At LUZ, quality is not just a commitment: it is the guiding principle behind every detail of the project. We have designed your new home for you to enjoy from the very first moment, even before stepping inside.
The development offers a private, modern and secure environment, featuring fully equipped sports and wellness facilities. You will be able to enjoy unforgettable moments with your loved ones thanks to its adults’ and children’s swimming pool, children’s play area, outdoor fitness space and bicycle parking.
THE DEVELOPMENT
FULLY EQUIPPED COMMUNAL AREAS
The communal areas have been designed with special attention to detail. Interior spaces will feature ceramic tile flooring and walls finished with carefully selected materials suited to each area, creating harmonious and long-lasting environments.
Technology is also an integral part of the design, with a lighting system incorporating motion sensors by area, optimising energy consumption and delivering significant energy savings.
The buildings will be equipped with lifts providing access from the garage to all floors, finished in line with the project’s style and featuring automatic stainless-steel doors, alarm systems and emergency telephone service, fully compliant with accessibility requirements.
THE RESIDENTIAL
Enjoy peace and tranquillity with three landscaped communal swimming pools surrounded by a wide variety of vegetation.
Biomechanics and calisthenics area, along with a fully equipped gym.
Electric vehicle charging points.
Security and CCTV system.
The resort’s children’s park features a dedicated play area for younger residents.
INSIDE YOUR HOME
The flooring in your new home, including the living room, bedrooms and hallways, will be finished with highquality porcelain stoneware. The floors will be complemented by white lacquered skirting boards, matching the interior carpentry to create a fully integrated and cohesive atmosphere throughout the home.
The walls will be finished with smooth plastic paint. A suspended plasterboard ceiling will be installed in the living room, hallways and bedrooms, finished with plastic paint.
CEILINGS
Plasterboard system PLADUR, finished with white plastic paint.
WALLS
Finished with white plastic paint.
FLOORING
Porcelain tile flooring, Forest model. On terraces, the same model with a non-slip finish.
CEILINGS
Plasterboard system PLADUR, finished with white plastic paint.
WALLS
Tiled finish, Le Blanc model, 40 × 120 cm, glossy, rectified.
FLOORING
Porcelain tile flooring, Forest model. On terraces, the same model with a non-slip finish.
Tiling Calacatta Gold
33.3 × 100 cm
Forest Arce
22 × 90 cm
One 61 cm
One 61 cm vanity unit
all-hung toilet ompact Timeless val flush plate
Krionshell countertop
Round washbasin tap
ENTRANCE DOOR
Modern-design, white lacquered armoured entrance door, single-leaf, with 3 locking points. Equipped with a recessed security lock with anti-drill shield on the exterior Includes knob, handle and peephole.
INTERIOR DOORS
White lacquered hinged doors with handle. Privacy locks will be installed on bathroom doors.
WARDROBES
Bedrooms will feature built-in wardrobe fronts with smooth, hinged, white lacquered doors Interior finished in white melamine, including a top storage shelf and hanging rail
BUILDING ENVELOPE
ROOF
Non-accessible terrace roof with waterproofing and insulation, finished with artificial grass.
ORIENTATION
The orientation of the homes and their interior spaces is designed to optimise climate control efficiency.
AEROTHERMAL SYSTEM
System for the production of domestic hot water.
EXTERIOR CARPENTRY
Black lacquered aluminium exterior carpentry with thermal break. Double-glazed windows.
Shading system in bedrooms via blinds in the same colour as the aluminium profiles, with insulated shutter boxes.
FAÇADE
Brick façade with thermal insulation, finished with monocouche mortar combined with other materials.
THERMAL INSULATION
Thermal insulation in walls.
LED LIGHTING THROUGHOUT THE HOME
Home lighting fitted with LED luminaires.
LIFTS
Low-energy lifts equipped with frequency converters to reduce consumption during start-up and stopping.
LED LIGHTING IN COMMUNAL AREAS
Lighting in communal areas using LED luminaires with motion sensors.
PLUMBING
The internal hot and cold water installation within the home will be carried out using cross-linked polyethylene (PEX) piping, with insulation on the hot water pipes and a shut-off valve in each wet area.
DRAINAGE
The network of downpipes and drainage for the homes will be installed in PVC. All sanitary fittings will be equipped with individual traps or accessible siphon traps.
VENTILATION
Ventilation of the home’s rooms will be provided by mechanical means. An extraction system in wet areas is planned, using a duct network to remove stale air from bathrooms and the kitchen, with fresh air supplied to dry rooms via air inlets or grilles located in the window frames.
An independent duct will be provided for all kitchen extractor hoods, vented to the roof.
ELECTRICITY AND TELECOMMUNICATIONS
The electrical installation will be designed with a high level of electrification, intended to meet current demand requirements and allow for future expansion of systems or technology.
Electronic video intercom system.
Telecommunications installation with RJ45 and TV outlets in the living room and bedrooms, in accordance with the telecommunications project.