Skip to main content

WA450-1 Komatsu Service Manual PDF DOWNLOAD

Page 1

SEBM04210108

SHOP MANUAL KOMATSU

WA450-1 MACHINE MODEL

SERIAL No.

WA450-1

10001

•

and up

ble in s and optional equipment that are not availa This shop manual may contain attachment for those items you may require. your area. Please consult your local Komatsu distributor Materials and specifications are subject to change without notice.

WA450-1 mount the S6D125-1 engine. Engine Shop Manual. For details of the engine, see the 6D125 Series

Printed in Japan 07-90(01)03321

00-1


CONTENTS 00 GENERAL

No. of page

01-1

10 ENGINE 11

STRUCTURE AND FUNCTION

11-1

12

TESTING AND ADJUSTING

12-1

13

DISASSEMBLY AND ASSEMBLY

13-1

14

MAINTENANCE STANDARD

14-1

20 POWER TRAIN 21

STRUCTURE AND FUNCTION

22 23

TESTING AND ADJUSTING DISASSEMBLY AND ASSEMBLY

24

MAINTENANCE STANDARD

21-1

22-1

23-1 24-1

40 STEERING SYSTEM 41

STRUCTURE AND FUNCTION

41-1

42

42-1

43

TESTING AND ADJUSTING DISASSEMBLY AND ASSEMBLY

44

MAINTENANCE STANDARD

44-1

43-1

50 BRAKE AND AIR SYSTEM 51

STRUCTURE AND FUNCTION

52 53

TESTING AND ADJUSTING DISASSEMBLY AND ASSEMBLY

53-1

54

MAINTENANCE STANDARD

54-1

51-1 52-1

60 WORK EQUIPMENT SYSTEM 62-1

63

STRUCTURE AND FUNCTION TESTING AND ADJUSTING DISASSEMBLY AND ASSEMBLY

64

MAINTENANCE STANDARD

64-1

61

62

61-1

63-1

80 ELECTRIC AND ELECTRONIC SYSTEM 81

STRUCTURE AND FUNCTION

81-1

82

TESTING AND ADJUSTING.

82-1

83

DISASSEMBLY AND ASSEMBLY

83-1

90 ОТHERS

00-2 ②

91

STRUCTURE AND FUNCTION

91-1

93

DISASSEMBLY AND ASSEMBLY

93-1

97

GEAR PUMP

97-1

WA450-1


LIST OF REVISED PAGES

The affected pages are indicated by the use of the following marks. It is requested that necessary actions be

Mark

Indication

Action required

taken to these pages according to the table below.

Page to be newly added

}

Add

Page to be replaced

Replace

Page to be deleted

Discard

Pages having no marks are those previously revised or made additions.

LIST OF REVISED PAGES Page

of Time Time oT revision

Mark

Page

Time of revision

Page

Mark

Time of

revision

Mark

Page

Time of revision

Mark

Page

Time of

revision

00-1

⑧

(00-22)

12- 4

Π

13-18

Π

14- 1

00-2

②

(00-23)

12-5

3

13-19

2

14- 2

5

00- 2-1

8

(00-24)

12-6

4

13-20

2

(00-25)

12-7

4

13-21

2

I

13-22

②

21-1

5

00- 2-2

2-3

(8)

(00-26)

12-8

2-4

8

(00-27)

12-

00- 2-5

8

(00-28)

12-10

4

00- 2-6

8

(00-29)

12-11

6

13-25

00- 2-7

(8)

(00-30)

12-11-1

6

13-26

21-5

(00-31)

12-11-2

6

13-27

21-6

5

00- 4 00- 5

01-1

5

00- 6

01-2

5

00- 7

01-3

5

00-8

01-4

5

00-9

11-1

(00-12)

11-2

5

5

13-30

21-9

5

7

21-10

13-32

7

21-11

13-33

7

21-12

21-13

13-34

②

13-35

13-5

2

13-36

13-37

7

21-16

13-38

8

21-17 டு

G

11-3

13-6

7

133-7

7

(00-15)

1-5

13- 8

•

21-14 21-15

13-39

L

21-18

13-9

①

3-39-1

7

21-19

13-10

7

133-39-2 -3

13-11

①

13-12

7

(00-18)

12- 1

(00-19)

12-2

(00-20)

12- 2-1

6

13-13

(00-21)

12-3

4

13-14

WA450-1

13-29

8

13-

11-4

3

5

21-7

13-31

2

21-4

21-8

13-28

13-1

(5

G

3

(00-13)

(00-17)

21-

6

(00-14)

(00-16

13-24

12-12

13-

(00-11)

21-2

12-13

13-2

00-10

13-23

L

00-

D

Mark

•

21-20

13-40 13

8

341 13-42

21-21

③

②

21-22

3

2

21-23

21-24

00-2-1 8


LIST OF REVISED PAGES

Mark

Page

Time of revision

21-25

Page

Mark

Time of revision

Mark

Page

Time of revision

Mark

Page

Time of revision

Mark

Page

Time of revision

22-4

3

23-8

D

23-31

2

23-72

2

2

23-73

2

21-26

8

22-5

9

23-9

2

23-32

21-26-1

8

22-6

6

23-10

2

23-33

2

23-74

2

23-75

2

이 21-26-2

8

22-7

6

23-11

2

23-34

2

23-35

(2

23-76

2 2

21-27

4

22-8

4

23-12

2

21-28

8

22-8-1

6

23-13

4 4

23-36

2

23-77

23-37

2

23-78

2 8

21-29

5

22-8-2

6

23-14

2

이

21-29-1

8

22-9

3

23-15

2

23-38

23-79

이

21-29-2

8

22-11

6

23-16

(7

23-39

23-80

21-30

22-12

6

23-17

2

23-40

23-81

(7

21-31

22-13

Ο

23-18

D

23-41

21-32

8

22-14

D

23-19

2

21-33

③

22-15

4

23-20

2

21-34

3

22-16

23-21

4

23-44

2

23-84

6

23-22

23-45

21-36

6

23-23

23-46

21-37

22-17-2

6

23-24

23-47

21-38

22-18

Ο

23-25

23-48

23-88

21-39

22-19

3

23-25-1

23-49

233-89

21-40

22-20

3

23-25-2

7

23-50

3-90 23-

21-41

22-21

4

23-25-3

8

23-51

-90-1 23-90

22-22

D

23-25-4

7

23-52

23-91

23-25-5

7

23-53

23-25-6

7

23-54

5

21-43

5 235

2

23-94

23-2

(7)

23-25-8

(7

23-56

2

21-45-1

23-55

23-25-7

23-93

23-95

23-25-9

23-57

2

21-45

23-91

D

21-44

23-86 23-87

2

21-42

23-85

23-96

23-58

2

96-1 23-90

23-59

2

-96-2 23-90

23-60

2

23-9

21-45-2

5

23- 2-1

8

21-46

5

23- 3

7

23-25-10

21-47

5

23- 4

2

23-25-11

8

23-25-12

8

23-25-13

D

23-61

2

23-9

Ο

23-25-14

8

23-62

2

3-99 23-

23-99-1

21-48

5

23- 5

21-49

(5

23-6

8

2

22-17 22-17-1

2

21-35

2

23-83-1

2

8

2

2

23-83

23-43

2

23-42

2

2

2

23-82

2

Π

21-50

23-6-1

21-51

23- 6-2

23-25-15

7

23-63

2

21-52

23-25-16

7

23-64

2

23-1 3-100

2

23-65

2

23-101

2

23-66

2

23-102

2

23-103

2

5

23- 6-3

21-53

5

23-6-4

8

23-25-17

21-54

5

23-66-5

Ο

23-26

Π

23-27

②

23-68

2

23-7

7

23-28

②

-6 9 233-6

2

23-104

3

23-7-1

7

23-29

2

23-70

2

23-105

2

7

23-30

2

23-71

2

23-106

2

23-6-6 22- 1

3

22- 2

6

22- 3

Ο

23-7-2

00-2-2

2

WA450-1


LIST OF REVISED PAGES

Page

Time of Time of revision

8

24-6

41-13

8

24- 7

41-14

5

41-15

5

42- 9

5

23-11

24- 9

5

41-16

8

23-11

24- 9-1

5

41-17

8

41-18

8

24-11

5

41-19

24-12

5

41-20

24-13

5

41-20-1

8 8

7

D

24-13-1

8

이 41-20-2

•23-118

8

24-13-2

8

41-20-3

8

23-119

L

24-13-3

8

41-20-4

8

43-15-7

42-14

6

43-15-11

43- 1

43-15-13

43-16

8

43-

43-17

24-15

5

41-20-7

8

43-4

7

43-17-1

24-16

S

41-20-8

8

43- 5

43-17-2

41-20-9

43-

7 7

24-26

5 5

D

23-132 7

41-

8

⑦

41-2

5

23-135

7

41- 3

(7)

23-136

8

41-4

43-7-6

41-20-16 41-21

41-22

5

41-24

5

41-25

5

41-27

5

8

42- 2

9

5

41- 7

8

24-2

5

41-8

2

2

43-22

43-23

2

43-24

2

43-26 43-27

2 2

43-7-7

43-7-8 43-7-9

43-7-10

43-28

43-7-11

43-29

43-7-12 43- 7-13

43-30

43- 8

42- 1

24- 1

5

41-26

5 8

5

41-23

41- 5

5

41-

5

43-20 43-21

5

42- 4

24-4

5

41-10

5

42-5

24-5

5

41-11

5

42-

43-32

2

43-9

4

43-33

2

43-10

43-34

2

43-11

2

43-36

43-12

7

43-37

43-38

2 2

2

42- 3

41-9

2

43-31

8

43-13

43-14

D

23-129

23-130

5

43-7-5

9

D

24-24

24-25

43-7-4

8

7

9

23-128

8

41-20-15

43-19-2

2

5

43-7-3

41-20-14

43-19-1

D

L

24-23

(8)

43-19

L

23-127

43-7-2

41-20-13

이

5

8

O

24-22

41-20-12

0

5

2

43-7-1

이

2

23-126

5

43-7

D

41-20-11

D

24-19

7

43-18

L

7

41-20-10 8

5

7

43-15-10

42-15

43- 2

5

7

43-15-9

8

24-17

7

43-15-8.

41-20-6 이

23-125

9

WA450-1

3 3

8

24-18

24- 3

42-11

42-12

(5

24-21

23-134

43-15-5

43-15-6

24-13-4

24-20

23-133

42-10

24-14

23-124

23-131

43-15-4

41-20-5

L

23-123-3

6

이

23-123-2

7

43-15-3

이

23-123-1

43-15-2

L

L L

8

42-8

42-8-1

L

D

23-123

이

23-122

이

23-120 23-121

7

L

L

233-116 -1

Time of mme or revision

Page

43-15-1

42-13

23-117

Ο

6

Mark

L

8

8

23-11 115

24-10

42-7

Time of Time or revision

43-15 2

5

24- 8

23-11 114

Page

41-12

24- 5-1

23-1113

Mark

L

2

Mark

L

23-10 109

revision

2

2

Time of

L

23-108

Page

L

3

Mark

D

Time of

revision

23-107

23-11 110

•

Time of

L

Page

8

Mark

43-39

43-15

2

43-40

00-2-3


LIST OF REVISED PAGES

Mark

Page

Time of revision

Mark

Page

Time of

revision

43-41

4

44-14

5

43-42

2

44-15

5

43-43

2

43-44

2

43-45

2

43-46

2

51-1

5

51-2

Page

Mark

Time of revision

Mark

Page

Time of revision

Mark

Page

Time of revision

52-6

6

53-17

2

53-39

2

52-7

6

53-18

D

53-40

2

52-8

3

53-18-1

8

53-41

2

52-9

6

53-18-2

D

53-42

2

52-10

6

53-18-3

8

53-43

2

5

52-10-1

53-18-4

D

53-44

2

51-2-1

5

52-11

6

53-19

4

53-45

8

51-2-2

5

52-12

Ο

53-20

2

53-45-1

8

43-49

51-3

5

52-13

53-21

2

53-46

2

43-50

51-4

5

52-14

0

53-22

4

51-5

5

52-15

D

53-23

2

54-

5

51-5-1

5

52-16

4

53-24

2

54-2

(5)

52-17

43-48

T

43-52

43-51

①

(7)

51-5-2

4

53-25

2

54- 3

43-54

7

51-6

52-18

Ο

53-26

2

54-4

51-7

52-19

U

53-27

2

54-5

52-20

53-28

2

54-6

54-7

43-5

43-53

43-56

D

51-8

43-57

8

51-9

53-29

(2

43-58

7

51-10

53-30

8

43-59

7

51-11

53-1

51-12

53- 2

D

51-13

53- 3

D

51-14

53- 4

53-34

51-15

53-5

53-35

51-16

53-5-1

53-35-1

61-1

51-17

53

53-35-2

61-2

43-60 43-61

43-62 43-63

43-64

D

43-65

Π

5-2

54-9

2

53-32

54-10

2

53-33

54-11

7

51-18-1

51-19

53-8

5

51-20

53-9

5

51-21

53-10

8

44- 3

3

51-22

53-11

44-4

5

51-23

53-11-1

44-5

5

51-24

53-11-2

44-6

5

53-35-4

61- 3-1

53-35-5

61-4

53-35-6

61-5

53-35-7

61- 5-2

53-35-8

5-3

8

53-35-9

61-5-4

53-35-10

Ο

61-5-

8

44-7

61-3

(2

D

3

53-35-3

53- 7

D

44- 2

5

44- 1

53- 6

2

L

43-66

54- 8

53-31

51-18

5

53-35-11

8

61- 6

7

53-35-12

8

61-7

G

43-47

53-11-3

53-11-4 53-12

2

53-35-13

61-8

2

53-35-14

61-9

5

5

52- 1

5

52-2

5

52-3

53-14

2

53-36

2

61-10

44-11

5

52-4

σ

53-15

2

53-37

7

61-11

5

44-12

5

52-5

9

53-16

2

53-38

2

61-11-1

5

44-8

44-9 44-10

00-2-4

6

53-13

WA450-1

5


This is the sample of the manual Click on the download link for complete manual

Download Link


LIST OF REVISED PAGES

Page

Time of o at

revision

Mark

Page

Time of ue o revision

ய

Mark

Page

Time of

revi

7

61-11-2

5

62-

61-12

5

62- 2

63-7-1

62- 3

63-7-2

7

63-8

7

63-9

2

61-13

5

6

63-

Mark

Page

Time of evision

Mark

Page

Time of revisid

63-31

4

81-6-3

5

63-32

7

81- 6-4

5

63-33

7

81-6-5

5

63-34

8

81- 6-8

8

63-35

4

81- 6-9

8 6

61-14

62- 4

61-15

62

61-16

62- 6

63-10

63-36

4

81- 6-10

62- 7

63-11

2

63-37

2

81- 6-11

8

6

63-12

7

63-38

8

81- 6-12

8

6

62-17

5

81-15

5

64- 8

5

81-15-1

5 5

63-18

62-18

4

63-19

62-19 62-20 62-21

4

64- 7

63-21

2

63-22

63-22-1

63-22-2

62-22

61-28

63-22-3

61-29

L

63-22-4

61-31

5

63-2

61-32

5

61-30

63-

L

63-22-6

63- 3

L

63-22-7

61-33

63- 3-1

8

63-22-8

61-34

63-3-2

L

63-22-9

61-35

63-3-3

63-22-10

63-23

5

63- 3-4

8

5

63-3-5

L

63-24

61-38

5

63-3-6

L

61-39

5

63-24-1

63- 3-7

8

63-25

61-40

5

63-4 63-5 63- 6

D

5

64-11

5

81-16-1

5

5

81-16-2

5

5

64-12

64-13

5

81-16-3

64-14

5

81-16-4

5

64-16

5

81-16-5

5

5

81-16-6

5

5

81-16-7

5

5

81-17

5

5

81-18

5

81-19

5 5

64-17

64-18

64-19 64-20

64-21 64-22

5

81-20

64-23

5

81-21

5

81-22

5

81-23

81-1

81-24

5

8

81-25

5

81-26

5

63--26 2

81-3

$-27 63-2

81-5

8

63-28

2

81-6

8

81-27

5 5 8

L

WA450-1

5

81-16

64-9

L

63-6-2

64-10

D

63-

5

81-15-2

e

61-36 61-37

5-1

2

63-20

D

61-27

63-17

②

61-26

5

81-14

9

61-25

5 5

64-

6

4

5

64- 5

9

61-24

5

81-13

63-16

2

61-22 61-23

81-12

L

62-16

5

64-4

63-15

6

61-21

‫ی‬

D

61-20

81-11

①

62-14-1 62-15

64- 3

7

5 5

63-14

81-10

L

62-14

81-9

64-2

L

5

20 61.19-4

63-13-4

64-11

L

61-119-3

D

Ο

62-13

63-13-3

Ο

5

63-13-2

Ο

62-12

19-2 61-19

81-8

A

5

63-13-1

Ο

62-11

19-1 61-19

81-7

1 )‫ام‬

61-19

62-10

63-13

6

9

61-18

62-9

D

5

5

9

61-17-2

62-

8

9

G

9

61-17-1

9

61-17

5

L

Mark

63-2

②

81-6-1

5

81-28

30 63-3

4

81-6-2

8

81-30

00-22-5 8


LIST OF REVISED PAGES

Page

Time of revision

Mark

Page

Time off revision

Mark

Page

Time of

revision

Mark

Page

81-31

5

82-21

6

82-45-7

6

81-32

8

82-22

6

82-45-8

6

82-47

81-33

5

82-22-1

6

82-45-9

6

82-49

81-34

5

82-22-2

6

82-45-10

6

82-50

81-35

5

82-22-3

6

82-45-11

6

82-51

•81-36

8

82-22-4

⑧

82-45-12

6

81-37

5

82-22-5

8

82-45-13

81-38

8

82-22-6

6

82-45-14

81-39

8

82-23

6

81-40

8

82-24

8

82-25

6

82-45-17

•

82-46

Time of

revision

Mark

Page

8

82-88

Ο

82-89

Ο

3

82-90

Ο

82-92

4

Ο

82-93

Ο

82-52

Ο

82-94

Ο

6

82-53

Ο

82-95

D

6

82-54

4

82-96

Ο

82-45-15

6

82-55

Ο

82-97

Ο

82-45-16

6

82-56

6

82-57

Ο

82-99

82-58

4

82-100

82-59

4

82-101

82-60

4

82-102

82-98

81-41

(5

81-42

5

82-25-1

8

82-45-18

6

81-43

8

82-25-2

6

82-45-19

6

81-44

8

82-26

(8)

82-45-20

82-27

8

82-45-21

6

82-61

D

82-103

82-45-22

6

82-62

Ο

82-104

81-48

(5

82-27-2

8

82-45-23

6

82-63

3

82-105

81-49

(5

82-28

6

82-45-24

6

82-64

3

82-106

82-29

6

82-45-25

6

82-65

82-107

82-30

6

82-45-26

6

82-45-27

6

82-67

82-109

6

82-45-28

82-111

81-47

8

82-32

82- 3

82-108

9

82-68

6

82-33

6

82-45-29

6

82-69

82-4

6

82-34

6

82-45-30

6

82-70

Θ Θ

6

82- 2

82-66

82- 4-1

8

82-35

6

82-45-31

6

82-71

Θ

82-1

82-31

A

82-27-1

8

D Θ

5

Ο

Θ

81-46

Time of revision

Θ Θ Θ

Mark

82-5

8

82-36

6

82-45-33

6

82-72

2-115 82-

2-6 82-

D

82-37

6

82-45-34

6

82-73

2-116

82-8

Ο

6

82-45-35

6

82-74

82-9

4

82-45-36

6

82-75

82-10

82-40

6

82-45-37

6

82-76

Ο

82-45-38

6

82-77

82-11

6

82-41

82-12

6

82-42

6

82-45-39

6

82-78

6

82-43

4

82-45-40

6

82-80

82-14

④

82-44

①

82-15

D

82-45

82-16

D

82-45-2

8

82-45-3

82-18

6

82-45-4

82-19

8

82-45-5

81-20

8

82-45-6

82-13

82-17

00-2-6

82-113 82-11 114

2-117 の

2-118 82-

O

82-38

82-39

82-112

2-119 82-

120 82-12

82-121 D

122 82-12

8

2-123 82-

6

82-45-41

6

82-81

D

82-45-42

6

82-82

①

82-124

82-45-43

6

82-83

Ο

82-125

8

82-45-44

6

82-84

①

82-126

6

82-45-45

6

82-85

4

82-127

8

6

82-45-46

6

82-86

4

82-128

8

8

82-45-47

6

82-87

Ο

82-129

6

50-1 WA450

6

⑧


LIST OF REVISED PAGES

Time of o at

Page

Mark

evision

Mark

Page

Time of

revision

82-130

93- 1

2

82-131

93- 2

2

93-

2

82-133

6 6

82-132

82-134 82-135

6

3

93- 4

2

93-5

2

93-6

2

82-136

6

93-7

2

82-137

டு

93-8

②

93-9

2

93-10

4

82-138 6

82-139

Mark

Page

Time of revisio

Mark

Page

Time of revision

Mark

Page

Time of

revision

82-140

82-141 97-001

2

97-002

2

82-144

97-003

2

82-145

97-004

2

97-005

2

97-006

2

2

2 2 2 2

97-104

2

97-105

2

97-106

2

97-107

2

97-108

2

97-109

2

82-142

அ

82-146

9

82-143

82-147

82-148

9

97-007

82-149

9

97-008

82-150

9

97-101

82-151

9

97-102

82-152

6

97-103

83- 1 83-

2

2

97-110

2

91-2

97-111

2

91-3

97-112

2

91-

97-113

2

4

91-1

97-115

91-6

97-116

91-7

97-117

WA450-1

e

91-5

00-2-7


IMPORTANT SAFETY NOTICE Proper service and repair is extremely important for the safe operation of your machine. The service and repair techniques recommended by Komatsu and described in this

manual are both effective and safe methods of operation. Some of these operations require the use of tools specially designed by Komatsu for the purpose. To prevent injury to workers, the symbols

are used to mark safety pre-

and

cautions in this manual. The cautions accompanying these symbols should always be followed carefully. If any dangerous situation arises or may possibly arise, first consider

safety, and take the necessary actions to deal with the situation.

ASAFETY Mistakes in operation are extremely dangerous.

Read the Operation and Maintenance Manual

carefully BEFORE operating the machine. 1. Before carrying out any greasing or repairs,

read

all

the

workshop to keep tools and removed parts. Always keep the tools and parts in their correct places. Always keep the work area clean and make

6. Decide

GENERAL PRECAUTIONS

precautions

given

on

the

place in the repair

a

dirt or oil on the floor.

sure that there is no

Smoke only in the areas provided smoking. Never smoke while working.

for

decals which are fixed to the machine. 2. When

carrying

out

wear safety shoes

any

operation, always

loose work clothes, or clothes with buttons

missing. •

Always wear safety glasses when hitting parts with a hammer.

safety glasses when grinding parts with a grinder, etc. Always

wear

3. If welding repairs are needed, always have a

trained, experienced welder

carry out

the

carrying out welding work, always wear welding gloves, apron, glasses, cap and other clothes suited for welding work. When

work.

WORK

making any repairs, park the machine on hard, level ground, and block the wheels or tracks to prevent the

7. Before

adding oil

or

machine from moving.

8. Before

starting work, lower blade, ripper,

bucket or any other work equipment to the ground. If this is

not

workers, always agree on the орbefore starting. Always

erating procedure

inform your fellow workers before starting any step of the operation. Before starting work, hang UNDER REPAIR signs

on

the

controls in the operator's compartment. 5. Keep all tools in good condition and learn the correct way to use them.

possible, insert the

safety pin or use blocks to prevent the work equipment from falling. In addition, be sure to lock all the control levers and hang warning signs on them. 9. When disassembling

4. When carrying out any operation with two or more

PREPARATIONS FOR

and helmet. Do not wear

or

assembling, sup-

machine with blocks, jacks stands before starting work. port the

or

10. Remove all mud and oil from the steps or other places used to get on and off the machine. Always use the handrails, ladders or

steps

when

getting

on

or

off

the

machine. Never jump on or off the machine. If it is

impossible

to

use

the

handrails,

ladders or steps, use a stand to provide safe

footing.

00-3


19. Be sure to assemble all parts again in their

PRECAUTIONS DURING WORK 11. When removing the oil filler cap, drain plug or

hydraulic

original places. Replace any damaged parts with new parts. When installing

measuring plugs,

pressure

sure that

loosen them slowly to prevent the oil from

spurting out.

the pressure completely from the

circuit.

12. The water and oil in the circuits

are

hot

when the engine is stopped, so be careful not to get burned.

Wait for the oil and water to cool before car-

rying

out

any

work

on

the oil

or

water

circuits.

battery. Always remove the lead from

the negative (-) terminal first. 14. When

raising

hoist or crane.

heavy components,

use

a

damage. Always use lifting equipment which has ample capacity. Install the lifting equipment at the correct

are free from

a

hoist or

crane

and operate

slowly to prevent the component from hit-

ting any other part. Do not work with any part still raised by the hoist or crane.

15. When removing covers which are under internal pressure

or

under pressure froma

spring, always leave two bolts in position on opposite sides. Slowly release the pressure,

then slowly loosen the bolts to remove.

16. When removing components, be careful not to break or

damage the wiring. Damaged

wiring may cause electrical fires.

removing piping, stop the fuel or oil from spilling out. If any fuel or oil drips on to

17.When

the floor, wipe it up immediately. Fuel or oil on

the floor can

even start

cause

you to slip,

or can

fires.

18. As a general rule, do not use gasoline to wash parts. In particular, use only the minimum

parts.

00-4

be

20. When installing high pressure hoses, make sure

that

of gasoline when washing electrical

they are not twisted. Damaged

tubes are dangerous, so be extremely care-

ful when installing tubes for high pressure circuits. Also, check that connecting parts are correctly installed.

21. When assembling or installing parts, always

the specified tightening torques. When

installing protective parts such as guards, or parts which vibrate violently

or

rotate at

high speed, be particularly careful to check that they are installed correctly. 22. When

Check that the wire rope, chains and hooks

places. Use

wires,

chine is being operated.

use

13. Before starting work, remove the leads from the

and

contact with other parts when the ma-

Before disconnecting or removing components of the oil, water or air circuits, first remove

hoses

they will not be damaged by

aligning two holes, never insert your

fingers or hand. Be careful not to get your

fingers caught in a hole. 23. When measuring hydraulic pressure, check that the measuring tool is correctly assem-

bled before taking any measurements.

24. Take care when removing

or

installing the

tracks of track-type machines.

When removing the track, the track separates suddenly, so never let anyone stand at either end of the track.


-FOREWORD

This shop manual has been prepared as an aid to improve the quality of repairs by giving the serviceman an accurate understanding of the product and by showing him the correct way to perform

repairs and make judgements. Make sure you understand the contents of this manual and use it to full effect at every opportunity.

This shop manual mainly contains the necessary technical information for operations performed in a

service workshop.

For

ease

of

understanding, the manual is divided

into

chapters for each

main

group

of

components; these chapters are further divided into the following sections. STRUCTURE AND FUNCTION

This section explains the structure and function of each component. It serves not only to give understanding of the structure, but also serves as reference material for troubleshooting.

an

TESTING AND ADJUSTING

This section explains checks to be made before and after performing repairs, as well as adjustments to be made at completion of the checks and repairs.

Troubleshooting charts correlating "Problems" to "Causes" are also included in this section. DISASSEMBLY AND ASSEMBLY This section explains the order to be followed when removing, installing, disassembling or

assembling each component, as well as precautions to be taken for these operations. MAINTENANCE

STANDARD

This section gives the judgement standards when inspecting disassembled parts.

NOTICE The specifications contained in this shop manual are subject to change at any time and without any advance notice. Contact your KOMATSU

distributor for the

latest information.

00-5


HOW TO READ THE SHOP

MANUAL

HOW TO READ THE SHOP MANUAL REVISED EDITION MARK (① 2 3....)

VOLUMES Shop manuals are issued as a guide to carrying

out repairs. They are divided as follows:

When a manual is revised,

an

edition mark is

recorded on the bottom outside corner of the pages

Chassis volume: Issued for every machine model

Engine volume: Issued for each engine series Electrical volume

Each issued as one

:

Attachments volume :

to cover all ☐ volume models

These various volumes are designed to avoid du-

plicating the same information. Therefore to deal with all repairs for any model, it is necessary that

REVISIONS Revised

pages

are

shown

at

the

LIST OF

REVISED PAGES on the between the title page and SAFETY page.

chassis, engine, electrical and attachment volumes are ready.

DISTRIBUTION AND UPDATING Any additions, amendments or other changes will be sent to

KOMATSU distributers. Get the most up-

to-date information before you start any work.

SYMBOLS So that the shop manual can be of ample practical use,

important places for safety and quality

are

marked with the following symbols.

FILING METHOD 1. See the page number on the bottom of the page.

Symbol

Item

File the pages in co

File the pages in correct order.

Special safety precautions are

2. Following examples show how to read the page

necessary when performing the

work.

number.

Safety

Example 1 (Chassis volume):

the wark hocauseitis undar the work because it is under

Unit number (2. Power train)

interpal pressure. pressure internal

Item number (1. Structure and

Eunctid

Special technical precautions or

Function)

.Consecutive page number for each item.

Caution

Weight of parts or systems.

410

Caution

Unit number (1. Engine)

Consecutive page No. (Page 10

kg

3. Additional pages: Additional pages are indicated by a hyphen (-) and number after the page nhor Fila number. File as in the example.

Example:

Weight

kgm

Tightening torque

A

Coat

Oil, water

21-4

12-203

21-4-1 21-4-2

-12-203-1

Added pages12-203-2

12-204

when Caution necessary necessary when

selecting hoisting wire, or when working posture is important, etc.

of Group 4)

00-6

preserving standards are

work.

Item number (2. Testing and Adjusting) Group No. (4. Fuel system)

21-5

other precautions for

necessary when performing the

Example 2 (Engine volume): 12

Extra special saley safety precautions LAla special recau are necessary when pertorming

21-3

TT

Remarks

Places that require special

attention for the tightening

torque during assembly.

Places to be coated with adhesives and lubricants etc.

Places where oil, water or fuel

must be added, and the

capacity. Drain

Places where oil or water must be drained, and quantity to be drained.


HOISTING INSTRUCTIONS

HOISTING INSTRUCTIONS

Heavy parts (25 kg or more) must be lifted etc. In the Disassembly hoist et a noist with witr a and Asassemory and

sembly section, every part weighing 25 kg or

more is

1. If

a

indicated clearly with the symbolkg

kg

Slinging near the edge of the hook may cause the rope to to slip off the hook during hoisting, he tope sud on and a serious accident

can

result. Hooks have

maximum strength at the middle portion.

part cannot be smoothly removed from the

machine by hoisting, the following checks should be made: •

Check for removal of all bolts fastening the part to the relative parts. Check for existence of another part causing interference with the part to be removed.

100%

79%

88%

71%

41% FS0064

3) Do not sling a heavy load with one rope alone, but sling with two or more ropes symmetricaliy wound on to the load.

Slinging with one rope may cause turning of the load during hoisting, untwisting of

2. Wire ropes

1) Use adequate ropes depending on the weight

the rope,

of parts to be hoisted, referring to the table below:

slipping of the rope from its

4) Do not sling a heavy load with ropes forming a

Wire ropes

(Standard "Z" or "S" twist ropes

without galvanizing)

wide hanging angle from the hook. When hoisting a load with two or more ropes,

the force subjected to each rope will increase

Rope diameter (mm)

Allowable load (tons)

10

1.0

11.2

1.4

12.5

1.6

14

2.2

16

2.8

18

3.6

20

4.4

22.4

5.6

30

10.0

40

18.0

50

28.0

with

the

hanging angles. The table below

shows the variation of allowable load (kg) when

hoisting is made with two ropes, each of which is allowed to sling up to 1000 kg vertically, at various hanging angles.

When two ropes sling a load vertically, up to 2000 kg of total weight can be suspended. This weight becomes 1000 kg when two ropes make a 120° hanging angle. On the other hand, two ropes are subjected to an excessive force

large as 4000 kg if they sling a 2000 kg load at a lifting angle of 150°.

as

kg 2000

40.0

1900

1700

2000 92

strength of the rope used.

2) Sling wire ropes from the middle portion of the

1400

1000

Load capacit

The allowable load value is estimated to be one-sixth or one-seventh of the breaking

hook.

or

original winding position on the load, which can result in a dangerous accident.

30°

60°

90°

Lifting angle:

120°

150°

a

FS0065

00-7


STANDARD TIGHTENING TORQUE

2kgm

STANDARD TIGHTENING TORQUE

1. STANDARD TIGHTENING TORQUE OF BOLTS AND NUTS The following charts give the standard tightening torques of bolts and nuts. Exceptions are given in sections of

"Disassembly and Assembly".

of bolt

(mm)

Width across flat

(mm)

어

Thread diameter

T

H

kgm

Nm

6

10

1.35 ±0.15

13.2±1.4

8

13

3.2±0.3

31.4±2.9

10

17

6.7±0.7

65.7±6.8

12

19

11.5±1.0

112±9.8

14

22

18.0±2.0

177±19

16

24

28.5±3

279±29

18

27

39±4

383±39

20

30

56±6

549±58

22

32

76±8

745±78

24

36

94.5±10

927±98

27

41

135±15

1320±140

30

46

175±20

1720±190

33

50

225±25

2210240

36

55

280±30

2750±290

39

60

335±35

3280±340

This torque table does not apply to the bolts with which nylon packings or other non-ferrous metal washers are to be used, or which require tightening to otherwise specified torque. *

Nm (newton meter):

1Nm= 0.1 kgm

2. TIGHTENING TORQUE OF SPLIT FLANGE BOLTS

Use these torques for split flange bolts.

Thread diameter of bolt

(mm) 10

00-8

Tightening torque

Width

across flats

(mm)

kgm

Nm

14

6.7±0.7

65.7±6.8

12

17

11.5±1

112±9.8

16

22

28.5±3

279±29


STANDARD TIGHTENING TORQUE

kgm

Sealing surface

3. TIGHTENING TORQUE FOR NUTS OF FLARED Use these torques for nut part of flared.

R

00000000000000 FS0068

Tightening torque

Thread diameter of nut part (mm)

Width across flats

(mm)

kgm

Nm

14

19

2.5±0.5

24.5±4.9

18

24

52

49±19.6

22

27

8+2

78.5±19.6

24

32

14±3

137.3±29.4

30

36

18±3

176.5±29.4

33

41

20+5

196.1±49

36

46

25±5

245.2+49

42

55

30±5

294.2+49

of nut part

COATING MATERIALS The recommended coating materials prescribed in Komatsu Shop Manuals are listed below. Nomenclature

Komatsu code

Applications

LT-1A

Used to apply rubber pads, rubber gaskets, and cork plugs.

LT-1B

Used to apply resin, rubber, metallic and tallic parts when a fast, strong seal is needed.

LT-2*

Preventing bolts, nuts and plugs from loosening and leaking oil.

LT-3

Provides an airtight, electrically insulating seal. Used for aluminum surfaces.

LG-1

Used with gaskets and packings to increase sealing effect.

LG-3

Heat-resistant gasket for precombustion chambers and exhaust piping.

LG-4

Used by itself on mounting surfaces on the final drive and transmission cases. (Thickness after tightening: 0.07 0.08 mm)

Adhesives

Liquid gasket

-

LG-5

Antifriction Antiinietion compound compound

(Lubricant including

molybdenum disulfide) Grease

esparG

(Lithium grease)

Vaseline

Used by itself to seal grease fittings, tapered screw fittings and tapered screw

fittings in hydraulic circuits of less than 50 mm in diameter.

LM-P

Applied to bearings and taper shafts to facilitate press-fitting and to edded

G2-LI

Applied to bearings, sliding parts and oil seals for lubrication, rust prevention and facilitation of assembling work.

prevent sticking, burning or rusting.

Used for protecting battery electrode terminals from corrosion.

*LT-2 is also called LOCTITE in the shop manuals.

00-9


Turn static files into dynamic content formats.

Create a flipbook
WA450-1 Komatsu Service Manual PDF DOWNLOAD by Heavy Equipment Manual - Issuu