10

Truck and Unit F550/4x4/37’ Sqirt Boom

F550/4x4/Crew Cab Line Truck F750/4x4/MH/Climbing Crew Frgtliner/4x4/55’ MH/Climbing Crew F750/4x4/55’ Material Handler 7400 Int./4x4/60’ Material Handler F550/4x4/42’ Material Handler F550/4x4/40’ Material Handler Int. 6x4/DC47/93’ Material Handler

3- Freightliner/C4042 Digger Truck 1- International /5052 1- F750/4x4/C4047 1 - F750/ALTEC/45’

Necessary Equipment Necessary Equipment

Special Equipment 1 - UTV 4x4 Polaris 1 - UTV 4x4 John Deer 1 - Mini Excavators CAT 305.5 1 - Mini Excavators CAT 303.5 2 - RTX 550 Trenchers Quadtracts 1 - Skytrim Trimmer 75’ 1 - Caterpillar Mini Skidsteer 299D with 45’ Pole Sitting Capability 1 - 2664 Prentice Hydroax 1 - 2764 Prentice Hydroax 1 - D2oX22 Borning Machine 1 - Clipper Trimmer 52’ Mini On Tracks

-68-

AUGUST 2020


Twin County Electric Power Association P.O. Box 158 Hollandale, MS 38748-0158 662-827 -2262 Manager:

Tim Perkins

Nights, Sundays & Holidays: 662-827-2262 Unlisted Number: 662-827-5325 Fax Number: 662-827-2832 Cell 662-390-6571

Home

n Name and phone number of alternate contacts: Gene Newton Kenneth Wolford Clay Seymour

Home

662-332-1441

District Offices:

Cell 662-820-4825 662-390-6583 662-820-8702

Office/Home 662-247-1909

Belzoni 101 Castleman St., Belzoni 39038 Brian Cochran 662-247-3060 Jeremy Fuller 662-247-2922 Rolling Fork 662-873-4233 291 McLaurin Ave. Rolling Fork 39159 Tom Price 662-873-2970 Russ Stewart

Greenville 1260 VFW Rd, Greenville 38701 Marcus Ross Mike Manor

n Radio Information:

662-334-9543 662-335-7796

Regular Operating Frequency: RX 153.515 Alternate Frequency: TX 158.145 RX153.485

Email gnewton@twincoepa.com kwolford@twincoepa.com cseymour@twincoepa.com

Cell

Fax/Email 662-247-1907

662-820-5191 662-820-7080

bcochran@twincoepa.com

662-827-1014 662-873-7482

tprice@twincoepa.com

662-820-8405 662-820-8534

mross@twincoepa.com

TX 158.250

-69-

Email twperkins@twincoepa.com

662-873-2676

662-335-3507

Call Letters: WPST672

AUGUST 2020


Twin County Electric Power Association n System Information:

System Voltages: 7620/13200 and 14400/24900 Primary Conductor: #6-1/0 cu. #4-477ACSR Splicing Sleeves Used: Automatic Personnel: Union: No

Mobile Substation: Yes

n Equipment Available: Service Trucks Heavy Trucks Special Mobile Equipment

Size: 10 MVA

Sleeving Tools: Anderson

Operating Voltage 115-7.62/132

Number 2

Personnel on each 2 Size 2 ton 2 1/2 ton

Number 1 2 1

10 MVA

Special Equipment Bucket truck Digger derrick

Mobile Unit

n Special Facilities:

Chain Saws Spotlights Generators

6 7 1 (Size 7 1/2 KV)

n System’s definition of the following:

Service Crew Construction Crew Bucket Truck

Number of Men 2 6 3

Type of Equipment 1/2 ton service truck 2 1/2 ton digger derrick 2 1/2 ton bucket truck

-70-

AUGUST 2020


Yazoo Valley Electric Power Association

P.O. Box 8 Yazoo City, MS 39194-0008 662-746-4251

Manager:

Ron White

Nights, Sundays & Holidays: 662-746-4251 Unlisted Number: 662-716-7369, Ext. 229; 662-571-1300 Fax Number: 662-751-1060 Dispatch: 662-751-8029 CRC After-Hours: 1-866-484-4277 Home 662-746-7976

Cellular 662-571-5250

n Name and phone number of alternate contacts:

Michael Neely

662-751-8059

662-571-7127

Josh Reeves

662-751-8012

662-571-7175

n Radio Information:

Regular Operating Frequency: 152.3075 Alternate Frequency:

Call Letters: WQMX967

n System Information:

System Voltages: 7.62/13.8, 14.4/24.9 KV Primary Conductor: ACSR #4,1/0, 2, 3/0, 4/0, 397, Cu. #6, 6A, 8A, 9-1/2D, 3#12, 1/0, 2/0 Splicing Sleeves Used: Automatic Sleeving Tools: Anderson, Burndy, Nicopress

Personnel: 4 foremen, 8 linemen, 9 appr. linemen, 2 mechanics, 4 servicemen Union: No

-71-

AUGUST 2020


Yazoo Valley Electric Power Association Number Voltage Capacity 1 13200Y/7620 X 24940Y/14400 15000KVA 23,200# Mobile Transformer: 1

n Equipment Available:

Service Trucks Service Buckets 1-Ton Trucks Bucket trucks

Number 6 5 4 3

(Construction Material Handlers 44-55ft.)

Digger Trucks

n Special Facilities:

Boat with motor Generator Four wheelers

Impedence 8.0%

Mfg. WH

Polarity Sub

Personnel on each 2 2

4

2 with motor 4 - 5000 2

Other material which may be helpful: D4H Cat Dozer w/truck and trailer

n Sytems’s definition of the following:

Service Crew Construction Crew

Number of Men 2 5

-72-

Type of Equipment 37’ material handler 4/4 1 1-ton, 1 digger, 1 bucket, 1 pole trl.

AUGUST 2020


P.O. Box 15849 Hattiesburg, MS 39404-5849 Shipping: Field Operating Center 3492 U. S. Highway 42 Hattiesburg, MS 39042 601-268-2083

Manager:

Cooperative Energy

Nights, Sundays & Holidays: 601-596-1140 601-596-1491 601-596-1489 601-4586329 Unlisted Number: 601-264-3909 Fax Numbers: 601-261-2374, 601-261-2351, 601-261-2375 Cell

Jeff Bowman

n Name and phone number of alternate contacts: Christa Bishop Executive Vice President - Chief Communications Officer Nathan Brown Senior Vice President - Chief Operating Officer Brad Wolfe Senior Vice President - Power Delivery

Mark Smith Senior Vice President - Power Generation James Evans Director Transmission Maintenance

Sara Peterson Corporate Communications Manager

Work

601-520-0092

601-268-2083

601-329-1679

601-705-6612

601-408-0062

601-261-2303

601-543-3540

601-705-1701

601-405-8919

601-261-2386

601-606-0884

601-705-1705

601-297-3419

601-705-6614

n Radio Information:

KNCH620 System A System B

Hattiesburg Tx Rx 153.605 158.175 150.875 160.110

System Information:

System Voltages: Primary Conductor: Splicing Sleeves Used:

69/115/161/230 kV 4/0, 336, 477, 795, 1351, Kcmil ACSR Compression Sleeving Tools: Hydraulic 12 and 60 ton

Personnel: Public Relations personnel available to help other systems during emergency: Christa Bishop and Sara Peterson Union: No -73-

AUGUST 2020


Cooperative Energy n Equipment Available:

Service Trucks Heavy Trucks

Number 1 3 1 1 2 1 1 1 1 1

n Special Facilities:

Chain Saws Walkie-talkie sets Generator Portable fuel tank

Number 8

Personnel on each 2

Size 80’ 50,000 GVW 65’ boom 75’ bucket w/13’ elevator Flatbed 650 105’ 40 ton 38 ton 60’

6 (Size: 16”) 4 2 (2-3500W) 1

Special Equipment General derrick Mack tractor Track General Track Hi-Ranger Go-Truck Dozer/John Deere Terex TM-105 Mantis Crane Truck Crane Digger/derrick

Hot line trailer sets Pole trailers

1 1

Other material which may be helpful: 1 Dropneck low-boy trailer (20,000 axle cap. 80,000 frame cap.) 2 Dropneck low-boy trailer (20,000 axle cap. 100,000 frame cap.) 2 Float trailer - 48’ 3 Totem-All Trailers - 20’ (23,200 GVWR) 1 Pinnel hook trailer (37,310 GVWR) 1 37’ Bucket Truck

n System’s definition of the following:

Line Crew

Number of Men 6

-74-

Type of Equipment 1/2 ton 4x4 PU 1 ton 4x4 Crew PU Digger Derrick 77’ Bucket AUGUST 2020


Turn static files into dynamic content formats.

Create a flipbook
ECM Emergency Work Plan by American MainStreet Publications - Issuu