Skip to main content

Monterra Success Story

Page 1


Success Story:

Location: Cooper City, FL

Project Type: Multi-Family | Active Senior

PHASE 1: SCHEMATIC DESIGN

Mood Board

PHASE 2: DESIGN DEVELOPMENT

DESIGN DEVELOPMENT | Ceiling Plan + Elevation Sketches

Reflective Ceiling Plan
Elevation at Entrance
Elevation of Yoga Room
Interior View of Entrance
Finish, Furniture, Lighting Selections
Interior

PHASE 3: DESIGN DOCUMENTATION

DESIGN DOCUMENTATION | Interior Drawings + Schedules

Interior Drawings
Lighting Schedule
Craft Room Interior
Game Room Interior

1 | CLUBHOUSE BAR FRONT

| CLUBROOM 3 | 3RD FLOOR - TYPICAL MODEL UNIT

4 | GROUND FLOOR ENTRY

PHASE 4: PURCHASING

IFA Cost Breakdown

PURCHASING | Furniture + Materials

(Images for Approval)

PHASE 5: CONSTRUCTION ADMINISTRATION

CONSTRUCTION ADMINISTRATION

Thank you!

Turn static files into dynamic content formats.

Create a flipbook