Skip to main content

Intrim Shadowline System Installation Instructions

Page 1

Instruction Manual Intrim 800 Series Shadowline® System NOTE:

1. Door Jamb Assembly Cut DJ800 door jamb material to required lengths with a 45-degree mitre cut to the JOINT NAILED & GLUED WITH PVA ADHESIVE

with PVA glue and nails or screws. (Detail A) (Refer to Figure 1)

2. Door Jamb Install & Fixing Skirting

WALL FRAME SECTION

TOP PLATE

DETAIL A SCALE 1 : 5

DJ800 DOOR JAMB STILE AND HEAD MITRE JOINT METHOD

JOINTS NAILED & GLUED

STUD

A NOGGIN

Pack opening and install DJ800 door jamb plumb and level. Take care when installing jamb material, to make sure it (example – if framework is 90mm wide and plasterboard is 10mm thick = 90mm frame + (2 x 10mm) 2 thicknesses of plasterboard + (2 x 3.5mm) 2 thicknesses of plaster set = 117mm total width of

DJ800 DOOR JAMB

BOTTOM PLATE

FIGURE 1 - DOOR JAMB ASSEMBLY DETAILS door jamb face = (117 – 90) divided by 2 = 13.5mm on both sides between the jamb face and framework face. (Detail B) Once all DJ800 door jambs are installed, it

and external corners of framework. Cut for internal and external corners. Use a splice joint when joining the skirting ends together over a straight wall section. This joint must be formed over the centre of the wall frame stud. A butt joint is not acceptable.

steel frame, into every stud at a maximum distance of 600mm centres. (minimum

FIGURE 2 - SKIRTING FIXING DETAILS per stud for 235 to 285mm wide). These

Install with 5mm packers between the

NOTE:

for any subframe movement.(Detail B) (Refer to Figure 2)

1800 622 081

intrimmouldings.com.au


Turn static files into dynamic content formats.

Create a flipbook
Intrim Shadowline System Installation Instructions by Intrim Mouldings - Issuu