Skip to main content

MaroonISSUE6_March2025 (1)

Page 1

For a greater Loyola Loyola University New Orleans Since 1923 | March 14, 2025 Issue 6 | loyolamaroon.com

Biever Hall to close due to renovation in Fall 2025 By Natalie Thomas nethomas@my.loyno.edu Biever Hall will undergo renovations after Spring 2025, with students being reassigned to other halls, including the new residence hall for the fall 2025 semester. Loyola aims to ensure a smooth transition, says Kyle Gregore, the Director of Facilities.

Despite its central location and important role in student life, the aging structure requires a full-scale renovation to meet the needs of modern housing standards. Biever Hall is known for providing freshmen students access to an abundance of student activities. As a result of Biever Hall’s closure, in-

coming freshmen will be assigned to other housing options on Loyola’s campus. However, the new residential hall will be strictly for upperclassmen. The new residence hall will open in August 2025 with students moving in during upperclassmen move-in day.

See RENOVATIONS, p.2

Photo of Biever Hall. Ava Dufrene/The Maroon


Turn static files into dynamic content formats.

Create a flipbook
MaroonISSUE6_March2025 (1) by Loyola Maroon - Issuu