REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING Prof. Manohar B. 1, Sachin Krishna Gond2, Sandesh Shanmukha Naik3, Sanjay Bhaskar Naik4, Shikha Sunil Govekar5 1Assistant
Professor, Department of Civil Engineering, Anjuman Institute of Technology and Management, Bhatkal, Karnataka, India 2,3,4,5Student, Civil Engineering, Anjuman Institute of Technology and Management, Bhatkal, Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------between the structure frameworks such as clash detection Abstract - Building Information Modelling (BIM) is a method
work. By identifying the struggles, issues can be settled before sincere development which sets aside cost and time contributed.
consisting creating, processing, handling and using a computerised visualization of physical and functional characteristics of building. The term 4D is intended to refer to the fourth dimension: time, means, 4D is 3D + schedule (time). The BIM extends this technique into 3 dimensional (3D) drawings in the three basic dimensional breadth (b), height (h) and thickness (d) with time as 4th dimension and cost as 5th dimension. BIM is a process of the development and use of computer-generated multi-dimensional models to simulate the planning, design, construction and operation of a facility. BIM ia an intelligent 3D model based process plays an important role in AEC industry. BIM in terms of modelling saves a lot of time and money comparing to traditional scheduling process.
1.1 BIM Software Building plan and building data displaying (BIM) programming includes computer aided plan (CAD programming), items utilized normally inside the design and development enterprises. BIM software offers a model-based process for planning and supervision structures and frameworks, going past development drawings to produce a computerized representation of the useful properties of the workplace. Different items in this classification might be utilized for a scope of CAD purposes past structural plan, modelling of plan to get three dimensional structure etc.
Key Words: Real time analysis, 4D, 5D, BIM, Rendering, Simulation, Scheduling, Time and Cost overrun
1.2 Cost Overrun
1. INTRODUCTION
A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms called cost overrun.
Construction planning and scheduling are considered as integral and significant units of all construction project. The interpretation of a design to a construction schedule consist users interpretation and requires variations of data in different stages. The present planning methods are completely manual and time-consuming process. Current practices of construction project planning involve a number of approaches/skills that model dependencies and sequencing of project activities. There are some manual approaches like bar charts, CPM based network diagrams, and time-changes diagram. None of these techniques have the capability of modelling and visualizing both the sequencing and finishing the pattern of activities.
Cost overrun= Actual Cost – Expected Cost 1.3 Time Overrun It is the phenomenon in which the project gets delayed beyond its expected completion time due to certain difficulties i.e. more time is required to finish the project than initially planned. Causes:- Plans, specifications etc. are not received by the contractor n i time.
Building Information Modeling (BIM) is the documentation interaction including of data about various periods of any undertaking like plan, development, arranging, managing, office the executives and activity. It is one comprehensive documentation process gainful for functional representation, and development application, for example, assessing, planning and plan coordination. Principal benefit of carrying out BIM application is the visual coordination of the structure frameworks like preparing three dimensional models and it additionally recognizes the potential struggles
© 2022, IRJET
|
Impact Factor value: 7.529
Time overrun= Actual Time – Expected Time 1.4 Objectives Explain the ideologies of Building Information Modeling (BIM). Describe the features of a BIM model.
|