Fall/
&
Backsights Foresights
SPRING Winter 2015 2018
Biannual Semiannual newsletter newsletter created on forcompany Houston Engineering, projects, news, Inc.'s andclients events. and employees
FIELD TO MARKET
Creating Sustainable, Productive Agriculture As society continues to grow its awareness of how and where our food is grown, it's more important than ever to support the agricultural industry and its partners. Consumers seek transparency, value, and sustainability from those they buy groceries from. These expectations are leading to breakthroughs in creating sustainable agricultural production. Just last year, Houston Engineering, Inc. (HEI) became a member of Field to Market: The Alliance for Sustainable Agriculture. Field to MarketÂŽ is an industry leader in uniting the agricultural supply chain in defining, measuring, and advancing the sustainability of food, fiber, and fuel production in the United States.
continued
INSIDE THIS ISSUE Building Infrastructure in America's Duck Factory......................................................4 What Happens When You Reconstruct the Only Bridge in Town?........................................5 Hansen Park: Big Investment. Big Results.....6 Transportation Innovators................................8 Drone-based LiDAR..........................................9 Featured Service Area......................................10 News and Events...............................................11 Project Snapshots.............................................13 Employee Spotlight...........................................14
THE ALLIANCE
THE PROJECT
Field to Market was born in 2006 when stakeholders from across the agricultural industry came together to discuss a sustainable approach to agriculture. This diverse group comes from every step of the agricultural supply chain: • Grower organizations • Agribusinesses • Food, beverage, apparel, restaurant, and retail companies • Conservation groups • Universities • Public sector partners
HEI was hired by Field to Market to bring their Fieldprint‰ Platform into the next generation. This enhancement puts the Platform on the forefront of creative web applications for the agricultural community. With a user-friendly interface and science-based data and models, the Fieldprint‰ Platform Version 3.0 provides farmers and landowners with a convenient tool to voluntarily and securely analyze how their management choices impact natural resources and operational efficiency. This helps farmers assess the environmental performance of their management practices against local, state, and national benchmarks for key sustainability indicators.
This group seeks to define, measure, and advance the sustainability of food, fiber, and fuel production in the United States. Field to Market and its members seek to drive continuous improvement in the sustainability of commodity crop production by coming together to accomplish a common goal.
OUR MEMBERSHIP By joining Field to Market, HEI will work with other members of the organization to help accelerate opportunities for continuous improvement across the agricultural value chain. These improvements include productivity, environmental quality, and human well-being. 2
Fall/Winter 2018
Fieldprint Platform Metrics let landowners see the sustainability of their farming practices
HEI is committed to being a steward of our agricultural resources. By serving every level of the agricultural industry, we hope to enhance the ability for today's agricultural community to provide safe, secure, and sustainable food supplies.
HEI AND AGRICULTURE
ps and fee ro
COMMUNITY-FOCUSED
As a community-focused firm located in the Midwest, we meld credible water quantity and quality science, natural resources science, economic information, and policy insight into creative solutions across many industries and diverse clients. From our humble roots, our future vision is to serve the agribusiness industry as a thought leader, bringing multi-disciplinary approaches that break down traditional barriers and change the dialogue about natural resources stewardship and agriculture.
hways pat
more
d
c
HEI is thrilled to have been selected as the technology vendor to rebuild the Fieldprint® Platform. The project has been a great collaboration with Field to Market staff and members. As a result of this partnership, the below new features and functionality were developed for this upgraded platform:
HEI has a long history offering agricultural services in the Upper Midwest, rooted in rural water supply and drainage water management by our founder George Houston. Today's HEI continues that early commitment with a firm understanding of American Agriculture and expanded services that embrace the shared values across the supply chain. We work to serve agriculture by enhancing the legacy of land stewardship and food production while recognizing the need for clean water and sufficient water supplies.
sc tter ience e b
HEI provides a wide array of services that unite under one streamlined approach: to create solutions that are both implementable and durable. We help boil down complicated science, models, and regulatory issues into understandable solutions that maintain and strengthen the economic viability of individual farmers and communities.
ved user e o r
d supply ch e c
ust ana ly rob
s tic engine
mo re
ag r
ion rat
ed anc integ h n
HEI'S AGRIBUSINESS SERVICES lo no
gy refre s
h
tec h
Such a large endeavor cannot be taken on alone. HEI’s team is working diligently to build partnerships with agriculture clients that recognize the need to sustain productive lands while finding opportunities to improve the quality and quantity of our water. We seek to honor the legacy of our founder by continuing to build trusted local relationships with the businesses and families that have the closest ties to the land and water: farmers. HEI’s team is committed to several agribusiness partner groups, working collaboratively as part of private-public partnerships to improve water quality and natural resources for American Agriculture. We are excited to support the great work being done to measure and enhance the ability for today’s agricultural community to provide safe, secure, and sustainable food supplies.
ments ve
omic impro on
e
COMMUNITY PARTNERSHIPS
features ain
enha n
erience xp
imp
MANY SERVICES, ONE APPROACH
Building Partnerships
Science to Support Ag 's S t o r y
Custom Supporting Software Infrastructure Development
Learn More https://fieldtomarket.org/ https://calculator.fieldtomarket.org houstoneng.com
3
Prairie Pothole Region in the United States
Building Infrastructure in America’s Duck Factory
A
merica’s Duck Factory. That’s one name used to describe what is more properly known as the Prairie Pothole Region—an area that many cherish for its benefits to migratory waterfowl and other wildlife. While this area is of unquestionable ecological importance, its benefits come with some tough challenges for civil engineering projects.
WHAT IS THE PRAIRIE POTHOLE REGION? The United States’ portion of the Prairie Pothole Region includes more than five-million acres of wetlands. These wetlands are located primarily throughout North Dakota, South Dakota, and Minnesota but are also found in Iowa and Montana. The abundant shallow wetlands (i.e., potholes) were created by receding glaciers thousands of years ago. The dips in the land’s topography became filled with water (some seasonally, some permanently), creating one of most significant wetland regions in the world. Every year, millions of waterfowl pass through or nest in the Prairie Pothole Region. Ducks Unlimited describes how waterfowl of every sort, from mallards to Canada geese, rely on the wetlands to provide food, nesting grounds, and more. The region provides other less obvious benefits, many of which benefit those who live 4
Fall/Winter 2018
within the region—even if they don’t realize it. According to the Environmental Protection Agency, these abundant wetlands solve many potential water resources problems without people having to lift a finger by reducing erosion and sedimentation, filtering water, and absorbing floodwater.
A BALANCING ACT While the wetlands provide several measurable benefits, those who live in the region also depend on roadways, drainage ditches, and railroads. Those who maintain and construct that infrastructure must check their efforts against their obligation to protect the wetlands, seeking ways to avoid and/or offset impacts before moving ahead with construction. That's rarely a simple undertaking in the Prairie Pothole Region. The value provided by wetlands and other aquatic resources means some scientists spend the bulk of their careers—whether in public or private practice—working to identify and preserve them. That includes several of the scientists at HEI. Scientists like Donna Jacob support civil engineers and planners by getting out of the office and into the field—at least during the non-winter months. Her job is to ensure that engineering projects are designed and constructed responsibly.
quality of the wetlands. After “Often, a project can the wetlands are quantified, seem straightforward,” the scientists, engineers, and says Donna Jacob, “but permitting agencies work together to find the optimal way then it needs to be to achieve a project’s outcome modified to accommodate while minimizing the impacts to these systems. Sometimes the natural environmental and essential ecosystem functions. it seems daunting to adjust plans or projects, SCIENTISTS GET THE JOB DONE but these changes Scientists are a cornerstone help maintain a healthy of successful engineering ecosystem.” projects, especially in the Donna and other scientists in the industry quantify aquatic resources by mapping the systems and determining the
Prairie Pothole Region. With their help, America's Duck Factory can keep up its production without halting civil infrastructure projects.
HEI's Aquatic Resources Experts
Mark Aanenson
Donna Jacob
Emmy Baskerville
Hannah Erdmann
Gained experience after graduation with a soil and water conservation district before joining HEI.
Lived and studied in Ireland while earning her PhD before returning to the United States.
Serves out of the Twin Cities, providing environmental services for both urban and rural projects.
Recently earned her bachelor's degree from North Dakota State University and is now pursuing her master's degree.
Certified Wetland Delineator
Professional Wetland Scientist
Certified Wetland Delineator In-Training
What Happens When You Reconstruct the Only Bridge in Town?
L
ike many Upper Midwest towns in the late 1800s, the City of Lake Park, Minnesota, was founded along the railroad. Large and small, many towns throughout the region have the railroad to thank for their starts and early sustainment. They built businesses, homes, and roads around the tracks that were their lifelines. Even now, you can see old tracks running through downtown Lake Park, an offshoot of the mainline that was used by the town’s grain elevator. Nowadays, train traffic has increased, roads are busier than ever, and the Upper Midwest has a more diverse economy. Given the chance to do it all over again, urban planners would probably propose a layout other than one where railroad tracks run right through the heart of a city. But the tracks are where they are, and cities have found ways to minimize the challenges of railroads while continuing to benefit from their presence.
A TOWN IN TWO PARTS In Lake Park, the railroad runs east and west, splitting the town roughly into two halves. The north part has a large portion of the population as well as a grocery store, bank, restaurant, and most of the commercial businesses. The south half includes a school, connects to US 10 (the main corridor through the region), and is home to its own significant portion of the population.
Residents and businesses in Lake Park depend on access between the two halves. Businesses receive traffic from US 10, and residents in the north attend school or commute along US 10 to jobs outside the community. A bridge was constructed over the BNSF railroad decades ago to ensure that there would be unhindered access over the railroad at all times. This bridge has served motorists and pedestrians well while also allowing the railroad to continue business uninterrupted below. However, the Becker County Highway Department recently determined that the bridge had reached the end of its service life and the time had come to replace it.
MAINTAINING ACCESS OVER THE RAILROAD Replacing the bridge in Lake Park, while necessary, threatened to temporarily remove residents’ only means of crossing the tracks in town. This was deemed unacceptable. The next closest crossing is located about 1.5 miles west of town on a gravel road, which would have not only been inconvenient— adding miles to travel routes— but also less safe. The crossing west of town is at-grade and, considering a high-speed train is present every 45 minutes and the roadway’s average daily traffic would increase to up to 1,000 vehicles, the risk of a train-vehicle collision was determined unacceptable to
Becker County and BNSF. This crossing also is on a gravel surfaced road, has limited advanced warning devices, and no intersection lighting. The County retained HEI to serve as civil engineer for the project and come up with a solution to keep traffic flowing. HEI worked with the County to create a construction phasing plan that would preserve a grade-separated railroad crossing in town through the construction zone by using the existing bridge. A construction staging plan was developed that would allow the new bridge to be constructed one-half at a time. A single lane of traffic and a pedestrian path would be maintained throughout construction operations. The previous timber structure was nearly 75 years old and had sustained several train impacts over the years as well as a recent vehicle impact. These issues, along with its age, created concerns over stability during demolition and temporary traffic use.
A single lane of traffic was maintained throughout the project. Roughly half of the original timber structure was preserved temporarily to allow for traffic while the first portion of the new structure was built.
The structure was analyzed to determine its stability before half of it was demolished. With new load ratings and other restrictions in place, traffic was reduced to a single lane over the timber structure (temporary signals at either end managed traffic flow). After the first stage of construction, traffic was shifted to the new adjacent half structure, and the remaining half of the initial structure’s demolition was completed. The rest of the new bridge was then constructed. In the fall of 2018, construction for the bridge was successfully completed, and two-lane traffic, pedestrian passage, and access to the future multi-use trail were all restored over the new bridge. The new bridge serves the same basic purpose as the old—get people over the tracks—but it will do so with several improvements. Pedestrians will have a protected shareduse path, BNSF will have the option to add an additional track, and the stability of the structure itself will mean it can serve the city for several decades into the future.
The bridge serves as the only above-grade crossing over the railroad in Lake Park. houstoneng.com
5
an
nd
Th e
sa
un
iq
vative, iron - en no h
d ce
ue
n ,i
filter.
New dam structure increases water storage.
HANSEN PARK: Big Investment. Big Results. Hansen Park is in the Rice Creek Watershed District (RCWD) in New Brighton, Minnesota. The District recently completed a comprehensive project within the park to improve downstream water quality and mitigate urban flooding while balancing recreational opportunities and improving wildlife habitat. HEI supported the RCWD to complete the project that included: • Pond dredging (≈70,000 CY excavated) • Contaminated sediment removal (≈22,000 tons landfilled) • Dam reconstruction • Installation of new park trails • Habitat improvements through native vegetation establishment (aquatic & terrestrial) • Installation of unique Iron Enhanced Sand Filter (IESF) system
GETTING THE FACTS STRAIGHT In 2013, the cities of New Brighton, St. Anthony Village, and Roseville petitioned to create the Basic Water 6
Fall/Winter 2018
Management Project. The project would address stormwater management and flooding within the drainage area of Ramsey County Ditch 2, which flows through the Hansen Park pond. This petition launched the RCWD and HEI into the first phase of this project: analyzing current conditions of the drainage area and how they could be improved with the Basic Water Management Project. Through this analysis, HEI proposed the Hansen Park project as a solution for
improvements to water quality and flooding in the region. The City of New Brighton took HEI’s findings and incorporated the project into an amended petition. On June 11, 2014, the RCWD accepted the amended petition and began to work in earnest to develop the background information and concept plans for the Hansen Park project.
from the Minnesota Board of Water and Soil Resources (BWSR) that included an allocation of $1.5 million for the project. Combined with $2.5 million in matching RCWD funds, the grant funding makes Hansen Park the largest and most complicated project in RCWD's history.
FUNDING THE PROJECT
HEI worked with stakeholders to design the multi-benefit project. This design married together several best management
With HEI's support, the RCWD and City of New Brighton secured a Targeted Watershed Demonstration Project Grant
GETTING A DESIGN IN PLACE
HANSEN PARK by the Numbers
$4 1
-million budget
unique iron-enhanced sand filter
᾿14 235
project start year lbs/year of sediment removed
᾿18 $1.5
construction completed
-million grant funding
practices, including: • Targeted removal of accumulated sediments contributing to significant phosphorus loading to improve water quality • Increased flood storage capacity via sediment removal and installation of threestage dam and outlet design • Establishment of native plant community • Development of an automated IESF pumping system Our drone team captured videos of the existing site to be sure we had a full understanding. They have continued to take more videos to document the construction effort.
MOTHER NATURE HAD OTHER PLANS The project was developed to accommodate mechanical dredging (excavation). To do so, it was necessary to conduct excavation operations under frozen conditions to allow for access to the pond. It was initially anticipated that major excavation (dredging) operations would be completed during the winter of 2016/2017. The temperatures were just as cold as anticipated, and everything was running smoothly when construction began in December. Then, in mid-January, temperatures skyrocketed. The exposed surface of the pond quickly thawed. The Contractor made a noble effort to maintain the work surface
via the installation of woodchip haul roads. The wood chips acted as a thermal barrier, preventing soils from warming and giving us a firm foundation to work on.
Construction was planned during winter to take advantage of frozen ground to provide a solid foundation to work on and make transporting equipment much easier. However, several weather woes created challenges to overcome:
The Contractor also implemented the use of a composite matting surface to prolong trucking access to the pond. Despite their best efforts, continued excavation operations were deemed unsuitable and unsafe. As a result, following installation of the new sheetpile dam structure and outlet control structure project work was suspended for the season.
Temperatures averaged 5.2°F ABOVE normal during construction, warming soils and melting snow.
We took advantage of warmer weather to complete the sheet pile dam coating, which needed warmer weather to seal properly.
Higher temps meant soils expanded more, leading to less soil hauled off daily than planned, more landfill coordination, and more difficult excavation methods.
Our team provided extensive coordination assistance to ensure as much material was disposed of as possible.
Instead of frozen ground, our crew dealt with muddy soils, slowing construction equipment and making a mess of the site.
We used wood chips to create a simple, cost-effective means of keeping the soil cooler and give the team a stronger foundation to work on.
Due to these conditions, excavation was extended into the following winter.
Our team was able to establish vegetation easier in softer ground earlier than expected.
Project work to complete the dredging effort resumed during the winter of 2017/2018. The IESF system and native vegetative restoration effort were completed during the summer of 2018. The IESF system at Hansen Park consists of a series of sand beds with iron fillings mixed into the sand. When pond water that is heavily laden with phosphorus is pumped to the beds, it chemically bonds with the iron filings, greatly reducing phosphorus discharge concentrations. The Hansen Park system utilizes complex controls to automate the application of water to the multi-bed system. Initial testing of discharges from the IESF system has demonstrated phosphorus removal efficiencies in excess of 90%.
Weather Woes
This project substantially reduced flood risk in a community prone to flooding.
Our Solutions
Wood chips created a thermal barrier and firm footing for construction operations.
This innovative IESF has an advanced control system that automates the pumping process and can be operated remotely.
Our drone team visited the site throughout the project's life span to ensure we had a complete understanding of the area and that the project was completed correctly.
BEFORE 2016
AFTER 2018 houstoneng.com
7
TRANSPORTATION INNOVATORS Consensus Building
1
Engaging the community and identifying and addressing the public's concerns are top priorities during the consensus building process. Here are ways we are connecting with invested parties to build consensus. • • • • • •
Public meetings Social media/website Newsletters 3D visualizations Face-to-face meetings Stakeholder meetings
Starting with planners and traffic engineers and all the way to roadway designers and landscape architects, HEI uses innovative transportation solutions for the most efficient and safe transportation infrastructure and operations for our clients.
Visioning
Innovation
2
Helping our clients define an overall vision is a main goal of every HEI corridor, facility, or intersection project. Using key takeaways from the consensus building process, HEI works to establish a project-specific vision. Our team takes into consideration everything from adjacent land use, roadway functional classification, access spacing, speeds, corridor aesthetics, and multi-modal accommodations when determining transportation solutions.
3
Doing the "same old thing" doesn't work for every intersection. Our team takes a lot of pride in our innovative and out-ofthe-box thinking as we strive to create the best possible solution. Part of this process is finding a balance between operations, access, and safety to achieve the correct fit for each and every corridor. HEI's innovative solutions include: • First roundabout in the City of Moorhead • First RCUT in the City of Fargo
Intersections
Innovation Tool Box At HEI, we have a wide variety of options to choose from when helping our clients find the perfect fit for their community.
Intersections
Interchanges
• • • • • • •
RCUT Single-lane roundabout Multi-lane roundabout Media U-turn intersection Bow-tie intersection Continuous green T-intersection Pedestrian improvements
Interchanges
• Diverging diamond • Single-point urban interchange • Roundabout interchange
8
Fall/Winter 2018
Photo credit: North Dakota Department of Transportation pictured with representatives from HEI and SkySkopes
DRONE-BASED LIDAR
D
rones continue to be a buzzword in many industries, including the architecture/engineering world. Drones are enhancing how we do traditional work, including survey data collection for projects. Earlier this fall, HEI conducted a drone-based LiDAR survey on ND Highway 3 north of Harvey, ND, for the North Dakota Department of Transportation. This was the first time a drone with LiDAR capabilities has been used on a state roadway project. Drones can collect LiDAR data much faster and more efficiently compared to the traditional aerial LiDAR method or as ground survey. Acquiring aerial LiDAR data can be a costly investment with the traditional method. To mobilize an airplane for one day can cost up to $5,000. That's before the plane even gets into the air! In comparison, two hours of a drone LiDAR flight can cost approximately $1,400, and a drone flight can cover roughly 200 acres in one flight before needing to recharge batteries. HEI and our teaming partner are excited to pioneer the way we use this technology to help us work smarter and faster, which helps our clients save time and money. Learn more at www.houstoneng.com/drones
ADVANTAGES OF DRONE-BASED LIDAR Safety Surveyors and drone pilots can capture LiDAR information of rough, unstable terrain from a safe location.
Cost
The traditional aerial LiDAR method cost can start at roughly $5,000 just to mobilize the plane for one day! The cost for drone-based LiDAR is established by the time to fly the area and the data processing time, which costs significantly less than aerial LiDAR.
Accuracy The drone-based LiDAR system can capture surveygrade (cm-level) vertical accuracy with a scan rate of 700k points per second. Millions of points are collected during this process, resulting in highly accurate surface models that can be used for project design.
WHAT IS LIDAR? LiDAR (light detection and ranging) uses light in the form of lasers to measure variable distances. It can be used for:
3D Modeling Digital Terrain Models Right-of-Way Mapping and Monitoring The drone is equipped with a state-of-the-art LiDAR system to capture accurate data points for mapping needs. houstoneng.com
9
Featured Service Area
LANDSCAPE ARCHITECTURE In a society that continues to demand more and more from its design consultants, HEI has held onto our commitment of exceeding expectations by adding landscape architecture to our palette of services. Landscape architecture is the art and practice of designing an outdoor environment. Landscape architects play a major role in the development of our communities by literally shaping the world we live in. From parks to streetscapes, stormwater management to community development, and beyond, our team combines landscape architecture with civil engineering to create projects that not only get the job done but look good doing it.
MEET JOSH Josh Johnson, PLA, ASLA Landscape Architect 605.271.0378 jjohnson@houstoneng.com
Grew up in southeastern Minnesota 10
Fall/Winter 2018
Josh Johnson joined HEI's team in September 2018, leading our new Landscape Architecture service area for all HEI locations and clients. After earning his bachelor's degree in landscape architecture from North Dakota State University, Josh developed a strong resume providing landscape design services to clients across the country.
"Josh's expertise and
Josh has more than 20 years of design and project management experience for a variety of public and private organizations. Combining landscape architecture with civil engineering components, Josh helps clients create places that are not only functional but aesthetically pleasing and sustainable.
complements our expanding
Can serve any client and project company-wide
previous project experience, along with his client service and management expertise, is a great addition to HEI's team and naturally planning service sector." - Jef f Le D oux, P resident and C EO
Registered Professional Landscape Architect in SD, ND, MN, WI, and AL (IA pending)
NEWS AND EVENTS 30
25
years
Our employees
Years
years
are the core of
of
our company, and
Service John Freitag, PE Sr Construction Engineer
Jeff LeDoux, PE President and CEO
we value their commitment and
Rick Gunderson, PE Sr Project Manager
20
contributions.
15
years
Congratulations
years
to the following employees on their milestone work Mark Aanenson, CWD Project Manager/ Environmental
Brad Johnson Engineering Specialist
Chad Qualley Sr Technician
Jeremy McLaughlin, MBA, PE Sr Project Manager
Dave Schwengler Engineering Specialist
Kristi Stroud CAD Supervisor
Greg Thompson, PE, CFM Project Manager
anniversaries!
10
years
Emmy Baskerville, CWD Scientist II
Greg Bowles, PE Project Manager
Daniel Heitzman, PE Project Engineer
Zach Herrmann, PE Project Engineer
Alan Kemmet, PE Project Manager
Shawn Mistelski Administrative Assistant
Kate MacDonald, PE Project Engineer
Tony Nordby, PE Project Engineer
5
years
Chris Otterness, PE Project Manager Trent Berg, PE Engineer III
Chad Cass, EI, LSI Construction Engineer
Lois Erickson, SHRM-CP HR Manager
Michael Ferrie, PE Engineer III
Stan Hanson, PE Project Manager
James Hennessy, PLS Project Manager/ Land Surveying
Dan Korf, PE Engineer II
Cameron Miller, EI Engineer II
Garrett Monson, MS, PE Engineer III
Jerry Neu Engineering Specialist
Chad Nunemacher Sr GIS Analyst
WELCOME
Cory Hartung Software Engineer I
Kelby Laxdal, PE Engineer III
Josh Hengel, PE Engineer III
Rusten Roteliuk, PE Project Engineer
Noah Irby GIS Analyst I
Nick Shaske Technician I
Jeremiah Sandahl Software Engineer II
Jun "Jay" Yang, PhD, PE Engineer III
PE REGISTRATION
Josh Johnson, Russell Kerber, PLA, ASLA EIT Landscape Architect Engineer I
Destin Spellman Engineer I
Jeff Renner CAD Technician II
Brenda Stroh Controller
EARNED
NEW EMPLOYEES
Rob Davis, MS Scientist II
Brian Pattengale, PE Project Engineer
Brady Wall, PE Engineer III
Wes Keller, MEng, PE Engineer II
Dan Korf, PE Engineer II
Joe Reiter, PE Engineer III
Jerry Wallace, PE Engineer II
houstoneng.com
11
NEWS AND EVENTS 1
2
3
4
5
6
7
9
10
1. Gabe Brien took second place in the Adult Division of the 43rd Annual International Old-Time Fiddle Contest in June at the International Music Camp near Dunseith, ND. 2. HEI's Thief River Falls team tossed out candy and treats in the the annual Pennington County Fair parade. 3. In celebration of Shark Week, HEI's Fargo team tested their shark knowledge with a trivia break. 4. HEI's Fargo team participated in West Fargo's West Fest parade in September. HEI's float promoted safety with staff dressed in reflective vests and hard hats.
12
Fall/Winter 2018
8
11
5. HEI's Maple Grove team enjoyed
12
9. For the fifth consecutive year,
12. HEI's Bismarck and Dickinson
their first annual golf scramble in
Prairie Business Magazine
team won the 2019 Dickinson
September.
recognized HEI among the
Trap Club Championship.
50 Best Places to Work in the 6. HEI hosted a tailgating spot
northern Great Plains. HEI
during the North Dakota State
couldn't have received this
University Bison football games
honor without our wonderful
for employees and their families
employees!
to enjoy. 10. Hannah Rollin and Sarah 7. The North Dakota Chapter of
Walker are participating in the
the American Public Works
uCodeGirl mentorship program
Association recognized HEI with
through May 2019. The program
the 2018 Project of the Year
brings together STEM women
award for the Downtown Minot
professionals and teen girls
Infrastructure Improvement
to build a support system for
Project.
academic success.
8. Jeff LeDoux, President and CEO,
11. HEI's Fargo team enjoyed
was interviewed by Fargo INC!
their annual golf scramble in
magazine, sharing 10 tips from
September.
HEI's 50 years of business.
Want to learn more about what's happening inside HEI? Follow us on social media and visit our website to stay connected.
houstoneng.com
PROJECT SNAPSHOTS
You spoke and we listened! Your feedback from our spring/summer issue survey indicated that you are hungry to read more project stories. Here are some project highlights we've been working on this past year. Drain 22 Walsh County, ND
FM-15-F2 Harwood, Hackberry, and River Drive Levees Phase 2 Fargo, ND
This project will provide flood protection along River Drive in Fargo, ND, consisting of approximately 2,645 LF of levee with a 10-foot top and 4:1 side slopes averaging 7 feet tall. Over 23,000 cubic yards of impervious (clay) material was required for construction. This project started July 2018 and wrapped up this past fall with seeding happening in the spring.
New culverts and two riprap outlet structures were constructed in the summer of 2018 to repair erosion that was occurring on the bank of the Red River. The project also consisted of three miles of ditch cleanout and more than one mile of ditch reconstruction.
North Hill Elevated Water Tank
Drain 87/McLeod Drain Walsh County, ND A new legal drainage system was established at the request of landowners in the drain assessment area to address poor field drainage. Currently, more than five miles of ditch are being constructed with more than 1.1 million cubic yards of dirt being moved. It's expected to be completed by July 2019.
MInot, ND The 1.5-milliongallon water tank being completed this fall houses three times the capacity of the existing tower to serve the growing community.
The Bridges Student Edition
Fish Lake Rapids
North Dakota State University, Fargo, ND
Pelican Rapids, MN
This new student housing facility, which HEI provided the civil site design for, opened in August 2018 with more than 350 units.
The Fish Lake Dam sets water levels for several lakes as part of the chain of lakes on the Pelican River. The aging dam infrastructure was replaced with a rock ramp and natural boulder arch rapids completed this fall. This project improves fish migration, maintains current lake levels, and created aesthetically pleasing naturallooking rapids.
 Clay County Joint Law Enforcement Center Moorhead, MN This project consisted of expanding/remodeling the existing joint law enforcement center and county jail facility to be the new county jail. A brand new joint city/county law enforcement center was also constructed on the campus.
Before
After houstoneng.com
13
EMPLOYEE SPOTLIGHT Brian Fischer started at HEI 17 years ago as a GIS specialist making maps and performing GIS analysis from our Maple Grove office. Since that time, Brian has led the development of HEI’s technology business sector, which includes GIS services, web and mobile application development, and niche software products.
Brian with his wife, Jennifer, and their four children: Peyton, Miah, Owen, and Ella
He spends most of his time today leading a team of software engineers and GIS analysts, working on business development, managing projects, and gathering software requirements for HEI’s technology business sector. Outside of work, Brian enjoys golfing, fishing, watching about any sports, and being involved with his four children’s activities—from volunteering at basketball and baseball games to watching dance recitals and tournaments.
Getting to know
Brian Fischer
Q&A Tell us about the projects you are currently working on? I’m currently working with Field to Market® to rebuild their Fieldprint® Platform. This is a software development project to rebuild and enhance their assessment framework that allows the agricultural supply chain to measure the environmental sustainability impacts of commodity production and identifies opportunities for continuous improvement. This project has been fun and challenging, but HEI has a great team working on the project to make it successful. I have really enjoyed getting back into the agricultural domain after growing up in a farm community in rural Nebraska.
14
Fall/Winter 2018
Fun Facts What has been the most rewarding project you’ve worked on thus far at HEI? There have been numerous projects over that past 17 years, but one project that sticks out is the data management system we developed for the Metropolitan Mosquito Control District in the Twin Cities. It was very rewarding seeing the use of GIS, web, and mobile technologies come together to help an organization modernize their data collection and reporting systems. This included everything from tracking public calls to helicopter treatments. What do you like most about your job/role? I enjoy the problem-solving aspect of my job and helping clients use software solutions to meet their business needs.
What have you learned from your experience at HEI? No two projects are the same. Each has its own challenges and rewards. What book are you currently reading? Do children’s books count because I read many of those each night!
Favorite Home Cooked Meal: Tater tot hotdish. Special Skill: "I'm pretty good at playing guitar hero and Madden on Xbox with my kids."
Avid Cornhuskers Fan: The Nebraska native makes it to a game whenever he can.
Mark with his wife, Michele, and daughters, Bailey and Sidney
Getting to know
Mark Aanenson Mark Aanenson has two offices—sort of. The first is located in Fargo, ND. In it is a brown wooden desk covered in GIS maps, a metal bookshelf weighed down by plant identification manuals, and a northfacing window from which he can see cattails waving when the parking lot empties out. His second office—where he prefers to spend his workdays—is quite a bit bigger. In fact, that same north-facing window looks right into it. As one of HEI’s environmental scientists, Mark spends much of his time outdoors. He and his team travel overland into fields and forests, down into ditches, and out onto rivers to provide environmental services for clients. This includes biological assessments identification, aquatic resources delineation, and more. Mark joined HEI in the late 1990s after previously serving as the District Manager for the Mahnomen Soil and Water Conservation District. When he’s not working, he still finds opportunities to get back outside, spending his weekends hunting and fishing, golfing, and snowmobiling. Whether he’s on personal or professional time, one is most likely to find Mark somewhere in the great outdoors.
Q&A You've been with HEI for two decades, any stories from your experience? It’s not really a story, but I have worked out of six HEI office buildings since I started in 1998. Part of the reason for this has been how much our company has grown. When I began, I think we had fewer than 50 staff across the company. Now, we have double that in just this office (Fargo) alone! Where is the most interesting place you’ve traveled for work and why? I really enjoy both the forested areas in Minnesota and the prairies of North Dakota. Last year we worked on some projects west of Havre, MT. This was way up in west-central Montana where we could see the
Rockies to the west. Living and working out of the Red River Valley, we don’t get to see the mountains too often—whether for work or in our personal lives—so that was a treat. What have you learned from your experience at HEI? A positive attitude and good communication can solve most problems. And having a great team makes a huge difference. When I first started at HEI, I completed most of my work alone. Now, I’m joined by some great scientists who help ease the burden and bring their own unique skills to each project.
What has been the most rewarding project you’ve worked on thus far at HEI? Having personally experienced a major flood, I would say working on flood protection projects. I know firsthand the financial and emotional toll floods can have on peoples’ lives. Our family went through a flood in 1997 when we lived in Ada, MN. Being part of a team building flood protection for people in communities like Fargo, Minot, Warren, and Moorhead—that is pretty rewarding for me.
Fun Facts Passionate Outdoorsman: He spends as much time in nature as he can even when he's not on the clock. Familiar Face at HEI: He's been with the firm for 20 years and counting, and he has served clients out of six different HEI office buildings as HEI’s staff and services have grown and expanded.
houstoneng.com
15
1401 21st Avenue North • Fargo, ND 58102
Minnesota Maple Grove Thief River Falls North Dakota Fargo | Bismarck | Dickinson Grand Forks | Minot Iowa West Des Moines
South Dakota Sioux Falls
houstoneng.com
RECYCLING IN ENGINEERING As an environmentally focused engineering firm, we’re always looking for ways to make our projects eco-friendly yet affordable. One of the best ways to do this is to refer to the adage: Reduce. Reuse. Recycle. Many times the materials we need for our projects are right under our noses— we just need to know where to look.
Grand Marais Repurposed Flatcar Bridges
GRAND MARAIS FLATCAR BRIDGES HEI designed small bridges with repurposed flatcars as part of the Grand Marais Outlet Restoration. These flatcars saved our project team time and money during construction as well as extended the useful life of the fabricated structures.
NDSU WE PARKING LOT HEI reclaimed existing pavement from the original WE parking lot to use it as the base aggregate during the recent redesign.
Reclaimed Base Aggregate for North Dakota State University's WE Parking Lot Before/After
Before/After
REPURPOSED OSGOOD BRIDGE The City of Fargo hired HEI to expand their pedestrian trail system while maintaining historic charm. To do this, a 1920s-era overhead steel truss bridge was converted into a landmark pedestrian crossing over the Sheyenne River. 16
Fall/Winter 2018
Converted Truss Bridge into Pedestrian Crossing over the Sheyenne River