First Electric Cooperative Condensed Rate Schedule Rate 1, 51 ‐ Single Phase Service Availability Charge Per Month Minimum Bill Summer: All kWh Winter: 0‐500 kWh Excess kWh Rate 2 ‐ Three Phase 50 kVa or less Service Availability Charge Per Month Minimum Bill Summer: All kWh Winter: 0‐500 kWh Excess kWh Rate 4 ‐ General Service 51‐150 kVA Service Availability Charge Per Month Summer rate kW demand Winter rate kW demand All kWh Rate 5 ‐ Agricultural Water Pumping Service Availability Charge Per Month Minimum Bill (Summer, per KW) Summer: July through October 0‐342 kWh/kW Sum Excess kWh Demand 5.0 hr. load management switch credit Winter: November through June All kWh Rate 8 ‐ Lighting 100 Watt High Pressure Sodium 175 Watt Mercury Vapor 7000-9000 Lumens LED Security Light 150 Watt High Pressure Sodium 250 Watt Mercury Vapor 250 Watt High Pressure Sodium 400 Watt Mercury Vapor 20000-30000 Lumens LED Flood Light 400 Watt Metal Halide 400 Watt High Pressure Sodium Rate 12 ‐ Athletic Field Lighting Service Availability Charge Per Month All KW All kWh Rate 13 ‐ Large General Service Over 150 kVa Service Availability Charge Per Month Summer rate kW demand Winter rate kW demand All kWh

Updated 05/24

$28.00 $31.00 $0.12264 $0.12264 $0.10764 $45.00 $55.00 $0.133424 $0.133424 $0.118424 $45.00 $15.13 $12.13 $0.061386 $53.00 $15.00 $0.198707 $0.147244 $8.50 ($-0.0600) $0.147244 $8.38 $9.14 $7.87 $11.46 $12.60 $15.53 $17.30 $14.89 $22.95 **Lamp fixtures no longer available for new installation. $23.02 $38.00 $1.78 $0.077352 $95.00 $16.06 $13.81 $0.063082

Cost of Energy and Cost of Debt Adjustment These adjustments shall be applied monthly to reflect the cooperative's cost of energy and cost of debt. Summer Rate: Applied to billing months of June through October Winter Rate: Applied to billing months of November through May


Turn static files into dynamic content formats.

Create a flipbook
First Electric Rate Schedule by Inside Information, Inc. - Issuu