Skip to main content

Boulder Brook, Phase 1, Replat Lots 17-20 - CC&R's

Page 1


REPLAT OF LOTS 17 THROUGH 20, BOULDER BROOK, PHASE 1

LOCATED IN THE SW1/4 OF THE SW1/4 OF SECTION 9, T15S, R13E, W.M., CITY OF REDMOND, DESCHUTES COUNTY, OREGON CITY OF REDMOND PLANNING FILE: MC01-10

OWNER'S DECLARATION

LEGEND

FOUND 5/8 IRON ROD WITH PLASTIC CAP MARKED "L52527* AS PER THE PLAT OF BOULDER BROOK, PHASE 1 (CS14186) BY ME FILED 9/27/00.

FOUND 5/8" IRON ROD WITH PLASTIC CAP MARKED "LS2527" AS FILED 9/27/00. MONUMENT WAS REMOVED THIS SURVEY TO AVOID CONFUSION

SET 5/8 IRON ROD WITH YELLOW PLASTIC CAP MARKED "LS2527". RECORD DATA AS PER C514186 MATCHES CHES MEASURED D

IMENSION LINE

ORIGINAL LOT BOUNDARY.

ASEME

PPROXIMATE ADJOINER BOUNDARY. DESIGNATION- REFER TO TABLE

SURVEYOR'S CERTIFICATE

I, JERRY D. STICHLER, OREGON REGISTERED PROFESSIONAL LAND SURVEYOR NO. 2527, HEREBY CERTIFY THAT I HAVE CORRECTLY SURVEYED AND MARKED WITH PROPER MONUMENTS THE LANDS SHOWN ON THIS REPLAT OF LOTS 17 THROUGH 20, BOULDER BROOK, PHASE 1, THE BOUNDARY BEING DESC FOLLOV

BEGINNING AT THE INITIAL POINT, A 5/8" IRON ROD WITH PLASTIC CA MARKED L52527" LOCATED AT THE NE CORNER OF LOT 20 OF BOULDER RECORDED IN THE OFFICE OF COUNTY CLERK FOR DESCHUTES COUNTY, THENCE SO0'12 3.00 FEET ALONG THE BOUNDARY OF LOTS 17-20 OF SAID BOULDER BROOK, PHASE 1 TO THE SE CORNER OF SAID LOT 17; THENCE S89'47'41 W-48.00 FEET ALONG SOUTH BOUNDARY OF SAID LOT 17; THENCE N00 12'19 W 7.50 FEET ALONG SAID SOUTH BOUNDARY; THENCE S89'47'41 W-32.00 FEET ALONG SAID SOUTH BOUNDARY TO THE SW CORNER OF SAID LOT 17 THENCE NO0 12'19W -98.00 FEET ALONG THE WEST BOUNDARY OF SAID LOTS 17-20; THENCE N894741"E~ 32.00 FEET ALONG THE NORTH BOUNDARY OF SAID LOT 20; THENCE N00'12'19W-7.50 FEET ALONG SAID NORTH BOUNDA 8947'41°E-48.00 FEET ALONG SAID NORTH BOUNDARY TO THE POINT OF BEGINNING

PARCEL CONTAINS 8560 SQUARE FEET SUBJECT TO ALL EASEMENTS, ABOVE DESCRIBED LANDS-

PROPESSIONAL LAND SURVEYOR

Juyt Stieseer

8/17/01

OREGON

JERRY D. STICHLER RENEWAL 6/30/02

BOULDE

CONSTRUCTION, INC AN OREGON CORPORATION, IS THE OWNER OF THE LANDS SHOWN ON THIS REPLAT OF LOTS 17 THROUGH 20, BOULDER BROOK, PHASE 1, THE BOUNDARY OF WHICH IS MORE DESCRIBED IN THE ATTACHED SURVEYOR'S CERTIFICATE, AND THAT WITH THE CONSENT OF FIRST SECURITY BANK, NA, AS A TRUST DEED BENEFICIARY, BC'S BOULDER CONSTRUCTION, INC. CAUSED THE SAME TO BE SURVEYED AND REPLATTED INTO LOTS AS SHOWN HEREON, AND THAT BC'S BOULDER CONSTRUCTION, INC. DOES HEREBY SUBMIT FOR RECORD AND APPROVAL SAID SUBDIMISIO

Ralnt 1. S

ROBERT L SYMANK, .0.N IN BC'S BOULD TION, INC.

BC'S BOULDER CONSTRUCTION, INC.

TOM KOPPANG, VICE PRESIDENT

ACKNOWLEDGMENT

STATE OF OREGON

COUNTY OF DESCHUTES

GOING INSTRUMENT WAS BEFORE ME BY CARL A ITTELSON, BEING FIRST DULY SWORN, WHO DID SAY THAT HE IS THE RESIDENT OF BC'S BOULDER CONSTRUCTION, INC. AND ACKNOWLE SAD INSTRUMENT TO BE IT'S VOLUNTARY $24 Auqust

NOTARY

NOTAP FUBLICIEGON HY COMMISSION EXPIRES DEC 9,2001

ACKNOWLEDGMENT

STATE OF OREGON COUNTY OF Clackamas

THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME BY TOM PRESIDENT OF FIRST SECURITY BANK, NA. AND ACKNOWLEDGED SAID INSTRUMENT TO BE IT'S VOLUNTARY ACT AND DEED ON THIS 23 DAY OF August

NOTARY PUBLIC LAYNIE

SIGNATURES BY THE CITY OF REDMOND CONSTITUTES ACCEPTANCE

WATER RIGHTS STATEMENT THERE RIGHTS APPURTENANT

BASIS OF BEARINGS

BASE BEARING DETERMINED FROM THE EAST BOUNDARY OF LOTS 17-20 OF BOULDER BROOK, PHASE 1 (CS14186) BY ANDERSON ENGINEERING SURVEYING FILED 9/27/00.

NARRATIVE

THE PURPOSE OF THIS SURVEY WAS TO REPLAT FOUR LOTS (LOTS 17-20) OF BOULDER BROOK, P INTO THREE LOTS IN ORDER TO BUILD A 3 UNIT ZERO LOT LINE BUILDING. MY PREVIOUS SURVENDARIES BOULDER BROGNSE WAS USEd AS SS O BOOND PREVOUSLY PLATTED LOTS WERE REMOVED TO AVOID CONFUSION A NEW MONUME REVISED LOT CORNER

NOTES

1. ORIGINAL PARCEL MAY BE SUBJECT TO A 5'WIDE EASEMENT FOR AN SNGNED AND COMMON WELL IS NO LONGER I

Turn static files into dynamic content formats.

Create a flipbook