Skip to main content

2025_JiaJoyHu_DesignWorkSamples

Page 1

01. THIRD SPACES - HIGH END VC/TECH OFFICE Location: Burlingame, California Project Type: High end VC office TI (Tenant Improvement) Phase: All Phases of Design through Construction, Complete Role: Lead Project Architect + Designer Area: 4500 sf

JIA.JOY.HU@GMAIL.COM

ORIGINAL MOOD & MATERIAL BOARD Brick | Bronze | Quartzite | Oak

This high end VC office reflects the post-pandemic phenomenon of “third spaces”. This project combines aspects of coffee shops, lobbies, and social clubs, acknowledging that people want to be in community, building social networks and in spaces that are flexible, comfortable, and offering moments of privacy. The design contains a mixture of spaces for private conversations and social areas for serendipitous interactions and centers around the central jewel conference room as the feature in the space.

4.1

3

PT3 PAINTED GWB GOES TO UNDERSIDE OF DECK OF FLOOR ABOVE

4

ALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH ALL CODES AND REGULATIONS HAVING JURISDICTION OVER THIS SITE LOCATION.

3.2

WOOD ACCENTS WD1 AND PL1 APPLIED ON TOP OF GWB SOFFIT

6 A-950

+ 15' - 10 9/16" SECOND FLR

3

30"

GL1-T

GL1-T

GL1-T

GL1

GL1

GL1

GL1

GL1

GL1-T

GL1

GL1

GL1

GL1

GL1

3/8" = 1'-0"

4

5' - 0"

2

3/8" = 1'-0"

9

3

4

284 1/8" HOLD 23' - 8 1/8" R.O. STOREFRONT

8 A-950

A-950

7

4.1

32" MIN CLEAR

A-950

NESTED STUD, SSD FOR CONNECTION AND SIZING DETAILS 8 A-510

RS

SINGLE SWING DOOR

ACCENT

6 A-950

H EDGE

1/2

"

LW

OR

A-800

1/8" OF BANQ

UETT

APPLIED WD1 MILLWORK SLATS, SEE DETAIL FOR SPACING

E BACK

K

32" MIN CLEAR

EQ

3

D1

CL

6. GC TO VERIFY WALL/JAMB DEPTHS PRIOR TO ORDERING OF DOORS

3

8 DETAIL PLAN - MAIN CONF ROOM CURVED GLASS TO ANCHOR 3" = 1'-0"

RS

GL

111 5/16" HOLD

9' - 3 5/16" R.O. MULTI-FOLD DOOR, WITH SINGLE SWING DOOR

1 MAIN CONF ROOM - ENLARGED PLAN 3/8" = 1'-0"

EQ

2" 4" 3

ED

HSS POST EA SIDE, SSD FOR CONNECTION DETAILS

RV

5. ALL FAUX WOOD POWDERCOAT FINISHES AND WOOD STAINS, PROVIDE SAMPLE FOR ARCHITECT'S REVIEW BEFORE ORDERING

CU

4. ALL TAGGED GLASS, REFER TO A-991 DOOR AND HARDWARE SCHEDULE FOR SPECIFICATIONS

51 7/8" 3

GLASS STRAIGHT, VIF

8 A-800

65"

5' - 8" 11' - 10"

P

ARCHITECT: 5' - 5"

86' - 9"

E

WD1 APPLIED MUNTINS ON INTERIOR AND WD1 VERTICAL SLATS ON EXTERIOR, CONCEALED ATTACHMENTS T+B W/ HORIZONTAL SUPPORTS (1/2" ⌀ WOOD DOWEL) CENTERED ON SLAT.

D.8 CD01

PLT2

PLT2

C03

C04 C04

C07

C07

T07

T04 C07

C04 T12

C07

C07

C07

DATE

1 2 3 4

19 APR 2024 50% CD GMP PRICING SET 28 JUN 2024 BUILDING PERMIT SET 12 JULY 2024 BLDG PERMIT SET - ASI-1 -----

ISSUE

C B

A.3 A

C03

101

C04

C04

T03

T03

T03

T01

T04

T04

C04

C04

C04

RECEPTION 100

1/4" = 1'-0"

C05

C05

C05

C05

C05

C05

C05

C05

PROJECT:

250 CALIFORNIA DRIVE, FIRST FLOOR 250 CALIFORNIA DRIVE, FIRST FLOOR BURLINGAME, CA 94010

ACT PROJECT NO. 2119 PROJECT PHASE:

BUILDING PERMIT SET DATE:

T05

C C02

B

T05

2' - 4"

3

3.2

06/28/2024 DRAWING HISTORY:

16' - 8"

6"

5' - 6"

13' - 0"

5' - 1"

1' - 6"

8' - 5"

NO.

DATE

1 2

20 DEC 2023 25% DD ROM PRICING SET 28 JUN 2024 BUILDING PERMIT SET

ISSUE

SHEET: 0" 1' - 11 1/2" 3' - 8 1/2"

77' - 8"

1 FFE PLAN

C05

C01

A 19' - 0"

2

C05

C05

P

R01 C04

MAIN CONF RM ENLARGED 1.3

C05

C.5

A.3

1

C05

C02

T05

0" 1' - 11 1/2" 3' - 8 1/2"

C05

C05

C.8

LOUNGE

T04

102

SHEET:

A-510

C04

D

C03

C04

C04

COWORKING SPACE

DRAWING HISTORY:

C03 T02

C03 C07

C04

C04

C05

36°

C03

C07

2410 CALIFORNIA STREET #3 SAN FRANCISCO, CA 94115 WWW.CHOTHOMPSON.COM CHRISTINA CHO YOO | AIA, PE, LEED AP BD+C, IIDA CHRISTINA@CHOTHOMPSON.COM | 415.799.1613

D.6

MAIN CONF ROOM

C07

C.5

8.13.2024 NO.

ATELIER CHO THOMPSON

3' - 1"

T10

S01

C04

F 18 8 1/2 15 AS ' S (4 8 1/2 " EQ " PIEC ES ), VI

SINGLE SWING DOOR

CL OF GLASS AND STRUCTURAL MEMBERS

3. ALL VISIBLE DOOR HARDWARE, INCLUDING LEVERS, HANDLES, FINISH TO BE VERIFIED WITH ARCHITECT BEFORE ORDERING

106

D

EQ

SS GLA

2. ALL DOOR R.O. SIZES AND STOREFRONT LENGTHS TO BE CONFIRMED/MEASURED ON SITE BEFORE ORDERING

C11

PLT2

C.8

ACT PROJECT NO. 2119

1 A-950

4 A-950

OFFICE 2

105

PLT2

DATE:

E OF

LIN

" R 120

5 A-950

2 A-911

1. ALL DOORS AND DOOR HARDWARE REFER TO A-991 DOOR AND HARDWARE SCHEDULE

8. CONTRACTOR TO VERIFY ALL STOREFRONT AND DOOR ROUGH OPENING. DIMENSIONS IN FIELD BEFORE ORDERING, TO BE VERIFIED WITH ARCHITECT.

R 125

FINIS

R 115

MIL

CTR

C.5

ORK,

SHEET NOTES

7. ELECTRIFIED DOORS TO BE COORDINATED WITH SECURITY AND DESIGN-BUILD CONTRACTOR FOR CARD READER AND POWER

3

9

MILLW

TO

3 3/8"

15' - 2 1/8"

CL

10"

C.8 CL

51 7/8"

D

WD1

EQ

RS

CL

250 CALIFORNIA DRIVE, FIRST FLOOR BURLINGAME, CA 94010

PLAN CHECK RESPONSE

STRAIGHT GLASS, VIF

ROOM SCHEDULER, CENTERED ON MILLWORK ACCENT

LENGTH OF STUD WALL

5"

T10

C11

C06

104

PROJECT PHASE:

D2

5"

5' - 8"

250 CALIFORNIA DRIVE, FIRST FLOOR

3/8" = 1'-0"

3.2

T06

P01

C06

D.6

PROJECT: MULTIFOLD DOORS

3

S01

3' - 1"

2410 CALIFORNIA STREET #3 SAN FRANCISCO, CA 94115 WWW.CHOTHOMPSON.COM CHRISTINA CHO YOO | AIA, PE, LEED AP BD+C, IIDA CHRISTINA@CHOTHOMPSON.COM | 415.799.1613

MAIN CONF ROOM - STOREFRONT EXTERIOR SOUTH ELEVATION NESTED STUD, SSD FOR CONNECTION AND SIZING DETAILS

T06

OFFICE 1

D.8

ATELIER CHO THOMPSON

SWING DOOR MIN 32" CLEAR

60"

14' - 6"

+ 0' - 0" GROUND FLR + -0' - 9" GROUND FLR (NORTH)

T06

P01

E.8

C06 P01

9' - 0"

10" ADA COMPLIANT BOTTOM RAIL 3' - 0 3/4"

F 60" TYP

4' - 0"

GL1-T

2' - 11 1/8"

CZ1

C08

3' - 6"

GL1-T

2' - 11 1/8"

C08

T08

10' - 0"

GL1-T

2' - 11 1/8"

C08

2' - 0"

GL1-T

2' - 11 1/8"

C08

C08

C08

28"

T06

5' - 9 1/2"

GL1-T

2' - 11 1/8"

3' - 6"

GL1-T

2' - 11 1/8"

MAIN CONF ROOM - NORTH INTERIOR ELEVATION

T06

P01

C08

1' - 11 1/2"

EQ

E

ARCHITECT:

T06

T06

C06

3' - 6"

7' - 1"

P01

C06 P01

T06

P01

11' - 10"

3

86' - 9"

GL-2T

36"

3' - 0"

F1A

30"

2' - 0"

2" EQ

D1

MULLION BAR ACCENT

MAIN CONF ROOM - WEST INTERIOR ELEVATION

C06 P01

4" EQ

EQ

RS

T06

107

E.8

EQ

GL1-T

T06

P01

36"

BULLPEN

2' - 6" VIF

GRAIN

GL1-T

T09

S02

7

72"

PL1

108

C09

C06

C0

3' - 6"

GL1-T

3

ROOM SCHEDULER INTEGRATED IN MILLWORK ACCENT

+ 0' - 0" GROUND FLR EQ

PL1

T06

10' - 0"

STEEL HSS POST ON EA SIDE, SSD FOR SIZE/CONNECTION DETAILS STEEL TO BE COVERED IN 4 MILLWORK TRIM WD1 A-950

GL1-T

4.1

EQ

GL1-T

4

P01

T06

P01

9' - 0"

GL1

1 A-950

SMALL CONF. RM

109

C06

F

WD1 VERTICAL SLATS ON EXTERIOR, CONCEALED ATTACHMENTS T+B W/ HORIZONTAL SUPPORTS (1/2" ⌀ WOOD DOWEL) CENTERED ON SLAT

150"

GL1

D3

B4

PHONE RM

C06 P01

3

BOX OUT EXISTING BEAMS, PT3 PAINT GWB TO MATCH SEE RCP FOR AFFECTED BEAMS

EQ

12' - 6"

12' - 6"

5' - 0"

WB1

CL

36"

GL1

CL

WB1

3

R.O.HEIGHT

GL1

STEEL HSS HDR, SSD FOR SIZE / CONNECTION DETAILS, STEEL TO BE COVERED IN 5 WD1 CAP, INSIDE AND 3 A-950 OUTSIDE

GL1-T

ALL DIMENSIONS AND INFORMATION SHALL BE CHECKED AND VERIFIED ON THE JOB AND ANY DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT. THESE DRAWINGS MUST NOT BE SCALED.

C11

PR1

4" HSS

GL1

GL1-T

150"

GL1-T

HOLD

GL1

GRAIN

GL1

110"

GL1

EQ

5 A-950

PL1

DOOR R.O. HEIGHT

3' - 0"

GL1

6' - 6"

4' - 0"

86" MONITOR AND WEBCAM DEVICE, ON ARTICULATED MOUNT, BY OTHERS COORDINATE WITH AVIT

GL1

GL1-T

EQ

3.2

WD1

TEMPERED GLASS AROUND ANY DOOR

6

3

+ 15' - 10 9/16" SECOND FLR

F1A

GL1-T

EQ

CURVED GLASS STOREFRONT WITH WOOD SLATS IN FRONT

WOOD ACCENTS WD1 AND PL1 APPLIED ON TOP OF GWB SOFFIT

6 A-950

ALL WORK SHALL BE CARRIED OUT IN ACCORDANCE WITH ALL CODES AND REGULATIONS HAVING JURISDICTION OVER THIS SITE LOCATION.

T10

5' - 5"

PT3 PAINTED GWB GOES TO UNDERSIDE OF DECK OF FLOOR ABOVE

4.1

WOOD ACCENT

1 A-911

GL1-T

EQ

OPENING, CURVED GLASS

4

+ 15' - 10 9/16" SECOND FLR

2 A-911

GL1-T

EQ

3/8" = 1'-0"

3.2 8 A-950

GL1-T

EQ

12' - 6" VIF

3

GL1-T

EQ

3 MAIN CONF ROOM - STOREFRONT EXTERIOR NORTH ELEVATION

3/8" = 1'-0"

D

S01 S01

F.8

BANQUETTE HEIGHT

C.8

NOTE: FOR REFERENCE ONLY

C07 T10

C11

C11

3' - 0"

RS

10" ADA COMPLIANT BOTTOM RAIL

C07

C11 T11

H G

MULLION BAR ACCENT

3 3/4"

5 MAIN CONF ROOM - SOUTH INTERIOR ELEVATION

3/8" = 1'-0"

VERIFY HEIGHT WITH ARCHITECT & AV CONSULTANT

D3

GRAIN

150" 3

ROOM SCHEDULER INTEGRATED IN MILLWORK ACCENT

D1

GL1-T

36"

80"

F1A

+ 0' - 0" GROUND FLR + -0' - 9" GROUND FLR (NORTH)

7 MAIN CONF ROOM - EAST INTERIOR ELEVATION C.5

ACOUSTIC WALL PANEL ALONG CURVING WALL

36"

B4

18"

36"

3' - 6"

F1B

B4

+ 0' - 0" GROUND FLR

6' - 8" VERIFY WITH ARCHITECT

12' - 6"

F1B

PL1

STEEL HSS HDR, SSD L8 GL-2T

78"

GL-2

R.O. HEIGHT, HOLD

GL-2

114"

GL-2

9' - 6"

GL-2

36"

GL-2 GL-2

CC

FF.2

0"

J

70"

GL-2

9' - 0"

GL-2

19' -

111

7

TEMPERED GLASS AROUND ANY DOOR

3

GL-2T

3

3

FF

110

OFFICE 4

AA

C0

EQ

2' - 6" MILLWORK, VIF

GL1-T

EQ

150"

GL1-T

EQ

WD1

36"

GL1-T

12' - 6" VIF

MILLWORK TRIM

PL1

BB

OFFICE 3

ALL DIMENSIONS AND INFORMATION SHALL BE CHECKED AND VERIFIED ON THE JOB AND ANY DISCREPANCIES MUST BE REPORTED TO THE ARCHITECT. THESE DRAWINGS MUST NOT BE SCALED.

8 A-950

15"

1-1/2" X 1-1/2" APPLIED MUNTINS WD1 ~ 4'-0" OC AT BUTT GLAZED JOINTS

30" TYP

3.2

2' - 0"

5 A-950

9' - 0"

1 A-950

4' - 0"

4

2' - 0"

4.1

C.5

5' - 9 1/2"

C.8

1' - 11 1/2"

D + 15' - 10 9/16" SECOND FLR

4

4.1

4.4

5

5.4

5.5

1

6

1.3

19' - 0"

2

2 FFE PLAN - ALL HANDS 1/4" = 1'-0"

FFE PLAN 3

A-160


Turn static files into dynamic content formats.

Create a flipbook