Analysis of Samara green city
Core building facilities
Parking strategy
Public Transport network
Parking space required: 1st stage: 3 250 p.p. 2nd stage: +1 080 p.p. (4 330 p.p. in total)
Transport Hub Parking
6000 CPS
Residential Multi-level Parking
2700 CPS
Residential On-Street Parking
1630 CPS
Stadium Parking
2400 CPS
Hippodrome Parking
630 CPS
Techno-Campus surface Parking
600 CPS
KPMG| LAND | ASADOV | SAMARA STATE TECHNICAL UNIVERSITY
OPEN INTERNATIONAL COMPETITION OBJECTIVE
To develop an effective and economically sound concept of integrated development of the territory located around the Samara Arena stadium.
LOCATION:
PARTICIPANTS Russian and foreign organizations in the field of integrated development of territories and urban planning, architecture, design .
RUSSIA
SAMARA
MASTER PLAN DEVELOPING: LANDSCAPE
BUILDING USE :
INNOVATIVE RIVERSCAPE DESIGN URBAN NEIGHBOURHOOD
1.
Residential facilities
5.
Horse stable
1.1-1.6
Residential
3
Tennis center
1.7
School and pre-school facilities
1.8-1.11
Residential
1.12
Structured parking (1 200 p/p)
2
Commercial facilities
2.1
Apart-hotel
2.2-
Market pavilions
2.3 2.4
Family & Leisure center
5.
Reconnecting people with nature
Sustainable and site-sensitive approach
Networked space around the user
SPATIAL DEVELOPMENT CRITERIA:
2.5
4 5.6 5. 5.7 5 5.8 5.9 5.10 5.11 5.12
Botanical garden and entertainment
park
5.13 6.
Development of the ecological connections
Cluster development of the territory
2.6
Children playground and skate park
2.7
Boulevard and stadium plaza
3
Techno-Сampus facilities
3.1
Techno-Сampus
3.2
Street-retail
3.3
Museum of technical creativity
4.
Medical facilities
5.
Sport and recreational facilities
5.
Park
1
Hippodrome
6.2 6.3-6.4
6.7 6.8
Indoor manege Samara Arena stadium area Drive-in cinema Water sport center Extreme sport center Entertainment park Circular plaza objects
Hotel 3-stars and Hostel Offices Wedding palace Congress-center
Expo
6.10
Art-village
6.11
Other objects
7 7.1
8. 8.1 8.2
Reconnecting ecosystems: the green and blue grid
Musical theatre and retail
High-rise landmark building with hotel 4- stars and offices
7.3
2
Reconnecting the river to the city: the blue rays
Beach sport center
6.9-
7.2
5.
NEW INFRASTRUCTURE: Reconnecting nature to the city: the green rays
Parking
6.1
6.5
Genesis of the fluid boulevard
Football grounds
Transport hub (1 890 p/p) Transport hub (2 670 p/p) Green areas management complex
Objects outside the plot
Agromarket Specialized retail
KPMG| LAND | ASADOV | SAMARA STATE TECHNICAL UNIVERSITY
Сlusterdevelopment of the territory:
Arena esplanade
Musical theatre
Medical center
The Expo and congress district
Economy cluster
HOW CAN WE CREATE A STIMULATING ECONOMICAL SETTING FOR THE DEVELOPMENT OF THE SAMARA ARENA AREA?
Enjoyment cluster The residential blocks and the school
Family & Leisure center
HOW CAN WE BOOST ECOLOGICAL DEVELOPMENT?
Ecology cluster HOW CAN WE CREATE AN ATTRACTIVE AND VIBRANT NEW DISTRICT?
Parameters Class –comfort Total GBA –300k m2 Total NSA –195k m2 Average number of floors –6-7 Population –7k people
MASTER PLAN:
The circular plaza
The fluid boulevard
RECONNECTING PEOPLE WITH NATURE
Stages of the development 2021-2025
SAMARA 2023 2026-2030
2030 +
LIVEABLE PLACES FOR A SHARING SOCIETY
251000 m2
STIMULATING ENVIRONMENT FOR INDIVIDUALS, FAMILIES & BUSINESS
Results
87000 m2 New sport infrastructure
Social infrastructure
300 000 m2
Residential development
>10 000
New employment
10%
Variety of services in the residential area
conclusions
Providing job opportunities Dividing the development into stages
walkable Affective network The concept fit the site positively
’Green city “ Open spaces Self contained
ENPL331 Dr. Shireen Alqade Eng. Yanah enayah Lena abuaisheh 1210739 Layan mimi 1212902 Reem bannoura 1211794