Skip to main content

Atzompa Pendant Install Instructions

Page 1

AT ZOM PA PENDAN T ALL SIZES ATZOMPA PENDANTS ASSEMBLY INSTAL L IN ST R UCT IONS 13/16" DATE 10.13.22 0.81mm

ADJUSTAB LE ON SI TE

2 1 2 . 6 2 5 .9 6 0 5 ST U D I O @ L AV IVAHOM E.C OM PAGE 1 OF 2

2" 2.00mm

46 in 41 in 33 in

30 in

30 in 15 in 25 in

7 in 5 in 17 in

21 in

18 in

PLEASE NOTE

CONTENTS

All of our lighting is carefully inspected and electrically tested

•

Ceramic Shade Assembly

•

Wood Ring and Jump Ring

•

Link Chain (3 ft Standard, Adjustable on Site)

•

Suspension Wire and Locking Mechanism

•

Canopy

•

1/4 IPS Hang Straight Screw Collar Loop

•

Cross Bar

•

Wire Nuts (2x)

•

Canopy Lock Washer

using higher wattage bulbs can short the wiring, and L’Aviva

•

Canopy Nut

Home does not take responsibility for any damage incurred

•

E26 LED Bulb (Size A & B: 1x | Size B & C: 3x)

prior to shipping. Once received, we ask that you please inspect thoroughly—prior to installation—for any physical defects which may have occurred during shipping. Lighting that has been installed is not eligible for return or exchange, and L’Aviva Home does not take any responsibility for any damage incurred during installation itself.

Each fixture includes a compatible bulb. In the event that a replacement bulb is used, for any reason, please be sure to note the maximum recommended wattage for your fixture:

under these circumstances. CAREFULLY REMOVE FIXTURE FROM PACKING MATERIALS


AT ZOM PA PENDAN T

2 1 2 . 6 2 5 .9 6 0 5

INSTAL L IN ST R UCT IONS

ST U D I O @ L AV IVAHOM E.C OM

ADJUSTABLE ON SI TE

PAGE 2 OF 2

DATE 10.13.22

INSTALLATION Nut

1. This product must be installed in accordance with applicable installation code by a person familiar with the construction and

Ground Screw Cross Bar

operation of the product and the hazards involved. 2. Turn off power to junction box before installing. 3. Adjust link chain to desired length. 4. Install the crossbar using #8-32 screws to the junction box. Pull the main wires out so they are accessible while making the main connection later.

8-32 Screws

Canopy 1/4 IPS Threaded

5. Once the crossbar is secure, connect the ground wire to the ground screw on the cross bar. 6. Screw the 1/4 IPS nipple into the hang straight loop and then into the crossbar. 7. Unscrew the screw collar from the hang straight loop. Feed onto the wire and chain from the fixture, followed by the canopy. 8. Carefully raise fixture to ceiling and hold, attach chain to loop. 9. Guide the suspension and electrical wire through chain and the hang straight loop into the junction box. 10. Pull suspension wire through one side of the locking mecha-

Hang Straight Loop

nism, then loop suspension wire around crossbar. 11. Feed suspension wire through the other side of locking mechanism so that it makes a loop around the crossbar. Tighten locking

Screw Collar

mechanism. 12. Strip eletrical wires and make connections to the leads in the ceiling with provided wire nuts. 13. Tuck the connected wires into the junction box and raise the canopy and hang straight nut. 14. Thread the screw collar onto the hang straight, tightening the canopy flush to the ceiling. 15. Install E26 LED Bulbs, then supply power to the fixture.

Adjustable Chain


Turn static files into dynamic content formats.

Create a flipbook
Atzompa Pendant Install Instructions by lavivahome - Issuu