Skip to main content

Amendments to SEQR Regulations

Page 1

9/28/2018

1

2018 Amendments to the Regulations Implementing SEQR September 28, 2018

2

SEQR – Overview The Fundamental Tenets of SEQR 1. Environmentally-Informed Government Decisions 2. Consideration of Alternatives 3. Public Disclosure of Environmental Impacts 4. Avoidance and Mitigation of Impacts 5. Contextual Impact Analysis

3

A Brief History of SEQR • • • •

National Environmental Policy Act of 1969 State Environmental Quality Review Act of 1975 Original SEQR Regulations adopted in 1976 Major Amendments to SEQR Regulations 1978, 1987, 1996

1


9/28/2018

4

2018 Amendments to SEQR – Part 617 2018 amendments build upon previous improvements: • EAFs revised to web-based forms • GIS Mapping component added (EAF Mapper) • Workbooks released as guidance

5

DEC’s SEQR Website www.dec.ny.gov/permits/357.html

6

DEC’s SEQR EAF Mapper www.dec.ny.gov/EAFMapper

2


9/28/2018

7

DEC’s SEQR EAF Workbooks www.dec.ny.gov/permits/90125.html

8

DEC’s SEQR Handbook http://www.dec.ny.gov/permits/6188.html

9

DEC’s SEQR Cookbook http://www.dec.ny.gov/permits/57228.html

3


9/28/2018

10

2018 SEQR Amendments – Part 617 • Goal: Streamline regulatory process without sacrificing environmental protection • Generic EIS and findings explain changes

11

Timeline for 2018 SEQR Amendments • • • •

Notice of Intent and Draft Scope - July 11, 2012 Final Scope - November 28, 2012 Proposed Rule and Draft GEIS – January 20, 2017 Revised Rule and Revised Draft GEIS – April 4, 2018 • Rule Adopted - June 27, 2018 • Rule Effective - January 1, 2019

12

Overview of Amendments • • • • • •

Type I List Type II List EIS Scoping EIS Preparation Document Preparation SEQR Fees

4


9/28/2018

13

DEC’s 2018 Amendments – Critical Documents https://www.dec.ny.gov/permits/83389.html

14

Type I List Lowered thresholds for residential subdivisions: • From 250 to 200 units - pop. 150,000 or less • From 1,000 to 500 units – pop. 150,001 to 999,999 • From 2,500 to 1,000 units – pop. 1,000,000 or greater

15

Type I List Added a threshold for parking spaces in smaller communities: • 500 or more vehicles – pop. of 150,000 or less • 1,000 of more vehicles – pop. of 150,001 or more

5


9/28/2018

16

Type I List • Adds thresholds to historic properties similar to other sensitive resources • Adds “eligible” historic properties • Eligible properties will now appear on EAF Mapper

17

Type II List • Upgrading buildings to meet state energy code

18

Type II List • Green infrastructure

6


9/28/2018

19

Type II List • Installation of telecommunications cables in ROWs with trenchless burial or use of existing poles

20

Type II List • Conveyances of land in connection with 1-3 family residence

21

Type II List • Solar (on rooftops, landfills, brownfield and Superfund sites, wastewater treatment facilities, parking lots/garages and industrial areas)

7


9/28/2018

22

Type II List • Lot line adjustments

23

Type II List • Reuse of a commercial or residential structure

24

Type II List • GML §§ 239-m or 239-n planning recommendations

8


9/28/2018

25

Type II List • Acquisition/dedication of parkland or conservation easement

26

Type II List • Conveyance of property by public auction

27

Type II List • Organic digesters at operating municipal landfills

9


9/28/2018

28

Scoping • Scoping will be required for all EISs (similar to Federal and NYC requirements) except for supplemental EISs • New process for late-filed comments on scope

29

EIS Preparation • Clarify procedures to define when a DEIS is adequate for public review • Addition of requirement, where relevant, to evaluate measures to avoid or reduce an actions impact on climate change and associated impacts of flooding and sea level rise.

30

Document Preparation and SEQR Fees • Draft and final scopes must be noticed in the ENB • Draft and finals scopes, as well as draft, final and supplemental EISs must be posted on a publicly available website

10


9/28/2018

31

Q&A

32

Contact Information DEC, Division of Environmental Permits 625 Broadway, Albany NY 12233-1750 james.eldred@dec.ny.gov (518) 402-9167 http://www.dec.ny.gov/permits/ 83389.html (regulatory documents)

11


Turn static files into dynamic content formats.

Create a flipbook
Amendments to SEQR Regulations by Hofstra University - Issuu