Thank you for choosing STONESENSE to provide your worktops. We use the latest technology available to ensure your worktops are fabricated to a high standard. Your worktops are in safe hands. Please see below for our ‘Pre-template Checklist’ to ensure you are ready and that we are able to template The Checklist is there to ensure everything from template, fabrication to fitting runs smoothly. If your kitchen units are not ready, or you are still awaiting delivery for certain appliances, you need to let us know prior to coming out. Otherwise you will be charged an additional template fee for the revisit and this will cause delay. Please Use this guide to ensure you are ready, to reduce the risk of delay.
WORKTOP PREPARATION CHECKLIST No 1
Requirements prior to template Does the quote show the correct material? (Please confirm name and colour is correct)
2
Did you visit the showroom to confirm the sample colours If so, was the sample you saw correct?
3
If there are large pieces, to reduce the joints required , is there adequate access? (We as part of our quote provide 2 people, if more are required you can ask us to quote for this or you can provide extra labour)
4
If Granite did you request for a photo of the slab to be sent by email? If so was the photo of the slab correct?
5
Have all appliances and existing worktops been removed and are the surrounding areas free from obstruction?
6
7
8
Are all the units and end panels in place, level and secure? Note: We strongly recommend that all cupboard doors and drawer fronts are on to give accurate measurements for any overhang you may have (but please ensure these are covered for protection)
Has the necessary support to bear the weight of the stone worktop been installed (including battens where necessary)? Note: Worktop must be supported every 600mm. A worktop without support MUST NOT exceed 250mm at 20mm thick and 300mm at 30mm thick
Have Ranges, Agas and appliances been installed? Note: This must be done prior to our arrival. Please also ensure that the extractor is fitted so we can get the final height of any splashbacks. Hobs need to be onsite but not installed.
Ensure sinks have been pre fitted in the kitchen carcass 9
Note: The minimum front rail on a sink is 70mm, however we recommend 85mm. Sinks should be pre fitted to ensure accurate measurements can be taken Note: Under mount sinks must always be fitted into units before templating, especially heavy ceramic/porcelain or stone sinks, we don’t recommend attaching the sinks to the worktops.
10 11
Are all appliances that need to be fitted to the worktop onsite? Note: This includes sink, tap, hob, pop up plug, Sample of Led Lighting and any other relevant item.
Have profile edges and worktop overhangs, if applicable, been confirmed? If not please visit showroom prior to template Note: There is a 2mm tolerance on requested overhangs and thickness of stone.
Full height cladding: Have all electrical boxes been fully fitted? 12
Note: Front Face Plates must be left disconnected, ensure the fixing screws are long enough to go through the stone splashbacks.
Yes
No