Skip to main content

Professional Resume

Page 1

905 West Peachtree St. Atlanta GA 30309

KEVIN MILLER

410-812-9320 kjmill097@gmail.com

Experienced architectural professional with extensive in programming, andand technical drawings specific 8 years ofbackground experience practicing sports,design, higher ed, adaptive reuse corporate to sports design. Eight years with HEERY Sports, now a studio with SLAM Collaborative, has provided a strong foundation in projects. Extensive background in programming, concept development, project coordination, and technical drawings. Passionate concept development, programming, project coordination, and all technical phases of the architectural process. Passionate about expanding on this strong foundation with a team that values innovation, sustainability and firm culture. Confident in abilities about expanding this foundation withand anteam established understanding market. and a that values innovation, sustainability firm culture. to coordinate in internal, consultant client facing roles to deliver of anthe exceptional product. Beyond a strong background in the professional realm lies an unwavering commitment to growth and a desire to engage with multidisciplinary peers especially about topics related to watershed and cities.

Professional Experience: Education

Dec. 2015present

May 2023present

Nov. 2021

Dec. 2015

Dec. 2017

Universitat Politecnica de Catalunya Clemson University Georgia Institute of Technology Heery International / SLAM Collaborative Bachelor of Art in Architecture Satellite Campus Studies Master of Architecture The HEERY Sports studio was bought and sold two times during this 8 year tenure. The first acquisition was to CBRE in 2018 then SLAM in Jan 2020 where the sports studio left behind the interiors group, engineering, and project managment. The multidissiplinary structure of this team and flexibilty to adjust to any circumstance was Professional Experience implemental in building a strong understanding of coordination and what it takes for a project team to succeed. S/L/A/M Collaborative - Atlanta, GA Staff Architect, May 2023 - July 2024

Staff Architect

Recruited the principle of the sports studiocoordination to lead project documentation and consultant coordination of GT Leadingbythe documentation and consultant of GT SAPC - a new student athlete performance SAPC. Thisattached is a newto student performance center at of Bobby Dodd Stadium. Promotes the GT brand offering center Bobby athlete Dodd Stadium. This is a state the art facility focusing on innovation through innovative performance and technology and sustainable technology and the use ofrecovery sustainable construction techniques.construction techniques - hostedbibi-weekly projectdesign designcalls callswith withconsultant consultantteam team -hosted weekly project - exposedtotomass masstimber timberconstruction construction -exposed - coordinatedproducts productsand anddetails detailsfor fordocumentation documentation -coordinated - led code and life safety analysis -lead S/L/A/M Collaborative - Atlanta, GA Project Architect Project 2021Way - Aug. 2022fitout project. This 35,000SF adaptive resuse project was delivered to 2135Architect, American Nov. Industrial tenant

the client adaptive 8/22 andreuse is nowproject the home of Wheels Up.now Design opportunities included pinched lintel openings A 35,000SF for tenant fit-out the home of Wheels Up private airline bookings. Design in double wythe exterior walls,lintel largeopening roll-up doors openwythe to covered patio creating a open-air cafe loungepatio opportunities included pinched in double exterior walls, large roll-up doors to aand covered space,aexposed and groovespace, canopy and a mural byand a local artist. creating open-airtounge cafe and lounge exposed tongue groove canopy and a large wall mural completed -lead project documentation team by a local artist. -coordinated developer and GC during preconstruction meetings - led project between documentation team -exposed to practice management in contract reviews - coordinated between developer and GC during preconstruction - exposed to practice management in contract reviews

Architectural Designer

The path towards -licensure begins with the sports studio at HEERY International, now SLAM Collaborative. The HEERY International Atlanta, GA sports studio focuses Nov. on collegiate Architectural Designer, 2015 athletic facilities; stadiums, arenas, indoor practice facilities, and student athlete performance centers. In a competitive market projects prioritize fan experience and recruiting the most The path towards licensure begins with the sports studio at HEERY International, now S/L/A/M Collaborative. The talented student athletes. sports studio focuses on collegiate athletic facilities; stadiums, arenas, indoor practice facilities and team -developed benchmarking studies for project pursuits operations facilities. In a competitive market projects prioritize fan experience and recruiting the most talented -supported campus masterplanning efforts for feasability studies student athletes. -introduced new workflows to enhance project delivery, renders and project templates - introduced new workflows to enhance project delivery; renders and project templates -presented firm projects at a national sports conference - supported campus master planning efforts for feasibility studies - presented firm projects at a national sports conference Awards + -Press developed benchmarking studies for project pursuits AIA Georgia, Excellence Award for Built Project – Nippert Stadium, Cincinnati Awards + Press IIDA NE Chapter, Education Under 50,000SF - UGA Butts-Mehre Heritage Hall - Athens, GA AIAArchitect Georgia, Magazine, Excellence Adaptive Award forReuse Built Project - NippertAtlanta Stadium, Cincinnati - GSU Stadium, IIDA NE Chapter, Education Under 50,000SF - UGA Butts-Mehre Heritage Hall - Athens, GA Architect Magazine, Adaptive Reuse - GSU Stadium, Atlanta

Selected Projects

May 2023 Jan 2022 May 2023 Aug 2020 Jan 2022 Mar 2019 Aug July 2020 2017 Mar 2019 Dec 2016 July 2017 Dec 2015 Dec 2016 Dec 2015

GT Student Athelete Performance Center - Atlanta, GA Selected Works& Field Renovation - Athens, GA UGA Track GT UTK Student Athlete Performance Center - Atlanta,TN GA Neyland Stadium Renovation - Knoxville, UGA Track & Field Renovation Athens, GA WVU Football Ops Expansion - Morgantown, WV UTKCCU Neyland Stadium Renovation TN Football Stadium Upgrades- Knoxville, - Conway, SC WVU Football Ops Expansion Morgantown, WV UNT Master Plan & Indoor Practice Facility - Denton, TX CCU Football Stadium Expansion SC GSU Football Stadium Retrofit -- Conway, Atlanta, GA UNT Master Plan & Indoor Practice Facility - Denton, TX GSU Football Stadium Retrofit - Atlanta, GA

Size

Budget

107,900SF $67,690,000 Size Budget 11,500SF $4,744,400 Phase 107,900 SF $67,690,000 CD, CA 196,250SF $119,808,300 11,500 SF $4,744,400 DD, CD, CA 60,657SF $30,874,000 196,250 SF $119,808,303 Concept, SD, DD, CD (50) 47,850SF $7,145,000 60,657 SF $30,874,000 SD, DD, CD 90,080 SF $16,311,900 47,850 SF $7,145,000 SD, DD, CD (50) 137,900SF $16,626,000 90,080 SF $16,311,900 Concept, SD, DD, CD 137,900 SF $16,626,000 Concept, SD, DD, CD, CA


Turn static files into dynamic content formats.

Create a flipbook
Professional Resume by Kevin J. Miller - Issuu