The global oil and gas sector in 2026 operates in an environment defined by market volatility, tight capital discipline, and an increasing need for operational efficiency. In Mexico, the industry is adjusting to a landscape shaped by ambitious state-led targets, aiming for 1.8MMb/d of liquid production and 5bcf/d of natural gas, against a backdrop of significant financial pressure. With national natural gas reliance on US imports hovering between 75% and 80%, expanding domestic supply across both conventional and unconventional basins has become a matter of long-term economic resilience. At the same time, addressing PEMEX’s liabilities and resolving widespread supplier payment backlogs are critical prerequisites to maintaining field activity and keeping service equipment in the country. Mexico Oil & Gas Summit 2026 served as a key forum for operators, financial institutions, and service providers to address the intersection of policy, capital deployment, and field operations under the legal frameworks established by SENER and the National Energy Commission (CNE). Discussions centered on how Mexico can maintain its competitive position, derisk investment, and build the infrastructure to ensure project bankability across public and private initiatives. Through its 13th edition, the Mexico Oil & Gas Summit gathered more than 200 industry leaders and key stakeholders, serving as the premier platform to address the essential topics for securing a prosperous country, industry, and society through responsible energy development. A central theme of the forum was the direct link between commercial certainty and operational continuity. Discussions highlighted how timely payment structures, transparent risk-sharing in mixed-investment contracts, and alternative supply chain financing are essential for protecting contractor liquidity and keeping projects running.


4

C onference I mpact

174

companies

298

conference participants

13

34

sponsors

speakers

6,700

13th

visits to the conference website

Edition

Breakdown by job title LinkedIn pre-event CTR: 5,8% Impressions: 181,384 15.4%

President / CEO / Managing Director/ C-Level

25.5%

Director / VP / Partner

30.2%

Manager

28.8%

Associate / Executive / Coordinator / Consultant / Lead / Analyst

Engagement rate: 7.45%

Twitter pre-event CTR: 1.3% Impressions: 3,757 Engagement rate: 0.3 %

LinkedIn during the event CTR: 13,8% Impressions: 7,495 Engagement rate: 15,35%

Twitter during the event CTR: 1.2%

Impressions: 885

Engagement rate: 0.4%

Matchmaking Mexico’s leading B2B conference organizer uses a customized app to deliver an unparalleled experience The MBE App delivered AI-powered intent-based matchmaking to Mexico Oil & Gas Summit 2026 attendees

MBE App Impact

Matchmaking intentions

229

participants

1422

matchmaking communications

313

1:1 meetings conducted

Total

2,183

813 Trading 1370 Networking


5

C ompany A ttendance •

149MKM

•

Empresario

•

ABB México

•

Endress+Hauser

•

Aerial UAS Solutions

•

Energía Regional

•

Aggreko Mexico

•

Energy Experts

•

Alis Bio

•

Enestas

•

ALKHORAYEF

•

Eni México

•

Alliance

•

ENMEX

•

AmaranZero

•

EnReach Hot Tap Services Inc.

•

AMESPAC

•

Envent Engineering

•

AmSpec

•

Envirosoft

•

aosenuma

•

ERM

•

Asociación Mexicana de Empresas de Servicios Petroleros AC

•

Estacion Modulares

•

Evans Consoles

•

Atlas Cpoco

•

Exsto US

•

Autodesk

•

ExxonMobil Mexico

•

Baker Hughes

•

EY Mexico Asuntos de Consultoría, S.C.

•

BBVA Mexico

•

FARO CREAFORM

•

Becerril, Coca & Becerril

•

Ferraez Comunicacion Petroleo & Energia

•

Beicip-Franlab

•

FitchRatings

•

Blackwell Strategy

•

FQE POWER, INC

•

BNamericas

•

Fraguva Energy

•

Bow River Solutions

•

Geolis

•

Brenntag Mexico

•

GHGSat

•

Broväg Consulting

•

Global Business Reports (GBR)

•

Bulkmatic de México

•

Gobierno de Alberta

•

Bureau Veritas

•

GRIJALVA ENERGY

•

Calibraciones Profesionales e Ingeniería

•

GRUPO CIITA

•

Cantronic Systems (Canada) Inc.

•

GRUPO IMPERIAL CORPORATIVO

•

CARGOWELD

•

Grupo IPS

•

CEMOG

•

Grupo México

•

CME Oil and Gas / OPEX

•

GRUPO MEXICO INFRAESTRUCTURA

•

CMOG

•

Gulf Latin America

•

COMMOSA

•

Harbour Energy

•

Computer Modelling Group Ltd

•

Heartland Engineering

•

Consorcio Petrolero 5M del Golfo (C5M)

•

Hello Solticom

•

Consultec International inc

•

HF Offshore

•

Cotemar

•

Hokchi Energy

•

CSIPA

•

Holland House Mexico

•

Cuatrecasas

•

HOOMAN

•

Délégation générale du Québec à Mexico

•

Hyland

•

Demeresa

•

Ibañez-Parkman

•

DHL GLOBAL FORWARDING (MEXICO)

•

IEFSA

•

DIPREM Global

•

iik Technologies

•

Dirección Empresarial

•

IMP

•

DNV

•

Indimex

•

DuPont Vespel®

•

Inerco

•

DVL Film House

•

Ingecoper México

•

Dynatics Workflow Management

•

Instituto Mexicano del Petróleo

•

ECLIPSE OFFSHORE

•

International SOS

•

Edelman

•

IPS Powerful People

•

Embassy of Canada

•

Jaguar E&P

•

Emerson

•

Jamieson-group


6

C ompany A ttendance •

Kiewit

•

Samson Control Mexico

•

Kinjal Gas

•

SBI BioEnergy

•

KPMG México

•

SEAMAR OFFSHORE MEXICO

•

KUATRO MODULARES

•

SENEI

•

Lukoil

•

Shell

•

Madarina Company

•

SI Group

•

McKinsey & Company México

•

SL Intelligence

•

METALMED - TRITORC

•

SLB

•

Mexico Petroleum Company

•

SpaceX

•

MGI (a PEMEX subsidiary)

•

Spencer Stuart

•

MODEC

•

Sperton

•

Muvoil Consulting

•

SPM Oil & Gas

•

Nabors Industries

•

Sproule ERCE

•

NAFIN

•

STE consultec

•

NG RENTA

•

SUMMA INTERMEDIARIO DE REASEGURO

•

Norton Rose Fulbright

•

TechnipFMC

•

Nuvoil

•

Tecnohargrove

•

OCA GLOBAL

•

Tejiendo Redes Infancia

•

OH Maritime Services

•

TFMC

•

Oil and Gas Alliance

•

TriGen

•

Oilmex Energy

•

Trigen Energy

•

ONU (ICE-SRM)

•

Viridien

•

OPEX

•

VulcanX Energy Corp.

•

P.D.McLaren Limited

•

W-Industries

•

Perenco Brasil

•

Weatherford Mexico

•

Petrolera de Amatitlán

•

Western Drilling Tools Inc.

•

PETROQUIMIA DEL GOLFO

•

Woodside Energy

•

Phillip International

•

Worley

•

Posicionamientos Marinos Malaquias

•

Zimat Consultores

•

POTENVAL

•

ZION NDT

•

REASINTER INTERMEDIARIO DE REASEGURO

•

ZYGHT

•

Recon Intelligence Corporation

•

Relesur

•

RM Industrial & Naval Solutions

•

RMSH

•

ROCAPORT

•

RODANNMARINE

•

Rotaflow Fire Systems

•

Roxtec de México

•

S&P Global Energy


7

PROGRAM

W E D N E S D AY, S E P T E M B E R 3 0 09:00

MAXIMIZING PRODUCTION OUTPUT: SUPPLIER AND TECHNOLOGY PERSPECTIVES

Moderator: Alex Gonzales, Executive Director Strategy & Growth for LATAM of Weatherford Speaker: César A. Granados, Director General of CME Oil and Gas / OPEX Rossy Pérez, General Manager Mexico of Beicip-Franlab Jose Edel Alvarez Delong, CEO of Nuvoil Edmundo Leyva, Commercial Director of SLB 09:50

DECARBONIZING UPSTREAM: PATHWAYS TO LOW-CARBON E&P IN MEXICO

Moderator: Ana Matute, Marketing Director, Latin America of Emerson Panelists: Daniel Ehrlich, Partner & Commercial Director of aosenuma Nicte Ovando, Developer of Mini Grid Energy Projects of Aggreko Alejandro de Jesus, Senior Partner of ERM Sara Landon, Executive Director of Inerco 10:40

COFFEE BREAK & AI-BASED MATCHMAKING

11:30

MEXICO OILFIELDS BALANCE AI, COSTS AND OPERATIONAL RESILIENCE

Moderator: Cesar Vera, Commercial Commercial Officer of CEMOG Panelists: Daniel Pizzato, President of Aerial UAS Solutions Francisco Zamudio, Service Sales Manager ABB Automation Energy Industries of ABB Julio Ortiz, Director Mexico Control Systems & Software of Emerson Daniel Hernandez, SVP Commercial & Deputy Country Manager of Gulf Latin America Teresa Gallegos, Strategic Legal & Transactional Executive Energy & Infrastructure of Quantum Energía

12:20

MEXICO’S UPSTREAM PRIORITIES: SOVEREIGNTY, OPTIMIZATION AND ESG

Moderator: Javier Mundo, Head of Energy and Natural Resources for the cluster of Mexico and Central America at KMPG Panelists: Andres Brügmann, Partner at SL Intelligence Eckhard Hinrichsen, Country Manager of DNV Edgar Kiyoshi, Head of Exploration and Extraction of Mexican Petroleum Institute (IMP) Gaspar Franco, Co-Founder and Director of Technical Strategy and Energy Regulation of Fraguva Energy

13:10

REJUVENATING MEXICO’S MATURE OIL FIELDS: PROFITABLE LOW-CARBON BARRELS Speaker: Pieter Kaptejin, CEO of TriGen

13:30

NETWORKING LUNCH & AI-BASED MATCHMAKING

Check the panel/presentation’s highlights on mexicobusiness.mx clicking on the icon


8

PROGRAM

W E D N E S D AY, S E P T E M B E R 3 0 15:00

ONE PLAY, TWO COUNTRIES: AN EAGLE FORD PLAYBOOK FOR MEXICO

Speaker: Fidel Juárez, Mexico Country Manager and Team Lead, Reservoir Engineering of Sproule ERCE

15:20

CAPITAL, LIQUIDITY, AND LEGAL DE-RISKING: PROJECT BANKABILITY AND SUPPLY CHAIN FINANCE

Moderator: Arturo Medellín, Partner at McKinsey & Company Panelists: Estela Campuzano, Legal and Regulatory Compliance Director of Energía Regional Gleb Kouznetsov, Energy Finance Director of Bancomext Rafael Espino, President of AMESPAC Omar Castillo, Sr Vice President GTB CIB of BBVA 16:10

OPERATOR UPSTREAM OUTLOOK: VALUE CREATION AND EXECUTION EXCELLENCE

Moderator: Alejandra Leon, Director, Strategy & Business Development of S&P Global Energy Panelists: Alberto de la Fuente, SVP Commercial & Deputy Country Manager of Harbour Energy Óscar Roldán, Director of CONSORCIO PETROLERO 5M DEL GOLFO Dr. Vinicio Suro Pérez, Vicepresident of Hokchi Energy William Waggoner, CEO of Mexico Petroleum Company 17:20

CONTRACTS MATTER-WONDERFULLY!

Panelists: William Waggoner, CEO of Mexico Petroleum Company 17:30

NETWORKING COCKTAIL & AI-BASED MATCHMAKING

Check the panel/presentation’s highlights on mexicobusiness.mx clicking on the icon


9

MAXIMIZING PRODUCTION OUTPUT: SUPPLIER, TECHNOLOGY PERSPECTIVES As mature fields face sharp natural decline

Operators across the country face sharp

rate s a n d s h a l l ow-wate r a ss e t s fa ce

natural decline rates in aging onshore

operational delays, Mexico’s upstream oil and

assets, alongside operational pressure to

gas sector is increasingly restructuring field

bring new offshore discoveries online faster.

execution models. Operators are deploying

Reversing these trends requires replacing

integrated service contracts, modular

traditional, fragmented execution models

wellhead gas processing, and dynamic

with coordinated field technologies, while

subsurface software to overcome logistical

proactively addressing a critical human

non-productive time and maintain continuous

capital shortage by attracting young talent,

flow rates. These coordinated technologies

investing in early-career mentoring, and

allow state operator PEMEX and private

bridging old school domain expertise with

concessionaires to accelerate shallow-water

new digital capabilities.

developments, optimize hydraulic fracturing, reservoirs.

Rethinking Offshore Execution and Commercial Models

Mexico’s upstream oil and gas sector is

In shallow-water operations, logistical friction

turning to integrated service contracts,

and disconnected vendor contracts have

wellhead gas processing, and advanced

historically driven up non-productive time

software to stabilize production in declining

(NPT) and expanded project budgets. César

mature fields and accelerate shallow-water

Granados, Director General, CME Oil and Gas

developments to support national production

and OPEX, argues that restructuring offshore

targets that are striving to reach 1.8 MM/d, up

service models is essential to overcoming

from current levels of 1.6 MM/d.

these delays. Granados emphasizes that

and de-risk recovery strategies across aging

Mexico represents a world-class engineering environment across deepwater, shallowwater, and non-conventional reservoirs, but unlocking its value requires flexible commercial models. “The appetite is there. As long as mechanisms and contract models are established that allow private companies to invest, flow, and grow, that potential will ultimately be capitalized into barrels at the surface,” Granados noted. Citing his company’s direct operational experience across more than 10 offshore platforms, such as the Bacal field project, where CME/OPEX expanded production from 4Mb/d–4.5Mb/d to nearly 20Mb/d over 20 months through financial discipline, lifting systems, and subsurface evaluation, single general contractors now bundle platform drilling operations, supply vessel scheduling, and marine logistics into unified agreements. This contract model synchronizes fleet movements directly with rig operations, which eliminates vessel standby hours and brings new wells online ahead of schedule.


10

Protecting Mature Onshore Assets and Wellhead Processing

Á l va rez s a i d t h a t , a cco rd i n g to t h e company’s experience, deploying modular gas sweetening and field compression units,

Experts note that aging onshore fields

such as those used at the Ixachi gas field

present distinct operational hurdles, where

where modular processing plants up to 150m

rising water production and changing gas-

high were erected in just 10 months, allows

to-oil ratios frequently lead to well shut-ins.

operators to process sour gas directly at the

Alex Gonzales, Executive Director Strategy &

wellhead and keep wells online with minimal

Growth for LATAM, Weatherford, points out

financial risk.

that reversing these losses requires focusing

on well integrity across its entire lifecycle, from initial design through to ultimate plug

Modernizing Well Construction and Subsurface Intelligence

and abandonment, while removing personnel from high-hazard red zones on the rig floor,

At the same time, technology providers

eliminating downhole trips, and exploring

like Weatherford focus on modernizing

long-term transitions like converting mature

completion practices and well construction

fields to hydrogen production.

through digital platforms and integrated s e r v i c e s . I n M ex i c a n s h a l l ow - w a t e r

To maintain continuous flow rates without

operations, integrated service models

waiting for long-term pipeline extensions,

managing drilling, completion, and workover

Jose Edel Álvarez, CEO, Nuvoil, has focused

services reduced drilling schedules across

on field-level processing. Addressing data-

24 wells by over 40 days, unlocking US$6

rich mature environments like the Burgos

million in cost savings and bringing wells

basin, where operators manage over 250

onto early production. Across onshore assets,

wells with complex surface-subsurface

deploying multidisciplinary completion teams

disconnects. “What destroys the most value

using nodal analysis software (WellFlo) and

on the balance sheet is not whether a well is

automated well construction platforms

operating at its absolute maximum potential,

(Centro) allowed operators to optimize

but the risk that the well stops producing

hydraulic fracturing spacing, delivering

entirely. The days that a well goes offline

onshore completion programs 35% faster

result in deferred production that destroys

while exceeding expected oil production

the financial model of the field,” he said,

by 50%. Concurrently, real-time downhole

stressing that losing that production costs

monitoring and automated completion

ten times more than what it would cost to

toolsets provide continuous data streams to

install the flexible technology required to

maintain well integrity and protect flow rates

keep the well running.

over the asset lifecycle.


11

Finding unproduced oil pockets in complex

Connecting subsurface intelligence to

reservoirs requires updating subsurface

surface facilities requires replacing slow,

geological models rather than drilling

periodic desktop iterations with integrated

speculative exploratory wells. Rossy Pérez,

digital architectures and automated well

General Manager Mexico, Beicip-Franlab,

construction. Industry insights from SLB

emphasizes that static subsurface models are

emphasize that evaluating hundreds of

no longer sufficient for complex reservoirs.

simulation scenarios simultaneously allows

Utilizing dynamic stratigraphic modeling

engineering teams to identify which variables

and seismic inversion software allows

truly impact asset performance across

engineers to map facies architecture and

complex reservoirs.

fluid flow in real time. Pérez highlights that subsurface evaluation must be approached

Edmundo Leyva, Commercial Director, SLB,

as an integrated unit from start to finish,

stresses that surface logistics and end-to-

connecting geology, well construction, and

end integration are vital. “You can easily gain

surface facilities. “We frequently find that the

production at the wellhead, but if you lack

problem is not necessarily the reservoir, but

adequate preparation in water separation,

the mechanical state of the well or surface

gas handling, transportation, and surface

infrastructure that cannot sustain what the

logistics, that production stalls,” he said.

reservoir is capable of producing,” she says,

Leyva advocates for closing the value chain

adding that while AI accelerates study results

to minimize the friction steps between

from months to minutes, it must remain

data acquisition, evaluation, decision, and

grounded in reservoir physics and validated

execution.

by domain experience. Furthermore, with mature fields projected

Closing the Surface-Subsurface Loop with Digital Industrialization

to account for 80% of global hydrocarbon production by 2030, recovering lower-cost incremental barrels requires shifting from

According to technical analysis by SLB,

reactive, one-off repairs to vendor-agnostic

leveraging cloud computing and AI-driven

digital platforms like IDEX. Reflecting

automated data handling reduces the friction

on 28 years in the sector, shifting from

of manual data conditioning, transforming

passing directional surveys over analog

periodic reservoir studies into continuous

radio to remotely monitoring 3,000 wells

digital representations of the asset. This

and managing automated valve networks

dynamic approach de-risks secondary

p r o d u c i n g 7 0 0 M b /d , L e y v a a r g u e s

and tertiary recovery (EOR) strategies by

that mature fields demand full process

pinpointing exact bypassed reserves within

industrialization, shifting response times from

existing field limits.

hours to minutes.


12

By digitizing well surveillance, automating

downhole scaling or pressure drops before

procedure execution, and establishing

total production loss occurs. Ultimately,

standardized workflows across drilling,

fostering strategic collaboration among

completion, and plug and abandonment

international service providers, operators, and

(P&A), operators can continuously rank

local Mexican companies while developing

intervention candidates across an entire

a new generation of talent will ensure the

portfolio, close the feedback loop between

country’s energy sector delivers sustainable,

execution and post-job learning, and prevent

long-term returns.

DECARBONIZING UPSTREAM: PATHWAYS TO LOW-CARBON E&P IN MEXICO

Experts at Mexico Oil and Gas Summit

determine whether low-carbon projects

2026 argue that upstream decarbonization

advance. The first is precise measurement

in Mexico depends on precise emissions

of where emissions occur. The second is

measurement, fast-deployable gas capture

fast-deployable gas capture and power

and modular power, and early community

technologies. The third is a social license

engagement. With PEMEX flaring and venting

that recent court rulings have made legally

rising in 2026 and Mexico still required to

unavoidable.

use 98% of associated gas, panelists from Emerson, Inerco Consulting, ERM, aosenuma,

“58% of Mexico’s GHG emissions come from

and Aggreko frame emissions reduction as

the oil sector. Lowering emissions requires

an operational efficiency and financing issue.

increasing operational efficiency through

A recent Supreme Court ruling that lets indigenous communities join constitutional disputes makes social license a precondition for project viability. Mexico’s oil and gas operators can no longer treat emissions reduction and production growth as competing agendas, according to experts at Mexico Oil and Gas Summit 2026. Speaking on a panel about upstream decarbonization, executives from Emerson, Inerco Consulting, ERM, aosenuma, and Aggreko argued that three things now


13

the integration of new technologies,” says

flaring and methane-reduction projects

Sara Landon, Executive Director, Inerco

with support from the Global Flaring and

Consulting.

Methane Reduction Partnership (GFMR), reports MBN. In 2Q26, PEMEX and GFMR

Landon cites a 2026 World Bank report that

formalized studies for gas recovery systems

places Mexico fifth worldwide for gas flaring,

at gas processing centers including Cactus,

at 9.6 billion m³ per year. She adds that 2025

according to the company’s 2Q26 report. The

estimates from the International Energy

stakes extend beyond climate commitments:

Agency put the country’s methane output

every cubic foot of gas flared is a cubic foot

at about 1.2 million t, with roughly 696,000t

that must be imported at market price.

tied to offshore activity. Before discussing technology, she says, operators need to know

From Detection to Distributed Power

exactly where emissions occur, how they are distributed, and how large they are across the

Measurement is also becoming a financing

territory. Continuous, site-specific monitoring

condition. Mexico reported just 3% of its

must then support solutions that are also

oil and gas output under the UN’s OGMP

economically viable, such as gas compression

2.0 framework in 2025, and PEMEX has

and modular power generation units.

yet to join, reports BNamericas. Reaching the framework’s highest level requires top-

Ana Matute, Marketing Director Latin

down tools such as satellites, drones, and

America, Emerson, frames the challenge

aircraft-mounted sensors. Yet continuous

as an operational opportunity rather than a

measurement represents only 0.03% to 0.6%

trade-off. “Sustainability and productivity are

of gross production value, and many leak

not at odds. On the contrary, sustainability is

detection and repair programs pay back in

critical to reaching the long-term objectives

under 12 months. bnamericas

held by the oil sector,” says Matute. She points to the regulatory requirement that operators

Where captured gas has no pipeline outlet,

use 98% of associated gas.

modular power offers an alternative to flaring

That target remains distant. PEMEX sent

or diesel. Aggreko, represented on the panel

618MMcf/d of natural gas into the atmosphere

by Developer of Mini Grid Energy Projects

in 1Q26, a 78.6% increase from 346MMcf/d

Nicté Ovando, has documented microgrid

in 1Q25 and equivalent to 12.7% of total gas

deployments that run entirely on natural gas

production, according to PEMEX’s 1Q26

and become operational within 14 days. The

results. PEMEX has formally endorsed

generators each ship on a single truck, cutting

the World Bank’s Zero Routine Flaring by

freight and crane costs by 50%. When paired

2030 initiative and identified 35 priority

with battery storage, these systems absorb


14

load spikes from artificial lift equipment and

as interested third parties, social license is

avoid costly shutdowns. They also turn site

a nonnegotiable precondition to project

gas into on-site electricity.

viability,” says Alfonso Caso, Partner & Founder, aosenuma. On Aug. 25, 2026,

Social License as a Legal Precondition

the Supreme Court recognized indigenous communities as interested third parties in

Panelists stressed that technology alone will

constitutional controversies that may affect

not carry projects forward. “Real sustainability

them, for the first time, reports La Jornada.

is achieved through development that

The ruling does not allow communities to

satisfies current needs without compromising

initiate a controversy, but it does let them

those of the future, balancing economic

intervene in one already underway, review the

growth and environmental responsibility,”

case file, and present arguments.

says Alejandro de Jesus, Senior Partner, ERM. He points to water scarcity, physical security,

Fo r o p e rato r s , t h e r u l i n g re i n fo rce s

infrastructure gaps, and shifting regulation

requirements lenders already apply. Banks

as challenges operators face alongside

that follow the IFC Performance Standards

emissions. He says future energy projects

and the Equator Principles require social

will be judged by more than the energy they

impact assessments before issuing credit. That

produce. They will also be judged by their

makes early stakeholder mapping, territorial

capacity to deliver reliable, low-carbon power

intelligence, and security risk analysis

while protecting biodiversity, managing

prerequisites for capital, not afterthoughts.

water responsibly, and creating shared value

Emissions infrastructure is expected to

for surrounding communities.

operate for 20 to 30 years. Panelists concluded that aligning decarbonization with

That shared value now carries legal weight.

local development is what allows those assets

“With indigenous communities now entitled

to remain in operation.

to participate in constitutional disputes

MEXICO OILFIELDS BALANCE AI, COSTS AND OPERATIONAL RESILIENCE

At the Mexico Oil & Gas Summit 2026,

success in Mexico hinges on balancing high

industry leaders highlighted that while

deployment costs with operational resilience,

advanced technologies like AI, predictive

cash flow stability, and collaborative financial

analytics, digital twins, and robotics are

frameworks.

critical for optimizing oilfield operations, their


15

The Mexican energy sector is experiencing a

highlighted the use of drones, crawlers, mini-

significant operational shift. At the Mexico Oil

ROVs, LiDAR, and sonar to inspect offshore

& Gas Summit 2026, industry experts met to

and onshore infrastructure.

discuss how next-generation oilfield services can navigate the complex balance between

“Collecting data through robotics is only the

cutting-edge technology, cost efficiency,

first step,” says Pizzato. “The real value lies in

and operational resilience. As operators face

processing and analyzing that data to create

increasing margin pressures and technical

actionable insights for asset management”.

challenges, the integration of advanced tools has moved from a future concept to an

From an automation perspective, Francisco

operational necessity.

Zamudio, Service Sales Manager, ABB Automation Energy Industries, emphasized

“AI and digital transformation are changing

how digital applications optimize processes.

how we view operational health,” says Cesar

Zamudio stated that ABB focuses on

Vera, Commercial Officer, CEMOG. Vera notes

integrating digital tools to improve client

that while technology provides massive

efficiency, increase future profitability, and

amounts of data, the human element remains

lower operating costs while maintaining high

essential to interpret dashboard insights and

safety standards.

drive meaningful action on the ground. “AI does not replace human engineers,” says

Technical Solutions and Industrial Automation

Zamudio. “It accelerates knowledge and enriches decision-making processes across complex operational environments”.

Panelists detailed how specific digital tools and hardware are currently deployed across

F u r t h e r i n g t h e f o c u s o n p re d i c t i ve

Mexican oilfields. Daniel Pizzato, President,

capabilities, Julio Cesar Ortiz, Director Mexico

Aerial UAS Solutions, explained the role

Control Systems & Software, Emerson,

of robotics and autonomous systems in

addressed the transition toward predictive

m a i n t a i n i n g a ss e t i n te g r i t y. P i z z a to

maintenance and digital twins. He also noted that combining information technology with operational technology allows operators to anticipate equipment failures rather than merely responding to them. “Machine learning models allow us to analyze dynamic equipment like pumps, turbines, and compressors,” says Ortiz . “By simulating conditions through digital twins before field implementation, operators significantly reduce operational risks and optimize costs”.

Financial Strategies and Market Bottlenecks While technical solutions offer high potential, severe financial headwinds in the Mexican market create major deployment bottlenecks. O p e rat i o n a l co n t i n u i t y i s f re q u e n t l y threatened by delayed payment cycles and tight cash flows.


16

Te re s a G a l l e g o s , S t ra t e g i c L e g a l &

Gulf Latin America, stressed the necessity

Tr a n s a c t i o n a l E xe c u t i v e , E n e r g y &

of flexible commercial models. Hernández

Infrastructure, outlined the scale of these

emphasized that maintaining a skilled

commercial challenges. Gallegos pointed out

workforce and sustaining long-term projects

that PEMEX recorded significant accounts

requires financial structures that protect

payable burdens, creating financial pressure

cash flow while encouraging continuous

across the supply chain.

innovation.

“Cash flow uncertainty remains a critical risk

“Navigating current market realities requires

factor for service providers,” says Gallegos.

strong collaboration across the entire value

“To ensure continuity, companies must

chain,” says Hernández. “Without balanced

leverage structured commercial frameworks,

commercial terms, technical innovation

strategic alliances, and innovative financing

cannot reach its full potential in the field”.

mechanisms”. The overarching consensus among the Gallegos cited existing financial instruments

experts was clear: technology alone cannot

such as development bank programs,

solve the challenges of the Mexican energy

factoring schemes, and special purpose

market. Achieving true operational resilience

vehicles designed to maintain liquidity for

requires a comprehensive strategy that pairs

contractors.

advanced technical tools, such as AI, robotics, and digital twins, with sound financial

Complementing this perspective, Daniel

management and collaborative commercial

Hernández, Managing Director LATAM,

structures.

MEXICO’S UPSTREAM PRIORITIES: SOVEREIGNTY, OPTIMIZATION AND ESG impacts PEMEX, private operators, energy regulators, and industrial gas consumers across Mexico’s energy value chain. Sustaining strategic upstream development while managing PEMEX’s financial liabilities, which stood at US$84.5 billion at the start of 2026, requires innovative capital-deployment frameworks. Experts say long-term balance sheet stability dictates how operators structure co-investment models across core producing assets and exploration blocks. The federal government provided US$21.7 billion in financial assistance to PEMEX in 2025 alone, yet short-term supplier debt Mexico’s upstream sector must manage

remained critical at approximately US$28

PEMEX’s US$97.3 billion debt and US$28

billion. Furthermore, SENER’s mixed-contract

billion supplier arrears while attempting to

model has seen slow adoption, with only five

sustain 1.8MMb/d baseline crude output and

of 21 planned contracts awarded by late 2025,

reduce natural gas imports. To address a 51.2%

contributing a marginal 40Mb/d against

spike in methane emissions, state and private

the backdrop of total national production

stakeholders are shifting toward public-

averaging below 1.6MMb/d.

private partnerships, international abatement grants, and fiscal incentives to fund capture

Addressing this funding gap, Javier Mundo,

infrastructure. This strategic pivot directly

Head of Energy and Natural Resources for


17

Mexico and Central America at KPMG, points

in plays like Chicontepec. Furthermore,

out that while renewable energy is gaining

resolving contractor payment delays and

global traction, hydrocarbons will remain

maintaining clear legal and regulatory

indispensable to the energy mix for decades

functions remain essential to fostering

to come, making upstream investment

investor trust in these joint structures.

models vital for national sovereignty and sustainability. “Mexico has every type of

“Aligning the fiscal regime was necessary

reservoir imaginable, from deepwater and

to make Mexico competitive against other

shallow-water to carbonated formations,

jurisdictions,” says Brügmann. He explains

heavy oil, light crude, and non-conventional

that the main challenge now lies in natural

plays,” says Gaspar Franco, Co-Founder and

gas and surface infrastructure, where fiscal

Director of Technical Strategy and Energy

incentives are required to attract capital for

Regulation, Fraguva Energy.

midstream gathering and processing. PPPs serve as an essential vehicle to bridge state

Franco notes that this geological diversity

capital constraints across the hydrocarbon

allows any profile of company to enter and

value chain, provided projects establish

deploy specialized technologies, because no

strong social licenses and clear legal certainty.

single operator can address these challenges alone. Franco adds that Mexico possesses the legal mechanisms to deploy investment,

Technical Balance, Risk-Sharing, and Process Industrialization

provided regulators and authorities maintain the openness to dialogue and create the

Arresting steep decline rates across mature

necessary conditions to translate potential

onshore and shallow-water reservoirs, where

into barrels at the surface.

national liquid production fluctuates around 1.6MMb/d, demands specialized subsurface

Andrés Brügmann, Partner, SL Intelligence,

research and field recovery technologies.

highlights that public-private partnerships

“Each party must do what it needs to do at

(PPPs) offer a viable path to boost sector

the exact moment it needs to do it,” says

infrastructure and capital deployment,

Édgar Kiyoshi Nakamura, Head of Exploration

provided projects establish strong social

and Extraction at the Instituto Mexicano del

licenses. Brügmann emphasizes that

Petróleo (IMP). He emphasizes that when

PPPs serve as a key vehicle for the new

problems arise, true risk-sharing keeps

administration to bridge state capital

partnerships together, and that decision-

constraints, particularly across PEMEX’s

making in a capital-intensive industry must

hydrocarbon value chain, from natural

be supported by technical and scientific rigor

gas production, processing, storage,

to eliminate uncertainty.

and transportation to petrochemical modernization and complex field extraction


18

To maximize recovery factors across aging

cheap US import prices. Without accelerated

assets, which account for over 400 of Mexico’s

development of unconventional reserves

700 fields, operators deploy secondary and

and key offshore fields like Zama and Trion,

tertiary enhanced oil recovery techniques

long-term projections from the International

alongside advanced subsurface research.

Energy Agency (IEA) warn that Mexico

IMP is deploying specialized mechanical flow

risks becoming a net importer of crude oil,

control devices, such as Venturi-type tools,

importing up to 500Mb/d by 2030.

which leverage natural reservoir pressure to sustain continuous production in mature gas

“Over half of Mexico’s prospective resources

wells, delivering flow increases ranging from

lie in non-conventional reservoirs,” says

20% to 50%.

Brügmann. observes that because standalone gas projects struggle to cover infrastructure

In complex high-pressure, high-temperature

costs at current import prices, operators must

environments like the Ixachi field, the IMP

develop gas and crude in a unified, holistic

provides aerospace-grade downhole tools,

strategy, leveraging secondary recovery and

dynamic column simulation, and offshore

co-located liquids to fund gathering and

structural lifespan assessments to de-risk

transportation networks. Growing energy

operations. Managing field decline does not

demand from data centers and industrial

depend on a single silver-bullet technology,

expansion across North America could cause

but on identifying the optimal technological

pipeline gas prices to surge significantly

combination tailored to each field’s specific

over the coming decade, making domestic

mechanical and pressure conditions, which

midstream development an urgent priority.

can boost recovery factors by up to eight percentage points.

Operational continuity is directly linked to infrastructure integrity, as aging offshore

Mitigating Natural Gas Dependency and Infrastructure Bottlenecks

platforms, many approaching 50 years of continuous operation, face rising maintenance friction that threatens daily throughput and

Expanding domestic natural gas extraction

workforce safety. “Much of the offshore

across shallow-water, deepwater, and

infrastructure is reaching or exceeding

unconventional plays remains critical to

its fifty-year operational lifespan, making

mitigating national energy vulnerability, as

asset integrity a critical priority to prevent

Mexico currently relies on imports, primarily

accidents and protect baseline production,”

US pipeline gas, for approximately 75% of its

says Eckhard Hinrichsen, Country Manager,

total consumption. Key domestic natural gas

DNV. He advocates for deploying field-level

initiatives, such as the deepwater Lakach field

gas capture, platform electrification via

development, continue to face delays due

subsea power cabling (Power-from-Shore),

to narrow margins when competing against

and virtual gas distribution networks to


19

connect stranded production directly to

Enforcing strict environmental standards

regional industrial hubs.

while maintaining output requires deploying direct emission-mitigation technologies

Decarbonization, Emission Abatement, and ESG Standards

across surface facilities. Brügmann notes that private projects are adhering to stringent ASEA methane programs and CNH natural

Enforcing strict environmental standards

gas guidelines by deploying advanced

while maintaining output requires deploying

technologies, including gas-to-ammonia

direct emission-mitigation technologies

modular units and AI systems for platform

across surface facilities. State operators

and terminal management.

face severe environmental pressure, with methane emissions rising 51.2% in 1Q26 and

According to DNV’s Energy Industry Insights

flaring and venting reaching up to 3.925

2026, 74% of energy executives view oil and

Bcf/d, wasting 5.5% to 6% of total national

gas as essential to maintaining long-term

gas production. To address these liabilities,

energy security, prompting operators to pivot

the IMP is deploying physical inspections,

toward operational efficiency, a top priority

drone surveillance, automatic monitoring

for 81% of sector leaders. DNV highlights

systems, and satellite imaging to quantify

that integrating AI-driven monitoring and

and eliminate methane leaks across onshore

automated systems in field operations

and offshore facilities, while developing

delivers 1% to 2% in direct OPEX reductions.

ultra-selective metal-organic catalysts to

Meanwhile, scaling continuous methane

separate carbon dioxide and nitrogen from

leak detection and expanding global CCS

sour gas streams.

capacity, which is projected to grow by 70% in the near term, allows producers to lower

“The industry is effectively operating in an

carbon intensity per barrel without sacrificing

emissions surgery room, and we must rapidly

baseline supply.

implement proven technologies to reduce leak rates,” says Hinrichsen. He highlights

“Mitigating emissions and flaring must be

that DNV is partnering with operators on

viewed not only as a financial calculation

satellite leak detection, flaring recovery

or regulatory mandate, but as an ethical

systems, platform electrification, and modular

responsibility,” says Franco. He concludes that

liquefaction units in regions like Veracruz to

operators adopting proactive environmental

repurpose vented gas into high-value LNG or

standards and collaborative technology

marine fuels. Hinrichsen notes that PEMEX’s

frameworks will secure long-term capital and

formal endorsement of the World Bank’s Zero

drive sustainable production for the country.

Routine Flaring by 2030 initiative marks a vital step toward international environmental alignment.

REJUVENATING MATURE OIL FIELDS: PROFITABLE LOW-CARBON BARRELS At Mexico Oil and Gas Summit 2026, TriGen

Kapteijn says consortium-based contracting,

Energy CEO Pieter Kapteijn proposed

regulatory flexibility, and technology transfer

rejuvenating Mexico’s mature oil fields

are needed to make the projects bankable.

by pairing pressurized oxy-fuel power generation with CO2-enhanced oil recovery.

Mature oil fields offer Mexico its fastest

Based on 15 PEMEX fields holding about 7Bb

and lowest-risk path to new production.

of original oil in place, the model could add

When combined with carbon capture, they

650MMb to 820MMb of incremental crude

can also cut the emissions of every barrel

and sustain 150Mb/d of production. It would

they produce, says Pieter Kapteijn, CEO,

also store 200 million to 250 million t of CO2.

TriGen Energy. Speaking at Mexico Oil and


20

The Case for Mature Fields Kapteijn says a world-class discovery can take eight to 12 years to reach production. Mature fields, by contrast, already have wells, surface infrastructure, trained personnel, and decades of reservoir data. “The fastest way to get to new barrels is to go to a place where you already have operating fields,” he says. Because those fields have been operated for so long, the subsurface risk that usually concerns investors most has largely been resolved. The remaining upside is significant. Kapteijn explains that primary depletion typically Gas Summit 2026, Kapteijn presented a

recovers 10% to 15% of original oil in place,

model that pairs pressurized oxy-fuel power

waterflooding adds 20% to 25%, and

generation with CO2-enhanced oil recovery

enhanced oil recovery can yield another 15%

(CO2-EOR). Applied to 15 PEMEX fields,

to 20%. He describes the EOR phase as a

he says, the model could add 650MMb

source of short-term, low-cost energy for a

to 820MMb of incremental crude while

country with existing reserves. TriGen’s model rests on pressurized oxy-fuel

“CO2 is bad for the environment, but for the oil

combustion. The process burns gas with pure

industry, CO2 can have a lot of value because

oxygen and converts it into power, water,

you can use it for enhanced oil recovery”

and a concentrated CO2 stream. Kapteijn

Pieter Kaptejin

says the technology tolerates contaminated

CEO | TriGen

reducing the carbon footprint of production by about 50%. “CO2 is bad for the environment, but for the oil industry, CO2 can have a lot of value because you can use it for enhanced oil recovery,” says Kapteijn. The proposal arrives as Mexico’s reserve base continues to erode. PEMEX’s proven reserves fell from 12.4Bboe in 2014 to 7.471Bboe at the close of 2025, a decline of about 40%, according to MBN. At current production rates, the company’s proven reserves under SEC methodology cover roughly eight years and nine months of output. Meanwhile, PEMEX’s total hydrocarbon production averaged 2.44MMboe/d in 2Q26, up 4.6% from 2Q25, reports MBN.

gas, biogas, and landfill gas. The CO2 is then


21

injected into mature reservoirs to recover

limited because every component is proven.

additional oil. At the end of the EOR cycle,

Oxy-fuel combustion has logged 10,000

the field is repressurized so that up to 80% of

hours in EU industrial pilots, and CO2-EOR

the injected CO2 remains stored permanently.

has operated in the US for more than 50

Kapteijn compares the process to a washing

years. The power cycle also relies on steam

machine that rinses oil from the reservoir over

turbines rather than gas turbines, which

several cycles.

Kapteijn says avoids the supply bottlenecks created by demand from data centers and

The system produces four revenue streams.

hyperscalers.

The first is power, which Kapteijn notes can command a premium of 20% to 30% in some markets when it is certified as clean.

Commercial Design and Regulatory Space

The second is fresh water, since the process produces water rather than consuming it. The

Kapteijn identifies commercial engineering as

third is incremental oil. The fourth is carbon

the main challenge rather than technology.

storage that generates credits. Because the

A value chain that links gas, power,

carbon embedded in that oil has already been

infrastructure, and oil companies requires

captured, TriGen markets it as “blue barrels.”

partners with different risk profiles to

According to TriGen’s presentation, each site

agree on a shared framework. “The normal

could deliver 150MWe of firm power, 19Mb/d

contracting models do not work, because in

of fresh water, and 8Mb/d of incremental

a value chain, what you trade between the

oil. Each site would also sequester about

partners is risk and reward,” he says.

820,000t/y of CO2 and extend field life by 12 to 18 years.

To overcome this barrier, Kapteijn proposes a lighthouse project. It would bring together

A Portfolio Opportunity for PEMEX

a consortium of technology, sensing, and service providers to demonstrate the model to

TriGen has studied PEMEX’s mature assets

PEMEX and the government. He says storage

over the past decade. Across 15 fields

integrity would be central to certification,

representing about 7Bb of original oil

which creates demand for monitoring, AI,

in place, Kapteijn says, the model could

and digital asset modeling. The consortium

sustain 150Mb/d of incremental production

would also serve as a vehicle for technology

and reach that plateau within seven to nine

transfer to Mexican universities, workers, and

years. The portfolio would store 200 million

institutions.

to 250 million t of CO2. He estimates required CAPEX at US2.5billiontoUS3.5 billion, with

Regulation must evolve as well. “We need

many screened projects exceeding internal

the flexibility from the regulator to give us

rates of return of 30% to 40%.

the space to demonstrate, and once you have demonstrated the value of it, it will

Integration is what makes those returns

become the new norm,” says Kapteijn. He

possible, says Kapteijn. CO2-EOR and carbon

adds that a field delivering power, water, oil,

storage are often unprofitable on their own,

and carbon credits simultaneously requires

but combined in a single system they reinforce

a new regulatory framework, and TriGen is

each other. He adds that the technical risk is

seeking a first project in Mexico to prove it.

ONE PLAY, TWO COUNTRIES: AN EAGLE FORD PLAYBOOK FOR MEXICO Mexico can accelerate its unconventional

from the US Eagle Ford shale play. Analyzing

energy development and avoid costly

performance metrics across more than

operational mistakes by applying 15 years of

33,000 horizontal wells demonstrates that

technical, operational, and commercial data

long lateral lengths, optimized proppant


22

provides a clear playbook for Mexican field operations. Juárez says that the Eagle Ford play functions as an exceptionally complete natural laboratory for Mexico due to its geological continuity across the border and extensive dataset spanning more than 33,000 horizontal wells. “The Eagle Ford play provides a mature dataset that allows new basins to bypass a decade of trial and error,” Juárez says. Since its discovery around 2008, the Eagle Ford play transitioned from initial exploration to rapid scaling, underwent a downspacing adjustment in 2020, and settled into capitaldisciplined optimization. Running from the Mexican border near Laredo northeast across 30 South Texas counties, the formation features carbonate-rich, brittle mudstone deposited at depths between 4,000– 14,000ft. Thermal maturity fairways grade

“The Eagle Ford play provides a mature

from up-dip black oil to down-dip dry gas,

dataset that allows new basins to bypass

requiring tailored development plans for each

a decade of trial and error”

Fidel Juárez Mexico Country Manager and Team Lead, Reservoir Engineerin | Sproule ERCE

fluid window.

Operational Lessons in Well Design and Spacing Historical performance data reveals key

intensity, and controlled well spacing lower

operational shifts that defined the maturity

production breakevens to US$42/b, offering

of the Eagle Ford play. Over the past decade

a structured playbook for developing

and a half, operators doubled effective

domestic basins such as Burgos and Sabinas.

lateral lengths from 4,000 feet to 10,000ft, spreading fixed drilling costs over expanded

Mexico stands at a strategic crossroads as the nation seeks to reduce its reliance on imported natural gas and strengthen domestic energy security. To unlock its substantial shale potential in northern regions such as the Burgos and Sabinas basins, Mexican energy authorities are reevaluating technical and financial frameworks for unconventional resource development. Fidel Juárez, Mexico Country Manager and Reservoir Engineering Team Lead at Sproule ERCE, outlined at the Mexico Oil and Gas Summit 2026 how 15 years of operational history from the South Texas Eagle Ford play

reservoir contact.


23

Simultaneously, proppant intensity tripled

Under benchmark pricing assumptions of

from 785lb/ft to a plateau of 2,250–2,470lb/

US3.00/Mcf Henry Hub, the single-well model

ft. However, per-foot productivity flattened

yields a gross estimated ultimate recovery of

around 100boe per 1,000ft, indicating that

1.844Mboe. It generates a net present value

increased completion intensity eventually

at a 10% discount rate of US41.77/b.

yields diminishing returns per foot of rock. Liquid hydrocarbons drive overall project Well spacing represented another crucial

economics despite representing a smaller

learning curve. Between 2015–2016, operators

fraction of physical output. In the wet gas

pushed well density from 2.4 wells per section

model, oil and condensate account for 17.7%

to a peak of 9.5 wells per section, tightening

of sales volume but generate 43% of total

inter-well distances to 560 feet.

gross revenue.

This aggressive downspacing triggered

Natural gas liquids contribute 26% of gross

severe parent-child interference, where

revenue, while natural gas accounts for 31%.

younger child wells suffered pressure

Juárez says that mapping thermal maturity

depletion and lower recovery rates from

fairways before setting economic targets is

nearby parent wells. Industry operators

essential, as high-value liquids significantly

subsequently pulled back, establishing an

enhance project cash flows.

optimal density of eight wells per section at an average spacing of 750ft. Juárez says that

Total discounted revenues of US6.23 million,

section co-development must be prioritized

while severance taxes deliver US$1.16 million

over late infill drilling to prevent reservoir

to fiscal authorities, exceeding the net

interference.

present value retained by the operator.

Single-Well Economics and Revenue Dynamics

A Stage-Gated Roadmap for Mexican Field Development

To demonstrate commercial viability, Sproule

To successfully replicate these outcomes,

ERCE evaluated a representative 75-well

Sproule ERCE recommends a structured,

sample within the wet gas window. The

stage-gated development strategy for Mexico

modeled single well features a 10,640ft

rather than rushing from isolated successful

lateral, a true vertical depth of 8,053ft, and

wells into full-field expansion.

a total drilling, completion, and tie-in cost of US$7.7 million.

During the short term, covering the first 12 months, operators and regulators should


24

reprocess subsurface data, map fluid

infrastructure and maintaining a continuous

windows, and shortlist initial pilot areas in the

drilling cadence. Because shale production

Burgos basin. In the medium term, spanning

exhibits steep initial decline rates, sustaining

1–3 years, targeted appraisal programs must

regional volume requires an active drilling

test lateral lengths, completion designs, and

pipeline rather than a single capital injection.

inter-well spacing while developing local supply chains and water recycling systems.

Juárez says that adhering to stage-gate technical criteria at each milestone will

Long-term commercial scaling after three

ensure long-term capital efficiency and de-

years requires establishing midstream

risk Mexico’s unconventional energy future.

CAPITAL, LIQUIDITY, DE-RISKING FOR PROJECT BANKABILITY Securing capital for energy infrastructure

industry leaders emphasize that bankability

in Mexico requires structured supply chain

for both public and private projects hinges on

finance and legal de-risking under the

innovative supply chain financing, transparent

regulatory framework of SENER and the CNE.

mixed-investment contracts, and rigorous

With supplier backlogs exceeding US$20

ESG compliance.

billion, financial tools like factoring, payment

Evaluating project bankability under

trusts, and clear mixed-contract governance

Mexico’s evolving energy framework

are essential to maintaining contractor

requires lenders to move beyond traditional

liquidity. These mechanisms directly impact

off-taker credit profiles toward structured

financial institutions, energy developers,

risk-allocation mechanisms. Commercial

oilfield service providers, and institutional

lenders and development banks require

investors operating across Mexico’s energy

defined contractual guarantees within mixed-

value chain.

investment structures, where clear rules governing default remedies, administrative

Securing long-term capital and protecting

functions, and dispute resolution are

co n t ra c to r l i q u i d i t y a c ro ss M ex i co ’s

essential to establishing investor trust.

evolving energy sector requires structured

Gleb Kouznetsov, Energy Finance Director,

financial engineering, clear risk allocation,

Bancomext, points out that structural shifts

and regulatory predictability. As market

in state energy policy, specifically increased

part icipan t s adapt to th e n ew l e g a l

domestic refining capacity that reduced

frameworks established under SENER and

crude export volumes and delayed supplier

the National Energy Commission (CNE),

payment cycles, have altered investor


25

appetite, forcing financial institutions to

accounting for 13% to 15% of the total oilfield

look beyond traditional state balance-sheet

services sector, which faced unpaid supplier

guarantees.

backlogs exceeding MX28 billion from 2024 alone. “When there are contractual defaults

Achieving national energy ambitions hinges

or delayed payments from the main state

on bridging the gap between commercial

operator, service companies are forced

banking and field execution, as public

to seek high-cost emergency financing,

funding alone cannot cover necessary capital

equipment leasing, and debt assignments

expenditures. “The updated Hydrocarbon

just to survive,” explains Espino, calling

Sector Law provided long-term stability

for structural solutions that go beyond

that will enable project financing, because it

temporary factoring to restore liquidity.

set a linear production target of 1.8 MMb/d until 2039,” states Rafael Espino, President,

Extended payment cycles continue to exert

AMESPAC. He notes that while PEMEX’s

severe financial pressure across energy

investment budget saw an MX$8 billion

supply chains, threatening the operational

(US$442.2 million) increase, federal financial

stability of service providers and Tier 1 and

support was reduced by over 70%, making

Tier 2 vendors. In the oil and gas subsector,

private debt syndication essential to hitting

the Association of Mexican Oilfield Service

national liquid and gas production targets.

Companies (AMESPAC) reports that PEMEX’s unpaid supplier backlogs, exceeding US$20

According to Estela Campuzano, Legal and

billion, alongside administrative processing

Regulatory Compliance Director at Energía

bottlenecks in invoicing systems like

Regional, project bankability rests on six

COPADE, directly constrain field execution

fundamental pillars: explicit risk allocation,

and maintenance.

mandatory ESG integration, predictable cash flows, matching contractual terms, regulatory

Risk transparency remains the central hurdle

stability, and permit enforcement. “Mexico’s

for commercial institutions evaluating

updated Hydrocarbon Sector Law will be

Mexican energy infrastructure. “If we do not

key to attracting investment, providing a

know which risk each party will assume, we

15-year horizon of visibility across the value chain,” Campuzano points out. However, she cautions that specific regulatory bottlenecks, such as Article 93 of the Hydrocarbon Sector Regulations limiting commercialization permits to non-renewable 2-year terms, create entry barriers for off-takers attempting to secure long-term project financing.

Preserving Supply Chain Liquidity and Contractor Working Capital Extended payment cycles continue to exert severe financial pressure across energy supply chains, threatening the operational stability of service providers and Tier 1 and Tier 2 vendors. Extended backlog processing in administrative invoicing systems like COPADE directly constrains field execution and routine maintenance across core basins. To illustrate the scale of this pressure, AMESPAC represents 60 member companies


26

do not have the confidence we need to invest

Diversifying payment sources away from

in a hydrocarbon project,” emphasizes Omar

single-source state treasuries is critical to

Castillo, Senior Vice President GTB CIB, BBVA.

unlocking private capital. “The main challenge

To navigate these constraints, commercial

in financing mixed-investment projects

banks are structuring off-balance-sheet

is establishing third-party commercial

inventory financing with trading partners,

off-takers or private trade intermediaries

contract monetization, and trust structures

to diversify payment sources,” explains

to maintain healthy cash flows without

Kouznetsov. To help mid-sized service

overburdening contractor debt covenants.

providers survive extended state payment cycles, development banks are structuring

Legal Governance and Contractual Certainty in Mixed-Investment Models

flexible credit solutions, such as capped revolving credit lines, custom amortization schedules, and cross-guarantees backed

Ensuring long-term creditworthiness in mixed-

by healthier corporate affiliates rather than

investment hydrocarbon models requires

relying solely on PEMEX receivables.

robust corporate governance, transparent off-taker agreements, and unambiguous contractual design. Navigating regulatory

ESG Compliance, Social Impact, and the Cost of Capital

oversight under the CNE demands explicit legal safeguards to minimize administrative

E S G st a n d a rd s , m e t h a n e a b a te m e n t

discretion and protect investor confidence.

programs, and Social Impact Assessments (MIS) directly impact capital costs and loan

Building institutional investor trust requires

syndication access. Commercial banks and

legal frameworks that clearly separate state

international financial institutions increasingly

allocation rights from private economic

treat ESG compliance as a non-negotiable

rights so contractual rights can be assigned

prerequisite for debt closure.

as collateral for debt financing. “Mexico’s oil sector requires risk-sharing, ESG compliance,

Lenders increasingly view sustainability

transparent revenue streams, amortization-

as a direct proxy for financial health. “ESG

compatible contracts, and regulatory

compliance is no longer just a voluntary

certainty,” asserts Campuzano, stressing

commitment or a marketing tool; it directly

that robust governance must incorporate

determines project bankability and loan

international arbitration standards, creditor

pricing,” Castillo stresses, noting that energy

step-in rights, and strong operational

projects failing to satisfy environmental

committees capable of adjusting capital

baselines or social impact requirements

expenditures dynamically.

face higher credit risk premiums, whereas compliant operators gain access to broader


27

international capital pools at competitive

shared risk-taking will allow Mexico to protect

interest margins.

its supply chain liquidity, lower its overall cost of capital, and achieve long-term energy

Arturo Medellín, Partner, McKinsey &

security. “Market momentum will come

Company, stressed that while regulatory

down to three fundamental things: absolute

frameworks and financial structures have

clarity on project goals, satisfactory risk

evolved, market acceleration ultimately

management with fair risk allocation among

depends on operational execution. Aligning

all parties, and a contractual execution that

commercial banks, development institutions,

proves agreements are honored under this

operators, and service providers around

administration,” Medellín concluded.

OPERATOR UPSTREAM OUTLOOK:VALUE CREATION AND EXECUTION EXCELLENCE Private upstream operators at Mexico Oil

same factors will decide whether Mexico

and Gas Summit 2026 identified payment

can attract the capital needed to develop its

certainty, equipment availability, and contract

natural gas resources.

design as the main factors behind on-time, on-budget execution in Mexico. Executives

“Within the Mexican oil sector, it is crucial

from Consorcio Petrolero 5M del Golfo,

to guarantee suppliers that they will be paid

Hokchi Energy, Mexico Petroleum Company,

on time and have sufficient commercial

and Harbour Energy described strategies

substance to actually lower costs,” says

ranging from contingency planning and

Oscar Roldán, Director, Consorcio Petrolero

phased development to trust-based project

5M del Golfo.

financing. They also argued that Mexico needs gas-specific contracts, price signals,

Roldán says the current environment makes

and regulatory stability to attract capital

it difficult to keep projects on time and on

and reduce its dependence on US natural

budget, largely because of the payment

gas imports.

difficulties many suppliers face with PEMEX. Workover rigs, drilling rigs, and fracturing

Paying contractors on time has become

equipment are scarce onshore, and one or

one of the clearest competitive advantages

two isolated fracturing jobs cost far more

for private operators in Mexico’s upstream

than a sustained campaign. He adds that

sector. At Mexico Oil and Gas Summit 2026,

the traditional “PEMEX price” once meant

executives said payment certainty, equipment

the best rate in the market. Today, he says,

availability, and contract design now largely

it often carries an implicit financing charge

determine whether projects stay on schedule

that operators who pay on time should not

and within budget. They added that these

have to absorb.


28

The pressure on the supply chain remains

emphasizes planning with partners before

significant. By mid-2026, the oilfield services

execution begins. Harbour is pursuing

association AMESPAC estimated MX$528

synergies between its Zama and Polok

billion in recorded supplier payables and work

developments and favors phased execution

estimates not yet formalized, while PEMEX

over attempting everything at once. “Planning

had deployed only 38% of its approved

pays off. It is worth spending a lot of time on

annual investment budget, according to MBN.

planning,” he says.

Execution Under Uncertainty

Supply Chain and Social License

Hokchi Energy treats delays as a planning

Equipment availability is the most critical

problem rather than an excuse. “Whether or

constraint onshore, says Roldán. Some large

not PEMEX pays or our contractors deliver,

service providers have moved equipment

our duty is to complete our contractual

and personnel out of Mexico. He adds that

obligations on time and on budget,” says

operators need sufficient scale and payment

Vinicio Suro, Vice President, Hokchi Energy.

capacity to attract equipment in good

He says contracts built on certainty and trust,

condition. Suro says Hokchi Energy invests

with both penalty and incentive clauses, are

time and money to train and certify local

the main tool for meeting work programs.

contractors, and argues that the industry must

The company’s policy, he adds, is to delay

rebuild execution capacity lost as suppliers

work before it ever delays a payment to a

disappeared because of unpaid bills.

supplier, even when its own buyers pay late. Social and regulatory factors also cause External shocks are harder to plan for. León

delays. Roldán says taking over facilities

notes that S&P Global estimates trade

under Consorcio Petrolero 5M del Golfo’s

disruptions caused by armed conflicts added

mixed contracts, one in Altamira and two

about 6% to upstream cost inflation during

in Tabasco, required close coordination

2Q26 and 3Q26, driving up the price of steel

with PEMEX as co-owner. Those operations

and copper. Suro points to the exchange

now run 24 hours a day. Suro says securing

rate as an example: the peso moved below

pipeline rights of way requires overcoming

MX17perdollarandlateraboveMX18, and

community skepticism about whether

no forecaster anticipated either shift. In

operators will pay. De la Fuente adds that

such cases, he says, operators set aside a

poor coordination between federal, state,

contingency for extraordinary events and

and municipal authorities can delay capital

hope not to spend it.

deployment.

Alberto de la Fuente, SVP Commercial &

Competing for Global Capital

Deputy Country Manager, Harbour Energy,


29

William Waggoner, CEO, Mexico Petroleum

but has not attracted the dozens of new

Company, says Mexico has world-class rock,

entrants the country needs. PEMEX currently

talent, and seismic data but lacks a contract

has 10 signed mixed contracts, which the

model that offers a reasonable return. He says

government expects to add about 39,500b/d

a comparative analysis he conducted of 14

of liquids and 102.6MMcf/d of gas by

countries found the US lease model to be

December 2026, reports El CEO.

the most effective. “Capital does not want risk. Capital wants certainty,” says Waggoner.

The Gas Question

Mexico Petroleum Company plans to bring Permian Basin fracking technology to northern

Mexico’s reliance on US gas remains a

Mexico, and Waggoner warns that the heavy

strategic risk. Waggoner estimates that

upfront investment fracking requires will not

Mexico depends on the US for 75% to 80%

come without contract reform.

of its gas. He says new pipelines connecting the Permian Basin to the Henry Hub could

Suro says investment decisions rely on

erode the discount Mexico currently enjoys

certified reserves and a defined minimum

at the Waha Hub, with a potential negative

rate of return. He adds that contracts should

impact of about US$50 billion. Suro says

protect operators from regulatory changes

the government’s hydrocarbon sector

that materially alter the economics on which

development plan identifies 21 mixed

a final investment decision was based. De la

contracts, many of them for non-associated

Fuente notes that capital is also flowing to

gas. The plan targets 1.8MMb/d of liquids

Argentina, Brazil, Guyana, and Namibia, and

and 5,000MMcf/d of natural gas, according

says legal certainty and simpler regulation

to Expansión.

would make Mexico more competitive. De la Fuente argues that gas projects Roldán offers a practical workaround. His

in Burgos and northern Mexico require

company secured bank financing through

a contract designed specifically for gas,

a payment trust with Banorte, a structure

which does not yet exist. Roldán adds that

similar to reserve-based lending that uses

producers also need price signals. “Without

cash flow from projects already producing

them, non-associated gas projects will be

more than 20,000 b/d as collateral. Suro

difficult to develop,” he says.

says the model works for certain companies

CONTRACTS MATTER-WONDERFULLY! Mexico Petroleum Company (MPC) has

the United States. MPC identifies the decline

proposed a new contractual framework for

of the Cantarell and Ku-Maloob-Zaap fields,

the development of Mexico’s unconventional

limited development of deepwater resources,

oil and gas resources, arguing that simpler,

and the underdevelopment of shale resources

more stable and transparent terms could

as key elements of the country’s upstream

attract private investment while preserving

challenge. He argues that the Tampico-

state ownership of oil resources. “Contracts

Misantla Basin, which it describes as a

are the main issue Mexico is facing,” said

geological analogue to the Permian Basin,

William Waggoner, CEO, MPC, at Mexico

contains significant recoverable shale gas

Oil & Gas Summit 2026. “If oil is in the

resources that remain largely undeveloped.

ground, it does not feed and it does not

MPC also attributes difficulties in the 2024–

benefit anybody.”

25 mixed contract regime to structural ambiguity, mandatory PEMEX participation

Mexico’s crude oil production has fallen to

without corresponding capital and a political

approximately 1.2MMb/d, compared with

risk premium associated with the 2019

a peak of 3.4MMb/d in 2004, while 70% of

moratorium.

the country’s natural gas is imported from


30

remain with the state, but the contractual

Contract Simplicity as an Investment Driver

structure used to enable their development. “My only request is for professionals like me to

MPC’s central argument is that contractual

sit with the Senate to come up with solutions

simplicity, fiscal stability, and transparency

that benefit the country and generations to

are key to attracting upstream investment.

come,” he concluded.

“Good policy has no politics,” said Waggoner. He argues that contract simplicity drives participation because operators have greater clarity over their fiscal obligations. MPC recommends a Federal/PEMEX Hybrid Incentive Contract (HIC) as its preferred instrument for unconventional development in the Tampico-Misantla Basin. “Mexico needs a new contract or lease that resembles the old CEE licenses, and preference should be given to Mexican companies,” he said. MPC calls for immediate action in establishing a legislative framework for the new contracts. Waggoner concludes that Mexico’s unconventional resources could play a significant role in changing the country’s energy balance if they are developed. He argues that the central issue is not ownership of Mexico’s petroleum resources, which would

“My only request is for professionals like me to sit with the Senate to come up with solutions that benefit the country and generations to come”

William Waggoner CEO | Mexico Petroleum Company


31


32


33


34


www.mexicobusiness.mx


Turn static files into dynamic content formats.

Create a flipbook
MOGS 2026 - Impact Report by Mexico Business Publishing - Issuu