Skip to main content

Link Belt Crane HTT-8675 II Service Manual

Page 1


  

1.Capscrews,Washers,&Locknuts

2.LocatorCaps

3.BoomRestExtensions

BoomRestExtension,R&I

Thisprocedurecoverstheremovalandinstallationof theboomrestextensions.Forremovalandinstallation oftheremainingboomrestcomponents,seeSM KeysheetArea01---001.

Removal

1.Lower,detach,andsecureload,asrequired.

2.Stabilizethecraneforserviceasfollows:

a.Parkthecraneoutofthewayonafirmandlevel surface.

b.Engagetheparkbrakeand/orproperlyblock thetires.

c.Engagetheswingparkbrakeortravelswing lock,asrequired.

d.Levelthecraneonfullyextendedoutriggers.

e.Fullyretractandlowertheboomovertherear ofthecarrier.

3.Shutdowntheengineanddisengagethemainhydraulicpump.

4.Capscrews,Washers,&Locknuts

5.PivotAssembly

WARNING

Solventsandcleaningsolutionscanbe hazardous.Seriouspersonalinjurymay resultfrommisuseoftheseproducts.Read andfollowallthemanufacturer’s recommendationsconcerningsolventsand cleaningsolutions.

4.Thoroughlycleanareatobedisassembledwithan approvedcleaningsolvent.Allowtheareatoair dry.

RefertoFigure1.

5.Removethecapscrews,washers,andlocknuts(1).

6.Separatethelocatorcap(2)fromtheboomrest extension(3).

7.Supporttheboomrestextension(3),andremove thecapscrews,washers,andlocknuts(4).

8.Removetheboomrestextension(3)fromthepivot assembly(5).

9.RepeatSteps5thru8fortheremovaloftheoppositeboomrestextension(3),asrequired.

Turn static files into dynamic content formats.

Create a flipbook
Link Belt Crane HTT-8675 II Service Manual by Heavy Equipment Manual - Issuu