Geological Society of Australia
ABSTRACTS 1
Number 20
GEOLOGY AND COAL MINING CONFERENCE
13-15 October 1987 New South Wales Institute of Technology Sydney L
COAL GEOLOGY GROUP Geological Society of Australia Inc.
NEW SOUTH WALES INSTITUTE OF TECHNOLOGY
GEOLOGY AND COAL MINING CONFERENCE Proceedings
1 3 - 1 5 October 1987 New South Wales Institute of Technology Sydney
CONTENTS KEYNOTE ADDRESS Dr. H. Arauner Pivoting of Longwall Faces and Relevant Geological Considerations.
6
MINING IN AUSTRALIA Mr. A. Galligan Setting the Scene - Coal Resources and Mining in Australia.
32
Mr. C. Longworth Project Feasibility and Mine Production Costs.
42
MINE PLANNING Prof. K. Moelle Geological Aspects of Longwall Mining Operations Past, Present and Future.
60
Mr. A. Kremor & Mr. A. Muir Geology - A Key to Mine Planning - A Case History of the Lochiel Coal Deposit.
75
Mr. B. Ross, Mr. C. Tobin, Mr. A. Williams Long Hole Exploration Drilling for Mine Planning in BHP Macquarie Collieires.
85
Mr. D. Fawcett Some intersections between Geological Data and Underground Mine Planning.
95
Mr. P. Goscombe 104 The Role of Coal Geologists in Open Cut Mine Planning. Mr. K. Whitby & Mr. G. May Exploration Geology and Geophysics - Their Role in Underground Mine Planning at German Creek Mine, Central Queensland.
113
Dr. C. Mallett & R.L. Hammond Prediction of Underground Conditions Using Open Cut Data.
121
Mr. I. Stone Site Characterisation and Forecasting Underground Mining Condtions.
127
Mr. G. McNally Use of Geophysical Logs as Input for Mine Layout Modelling.
136
4.
5.
6.
7.
ENVIRONMENTAL PLANNING Assoc. Prof- L. C. Bell Environmental Planning and Practice in Open Cut Mining.
148
Mr. R. Hughson Environmental Implications Arising from the Underground Extraction of Bituminous Coal.
160
COAL TECHNOLOGY Mr. N. Gibson Coal Preparation, and Possible Future Developments.
172
Dr. A. Waters Implications of Coal Properties for Thermal Coal Exports.
180
Dr. A. Lowe Important Coal Properties for Power Generation.
188
HYDROGEOLOGY Dr. W. Morton Exploration for Groundwater Sources and Hazards in Coal Mining.
198
Mr. J. Brumley An Overview of Geological and Hydrogeological Studies Conducted by the SECV for Open Cut Brown Coal Mining in the Latrobe Valley, Victoria.
205
GEOTECHNICAL STUDIES Dr. J. Shepard, K. P. Walton, Z. Nemes - Nemeth 218 Development of an Australian Colliery Roadway Support Nomogram Using Artifical Intelligence Computing Systems. Mr. N. Godfrey Assessment of Geotechnical Conditions Ahead of Surface Coal Mining - Case Histories from the Bowen Basin.
8.
230
GEOPHYSICS Mr. D. Palmer Surface Seismic Techniques.
246
Mr. J. Doyle In Seam Seismic - A Tool for the Coal Industry.
251
Mr. R. J. Whitely, W. M. Holmes, R. Dowle Downhole and Crosshole Seismic: A New Tool for Detailed Definition of Coal Seams and Geological Conditions.
260
4
1.
KEYNOTE ADDRESS
CONFERENCE FROM THE 13 - 15TH OCTOBER IN SYDNEY
"Pivoting of Longwall Faces and Relevant Geological Considerations"
by Dr. Hans-Wolfgang Arauner Bergwerksdirektor Eschweiler Bergwerks-Verein AG Federal Republic of Germany
PIVOTING OF LONGWALL FACES MID RELEVANT GEOLOGICAL CONSIDERATIONS
Mining con In the Federal Republic of Germany round about 80 million tonnes (saleable) of coal are produced every year. More than half of this production is burned in power stations, and the rest is either sold to iron and steel industries or used for heating purposes. In 1985 103 longwall faces were advancing ones, 71 retreating faces, and 30 faces were run in Z-configuration. The average daily output per face was of approximately 1700 tonnes (saleable) . This corresponds to a daily run-of-mine production of 3000 tonnes per coalface. The mining conditions are substantially different from those prevailing in Australia, South Africa, or the United States. As recently as 1960, the German collieries produced from an average winning depth of approximately 650 m, whereas the average working depth at present is almost 900 m.
Depth in m 700
-
800
-
900
-
1000
-
1100
-
1200
Average
weighted
—
winning depth
\ D e p t h of the deepest level
1300 1400
-
1500
-
1600 1960
i
i
i
i
65
70
75
80
85
I
1
1
90
95
2000
Fig. 1: Depth increase in the German hardcoal mining industry Although a part of the winning capacity has been transferred into new areas, an overburden thickness increase of approximately 7 m per year is expected for the future. Meanwhile the deepest production level is at 1440 m, where a number of coalfaces are actually operated. The specific gravity of the rock masses of 2.5 t/m3 means a depth pressure of approx. 3500 t/m2 (35 MN/m2) at a depth of 1400 metres.
—8—
The d e p o s i t s of the R u h r d i s t r i c t are c h a r a c t e r i z e d by a large n u m b e r of seams in close v i c i n i t y to each other- T h u s , a s t a n d a r d s t r a t a p r o f i l e f o r the E s s e n area shows a p p r o x . 20 seams of m o r e t h a n 1 m of t h i c k n e s s w i t h a t o t a l c o a l t h i c k n e s s of 25 m .
Depth -700m
-1500m
Seam Karl 2
cm 160
Ernestine Wilhelm
170 270
President
320
Dickebank 2
160
Sonnenschein
220
- — - -
6 Seams 13m Coal W e s t f a l e n Colliery
2 0 Seams 25 m Coal Central Ruhr District
Legend Coal • Sandstone I
F i g . 2: G e o l o g i c a l s t a n d a r d s e c t i o n T h e s e seams w e r e l a r g e l y m i n e d b y the o l d c o l l i e r i e s in this a r e a . In some e x t r e m e cases surface s u b s i d e n c e of up to 20 m has b e e n e x p e r i e n c e d . A t a l l c o l l i e r i e s , s e v e r a l seams are w o r k e d one b y one in the same a r e a , a n d this l a r g e l y a f f e c t s s t r a t a c o n t r o l in the m i n e w o r k i n g s , a n d also i n c r e a s e s risks of rock b u r s t as w e l l as m e t h a n e e m i s s i o n s . The d e p o s i t is f r e q u e n t l y d i s t u r b e d b y m a j o r and m i n o r tectonic faults so t h a t , in m a n y c a s e s , u n i n t e r r u p t e d m i n i n g of l a r g e r areas is s i m p l y i m p o s s i b l e . P i l l a r s and ribs p r e v i o u s l y left r e s u l t in c o n s i d e r a b l e i n c r e a s e of rock p r e s s u r e . Because the R u h r c o a l d e p o s i t s w e r e i n t e n s i v e l y w o r k e d in m a n y seams t h r o u g h o u t the p a s t , and due to the m e c h a n i c a l i n f l u e n c e of ribs and p i l l a r s l e f t , the rock p r e s s u r e s e n c o u n t e r e d at 1000 m d e p t h in the w o r k i n g s c o r r e s p o n d to those n o r m a l l y e x p e c t e d to p r e v a i l at m o r e t h a n 1500 m of d e p t h .
•9—
Excavation and maintenance of mine workings With these prevailing conditions it is obvious that mine openings are expensive to drive and to maintain. Attempts to use rock bolts only for stabilizing roadways driven exclusively "in seam", i.e. without cutting into the roof to obtain an arch profile, were unsuccessful. Only a roof bolt/steel mesh combination in arch-shaped roadways was reasonably successful under favourable conditions at the comparatively shallow depths of 400 to 800 m. Most of the roadways driven in rock or in the seam are supported by yielding arches.
Fig. 3: View of a gateroad with arch support and backfilling This applies to roadway cross-section of 18 to 23 m2 or more. In these cases, the arch centers are of 75 cm or even 50 cm dimension for arch section weights of max. 44 kg/m. Despite this heavy support being used, it is in many cases impossible to maintain a sufficiently large roadway cross-section. Hydraulically set solutions for filling behind the arch supports are used to an ever-increasing extent for improving the supporting function of arch supports. On passage of the face - in advance mining, and in particular in case of medium or large seam thicknesses - the ribs are stabilized by "roadside" packs of 1.5 to 2.5 m thickness, formed by hydraulically setting mortars.
—10—
Fig. 4: Roadside pack after face passage This practice contributed substantially to increased stability of arch supported roadways and to efficient sealing of the goaf against air leakages. These measures made the maintenance of roadways at great depths possible to such an extent that regular use is generally possible, although it is expensive. In particular with very thick seams, the heavy and bulky shield support requires face heading widths of 7 to 9 m. In case of high cover loads and less competent adjacent strata, the maintenance of gate roads is very often extremely difficult and expensive. Under extreme conditions the limits of feasibility are reached in those cases. Implications of the high costs for mine workings Due to the high costs for driving and maintenance of mine openings, the formation of two or more parallel roadways with several intersections is out of the question. The principal roadways as well as the main in-seam roads and the gateroads are headed as individual roadways, so that a coalface is linked to the general mine workings via a tail gate and a conveyor (main) gate. The cross-section of the main gate which, after passage of the face, remains more or less the same, has to cater for the conveyor with a belt generally 1200 m wide belt and for the material transport, generally a rope-driven suspended-monorail system or with traction by diesel or battery-powered locomotives. Since the roadway cross-section also has to be sufficiently large for the supply and disposal mains for compressed air, fresh water, waste water and cooling water, which makes "full use" of the
— 1 1 —
c r o s s - s e c t i o n , a n d the r o a d w a y needs to be f r e q u e n t l y d i n t e d o r r e - r i p p e d . T h e s i t u a t i o n is less d i f f i c u l t , as there is n o r m a l l y no b e l t c o n v e y o r i n s t a l l e d w h i c h , h o w e v e r , m e a n s that d i n t i n g w o r k is m o r e d i f f i c u l t . Due to these space constraints in G e r m a n coal mining o p e r a t i o n s - in c o n t r a s t to the c o n d i t i o n s p r e v a i l i n g in other countries non-trackbound "free-steered" special vehicles or corresponding t r a c k - b o u n d m e a n s of transport c a n n o t be u s e d e x t e n s i v e l y f o r s u p p l y a n d d i s p o s a l t a s k s f o r the c o a l f a c e o p e r a t i o n s , n o r can these systems be u s e d f o r m o v i n g e q u i p m e n t to f o l l o w - u p f a c e s . T h i s , in t u r n , m e a n s t h a t a s h i f t of the c o m p l e t e e q u i p m e n t of a c o m p l e t e d face into a n e w face r e q u i r e s u p to 10 000 m a n s h i f t s , a c c o r d i n g to the d i s t a n c e s to be c o v e r e d , and c o s t s 4 to 6 m i l l i o n D M (equivalent of 3 to 5 m i l l i o n A u s t r a l i a n D o l l a r s ) . It takes b e t w e e n 3 a n d 6 m o n t h s to m o v e the e q u i p m e n t of a 200 to 250 m l o n g w a l l f a c e . S i n c e , e v e n w i t h a f a v o u r a b l y thick s e a m , 0.5 to 1 m i l l i o n tonnes of s a l e a b l e o u t p u t c a n be o b t a i n e d w i t h one c o a l f a c e , the m o v i n g of c o a l f a c e s is a c o n t r o l l i n g f a c t o r f o r the o v e r a l l p r o d u c t i o n costs of the c o l l i e r y and f o r the u t i l i z a t i o n rate of the technical equipment. The shifting of coalface equipment alone c o n s t i t u t e s a c o s t f a c t o r of D M 5 to D M 10 (equivalent of 4 to 8 A u s t r a l i a n D o l l a r s ) p e r tonne of s a l e a b l e output. C o n s e q u e n t l y , the l a y o u t of w o r k i n g s has to p r o v i d e for m a x i m u m c o a l b e i n g r e c o v e r e d by one c o a l f a c e . The " s w i n g i n g " or pivoting b y 180° of c o a l f a c e s is a g o o d a p p r o a c h to a c h i e v e that a i m , h o w e v e r , the a d v a n t a g e s and d i s a d v a n t a g e s require careful consideration.
Equipment of West-Germany
pivoted
coalfaces
at
Westfalen
Colliery,
- N u m b e r of c o a l f a c e s , r e s u l t s The following text r e f e r s e x c l u s i v e l y to the experience g a i n e d at W e s t f a l e n C o l l i e r y , w h e r e I am the chief e x e c u t i v e officer. A t p r e s e n t , W e s t f a l e n C o l l i e r y p r o d u c e s a p p r o x . 9000 tonnes of s a l e a b l e o u t p u t p e r day - this c o r r e s p o n d s to a d a i l y r u n of m i n e p r o d u c t i o n of 17 000 tonnes - from b e t w e e n 4 to 6 l o n g w a l l faces o p e r a t i n g at 1000 to 1200 m d e p t h . A c c o r d i n g to the p r e v a i l i n g g e o l o g i c a l c o n d i t i o n s , the face lengths r a n g e b e t w e e n 125 and 250 m , the l a t t e r b e i n g the d e s i r a b l e " s t a n d a r d " face l e n g t h . The a v e r a g e d a i l y o u t p u t of a l l c o a l f a c e s is at p r e s e n t a p p r o x . 1800 t (saleable) w h i c h c o r r e s p o n d s to a r u n - o f - m i n e p r o d u c t i o n of m o r e than 3000 t / d . As one c o a l f a c e always n e e d s to be run at o n l y 1000 t/d ( s a l e a b l e ) , the average p r o d u c t i o n of the o t h e r c o a l f a c e s is of a p p r o x . 2000 t/d (saleable) w h i c h c o r r e s p o n d s to a p p r o x .
3500 t run-of-mine per day. The highest-performing faces reach 3000 t/d (saleable) corresponding to more than 5000 t run-of-mine per day. it is intended to further increase the average ouput per face in the future. -Conveyors and coalwinning machinery Due to the great seam thicknesses, the highly varying intraseam stone bands, and the necessity to work through faults, drum shearer loaders are exclusively used at Westfalen Colliery. The double-ended ranging drum shearer loaders of the EDW 300 L type supplied by Eickhoff, Bochum, are standard, and the operation of the first EDW 600 L shearer is being prepared. Depending on the seam thickness, high-design or low-design machine frames and ranging arms of 1600 to 2680 mm length, as well as drum diameters of 1600 and 2000 mm are deployed so that seam thicknesses ranging between 2 m and more than 5 m (cutting height) can be accommodated. Faces dealing with strong and "difficult-to-cut" stone bands whose supply gateroad is headed to full section in line with the face, are occasionally equipped with two drum shearer loaders. Cut coal clearance is assured by face conveyors of the EKF III type supplied by Halbach & Braun, Wuppertal, with type E 82 pans with 30 mm bottom plate, 300 t connectors on both sides of the pans, and heavy-duty brackets.
Fig. 5: Controllability of the face conveyor ("diving")
—13—
This particular design assures high stability and operational reliability. Good controllability of the face conveyor is important. The conveyor is run with 30 mm double center chain strands with 2 x 113 t rated breaking load.
Fige 6: Controllability of the face conveyor (climbing) Depending on the prevailing conditions, the conveyor motors and drives' rating varies between 400 and 600 kW. The conveyor ramps are assigned a double function. When the conveyor is advanced they are to serve as static loading aid for the residual coal in the cutter track and, acting as travelling ramp for the shearer loader, they are to assure high stability by affording sufficient support to the machine with up to 50 t of weight. At Westfalen Colliery the Eickhoff-supplied Eicotrack chainless haulage system is in use as well as the Dynatrac system supplied by Halbach & Braun. Both systems are now well established and proven. Power supply and water supply for cooling and spray nozzles are assured by a chain-reinforced trailing cable handler. For financial reasons, a new conveyor design with exchangeable pan top (regarded as wear part) offered by Westfalia Lunen and by Halbach & Braun, has not yet been used at Westfalen Colliery. This design, however, exhibits significant advantages for great working lengths, and is thus particularly interesting for the "swung" faces because of its long service life.
—14—
Shield ^ u The whole development of shield supports for pivoted coalfaces in West German coal mining operations was significantly supported by Westfalen Colliery- Since 1973, 15 more or less complete shield support sets were fielded, and a large amount of experience is reflected in the application of latest design improvements. Shield supports from all three manufacturers (Westfalia Lunen, Hemscheidt and Klockner-Becorit), as run at Westfalen Colliery, allows successful "swinging" of longwall faces. For the German mining conditions the the following requirements:
support needs
to meet
Fig. 7: Lowered shield for large seam thicknesses - For adaptation to the varying seam thickness, a large hydraulic adjustment range of 1 to 2.7 or 1 to 3 is required. By using extendable forepoles with jointed canopy tips, the roof can be supported far beyond the face conveyor, so that, even with coal running off the face, the exposed roof can be supported to a farreaching extent.
—15—
Fig. 8: Extended shield for large seam
thicknesses
- The distance between the canopy tip and the coalface has to be kept small for reducing support lag, however, it should be large enough to allow the machine to cut up to the roof without contacting the support.
The cantilever length of the canopy is specified sufficiently large enough, so that a one-step-back operation is possible, i.e. after passage of the shearer loader the support is advanced. The face conveyor is advanced in a later cycle. - The tilting range of the face sprags must be of 180° ; when used as a jointed canopy tip, they are to induce a minimum of 40 kN into the roof, and, when used as face sprags, they need to induce a minimum of 50 kN into the coalface.
-16-
- The specific supporting pressure needs to be of 700 to 300 kN/m2 and must be directed towards the face side. - The support forces induced by the extended forepoles shall be of at least 300 kN magnitude. - In order to assure that the rated support forces become effective in operation, the shields, once a minimum pressure of 50 to 80 bar is achieved, need to be set by an automatic adjustment control to a pump pressure of 320 bar, independently of human intervention.
Fig. 9: Two-leg-shield with alining cylinders and pusher cylinders
- Dust shields are of particular importance for shields to be used in "swung" faces. The dust shields extend to the jointed canopy tip. They are operated by a total of 6 adjustment rams of 100 kN each. By controlled and directed extension of these rams, positioning of the neighbouring shields can be controlled and affected. - The main directional control of the shields is assured by pushers, installed in the skid system of each shield support unit; they need to apply a minimum force cf 300 kN. These heavy rams always have to be arranged behind the center of gravity of the shields, thus allowing better "steering" by the shields' rear end. - Instead of the pushers, diagonally arranged rams mounted on the skids of neighbouring shields can also serve the same purpose.
F i g . 10: V i e w of the face w i t h e l e k t r o h y d r a u l i c
control
The c o n t r o l of the s h i e l d s n e e d s to m e e t particular r e q u i r e m e n t s , s i n c e the rams in the dust seals f o r the j o i n t e d c a n o p y t i p , the m a i n c a n o p y , the g o a f - s i d e s h i e l d a n d the r e a r strut s y s t e m have to be a c t i v a t e d s e p a r a t e l y . The m o s t a d v a n c e d s h i e l d d e s i g n in a c o a l f a c e , a c t u a l l y in the s w i n g i n g p h a s e , is s u s c e p t i b l e to 18 + 2 c o n t r o l f u n c t i o n s . S u c h a d e s i g n at W e s t f a l e n C o l l i e r y a l l o w e d e l e c t r o h y d r a u l i c c o n t r o l f o r the f i r s t time in p r a c t i c e .
P r e p a r a t i o n of a "swing" p h a s e
of a c o a l f a c e
The faces m a y p i v o t e i t h e r a r o u n d a p o i n t in the c o n v e y o r g a t e o r a r o u n d a p o i n t in the s u p p l y g a t e . In a d d i t i o n , the p o i n t s a r o u n d w h i c h the "swing" takes p l a c e m a y be s i t u a t e d m o r e o r less w e l l b e y o n d the o p p o s i t e r o a d s i d e so that the i n n e r shields do not turn a r o u n d t h e i r v e r t i c a l a x e s , but f o l l o w a 180° s e g m e n t of a c i r c l e . A l l these v a r i a n t s have been practiced successfully at Westfalen Colliery. The e a s i e s t w a y is a "swing" a r o u n d a p o i n t s i t u a t e d in the conveyor (main) gate. This variant should always be p r e f e r r e d , e v e n if the c o n v e y o r s y s t e m n e e d s to be m o d i f i e d to some e x t e n t . The f o l l o w i n g s t a t e m e n t s r e f e r e x c l u s i v e l y to a "swing" a r o u n d the m a i n d r i v e .
— 1 8 —
Pivot point main drive For a 180° "swing" the main drive of a coalface of 200 m length does not change position over 5 to 6 months, as determined by the face advance rate.
Fig. 11: Swinging center at the main drive - old version This positioning therefore needs to be carefully prepared with consideration of the pressure conditions to be expected. While normally the stage loader is bedded not too deeply into the floor, and the main drive is advanced on slide rails, the swing requires an adequately dimensioned "cellar" to support the stage loader. Section
A-B
Section
C-D
Fig. 12: Swinging center at the main drive - new version
—19—
This means that the roadway cross-section is to be increased from 20 to 23.7 m2 , and the floor width is increased to 6.4 m. Around the pivoting point, 2 to 3 m of coal are removed, and the roof strata are consolidated with fully resin-set strata bolts. Subsequently, the space between roadway support and rib sides is backfilled with cement matter, i.e. bulk matter such as anhydrite. Since the face end transfer point remains at the same location, it is extremely important to keep the lower strand of the face conveyor free of coal fines. This is assured by an approx. 1.2 m deep "cellar11. The main drive is kept in its position above the "cellar" by means of a steel structure. The standard fines conveyor is disposed of. For maintaining free access to the face, the main drive is fitted with a spur bevel gear on its goaf side, as in this fashion, the motor can be arranged closer to the face conveyor and consequently requires less space. The swing manoeuvre of a face For correct manoeuvring of a 180° "swing" of a coaface, a well-trained and disciplined crew is necessary. Training has been carried out underground and on the surface by supervisory personnel of the colliery, by expert representatives of the support suppliers, and an engineer of the mines surveying department. Success is a matter of exactitude in the work involved. The following points require particular consideration: 1. K e e p s p r o c k e t in swinging c e n t e r 2. Keep t r a n s f e r s t a t i o n in order 3. Short s u p p o r t tag 4. Install a d d i t i o n a l
supports
5. Lay rails on shields 1-3 6. Pack-building material at swinging center 7. Keep f a c e c o n v e y o r s t r a i g h t 8. Never
ever b a c k w a r d lean
9. Shields v e r t i c a l to c o n v e y o r 10. A d v a n c e shields f r o m s w i n g i n g road 11. S t a k i n g shield
No.1
12. A v o i d spalling of the c o a l face
Fig. 13: Please note in particular
—20—
- During the "swing" manoeuvre the center of the chain sprocket is identical with the pivot point around which the swing takes place. The main drive must not be moved off alignement i.e. the main drive must be re-adjusted consistently and exactly. - The transfer from the main drive side to the stage loader must be kept in its correct configuration. In case of floorheave, dinting works must be done early enough. - The support lag after advancing is to be kept to a minimum. -
Additional
support
is
to
be
set
as
soon
as
possible.
- 5 m prior to the beginning of the manoeuvre, steel bars are placed on the shields Nos. 1 - 5 for preventing roof falls and for making use of the lower friction coefficient (steel on steel) for easier directional change (small advance travel, large circumferencial travel). - After re-adjustment of the first shield unit, cavities need to be correctly filled for protecting the pivot point. - It is absolutely essential to keep the face conveyor in a straight alignment. The conveyor line must never exhibit a backward salient. A slight forward salient in the middle of the coalface of up to 2 m, which implies a slight trend of the conveyor pan joints to open on the face side, can be advantageous.
- Over the whole length of the face, the shields must always be kept and "moved" normal to the conveyor line. This means that, in the zone of the pivot point, the shields' angular movement must correspond exactly to that of the remotest shields. Consequently, the outward shields are advanced by several cycles while the shields in the vicinity of the pivot point turn more or less around their rear portion. - To allow turning of the shield, the outward neighbouring shield must first be manoeuvred to create the necessary space. This applies in particular to the shield units Nos. 1 - 30 which always need to be advanced in a "outward-inward" sequence. For the more outward shields the design-inherent gaps between the individual units may be sufficient for manoeuvring. - Whereas for the shield units in the face, the neighbouring shields need to serve as abutment for manoeuvring and readjustment, this does not apply to the first shield on the actual pivot point.
F i g . 14: S t a k i n g of the edge s h i e l d s The f i r s t and the t h i r d s h i e l d u n i t , r e s p e c t i v e l y , c o u p l e d b y chains a n d h y d r a u l i c rams in s u c h a w a y , that f i r s t s h i e l d c a n be p u l l e d v i a skids and c a n o p i e s into r e q u i r e d p o s i t i o n , so that it c a n be u s e d as a b u t m e n t f o r second shield's manoeuvring.
are the the the
- D u r i n g a s w i n g m a n o e u v r e b y 180° the c o a l f a c e n e c e s s a r i l y i s , at a g i v e n m o m e n t , in a p o s i t i o n p a r a l l e l to the d i r e c t i o n of c l e a t s . If c o a l " r u n - o u t " from the face at that stage c a n n o t be a v o i d e d , in spite of s u i t a b l e s h i e l d d e s i g n , it m a y b e c o m e n e c e s s a r y , to some e x t e n t , to take m e a s u r e s a g a i n s t c o a l r u n - o u t , i . e . to use w o o d e n d o w e l s a n d to c o n s o l i d a t e the c o a l f a c e e . g . b y p o l y u r e t h a n e application.
The m o s t serious m i s t a k e s faces a r o u n d
to be a v o i d e d w h e n " s w i n g i n g "
coal
S e v e r a l m i s t a k e s c a n be coalface being stopped.
made,
the
that
could
result
in
- A " b a c k w a r d s " s a l i e n t of the face line r e s u l t s in the s h i e l d u n i t s b e c o m i n g stuck a g a i n s t e a c h o t h e r so that the face s u p p o r t as a w h o l e c a n n o t m o v e f o r w a r d a n y m o r e . It is e x t r e m e l y b o t h e r s o m e , above a l l in case of long and d i f f i c u l t c o a l f a c e s , to create the n e c e s s a r y c l e a r a n c e , s t a r t i n g from the r a d i a l r o a d w a y , to a l l o w a d v a n c e m o v e m e n t . F o r these purposes, transportable short hydraulic rams are used.
— 2 2 —
- D i s c o n n e c t i n g of e i t h e r one o r s e v e r a l shields from the c o n v e y o r for the a b o v e - m e n t i o n e d r e a s o n s is to be a v o i d e d . I f , f o r saving w o r k and t i m e , the m a n o e u v r e s of the s u p p o r t s - o v e r the i n i t i a l t h i r d of the face's t o t a l lengthis not run w i t h the n e c e s s a r y c a r e , the s u p p o r t w h i c h w o u l d then be in a d i a g o n a l p o s i t i o n r e l a t i v e to the c o n v e y o r , m a y b e c o m e s t u c k , m a k i n g f u r t h e r advance i m p o s s i b l e .
M o n i t o r i n g of the "swing" m a n o e u v r e Since the e x a c t i t u d e in c a r r y i n g out v a r i o u s i n d i v i d u a l w o r k i n g cycles is a k e y f a c t o r for s u c c e s s , early m o n i t o r i n g and i n f o r m a t i o n of the face crew on p l a n n i n g and d e v i a t i o n s from p l a n n i n g , is r e q u i r e d . If the w o r k e d t h i c k n e s s , the face l e n g t h , and the t e c h n i c a l e q u i p m e n t allow use of a l a s e r , s u c h a l a s e r unit on a p i v o t frame of the m a i n drive c a n be h e l p f u l . L a s e r u s e , h o w e v e r , has not y e t b e e n p r a c t i s e d b e c a u s e of the u n d u l a t i n g shape of the seams and b e c a u s e of the size of the s h e a r e r l o a d e r s . The m o n i t o r i n g of the "swing" m a n o e u v r e is c a r r i e d out as d e s c r i b e d in the following: P i l o t shields are m a r k e d as such in a w a y w h i c h c o r r e s p o n d s to the face l e n g t h , and these p i l o t s h i e l d s serve f o r o r i e n t a t i o n of the w h o l e s h i e l d s u p p o r t s y s t e m .
F i g . 15: M o n i t o r i n g a 200 m s w i n g i n g face w i t h p i l o t s h i e l d s In a 200 m long c o a l f a c e , the "outside" s h i e l d (No. 133) needs 10 a d v a n c i n g cycles for 7.50 m of face a d v a n c e p e r d a y .
—23—
F o r s h i e l d N o . 96 the v a l u e r e a d s 7 , for N o . 61 the v a l u e r e a d s 5, and for N o . 36 t h r e e c y c l e s m u s t b e r u n w h i l e s h i e l d N o . 10 o n l y m o v e s by one c y c l e p e r d a y . Per s e c t o r e a c h s h i e l d r e q u i r e s a d i r e c t i o n a l c h a n g e - b y its end- w h o s e o r d e r of m a g n i t u d e d e p e n d s on the s h i e l d ' s l e n g t h and n e e d s to b e d e t e r m i n e d for e a c h i n d i v i d u a l type of s h i e l d equipment.
Fig.
16:
Movement
of
the
shields
during
"swinging"
action
F o r a 6 m l o n g s h i e l d , the o r d e r of m a g n i t u d e of d i r e c t i o n a l c h a n g e is 0.22 m to be a c h i e v e d b y s h i e l d N o . 133 in 10 a d v a n c e c y c l e s and b y s h i e l d N o . 10 w i t h o h n e s t e p w h i l e s h i e l d N o . 1 is m o r e or l e s s t u r n i n g a b o u t its v e r t i c a l a x i s . Whereas the more remote shields' moves can easily be c o r r e c t e d w h i l e a d v a n c i n g , the s h i e l d s n e a r the p i v o t p o i n t r e q u i r e " c o r n e r i n g " in s m a l l s t e p s s e v e r a l t i m e s p e r d a y . F o r the s h i e l d s N o . 1 to N o . 5 the s t e e l b a r s a b o v e the c a n o p i e s f a c i l i t a t e this m a n o e u v r i n g as the f r i c t i o n c o e f f i c i e n t of s t e e l a g a i n s t s t e e l is l o w e r . For i m p r o v e d m o n i t o r i n g , e a c h p i l o t s h i e l d is f i t t e d w i t h a b o a r d s h o w i n g the a s s i g n e d n u m b e r of a d v a n c i n g c y c l e s , e . g . ten for s h i e l d N o . 1 3 3 .
—24—
Fig.
17:
Monitoring
boards
at
the
pilot
shields
F o r s h i e l d N o . 36 o n l y 3 cycles are m a r k e d . The b o a r d is s u b d i v i d e d b y fields a c c o r d i n g to the n u m b e r of advance cycles a s s i g n e d to it and the c o m p e t e n t s u p e r v i s o r m a r k s each a d v a n c e cycle r u n b y c r o s s i n g the r e s p e c t i v e f i e l d . A l l fields n e e d to be c r o s s e d on c o m p l e t i o n of a w o r k i n g d a y . According to the advance r e c o r d e d and the professional a p t i t u d e and q u a l i t y of the c r e w , the s u r v e y i n g d e p a r t m e n t runs twice w e e k l y an e x a c t c o a l f a c e s u r v e y . In the course of this s u r v e y , the n u m b e r of cycles r u n is c o n f i r m e d , and the n u m b e r of cycles s t i l l n e c e s s a r y f o r the i d e a l p o s i t i o n of the c o a l f a c e is m a r k e d b y l e t t e r s M (the i n i t i a l f o r M a r k s c h e i d e r e i = mine s u r v e y i n g d e p a r t m e n t ) on the b o a r d s . A c c o r d i n g to the i n s t r u c t i v e d a t a s u p p l i e d by the m i n e s u r v e y i n g d e p a r t m e n t , the c o n v e y o r is again m a n o e u v r e d into the e x a c t l y c o r r e c t p o s i t i o n in s u c h a f a s h i o n that o n l y those sectors of the face are a d v a n c e d , w h i c h have b e e n i d e n t i f i e d as lagging b a c k o r b e h i n d . By the m e t h o d d e s c r i b e d , s e v e r a l s w i n g m a n o e u v r e s have b e e n run s i m u l t a n e o u s l y w i t h o u t the s u p p o r t b e c o m i n g stuck even o n c e . M e a n w h i l e the crews at W e s t f a l e n C o l l i e r y are so w e l l d r i l l e d , that m o n i t o r i n g by the s u r v e y i n g d e p a r t m e n t is u s e d less for c o r r e c t i v e action, but for confirmation only.
—25—
H e a d i n g of the r a d i a l r o a d w a y If the r a d i a l r o a d w a y is n o t " h e a d e d " i n l i n e w i t h the f a c e b u t a h e a d , c a r e s h o u l d be t a k e n t h a t t h e f a c e l e n g t h f r o m the p i v o t p o i n t to the r a d i a l r o a d w a y c o r r e s p o n d s e x a c t l y to the p r e - d e t e r m i n e d l e n g t h . In c a s e of s e a m s w i t h c h a n g i n g d i p s (inclination), the face length necessarily varies with i d e n t i c a l r a d i u s . It m a y t h e r e f o r e b e c o m e n e c e s s a r y to v a r y the r a d i u s a r o u n d the p i v o t p o i n t in o r d e r to m a i n t a i n e f f e c t i v e l y the face l e n g t h p r o v i d e d .
Practical examples and results In a p a n e l of S o n n e n s c h e i n "swing" manoeuvre.
Fig.
18:
Layout
of
Seam, mining
Sonnenschein
seam
was
planned
without
This would have required 5 or even 7 coalfaces saleable output.
without
swinging
f o r 2.2 M t
of
B y c h a n g i n g the o p e r a t i o n s ' p l a n n i n g the p a n e l is w o r k e d almost completely (2 M t ) by one coalface and 3 swing m a n o e u v r e s , w i t h o u t m o v i n g f a c e e q u i p m e n t to n e w f a c e s a n d without interrupting production, thus achieving a m u c h more efficient mining operation.
— 2 6 —
F i g . 19: L a y o u t of S o n n e n s c h e i n Seam w i t h
F i g . 20: L a y o u t of W i l h e l m Seam w i t h o u t
"swinging"
"swinging"
The r e s e r v e s c o n t a i n e d in W i l h e l m Seam w e r e to be r e c o v e r e d by 6 c o a l f a c e s . The p a n e l o r i g i n a l l y a s s i g n e d to 4 faces was w o r k e d b y one face r u n w i t h three "swing" p h a s e s b y 180° each.
—27—
Fig. 21: Layout of Wilhelm Seam with
"swinging"
This face commenced in 1980, it is still operational and, after a downtime required by the layout, will work the remaining reserves of No. 8 phase till mid-1988. By then a total of 3 Mt of saleable output corresponding to 5 Mt run of mine will have been produced by one single face.
Fig. 22: Operating results when mining the Wilhelm
seam
—28—
The table b e l o w shows the phases of a n o r m a l face o p e r a t i o n and those of the 180° "swing" m a n o e u v r e s . From the table it m a y be s e e n that p r o d u c t i o n d u r i n g " s w i n g i n g " was on a v e r a g e o n l y 10 % lower t h a n in n o r m a l o p e r a t i o n The highest production of 2927 t per day of saleable output, c o r r e s p o n d i n g to a l m o s t 5000 t p e r d a y r u n - o f - m i n e , was a c h i e v e d d u r i n g a s w i n g m a n o e u v r e . C o n s i d e r i n g the o p e r a t i o n r e s u l t s , h o w e v e r , e m p h a s i s s h o u l d be p u t o n the f a c t , that the m a n n i n g of this c o a l f a c e v a r i e d c o n s i d e r a b l y a c c o r d i n g to the o v e r a l l o p e r a t i o n s i t u a t i o n of the c o l l i e r y . In case of the r a d i a l p r o f i l e r o a d w a y b e i n g h e a d e d b e f o r e h a n d , it m a y be a s s u m e d that d u r i n g the swing m a n o e u v r e p r o d u c t i o n is a l m o s t as h i g h as in a n o r m a l s t r a i g h t f o r w a r d o p e r a t i o n .
R i s k s e n c o u n t e r e d w h e n "swinging" faces A t W e s t f a l e n C o l l i e r y , the g r e a t w o r k i n g d e p t h a n d m i n i n g in s t r a t a c o n t a i n i n g thick sandstone b e d s h a v e r e s u l t e d o c c a s i o n a l l y in h i g h e r s t r e s s e s in the seams w h i c h , in t u r n , h a v e led to sudden coal outbursts. Throughout the "swing" manoeuvres, unfavourable geometric conditions may occur, and this m e a n s "zones of h i g h e r r i s k s " .
603
Ernestine
o
Seam
4 4
^
4
4
116 Test Drillings ^
6 8 Stress Relieve Drillings
462
/
r^-rrTTrrTTTTTTTTTTl - Dri" Cuttin9S Spineroad / LJJLllllllllillllAV Wilhelm Seam
/
/ / X'STAZ A y f t y / jQSCy /
/
103
«ngs/ / Relieve Drillings V / V s 917m Drill Cuttings / / / ^ 5 9
T e s t
Dri,,
S t r e s s 3
/V /Om / '
/
50m '
/
TZ
X
19.1
/
/
/
/
/
1 /
/
/
/
F i g . 23: T e s t and stress r e l i e v e m e a s u r e s in the W i l h e l m Seam workings
—29—
By testing and stress-relief measures, i.e. by drilling boreholes of 48 or 96 mm diameter and 20 m depth, coal is removed from the roadside and in some cases also from the face in order to arrive at stress-relief to the strata in the vicinity of the workings. In the Wilhelm Seam 116 test boreholes and 68 stress-relief boreholes were drilled in the spine road, and 463 m3 of coal debris were removed. This is the only way to achieve stress-relief in the strata« In the "swing" roadway more than 900 m3 of coal were removed from 59 stress-relief boreholes of 96 mm diameter. In zones with even higher rock pressure, the advantages and disadvantages of "swing" manoeuvres need to be carefully considered because of such stresses, and also if increased methane release is to be expected. This applies in particular to the working of other seams, thus exposed to additional pressures induced by "edges" and pillar edges of old workings in the seams previously mined. In the past, therefore, many "swing" manoeuvres resulted from constraints and were purposefully run in spite of certain disadvantages likely to occur in the future. If a colliery works only one seam, as is the pratice in many coal mining countries, the advantages of coalface swings seem to be well-established in comparison with expensive shifts of face equipment. In particular with multiple-entry systems, layouts may be realized which allow the gateroads being used only once in retreat, and abandoned after passage of the face. Repeated "swing" manoeuvres are definitely possible. Moderate inclination of the seams make layout work easier, i.e. the direction of coal removal the face can be changed if required.
Summary To sum up, we may state that "swings" of longwall faces offer great advantages if certain prerequisites can be met. The drawbacks need careful consideration. Exactitude in all working cycles is the key to success. Small mistakes, such as backward salients of the conveyor or deviations from the shields1 position normal to the conveyor, which have only nuisance value and can easily be corrected in conventional operation, may result in longer absolute ceasing of all face operations during the "swinging" phase. Face "swings" should only be contemplated by operators who are willing to guarantee the required exactitude of all work to be done during the manoeuvres involved.
•30—
2. MINING IN AUSTRALIA
—32—
SETTING THE SCENE - COAL RESOURCES AND MINING IN AUSTRALIA
By A. Galligan Chief Coal Geologist New South Wales Department of Mineral Resources
—33— BLACK COAL RESOURCES The majority
of
the identified black coal resources of Australia are
Permian in age and occur in the Bowen Basin in Queensland and the SydneyGunnedah Basin in New South Wales (figure 1). Permian deposits
Queensland,
the Oaklands and Gloucester Basins in New South Wales, the
Arckaringa Basin Australia.
are present
Other smaller, but still
significant
in
the Galilee Basin in
in South Australia and the Collie Basin
Thick coal seams have been
intersected
in Western
during petroleum
exploration in the Cooper Basin but the coal is very deep. Triassic
coal basins (figure 2) in Australia are limited in extent but
black coals of Triassic age are mined in the Callide, Tarong and Ipswich Basins
in Queensland,
the Telford Basin in South Australia and
in the
north-eastern part of the Tasmania Basin. In recent
years,
intensive exploration of the Jurassic
coal measures
(figure 3) in the Surat-Moreton Basin in Queensland has indentified large resources
of black coal at shallow depths but to date no significant
exploitation both
of these resources has occurred.
Jurassic
and
Cretaceous
Small coal deposits in
Basins have previously
been worked
in
Queensland and Victoria. The
identified black coal resources of Australia
are given in Table
1.
Figure
In
5
shows
the resources for each
state.
surrmary, the
resources are:In-situ Resources Measured + Indicated Resources: Inferred Resources:
9 70 x 10 tonnes 9 57 x 10 tonnes
+ Very Large (Queensland) Measured + Indicated Resources Potential for Opencut Mining:
9 27 x 10 tonnes 9 Potential for Underground Mining: 43 x 10 tonnes
Within
the categories of Measured and Indicated Resources some
cent of the Resources may have potential for open cut mining.
38 per
1.
Age
State
Basin
(1)
QUEENSLAND
NEW SOUTH WALES
Identltied b l a c k c o a l r e s o u r c e s by Basin. S t a t e , a n d potential mining m e t h o d .
(2)
SOUTH AUSTRALIA WESTERN* AUSTRALIA
QUEENSLAND
Bowen Galilee
< S -§ g6
Potential Total Potential Measured Underground Open-cut Inferred Measured t Indicated Indicated 6 (tonnes x 10^ (tonne x 1 0 ) (tonnes x 10*
Sub Total
4177 705 488 2
19732 1660 ~21392~~
23909 2365 26274
Syciney-Gunnedah Oaklands Gloucester Ashford
12^37 1388 101 <1
19^63
31905 1388 143 <1
39 19507
33436
1410
2786
140
2926
9475
Collie Perth Sub Total TOTAL
436 480 916 22513
305 230 535 41574
741 710 1451 64087
Callide Ipswich Tarong
78 17 255
122 630 25
200 647 280 1127
350
777
Tasmania
25
505
SOUTH AUSTRALIA
Telford
150 525
1282
QUEENSLAND (4)
Surat-Moreton Mulgiidie Styx
3377 20
64 4
4
Sub Total
3397
68
3465
SOUTH AUSTRALIA
41920 3260 30
43300 3260 60
490
9965
345
354 u>
fery
sficno Large Large
530 150
300
300
1807 3441
300 + L a r g e Very Large Small
•20
V p r y f^rrje...
Polda
310
310
10
10
TOTAL
3707
68
3775
10
10
GRAND TOTAL
26745
42924
69669
11204
46055
Queensland Opencut Resources generally based on max. 60m overburden.
(2)
NSW Opencut Resource limit 300m depth and
not ^
10:1 linear overburden ratio. (4)
1-3
(tonnes x 10^)
Large
(1)
References
30
13929
Sub Total
Total Inferred
V e r y L a r o e (3 1380
Sub Total
TASMANIA
Potential Underground Inferred
Very Large
Arckaringa
Total
a !
Potential Open-cut Measured • Indicated (tonnes x 10^
10
Very +Large
^
- ™
n o t —
Minor coal production occurs in Maryborough Basin but resources estimates are not available.
AG-02
—35—
Figure 1.
Permian Basin black coal deposits.
Figure 2.
Trlasslc Basin black coal deposits.
AG-03
—36—
Figure 3.
J u r a s s i c / C r e t a c e o u s Basin black coal deposits.
Figure 4.
Tertiary Basin brown coal deposits.
AG-04
—37— BROWN COAL RESOURCES The
irejor brown coal deposits of Australia are of Tertiary age
found
in
(figure those
the 4).
in
Latrobe Valley area of the Gippsland Small
Basin
and
in
are
Victoria
Tertiary deposits occur in most states and some
South Australia may be mined in the near future
for
of
domestic
power station coal supply. In
estimating
Geological system
the
which
resources. resources Coal".
brown coal resources for
broadly correlates with that system used In
addition
"Identified Identified
geological depths.
Victoria
(table
2),
the
Survey of Victoria (Reference 4) has adopted a classification for
black
the Survey quantities two other categories
Inferred Sub-economic
Inferred
Resources"
Sub-economic Resources are
and
coal of
"Inferior
determined
interpolation in extensions of known coalfields down to
by 500m
Inferior Coal refers to coal with an ash content (dry basis) of
between 10 and 30 per cent. All
of the resources listed in Table 2 are considered to be
potentially
mineable by open cut methods. Table 2. STATE
Victoria
Identified Tertiary brown coal resources by Basin and State.
BASIN
DEPTH CATEGORY (M)
MEASURED + INDICATED (tonnes x 10 )
Gippsland
0 - 300 300 - 500 0 - 300
Otway Murray
Sub Total South Australia
Western Australia
INFERRED ^ (tonnes x 10 )
INFERIOR + INFERRED SUB-BCONCMIg (tonnes x 10 )
80163 4235
4651 2739
54516 30280
500
15000
80663 4235 84898
39240 2739 41989
970
0 - 300 0 - 300 300 - 500 0 - 500
19599
St.Vincent
2524
Murray
938
160
Sub Total
3462
1130
Bremer
614
760
TOTAL
88974
. 43879
54516 30280 84776
04776
Criteria Used: Victoria: seams
3m thick;
Ash
10% except for Inferior vvhere ash
30%
AG-05
—38—
1970/71
state
Figure 5.
M e a s u r e d and indicated
Figure 6.
resources.
76/76
Year
80/81
86/86
B l a c k c o a l p r o d u c t i o n In Australia.
140n
1070/71
78/70
80/81
86/88
Year
Figure 7. B l a c k c o a l e x p o r t s
1070/71
76/78
80/81
85/86
Year
from
F i g u r e 8.
Black coal usage.
Australia. AG-06
—39—
COAL MINING Black Coal Unfortunately statistics
at
the
time of preparation
of
this
paper,
production
for 1986-87 were not available and hence 1985-86 figures
are
used. In
1985-86 production of raw black coal in Australia was
163.6
million
tonnes (Reference 4). Black coal is mined in all states except Victoria. Queensland
and New South Wales dominate production and these two
States
are responsible for all exports of coal. TABLE 3: State
BLACK COAL PRODUCTION BY STATE 1985 - 86
Raw Coal Production
Saleable Coal Production
(Tonnes x 10 3 )
(Tonnes x 10 3 )
New South Wales
77 186
64 081
Queensland
80 012
63 997
Western Australia
3 750
3 750
South Australia
2 167
2 167
502
310
163 617
134 305
Tasmania
TOTAL
The tonnage of black coal produced in 1985-86 shows a three-fold increase over
1970
production
production
which
was
some
53
million
tonnes.
Saleable
shows a similar trend, increasing from 45 million tonnes
in
1970 to 134 million tonnes in 1985-86 (figure 6). Saleable
coal production and the method of production for each basin
is
given in Table 4. Of the 134 million tonnes of black coal produced in Australia in 1985-86, over 65 percent or 90 million tonnes were exported (figure 7). Australia
—40— TABLE 4: SALEABLE BLACK COAL PRODUCTION BY BASIN 1985-86 Black Coal Age
Basin
Saleable Production
Open Cut
Underground
(Tonnes x 1Q3) PERMIAN
Bowen
54 412
51 827
2 585
*Sydney-Gunnedah
64 081
24 474
39 607
Collie
3 750
2 921
829
122 243
79 222
43 021
1 349
TRIASSIC Ipswich
2 965
1 616
Callide
3 403
3 403
Tarong
.2 974
2 974
Telford
2 167
2 167
Tasmania
310
5
305
11 819
10 165
1 654
228
129
99
JURRASSIC- Surat-Moreton CRETACEOUS Maryborough
TOTAL
16
16
244
129
131
134 306
89 516
44 790
* Includes Ashford Basin
AG-08
—41— is currently
the largest exporter of seaborne coal in the world and
Australian coal is shipped to most countries with limited coal resources. Both coking and thermal coal are exported. increased
Thermal coal exports have
dramatically in recent years and now constitute
of the export coal.
45
percent
Most of the export coal is produced from the Bowen
and Sydney-Gunnedah Basins.
Danes tic consumption major use being
in 1985-86 was
42.5 million
for power generation.
tonnes with the
A comparison of
the domestic
consumption and export tonnages is shown in Figure 8. The coal mining industry in Australia is highly mechanised
and overall
productivity as measured by the raw coal output per manshift worked is 21.96
tonnes.
Approximately two thirds of the coal is produced by open
cut mining methods. Most underground mining is concentrated in New South Wales where some 45 1985-86.
million tonnes were produced by this method in
In recent years, many of the underground mines have been
upgraded by the installation of longwall mining equipment with resultant increases in productivity. Brown Coal Brown coal is currently mined in Victoria at three localities and is principally used as a fuel source for electricity generation.
Small
quantities are used for industrial purposes and briquette manufacture. Total production
in 1985-86 was 36.5 million
tonnes.
All coal is
produced by open cut methods. In the larger mines, the coal is recovered by bucket wheel excavators. ACKNaVLEDGEMENTS In addition to the references listed below, the author wishes to acknowledge resource data Western^Australiaf ^ ^
^
^
^
^
^
^
T—nia,
S o u t ^ r ^
^ d
References 1.
GalTigan A.G in prep. Coal Resources in Australia. In Geology of Australian Coalfields Monograph of Bureau of Mineral Resources and Coal Geology Group of P Geological Society of Australia.
2.
Anon
3
S
' 4 4. 5.
llff
1986. Queensland Resources of Black Coal, Government Mining Journal, Vol 87 (1016) 257-260 J
1986
June,
1986.
In
Queensland uueensiana
Ne
' Reser^;; 1 9 8 ^ J V n ^ f \ " " » Wales Coal Resources and sta.de T 1986 New Soutl, Wales Department of Mineral Resources Publn. Stanley, D . R , 1986 Brown Coal Resources of Victoria, an Overview. Geological 0giCaX Survey of Victoria Rep. 1986/25 (unpubl.). Joint Coal Board, 1986. Black Coal in Australia 1985-86. A Statistical Year Book.
AG-09
—42—
P R O J E C T F E A S I B I L I T Y A N D M I N E P R O D U C T I O N COSTS
By C , R . Longworth General Manager Planning + Development and Director Clutha L i m i t e d L e v e l 18, 1 York Street Sydney, 2000
The paper outlines the present i n v e s t m e n t e n v i r o n m e n t e x i s t i n g in t h e A u s t r a l i a n Coal Industry and places this in the c o n t e x t of the c u r r e n t w o r l d seaborne coal trade.
Those f a c t o r s w h i c h have the g r e a t e s t i n f l u e n c e on the v i a b i l i t y of c o a l
p r o j e c t s today, namely
c o a l prices
and q u a l i t y , exchange r a t e s , cash cost
of
p r o d u c t i o n , c a p i t a l and b o r r o w i n g costs, i n f r a s t r u c t u r e and g o v e r n m e n t charges are d e a l t w i t h b r i e f l y . B o t h coking c o a l and s t e a m i n g c o a l prices have d e t e r i o r a t e d s i g n i f i c a n t l y in the last year m a k i n g i t e x t r e m e l y d i f f i c u l t to j u s t i f y the development of new p r o j e c t s t o replace those w h i c h w i l l be exhausted in the n e x t decade. The
significance
of
cash
costs
are
discussed
and
it
is concluded
that
the
i n c r e m e n t a l expansion of good q u a l i t y low cash cost e x i s t i n g mines w i t h ample reserves w i l l be the only p r o j e c t s l i k e l y t o stand the c u r r e n t f i n a n c i a l tests. High i n t e r e s t rates and low exchange rates have had a s i g n i f i c a n t a f f e c t on the c a p i t a l cost components of selling p r i c e s .
L o w exchange rates on the other hand
have assisted the i m p r o v e m e n t in the A u s t r a l i a n dollar r e t u r n but prices in US dollars
have
continued
to
weaken
during
this
period
of
devaluation
of
the
Australian currency. The i n f l u e n c e of t r a n s p o r t and i n f r a s t r u c t u r e as w e l l as g o v e r n m e n t charges and taxes are discussed.
T r a n s p o r t and i n f r a s t r u c t u r e costs now represent a very
s i g n i f i c a n t p r o p o r t i o n of the t o t a l F O B T selling p r i c e and savings need to be made in these areas i f the i n d u s t r y is to r e m a i n c o m p e t i t i v e . The paper concludes by g i v i n g a schedule of those f a c t o r s of a l o c a l c h a r a c t e r w h i c h can be changed to render p r o j e c t s more c o m p e t i t i v e and also presents some external
factors
beyond A u s t r a l i a ' s c o n t r o l w h i c h w i l l ,
d e v e l o p m e n t of the industry in the next decade.
in p a r t , influence
the
•43—
INTRODUCTION C o a l is a source o f carbon f o r e i t h e r d i r e c t energy use or as a c o m b i n e d e n e r g y / r e d u c t a n t in s t e e l m a k i n g .
I t is a basic c o m m o d i t y w h i c h in A u s t r a l i a
today sells f o r f r o m 3.0 t o 6.50 per k i l o g r a m f r e e on board (FOB) ocean vessel*.
The paper r e v i e w s the p r i n c i p a l f a c t o r s w h i c h c u r r e n t l y i n f l u e n c e
the v i a b i l i t y o f e x p o r t c o a l p r o d u c t i o n in A u s t r a l i a , most are adverse and f a r o u t w e i g h those t h a t are f a v o u r a b l e .
In s p i t e of the poor o u t l o o k f o r t h e
i n d u s t r y , e x p l o r a t i o n and e v a l u a t i o n must c o n t i n u e in order t o m a i n t a i n an i n v e n t o r y of prospects to r e p l a c e mines as they become exhausted. Most of the w o r l d ' s m a j o r c o a l producers r e l y on the home m a r k e t t o provide stability to their industry.
A u s t r a l i a is an e x c e p t i o n and depends very m u c h
on the e x p o r t m a r k e t f o r v i a b i l i t y .
The i n d u s t r y is s t i l l the N a t i o n ' s l a r g e s t
e x p o r t e r earner w i t h sales in excess of 5 b i l l i o n dollars, even though c u r r e n t p r i c e r e d u c t i o n s have slashed i n c o m e and g r o w t h prospects h e a v i l y . While many of t h e f a c t o r s discussed in t h i s paper are c o m m o n to d o m e s t i c coal p r o d u c t i o n f o r i n d u s t r i a l and power g e n e r a t i o n uses, c a p t i v e d o m e s t i c mine
evaluation
industries.
is
heavily
related
to
the
viability
of
the
end
user
Many p o l i t i c a l issues also i m p a c t on d o m e s t i c c o a l p r o j e c t s and
t h e y are best considered in i s o l a t i o n . T o t a l A u s t r a l i a n coal sales in 1986 a m o u n t e d to 5.914 b i l l i o n dollars w h i c h was a rise on the previous year of 13%. now
operates
oversupply.
in
an
extremely
In spite of t h i s rise, t h e i n d u s t r y
precarious
situation.
There
is
gross
The m a r k e t is unstable and s t e a m i n g c o a l sells below the c o a l
costs of p r o d u c t i o n .
There is a low l e v e l of e q u i t y p a r t i c i p a t i o n in the
industry w h i c h has a n e g a t i v e r e a l r e t u r n on funds e m p l o y e d . There has been a qradual increase in b o r r o w i n g s , now in excess of 4 b i l l i o n dollars R e f (1), and a c o m m e n s u r a t e
decrease in shareholders 1 e q u i t y .
D u r i n g the
1985
p e r i o d the d e b t / e q u i t y r a t i o o f the industry increased f r o m 0.95 t o 1.13 and e x p l o r a t i o n is c u r r e n t l y at a d i s t u r b i n g l y l o w l e v e l .
A l l of these f a c t o r s
point t o a sick i n d u s t r y .
A l l m o n e t a r y sums are in A u s t r a l i a n c u r r e n c y unless o t h e r w i s e n o t e d .
CRL-01
—44— A f u r t h e r f a c t o r of deep concern is t h e steep decline in e x p e n d i t u r e on f i x e d assets w h i c h cover e q u i p m e n t r e p l a c e m e n t .
A n i n d u s t r y w h i c h does not
m a i n t a i n sound modern e q u i p m e n t , w i l l i n e v i t a b l y become r u n down, and this f a c t o r is now c l e a r l y e v i d e n t in c e r t a i n sectors of the i n d u s t r y . The industry is c y c l i c a l and has been in states of depression b e f o r e but has r e c o v e r e d to achieve increased p r o d u c t i o n . Those f a c t o r s having the g r e a t e s t i n f l u e n c e on p r o j e c t v i a b i l i t y are c o a l prices and exchange r a t e s , cash costs of p r o d u c t i o n , c a p i t a l and b o r r o w i n g costs, i n f r a s t r u c t u r e and g o v e r n m e n t charges.
E n v i r o n m e n t a l f a c t o r s can
r e s u l t in t i m e delays and s e r v i c i n g costs in p r o j e c t i m p l e m e n t a t i o n and w h i l e i m p o r t a n t , these are e x c l u d e d f r o m the paper, because of t h e i r s u b j e c t i v e character. 2.
G E N E R A L OBSERVATIONS O N W O R L D C O A L T R A D E A r e v i e w of h i s t o r y R e f (2) t e l l s us t h a t sound r e c o v e r i e s in t h e industry have o c c u r r e d f o l l o w i n g m a j o r s t r u c t u r a l and t e c h n o l o g i c a l change. The conclusion t o the paper deals w i t h some of the changes necessary t o render l i k e l y prospects v i a b l e , and mentions some of the e x t e r n a l f a c t o r s w h i c h w i l l a f f e c t the p r o f i t a b i l i t y o f f u t u r e p r o j e c t s . The amount of black c o a l w h i c h moved in w o r l d c o a l trade in 1986 was 336 m i l l i o n tonnes R e f (3) or about 10% of t h e t o t a l w o r l d o u t p u t of 3.68 b i l l i o n tonnes.
The decline in s t e e l o u t p u t of the m a j o r i n d u s t r i a l i s e d nations has
c r e a t e d a reduced demand f o r the higher p r i c e d higher q u a l i t y coking coals. Crude s t e e l p r o d u c t i o n in the n o n - c o m m u n i s t developed c o u n t r i e s decreased by 18.7 m i l l i o n tonnes in 1986 Ref.(4) w h i l e modest increases have o c c u r r e d in the developing c o u n t r i e s of R e p u b l i c o f K o r e a , T a i w a n , India, P a k i s t a n , T u r k e y , B r a z i l and A r g e n t i n a .
A u s t r a l i a n e x p o r t s in 1986 amounted to 92
m i l l i o n tonnes or about 27 p e r c e n t of the world's t o t a l seaborne coal t r a d e . 3.
COAL QUALITY In US dollar t e r m s , c o k i n g and non c o k i n g coals have shown a steady p r i c e decline, since the early e i g h t i e s .
The p r i c e v a r i a t i o n s are shown in Figs 1,2
and 3 and have had the g r e a t e s t i m p a c t on p r o j e c t v i a b i l i t y in the last 2 years.
The Japanese c o k i n g coal m a r k e t is an established b e n c h m a r k f o r
w o r l d prices, although w i t h c u r r e n t oversupply, prices in m a r k e t s other than Japan are on average l o w e r .
T h e r m a l coal prices to m a r k e t s , other t h a n
Japan, are at present up t o 10 p e r c e n t l o w e r on average.
CRL-02
—45— When viewed in Australian dollar terms, prices did not go into steep decline until mid 1986, as evidenced by the stabilising influence of the long progressive decline in the Australian dollar, shown in Fig.4. Extreme oversupply of all types of coal has existed in world trade during this period, and most of the recent projects in Australia, producing steam coal for export, are just covering cash costs with nothing l e f t for debt servicing and i n t e r e s t , let alone the shareholder. The steep fall in the Australian Dollar in early 1985 improved producer cash flows and in part staved off the crisis which now exists in the industry. Australia isn't unique with difficult conditions existing in Canada and South Africa. The prediction of coal prices for new projects will always prove difficult and the industry has experienced the use of various accepted test criteria by customers over the years to establish prices. The steel and power generation industries have learnt to use a wider variety of coals and have achieved skills in changing coal sources relatively quickly. They now watch closely the consuming p a t t e r n s of their competitors. There now appears to be a close correlation between coal prices in US dollars per tonne of net carbon. Fig.5 illustrates the price variations of hard, s o f t and weak coking coals and thermal coals supplied from N.S.W. to the Japanese market over the past 8 years. Acknowledgement is made to the Australian Coal Report for this d a t a . The weak coking coals and thermal coals achieve the same price on a net carbon basis, regardless of whether the coal is used for metallurgical or electricity generation, and hard and s o f t coking coals have also achieved price equality on this same basis. Pricing based upon net carbon content may seem very obvious at a time of oversupply of all types of coal. For coal quality and price predictions constant attention to the international market scene remains the best advice. In the last 3 years customers have demanded higher quality coals. Average ash levels for coking and thermal coals have been progressively reduced. Future export projects will t h e r e f o r e need to reach lower ash levels if they are going to p e n e t r a t e new m a r k e t s . This f a c t o r will influence yield assessment and washing plant capital costs. Washing plants will become more sophisticated. The influence of yield cannot be stressed too highly in coal prospect evaluation. A number of productive mines in Australia have had to cease operations primarily due to the influence of yield on their production costs.
CRL-03
MINING COSTS AND PRODUCTIVITY An analysis of the distribution of costs comprising the F O B T selling price of coal from all existing Australian mines is shown in Fig.6. Mining and washing costs represent an average from 29 to 46 percent of the selling price. The distribution figures guoted are not sufficiently recent to reflect the significant improvements being effected by the new longwalls. Most Australian open cut mines face progressively increasing strip ratio over the mine life resulting in an increasing cash cost of raw coal production. There is thus a constant need for further new capital to maintain production. Some multiple seam Hunter Valley mines are exceptions and have relatively stable strip ratios over the mine life. The increased productivity from underground operations equipped with longwalls is gradually closing the gap between the open cut and underground cash costs. Fig. 7 shows the change in raw coal output pattern over the past 35 years and serves to illustrate the influence of certain physical, technological and industrial factors on productivity and hence mining costs. Fig. 7 is based upon industry averages. While underground operations have much lower outputs than open cuts the best new longwall is better than many of the mature open cut mines. When capital requirements are taken into account, it will be concluded that high production underground mining of the right type of coal, favourably situated to the port will remain competitive. This is in contrast to Western Canada where underground mining has ceased. It is not possible to generalise on raw coal cash costs of production but with the new generation of longwalls, working under ideal conditions, cash costs in the region of $15 per tonne can be achieved. The costs are higher than ideal open cut operations of say $9 per tonne, when capital costs are added some underground mines will prove more competitive. Deeper mining with greater support requirements and the likelihood of gas drainage, add significantly to underground cash costs which can rise to $24/tonne or more. Labour costs impact heavily on mining costs. If the industry is to remain competitive in the world scene then these costs have to be reduced by a combination of lower levels of manning, wage reductions through more
CRL-04
47— a p p r o p r i a t e bonuses, the e l i m i n a t i o n of p e n a l t y r a t e s and a wide range of work practices.
These steps in c o n j u n c t i o n w i t h new technology w i l l reduce
cash costs and c o n t r i b u t e to the r e s u m p t i o n of a h e a l t h y s t a t e of g r o w t h in the i n d u s t r y . 5.
C A P I T A L COST I N T E R E S T A N D E X C H A N G E R A T E S R e f e r e n c e to F i g . 6 shows t h a t t h e c o n t r i b u t i o n t o F O B T selling p r i c e s f r o m b o t h c a p i t a l and r e p l a c e m e n t c a p i t a l varies f r o m 12.2% t o 21.7%. In r e a l i t y , f o r new p r o j e c t s the c a p i t a l c o n t r i b u t i o n is s i g n i f i c a n t l y higher t h a n this and in the present m a r k e t e n v i r o n m e n t , i t w o u l d be e x t r e m e l y d i f f i c u l t to f i n d a grass roots p r o j e c t w i t h m i n i n g and c a p i t a l costs s u f f i c i e n t l y low to m e e t financial acceptance. Most underground and opencut m i n i n g e q u i p m e n t has s i g n i f i c a n t manufacturing component. has
therefore
become
overseas
The i n f l u e n c e of t h e reduced A u s t r a l i a n d o l l a r
a two
edged s w o r d ,
i m p r o v i n g cash r e c e i p t s
but
increasing the c a p i t a l cost c o m p o n e n t o f p r o d u c t i o n and thus m a k i n g new p r o d u c t i o n d i f f i c u l t to j u s t i f y .
By way o f e x a m p l e , t w o h y p o t h e t i c a l c a p i t a l
cost dissections are p r o v i d e d , one f o r a new underground mine and the o t h e r an opencut m i n e , b o t h w i t h s i m i l a r saleable c o a l o u t p u t s .
Longwall underground mine producing 3.3 million tonnes of saleable coal per annum $M E x p l o r a t i o n and p r e l i m i n a r i e s
12
L a n d purchase
1
Service f a c i l i t i e s
30
Construction camp
15
D r i f t s and s h a f t s
27
Longwall mining equipment
36
Conveyors
19
Electrical
3
Conventional miners, FCTfs etc.
17
Underground transport equipment
5.3
Surface e q u i p m e n t
2.5
Coal p r e p a r a t i o n and handling
66
R a i l loop
15
Spares
4
Engineering and p r o j e c t m a n a g e m e n t
11
Total
$263.8m
CRL-05
—48— The capital cost per saleable tonne of output is djo/7 Rrr» = $80 per annual tonne of production 3.3 Opencut Mine Producing 3.3 million tonnes per annum of saleable coal
$M 12
Exploration and preliminaries Service facilities
1 35
Construction camp Mining and surface equipment
385
Coal preparation and handling R a i l loop
66 15
Land purchase
15
Spares
5
Engineering and project management
20 $554m
Total
The capital cost per annual tonne of output is <t» c c/, __ _ = $168 per annual tonne of production 3.3 It can be seen from this example that the capital cost per annual tonne of output for the underground mine is approximately surface mine.
one half that of the
Surface mines are far more capital intensive unless the strip
ratio is low such as exists at Blair Athol. In the capital cost examples selected, no provision has been made
for
infrastructure such as townships, water and power supply, contributions to railways and ports.
These items are significant in relation to a number of
Australian project mines awaiting a more favourable development climate. Underground mines are generally less capital intensive but have higher cash costs.
In
general
underground
mines
reguire
less
additional
capital
throughout their life than opencut mines to maintain the designed level of production. With underground mines a need arises over the mine life to extend district coal conveying systems and to provide additional man access and surface facilities to reduce travelling times to the face as well as constructing extra ventilation facilities.
With opencut mines overburden removal represents
the largest ongoing capital requirement.
CRL-06
—49— F i g . 8 i l l u s t r a t e s the v a r i a t i o n in c a p i t a l i n v e s t m e n t in t h e A u s t r a l i a n C o a l Industry in the 5 years to 1985.
The low cash cost mines c o n s t r u c t e d in the
last decade are now t h e only ones w h i c h can c o m p e t e in the c u r r e n t w o r l d market. In
the
underground
mining
example
guoted if
a cash cost of
raw
coal
p r o d u c t i o n o f $15 was adopted, a washing cost o f $4 and a y i e l d of 80%, t h e n the p i t head cost of saleable c o a l w o u l d be $23.75. I f a 15% c a p i t a l f a c t o r is adopted t h e n t h e p i t head selling p r i c e of t h e p r o d u c t i o n w o u l d be $35.75. A d o p t i n g a s i m i l a r approach f o r the opencut mine e x a m p l e and using a cash cost of p r o d u c t i o n o f $9 w i t h a washing and handling cost of $4 and a y i e l d of 70%, ( l o w e r y i e l d due to o u t - o f - s e a m d i l u t i o n ) the cash cost of p i t h e a d p r o d u c t i o n is $18.57 and a p p l y i n g a s i m i l a r c a p i t a l f a c t o r gives an e x - m i n e selling p r i c e o f $43.77.
Unless p o r t and t r a n s p o r t charges are e x t r e m e l y low
n e i t h e r o f these mines w o u l d be c o m p e t i t i v e , at p r e s e n t . The overseas c u r r e n c y c o m p o n e n t in the cost of m i n i n g e q u i p m e n t plays a very m a j o r p a r t in the c a p i t a l cost c o m p o n e n t and in t h e case of l o n g w a l l e q u i p m e n t can amount t o 70% o f the t o t a l costs.
R e f e r e n c e to F i g 4 gives
the v a r i a t i o n in A u s t r a l i a n d o l l a r U.S. dollar r a t e and t h e 90 day bank b i l l r a t e , as an i n d i c a t i o n of b o r r o w i n g costs. Exchange rates and debt f i n a n c i n g have had a m a j o r i n f l u e n c e on the v i a b i l i t y o f a l l the new mines established t h i s decade.
A s i g n i f i c a n t i m p r o v e m e n t in b o t h o f these r a t e s w o u l d lead t o
an e n t i r e l y d i f f e r e n t p e r s p e c t i v e on the economics of c o a l m i n i n g . u t i l i s a t i o n is too low in the i n d u s t r y .
Capital
E v e r y e f f o r t should be made in the
e x i s t i n g c l i m a t e of w o r k p r a c t i c e r e v i s i o n to e x t e n d p r o d u c t i o n to 7 days and r a t i o n a l i s e manning r o s t e r s , thus o b t a i n i n g a more e f f i c i e n t use o f c a p i t a l . TRANSPORT A N D INFRASTRUCTURE The t w o h y p o t h e t i c a l examples of c a p i t a l costs f o r underground and o p e n c u t mines given in Section 5 e x c l u d e d i n f r a s t r u c t u r e i t e m s .
The provision o f
w a t e r supply power systems, townships and c o n t r i b u t i o n s to r a i l w a y s ' r o l l i n g stock and p o r t f a c i l i t i e s , can increase the c a p i t a l c o n t r i b u t i o n by 50% or more depending upon p r o j e c t l o c a t i o n .
I t is c l e a r , in these c i r c u m s t a n c e s ,
that
take
the
only
developments
expansions of e x i s t i n g
mines
likely
to
and t h e n only
place
are
the
incremental
when these mines have
low
t r a n s p o r t and p o r t costs. F i g . 9 i l l u s t r a t e s the a p p r o x i m a t e c u m u l a t i v e e x p o r t mineable reserves of coal d e p i c t e d in r e l a t i o n to distance f r o m the p o r t . appear
attractive,
it
is only those
While the reserves
prospects w h i c h are associated
with
CRL-07
—50— e x i s t i n g mine d e v e l o p m e n t and i n f r a s t r u c t u r e t h a t can possibly c o m p e t e and t h e n only i f endowed w i t h high p r o d u c t i v i t y , f a v o u r a b l e labour r a t e s and good i n d u s t r i a l p r a c t i c e s . A u s t r a l i a n r a i l f r e i g h t r a t e s f o r c o a l have t r a d i t i o n a l l y been m u c h h i g h e r t h a n those o f C a n a d a , South A f r i c a and The U n i t e d S t a t e s .
I t is g e n e r a l l y
a c c e p t e d t h a t the NSW and Queensland r a i l f r e i g h t r a t e s have been used as an i n d i r e c t f o r m o f S t a t e t a x a t i o n .
In N e w South Wales t h e r a i l f r e i g h t r a t e s
on a tonne k i l o m e t r e basis are m u c h h i g h e r f o r the s h o r t e r haul r o u t e s and are at least 100% h i g h e r t h a n t h e C a n a d i a n and A m e r i c a n r a t e s .
Short haul
r a i l f r e i g h t r a t e s in N.S.W. are in the o r d e r of 9.8 c e n t s per tonne k i l o m e t r e , w h i c h is c o m p a r a b l e t o r o a d t r a n s p o r t w h i l e l o n g e r r o u t e s are in t h e order of 4.4 c e n t s a l t h o u g h
the r a t e s are on a p r o g r e s s i v e l y
r e d u c i n g scale
with
d i s t a n c e , and g e n e r a l i s a t i o n c a n n o t be a d o p t e d . In c o m p a r i s o n the W e s t e r n C a n a d i a n r a t e s are in t h e o r d e r o f 1.65 c e n t s per tonne k i l o m e t r e and t h e East C o a s t U n i t e d States r a t e s are 2.5 cents per tonne k i l o m e t r e .
The n e w e r Queensland c o a l p r o j e c t s are also be burdened
w i t h v e r y high r a i l f r e i g h t r a t e s w h i c h w i l l i n h i b i t d e v e l o p m e n t of f u r t h e r projects. I t is u n l i k e l y t h a t a new m i n e c o u l d j u s t i f y t h e c o n s t r u c t i o n o f a stand alone e x p o r t c o a l l o a d i n g t e r m i n a l in t o d a y s c o a l m a r k e t .
T h e r e is s t i l l s i g n i f i c a n t
surplus
and N.S.W.
terminal
capacity
existing
in
Queensland
Terminal
charges f o r c o m m o n user f a c i l i t i e s are h i g h e r t h a n our e x p o r t c o m p e t i t o r s . N e w t e r m i n a l s h a v i n g i n s u f f i c i e n t t h r o u g h p u t are e n c u m b e r e d w i t h excessive c a p i t a l s e r v i c i n g charges, K o o r a g a n g c o a l being an e x a m p l e . Port
Kembla
is
high
due
to
over-manning
f a c i l i t i e s in A u s t r a l i a n and a b r o a d .
when
The t a r i f f a t
compared
with
other
The annual c a p a c i t y in tonnes per m a n
e m p l o y e d at P o r t K e m b l a is less t h a n 40,000 c o m p a r e d w i t h 120,000 tonnes at t e r m i n a l s such as R o b e r t s Bank in Canada and Hay P o i n t in A u s t r a l i a . There is thus scope f o r a r e d u c t i o n , in r e a l t e r m s , in loading c h a r g e s . I n t e r n a t i o n a l shipping r a t e s w i l l play an i m p o r t a n t p a r t in t h e f u t u r e trade pattern.
coal
In the l a s t 12 m o n t h s f r e i g h t r a t e s to A R A posts f o r capesize
vessels have been as l o w as US$7.00 per t o n n e .
The hardship e x p e r i e n c e d in
c e r t a i n areas of the ocean f r e i g h t business is as bad as the c o a l i n d u s t r y . The
rate
of
construction.
scrapping
of
old
tonnage
is now e x c e e d i n g
new
bulk
ship
This f a c t o r when c o m b i n e d w i t h increased o i l prices w i l l lead
t o a m o r e r a p i d r a t e o f increase in f r e i g h t r a t e s w h i c h w i l l i n f l u e n c e c o a l t r a d e p a t t e r n s in the n e x t decade.
CRL-08
—51— 7.
TAXES The
coal
industry
in A u s t r a l i a
is now
burdened
with
a wide
range
of
G o v e r n m e n t charges and taxes w h i c h w e r e able to be absorbed during t i m e s of higher prices and positive r e t u r n s on funds i n v e s t e d .
For r e p l a c e m e n t
p r o j e c t s to proceed i t w i l l be necessary to r e v i e w a l l o f these charges in order to e f f e c t a r e d u c t i o n c o m p a r a b l e w i t h t h a t t a r g e t e d in the area o f cash costs. rental,
The charges and taxes c o m p r i s e excise, r o y a l t i e s , lease fees and
fringe-benefits
tax
on housing, w h a r f a g e , harbour
dues
research
levies as w e l l as the i n d i r e c t s t a t e t a x a t i o n t h r o u g h excessive t r a n s p o r t and p o r t charges. 8.
THE N E X T D E C A D E OF COAL PROJECTS To conclude a number o f observations and r e c o m m e n d a t i o n s f o r change are made to c a t a l y s e the e x p l o r a t i o n planning and d e v e l o p m e n t of soundly based coal mines. i)
A buyers 1 m a r k e t w i l l e x i s t f o r some t i m e , as a p r i c e t a k e r A u s t r a l i a must reduce costs in a l l q u a r t e r s .
ii)
Development
will
be l i m i t e d
to established c o a l areas served
by
infrastructure. iii)
The i n d u s t r i a l r e c o r d in the i n d u s t r y is 3600 p e r c e n t worse than the r e s t of t h e A u s t r a l i a n w o r k f o r c e .
I t has average w e e k l y earnings of
$875 w h i c h is s i g n i f i c a n t l y higher than o t h e r mine w o r k e r s in more profitable
metal
mines.
Labour
costs
must
be
reduced.
Poor
i n d u s t r i a l r e l a t i o n s add s i g n i f i c a n t l y t o c a p i t a l and o p e r a t i n g costs and destroy c u s t o m e r c o n f i d e n c e . iv)
Infrastructure
costs
and f r o n t
end p r o j e c t
loading costs must
be
reduced. v)
R a i l f r e i g h t r e d u c t i o n s are r e q u i r e d f o r a l l p r o j e c t s and n o t r e s t r i c t e d to those w i t h long distance hauls.
vi)
New p r o j e c t s w i l l need to be h i g h l y p r o d u c t i v e and of low cost, yield.
capable
of
speedy
development
capital
w i t h good c o a l q u a l i t y
The a u g m e n t a t i o n of e x i s t i n g mines or the d e v e l o p m e n t
and of
nearby deposits w i l l be the most l i k e l y candidates. vii)
Reduction
in
government
charges
and
taxes
as an
incentive
to
revitalisation. viii)
R e m o v a l of the F l a g o f Convenience ban on N.S.W. c o a l e x p o r t s ,
ix)
P r o d u c t i o n o f an increased range o f c o m p e t i t i v e A u s t r a l i a n produced
x)
R e d u c t i o n in i n t e r e s t r a t e s .
imposed by M a r i t i m e Unions. mining equipment.
CRL-09
—52— xi)
Maintenance of devalued currency until industry is revitalised and servicing equity participants adequately.
x)
Reduction in the inflation rate.
It is appropriate to record some external factors which will have positive and negative influences on Australian coal projects.
Factors of positive
influence are: a)
The reduction in coal production in Japan, France, Belgium, Britain
b)
The reduction in the enormous subsidies paid to the West German
and West Germany. industry which could occur in the next decade. c)
Reduced exports from South A f r i c a , Canada and U S A .
d)
Continuation of high inflation in South A f r i c a as well as industrial
e)
disruption and high financing costs. Increase in oil prices.
f)
Increase in coal fired power plant construction
q)
Decrease
in
nuclear
power
plant
construction.
High
cost
of
decommissioning old nuclear plants. h)
Increased growth and financial stability in developing nations.
Factors of negative influence are: i)
Increased exports from China, Colombia and Indonesia.
ii)
Increased ocean freight rates.
iii)
Further reductions in steel output from developed nations.
iv)
Embargos and trade restrictions.
v)
More efficient use of electricity e.g. the advent of super conductors in the next 2 decades.
CRL-10
—53— References 1.
Coopers & L y b r a n d - A u s t r a l i a n C o a l A s s o c i a t i o n , I n d u s t r y R e p o r t 1986,
2.
E l l i s M . H . - A Saga o f C o a l - Angus & R o b e r t s o n .
3.
F i n a n c i a l T i m e s I n t e r n a t i o n a l C o a l R e p o r t - C o a l Y e a r 1986.
4.
I n t e r n a t i o n a l Iron & Steel I n s t i t u t e regular r e p o r t s .
CRL-11
—54—
N.S.W. HARD COKING COAL PRICESReproduced TO JAPAN from data from
Australian Coal Morketmg Monual Supplied by Australian Coal Report
FIG I
64 - AUSTRAl IAN S
60
M —— mmmm-
U.S. S
56 i i i
52
48
—r f i
44 A
i
40 J V v /
36
\i
-Y
\ -v
1
r
A
A
V
V
.
VAA , A* / V M
t
r
_
i 1• i/ \ %i i\ V
t\ \P
1
J / Ar If ft < Jt iI a N l! M I%/n# I' , p^ \ 1
\
1
t/
\
V V
1978
1979
t i —t
\1/ V
f 32
A
1980
1981
19 82
1983
1984
/985
1986
N.S.W. SOFT COKING COAL PRICES TO JAPAN
1987
Reproduced from data from Australian Coal Marketing Manual Supplied by Australian Cool Report
FIG 2
—55—
AVERAGE EXPORT VALUES FOR AUSTRALIAN NON COKING COAL FIG 3
1-20
' 1978 '* 1979' "1 i'seo
1 1981 ' ' 1982 1 1983
1 1984
90 DAY BANK BILLS FIG 4
1985
1986 1987 EXCHANGE RAT£
CRL-13
—56—
HARD COKING SOFT
COKING
WEAK COKING THERMAL
IS79
I990
1981
1982
1983
1984
1983
1986
1987
DATA PROVDED BY AUSTRALIAN
COAL PRICE VARIATION WITH NET
COAL
COAL
REPORT
CARBON
FIG 5
12 2 2 % LABOUR
28-71%
LABOUR
285%
16-90% MATERIALS POWER FUEL OThER
14-32% Q-90%
WASHING
COSTS
16-68%
PORT
4-30% 4-47% 3-64%
_G0V7"
12-35%
9 10%
co^ 8-84%
27-68% FREIGHT
FREIGHT 23-52%
MATERIALS POWER FUEL/ OTHER ^
26-86%
PORT 8 00% 4-43%
ilfM
UNDERGROUND (jONGWALL
CAPITAL
2 66%
379% 19 0 1 % 8-45%
CAPITAL
CONVENTIONAL UNDERGROUND
OPEN CUT > 2 0 MTPA SOURCE: AUSTRALIAN COAL CONSULTATIVE COUNCIL- COST STUOY 1985
FOBT SELLING PRICE COST DISTRIBUTION AUSTRALIAN COAL MINE CATEGORIES FIG 6
FOR CRL-14
—57—
CO
LJ
50
O h-
X CO
40
q: uI
CL 30 <1 LU > O t K D
CL
20
I— ZD O
§ CJ
10
£
1950
I960
1970
TRENDS IN OUTPUT PER FIG
1980
1990
MANSHIFT
7
CRL-15
—58—
I9QI
I9Q2
(963
1904
1985 SOURCE•• AUSTRALIAN COAL ASSOCIATION INDUSTRY REPORT 198 6 DATA ANALYSIS COOPERS & LYBRAND
VARIATION IN CAPITAL INVESTMENT AUSTRALIAN COAL INDUSTRY FIG 10000 J
8
— • TOTAL OLD a 1f SW - NSW • OLD.
mmmm
Ui
si < a 5
CO
Ui
g 6000)
/
- RESERVES QUOTED ARE CONSIDERED MINEABLE BY PRESENT METHODS WITHIN 30 YEARS
••
-RESERVES DEDICATED TO POWER STATION STEELWORKS OR OTHER DOMESTIC CONSUMERS HAVE NOT BEEN INCLUDED
rA •f •
P
3 § §
/
/
NOTES
/
4 0 0 0)
-CUMULATIVE RESERVES SHOWN AGAINST A RAIL DISTANCE TO PORT INDICATES THE TOTAL MINEABLE RESERVES CONTAINED WITHIN THAT DISTANCE TO A PORT
t
2000
/d
500 RAIL DISTANCE
I
RAIL DISTANCE
TO
PORT
TO PORT VERSUS CUMULATIVE MINEABLE RESERVES NSW a QUEENSLAND FIG 9
EXPORT
CRL-16
3. MINE PLANNING
—60—
GEOLOGICAL ASPECTS OF LONGWALL MINING OPERATIONS PAST, PRESENT AND FUTURE
KONRAD 11.R. MOELLE DEPARTMENT OF GEOLOGY TELE UNIVERSITY OF NEWCASTLE
—61—
GEOLOGICAL ASPECTS OF LONGWALL MINING OPERATIONS
-
PAST, PRESENT AND FUTURE
K.U.R. MOELLE DEPARTMENT OF GEOLOGY THE UNIVERSITY OF NEWCASTLE
ABSTRACT The geologist assists the mining engineer during the planning of the colliery layout and during the production period. The elimination of geological "surprises11 is one of the main tasks of the geologist. Faults, igneous intrusions, washouts and palaeochannels, sedimentary dykes and "stonerolls" are the most common geological features that may cause delays in development and production if encountered unexpectedly. The geological setting of a colliery holding usually provides a considerable amount of information pertaining to the system "floor-seam-roof." The large number of geological variables that commonly occur in such a system make it very difficult to assess the system algebraically. The mining engineer is concerned with geological phenomena that result from several processes and conditions. It is an engineering task to extract the coal, sometimes with difficulties. The geologist must analyse the environment in which the engineer operates and these analyses are designed to define the geological "environment11 of the mine workings.
Such a definition of tasks should ideally lead
to a close co-operation between the engineer and the geologist toward the choice of an efficient and highly productive mining method.
INTRODUCTION
Many mining methods have been successfully used in the Permian Coal Measure sequences of the Sydney and Bowen Basin structure.
The development of Australian longwall mining practice in the early f60s was marked by two contrasting events.
Whereas the first installation
could not successfully operate in the Bulli Seam of the Permian Illawarra Coal;Measures, a longwall face commenced not long after achieved a production record, mining also in the Bulli Seam.
Longwall faces were brought into an efficiently operating industry that relied almost exclusively on continuous miner-based bord and pillar mining methods with subsequent pillar extraction on the retreat.
Mining operations
took place at relatively shallow depths ranging from approximately 150 metres to 250 metres in flat lying coal seams occasionally disturbed by moderate to small scale faulting.
Igneous intrusions in the form of dykes
and, less frequently, sills, have impeded development and extraction work in most mines.
Other geological features and phenomena have proved
troublesome to the evolving Australian mining practices as well as to the rather rapidly introduced methods, which revolutionised the extractive processes on occasions.
Each major phase of innovation has brought improvements and increases in productivity, because the introduction of modern machinery and technologically advanced auxiliary equipment did not only optimise their performance but it also often considered the geological aspects of the coal measure strata.
THE MINING METHODS AND GEOLOGICAL ASPECTS
High and low capacity coal mining operations are extractive processes in a mechanically anisotropic, layered and heterogeneous geological discontinuum. The response of a rock body with such attributes to the removal of one of its "layers" is a complex petrophysical "reactionary" sequence of events, which cannot always be mathematically assessed and categorised.
The
characteristic response patterns of rockmasses to mining operations depend on the mining methods used, rate of extraction and type of support, just as significantly as on their own scalar and vectorial attributes.^ KHRM-01
A study of mine plans, drawn in the hand mining era, reveals that early miners "understood" the concept of directional stability as well as modern rockmechanics researchers.
Plans of pillar extraction patterns in
conventionally driven panels clearly show the varying mining conditions in specific areas, which can now also be defined as geological domains.
The extreme difficulty of the initial bord and pillar operations at Appin Colliery demonstrated that "mining engineering" had to be practised in specific and typifiable geological environments and that mining methods had to "interact" with those attributes of the rockmass that are mechanically significant.
The bord and pillar mining method was replaced by the longwall method which resulted in greater stability, much improved productivity and in an "interaction" response from the rockmass rather than in a "reaction" leading to instability. The geological setting of the Permian Coal Measure sequences in the Sydney Bowen Basin Complex ( 2 ) ( 3 ) has created very favourable conditions for retreating longwall mining operations (Figures 1 and 2).
The specific
anisotropies that determine the total response of a rockmass to the inevitable disturbance by the mining process are:
1.
The planar discontinuities (bedding planes, including cross-bedding and foreset bedding, joints and faults and sheetlike intrusions).
2.
The linear elements (intersections of planar discontinuities).
3.
The petrofabric patterns in the sedimentary rocks, notably imbrication and the preferred dimensional orientation of oblong clasts.
4.
The type and nature of stratification surfaces separating different lithologies (propagation and modification of mining induced stresses through layered media).
5.
The differential compaction structures and textures in areas affected by primary non-diastrophic features (stonerolls, "wants," erosion channels). KHRM-02
- 64 These anisotropics have vectorial and scalar attributes, spatial attitudes and geometric relationships, that can be related to the mechanical processes of longwall seam extraction, namely the coal cutting, support and convergence phases.
It is evident that longwall mining can achieve record breaking productivity in the currently mined areas in the Sydney and Bowen Basin structure under the prevailing geological conditions; consequently that mining method is applicable and suitable.
While a number of longwall faces performs at
satisfactory levels, some faces have not produced the expected tonnages. It is suggested that such instances do not indicate a need for a different mining method, but rather that the "right'1 geological questions have not been asked during the assessment, planning and development stages of the longwall face (Figure 3).
The concept of longwall mining "engineering" in a block of coal with floorand roofstrata, that is, in a geological body, must include an initial test for the susceptibility of that body to "engineering."
The affected
parts of the geological body must be structurally integrated into the mining process.
Such an integration may not always be achievable, because the inherent self-supporting capacity of a rockmass segment is insufficient and cannot form a beam.
It is also often observed that a previously formed "beam"
over a gateroad has been converted into two cantilever segments by a penetrative mining induced fracture set.
The consequent response of the
gateroadfs roof can consist of a marked deterioration in roadway stability affecting eventually a portion of the face.
The interaction between the stresses generated by the mining process and the existing regional stressfield is a critical link in the sequential events that accompany the progression of a longwall face in a layered geological discontinuum.
The generated and existing stresses, their
superposition on one another and the mechanical involvement of the "floorseam-roof" system with its anisotropies must be assessed and analysed in a geological context, and mathematically modelled as well as possible. The geologically interpreted results should then be used as criteria KHRM-03
- 65 for the dimensions and layout of the face and gateroads, selection of supports, cutting machinery and conveyor equipment.
The gateroads should receive particular attention.
The concept of "in-seam11
single entry merits increased research and development efforts.
GEOLOGICAL FEATURES AND LONGWALL MINING
The geological conditions are generally ideal for longwall mining; the assessment of geological bodies and the delineation of relevant attributes improve rapidly with advances in technology and instrumentation available to the geophysicist and petrologist.
Economic pressures resulting from
increasing international competition for a non-expanding market will prompt support for sustained research efforts.
Methods are being developed that can identify and define those geological factors and phenomena restricting the capacity for dimensional increases of longwall panels.
The processes of violent gas emissions and outbursts, that may seriously threaten the development of future large panels, are not fully understood at present; a considerable advance, however, is indicated by recently
(4) reported findings
that the chemical and isotopic composition of seam
gases emitted depends on physical disturbances associated with the sampling method.
Of particular interest in this context is the observation by
Gould (opc cit.) that coal measure sequences, with increased CO2 contents due to invasion by externally derived gases, emit gases with different compositions in a time dependent fashion.
As future and larger longwall
panels are likely to cause brittle deformation of considerable rockmass volumes, the areal extent of increased fracture porosity should be researched. The production capacity of longwall panels can be further restricted by loss of coal integrity at the face, the presence of igneous intrusions, sedimentary dykes and "stone-rolls.11
Spalling at the face is commonly
due to unfavourable angles between the face alignment and the spatial attitudes of cleats, but can also be caused by an inability of the coal to support the load at the face line after cutting, but phenomena have geological causes. KHRM-04
—66—
The floor- and roofstrata have ideally a rectangular relationship with the face; this should be maintained by use of appropriate machinery and support systems for the specific geological conditions in the panel.
The floorstrata perform three principal functions in a longwall mining operation which depend for success and efficiency on geological attributes; floorstrata provide a support and glide horizon for the shield and/or chock-shield supports.
They provide the base for the armoured face conveyor
and stage loader, and they provide movement planes for lateral adjustments of the coal seam.
Floorheave and high coefficient of friction values at the interface of seam and floor will invariably lead to loss of production time.
Floorheave is frequently due to high shear stress concentrations.
The
presence of layers with expanding clayminerals in the floor is occasionally responsible for floorheave when water from the shearer reaches the claystone layers through the opening joint sets in the floor and causes expansion.
It is advisable to regard the roofstrata as an anisotropic and layered cantilever, consisting of particulate matter in three size and "function" categories, namely clasts, matrix and cement.
A distinction should also
be made between the "immediate" roof and the main roofstrata, as defined by N a t a u . ^
The "immediate" roof is of great mechanical significance as
it propagates the applied supporting load from the support system; it fractures by shear (Fig. 4) and is thus a vital element in the convergence process.
The "immediate" roof is commonly twice as thick as the seam
mined.
The application and propagation of supportive forces through a
bedded (layered) geological unit over a short, but variable time span causes specific response patterns in a "layered" fashion and does not develop uniformly.
The strength, rigidity and stiffness of the floor- and roofstrata have to be determined in addition to those moduli measured in the coal.
KHRM-05
—67— The phenomenon of bedding is an important feature in the development of sedimentary rock sequences and also in the study of their behaviour under load, may it be applied vertically, obliquely or horizontally.
Bedding, in the context of longwall mining, is to be regarded as a product (Pettijohn et a l . ) ^ of
and
(a)
composition
(b)
size of particles
(c)
shape of particles
(d)
orientation in space of particles
(e)
packing of particles.
It now becomes interesting from a "mechanical behaviour and response" viewpoint, to examine if such a product is also a mechanical functional feature in a load situation or not.
Its anisotropic nature has been
established, consequently there is reason to search for such a functional aspect.
The active functional role of the individual bedding plane surfaces
and units is well established in model work and prototype behaviour, as well as in fabric studies, that have established the co-existence of functional and morphological fabrics.
The superposition of a mining induced stressfield on to an anisotropic rockmass leads to a ndeformational response."
The rockmass has been "loaded"
before; the residual stress may be called primitive stress or geologically, a "finite state of strain."
It is thus suggested that a load redistribution
is directly linked to a deformational response in a "composite material" characterised by planar discontinuities in two principal attitudes, namely horizontal and vertical.
Bedding planes constitute the horizontal element and should be regarded as planar discontinuities along which varying deformational processes take place.
Initially, a stress pattern variation across a bedding plane may not be demonstrable geometrically on a specimen scale, although it may be visible under a microscope.
The failure types occurring in rockmasses along bedding KHRM-06
—68— planes vary considerably in situ and also in testing devices, as they do separate "unlike" (to varying degrees) fabrics and lithological entities.
The mechanical aspects of joint systems in the roof- and floorstrata of longwall panels have been defined and discussed previously ( 1 9 7 9 a ^ and 1979b). (8)
Recently initiated microscopic analyses of roofstrata specimens sampled in goaf areas indicate the possible presence of "fatigue" cracks in the highly anisotropic sedimentary fabrics of fluvially deposited sandstones. Fatigue cracking of "brittle" sandstones with siliceous cement as a result of low frequency loading and unloading cycles, produced by the advancing support systems, would be a failure mode not previously considered in the mining context.
Such a failure mechanism, if it can be demonstrated,
could provide explanations for certain stress distribution patterns observed along longwall faces under strong roofstrata.
FUTURE DEVELOPMENTS
The "future" longwall panel is likely to be considerably larger than at present.
Panel lengths of up to 5000 metres are probably possible in
the geological settings of the Sydney and Bowen Basin.
The control of Energy Release Rates (E.R.R.) will probably become possible over the next 10 years by advances in the study of interaction processes between geological anisotropies and mining induced stress fields, and taking gas type and distrubution patterns into consideration.
The "pivoting" of longwall faces will probably become an economically interesting alternative to the "shifting" of faces under deep cover.
Mining geologists should develop special maps of the potential longwall mining areas in the individual coalfields, showing "tectono-depositional" trends and domains.
Such maps could be compiled from available data with
little manipulation necessary. KHRM-07
- 69 It may also be very useful to develop a set of maps that may become known as "Anomaly" plans.
Such plans should highlight any significant deviations
from the conceptual model of a basin development, sedimentation and modification in the conventional geological sense.
The preliminary, interim and final geotechnical models of all types assisting the mining engineer in the choice of design criteria should be based on such an "anomaly" map,
The mining geologist of the future should be able to interact with the mining engineer on questions of production capabilities, possible dimensions of longwall panels and "reaction" patterns of the rockmass to high volume mining.
Geologists must have the intellectual courage to think innovatively within geological frameworks to match the engineering progress; geologists and engineers should think together and not merely rearrange "failed" prejudices.
REFERENCES
(1)
Moelle, K.H.R. 1978, Directional mining in rocks of the Sydney Basin, N.S.W., 3rd Australian Tunnelling Conference, The Inst, of Engineers, Australia, Canberra, pp. 7-10.
(2)
Branagan, D.F., C. Herbert & T. Langford-Smith 1976, The Sydney Basin, Sydney Science Press.
(3)
Murray, C.G., 1985, Tectonic setting of the Bowen Basin, GSA Bowen Basin Symposium, pp. 5-16.
(4)
Gould, K.W., A.J. Hargraves & J.W. Smith, 1987, Variation in the composition of seam gases issuing from coal, Bull. Proc. Aus.I.M.M., Vol 292, No. 5, pp. 69-73.
(5)
Natau, 0., 1975, Quantitative Gebirgsdrucktheorie fur den oberflachennahen
(6)
Pettijohn, F.J., Potter, P.E. & Siever, R., 1972, Sand and sandstone,
Strebbetrieb, Erzmetal, Vol. 28, pp. 225-228.
Springer Verlag, New York, 618 p. KHRM-08
(7)
Moelle, K.H.R., 1979a, Fracture"ysterns in roof rock strata and goaf formation, 4th Tewksbury Symposium, University of Melbourne, p. 4. 1-4. 13, Melbourne.
(8)
Moelle, K.H.R., 1979b, On the interaction of geological fractures and mining induced fractures, in G.C. Sih & S.R. Valluri (eds.) Fracture mechanics in engineering application, pp. 505-509, Alphen aan den Rijn, Sijthoff & Noordhoff.
ACKNOWLEDGMENTS
Thanks are expressed to Messrs B. White and R. Phillips for many very useful discussions on ideas and mining engineering aspects. Mrs J. Pitts kindly typed the manuscript.
KHRM-09
SOURCE AREA ROCKTYPES EROSIONAL A C T I V I T Y TRANSPORTING MEDIUM 1 D E P O S I T I O N A L AREA PALAEOENVIRONMENT PHYSIOGRAPHY-MORPHOLOGY CLIMATE RATE/MODE OF D E P O S I T I O N PRIMARY NON DIASTROPHIC ANISOTROPIES I (PROCESS ELEMENTS) I DIAGENESIS STRUCTURAL/TECTONIC CHANGES
*
(RESPONSE ELEMENTS) i L I T H O L O G I C A L SYSTEM I * HETEROGENEITIES ANISOTROPIES I RESPONSE, BEHAVIOUR PATTERN UNDER LOAD
EROSION,
REPLACEMENT
Figure 1.
Processes and events d e t e r m i n i n g response p a t t e r n o f rockmasses under l o a d .
HETEROGENEOUS
A P P L I C A T I O N OF
ANISOTROPIC
DIRECTED FORCES
GEOLOGICAL BODY
CHANGE OF PHYSICAL CONDITIONS
STRESS D I S T R I B U T I O N 1 MOVEMENTS OF COMPONENTS 1 HISTORY-STRUCTURE-STRESS/STRAIN
DEPENDENCY
J STRUCTURAL ANISOTROPY STRENGTH ANISOTROPY F i g u r e 2.
Development o f s t r e n g t h
anisotropy.
- 72 -
GEOLOGICAL JUDGEMENT
FORMAL KNOWLEDGE
RISK
CAPITAL EXPENDITURE
MAIN DEVELOPMENT ROADWAYS
PIT BOTTOM ;
7*
PANELS
DRIF TS SHAFT S
SUPPORTS
MINING MACHINES TRANSPORT
PRIMARY NON-DIASTROPHIC ANISOTROPIE5
COAL TYPES
ROCK TYPES
DYSTROPHIC AMISOTROPIES
SEAM THICKNESS
PHYSICAL PARAMETERS
PROFITS
PRODUCTION
FUTURE MINING OPERATIONS
Figure
3
-
73
-
OVERBUR D E N IMMEDIATE
"SEAM NOW G O A F
SEAM HMHIlinninnimi " kN '
2c cos 3 , I'M. s AW=1 0 C1-XJ-C1+XDsin S K - 1
AW=1 0
2c cos9
C1-X) sinC2^-3D-C1+X)sin9'
•C1)
m2J
| _
K-i J
t = D E N S I T Y 2. 5 t / m 3 M"HEIGHT 2.2m K " L O O S E N I N G F A C T O R 1.5 S " F A C T O R OF S A F E T Y 1.6 S-4-0F INTERNAL FRICTION C - C O H E S I O N OF I M M E D I A T E
kN 1
Q o .
m 2
C2)
.
30 ROOF
Figure 4 DETERMINATION OF SUPPORTING LOAD CAPACITY CAW) Caccording lo N a t a u . 1 9 7 5 ) SHEARING IN THE IMMEDIATE ROOFSTRATA AFTER GOAF FORMATION
ROOF
- 74 -
APPENDIX CHECKLIST OF ITEMS TO BE CONSIDERED FOR LONGWALL MINING
A.
STRUCTURAL INTEGRITY OF THE COAL "BLOCK"
B.
(i)
Mining time in the "block" of coal
(ii)
Developments in adjacent areas, future deeper mining
SUPPORT SPECIFICATIONS '
(i)
What information is required to enable "informed" selection of the most suitable support systems?
(ii)
C.
D.
E.
Po stulated caving mechanism (conceptual model)
(iv)
The role of modelling
MINE LAYOUT CONSIDERATIONS (i)
Directional stability
(ii)
Pillar calculations
(iii)
Width of face
(iv)
Length of coal block
CAVING AND GOAF FORMATION (i)
Hydrological problems
(ii)
Subsidence, surface effects
MONITORING (i)
F.
(GEOL. & ENG.)
Chocks and shields
(ii)
Pillars
(iii)
Roadways
(iv)
Gas emissions
MINING DEVELOPMENT (i)
G.
Geotechnical assessment of the stratigraphic column
(iii)
Roof supports
(ii)
Rate of advance
(iii)
Rate of development work
EFFICIENCY (AVAILABILITY) OF THE LONGWALL (i)
Use of machinery at 90% or better. Which part is not always avaialble at that rate?
(ii)
Geological reasons for non-availability?
—75—
GEOLOGY - A KEY TO MINE PLANNING A CASE HISTORY LOCHIEL BROWN COAL DEPOSIT, SOUTH AUSTRALIA BY A. G. KREMOR & A. MUIR
•76—
Abstract The
Lochiel
mid-north
Deposit,
a T e r t i a r y s o f t b r o w n c o a l d e p o s i t in the
of S o u t h A u s t r a l i a , is c u r r e n t l y being
investigated
by
the E l e c t r i c i t y T r u s t of S o u t h A u s t r a l i a as a p o t e n t i a l s o u r c e of fuel for a base load p o w e r The
sedimentary
station.
sequence
consists
of
fluvio-lacustrine
and
m a r g i n a l m a r i n e s e d i m e n t s and the o v e r b u r d e n s h o w s a c o n s i d e r a b l e variation
in
lithology comprising unconsolidated, soil
c l a y , s i l t , sand and The
low
s t r e n g t h and h i g h pore w a t e r p r e s s u r e of the
sediments and of
combined
sedimentry mining
analyses
Geological models defined
geophysical
bee n
used
These
provided
to a
log
define means
interpretation
of p r e d i c t i n g
T h i s p a p e r d e s c r i b e s the studies
correlation
sediment
regimes. properties pit.
detailed have these
been
c a r r i e d o u t and
how
were
integrated with
concurrent
g e o t e c h n i c a l and
and
test h o l e s and a trial
which
hydrogeological
studies
to
questions
relating
answer to
specific highwall
stability.
Introduction In
1982 the E l e c t r i c i t y T r u s t of
South
Australia
carried
out
major exploration programme led
to
Lochiel
a
which
the
discovery
of
Coal
Deposit,
located
130 km n o r t h of A d e l a i d e
the
(Fig. 1).
set
from bore core
geological/geotechnical
and a b a s i s to site g e o t e c h n i c a l
and s p o i l p i l e
tectonic
d i s c o n t i n u i t y p l a n e s have c r e a t e d an u n u s u a l
have
geological
overburden
w i t h the p r e s e n c e of s u b h o r i z o n t a l ,
conditions. and
strength
coal.
KILOMETRES
Figure 1 - Locality
Plan
—77—
The
deposit,
basin
in
(Figure
some
the 2).
12 km long and 6 km wide occurs in a faulted
northern
part
of
within the Kooliata Coal Zone. to
20
m
but
the
classified
as
lignite
Reserves
the Tertiary St Vincent Basin
Within the resource area coal occurs in three seams average B
The combined seam thickness is up in
the order of 12 m.
The coal is
(ASTM) or soft brown, class 15 (ISO).
exceed 550 million tonnes in the measured and indicated
categories.
Insitu
coal quality for the reserves are presented
on Table 1.
Mine
planning
walking
to
removal method. 1982
date
draglines a
or
has
evaluated
bucketwheels
the use of either large
as the principal overburden
At this stage, draglines are preferred and since
number
of
combined
geological,
geotechnical
and
hydrogeological investigation programmes have been carried out to assess highwall and spoilpile stability.
The
sediments
outcrops on
subsurface
divided
in the deposit are essentially flat lying with no
and therefore geological evaluation has relied entirely on
investigatory
the
response
from
boreholes
drilled
methods.
The
sequence
has been
basis of lithology and geophysical borehole log interpretation at
a
and
spacing
correlation
of
less
of
over
300
than one kilometre,
Table 1 Coal Quality Specific Energy
23.4 MJ/kg
Total Moisture
61.5%
Ash
15.1%
Sulphur
2.89% (d.b.)
Sodium
0.95% (d.b.)
Chlorine
0.48% (d.b.)
(d.b.)
(d.b.)
Figure 2 - Regional Geology
AK-AM-0 2
—78— i n c l u d i n g a n u m b e r of fully and p a r t i a l l y cored h o l e s . holes
provided
signatures lateral
a
means
of
relating
(Figure
3).
To
aid
The cored
l i t h o l o g y to g e o p h y s i c a l
c o r r e l a t i o n and
understanding
l i t h o f a c i e s m o d e l s w e r e d e v e l o p e d and u t i l i s e d to d e f i n e
depositional
environments
depositional
environment
p r e d i c t i o n of s e d i m e n t
and
processes
(Figure
m o d e l s w e r e then a p p l i e d
4).
The
to a s s i s t
the
properties.
Geology The s e q u e n c e has b e e n d i v i d e d on F i g u r e 5 . The
b a s a l B u m b u n g a Sand has b e e n d i v i d e d
facies
which
channel
through
member
is
cyclic
sequence
equivalent end
into the s e v e n f o r m a t i o n s as s h o w n
represent
distributary
overlain of
floodplain
by
into three
depositional
a g r a d a t i o n of e n v i r o n m e n t from the
and
Condowie
lacustrine and
floodplain
fluvial
peatswamp.
This
S i l t w h i c h c o n s i s t s of a and
their
laterally
peatswamp deposits.
sediments
A t the
northern
of the a r e a , the top of the C o n d o w i e S i l t has been e r o d e d
the u p w a r d fining f l u v i a l D a r n l e i g h Park
by
Sand. SELF" P O T E N T I A L RESISTANCE
F i g u r e 3 - L i t h o l o g y and G e o p h y s i c a l Log
Signatures AK-AM-0 3
BUMBUNGA sZl^DS - LITH0FAC1ES MODEL
Distal Backswamp
Interdistributary Baekswomp
Carbonaceous Sand BU3
Interbedded Sand BU2
~ j Clean Sand (course) | Clean Sand (fine-medium)
Carbonaceous Sand 9» Silt
B
(
\ Coal
GEOPHYSICAL LOG RESPONSE
DEPOSITIONAL ENVIRONMENT
A
Condowie Silt Member Sand Lithofacies
DISTAL BACKSWAMP WITH INTERNAL DRAINAGE SYSTEM
Bumbunga Sand
FLUVIAL SYSTEM
Weathered Quartzite Basement
Natural Gamma API
Neutron - Neutron CPS
23 1.7 i—i— Apparent Density gms/cc
Darnleigh Park Sand Member
BACKSWAMP OVERBANK
\
CHANNEL OVERBANK
Bumbunga
STACKED CHANNEL
Sand
FLUVIAL SYSTEM
CREVASSE SPLAY INTERBEDDED SPLAYS AND DISTRIBUTARY CHANNELS Rosehaven Clay Basement
Figure 4 - Bumbunga Sand Lithofacies Model The
Kooliata
Coal
Silt
and
Darnleigh
bearing
the
Zone
conformably overlies both the Condowie Park
Sand
and consists of three coal
horizons separated by well defined but thin interbeds of
sand and silt.
AK-AM-04
—80— These
interbeds
are
single
lacustrine
cycles
which comprise
marginal swamp, shoreline and deeper water facies. The sequence to the top of the Kooliata Coal Zone is Upper Eocene and
this
is
overlain
01igocene/Miocene
marginal
Silt
highly variable in lithology, consisting of a number of
is
supratidal
Warrindi Silt and Tarella Silt.
marine
of
interdigitating
the
by
sediments
lithologies
depositional
representing
facies.
It
is
The Warrindi
intertidal
then
and
overlain by the
transgressive subtidal Tarella Silt. The Tertiary sequence has the northwest.
been regionally tilted at
about 1° to
The overlying Hindmarsh Clay equivalent consists of mottled and fissured silty and sandy clay deposited in an oxidising lacustrine environment. This formation is overlain by Recent sediments consisting of alluvial fan clay, sand and gravel and gypsum rich aeolinites.
STRATIGRAPHY
LATERAL CONTINUITY
AQUIFER DISTRIBUTION
CHARACTERISTICS OF AQUIFER SAND DEPOSITIONAL ENVIRONMENT
Holocene
AVERAGE GEOMETRY THICKNESS
lacustrine
tabular
LATERAL VARIABILITY
15
high very high
Pleistocene
Oligocene
Late Eocene BUMBUNGA SAND (sand, silty sand, coal)
estuarine channel
shoestring
2
estuarine-channel, shoreline, washovers
variable
I -10
high
deltaic
wedge
3
moderate
lacustrine shoreline
elongate
2
moderate
lacustrine shoreline
elongate
1-5
moderate
fluvial - meander belt
tabular
10
low
crevasse splay
wedge
0-5
high
fluvial system -crevasse splays -meander belts
tabular
15
low
fluvial undifferentiated clay, quartzite siltstone
Figure 5 - Stratigraphy and Sediment Characteristics
AK-AM-0 5
—81—
Application of geological data to geotechnical and hydrogeological aspects Following
preliminary and brief geotechnical and hydrogeological
assessment, grained presented aid
it
soil
was
recognised
strength
material
that
the
and
high pore water pressures
combination
of fine
a particularly difficult geotechnical environment.
selection
divided into geological regimes based on:overburden thickness aquifer thickness proportion of Tarella Silt in the overburden. Fully
cored
completed with
holes
in
major tests
testing
within
each
formation.
These
confirmed
strength and
were
each regime
engineering
performed
the
low
of the materials
also
number
identified
of
a
subhorizontal
defects in the overburden. As well
as
field
these
tests,
depressurisation
tests
were
regimes
2,
conducted
in
3
to
determine
the
of
on
pumping
water
To
of geotechnical investigation sites, the area was
and
pressures
4
effects the
pore
of
the
Tarella Silt.
Figure 6 - Geotechnical Regimes and Trial Pit Site Selection Criteria
AK-AM-0 6
— 8 2 —
These
regimes
represented
were
a
chosen
for hydrogeological testing as they
variation in sedimentary sequence from thick silt
with
no surrounding aquifer sand to silt with a thick aquifer at
the
base.
identified
Slope a
stability
number
analyses
which required further investigation.
1)
the
based
on
these
tests
of critical aspects common to most regimes These were:
rate and extent to which the pore water pressure in the
silts is reduced by dewatering and prestripping. 2)
the large scale strength of in situ materials.
3)
the strength and characteristics of subhorizontal defects.
It
was considered that the best method to examine these features
was
by
a
trial
effective
in
essential
that
of
the
the
trial
being of
excavation.
a
deposit
order
such
for this method to be
variable
lithology it was
the location of the trial pit was representative
aspects pit
In
with
previously defined. site
present at least
subhorizontal
was
9 metres
defects,
The technical selection of
based amongst other criteria on there of
Tarella Silt, the presence
and aquifers below
the Tarella Silt
( see Figure 6).
Relationships between geological and engineering properties. Depressurisation of Tarella Silt The rate and extent to which pore water pressure within sediments is reduced is related to vertical and horizontal permeability and the proximity of surrounding
aquifers.
The
stratigraphic
location and spatial distribution of aquifers
has
been
in
related
defined to
specific
detail
over the deposit and these can be
depositional
environments.
The processes
acting to form the aquifers has resulted in predictable geometry, thickness and lateral continuity (see Figure 5).
AK-AM-07
—83—
Prior
to the excavation of the trial pit it was assumed that the
Tarella
Silt
could
be considered homogenous for application of
consolidation theory.
Detailed line mapping demonstrated that an
intensive
pattern
shear
which
sand
aid
are the
rate
of
infilled. of
and tension defects exist, some of The existence of these features will
depressurisation
and future analyses will be
modified to include effects of these features.
Subhorizontal defects Subhorizontal defects in the overburden are weak zones which have the
potential
genetic
types
to
act
of
subhorizontal defects exist - sedimentary and
as failure planes for block slides.
Two
tectonic• The tectonic defects are confined to a polished shear zone within the
Tarella
coincides In
the
common
Silt,
The stratigraphic location of the shear zone
with
the clay rich base of a coarsening upward cycle.
trial
pit area this shear was shown to exhibit features
to other shear zones.
These include riedel and conjugate
riedel shears, thrust shears and a principal displacement shear.
It
was
also
demonstrated that the principal displacement shear
was essentially planar but that the validity of shear box testing was dependent on the selection of 2-
the principal shear plane for testing the direction of shear testing on the sample the frequency of subvertical displacement shears intersecting the principal subhorizontal displacement shear. Sedimentary to
20 mm
defects
are of two types; horizontal planar beds up
thick and occurring at the top of discrete sedimentary
cycles and as beds dipping at up to 17°.
AK-AM-08
—84—
These
features
o c c u r at the base of the T a r e l l a Silt and w i t h i n
the W a r r i n d i S a n d .
The h o r i z o n t a l p l a n a r beds are u b i q u i t o u s and
are
be
considered
to
representative
sedimentation
cycles
depositional
environment.
predicted
that
formed
individual
vertically
accreting
Because
of
beds
c o n t i n u o u s , extensive and
dipping p a r a l l e l to surrounding The
of
s u b a q u e o u s l y in e s t u a r i n e / l a g o o n a l are
this
process,
it
is
sediments.
dipping clay beds are c o n f i n e d to a p a r t i c u l a r m e m b e r of the
Warrindi Silt. and
occur
sand.
The beds are c o n t a i n e d w i t h i n e s t u a r i n e
sediments
as d r a p e s on a b a n d o n e d c h a n n e l s and on storm w a s h o v e r
P r e l i m i n a r y a n a l y s e s of p a l a e o f l o w data indicate that the
c h a n n e l flow d i r e c t i o n was to the south east and the shoreline of the
sea
was
orientation geophysical programme
also of
to
the
dipmeter which
c u r r e n t l y being
the
south.
dipping tool
used
To
aid
determination
of
b e d s , a test p r o g r a m m e utilising a was
completed.
The r e s u l t s of this
b o t h S c h l u m b e r g e r and BPB instruments are
assessed.
Conclusion The
assessment
integration
of
of
hydrogeological geotechnical
the
Lochiel
Coal
D e p o s i t has relied on an
understanding
of
aspects.
The
geology
which
enabled
regimes,
geological,
g e o t e c h n i c a l and
has been used to define optimal
siting
g e o t e c h n i c a l core holes and t r i a l d e p r e s s u r i s a t i o n
wells.
To
demonstrate
completed
and
understanding
of
the
geotechnical
assumptions
a
t r i a l pit was
the
extrapolation
of
is
based
of
the
results
geological
processes
thank
Electricity
which
on an
formed
the
of
South
s e d i m e n t a r y sequence . Acknowledgements The
authors
wish
to
the
Trust
A u s t r a l i a for t h e i r a s s i s t a n c e in preparing this p a p e r .
We w o u l d
also like to thank Mick O ' B r i e n for his c r i t i c a l a p p r a i s a l of the manuscript.
AK-AM-0 9
•85—
LQNGHQLE EXPLORATION DRILLING FOR NINE PLANNING IN BHP MACQUARIE COLLIERIES 1 1 by B. Ross , C. Tobin
2 and A. Williams
ABSTRACT In-seam longhole drilling is now routinely practiced as a means of geological exploration for mine planning in the BHP Macquarie Collieries mines in the Newcastle Coalfield. The technique is seen as complementary to our own in-seam seismic surveys for locating and interpreting structural anomalies affecting longwall layout planning.
A judicious combination of these techniques,
drawing on the particular advantages of each can provide the most cost effective and reliable geological assessment. A wide variety of geological environments have been investigated within our mines, with the longest hole having reached 1008m in Pacific Colliery.
The highest metreage rate is 330m per seven hour drilling
shift, although 150m - 200m per shift is more typical. Planning, supervision and interpretation of the drilling programmes is the responsibility of the mine geologist.
Drilling information,
often of a subtle nature, can then be integrated with other facets of geological knowledge, eg. changes in seam, roof, floor and splitting characteristic s or predicted structural anomalies based on in—seam seismic or surface geophysical surveys.
1. GEOLOGIST
2.
GROUP OPERATIONS GEOLOGIST
GEOLOGY DEPARTMENT BHP MACQUARIE COLLIERIES GROUP P.O. BOX 171, BELMONT, NSW 2280
•86—
LONGHOLE EXPLORATION DRILLING FOR MINE PLANNING IN BHP MACQUARIE COLLIERIES 1.
INTRODUCTION Long-hole drilling has been trialled or systematically practised at J
various Australian collieries since the early 1980 s.
At most of these
mines, in-seam drilling has been primarily for seam gas pre-drainage, to reduce problems associated with instantaneous outbursts and high gas makes (Williams et. al., 1986). At the four mines of the BHP Macquarie Collieries Group in the Newcastle Coalfield (Fig. 1), long-hole drilling has been used specifically for geological exploration.
The prime need has been to accurately
locate faults and dykes to assist longwall layout planning.
Longwall
mining has been introduced at each of the mines, except Lambton Colliery. A trial long-hole drilling programme, the first in the Newcastle Coalfield, commenced in January, 1986 at John Darling Colliery. The initial one month trial was set up and supervised by ACIRL, and a Longyear LMJ7 drill rig was used for the first time for this type of work in coal seams. Following the successful fig I.
Location of BHP Macquarie Collieries
introduction of the technique and operator training, the drill rig
and ancilliary equipment were purchased and have been in continual use on geological exploration programmes to the present time. A key element in the success achieved with the method has been that the planning, supervision and interpretation of drilling programmes is the responsibility of the mine geologist.
Drilling information, often of a
subtle nature, can then be integrated with other facets of geological knowledge, eg. changes in seam, roof, floor and splitting characteristics or predicted structural anomalies based on in-seam seismic or surface geophysical surveys etc. 2.
GEOLOGICAL AND MINING SETTING
2
Sedimentary and Structural Environment
-
1
The Macquarie Collieries Group of mines work seams within the Lambton SubGroup, in the lower part of the Newcastle Coal Measures. BR-CT-AW-01
—87—
The Borehole seam is mined at Stockton Borehole, Lambton, and John Barling Collieries with thicknesses typically 1.4m? 1.7m and 2.3m respectively.
The Young Wallsend seam is worked at Stockton Borehole and Pacific
Collieries, although over most of Pacific Colliery the seam is split into an upper Nobbys component and a lower Budley component.
Thickness ranges
from 2.1m - 3-0m. The mines lie within the northern part of the Macquarie Syncline. Bips on the flanks of the syncline are relatively gentle, upto 3°, although fairly steep rolls and flexures may affect seams locally.
The dominant
direction of faults, dykes and major joint and cleat sets in this part of the coalfield is approximately NW - SE. Bykes are common and vary in thickness but are almost always hard, so even with the current generation of longwall shearers even thin dykes (say <1m) invariably present cutting problems. 2.2
Mine Planning Requirements The accurate prediction of structural anomalies ahead of the workings
has assumed a far greater importance in recent years due to the introduction of longwall mining. The use of long-hole drilling, especially when coupled with the complementary technique of in-seam seismic reflection, has markedly increased the confidence level of geological prediction into virgin areas. Face-to-face in-seam seismic surveys have limitations with penetration distance (generally upto 400m, depending on circumstances), precision of reflector location and identification and, sometimes, survey geometry.
On the other hand, the method allows a broad lateral coverage
and may detect subtle features and variations such as faults with minor (less than half seam) displacements, discontinuous or en-echelon zones and changes in trend. The current long-hole drilling rig has a greater distance potential (generally upto 800m) than seismic reflection and, with appropriate survey control, can locate anomalies accurately. dykes can be determined.
The thickness and hardness of
However, it is possible that minor faults, or
even major faults, with coal to coal contacts, may not be detected.
Also,
the level of confidence in interpreting linear continuity of structures depends on borehole spacing and trajectories. It is clear that a judicious combination of available investigation techniques can provide the most cost effective and reliable geological assessment. BR-CT-AW-02
—88—
3.
THEORY AND PRACTICE OF ROTARY IN-SEAM DRILLING A relatively large diameter hole is drilled in relation to rod size
so that deviation in a vertical plane can be initiated when required.
In
our case an 80mm hole is drilled for BQ (56mm dia.) rods. Downward deviation is achieved using higher revolutions relative to feed pressure and upward deviation by higher feed pressure in relation to revs.
This is fairly successful in practice, but the ratio between the two
for a particular deviation varies according to penetration rate, strata cutting resistance, type of bit and bit sharpness.
In soft strata there is
a strong tendency for the bit to dive down and increasing pressure alone is sometimes insufficient to bring the bit up - revs must be dropped considerably and penetration rate reduced. In hard strata it is difficult to bring the bit down as higher feed pressure is needed to achieve penetration which counteracts the effects of higher rotation.
If the bit has been in hard strata above the seam for
several metres with no or minimal indications of it being brought back into the seam and the hole is less than 300m, it may well be worthwhile pulling out and starting a new hole.
A new hole may be drilled to the same dis-
tance in a few hours, and slight alteration to the drilling parameters may keep the hole in the coal seam.
In most cases a second hole would be
needed to determine if a fault was the cause of the penetration into hard strata.
A further factor in an early pull out decision is bit wear, which
will be considerable in hard strata when using high revs. An alternative way to deviate the bit is with a down the hole motor (Dynadrill or Slimdrill).
This gives control over vertical and horizontal
direction, compared with pure rotary drilling which has no control over horizontal direction (although stabilisers and/or reduced hole/rod size can produce a straighter hole with reduction in vertical deviation capability). In rotary drilling, lateral deviation appears to be controlled by the planes of weakness in a coal seam, seam dip and the rotation of the bit. Drilling a hole down-dip at more than 5° for any distance creates problems with cuttings returns as the heavier fragments tend to settle out.
A more
powerful water pump or different flushing medium may be needed. Drilling up-dip presents no problems with cuttings, but most of the drilling water is lost when changing rods so, in a long hole, there are delays while water is pumped up to the bit. A good knowledge of lateral and vertical variations within the coal seam are essential if the bit is to be kept within the coal seam. BR-CT-AW-03
This
—89— knowledge can be used for feed pressure/revolution adjustment whilst the bit is in the seam rather than when it penetrates roof or floor.
It has
been a major factor in our success with longhole drilling. When a drill bit exits the coal seam, a decision must be made whether it has gone into the roof or floor, and thus how to change drilling parameters.
If this does not return the bit into the seam within 10 - 20m then
a decision must be made whether to core (if the new strata cannot be positively identified) or pull out and drill a new hole, changing to slightly different parameters 10 - 20m before the point of exit. The identification of fine borehole cuttings is a considerable problem, particularly when they are not bright coal.
They typically are pro-
duced over long distances, due to grinding by rods, and also in hard strata. Hole surveying is a relatively long process, taking a minimum of 15 minutes at short distances and over 30 minutes at greater distances.
When
30m can be drilled in 30 minutes, this represents a considerable loss of drilling distance during a day.
The frequency of surveys needs to be
assessed by the geologist as the hole progresses and will depend on the constraints of time and the need to locate the hole accurately. Surveying can be carried out as the hole progresses or after completion*
The latter is better for time saving as the furthest survey gives
the geologist a good idea of total horizontal deviation and thus the frequency of surveys needed to ascertain the holes position with reasonable accuracy.
If post completion surveying is planned, it is still wise to
survey occasionally during drilling to ascertain that the hole is within target limits. 4* 4-1
SELECTED CASE STUDIES Lambton Colliery The main area of future development in the Borehole seam at Lambton
Colliery lies offshore.
In undersea mining, the thickness of solid cover
over the seam is critical for calculation of coal extraction ratios and pillar sizes, and thus has major influence over method of extraction.
In
Lambton Colliery the feasibility of longwall mining in this area was being considered. Depth to bedrock was known from marine seismic surveys, but levels from development headings being driven into this area indicated the seam was shallower, and thus the thickness of solid cover less, than expected. A longhole drilling programme was undertaken to investigate seam BR-CT-AW-04
—90—
REDHEAD (old
COLLIERY
workings) TYPICAL SECTION • BOREHOLE SEAM
Middle Band
Bottom Band Miners Floor
102
LONGWALL
Ponel
No. 5
LONGWALL TYPICAL SECTION-BOREHOLE SEAM 104
Panel
Middle Band
Bottom Bond
100
200m
Legend Borehole seam workings —
2
70mu
Longhole Seam structure contour
Longhole drilling in Lambton (fig 2.)
Fault
and John Darling (fig 3.) Collieries,
Dyke
Borehole searn.
JBR-CT-AW-05
—91— levels beyond the developed area, by maintaining the boreholes in the seam and taking frequent inhole surveys. Four holes were drilled (Fig. 2) with starting directions varying from 165° to 245°.
Each bore converged to within 4° of 219° at some stage
in its length indicating the influence of seam structure over drilling direction.
This degree of longhole convergence had been anticipated, so
the holes had been started from the most divergent points within the area. The drilling programme proved that the seam rolled over steeply to the S.W. as shown in Fig. 2.
This knowledge has assisted in planning for
development heading directions and extraction panel layouts.
However, the
thickness of solid cover would restrict longwall blocks to uneconomic widths and extraction ratios. 4.2
John Darling Colliery An extensive long-hole drilling project was carried out over six
months, involving 23 bores and 5,300m of drilling.
The objectives were to
investigate the position and extent of several dykes and faults, inferred from marine magnetometer surveys or projected from existing workings, in the area of possible future longwall blocks.
Part of the programme is
shown in Fig. 3. The programme proved a dyke (target A, Fig. 3) to the SW of, and parallel to, existing longwalls, but disproved the existence of intervening dykes suspected from marine magnetometer surveys. A known dyke and large fault which had been restricted to pillars during initial gateroad development were proved to deflect to the south (hole 23) permitting the continued development for longwall 5 block, but curtailing the adjacent planned longwall 6 to the south.
Three drilling problems encountered were:(a)
Graben - like troughs in the Borehole seam containing soft coal and
severe changes in dip.
The soft coal required the use of very low revs,
moderate feed pressure and a low penetration rate to maintain the bit in the seam. (b)
A very soft roof of shale containing swelling clays.
If this was
penetrated the bit would sometimes preferentially remain in this band, and after several hours hole collapse and closure would occur. (c)
The tendency of the bit to deflect to the S.W.
This was initially a
problem, but was used to great benefit in hole 21 where a suspected dyke presented a very naxrow end - on target.
The hole was drilled out para-
llel to strong jointing and eventually deflected through what was thought BR-CT-AW-06
-92would be the centre of the dyke.
The non-existence of the dyke was proved
and the hole was continued to dyke target A to become one of the longest holes drilled in Australia, at 795m. The Borehole seam at John Darling Colliery proved to be a good longhole drilling medium, with several claystone bands, a contrast between the bright main upper section and the dull basal plies, and a strong contrast between the sandstone floor and shale roof. 4-3
Stockton Borehole Colliery The area of Stockton Borehole Colliery shown on Fig. 4 was inten-
sively investigated in an effort to accurately delineate any faults and dykes which may have been present.
Both the Borehole and Young Wallsend
seams are being longwalled in this area, by Stockton Borehole and Pacific Collieries respectively, so there is very little margin for error in gateroad positioning. Fault zone A, a series of normal faults with a combined displacement of approximately 3m, was intersected in workings to the south but its north-westerly continuation was unknown. An initial interpre-
I I L%
l
tation (1) was fairly tentatively based on brecciation observed in core from a surface borehole. An initial trial survey of the in-seam
! I I I — H SEAM WOnKINGS • TOING W/\lLSENO BOREHOLE FAULT INJEnrnETAMONS OniGINAl BASED ON I ss — BASED ON LOfJGHOLE DRILLING
seismic (iSS) reflection method from the Borehole seam had led to an upgrading of this interpretation (2) and also provided some targets for in-seam drilling. The results of the drilling led to a further revision (3), which enabled the position and
fig 4.
Longhole drilling in Slocklon Borehole and Pacific Collieries Borehole and Young Wallsend seams
extent of the fault to be BR-CT-AW-07
—93— fairly accurately plotted prior to gateroad driveage.
It also demonstrated
that the ISS reflectors which had been interpreted as the north-westerly continuation of the fault, were probably due to very minor faulting or a zone of intense jointing. Two of the boreholes continued past the initial zone A to intersect another significant fault (4) and, towards the north, a thin and probably soft dyke (5), Most of the boreholes in this area were drilled in the Young Wallsend seam which has proved to be quite a good medium for in-seam drilling.
This is mainly due to the lateral persistence of tuffaceous bands,
both those within the seam and also the immediate roof, the Nobbys Tuff (Fig. 5).
Having a very distinctive roof was essential when exploring for
faults such as zone A which was likely to have a relatively small displacement as it died out towards the north-west.
Therefore, by staying within
the upper part of the seam (by repeated deflections from the base of the tuff), any small downthrown fault could be detected. On the other hand, NOBBYS TUFF
the Borehole seam in this area, presents greater I
interpretative problems
YOUNG WAltSENO SEAM
due to its highly variable roof and floor strata. 4.4
!
Pacific Colliery The area of Pacific
SIRAHGRARIIC SECTION
Colliery shown on Fig. 5
j<U
r
^
I'D
1 ^
provides another good example of the meshing
1
together of ISS and long-
FAULT IN IERPRE TAT IONS
hole drilling.
BASED ON I S S BASED ON LONGIKXE DnilLING
ISS anomalies (1) and (2) were interpreted with moderate confidence to be faults and lined up with a known normal fault to the south (displacement 1.7m). Anomaly (3) was of low
K?Q
290
3<?0
METRES
fig 5.
Longhole drilling in Pacific Colliery Dudley / Young Wallsend spams
4^0 5pO
confidence and was tentatively interpreted to line BR-CT-AW-08
—94—
up with a small normal fault (displacement 0.2m - 0.3m), also known to the south. The drilling results to date have confirmed the presence of faulting at the locations of anomalies (1) and ( 3 ) .
However, further drilling will
be necessary to fully define these features. A third structure shown as (4) was found by drilling alone and because of the number of intersections of this feature a high confidence is placed on both its presence and amount of displacement.
At the conclusion
of the drilling programme the seismic profiles were re-examined and a faint anomaly was found at the location.
This was of benefit for future
ISS interpretation in the area. The drilling in this area has been quite successful, mainly due to the presence of a shale split in the Young Wallsend seam (Fig. 5). The presence of this horizon, when coupled with the tuffaceous bands, allows a chosen stratigraphic position within the seam to be readily maintained. Because of this, a displacement of 0.5m - 1.0m could be confidently predicted for structure ( 4 ) . CONCLUSION Long-hole drilling has been successfully carried out in a wide variety of geological environments, with the longest hole having reached to 1008m in Pacific Colliery.
The precise location of geological
structures has been beneficial for mine planning, especially for longwall operations.
^
For the industry at large, various recent technological developments will enable improvements in routine hole distances, guidance and structural interpretation.
With the increasing adoption of longwall mining and the
constraints this imposes on layout planning, undoubtedly long-hole drilling, in conjunction with in-seam seismic techniques, will be increasingly used for geological exploration. 6.
ACKNOWLEDGEMENT
The authors wish to thank BHP Macquarie Collieries for permission to publish this paper. 7.
REFERENCE WILLIAMS, R. J., ALLAN, J., TRU0NG, D., BEAMISH, B.B. AND HUNGERFORD, F. (19B6). Hole Drilling.
An Evaluation of Seam Gas Drainage by Long-
The Coal Journal, No. 10.
BR-CT-AW-09
—95— SOME INTERACTIONS BETWEEN GEOLOGICAL EXPLORATION DATA AND UNDERGROUND MINE PLANNING D.H* Fawcett Fawcett Mining Consultants Pty. Limited 7/281-285 Pacific Highway Crows Nest. NJS.W. 2065 Ph (02) 959 3077 Fax (02) 959 5067 Abstract Attention is drawn to some basic factors which constrain underground mine viability and some problems which can arise from initial geological data are outlined. The primary needs are for well founded resource estimates for seams of adequate quality, thickness, and uniformity within a well defined structure and lithology. Problems noted, whilst trying to establish these, include resource and seam thickness anomalies, definition of major faulting, minor faulting, folding and dykes, interpretations of rock strength from lithology, and coal quality sampling. It is concluded that current mine development costs justify closer surface exploration than in the past but that in some environments trial mining may prove necessary as the final exploration stage.
DHF-00
—96—
SOME INTERACTIONS BETWEEN GEOLOGICAL EXPLORATION DATA AND UNDERGROUND COAL MINE PLANNING 1 JO INTRODUCTION Mine planning progresses from broad brush to detail and is a screening process which aims to identify the most profitable development of a resource. That profit is the final measure of success is inevitable and essential. It is impossible to fund a non-profitable development; subsequent employment at the mine cannot be secure unless the venture shows a positive cash flow. In seeking the best profit, underground mine planning should maximise revenue, (tonnes x price), and minimise costs and it is perhaps pertinent to outline basic factors which influence the subsequent mining costs in Australian coal mines since these can form constraints to future development, and sometimes be inferred early during explorations Coal price is dependent on coal quality and market demand. Minehead price is dependent on transport and port costs. Distance from the port is important for export projects; closeness to the consumer is important for domestic sales. Product cost is dependent on the washery yields. Most mining costs arise in run of mine* terms and are inflated by low yields. 'Run of Mine mining costs have a high labour content. Productive units are essential; successful longwall costs are much lower than continuous miner costs and indeed no sizeable new underground mine is likely to be developed unless longwall can be applied. Successful longwall requires adequate seam thickness, - preferably more than 2m sufficient mineable reserves to cover the capital expenditure, and a geological structure which allows layout of long panels. Deep cover increases the cost and time needed to get access to the seams and usually requires higher revenue, (i.e. more tonnes per year, and/or higher price), to render a mine profitable. New projects compete for markets and for finance. Within this background, some problems which can arise from the initial geological data are outlined and some of the wild cards in the pack are mentioned. The very necessary geotechnical and coal analysis work often undertaken by the geologist is excluded only by the scope of the paper. DHF-01 T
1
T
T
—97—
2J) RESOURCES/RESERVES - SEAM ISOPACHS The estimate of resources/reserves arising from the exploration data forms the basis for all future mining assessment. The recoverable reserves must allow sufficient life to justify the capital required for a new mine. The seam isopachs must allow layout of highly productive mining systems. The Australian Code for Reporting Identified Coal Resources and Reserves, (February 1986) , clearly states that the points of observation should provide sufficient confidence to support the various levels of mine planning/resource classification identified and further gives limits for the maximum distance between these points for various categories. T
Experience suggests that these maximum limits should often be treated as exceptions. Examples encountered include, (worst first),r-
Outcropping Seams at 70° dip (overseas)
A hole drilled 1 km from outcrop might encounter the seam at 2700m depth - the overseas limit of 100m between points of observation still takes the seam from outcrop to 270m depth between boreholes giving 'measured status. Failure to convert the seam thickness for the dip allows a 1m seam to show an apparent thickness of 2.9m. 1
Lenticular Deposits
These can show considerable variation over short distances in some areas and gradual change in others. In the Greymouth Coalfield, N.Z., a lm seam near outcrop may be 7m thick 400m away.
Washout Areas (not expected)
In one area in Australia an apparently uniform seam was adjoined by an area containing old workings which were subsequently found to be subject to numerous washouts. Drilling a check borehole 10m from an original exploration grid hole showed a reduction in seam thickness from 1.9m to 0.8m in a seam previously shown as uniformly 1.9 - 2.2m thick.
Washout Areas/Seam Anomalies - expected
o Drilling of a 42 knr area showed a seam with uniform trends except for one anomaly arising from an old borehole. During subsequent search for potential washery reject sites the borehole was accidentally found some 1 km from its stated grid location. Replotting removed the anomaly. The search for borehole sites is not always restricted to old boreholes - other DHF-02
—98—
cases are known where new boreholes were inadvertently drilled on a neighbour's area. Seam Splits Seam splitting can cause a mixture of the problems given by lenticular deposits and washouts when trying to interpolate seam isopachs and from them calculate resources/reserves. Often a problem can occur trying to identify correlations - is it a split? or is it an adjacent seam. Seam Correlation Without distinctive characteristics allowing seam correlation, reserves may be miscalculated but, perhaps more importantly, the structure may be badly misinterpreted. Mining Recovery In some Australian conditions - flat, uniform trends, no washouts, (expected or not), no anomalies or splits, and no correlation queries - the resource can be mathematically assessed with accuracy. To convert it to a reserve a mining recovery must be assessed. Views on recovery vary from optimistic at the top end to unproven. Some basic factors are however often misjudged:1) Wongawilli Extraction (Open ended lifts) This gives the highest mining recovery if practised systematically and poor recovery, (from self induced reasons), if not. 2) Longwall Extraction This looses coal against natural boundaries that do not match a rectangular layout and looses the pillars between faces and the safety pillars left to protect the main/trunk headings. Recovery is generally less than for systematic Wongawilli extraction, (and better than a poorly practised Wongawilli system). 3) Bord and Pillar Splitting/Recovery This generally gives the lowest recovery but not always - it depends upon the conditions. 4) Thick Seam Recovery (i.e. > 4m seam thickness) This is frequently low. Even with sophisticated, but economic, systems the recovery from say 12m seams is rarely greater than 30%. 5) Surface Constraints Recovery will be limited under a number of surface features including flood plains, escarpments, railways, dams etc. It may be limited also by conditions arising under old opencuts, talus of unproven depth etc. A DHF-03
—99— barrier must be left against the lease boundaries, and must also be left against outcrop or opencut walls, 'Wild Card As an example, the careful drilling of a uniform 40m grid over a shallow seam, (overseas), may be quoted. Coal was proved consistently. Resources, and for the shallow depth, opencut reserves were calculated "accurately". Unfortunately subsequent opencut working disclosed previous underground working with pillars on 40m centres. 1
GEOLOGICAL STRUCTURE Having, "hopefully", gained sufficient confidence in recoverable reserves and seam thickness from analysis of geological data and having thus identified "target seams" which may support economic mining operations - (reserves sufficient to allow capital recovery, seam thick enough to give economic production rates and uniform enough to allow longwall layout) - it follows that the geological structure must be assessed. Major Faulting Often the major faults have been determined during the exploration but this has not always been so - the existence of a 30m fault between boreholes 1000m apart would only change the gradient by 1.7 degrees and this could be well be interpreted as a flexure rather than a fault. Problems met in the field include: Tahmopr The decision to sink this new deep mine within a 42 km area was made when only 20 boreholes had been completed. At that stage one major fault - the Nepean - was firmly identified and a second possible fault postulated. Review after the drilling of a further 23 boreholes was made by 5 different individuals and five different structures, each fitting all the known facts, resulted. The final exploration tool - the continuous miner - has since shown that the simplest interpretation using monocline folds rather than faults for most of the change in gradient has proved correct though it was not the interpretation accepted when the mine was sunk. 2
T
T
DHF-04
—100— Regional Studies in N e w Zealand A number of regional studies have been made in N e w Zealand in areas where the
coal
was
indicated 1
of
inferred 1
or
status.
Whilst
the
exploration
boreholes and surface mapping had located many major faults, the frequency shown in the more closely drilled areas was higher than in the less well drilled
sections
of
the
coalfields.
In
order
to
allow
realistic
assess-
ment of mining results and costs it proved necessary to construct simulated structures for parts of all three coalfields. spacing areas,
Guides to the possible fault
are given by structural interpretation
of the more closely drilled
by the frequency of faults found in boreholes, by review
lineaments,
and
of course by surface mapping.
boreholes
included
structure
plans cannot
defects
suggesting
be expected
of photo-
(In one region 32% of the
faults).
The
subsequent
simulated
to locate faults precisely, - this can
only be economically done during underground drivage; the plans can however allow the mining economics to be more realistically assessed. Ljjgpite ExplpratiQn Exploration originally Only
of
the
Mae
requested
Moh
Lignite
assuming
a
basin
in
reasonably
northern
consistent
Thailand
basin
of the boreholes which 'finger printed1
the geophysical logging
was
structure. each
main ply, allowed the extremely complicated structure given by the closely spaced
major
confidence
at
normal
and
all.
Though
reverse faults
to be mapped with
final definition
of
any level of
the structure will
require
extensive forward drilling the fore knowledge of the complexity means that mining
plans
Although
can
this
be
framed
particular
to
example
cope
with
the
is, in fact,
variations
opencut
finally
a similar
found.
situation
could well occur in underground resources.
Minor Faults The
determination
very
rare;
even
of a
underground
resources
More
the
often
surface
drilling,
mines
and from
the
very
at one
frequency (to
majority
of
measured
comparison
have been
pattern
Queensland small
by surface drilling the
relatively
mine leaves some
faulting
status),
in
and
is
must
not
is
shallow
uncertainties.
indicated
be deduced
of regional structures;
proven by drivage underground. simulations
of small faults
close drilling
at
all by
from
nearby
it is invariably finally
Many instances have been experienced where
necessary
to allow
realistic mine costing.
Using
a
practical classification of faults as:Pit Stoppers DHF-05
—101—
Panel Stoppers and Face Stoppers it has been necessary to simulate virtually all the expected face stoppers', perhaps some 'panel stoppers , and very occasionally some pit stoppers . The resultant structures whilst clearly not ultimately correct, nevertheless allow the effect of faulting on mining methods, production, and costs to be assessed. f
1
T
1
An interesting example was a correlation of fault frequency and direction between two mines sited on the Muswellbrook Anticline. When allowance was made for a change in the anticline direction between the mines a close correlation was found. The simulated underground structure showed frequent small faulting which significantly constrained the methods of work which could be applied. Again only drivage underground can finally confirm this. Folding Major folding is not common in Australian colliery holdings but has caused some problems; in particular mis-interpretation of the exact nature of the 'Muswellbrook anticline has caused subsequent opencut mining difficulties. 1
An extreme exists in the Greymouth Coalfield in New Zealand. Exploration of deep resources in this field, where mining has been carried on for over 100 years, is constrained by the difficult surface terrain requiring helicopter installation and servicing of drill rigs. Even if the grid could have been reduced to 400m spacing between boreholes, it could not ensure detection of the folds shown in existing mines in which a complete anticline and syncline, with gradients up to 30°, could be found in a 250m span. In this case structures from existing mines were used to construct three models of different complexity and these models were then applied, as regional environment suggested, to the multiplicity of fault blocks (56) created by frequent major faults (> 50m throw). The resulting mine assessments seek to show the effects of the extreme complexity existing in this coalfield. Dykes and Sills Whilst sills may be delineated by surface exploration the location of dykes can only be finally confirmed by underground drivage. Underground mines formed from the highwalls of opencuts will benefit from the exposures DHF-06
—102—
made in the cuts, others may be able to trace dykes on the surface, from vegetation changes or from geophysical surveys. Many however are only finally proven during underground drivage. A knowledge of the rock properties, the possible variation in thickness and nature, and the frequency of dykes or swarms is however necessary for any realistic mining assessment. Areas subject to dykes have been successfully mined by Bord and Pillar method for many years and more recently have been mined by longwalls. The production results are however obviously affected, particularly by bad roof conditions adjoining weathered dykes, or at the other extreme by the difficulty cutting very hard dyke material. 'Wild Card
1
Wild Cards' include shafts/drifts driven through major faults, a difficulty recorded more than 200 years ago and still reoccurring from time to time - it is highly desirable to ensure good drivage conditions for the formation of expensive stone drivages and also for the pit bottom layout. T
4.0 LITHOLOGY
The lithology and the existence of rock defects, (bedding planes, joints etc.) go to determine the rock strengths subsequently reviewed by geotechnical testing, and may also effect ground water, (again separately reviewed later). They may also indicate depositional structures and trends. Whilst the final assessment will normally be based on geotechnical testing the initial geological data input remains important particularly for early reviews and may also prove important for anisotropies arising from depositional structures. 'Wild Card
1
Lithology and sonic logs suggested good immediate roof conditions in one area of a prospect. Core photographs showed grossly laminated strata immediately above the seam (shown later not due to drilling techniques).
5.0 COAL QUALITY
The coal quality will finally be established by detailed laboratory analysis and perhaps by large cores, bulk samples and even washing plant tests. Early review is much assisted however by seam logging of the visible coal properties. More important perhaps is the assessment of sources and possible extent of dilution DHF-07
—103—
during mining. The nature of roof and floor and their partings with the seam can be very important as equally can be the existence of marker bands in the seam. A seam without marker bands and with a floor which grades gradually from coal to mudstone will suffer much increased dilution. Early identification of such a problem allows floor material to be included for subsequent laboratory analysis - a necessary but often neglected practice. 'Wild Card
1
A bulk sample of more than 2000t sent for plant washing tests showed all the characteristics of the H seam, (not planned to be worked), rather than the A seam in which workings have since been entirely sited as planned. Washery design and associated capital was inflated by the difference. f
T
!
CONCLUSIONS
The increases in the capital costs and productivity required of new underground coal mines has produced ever closer exploration grids over the years - the days of sinking a new mine on one good borehole are long gone. The primary needs are for well founded resource estimates for seams of adequate quality, thickness, and uniformity within a well defined structure and lithology. Whilst closer surface exploration than in the past is inevitable, some features can only be finally determined by continuous miner drivage. The aim should be to eliminate exploration of non viable areas early and to concentrate efforts on increasing the knowledge of apparently viable target seams. In doing this no available data should be neglected and certainly early collection of coal quality data is vital. The selection of target seams is also much helped by early broad brush mining cost estimates - estimates which can be progressively upgraded as exploration proceeds. Where the environment is judged to include features which cannot be adequately defined from surface exploration then trial mining may prove to be the final exploration stage. 'Wild Card
1
Few of the mistakes are new. We should try to avoid our grandfather's blues and yet hopefully inherit their instincts for 'good coal . T
T
1
DHF-08
—104—
THE ROLE OF COAL GEOLOGISTS in
OPEN CUT MINE PLANNING
PETER W. GOSCOMBE MANAGER - COAL EXPLORATION & EVALUATION CSR LIMITED
ABSTRACT
Open cut coal mines are capital rather than labour intensive. The magnitude of loans needed for their development places considerable pressure on owners to maintain operations, even if the return is below expectations. This demands that all aspects of such projects are thoroughly evaluated before committing funds to their development. Uncertainty surrounding the nature of the resource is probably the main contingency in the development proposals for a new mine and as a consequence, geologists have a major role to play in their formulation. Geological uncertainties are reduced as information on the resource accumulates. This leads to an improvement in the reliability of cost estimates and a corresponding reduction in the economic risk associated with mine development. The technical evaluation therefore tends to involve the appraisal of very large amounts of data. The geologist must ensure these data are analysed in such a manner as to minimise economic risk. This is being achieved by the application of specialised computer techniques and the use of geostatistics. The evaluation is carried out by a multidisciplinary team of professional mining people, which includes geotechnical and mining engineers, coal technologists and environmental planners. To be effective, the project geologist must have strong communications skills and understand the role and requirements of the other members of the team. In this respect, there are few jobs for geologists which offer comparable, mult idisciplinary teamwork opportunities, making it one of the attractions of coal geology.
—105— Introduction
The single most of development
important
factor to influence the preparation
proposals
for open cut coal mining
operations
is the very large capital investment needed to bring them into production. capital
The magnitude of the loans needed
investment
places
considerable
for this large
pressure
on owners
to
maintain operations and therefore the cash flow to service the loans.
This
expectations
is
the
because
case to
even
close
if
the
return
the
mine
may
is
below
effectively
bankrupt the company.
The
financial
problems
export market
caused
for coal
by
the current downturn
have highlighted
thoroughly
evaluating
committing
funds to their development.
of
mining
geological
all
and
economic
risk.
The
responsibility
to
aspects
risk
coal
provide
the
in the
importance
of such p r o j e c t s
in
The largest
project
of
before
component
development
is
geologist
therefore
has
a
the
planners
and
project
mine
vital
managers with clear and accurate information on the resource.
Project Management
The key management issues are:(1) (2)
The strategic impact of the project on the company, The commercial risks inherent in the development of the project,
(3)
The
technical
evaluation
of
the
project
and
the
reliability and accuracy of the cost estimates, and (4)
The financial evaluation of the proposed
Decisions
taken
interrelated
and
on
each
jointly
of
these
four
impact on whether
development.
key
issues
to commit
are
funds to
the development of the project.
PWG-02
—106—
Technical
The
Evaluation
technical
with
the
evaluation
successive
resource
improving
the project to
the accuracy
development.
A
whether
proceed
to
of
additions
review
of
of
the
progresses
the
stages on
the
the cost estimates
for
its
findings of each
further
in
information
with
the
stage
decides
evaluation;
market
opportunities decide when the further work is carried out.
The stages of the evaluation are typically:Exploration Review Conceptual Study Prefeasibility Study Feasibility Study Preproduction
Assuming
Planning.
for the purposes of this paper that the resource
is a
new discovery, a point is reached in the primary exploration of the deposit
when
justification assessed
level
Exploration postpone
or
further
of
Review
further
prospects,
consideration
for
must
economic
to
on
the
of
the
either
be
to
relinquish
pending
an
improvement
a
broader
technical
economic
decision
the
commence
the
Depending
risk,
may
work
be given
investigation.
in
the
project,
its
economic
evaluation
with
a
view eventually of developing a mine.
The
first
Study.
stage
This
of
the
broader
evaluation
is
the
Conceptual
involves:-
an assessment of the likely scale of production, the
development
of concepts
for removing
the
overburden
and mining the coal, a preliminary appraisal of the likely utilisation of the coal and its market opportunities, and the assembly of order-of-magnitude
capital and
operating
cost estimates.
PWG-0 3
—107— The cost estimates are analysed against forward price to determine return on
if
the
required
investment
selling
is likely
price
scenarios
for a satisfactory
to be competitive
in the market
place.
The
studies
stage
and
comprise
evaluation
of
mine
output,
with
the
related
investigations
at
the
geological
the
detailed
deposit
product
geological tests of
aimed
quality
and
and
the
expected
study
commences
price.
The
of
resource
coal.
the
Following
Study
engineering
at establishing
investigation
the product
the P r e f e a s i b i l i t y
and
the
market
development
of the geological model, the mining and geotechnical
engineers
prepare
engineers
a
mine
plan,
civil/mechanical/electrical
design the infrastructure and environmental planners assess the impact of the proposals on the physical and social A financial evaluation opportunities proceed
The
at
the
time,
a decision
is made
on
whether
to
further with the evaluation of the project.
Feasibility
Study
has been identified to
environment.
is carried out and, depending on market
reduce
carrying
the
out
is carried out when a market
for the coal. risk
further
opportunity
The aim of the study is
associated
with
studies
investigations
and
the
resource
by
of
the
utilisation
of
the
information
from
geology, geotechnology, and coal quality, to o p t i m i s e equipment,
the mine possibly
trial mining
plan
with
and
the
the
aid
of
a
operation,
to match the production schedule to expected
sales,
to
quality
and
including
pilot
conduct
detailed
studies
of
the
utilisation characteristics of the coal,
scale studies on bulk samples, and to market the planned output, to
assemble
capital and operating
of
accuracy
and
to evaluate
costs of a high
the financial
project against contractural/forecast
order
return of
the
prices,
PWG-04
—108—
to secure
all Government
consents,
including
acceptance
of the environmental impact of the development proposals, and to prepare a scope document, arrange finance, and obtain management approval to commit funds to the development of the project. The Preproduction
Stage
is part of
the project.
Commitment
involves still
further studies
the construction
phase
of
to the development of the project and
investigations
in order
to
provide accurate technical information for the final design and specification well
as
of equipment,
the detailed
facilities
design
and
infrastructure,
as
scheduling
the
and production
of
first few years of mining.
Role of the Geologist Irrespective of whether the resource is a new discovery or the subject of a tender, geologists play a primary role, together with mining engineers, in the Exploration Review. Because of their prior involvement with the project, geologists also have
an
introducing
important
role
to play
in the Conceptual
Study,
the resource to specialists from other disciplines
and, quite possibly, to the management of the company. The
more
detailed
Prefeasibility
studies
Study
require
and the
investigations
establishment
team.
The structure of the team will depend
nature
of
people
the project
qualified
utilisation,
in
but will geology,
environmental
of
of a
the
project
on the size and
include an appropriate mix of mining
assessment,
engineering,
infrastructure
coal
design,
financial evaluation and administrative support. As
the
evaluation
progresses
through
the
Prefeasibility,
Feasibility and Preproduction Stages and the size of the
PWG-0 5
—109— project
team expands,
hierachy
of
uncertainty the most
the
the position of the geologist
team
usually
surrounding
significant
because of
thisf
the nature of aspects
the
diminishes.
of
the resource
the entire
importance of
in the
However,
the
is one of
evaluation
and
the role of the geologist
does not diminish. From
the
required
start to
of
the
Conceptual
communicate
with
an
Study, ever
the geologist
increasing
technical people, either professionally qualified or
specialist
outside
consultants.
Effective
is
range
of
team members
communications
are vital if those charged with the responsibility of designing and
operating
the
mine
are
appreciation of the resource.
to
have
a
perfectly
clear
Good teamwork and communication
skills should therefore complement the geologist's professional and technical ability. offer
comparable
There are few jobs for geologists which
multidisciplinary
teamwork
opportunities,
making it one of the attractions of coal geology. The Project Team To communicate effectively it is necessary for the geologist to understand team.
the
The
engineer
role and
requirements of other members of
geotechnical
and
engineer,
environmental
coal
planner
requirements which must be recognised geologist
technologist, all
have
the
mining
different
and addressed
by the
in the course of mapping, drilling and sampling the
resource .
For
example,
geologist
the
geotechnical
engineer
would
expect
the
to make a start on the definition of the in situ
geotechnical
conditions
during
exploration
drilling.
The
occurrence of joints, faults and other planes of weakness which lower
the strength of the rock mass should
geologist during
core
logging.
Groundwater
be noted by the inflows should
always be measured and recorded as the pressure and volume of
PWG-06
—110—
groundwater difficult
can
result
in
saturated
to handle, highwall
spoil pile instability. geologist
from
lithological
geomechanically
which
are
floor heave and
Depositional models constructed by the
geophysical
control
sediments
instability, logs
of
for effective
suspect
materials
the
holes
provide
sampling
and testing
of
in
overburden
and
the
interburden strata.
The
work
of
the geologist all
and
the
coal
stages
of
the
technologist
closely
linked
at
quality
is such
an
important
parameter
project,
quality
profitability
of
a
consideration
in
planning
Selective the
sampling
distribut ion
correlatable
exploration
of
the
physical
subsections
advantageous choice of working likely
coal
in determining trends
are
drilling
the quality
and
chemical
a
the
major
programmes.
properties
to be assessed
and
the
sections to be made.
to be mixed
also sampled and analysed. matching
As
of coal core on a ply-by-ply basis enables
seam
floor material
is very
evaluation.
of
most
Roof and
with coal during mining
is
Where core holes are widely spaced,
of the coal to the depositional
model
enables the prediction of properties between data points.
The geology of the deposit is the most significant variable to be
considered
in
mine
planning
and
the
therefore depends heavily on the geologist formulate
the plan.
mining
engineer
for information
to
Differing geological conditions alter the
technical and economic feasibility of a given mining method and it is therefore and
the
overburden the
necessary
predictions
coal
thickness seams,
geometry
of
strata,
and
for
the
reliable. and
the
volume,
tonnage
and
information The
to be
accurate
information
includes
the number quality
and of
thickness
the
coal,
the deposit, structural discontinuities the distribution
and
lithology
of the
in the
of overburden
and
interburden materials.
PWG-07
—Ill— The
geologist
assists
the
environmental
planner
by
providing
drillhole samples for tests of:the
suitability
of
the
overburden
and
interburden
mine
use
and/or
meet
anti-
is also likely
to be
materials for revegetation, the
suitability
of
groundwater
for
discharge off-lease, and the
ability
pollution Because
of
co-opted
of
the
his field
and
the
role, the geologist
to m e a s u r e ,
aspects of
coal
ash
to
regulations.
sample
monitor
various
the background environment, at least in the
initial
stages of the monitoring
and
otherwise
programme.
Data Management
The
technical evaluation of coal resources and the preparation
of development proposals for open cut mining operations require the
appraisal
especially more
so
detailed
of
very
today
as
large
amounts
proponents
investigations
to
of
of new
counter
data.
This
is
projects
carry
out
the
added
technical
risks associated with deposits with less than ideal geology and coal
quality.
techniques
The
and
availability
greater
of
environmental
specialised regulation
evaluation of
open
cut
coal mining have also added considerably to the amounts of data requiring
appraisal.
retrieving
this
A computer
data
computer programmes
and
the
is essential
for storing
application
of
is now established practice
and
specialised
for just about
every aspect of the technical evaluation.
The
largest
component
of mining
development is geological risk. ensure
that all available
and
economic
risk
in
The geologist should
information
project
therefore
is collated and analysed
in such a manner as to minimise
this risk.
Where
adequate
data
techniques
should
be
used
to
quantify
the
variables,
eg. coal
seam
and
set,
statistical
reliability
of
the
overburden lithology thicknesses, key coal quality
there is an
parameters,
PWG-08
—112—
etc.
The increasing
confidence
limits
application of geostatistics to determine in
resource
and
reserve
estimation
is
removing the subjective bias of estimates and enabling the coal geologist
to avoid
unnecessary
risk
through
underdrilling
or
waste through overdrilling.
For
example,
as
information
uncertainties are reduced. of cost estimates associated
with
be nefits
of
uncertainty, economic
and
development
reliability
the economic
uncertainty
reduced.
information
ie.
expected
higher are
subject
accumulates,
the
to
geological
the
additional
risk,
information
is improved mine
accumulates,
As a consequence,
in
However,
reducing
profitability diminishing
reliability
of
the
economic and
lower
returns.
As
the
profitability
estimate improves, but at a decreasing rate.
Exploration
is
normally
carried
out
in
stages
with
each
successive stage becoming progressively more expensive and time consuming
as the grid dimensions of the drill hole layout are
reduced.
The costs of drilling, assaying and data analysis to
obtain
the additional
of the profitability the benefits
improve
initially
but at some point, marginal
marginal costs. lowers
information and estimate will
Further exploration
the expected
profitability
reliability
benefits will
beyond
and
the
be outweighed this point
increases
the
by
equal simply
economic
risk of the project.
Summary
Geologists have an important responsibility open cut coal mining operations. have
strong
technical skilled
teamwork
and
in
the
application
of
and
communications
professional handling computer
of
in the planning of
To be effective, they should
ability. large
skills
They
amounts
techniques
and
as well
should of
data the
as
also
be
by
the
use
of
geostatistics.
PWG-0 9
—113—
THE G E O L O G I C A L SOCIETY OF A U S T R A L I A COAL GEOLOGY GROUP GEOLOGY AND COAL MINING
CONFERENCE
"EXPLORATION G E O L O G Y AND GEOPHYSICS THEIR ROLE IN UNDERGROUND MINE PLANNING AT GERMAN CREEK M I N E , CENTRAL Q U E E N S L A N D "
AUTHORS:
KERRY J , WHITBY
(1)
GAVIN P . MAY
(2)
Senior Associate
McElroy
Bryan & Associates
(2)
Senior Project
Pty.
Ltd.
P.O. Box 34 Willoughby.
N.S.W.
Geologist
—114—
1.
INTRODUCTION
German Creek Coal Mine, in the Bowen Basin of Central Queensland comprises a four dragline open cut operation and one longwall underground mine at Central Colliery (see Figure 1.1). A second underground mine in the south of the deposit will soon be established. Open cut operations commenced in July 1981, followed by underground production in January 1984. Exploration of the German Creek deposit was initiated with a major programme of drilling in April 1977. The management of Capricorn Coal Management Pty. Ltd. (Capcoal), operators of the project on behalf of their joint venture participants, have at all times demonstrated a commitment towards exploration techniques, which has enabled the complex nature of the geology and the ensuing mining operation to be effectively resolved. The technical success of the mining operation as a whole, and in particular Central Colliery longwall mine, is testament to the role played by geological and geophysical exploration in providing Capcoal engineers with reliable and accurate data on which to base mine planning.
2.
EXPLORATION TECHNIQUES
From the beginning, it was clear that the German Creek mining operation would initially be open cut oriented with the subsequent introduction of underground operations, to supplement at first, and eventually take over from, open cut production. While much exploration was directed specifically at the open cut or underground aspects of the development, the overall objective has been the evolution of a comprehensive assessment of the sedimentological and structural features of the entire coal deposit and its relationship within the regional framework. The general philosophy applied to all stages of exploration at German Creek has been to obtain data of the highest quality, particularly in relation to drilling. The significance of many results obtained during exploration is KW-GM-01
—115— often not fully appreciated at the time, and it was considered essential that all data be recorded in such detail that, allowing for unforeseen changes of project emphasis in the future, the data collected be acceptable for a variety of uses. The following geological and geophysical exploration techniques have been applied at German Creek over the past 10 years. Geological Drilling Open hole Fully cored diamond-vertical and inclined Large diameter Regional geological mapping Highwall and pit mapping
Geophysical Down hole geophysical logging High resolution magnetics High resolution surface seismic In seam seismic Ground resistivity
The relative merits of these techniques for locating geological hazards to mining and their application to the determination of geotechnical aspects relating to the prediction and monitoring of overburden characteristics is addressed (see Figure 2.1).
3.
G E O L O G I C A L AND STRUCTURAL MODEL
The complex interaction of igneous features (dykes, sills and plugs) with numerous normal, reverse, strike-slip and KW-GM-02
—116—
bedding plane faults at German Creek (see Figure 3.1) has necessitated the development of a structural and sedimentological model to assist in the planning of projected underground mining operations with a view to: (i)
increasing the accuracy of predictions related to ground conditions and the location of geological hazards such as dykes.
(ii)
determine target areas for detailed investigations.
The model is constantly under review, as additional data becomes available, and establishes a geological base from which further exploration targets are identified (see Figure 3.2).
KW-GM
G E R M A N CREEK O P E N CUT M I N E D OUT AREAS. TOWN OF MIDDLEMOUNT
AtoP 315C
AREAS SCHEDULED FOR M I N I N G ,
G E R M A N CREEK LEASE M L . 1306
MIDDLEMOUNT A l o P 315C
BLOCK
—117—
TRALEE
G E R M A N CREEK EAST A to P 4 M C
TRALEE SLOT
PARROT CREEK
-SURFACE LEASE BOUNDARY
BLOCK
bAK PARK BLOCK
SOUTHERN COLLIERY RESERVES
KILOMETRES
LOCALITY MAP GERMAN CREEK MINE FIGURE I I
—118—
Figure 2 1
—119—
CAPRICORN COAL MANAGEMENT P T Y
LTD
SOUTHERN COLLIERY MINE AREA
STRUCTURAL FEATURES/ Southern Colliery
kilometres
•—
Dyke, position approximate
•
Dyke, position inferred
: : ' ! ' / . : . ' . Intruded and heat affected Aquila Seam /£ —— lllllltlll
Woshout, German Creek Seam thickness < 1 • 7m
A
Intruded and heat affected Tieri Seam //
—JOO-- Overburden Isopoch, German Creek Seam U 0 Uo
y •
Normal fault T
//
Reverse fault Strike slip foult
Prepared by: McElroy Bryan & Associates Pty Ltd Figure 3-1
—120—
g "O . o
TECTONIC STYLE REGIONAL
LOCAL
Basement Rifting
COAL
MEASURE
SEDIMENTATION
PERMIAN - TRIASSIC
Igneous Boundary
Fault
@D1
A Sill Injection
II
v 02
Normal Faults Partial Reactivation of Rift
-?
Reverse Faults
Total Reactivation of Rift Zones
03
CZD 12 045°
Dyke Emplacement Controlled by Basement Fracturing
<v"
controlled by Joints
Stabilisation
J2
Dyke emplacement
of
^
315°
^
V
Riftlm
£
ES3 070°
Regional Compression
D4 E3
Regional Relaxation
Prepared by: McElroy Bryan & Associates Pty Ltd
SEQUENCE OF TECTONIC EVENTS
v
Figure 3 2
—121—
PREDICTION OF UNDERGROUND CONDITIONS USING OPEN CUT DATA BY C.W. Mallett & R.L. Hammond
CSIRO Division of Geomechanics Private Bag 3, INDOOROOPILLY. QLD. 4068
CM-RH-1
—122—
Underground Mining Needs
Data
from
surface
underground
pits
planning
can
and
be
important
design
for
a variety
requirements.
In the
of
pre-
development phase the feasibility of specific mining techniques need to be established
before major
equipment
commitments
can
be made. New underground developments are now concentrating on longwall
mining
economical
systems,
production
which
have
much
rates, but d e m a n d
higher
very
and
strict
more
ground
c o n d i t i o n s over the w h o l e area of a panel. The overall
mine
layout
with
of
panels
to be extracted
must
be
intergrated
service, access and transport systems. The layout is dependent on local geological
conditions,
which
are
usually
interpreted
from widely spaced b o r e h o l e s and any a d j a c e n t exposures. The area covered amounts to tens of square kilometres, and requires detailed
knowledge of location of structures with half
to one
seam thickness displacements throughout the area.
During
development
and ongoing
mining
forecasts p o s s i b l e of c o n d i t i o n s
operations,
required. Geological features such as sedimentary washouts, intrusions and faults, mining
and their
unexpected
the
best
in advance of w o r k i n g s are channels and
can be of major importance to
intersection
seriously
disrupt
operations. They are h o w e v e r , often surrounded by g e o l o g i c a l features
that
give
encountered.
warning
Exposures
of the nature
underground
are
of
changes
severely
to
be
limited,
usually to within the coal seam. It is difficult to develop an understanding
of the interconnection bewteen the components of
a g e o l o g i c a l feature in this e n v i r o n m e n t and larger exposures are
Many
features
surface
required.
that
are
important
for
strata
control
are
confined to i n t e r s e a m s and only affect the coal in a minor way. These features in highwalls can be completely exposed and their effects within the coal seam documented,
and used to
interpret
d e f o r m a t i o n m e c h a n i s m s in roof and floor strata underground. Zones of high gas and water
inflow are localised by geological
CM-RH-2
—123— d i f f i c u l t i e s of this nature at the surface, their nature and distribution ated
patterns
can be established
there f
and
extrapol-
underground.
Building Predictive Geological Models
Sedimentary models
The scale of Australian surface strip mines usually exceeds the dimensions of sedimentary depositional systems within the coal m e a s u r e s . It is t h e r f o r e p o s s i b l e to see the edges of d e p o s i tional units and determine their gross dimensions. Strip mines are linear features, so the section obtained is e s s e n t i a l l y a single slice through the sediment pile.
Directional
f e a t u r e s can be d e t e r m i n e d
outcrops. These are obtained
from
readily
the overall
in
highwall
orientation
and
s u p e r p o s i t i o n of beds, and internal f e a t u r e s such as current bedding.
Depositional processes and the hydraulics of sediment transport can
be
obtained
from
the
lithologies
and
textures
of
the
sediments. Lithologies reflect both the sediment source and the energy of the d e p o s i t i o n a l zone. The a s s o c i a t i o n s of beds can be built up to d e t e r m i n e a n u m b e r of c h a r a c t e r i s t i c facies of deposition for an stratigraphic
unit or geographic area.
are related back to p h y s i o g r a p h i c
These
m o d e l s such as a channel,
channel mouth bar, levee, splay etc, which in turn indicate the relative position of standing water levels or sea levels.
By
an
initerative
comparative
confidently
build
depositional
environment,
and
distribution
widely
scattered
association
up
process,
a picture and
varies
The
the
sedimentary
of l i t h o l o g i e s data.
of
is p o s s i b l e
units.
and
The
if
it
of is
a a
to
local
geometry
can then be p r e d i c t e d
continuity
dramatically
it
regional
from
lithological major
deltaic
channel sand, a feeder for a splay, delta m o u t h bar or a tidal channel sand. On a local scale the l i t h o l o g i e s could be very
CM-RH-3
—124— similar, and it is only by knowing what depositional
system
that you are dealing with, that successful correlation between boreholes can be made. Rock mass properties One
of
the
most
important
aspects
of m i n e p l a n n i n g
and
development, and of the safe operation of a mine, is defining the characteristics operating.
of the rock mass
The performance
in which the mine
of the rock
mass
is in
is
general
directly related to its structure, and to a lesser extent the material properties of the different constituent rock types. Structures in a rock mass might include: 1. boundaries between different rock types 2. joints & cleats 3. faults 4. folds and flexures 5. cleavage Under normal circumstances these
structural
it should be possible to integrate
f e a t u r e s into
a mine
scale
geological
conceptual model. Ideally this involves an understanding of how the various structures in the mine area developed and how they are
inter-related.
By necessity, the development of such a model involves more than a passing understanding of the geology of the surrounding region. It is simply not possible to develop adequate models of mine geology without referring to parameters like; regional deformation histories, or the distribution of major regional structures,
or indeed the general character of the
terrane
(e.g. a thrust belt). In many cases the developers of a proposed underground will have access to an abundance of highwall exposure provides
exact
information
about;
joint
density,
mine that joint
orientations, joint set inter-relationships, fault style, fault
CM-RH-4
—125— p a t t e r n s , u p - s e c t i o n or lateral continuity of faults, and so into
areas
where there is no exposure, provided there exists a mine
on.
This
information
can be used
to e x t r a p o l a t e
scale
conceptual model that offers a basis for careful An additional,
and equally
models
way
in
which
about
the
3-dimensional
is
the
predictions
extrapolation.
significant attribute of they
allow
conceptual
geologists
character
of
to
make
a
fault
system, and hence the mining performance of the immediate rock mass.
Of
particular
associations
importance
between
different
is
the
establishment
structures
that
allow
of the
p r e d i c t i o n , say, the o c c u r r e n c e of a fault b e c a u s e a roll in the floor is encountered, or perhaps because a systematic swing in cleat trends is noted. Associations can only be
established
with careful observation of geology wherever it is exposed.
Application of Mine Scale Modelling
Detailed interpretations can be made on highwall exposures and there are many examples where mines have done excellent mapping and
interpretations
for
strip
mined
areas.
Very
few
have
persisted long enough to develop a three dimensional picture of d e p o s i t i o n a l s y s t e m s from s u c c e s s i v e cuts, a l t h o u g h this is quite
feasible.
The further you go from the h i g h w a l l h o w e v e r , the sparser
is
the
of
information
and
less
reliable
the
prediction
l i t h o l o g i c a l d i s t r i b u t i o n s and faults. The p r o c e d u r e in m i n e scale modelling is to
1. Establish the best facies distribution and structural
model
possible based on all evidence from
lithologies,
bed
etc
extend
incorporate
from
borehole
2.
highwall
exposures,
and
it to
geometry
data.
Determine
the
relationship
between
structure
and
lithological distributions. This includes not only the controls
CM-RH-5
—126—
on l o c a l i s a t i o n also
the
joint
type and
of structure always exerted by l i t h o l o g i e s ,
internal
structures
characteristic
of
but
b e d s such
as
spacing.
3, Use i n d i c a t o r s of f e a t u r e s to p r e d i c t t h e i r l o c a t i o n
where
associations
slips
often
can be expected.
terminate
in v e r t i c a l
For example, reverse
faults
bedding which
d i s r u p t one s e a m , but d i e out to a s m a l l r o l l seam,
or even l i t h o l o g i c a l
usually
change l a t e r a l l y
transitions
into channels
plane
significantly
in an
overlying
such as l e v e e s
which might
lie
which
between
boreholes.
It
is t h i s
i n t u i t i v e geology that makes it d i f f i c u l t
remove the g e o l o g i s t from the process and depend on analyses
of a
as y e t ,
to
statistical
database.
The D i v i s i o n
of Geomechanics
sites
surface
where
underground p l a n n i n g .
has been
geology
has
involved
been
with
applied
These i n c l u d e Moura, South
many to
mine
assist
Blackwater,
German C r e e k , G o o n y e l l a and Oaky C r e e k , w h i c h c o v e r b o t h bord and p i l l a r and l o n g w a l l mining.
Examples from these s i t e s
be
predictive
presented
to
illustrate
g e o l o g i c a l modelling a p p l i e d to mining
capabilities
practice.
CM-RH-6
will of
—127—
SITE CHARACTERISATION AND FORECASTING
UNDERGROUND MINING
Ian J .
CONDITIONS
Stone
BP Coal A u s t r a l i a ,
Picton
ABSTRACT
S i t e s p e c i f i c mining Coalfield,
conditions
NSW have been studied
and forecasting mining
stressfield
The range of roof
of the s t r e s s f i e l d
components.
for each area of the mine to define conditions,
in the Southern
to provide a framework for
conditions.
were caused by variations ratio of the horizontal
at Tahmoor Colliery
correlating
conditions
orientation,
Roof F a i l u r e Curves were the r e l a t i o n s h i p between
o r i e n t a t i o n and r e l a t i v e
noted
magnitude
stressfield
and
constructed roof magnitude.
Forecasts of roof conditons were made by matching areas with similar Roof F a i l u r e Curves and projecting rates and roof conditions.
trends
support requirements
into unmined a r e a s .
Development
can be associated with forecast
roof
-128-
INTRODUCTION
High horizontal stressfields are one of many geological contributors to difficult roof conditions in underground coal mines.
This paper
outlines an approach to defining the in situ stressfield and its effect on mining conditions in Tahmoor Colliery in the Southern Coalfield of NSW.
Initial roof investigations suggested that the variations of
stressfield orientation and stressfield intensity caused the observed range of roof conditions (1).
Subsequent work involved characterisation
of the stressfield and roof conditions at specific sites, and correlating between sites to develop trends to forecast the stressfield and roof conditions in future workings. Studies which focus at specific sites, for example, monitoring roof strata - roof support interaction, must be aware of limitations on results from one site when transferred to other areas of the mine. Geological characterisation of sites will provide the necessary framework for transferring site specific data.
Tahmoor mine presents an example of
the interaction of a variable stressfield and mine roof conditions (2). The characterisation of the mining conditions in an area has two main aspects: 1.
determination of the stressfield orientation, and
2.
determination of the roof conditions typical of that area.
Methods required to gather, interpret and use this data for predicting expected roof conditions are outlined below.
STRESSFIELD ORIENTATION. The orientation of the apparent principal horizontal stress is determined from the pattern of mining induced shear fractures and tensile fractures in the immediate roof strata at the mining face.
This stress
direction generally reflects the in-situ virgin stress field but in some areas it is modified by mine development.
Variation of the apparent
lateral stress direction in Tahmoor can be either gradual or very rapid (Fig.l), for example, in one area the dominant stress direction changes some 90° within 100m.
The stress direction measured from fracture
patterns (Fig.l) are comparable to those established by in situ stress measurements which indicated the maximum horizontal stress component between 18.0 and 21.3 Mpa (3).
IS-01
—129— Three factors influence the roof fracturing: 1.
Roof fracturing is more clearly developed in the finely interbedded strata, as exists at Tahmoor,
than in massive
sedimentary rocks. 2.
A simpler roof fracture pattern occurs if there is one dominant horizontal stress direction.
Two principal horizontal
stress directions of almost equivalent magnitude, have a more complex roof fracture pattern.
Both situations exist at
Tahmoor. 3.
The intensity of roof fracture patterns varies in roadways dependent on the order of drivage in that mining cycle.
Table 1. lists the features that can be used to determine the apparent principal horizontal stress direction, for a dominant lateral stress direction and for lateral stress of nearly equivalent strength.
CHARACTERISATION OF ROOF CONDITIONS Short Term Roof Conditions The roof conditions at Tahmoor can be distinguished as short term and long term roof failure types (Table 2).
Short term failure
essentially occurs at the mining face, whereas long term failure develops after the placement of roof supports. Short term roof conditions are used to characterise the type of roof failure in an area because they are most easily compared to the stressfield intensity, and least affected by mining practices or methods. Likely long term roof conditions can be determined by the short term roof fractures, and some relationships have been reported (1).
In Tahmoor the short term roof conditions are affected by: 1.
The horizontal stressfield orientation,
2.
The angle between the principal horizontal stress direction and
3.
The stressfield magnitude, and
4.
relative strength of both in situ horizontal stress components.
the mine roadway (9sr),
Each of these four factors vary in different areas of Tahmoor and produce a different set of roof conditions which may have different roof support requirements.
Short term roof conditions vary with Gsr, being
worst when 0sr = 90°, but also vary with changes of stressfield intensity.
IS-02
TABLE 1 DETERMINING PRINCIPAL HORIZONTAL STRESS DIRECTION FROM ROOF FRACTURES.
1.
Relative condition of adjacent headings and cut-throughs
DOMINANT LATERAL STRESS
LATERAL STRESS MAGNITUDES NEARLY EQUIVALENT
One roadway in significantly worse condition
Similar condition in both directions
(gives quandrant of str
s direction)
Short term roof fractures, (refer to Table 2) (a)
Orientation of low angle conjugate shears relative to roadway direction
Oblique shears mostly oriented normal to horizontal stress directions. At higher stress magnitudes, or at certain Osr no oblique shear present.
Very few oblique shears, Normally parallel shear.
u> o
(gives stress direction)
(b)
Mining induced tensional fracture (m.i.f. ! s).
Where present preferential location to one side of roadway.
Where present occur both sides of roadway.
(gives quadrant of stress direction)
(c)
Location of short term term shear failure
Preferential location of shear to one side of the roadway.
No preferential locationcommon in centre of roadway.
(gives quadrant of stress direction)
IS-03
—131— TABLE 2. ROOF FAILURE TYPES Short Term Arch Severe parallel shear Parallel shear Parallel and oblique shear Oblique shear Good
Long Term Roof Fall Cantilever Gutter Sag Good
NOTES: 1. Shear refers to shear failure of immediate roof strata. 2. Oblique shear trends across the roadway and parallel shear runs along the roadway. 3. Mining induced fractures may occur with the short term failures types.
Fig.l. Orientation of the dominant lateral stress. In situ measurements indicated by bold lines.
IS-04
-132-
Stressfield Magnitude The stressfield magnitude can only be determined from direct measurement. At Tahmoor twelve types of short term roof failures are recognised and ranked by increasing severity of failure (Table 3). The relative intensity of short term roof failure has been used as a guide to the relative stress magnitude in different mining areas.
TABLE 3 SHORT TERM ROOF CONDITION SCALE AND SUPPORT REQUIREMENTS (Decreasing Severity) SHORT TERM ROOF CONDITIONS
SUPPORT REQUIREMENT (Bolts per W-strap)
Scale Failure Type Number 12 - Arch 8 11 11 - Severe parallel shear, mif* across roadway 11 10 - Severe parallel shear, mif 1 side 11 9 - Parallel shear, mif across roadway 8 - Parallel shear, mif 7 1 side 11 7 - Severe parallel shear 11 6 - Oblique and parallel shear, mif 11 5 - Parallel shear 4 - Oblique shear, mif 6 or 7 11 3 - Oblique, parallel shear 2 - Oblique shear 6 1 - No shear * mif - mining induced fractures (tensional)
Method of Comparing Roof Conditions The scale of relative stress magnitude, based on short term roof conditions, must be used in conjunction with 0sr because roof conditions vary as 0sr changes from 0° to 90°.
On a graph of short term roof
conditions versus 0sr, a curve can be drawn which will indicate the short term roof conditions expected to occur as the angle between the principal horizontal stress and the roadway changes (e.g. curve 2, Fig.2 ).
This
curve is referred to as a Roof Failure Curve (RFC) and is used to define the range of roof conditions possible in a specific area of mine development.
An area of the mine which is represented by one RFC has
consistent stressfield magnitude parameters.
IS-05
—133— Curve 2 in Fig.2 shows a number of characteristics: 1.
A distinct change of roof conditions either side of 0sr = 45°, reflects the different roof conditions commonly noticed between headings and cut-throughs.
2.
The relative intensity of roof failure, and relative intensity of the stressfield, is easily represented for a range of mining directions.
3.
A guide to the relative intensity of the two principal horizontal stress components is given by comparison of failure intensity greater and less than 45°.
COMPARISON OF ROOF CONDITIONS IN TAHMOOR Five different RFC's have been identified to describe the range of roof and stressfield conditions noted in Tahmoor development panels (Fig.2), The RFC ! s, curve 2 apart, are defined only for a limited range of 0sr (25° to 65°), because no mining has taken place at the extreme values of 0° and 90°.
Curve 2 shows the rapid deterioration of roof
conditions as 0sr approaches 90°.
In Fig.2
curve 1 represents the best
roof conditions and curve 5 the worst roof conditions.
The areas of mine
development in Tahmoor which are represented by RFC's 1 to 5 are placed on the mine plan to highlight trends, changes or patterns of roof conditions.
Roof conditions in adjacent planned workings can be
projected from such a mine plan.
PREDICTION OF ROOF CONDITIONS AND ROOF SUPPORT Prediction of Roof Conditions Mining conditions within future development workings are predicted by projection from adjacent workings.
Predicted roof conditions will be
best characterised by assigning an RFC to each planned development area. The number of different RFC's required to characterise one or more development panels will be determined from adjacent workings. To determine the expected roof conditions in headings and cut-throughs of a new area, the following is needed: 1.
expected sigma 1 trend in the area
2.
orientation of headings and cut-throughs
3.
determine Gsr (from (1) and (2))
4.
use the roof failure curve typical of the area to determine the expected roof conditions for the Osr values of headings and cut-throughs.
- 134 Roof Support Options Essentially three options of support are used - 6, 7 or 8 bolts per W-strap.
Spacing between W-straps is reduced as conditions deteriorate.
Experience at Tahmoor has enabled roof support requirements, or bolt density, to be related to the intensity of short term roof conditions (Table 3).
Bolt density may differ in headings and cut-throughs
dependent on short term roof conditions (Fig.2).
r f
12
UJ -J
<
r CD
9-
J
a
CO
o H H
a z o
O
i
cn 73
m
Z3
6-
U) H X) >
o
Li.
o o
3-
cc
i 30
l— 60
90
ANGLE OF STRESS TO ROADWAY (6sr) (degrees) FIG 2. Range of Roof Failure Curves (RFC 1 s) at Tahmoor.
SUMMARY OF PREDICTION OF ROOF CONDITIONS IN TAHMOOR Predicted roof conditions are determined for each new area based on conditions in adjacent workings, for which an RFC has been determined. The RFC for each new panel allows the expected roof conditions, and roof support requirements for headings and cut-throughs to be determined for appropriate 0sr values.
The production rate for the likely roof
conditions can be estimated. At Tahmoor roof conditions, and production rates are assigned to the twelve month development plan.
The roof conditions of some panels within
the development plan are expected to change during mining and therefore have a number of RFC's each with a different development advance rate.
IS-07
—135— Acknowledgement Acknowledgement is made to BP Coal Australia for permission to present this paper.
REFERENCES
1.
Gale, W.J,,
Rawlings, C.D., Cook, C., Stone, I.J., Rixon, L.K.,
Enever, J.R., Walton, R.J., Litterbach, N., 1984. An investigation of the stress field and its effect upon mining conditions at Tahmoor Colliery, CSIRO Aust.,
N.S.W., Australia.
Div. Geomech., Geomech. of Coal Mining Rep. No.49,
72pp. 2.
NicholIs, B. and Stone, I., 1986. Development of Strata Control at Tahmoor Mine. The AusIMM Illawarra Branch, Ground Movement and Control related to Coal Mining Symposium, August, Wollongong, p. 109 - 117.
3.
Walton, R.J., 1983.
A study of the behaviour of a bolted coal mine
roof subject to medium/high horizontal stress. Part 1: 2.1 metre long resin anchored bolts. CSIRO Aust., Div. Geomech., Geomech. of Coal Mining Rep. No. 46, 64 pp.
—136—
USE OF GEOPHYSICAL LOGS AS INPUT FOR MINE LAYOUT MODELLING
G.H. McNally Australian Coal Industry Research Laboratory Ltd-, (ACIRL) North Ryde, NSW
—137— 1.
INTRODUCTION
An investigation into geotechnlcal interpretation of downhole
geophysical
logs, and in particular the correlation of uniaxial compressive
strength
(UCS) with sonic log response, has recently been completed by ACtRL.
The
motivation for this project was the need for more cost-effective and realistic rock property input data for numerical and physical models of underground coal mining layouts.
Funding was provided by the Australian
Coal Association, and a more comprehensive account of the results obtained may be found in the End-of-Grant report to ACA (McNally,
1987).
Correlation of geomechanical parameters with sonic and neutron response has reached the stage where downhole logs are now used on a routine basis, along with conventional test results and experience, for specifying model input.
The numerical models are of three main types, in descending scale order,
Vertical sections through lougwall panels, to study caving
behaviour,
stress redistribution around mining voids, interaction between seam workings, and
subsidence;
Plan views of pillar and panel layouts, to select optimum face and pillar widths, estimate depths of yielding, and assess the need for rib support; and
Roadway cross sections, to evaluate optimum dimensions and roof support requirements.
Geophysical logs are principally used for defining strata units (Model Stratigraphy), and in estimating the bulk strength and stiffness of those units.
Geomechanical test results from short cored sections can in this
way be extrapolated
far above and below the mining excavation, the validity
of individual test values can be compared against a continuous record of overburden rock properties, and most importantly
the bulk or
?
rock mass 1
strength of layers several metres thick can be estimated from UCS specimens 0.1 to 0.2 m long.
GMcN-01
—138— During the course of the investigation approximately
1500 test results
(1000 UCS, 400 static elastic moduli, 100 tensile strengths) from 40 drillholes at eighteen sites were compared with sonic log response, and a lesser number with neutron log response.
The test sites were all at
operating or proposed coal mines, and covered a wide variety of sedimentary rocks, with strengths up to about 200 MPa.
Other geophysical logs
(gamma,
density, resistivity) were examined, but found to be less satisfactory for quantitative interpretation.
The principal findings of the study were
that,
-
Sonic log interval transit time (reciprocal velocity) provides a reliable, continuous record of rock strength in coal measures strata, and a relationship between UCS and transit time can be established by exponential regression analysis;
-
Similar empirical relations between UCS and neutron log response can be established, but they are more site specific.
There is also a marked
difference between the apparent neutron porosity of quartz-rich and clay-rich rocks of the same strength;
-
Static elastic modulus can be correlated with both sonic and neutron response, but the sonic correlation is again the more reliable, and in neither case is the correlation as good as that with UCS; and
-
indirect tensile strength can be estimated from sonic transit time, but the correlation is poor.
2.
STRATA UNIT DEFINITION
Where a number of drillholes have been geophysically logged in the vicinity of the mine areas under investigation, the log suites obtained can provide an objective basis for sub-dividing overburden sequences into strata modelling units.
In this respect neutron logs, sometimes supplemented by
gamma, are more suitable than sonic, since layers can more easily be correlated
from drillhole to drillhole.
GMcN-02
—139—
Neutron logs are also better for highlighting strength differences within thick, massive sandstone and conglomerate units, such as the Great Northern Seam roof on the central coast of NSW, or in the Maules Creek Formation north of Gunnedah.
Without the log response, sub-division of these roof
sequences - necessary
for the model to adequately simulate caving - would
have to be arbitrary, due to the absence of obvious bedding planes. log response in these conglomerates
Sonic
is very uniform, regardless of
strength, due to the influence of the 60-80% of chert and volcanic pebbles generally present. finer-grained
These also import a higher sonic velocity
than that for
rocks of equal strength.
Where only one or two logged holes are available in the area of interest the normal situation - sonic logs plus core photographs are used for defining tops and bases of strata units. 1
blocking 1
One way of doing this is by
the log into a stepped profile made up of layers of more or less
constant sonic velocity
(actually constant sonic interval transit time, or
reciprocal velocity, since this Is the parameter presented on most logs, in units of microseconds per foot).
The thickness of each strata unit is
dictated by the geological variability, and by the modelling detail required - since layers close to the mine excavation are much more influenced by stress redistribution than those far above or below it.
3-
STRENGTH ESTLMATION USING SONIC LOGS
The relationship between UCS and sonic log interval transit time (t) measured in microseconds per foot, the usual logging unit, was found to be exponential, and to take the approximate general form,
UCS
=
1000 e"" 0 , 0 3 3
11
MPa
Correlation curves from most test sites were fairly linear above 90 MPa, and the relationship is probably not valid above 120 MPa (where small increases in transit time correspond to large strength increments).
A
typical sonic/UCS correlation curve is illustrated by Figure 1.
GMcN-03
—140— For weaker rock, less than about 60 MPa, this reiatLonshLp
UCS
A00 e ~ 0 - 0 2 6
=
11
becomes,
MPa
Because of the steeper slope of the correlation curve (Figure 2) in this range, the sonic log presentation in terms of reciprocal velocity is actually more sensitive to variations in rock strength below 60 MPa than above it. would
Conversely, a log format in terms of metres per second
tend to emphasize high velocity
velocity
(hence high strength) layers.
For coal, the relationship between sonic transit time is once again exponential, and was found to be approximately,
UCS
250 000 e " 0 , 0 7 6
=
for 45 samples between 4 and 60 MPa.
UCS
=
C
MPa
In linear form this corresponds
150 - 1.04 t
to,
MPa
The exponential relationship flattens out above 30 MPa, indicating that stronger coals will have longer transit times (hence lower velocities) than rock of equal strength.
For coal in the most common strength range, 10-30
MPa, the linear form of the sonic/UCS relationship is sufficiently
accurate
for practical purposes.
Indirect tensile strength (ITS) did not correlate well with sonic transit time, but a composite curve based on 88 tests at five sites was of the form,
ITS
=
40 e ~ 0 - 0 2 8
1
MPa
The poor fit of this correlation curve is thought to be more due to the unreliability of Brazilian test results (relative to UCS), than to the inapplicability of sonic response to the estimation of tensile strength. For coal measures strata UCS is generally
10 to 20 times ITS, and fifteen
GMcN-04
—141— times is reasonable for estimating purposes; this ratio (UCS/iTS) is also known as the Brittleness Index, and may be a useful indicator of rock cuttability and cavability.
4.
MODULUS ESTIMATION
Static modulus of elasticity correlated well with sonic log transit time (and also with neutron response in less stiff samples, below about 18 GPa). sonic/modulus relationship was found to be more site-specific sonic/UCS, highlighting the lithology-dependent also known as the Modulus Ratio*
The
than
nature of the ratio E/UCS,
In coal measures rocks modulus is usually
about 200 times UCS, and the multiplier is about 150 times UCS for coal. Modulus ratios greater than 500 indicate very brittle rock, while less than 100 is characteristic of stress-relieved or highly weathered
samples.
A composite sonic/modulus curve (Figure 3) based on 114 data pairs from three sites was of the form,
E
=
330 e - 0 ' 0 4 2
C
GPa
An alternative method of estimating modulus is by means of various empirical relationships between E, sonic velocity and formation density. These are much used in petroleum exploration, particularly where downhole logs can record both P and S wave velocity which only Vp was recorded).
(unlike the present study, in
An empirical relationship developed during
this investigation was of the form,
E
=
0.044 (p V p 2 ) 1 , 5 7
Where E is static modulus of elasticity
GPa
(not dynamic), p is rock density
(gm/cc or t/m ) and Vp is in kilometers per second (data from 6 boreholes at 2 sites, see Figure 4).
GMcN-05
—142— 5.
ROCK MASS STRENGTH ESTIMATION
Rock mass strength, as opposed to intact specimen strength, is the notional strength of a .joint bounded b l o c k , or of an element within a numerical model m e s h .
The minimum dimension of the element is 10 to
200 times that of the laboratory specimen, and the element is assumed to be weaker in proportion to the degree of fracturing
present.
The rock mass (in-situ) strength for a model element is estimated in a number of steps.
F i r s t , the mean transit time for a particular layer
is estimated from the sonic or simply by choosing a 'best fit T vertical line between highs and lows on the trace.
The average UCS
for that layer is then obtained from the transit time intersection with the sonic/UCS curve.
This is then considered as a single large
test specimen, using a scaling factor based on the following formula (modified from Hoek and Brown, 1981),
Strength Scaling Factor = (d.) 0 ' 1 8
where d and D are the UCS specimen diameter and the minimum element dimension respectively.
6.
CONCLUSION
Geophysical logs, particularly multi-channel sonic, are an essential part of geotechnical investigations for underground coal mining. Uniaxial compressive strength, static modulus of elasticity and rock mass strength can all be estimated from sonic data and used for mine layout modelling input.
Neutron l o g s , while less useful for strength
and modulus estimation, can be helpful in defining model stratigraphy.
GMcN-06
—143— 7•
REFERENCES
HOEK, E. and BROWN, E.T. (1981) Underground Excavations in Rock. Institution of Mining and Metallurgy, London.
McNALLY, G.H. Geotechnical Applications and Interpretation of Downhole Geophysical Logs. End of Grant Report for ACIRL Project A21 to Australian Coal Association, July 1987.
J4,GeoLogs
GMcN-07
— 1 4 4 —
HOGERMAN CREEK FORMATION •
130-
GC6C.66
• GC 5 2 , 7 2 o G SO 1, 2
-120-
oo , 110I O OO o
£< 100 a:
UCS = H 5 0 e " Q
0 3 8 1
( n = 17 5 r » - 0 9 C I M P a
80 -
O2 70 -
6010
20
30
^O UNIAXIAL
SO
60
70
80
90
—i— 100
110
C O M P R E S S I V E STRENGTH ( M P o I
120
130
Figure 1. Uniaxial Compressive Strength (UCS) versus Sonic Interval Time, German Creek Formation 150 K0 no M 5 120 Ui
r
*z 110 <
re 100
80
70
COMPOSITE CONRELAllOfJ CURVE. SAMPLES < 60 MPo 0761 UCS = 102 9e2 MPq (r 3 -0 81,. r = 0 70.n * K2) o Conglome»ole • Sandslone • Sandslone, silly • Mudslone. sill slone, shale, la mini le * Clayslone A Coal
60
?0 30 UNIAXIAL CUMPPCSSIVC SinfFKilll IMPal Figure 2.
UCS versus Sonic Interval Time for Rock less than 60 MPa
GMcN-08
E(GPo)
Figure 3 .
Figure 4 .
Static Elastic Modulus versus Sonic Interval Time
Static Elastic Modulus versus Dynamic Modulus
GMcN-09
—146—
4. ENVIRONMENTAL PLANNING
—148— ENVIRONMENTAL PLANNING AND PRACTICE IN OPEN-CUT COAL MINING
L . C . BELL Department of Agriculture University of Queensland St. Lucia.
Q.
4067
Abstract
Open-cut mining for coal leads to major disturbance of the landscape and
thus
creates
the
environmental insult. therefore, against
potential
for
major
on-site
and
off-site
The immediate objective of rehabilitation programs,
is to reduce this impact by stabilization of the mined surface
erosion;
a long term objective is to return the land to a form
suitable for other uses.
Consideration
of
rehabilitation
requirements
at an early
stage of
mine planning is the most cost-effective method of reducing environmental problems during mining and of achieving the desired post-mining land use. Achievement
of rehabilitation
objectives requires
the reconstructed
landscape
is
such
requirements
satisfied
and
that
are
that erosion, the
surface
that the morphology of drainage
and land use
of
landscape
this
is
capable of supporting vegetation.
The procedures necessary for the design of the recontoured landscape and
the
construction of
the new root zone for plants will
depend on the
nature of the pre-mining landscape and overburden characteristics.
Thus a
physical
of
inventory
of
non-coal
resources
is
an
essential
part
the
rehabilitation planning process.
Geologists can play a major role in this
process
through
their
pre-mine
surface
particularly
characteristics
and
through
participation
their
lands cape •
the
in
the
documentation and
design
subsurface of
a
of
overburden
hydrology
stable
and
post-mining
—149— 1.
INTRODUCTION Although
quarter
of
open-cut
the land
coal mining
disturbed
is responsible
by mining
for
in Australia,
approximately
one
the proportion of
the continent affected is probably less than 0.005% at this time ( 1 ) . local
environmental
however,
can
be
impact
of open-cut
significant.
The
coal mining on surrounding
Environmental
effects
include
land,
increased
sedimentation in streams through erosion of unstable land and reduction in surface and ground water quality toxic
levels
of
elements.
through turbidity,
Thus
most
State
salinity,
Governments
acidity and have
passed
legislation designed to reduce off-site effects from mined land through a requirement for progressive rehabilitation during the mining process. A
well
planned
rehabilitation
program
not
legislative requirements are met with a minimum of greater efficiency and productivity
only
ensures
that
cost but also promotes
in the overall operation ( 2 ) .
In this
paper, an overview of the aspects which need to be considered in coal mine rehabilitation w i l l
be given.
The role of geologists in a number of
the
phases of the rehabilitation planning process is essential, and particular attention w i l l be given to these phases.
2.
REHABILITATION OBJECTIVES The immediate objective of any rehabilitation program is to create a
landscape which is and
rain
damage.
permanently
in
order
A
second
to
reduce
objective
stable against
the erosive forces of wind
both
and
on-site
should
be
to return
off-site
environmental
the mined
condition that allows it to be used in a productive manner.
land
to
a
Following the
temporary use of land for mining, a number of alternative land uses may be established,
viz.
animal
production,
recreational use, w i l d l i f e For
the rehabilitation objectives to be met,
must be satisfied uses
cropping,
involve
(2,3).
commercial
forestry,
conservation or urban development.
Firstly,
the establishment
of
since
two broad requirements
the majority of post-mining land
a vegetative
cover,
the surface of
the
reconstructed landscape must be capable of supporting plant growth in the long
term;
and soil.
the potential
substrates for
Secondly,
slopes and drainage
the
landscape must be compatible with
In certain instances,
these
achieving
alternative
in
strategies
may
the
overburden
and
spoil
the recontoured adequate
there may be l i t t l e f l e x i b i l i t y
rehabilitation
exist,
include
network of
the desired land use and with
erosion control. areas
plants
these
objectives; may
have
in
in
others,
economic
and/or
LCB-01
—150— ecological
advantages.
A systematic approach
to rehabilitation
planning
ensures that the optimum strategy is defined.
3.
PRE-MINE ASSESSMENT OF ENVIRONMENTAL HAZARDS AND REHABILITATION OPTIONS. Many
factors
objectives. greatly
can
Ignorance
increase
the
influence
of
the
limitations
costs of
achievement
to plant
rehabilitation
of
rehabilitation
growth on mined land can
once mining has
commenced.
As an example one can cite the situation where the overburden may contain one or more strata which may be toxic for the nature and extent of these strata involving
selective
developed.
and thus it
growth limitations this
of
these
Such a procedure may involve
machinery,
If
placement
of
information
vegetative
is important overburden
is
not
cover on spoil
plant
growth.
Delineation of
prior to mining enables a mine plan detrimental
materials
the use of additional
to
be
types of
to have information on the potential
spoil
prior
available,
the
to devising cost
of
the mine
trying
to
plan.
obtain
a
contaminated by toxic elements may far outweigh
the cost of the selective placement. Part physical
of
the rehabilitation
inventory
of
non-coal
influence
the
procedures
landscape
and
the
Preparation
of
required
process
involves
on the mine
base-line this w i l l
for
the new
root
zone
for
plants
the rehabilitation
plan
is
also
aided
by
(a)
(b)
glasshouse
of
materials 1
soil
growth
and
overburden,
limiting
factors
and
of
a as
the
construction
design
site
of
characterization these
planning
resources
(c)
the
recontoured (2,3).
laboratory
assessment
of
determination
of
techniques for establishment and maintenance of a vegetative cover at the mine site The
(4,5). base-line
inventory
topography, hydrology, These
factors
are
soils,
of
the mine
site
should
include
climate,
overburden, vegetation and current land use!
considered
in
detail
elsewhere
(2,3)
and w i l l
only be
considered briefly here. 3.1
Climate The amount,
distribution
and variability
of rainfall
evaporation and
temperature patterns have a marked effect
and success
a rehabilitation
of
program
through
their
together with on the
effect
on
nature erosion
and the growth of vegetation. 3.2
Topography Important components of topography are slope,
elevation and drainage
LCB-02
—151— density. from
An assessment
which
can
achieved with
be
the
pre-mine the
topography
elevation
effects of
disturbance more
of
overburden w i l l
elevated
pre-mining surface.
and
which
Knowledge
a
piles.
result
steeper
baseline
which
can
The
be
swell
in a landform
slopes
than
the
Examination of the slopes both within and surrounding
the mine site w i l l
which
slopes
generally
contains
indicate
the degree of recontouring needed to attain a
visual blending of spoil piles with the surrounding
relative
provides
and
subsequent reshaping of overburden spoil
which
is
of
calculated
of
the
stability
pre-mine
drainage
over geological
time,
terrain.
density,
which
is a useful
to design a new landscape which w i l l
has
achieved
starting point from
be stable
to erosive
forces.
Generally, however, a greater post-mining drainage density may be required to achieve stability because of the generally higher elevation and steeper slopes of the recontoured landscape. 3.3
Hydrology Open-cut
subsurface
coal
mining
hydrology.
can
drastically
alter
the
The importance of characterising
surface
and
the surface water
flows prior to mining in rehabilitation planning has already been referred to.
Underground water
may
affect
not
only
users.
The
floors;
in the USA,
flows may be cut by the mining
post-mining
possibility
of
land
these
use
effects
options
is
process,
but
greatest
also
and
this
downstream
in alluvial
valley
mining in such areas is prohibited unless it
can be
demonstrated that the aquifers can be reconstructed following mining. 3.4
Soils The
include
potential
overburden
substrates spoil
and
for
plant
growth
soil.
Soil
is defined here as the
at
open-cut
coal
mantle (1-2 m) of pedogenic material consisting of an organically surface
(A)
matter
and
horizon
underlain
interfacing with
rock (C horizon).
by
the
a
subsoil
overburden
(B)
horizon
through
to
document
rehabilitation site
during
conducted soils with
the
programme,
the
early
of
organic
weathered
soil.
Soils covering a typical mine lease are likely order
a zone
enriched
in
The overburden can be considered to be all the material
lying between the coal and the surface
In
low
mines
surface
early enough,
soil
resources which may
it
essential
is
planning it
has
problem engineering
stages
to be quite diverse. in
the
to prepare a soils map of
the
of
is
the
be
available
project.
If
the additional
advantage
of
features
the
of view
construction, building foundations,
from
point
this
highlighting of road
dam construction and so on.
LCB-03
-152The properties of soils vary both laterally and vertically. apparently
uniform
soils,
material
lower
in
the
profile
Even in
may
differ
markedly in its plant growth characteristics from that at the surface. Australian
soils,
increases
depth are common. the
chemical
horizons
of
Laboratory
in
the
levels
of
salinity
properties
each
major
of
the
characterization
chemical
factors
such
limiting
plant
growth
physical
limiting
tests
sodicity
In with
In devising a rehabilitation plan, it is important that
and physical
of
of
soil
soil
the various types
on
are
as
salinity
and
the
samples w i l l
factors
available
and
ease
(6). for
acidity of
surface
the
mine
testing
and
of
of
a
subsoil
measured.
preliminary
the likelihood of other of
physical
amelioration
A range
and be
provide
assessment of the availability of plant nutrients,
non-nutrient
and
factors
of
nutrient
laboratory
chemical
and
these have
been
soils,
and
and
summarized by Bell (1981)
( 5 ) , and Hannan (1984)
(3).
Ideally,
glasshouse
trials
of
types
should
follow
with
the
horizons
each
of
the
soil
the
laboratory analyses to confirm the plant response predicted from the soil tests unless this has been previously
conducted for
the range of soils in
the particular locality in connection with neighbouring mining operations. 3.5
Overburden As
material
indicated lying
previously,
between
the
overburden
soil
and
the
can be
considered
coal layer;
between two coal
seams is commonly called inter bur den,
the deepest
coal
seam is called underburden.
underburden
commonly
addition
unconsolidated
to
consist
of
surficial
alluvium
all
the
lying
and the rock below
Overburden,
sandstones,
as
the material
interburden and
mudstones
and
shales
in
but may
also
include
an
to
development
upper layer of basalt or other volcanic rock. Characterization delineate
those
detrimental
to,
rehabilitation properties
of
strata
overburden
prior
which
are
likely
revegetation
is
an
planning.
can allow
a
the likely
this
and
planning,
part
effect
Geologists
of rehabilition
beneficial
knowledge
and ground water quality after mining. aspect
mine
be
essential
Additionally,
prediction of
to
this
of of
for,
to or
pre-mine overburden
of spoil on surface
can play a key role in
topic
is
discussed more
fully in Section 4 . 3.6
Flora and Fauna In those
is desired,
cases where a return to native
plant
a base-line vegetation survey prior
species after mining
to mining w i l l assist
in
defining those species which are climatically suited to the area and which
LCB-04
—153— may be useful
components of
it
increasingly
is
being
the post-mining vegetation ( 7 ) .
realised
self-sustaining
ecosystems,
mining
a
provide
and
yard-stick
fauna
surveys
against
post-mining ecosystem stability 3.7
that
play
of
faunal
which
the
can be measured
Additionally,
an important
role
in
populations
prior
to
success
achieving
in
(8).
Pre-mining Land Capability and Use The capability of land is a measure of its capacity to be used for a
given
purpose
indefinitely.
The
land
use
prior
to mining
may
not
be
appropriate to its capability with the result that land degradation may be occurring.
Documentation of both land capability and use provides a guide
as to what can sensibly be achieved in the post-mining landscape.
4.
OVERBURDEN SAMPLING AND ANALYSIS After
the exploratory
undertaken
drilling
phase,
to delineate more accurately
pattern drilling is
the quantity
generally
and quality
of
the
coal reserves.
Geologists commonly use the overburden samples obtained in
this
to
operation
development, of
e.g.
potentially
stability
of
however,
that
measurement Essential
gain
hazardous
spoil
(9).
overburden
to
relevant
future
mine
the occurrence
blasting
requirements
and
is
still
universally
recognized,
samples
not
should
also
be
future
retained
to the future rehabilitation
for
program.
information which can be derived from these samples includes
major
water
quality
of various
toxic materials such as pyrite which
problems
strata
during
to support
and
plant
after
growth.
necessary for early decisions to be made regarding toxic
to
the It
properties relevant
the presence of potentially
ability
information
consequences of mining,
faults,
piles
these
of
additional
the hydrological
strata
required.
and
whether
Unfortunately
soil
retention
and
mining
(a)
can lead
and
(b)
the
Such information
is
selective placement of
replacement
on
spoil
is
there are a number of examples in Australia where
failure to fully document the properties of overburden early in the mining process has led to prohibitive rehabilitation costs at a later 4.1
stage.
Sampling Intensity Like
soil,
and vertically,
overburden varies
measure of this v a r i a b i l i t y . guidelines et a l .
characteristics
both
by Sobek et a l .
(11) and Sendlein et a l .
programs
conducted
laterally
to obtain a
Comprehensive coverage of sampling intensity
is given in publications
(1980)
research
in its
and the sampling intensity must be sufficient
by
the
(1983)
(12).
University
of
(1978)
(10),
Barrett
In the rehabilitation Queensland
for
coal
LCB-05
—154— mines,
samples
are
collected
across
the
proposed mine
possible
subsequently
analyzed
is
at
1
varied
m intervals path.
from
as
many
The number
of
1 m increments
depending
on
stratigraphy
holes
and
as
initial
reconnaissance analyses. 4.2
Analyses The properties
of overburden material
below
the zone of weathering
may change significantly when exposed to the atmosphere following mining. Physical changes such as slaking and dispersion are common with solid rock being reduced to fine-sized material
in a few years.
Important
chemical
changes include the leaching of soluble salts and the oxidation of pyritic minerals to produce acid.
It is important,
therefore,
weathering
on
are
taken
into
account
when
unweathered
overburden
samples
are
being
assessed
in
properties
future properties of overburden spoil.
that the effects of the
analyses
the
light
of
Simple laboratory weathering
on the
tests
can provide valuable information on the nature of the future spoil. The
overburden
planning have Australia made,
analyses
been well
(3,5,14)
however,
and will
about
considered most
useful
documented elsewhere for
important
rehabilitation (10,11,13)
and
Brief
comment will
be
not be detailed here.
the most
for
the USA
factors requiring
assessment
in
coal mine overburden in Australia. 4.2.1
Active and potential
acidity
Most
a
growth.
plants
require
pH value
between 5 . 5
and 8 . 5
for
adequate
While pyrite - containing overburden may have a pH value in this
range in the unweathered state, its pH may rapidly decrease to less than 3 with the oxidation of the pyrite. sterilized such
for
the growth of
overburden
concentrations quality
and
of
capacity hazard
can
thus make
Additionally,
be
extremely
acid
it
difficult
for
is effectively
surface runoff
and
have
companies
from
high
metal
to meet
water
regulations.
Measurement amount
spoil
At this pH, the material
plants.
pyritic
of
the
sulphur
total and
potential
of other overburden minerals
associated
with
each
acidity
comparison with
by
assessment
the inherent
allows a determination of
strata.
Where
such
of
the
neutralizing
acid-base
the acid
accounting
predicts an excessive net acidity,
the pyritic overburden should be either
selectively
placed
at
depth
subsequently
non-pyritic
overburden
spoil
or or
soil
in
covered
the
with
post-mining
a
layer
of
landscape.
Pyritic overburden is found in a number of mines in the Bowen and Sydney Coal Basins and in the Collie f i e l d in Western Australia.
LCB-06
—155— 4.2.2
Salinity High
levels
of
soluble
plant
growth
on
runoff
from
the mine
Many mines
in
the
site
Bowen and
several
permeable,
wet
seasons,
in
spoil
being
high in salt to significantly relatively
salts
the resultant
overburden
and also
unsuitable
Sydney
Coal
can inhibit
lead for
stock
Basins have
affect plant growth.
however,
salt
but
process
the
to the
reduce water
and
agriculture.
spoil
sufficiently
Where the substrate is
w i l l leach out is
or
surface
of
extremely
the root
slow
in
zone
in
relatively
impermeable high clay material. 4.2.3
Sodicity Toxic
levels
of
salinity
in
sedimentary
associated with high levels of sodium which following
the reduction in electrical
leaching.
Exposure
spoil,
this
and
is
of
sodic
one of
strata
the major
materials
conductivity can
are
can result in clay
thus
at the surface
cause
limitations
severe
often
dispersion through
crusting
in
to the establishment
of
vegetation on spoil at many coal mines in Queensland and New South Wales. 4 . 2 . 4 Nutrient
availability
Overburden and
less
copper
spoil
commonly
and zinc.
addition.
is
in
These
Less
commonly
potassium
deficient
and
deficiencies
easily
in
some of
nitrogen and
are easily rectified
rectified
is
phosphorus
the micronutrients
the
dearth
by of
such
as
fertilizer beneficial
micro-organisms which increase availability of various nutrients to plants and which
are
normally
Such organisms w i l l layer
of
fresh
present
slowly
soil
on
in
soil
but
absent
colonize vegetated spoil, spoil
ensures
their
in overburden
spoil.
but replacement of a
rapid
return
to
the
new
landscape. 4.2.5
Physical
properties
The physical ameliorate, the
more
properties of a medium are often the most difficult to
and
thus often
dictate
the yield
easily
altered
chemical
and
potential
for
microbiological
plants
after
properties
are
changed. A suitable root zone for
plants
should have a good available water
capacity but be sufficiently well drained so as not to affect root growth through
lack
mechanical
of
aeration;
impedance
to
additionally the
properties are a function of its
stability.
expanding
the
medium
root
should
system.
not
All
of
provide these
the pore size distribution in the medium and
This distribution,
in turn,
is determined by the primary
particle size distribution and the aggregation of these
particles.
LCB-07
—156— spoil
is
fine-grained
Overburden
sediments;
in
some instances,
as
dominate
to
produce
sandstone
capacity
but moderate
the Bowen and Sydney
a
heterogeneous
spoil
Basins,
mixture
and such
which
to high hydraulic Coal
coarse-
coarse-grained materials has
a
of
low water
conductivity.
the overburden
tost
holding
commonly
contains a
in
significant
proportion of fine-grained material such as shales and mudstones to give a spoil
which
has
conductivity.
moderate
to promote surface rainfall,
to
high
available
Lack of aggregation of crusting
water
particles
through particle
but
poor
in weathered spoil
capacity
tends
sorting under
the action of
and this can be aggravated by dispersion of the colloid fraction
which is commonly sodic.
5.
CONSTRUCTION OF THE PLANT GROWTH MEDIUM In
constructing
a
suitable
medium
for
plant
growth
in
order
to
achieve a particular land use goal, a decision must be made as to whether the root zone is to consist of soil alone, Characterization
of
the properties
of
soil plus spoil or spoil alone.
soil
and spoil
(Sections 3 and
4)
allows a rational judgment to be made on this matter. Soil should be conserved and used in the rehabilitation program when overburden material
cannot
after
treatments
costing
soil
applied.
and
ameliorative replacing
retention are of
the
the
are
of
the
Generally,
multiplicity
however,
achieved more quickly with cropping land, where
the
the desired post-mining land use up to
most
soil
that
involved
Cost-benefit
complicated by the difficulty
effects
growth.
support
of
factors
retention.
which
show
Indeed for
is
to
return
the
native
soil
use
plant
goals
re-instatement
soil retention and replacement is essential.
intention
of
the magnitude
influence
land
even
conserving
analyses
in quantifying
analyses
in
vegetation
are of
Additionally, after
mining,
replacement of fresh surface soil is the most economical and reliable way of
ensuring
exist
in
the re-establishment
native
selection of
ecosystems.
soil horizons,
of
When
the wide soil
is
diversity conserved,
of
species which
decisions
on
the
optimum depth of replaced soil and the effect
of stockpiling all have to be addressed
(2).
Selective handling of overburden layers may be required material which is not suitable for land use goals by contaminating
plant
(a) to bury
growth or which may also affect
surface and groundwater
or
( b ) to retain
desirable root zone material. As
indicated
previously,
adverse
properties
of
overburden
strata
LCB-08
—157— which
may
limit
plant
growth
Where
the
major
portion
of
the
include
be
undertaken
selective
handling
should
suitable
strata
at
the
recontoured
adverse
strata
make
up
a
procedures
should
small
be directed
acidity,
overburden
proportion
ensuring
those
the
sodicity. properties,
placement
In of
and
undesirable
to ensure
surface.
towards
salinity
has
of
the most
cases where
overburden,
the material
the
handling
does not
end
up at the surface. Even when a decision has spoil,
the
total
depth
of
been made
soil
plus
to replace
spoil which
a layer of
should
be
root growth should be at least 1 m and preferably 2 m depth. will
ensure adequate water reserves for
a buffer
against
occur from underlying of
spoil
6.
LANDSCAPE DESIGN
toxic
spoil.
final
landscape
over for
Such a depth
seasons and provide
and/or
The mechanics
is discussed by Hannan ( 1 9 8 4 )
The
plants in dry
the upward movement of acidity
soil
suitable
salinity which may
of
selective
placement
(3).
should
be
compatible
with
the
desired
post-mining land use, adequate erosion control and drainage requirements. 6.1
Land Use and Erosion Requirements The
greatest
re-instatement fertile close
soil to
with
its
rotational 14% with
of
constraint cropping low
slopes
original
(<
contours,
basis with appropriate
in landscape land.
pastures erosion
design
is
associated with
Prime
agricultural
6%) would
be expected
but
can
land which
is
established
on
be
control
measures
such
to
land to
be
be
cropped
slopes
as
the
which
has
reinstated on a
up to about
contour
banks
and
waterways. The establishment of pastures poses fewer limitations on recontoured landscape, with associated proper
slopes up to 18 to 20% being possible as long as they are
with
appropriate
management
soil/spoil
to
benching
ensure
surface.
The
to
pasture
use
of
reduce
vigour
conventional
slope and
length
and
with
protection
of
the
agricultural
machinery
is
also limited on slopes > 20%. Where the intention is to establish the
native
appropriate rainfall advocated.
vegetation
after
mining,
benching
to
reduce
slope
intensities
are
high,
however,
Such
a
limitation
is
commercial forestry or to return
slopes
>
length. and
20% In
slopes
particularly
vegetation establishment where retention of a soil
may
be
northern less
important
used
with
Australia,
than with
20%
are
native
layer may be necessary
LCB-09
—158— to
provide
a
source
of
propagules;
the
replaced
soil
is
particularly
vulnerable to erosion on slopes > 2 0 % . 6.2
Drainage
Requirements
The f i n a l
landscape must be such that runoff
the mine area to adjacent density r e q u i r e d w i l l , for
the
to
be
particular considered
given by Hannan Other assessing
7.
Detailed
drainage
input
from
flow
into
the depression
(15).
water
The drainage
the management
discussion
requirements
of
for
the
units
factors
mined
land
is
essential
are
in
void and the s t a b i l i t y
of
geologists the f i n a l
is
CONCLUSIONS A major factor
is
desired.
the size of
(3).
where
likely
the faces l i n i n g
use
can be conducted w i t h i n
excessive erosion.
influence
assessing
(1984)
areas
the
in turn,
land in
streams without
preliminary
i n achieving
assessment
of
successful r e h a b i l i t a t i o n
landscape
post-mining
limitations
overburden
characterization
are
planning.
Because
of
their
expertise
major
to
in
ensuring
role
play
to
plant
growth.
thus
that
o b j e c t i v e s and with a minimum of
stability
and
of
of mined the
land
potential
Landform,
hydrology
important
facets
of
rehabilitation
in
areas,
geologists
these
companies meet
their
and
have a
rehabilitation
cost.
REFERENCES 1.
Bell,
L.C.
(1986).
Australian Press, 2.
Hannan,
J.C.
G.H.
Mining.
Soils
Brisbane,
pp.
and B e l l ,
L.C.
Martin
In J . S .
- The Human
Russell and R. F. Impact.
Hannan, J . C .
(1986).
Coal Mining
4.
Bell,
L.C.
Practice.
Parkville.
Mine R e h a b i l i t a t i o n .
Mining Industry.
pp.
P.C.
(1975).
5.
Bell,
L.C.
(1981).
R e h a b i l i t a t i o n of mine wastes
Mildura,
A systematic approach
fertilizer
requirements
Australian
Mining
September,
198 1,
for
Industry
Canberra,
the
pp.
Third
National
T26-T28 .
to the assessment of
rehabilitation
Council pp.
the Coal
Sydney.
in Northern A u s t r a l i a - problems and approaches. Chemical Engineering Conference,
In
Australian
233-252.
A Handbook for
New South Wales Coal A s s o c i a t i o n ,
and Whiteman,
(Eds.). Queensland
Surface mine reclamation.
( E d . ) Australasian
(1984).
of
444-466.
I n s t i t u t e of Mining and Metallurgy, 3.
Isbell
University
Environmental
of
mine
wastes.
Workshop
21-24
15-36.
LCB-10
—159— 6.
Bell, L . C .
(1985).
Opportunities and constraints in achieving land
use goals.
Proceedings of Seminar on Coal Mining as a Land Use.
8-9 August,
1985, Brisbane.
Australian Coal Association,
Sydney,
Re-establishing A u s t r a l i a ' s
flora
pp. 240-255. 7.
Ford, R. and Langkamp, P. on
mined
(1987).
areas.
Environment.
_In_ Mining
and
the
Return
of
Australian Mining Industry Council,
the
Living
Canberra.
pp.
10-14. 8.
Allen,
N.T.
and
(1987).
the
Welcoming back the native w i l d l i f e .
Return
of
the
Living
Industry Council, Canberra, 9.
Merritt, R . D . and
(1983).
Premine
Environment.
pp.
Mining
15-19.
Coal Overburden.
Planning.
In Mining
Australian
Geological
Noyes Data
Characterization
Corporation,
Park Ridge,
New
Jersey. 10. Sobek, A. A . , Field
Schuller, W.A. , Freeman, J . R . and
Laboratory
Minesoils.
Environmental
EPA-600/2-78-054, Cincinnati, 11. Barrett, J . , R.D. ,
McWhorter,
Mines.
U.S.
and Smith, R.M.
(1978).
Applicable
to
Protection
Technology
Environmental
Overburdens
and
Series
Protection
Agency,
Ohio.
Deutsch,
Recommended
Methods
for
General
P.C.,
Ethridge,
D.B.
and
F.G.,
Youngberg,
Franklin, W . T . ,
Heil,
A.C.
(1980).
Procedures
Overburden
and
Hydrologic
Studies
of
Surface
Technical
Report
INT-71,
Forest
Service,
U.S.
Ogden, Utah. 12. Sendlein,
L.V.A.,
(Eds.)
Vazicigil,
(198 3 ) .
H. , Carlson,
Surface
Reclamation Handbook.
chemical
western
analysis
United
States.
C.L.
and Russell, H. K.
Environmental
Monitoring
and
Elsevier, Amsterdam.
13. Sandoval, F.M. and Power, J . F . for
Mining
(1978).
of
Laboratory methods recommended
mined-land
spoils
Agriculture
Handbook
and
overburden
No.
525,
in
USDA,
Washington D.C. 14. Anon ( 1 9 8 3 ) .
Chemical Characteristics of Overburden from Surface Coal
Mines in the Upper Hunter Valley.
Hunter Valley Technical Report
No.3, State Pollution Control Commission, 15. Seedsman, R.W.
and Williams, D . J .
rehabilitated
strip
Professional
Approach.
(1987).
coal mines.
In
20-21 July,
Institute of Mining and Metallurgy,
Sydney.
Long term stability of Mining and Environment - A 1987, Brisbane, Parkville.
pp.
Australasian
27-32.
LCB-11
—160—
ENVIRONMENTAL IMPLICATIONS ARISING PROM THE UNDERGROUND EXTRACTION OP BITUMINOUS COAL
R.A. Hughson Floor 29 Legal and General House Department of Mineral Resources 8-18 Bent Street SYDNEY NSW 2000 Telephone:
240 4535
—161—
1.
INTRODUCTION
1.1.
WHY IMPLICATIONS The very nature of undertaking extraction results in change to the natural order.
Undertaking extraction in an
underground or covered environment, magnifies the degree of effect on this natural order change, particularly as depth increases. The reason for using the word implication in the title is to extend the suggestion of involvement towards an intertwining of many factors which result in environmental change, some of a temporary nature and some geologically permanent. From the time when early man sought flint and later metallic ores, clay and building stone, homo sapiens has modified the natural order.
The industrial revolution
period was when man began to question his industrial activities.
Gordon Bottomley born in 1874 wrote in his
poem - "To Iron-Pounders and Others". "When the old hollowed earth is cracked, And when, to grasp more power and feasts, Its ores are emptied, wasted, lacked, The middens of your burning beasts. Shall be racked over till they yield, Last priceless slags for fashionings high, Ploughs to make grass in every field, Chisels men's hands to magnify. Already towards the end of the 19th Century man was expressing his concern about an unfavourable environment, developing due to industrial expansion RH-01
—162—
Todays attitudes are an extension of this concern which has been expressing itself for over 100 years. When the implications of our historical past and present day needs are recognised, the difficulty of securing an idealistic solution can be gauged. Much of the past is viewed from a subjective and emotional standpoint, especially by those who have lived with it, accepted it for what it was, why it was there and had their own vested interest to protect; owner, manager and worker alike. This intertwining of vested interests has been under challenge for many years both internally and externally, a struggle between enlightenment and entrenched attitudes, oblivious to the strengthening wind of attitudinal change as the levels of community expectation heightened. No longer can we ignore the expressed views of the community, supported by a level of expertise equal to our own, capable of erudite expression and often in fundamental opposition to our own professional preferences. It is to meet this challenge, a result partly of our own past inadequacies, that all extraction and particularly underground extraction within or close to populous areas, has to achieve a level of environmental purity, acceptable to the more aware and hopefully responsible members of our society.
Failure can only increase antagonism and
encourage those of the opposing viewpoint, who seek to place ever increasing levels of constraint and compliance on the extractive industries. RH-02
—163—
2.
The Environmental Issues.
2.1.
The Visible Surface. Community awareness of mining as practiced underground is limited to what can be seen on the surface and what is fed to them through the media, - usually highly sensationalised due to tragedy or industrial disputation, - and through visits to operations and museums, akin to biased sampling because of the obvious limitations of such exposure. From a geologists 1 point of view there are specific matters of surface interest where his or her professional expertise is necessary, to ensure minimum surface disturbance and the prevention of unnecessary vandalism. Other aspects are just as likely to be of importance to a geologist as to other community members.
Let us first
consider the more general aspects of environmental intrusion likely to result in temporary or permanent change. An underground mine compared to an open cut mine has substantially less visual impact and in many cases is only known to a small proportion of the local inhabitants. What can be seen are pit head buildings, including a washery if one is required, power lines, pondage for water storage, product coal disposal facilities and stockpiles, of which reject will become one of the few permanent reminders of a colliery 1 s existence.
A well constructed
and rehabilitated reject stockpile can result in enhancement and the provision of additional useful land. RH-03
These facilities are mostly capable of removal at the cessation of operations or of being constructed to blend in with the surroundings, ensuring permanent acceptance when finally rehabilitated. Modern colliery surface structures are designed to blend in with their surroundings. The most recently constructed colliery surface sites are a credit to the companies and to the industry. As examples one can nominate Cordeaux and Tower Collieries, placed in environmentally sensitive areas and both blending in to their environment in an unobtrusive manner and meeting with the stringent lease conditions imposed. Prior to any mining taking place we are required to prove up the resource through drilling, to obtain samples for assessment purposes and gain structural knowledge. This is usually the first stage likely to suggest environmental interference, through surveying especially in timbered country and establishing access roads and drill sites. The more difficult the terrain, usually the greater the environmental interference. Once the deposit is shown to be worthy of more detailed examination, larger samples are usually sought, thus requiring the excavation of both waste and product materials with such activities beginning the process of permanent change. Provided that all of the activities are carried out in a responsible manner, the extent of permanent change should be minimal. Drill sites should be cleaned up before leaving, roads can be scarified to promote new growth, and drill holes, surface drifts and shafts plugged according to imposed conditions. Given natures ability to rehabilitate itself, lasting damage should be totally avoidable. RH-04
—165—
Even where an underground colliery has existed for years, its location, once the site has been cleared, may leave little more than lasting memories and to illustrate this point, how many people here could walk to the site of Balmain colliery.
The most likely lasting effects from underground extraction and the one likely to have the greatest impact during the extraction phase is subsidence.
Unless extraction is
limited to first workings, which is simply excavating roadways to form pillars of coal, the degree of subsidence is likely to result in significant topographical change. First workings are unlikely to be economically viable and are certainly going to result in an unsatisfactory level of resource recovery.
Surface movement resulting from underground extraction will vary from the accepted minimum of 20mm, to a measured maximum for New South Wales which is of the order of 65$ of seam working thickness, which for a 3.0m seam working height^ results in lowering the ground surface by some 1.9m. Where a number of seams are extracted in the same area the effect is cumulative. The low end of the scale is reached at the extremities of the angle of draw and the most pronounced movement occurs towards the centre of the total extraction panels, of super critical widths.
Subsidence must not be viewed only as movement resulting in topographical change.
It is a mechanism producing ground
strains during the active phase which open up cracks, push structures laterally and cause tilt which is usually self correcting.
The results of subsidence can be significantly
magnified by changes in the terrain and the proximity of outcropping or near surface strata and conversely, RH-05
—166-
ameliorated by unconsolidated sediments and sediment type. Our understanding of subsidence can allow us to design a system of extraction which can meet all conceivable needs. The problem is often having an economically viable system of extraction.
Anything less than total extraction accepts
some degree of sterilisation. When considering what criteria should be addressed, the range includes seam depth, extraction thickness, extraction panel width, angle of draw, cover rock types, seam floor and roof characteristics, geological structural features, ground water regimes and surface topography. Subsidence creates conditions which when controlled, has no marked long lasting effect on both natural and man made structures. When control is not fully exercised, unacceptable levels of damage can occur.
Even.where terrain changes occur,
correction can be undertaken at a price.
The aim is to
minimise the cost and disruption caused; any assessment should take into account the loss of resource likely to occur due to sterilisation and the cost of introducing modern technological developments to prevent both disruption and sterilisation. 2.2.
Underground and out of sight. The saying, "What you see, you get" does not apply to underground coal extraction. The whole sub-terrainean environment is altered due to both removal and displacement.
Coal mining takes place over
substantial areas due to its lateral development.
RH-06
—167—
The least disruption in a geological sense occurs in the strata closest to the surface and the greatest disruption at the point of extraction.
In between, strata beds fail and distort breaking into discrete blocks within the caved goaf area, above which the forces of strain cause fissuring and bed separation occurs. Depending upon the depth of mining, the fissuring becomes less pronounced as the surface is approached.
Differing
rock types also control the degree of fissuring and cushioning, exerted above the main zone of failure.
Drill
holes as you known show the ability of plastic type rocks to displace and close voids, so yielding rock beds can influence the effects of strata displacement, deformation and failure.
The resources existing within sedimentary strata extend beyond coal to water and petroleum, both of which are likely to be affected by strata dislocation.
The degree of
protection to be given will dictate the extent to which coal can be removed.
The principles of subsidence apply to
the intervening strata between the seam and the surface and our N.E.R.D.D.C. borehole research project is establishing the behaviour characteristics of this twilight zone, covering vertical movement, permeability and bulk density change.
An improved understanding of this zone's characteristics will improve our ability to relate the potential of subsurface strata to predictable levels of dislocation.
This
is particularly important as the upper beds integrity controls the downward flow of surface waters, such as exist above coastal mines and support impounded waters which sterilise substantial areas in the Southern Coalfield.
RH-07
—168—
Similarly migration of gas and fluid from both above and below a worked seam can be detrimental and exercising control is necessary if those resources are to be managed responsibly. Finally, we come to disposal of waste material both solid, liquid and gaseous which result from mining activities. Waste rock and wash plant reject are generally disposed of by surface emplacement, water is utilised after being pumped for coal treatment and if being discharged requires treatment itself.
Hydrocarbon gas is generally removed
from underground as a component of the exhausted ventilation air current.
At two mines in N.S.W. the gas is
being recovered through "in seam" gas drainage technology to fuel an electrical power generating system.
At two
others the gas after drainage is exhausted to the atmosphere. Pan ventilation though outside the area of geological interest is acknowledged as an environmental problem, to which engineering solutions exist to ensure compliance levels can be attained. 3.
Conclusions. This presentation aims to show how geological knowledge and its application integrates with the environmental problems associated with underground coal mining. In many cases, only through a thorough understanding of the geological setting can the solutions to some of our environmental problems be found because of the problems occurring in this geological setting. The few departures into the unrelated areas of engineering which have no geological significance, are included to RH-08
—169—
complete the picture of environmental implications, of which we must all remain aware irrespective of academic discipline.
RH-09
—170—
5. COAL TECHNOLOGY
-172-
OOAL PREPARATION AND POSSIBLE FUTURE DEVELOPMENTS
Author
Mr. N.W. Gibson School of Applied Science - Division of Materials Technology Wollongong College of T.A.F.E. P.O. Box 1223 North Wollongong N.S.W. 2500
Abstract The preparation of coals for coke in the metallurgical industries has been aligned with the technological progress in the ironmaking blast furnace. Coke consumption in the blast furnace has been reduced considerably through a series of operational and technical changes, in which coal preparation and coal blending has contributed to improved chemical and mechanical properties of coke. The techniques of coal preparation are reviewed and the limitations of coal cleaning units are presented as they relate to
the coke making process. Enhancements to present ironmaking
practice and new developments that involve non-coking type coals for smelting reduction, are discussed in the context of cost considerations for steelmaking
routes. Coal preparation is anticipated
to follow the
teclinological requirements of the ironmaking process, with attention to the lowering of ash content, sulphur content and moisture content. Microwave technology, involving coals, is emerging with an alternative process for metal smelting.
—173— Carbon based
fuels
have
long
enjoyed
a
unique position
in the
metallurgical industries, serving the functions of energy
source, either
directly
through power
in the
form
of heat energy or
indirectly
generation, or as a reducing agent, in the form of solid carbon or carbon monoxide gas.
Ironmaking The mainstream of development in the preparation of coals, coke or carbon monoxide
fuels and
reducing agents,
technological progress
in the
has been
through years
ironmaking blast furnace.
of
In turn the
ironmaking developments have been structured by new demands in subsequent steelmaking practices. In large steelplants, based on blast basic oxygen steelmaking
furnaces and
units, the concept of strict raw material and
liquid iron composition has been practiced
to optimise the heat balance
and reactions in the steelmaking process. The preparation of coal as a raw material for coke in the blast furnace is critical to the furnace operation. Coke has four major functions: (a) It
is
the principal
source of heat energy arising
from
the
combustion of carbon at the tuyere region of the blast furnace. 2C + 0 2 = 200
AH298K = -222,000 kJ kgmol-*
(b) Hie carbon monoxide gas produced, provides reducing
conditions for
the metallies in the furnace charge. Fe203 + 300 = 2Fe + 3002 (c) The coke
layers, shown
retained through
in figure
the cohesive
1, formed during charging, are
zone where the metallics undergo
softening and melting and restrict the permeability gas. The well defined
coke slits
in this
of the reducing
zone permit both
permeability and efficient gas distribution.
NG-01
—174— (d) Coke in the lower zones of the furnace supplies the carbon for combustion and ore and coke layers
supports the raw material burden in this high temperature zone. Hence the high
temperature
mechanical
and
chemical properties of the coke are essential.
Figure 1 Schematic of blast furnace zonesJ Raw materials The developments in the technology of preparation of raw materials for the blast furnace and operational efficiencies has significantly reduced the consumption of coke2-6 as shown in figure 2. The review period suggests a lowering of coke rate from
1200 kg/t of iron produced in
1924 to the
current rate of around 460 kg/t with the the gains of the 1960/80 period being quite pronounced.
It is suggested that no single factor has
contributed to the reduction in coke rate as many operational features, such as furnace size, charging methods, raw material preparation and blast temperature, have been improved.
However within the
raw material
preparation area the technology has been centered on the blending of coals to achieve the optimum properties for coke making7. 1400' -
o>
1200"
JC
£< 1000AC
ULi 800 O o 600 -
nn n n
400 -
t> o o
o>
0)
in 00 05
YEAR
Figure 2 Blast furnace coke rate The factors that have been considered as optimising the properties for the blending of coals include ash content, swelling
index, reflectance,
fluidity, volatile matter and composition. Where indigenous prime coking coals are available for the ironmaking unit, attention has been centered
NG-02
—175— on providing consistent ash content and swelling/fluidity characteristics. Blending, for producers without indigenous coking coal a number
of supply
sources, is
blend properties would
generally very
be consistent
resources and with
extensive, although
the
with comparable specifications
for
ash content, reflectance and fluidity.
Coal preparation The
selection
of
coal
cleaning
equipment
to
satisfy
specifications requires a knowledge of the nature of an
assessment
profitability. Considering
of
the
equipment
the technical
efficiencies of
and
coal
of
cleaning equipment
the
product
economic
measures
only, the
performance
context are
the
the coal, the design
influenced by
four
of
major
factors: (a) The density/mass distribution of the feed coal. (b) The size distribution of the feed coal c (c) The relative density of separation of the coal. (d) The design characteristics of the equipment.
The objective of coal cleaning equipment is to at the chosen
relative density.
achieve a sharp separation
Figure 3 presents
an assessment
relative efficiencies of the principal coal cleaning units® coal by
density and
examined. A
mass
prediction
indicies) has been
distribution is
of the
yields
established using
used for
and
each
ash contents
typical design
of the
A conmon feed of the
units
(presented
as
partition data
for
each of the units. RD
3
-
1
2
3
4
ASH
5
1.8
6
7
INDEX
Figure 3 Coal cleaning efficiencies
NG-03
—176— The dense medium units are essentially independent of separating density and show high efficiency over the full range of separating densities. This feature is a characteristic of dense medium coal cleaning units in achieving a sharp separation independent of the
density and mass
distribution of the incoming coal feed. In practice, and with close control of operating parameters, dense medium units are able to accomodate around 25% of "near density" material within io.l
of the separating
density. The sharpness of separation for the dense medium units is dependent upon size distribution, dense medium baths generally have a lower size limit of 6 ran below which there is a pronounced deterioration in efficiency. Dense medium cyclones have high efficiency for a wide size range from 40 nun down to 1 mm, with a marginal decrease in efficiency down to 0.5 ran and pronounced decrease in efficiency for sizes below below 0.3 ran. Jigs, Tables, Spirals and Water Cyclones show the greatest variation in separating efficiencies. Within the separating mechanism of these units is the function of particle settling velocity, which is proportional to both particle density and size, hence the efficiency of separation will be maximised by maintaining a uniform feed size distribution. Jigs however, are capable of handling a wide size range, with reasonable efficiency and when separating at relative densities above 1.60. The jig is particularly susceptible to misplacing material when the amount of near density material exceeds 7-10%. With a uniform feed size range and high separating density, jig efficiencies will approach that of the dense medium units. Tables exhibit high separating efficiency when the feed contains a controlled narrow size range and less than 7% near density material, but are limited by low productivity. Multiple start spirals are dependent on the density/size distribution and appear effective when near density material is less than 7% and size is in the range -2 mm to +0.1ran.Water cyclones are relatively inefficient separating units. As the normally brittle reactive class macerals predominately report to the fine sizes, the recovery of the fine sizes is important in optimising the bonding properties of the coke. As flotation of coal fines is a process independent of relative density, relying on the surface properties
NG-04
—177— of the particles, surface oxidation will markedly reduce
floatability.
Efficient flotation is dependent on particle size, efficiency
increases
below 0.5 mm, but decreases with ultrafines below 50 jm where strict control of pulp density will minimise
the drop in efficiency. Flotation
processes continue to suffer from the inability of the reagents to be sufficiently selective in separating particles of say, 10% ash content, from those of 15% ash content. In addition, certain coals, when associated with active clays,
inhibit the action of reagents in flotation due to
slime coating of the particles.
Hie dependence of most coal cleaning processes
on sizing results
typical coal preparation circuit being divided
in the
into coarse sizing
(-150+20 mm), intermediate sizing (-20 +0.5 mm) and fine sizing (-0.5 mm). There are few instances of size reduction units being employed exclusively for the liberation of clean coal
from associated
refuse, although
the
initial size reduction that limits the maximum size to the coarse coal cleaning
unit
achieves some
particle
liberation. Size
principally involves the application of rotary breakers and
reduction
toothed roll
crushers with hammer mills typically preparing the cleaned coal ( to -3 ram) for charging to the coke ovens. Screens, normally used in open circuit, achieve size selection for the respective coal cleaning -0.5 mm
and within this range may serve the
units down to
important
function of
dewatering. Water classifying cyclones, where appropriate, may be utilised for finer size selection in spirals, tables and flotation circuits and serve the function of dewatering/thickening units.
The requirement of low moisture contents for coke oven feed material and the environmental constraints on discarding of refuse, completes the coal cleaning circuit with dewatering drainage on vibrating
techniques. Coarse coal is dewatered by
screens, intermediate
sizes are dewatered by the
combination of sieve bends/vibrating screens/centrifuges
and fine sizes
generally require pre-thickening prior to vacuum filtration * Dewatering of refuse varies considerably according
to the discard constraints and
involves screen dewatering of coarse and intermediate sizes, thickening of fine sizes
followed by emplacement
in tailings dams.
In the more
constrained situation the fine sizes will require thickening, centrifuging or mechanical/vacuum filtration before waste site emplacement. In general, water circuits require critical controls on plant recirculated water and on water released from the plant, tailing dams or other emplacement sites.
NG-05
—178— Developments It is anticipated
that the developments in coal preparation will be
closely aligned with
technological
changes in the
ironmaking and
steelmaking process. Long term commitment to iron and steel making requires a substantial investment cost and a recent European study8 of the specific investment costs for crude steel production is presented in Figure 4.
From
this
study
the viability
of
the
traditional
cokemaking/blast furnace/basic oxygen steelmaking route is only apparent for large scale operations in excess of 2x106t/a. Projected plants and mini-steelworks requiring capacities less than the large scale operation, are more likely to involve the alternate direct reduction/electric arc furnace steelmaking process. x
UJ
1000
o
z
H C0
O o 800
coking plant-blast furnace-b.o.s direct reduction-e.a.f
Ui 5
to
>UJ
z
600
o o UJ Q. 400 CO
0.5
1.0
1.5
2.0
2.5
CRUDE STEEL PRODUCTION, 10 6 t/a
Figure 4 Steelplant specific investment costs The continued development of the blast furnace route will occur in large scale plants through enhancement of the operating process • Hie direction of enhancement will
involve process technologies that are aimed at more
efficiently and economically utilising the energy components. Currently, techniques of injection of natural gas, coke oven gas, pulverised coal with recirculation of the blast furnace gas and plasma gasification are expected to lower coke rates. The relative accent placed on any of these techniques will be dependent upon the cost efficiency of the process. Coke will continue to be prepared to similar specifications through conventional coal preparation plants. When coal is used as a blast furnace injectant or in the alternative direct reduction units, a wide range of coal qualities may be utilised making some previously NG-06
—179— now suitable.
As European studies9
show
represents 40% of
the capital costs
of the
ironmaking
new
unsatisfactory indigenous coals that the cost
of coke ovens
conventional blast
furnace
non-coking coals are of potential established direct reduction steel in electric
metal bath to
processes
units producing sponge
arc furnaces, the
smelting reduction, where
plant,
coal and
produce liquid
utilising
interest. Whilst there are a iron and
newer developments oxygen are
iron and
number of melting to
will incorporate
injected directly into
the evolved
carbon monoxide
a
gas
pre-reduces the counter-flowing fine iron ores.
The present technologies
in coal
undergo enhancements in line
preparation processes
with blast furnace and
processes. However the optimising of the energy
are expected
to
alternate ironmaking
components for ironmaking
practice using some form of coal injection is highly sensitive to moisture ash content10. Enhancement of
content but less sensitive to preparation
units,
especially
continue to improve
through
on-line
the operating efficiencies
for lower
ash contents
contents,
especially
and in
desirably lower
the
fine
coals,
improvements. A potential new technology
present coal
instrumentation,
of the units
sulphur contents. will
require
Moisture
technological
is the microwave drying
coals11 which operates by the absorbtion of microwave
will
and provide
of fine
energy by moisture,
without excessively raising the temperature of the coal.
Microwave technology is further offering a new approach to the smelting of metals. In
applying
examining a number of
this
technology,
a
program
alternate smelting techniques
of
investigation
is
involving composites
of various types of coal with metallic ores12. References 1 D.R. JENKINS: 'Gas flow distribution in the ironmaking blast furnace* f Proc. Australia Japan Extractive Metallurgy Symposium, Sydney, July 1980, A.I.M.M.: 257 2 H.E. MbGANNON et al ed.: 'The making shaping and treating of steel *, USS Steel Corp., 5th Ed., 1941: 280, 288-289 3 ibid: 7th Ed., 1957: 254 4 ibid: 8th Ed., 1964: 420 5 ibid: 10th Ed., 1985: 580 6 K. KANBARA and A. SHIGEMI: 'Blast furnace dissection', Nippon Steel Report Overseas No. 10, November 1977. 7 K. CHARLTON: Metals and Materials, 1986, 2,(12): 755 8 E. STEINMETZ et al.: Metallurgical Plant and Technology, 1986, 14,(3): 24 9 R.B. SMITH and M.J. CORBETT: Ironmaking Steelmaking, 1987, 14,(2),: 50 10 ibid: 62-63 11 N.P. CHIRONIS ed.: Coal Age, 1986, 91,(12): 64-65 12 H.K. WORNER: Private communication. NG-07
-ISO-
IMPLICATIONS OF COAL PROPERTIES FOR THERMAL COAL EXPORTS
by
Allan G. Waters Senior Research Officer BHP CENTRAL RESEARCH LABORATORIES P.O. Box 188 WALLSEND. N.S.W. 2287
ABSTRACT The computerised mathematical model described in the paper can be used to determine the equivalent value of a range of possible coal feeds to a particular pulverised coal fired power station. The model considers the technical and economic effects of the various coal properties on station operation, e.g. required pulveriser capacity, ash collection efficiency, FGD, waste disposal etc. The information generated by the model can be used for marketing of energy coal and optimising the return from a particular coal reserve.
AGW-01
—181—
1.
INTRODUCTION
Coal quality not only varies between supplying
countries,
but can be extremely different from the sources w i t h i n a country. Apart from coal quality, factors affecting
the
delivered coal cost include transport costs between the producer and the consumer, w h i c h will be dependent on mine and port location and will differ for each situation.
In
addition, each consumer operates under a particular set of regulations and cost factors, and so the problem of assigning a value on different coals for a nominated consumer
arises.
It is the purpose of this paper to describe the development and operation of a computerised mathematical model of a coal fired power station that enables the relative economic value of energy coals to be estimated. The model incorporates
both
technical and economic aspects of the generation of electricity by the combustion of pulverised coal. It can be used for calculations based on a "green field" or existing power utility. 2.
MODEL DESCRIPTION
Figure 1 shows a block diagram of the model. The first operation is to input power station parameters for the unit being considered. These include capacity (MW),
location,
standard transport charges, pulverising mill data
(number,
capacity, power consumption), emission standards, and type of ash collecting device. The coal or blend of coals to be burnt by the utility is selected and the information is transferred from data files. The type of information stored in these data files is shown in the appropriate block in Figure 1. The program then calls the BOILER subroutine w h i c h carries out a heat and mass balance. Such an operation is the AGW-02
—182—
PROGRAM E C U f E C VERSION 1
DATA FILES COAL PROPERTIES MOISTURE PROXIMATE ANALYSIS ULTIMATE ANALYSIS ASH ANALYSIS HARDGROVE GRINDABILITY INDEX ABRASION INDEX ASH FUSION TEMPERATURES SUBROUTINE BOILER HEAT AND MASS BALANCE CALL FGD BOILER EFFICIENCY NET HEAT TO STEAM FLUE GAS COMPOSITION FLY ASH COMPOSITION/CONCENTRATION COAL TONNAGE REQUIRED
CALL BOILE R.
CALL TRANS STOCKPILE MILL
SUB, TRANS SHIPPING UNLOADING OVERLAND TRANS,
SUB, STOCKP STOCKPILE & HANDLING
SUB, MILL PULV, CAP FACT PULV, LOADING PULV, POWER CON
CALL B A G F U. OR ESP SUB, ESP ELEC, PRECIP, AREA POWER COSTS CALL FGD DISPOS PERIPH JL SUB, PERIPH NET POWER OUTPUT OF UNIT
SUB, FGD % FG SCRUBBED COSTS POWER
SUB. DISPOS DISPOSAL OF ASH & FGD SLUDGE
CALL OPCOST
PRINT COAL TPA BOILER CALCS EQUIP PERFORMANCE COSTS PENALTIES/SAVINGS
Figure 1
1 SUBROUTINE OPCOST OPERATING COSTS CAPITAL CHARGES MAINTENANCE COSTS POWER COST AS FUNCTION OF COAL PRICE
Block Flow Diagram for Computer Model of Pulverised Coal Power Station Operation.
AGW-03
—183— starting point for the evaluation of all operations. The basis of this calculation is one tonne of "as received"
coal,
i.e., material made up of coal, mineral matter and water. The stoichiometric quantity of air required for combustion is determined from the ultimate analysis of the coal and the total air requirement is calculated using the specified excess air level, usually in the range of 15 to 20%. The quantity of the gases (carbon dioxide, water vapour, nitrogen, oxygen and sulphur dioxide) resulting from combustion is determined. An additional 20 to 25% of "air leakage" is allowed. The net heat available for steam production per tonne of "as received" coal is calculated by considering: heat released by coal combustion, heat required to convert water into water vapour, the sensible heat loss in the flue gases heat needed in reheating flue gases that have passed through a flue gas desulphurisation device, and losses due to radiation and unburnt carbon. By using the net heat available, net turbine heat rate* and the unit capacity (MW), the hourly coal tonnage
requirement
can be calculated, as well as gas flow rates, fly ash production rates and air requirements. Annual coal requirements are computed using the specified capacity factor (i 0 e., the proportion of time that the unit is operating). This information is transferred back into the main program for use in the other
*
subroutines.
Net turbine heat rate is the amount of heat needed to be
transferred into superheated steam to produce 1 kWh of electricity and is determined by the thermodynamics of the steam cycle.
AGW-04
—184— The TRANS subroutine uses the annual tonnage of coal to calculate a shipping cost and an unloading/handling cost. There is also provision for an overland transport cost to a utility. The costs of handling and storing the coal at the power utility are evaluated by subroutine STOCKP.
Pulveriser performance is evaluated in subroutine MILL. The Hardgrove Grindability Index and the required fineness of grind are used to calculate the mill capacity factor which modifies the nominal capacity to an actual capacity. The nominal capacity is the tonnes per hour of coal with a Hardgrove Grindability Index of 50 that a pulveriser will grind to 70% minus 0.075 mm (75 microns). By considering the hourly coal rate and the actual capacity of the pulverisers, the number required on line and their power consumption can be determined.
The collection of fly ash is carried out by an electrostatic precipitator or a bag filter. If the modelled power station is not yet operational, i.e., the performance characteristics of the ash collection device is unknown, subroutine ESP takes the emission standard and likely maximum current density and calculates the minimum precipitator efficiency required, the minimum specific collection area needed, the power consumption and the quantity of fly ash collected. Subroutine BAGFIL carries out similar calculations with regard to collection by a bag filter.
In many countries, a flue gas desulphurisation device is required to meet emission regulations for sulphur dioxide. The performance of such a device is evaluated in subroutine FGD. The percentage of the flue gas to be cleaned is calculated by a consideration of the sulphur dioxide level in the flue gases and the emission standard. The scrubber system used is a turbulent limestone contacting type where finely ground limestone in slurry form is mixed with the flue gases.
AGW-05
—185— Sulphur dioxide is removed by chemical reaction with calcium carbonate in the limestone. The flue gas that has been cleaned may need to be reheated to restore buoyancy before mixing with the uncleaned portion and put to the stack. The flue gas composition is then recalculated. The amount of limestone needed and the amount of FGD reject solids produced are determined. Power consumption, labour costs, maintenance charges and capital charges are also computed for this section of the power utility.
The disposal of fly ash, bottom ash and FGD wastes is a major cost item for many potential coal consumers, and the costs of this system are calculated in subroutine DISPOS. Subroutine PERIPH sums the power consumption of all the equipment used by the utility. The net quantity of saleable power can then be determined by subtracting the power consumption of peripherial devices from the stated capacity of the unit. The operating and capital charges for the power station are computed by subroutine OPCOST* Data are taken from other subroutines as well as being calculated in this section of the program. The power cost at the busbar, i.e., excluding cost of coal, is then determined. A range of coal prices is then included to give the power production cost as a function of free on board (FOB) coal price. Such information then allows the comparative values of different coals to be assessed.
The method used to assign an economic value to a coal is to select a base case or yardstick coal to which a coal price (FOB) can be ascribed. The equivalent value of another coal is the price (FOB) which gives the same power production cost as the base coal.
AGW-06
—186—
10
5
15
20
4
Ash Content (% db)
6
10
8
12
14
Moisture Content (%as received)
F i g u r e 2. Effect of Coal A s h content on coal v a l u e .
Figure 3. Effect of M o i s t u r e content on coal v a l u e .
Table 2.
content
Effect
of coal sulphur
Coal Q u a l i t y
on coal
Coal V a l u e ($US/tonne
*
value
FOB)
Ash
Total Sulphur
Annual
%
%
Tonnage
5 10 15 20
0.5 0.5 0.5 0.5
907700 960000 1018700 1087500
37.45 33 .70 30.00 26.15
15 15 15 15
0.5 1.0 1.5 2.5
1018700 1025900 1028600 1031000
30.00 24.00 19 .70 13 .70
Base case coal
-
value
AGW-07
—187— 3.
OPERATION OF THE MODEL
The capabilities of the model can be demonstrated byconsidering the effect of some coal properties on the equivalent coal value. To do this, the use of coal in a 500 MW power station is considered. It is envisaged that the power station is based on common design parameters and is located in a region which requires moderate transport costs and stringent emission control. The base coal was a 15% ash Hunter Valley coal. The effect of ash variation was determined by holding other properties constant
(except
specific energy and volatile matter which varied proportionally with ash) and allowing ash to vary from 5% to 20%. The results given in Fig. 2 indicate that coal price (FOB) is very dependent upon ash with a 5% ash coal worth approximately $US7„45 more per tonne than a 15% ash coal.
The effect of moisture on equivalent coal value is similar to ash but not as marked
(Fig. 3). Table 2 shows the
dramatic effect of coal sulphur content on coal value.
It can be seen that a 0.5 percentage point increase in sulphur content has a much greater effect on coal value than a 5.0 percentage point increase in ash content. This is because the capital and operating costs associated with Flue Gas Desulphurisation
(FGD) to meet air quality
requirements
are very high.
It must be emphasised that the prices given in this paper are indicative only and specific to the coal properties and power station factors used.
AGW-08
—188—
IMPORTANT COAL PROPERTIES FOR PCMER GENERATION
BY
DR A LCWE ENGINEER/COMBUSTION INVESTIGATION
ELECTRICITY COMMISSION OF NEW SOUTH WALES PO BOX 5257 GPO SYDNEY NSW AUSTRALIA 2001
—189— 1.
INTRODUCTION Power stations are very capital
intensive,
the cost of building
modern power station is of the same order as the present which that station would burn over its entire l i f e . cost
penalties
because
the
whether
the station
out of
service,
ciency,
low rank u n i t s .
costs
is operating
then
additional
operating efficiency.
Coal
of
capital
or not.
are
Also,
Downtime incurs severe incurred
if
irrespective
high ranking
generation must be carried affects
both
power
a
worth of the coal
station
Care must therefore be exercised
units
by lower
of are
effi-
availability
and
in selecting
appro-
analysis
which
priate coal for a particular power station. In general
power
stations
have
performance guarantees are to be met. range of the most important coal
a design
coal
properties.
Within
this range
pected that full load may be carried, although at reduced
range in coal properties.
by the design coal
it
is
ex-
efficiencies.
The selection of the type and capacity of the various in the power station will be effected
with
It is also usual to have an allowable
plant
and the
items
allowable
Coals with properties outside the allowable range
may be expected to affect the unit performance, usually but not always in a detrimental manner.
If
the
alty/bonus should be applied when applied
to the delivered
the coal its intrinsic It the
items.
is
affected
then
a cost
This
penalty/bonus
price of the coal on a unit heat basis
pen-
gives
value.
is stressed
interaction
plant operation
to the coal to compensate.
between
that the intrinsic
value
the
individual
coal
and
the
of coal
is
a function
power
station
of
plant
It is therefore not possible to properly price a coal without consi-
dering the power station in which it is to be burnt. Ihis paper reviews the major coal
related
plant
items in
station and considers those coal properties which affect their
a power
performance.
Where possible within the confines of this short paper, an indication of the magnitude of given.
the effect of a particular
The list of properties discussed
property on a plant
item
will
be
in the paper is not exhaustive but
the most important properties and effects are included. 2.
COAL HANDLING PLANT This equipment
includes
the
system
for delivery
of coal
into
the
power station, the coal stockyard and the system for conveying coal from the stockyard
to the pulverizing
the power station rail
transport
site
are
mills.
is usually via
used.
In
Australia
a conveyor
For export c o a l ,
sea
the delivery of coal system
although
transport
is
road
to and
important. AL-01
—190— Stockyard
equipment
South Wales
is
most
variable.
uses both automatic
Ihe
b u l l d o z e r s with slot reclaim hoppers. chutes are common to all
Electricity
stacker/reclaimers
Conveyors, b i n s ,
areas o f coal handling
Commission
and mobile
of
New
plant such as
feeders and
transfer
plant.
The prime requirement o f the coal plant i s to maintain a continuous release o f heat of all
in the b o i l e r s .
types i s mass flow in
a permanent restricted
inability
The basic
design
tonnes per hour.
to supply s u f f i c i e n t
mass flow throughput
heat
but design mass
flow.
shortfalls
energy throughput due to plant
and maintenance costs due to d u s t ,
Ideally
Table
1 lists
a study
would
identify
which coal
coal
properties
energy in
f a i l u r e or
which
affect
out on
an
property will
cause
problems
numerical value o f that property.
For
plant is
either by a
the coal
that
include
temporary
increased
operating
etc.
be carried
importance e x i s t s .
for coal
the b o i l e r ,
Other problems will
Further,
o f that property may be evaluated. plant
to
or by i n s u f f i c i e n t
i s transported in
parameter
Clearly the worst problem
It
in
handling
plant
the
item
plant
plant.
basis
and
at
to
what
the cost e f f e c t o f a degradation
should
example,
coal
individual
be noted
a transfer
chute
that in
a hierarchy the coal
of
stock-
yard vhich does not d i r e c t l y e f f e c t coal
flow to the b o i l e r s will be o f l e s s
importance
the
than
a
transfer
chute
therefore have a l e s s l i b e r a l It empirical
is
important
measurements
e f f e c t i s indicated shear c e l l coal
distribution
note
are
used
directly
power
station
system
and
may
in
fact
design. t h a t many c o a l
inter-related
1 under contributing to determine affected
properties
with
coal
other
properties. flow
by moisture,
are
properties. For
properties. mineral
matter
This
example, However, or
size
changes.
1. COAL PROPERTIES EFFECTING COAL HANDLING PLANT
Property Specific
Coal
is
to
Table
tests may be
flowability
TABLE
in
and
within
Energy
Flow
Properties
Contributing Properties Moisture Ash Ultimate
Analysis
Moisture Mineral Matter Analysis Size Distribution
Effect 1? decrease in s p e c i f i c energy increases required mass throughput o f coal by ] % . As flow properties degrade coal throughput remains r e l a t i v e l y constant until catastrophic blockages occur at a c r i t i c a l flow property v a l u e . I b i s c r i t i c a l flow property value is highly site s p e c i f i c .
AL-02
—191— TABLE 1, COAL PROPERTIES EFFECTING COAL HANDLING (CONTD.)
Contributing Properties
Property
Effect
Dustiness
Moisture Mineral Matter Analysis Size Distribution
Increased operating and maintenance costs with dusty coals. Potential for increased loss of a v a i l a b i l i t y .
Combustibility (Spontaneous Combustion)
Coal Rank Size Distribution Moisture Sulphur
Specific energy of stockpiled coal decreases due to spontaneous combustion. Plant layout and procedures are dictated by spontaneous combustibility.
3.
MILLS The pulverizing mills reduce the coal
from a top size typically of
20 to 40 mm to a fine powder with approximately 70% by weight passing a 200 mesh screen (74 um screen opening). direct on line throughput
For power generation, mills are usually
with no storage between
restriction
unless a spare mill
therefore
is
the mills
results
available.
and
immediately
For this
the boiler. in
reason
a loss
it
is
A mill
of
usual
output
to
mill capacity so that at least one mill is spare at unit full load.
select Despite
this spare capacity mills typically contribute to significant loss of availa b i l i t y in coal fired power plants. There are
three
types of mill
commonly used
for bituminous
coal.
These may be categorised by their rotating speed into low speed
(horizontal
ball m i l l ) , medium speed
(hammer or
attriter type m i l l ) .
(vertical
spindle mill)
and high speed
Each of these mills have different characteristics and
are affected differently by the various coal properties.
The low and medium
speed mills are most commonly used for bituninous coals and this discussion refers principally to these two types of m i l l . Mills are selected example index
be
the
mill
(HGI)
of
55
screen.
and
on a nominal maximum throughput.
throughput with a
in
tonnes/hr
product
at
fineness
of
a
This may for
Hardgrove 70%
Table 2 indicates the effect on throughput
grindability
passing
while
a
200 mesh
assuming
a con-
stant product fineness as the coal properties change by a small amount about the nominal value (large deviations may cause a non linear It is probable that the mill
response).
will physically process
substantially
greater quantities of coal than the nominal throughput, this will result in a degradation
in product fineness.
The lower
the effect on fineness of changing mill
section of
Table
2 indicates
throughput.
AL-03
—192— TABLE 2. COAL PROPERTIES EFFECTING MILLING PLANT TONNAGE THROUGHPUT
Mill
Type
Property
Total
Medium Speed
- 3% throughput for 1% moisture increase
- 1.5% throughput for 1% moisture increase above approx 1256 moisture
- 1 % throughput for 1 unit reduction in HGI
- 1% throughput for 1 u n i t reduction in HGI
- 3% throughput for 5 mm increase in top s i z e
No loss in throughput 60 mm top s i z e
Reduction in fraction passing 200 mesh screen by 0 . 3 5 ? for 1% increase in throughput
Reduction in fraction passing 200 mesh screen by 0.9% for 1% increase in throughput
Moisture
Hardgrove Gr ind ab il ity Raw Coal
Mill
Low Speed
Ind ex
Top Size
Throughput
below
BOILER The function of the b o i l e r
is to i g n i t e
and burn the coal
and completely and to ensure that the heat content o f the coal i s l y transferred
to the steam.
properly
proportioned
steam
in
order
that
design
peratures
cause
loss
of
cause loss o f
bituninous
production
steam
unit
it
evaporating, conditions
efficiency
is
important
superheating be
while
that and
the
heat
be
reheating
the
Low steam
tem-
temperatures
may
attained. high
steam
in
ignition
availability.
Table 3 of
In addition
between
reliably
efficient-
lists
coal.
of
properties The major
unduly high
of
importance
problems
quantities
encountered
of
unburnt
in
carbon
and
combustion
combustion and
of
flame
are
in
stab-
ility. In
drun
type
radiant heat transfer by
convective
heat
boilers
the
evaporation
transfer.
The
absorption
controlled by the radiating
and
slagging
transfer
in
the
related
properties.
is
effected
in the furnace while the superheating
problems
Table 4 l i s t s these
of
heat
in
principally
by
and reheating
is
the
properties o f the c o a l .
boiler
are
therefore
related
furnace
is
Most heat to
these
properties.
AL-04
—193— TAI3LE3iCOALPROPERTIE^
Contributing Property
Property Volatile Content
Effect Special burner design for flame stabilization required below a dry ash free volatile content of 2555
-
Ultimate Analysis
Carbon Hydrogen Nitrogen Sul phur Oxygen
Air requirements are affected by ultimate analysis, unit increase of carbon/hydrogen ratio increases air requirements per unit heat release by 0.8%
Fuel Ratio
Fixed Carbon Volatile Content
0.06% increase in efficiency loss due to unburnt carbon for 10? increase in fuel ratio at fuel ratio of 1c6.
Moisture
A ]% increase in moisture decreases boiler efficiency by 0.25% requiring a proportional increase in firing rate
™*
TABLE 4. COAL PROPERTIES EFFECTING HEAT TRANSFER
Contributing Property
Property
Effect
Slagging Propensity
Ash Elemental Analysis Ash Fusion Tem peratures Coal Particle Mineral Analysis
Slagging propensity generally ranked as low, intermediate, high or severe. Response to slagging propensity is function of unit thermal rating.
Furnace Wall Emissivity
Ash Elemental Analysis Wall deposit physical state
Furnace wall emissivity is typically 0*8, a decrease of ]% will increase furnace outlet gas temperature by 1.6 deg. C.
Foul ing Propensity
Ash Elemental Analysis "Active" Alkalies (Sodium and Potassium) Ash Fusion Tem peratures
Fouling propensity ranked low to severe. Response to slagging propensity is highly unit specific.
5.
ASH AND DUST PLANT The
disposed o f .
solid
residue
from
combustion
of
coal
must
be
collected
and
This solid residue includes mainly ash but also has a fraction AL-05
—194— of
unburnt
which
fall
coal.
Eelow
large
pieces
of
furnace
ash
is
slurry.
Furnace ash may constitute
the c o a l .
Most o f the remainder
again
usually disposed
mediate
in
hoppers
between
s i z e between the
properties a f f e c t i n g the dust
from the
and
material
and
extracted
the
disposal
air
there
hopper,
crushed
collected
slurry.
the furnace ash heater
a
water
from
the
and
and
in
the
small
the d u s t ,
is
economiser.
Dust c o l l e c t i o n
This
total
as a
ash
in
plant
fraction,
inter-
Table
equipment
into
collecting
collected
the performance o f the ash collection
equipment.
hopper walls.
to disposal
10? of the
the dust
A further and
filled
furnace
pumped
t y p i c a l l y 5 to
is
of as
is
clinker
5
in
grit
lists
coal
and disposal
is discussed
and
else-
where . TABLE 5.
COAL PROPERTIES AFFECTING ASH AND DUST PLANT
Contributing Property
Property
Effect
Ash Quantity Per Unit Heat Release
Ash Level S p e c i f i c Energy
A 1% increase in ash quantity per unit heat release increases the ash and dust plant duty by 1 ? .
SIagging Propensity
Ash Elemental Analysis Ash Fusion Temperatures Coal Particle Mineral Analysis
High slagging propensity increases duty on ash extraction p l a n t . Formation of large c l i n k e r s may cause blockages in hopper doors and contribute to ash crusher problems.
Ash S o l u b i l i t y
-
For wet hopper systems with recirculated water, formation o f scale in p i p e l i n e s may cause problems.
Erosiveness
Ash Elemental Analysis Ash Mineral Composition
Increased erosiveness will increase in p i p e l i n e s and sluiceways.
Clinker Reactivity
7.
wear
Some coals produce clinker in the furnace which is prone to explosive release o f energy on quenching in the ash hopper.
DUST COLLECTING PLANT The fine dust exiting
gases are exhausted ers (bag house)
the boiler must be collected
to atmosphere.
or by e l e c t r o s t a t i c
This i s
achieved
precipitators.
before
the
either by fabric In general
flue filt-
electrostatic
AL-06
—195— precipitators dominate this field
on a world wide basis although a substan-
tial committment to fabric filters has been made by ECNSW. Ihe major problem found with precipitators is excessive dust emissions.
Coal
properties
given in Table 6 ( A ) . ential
pressure,
replace
defective
effecting
dust
emissions
from
a
precipitator
are
The major problem with fabric filters is high differ-
excessive
emissions
are
bags.
Properties
affecting
fabric filters are listed
most
likely
due
to
differential
failure
to
pressure
on
in Table 6 ( B ) .
TABLE 6, COAL PROPERTIES AFFECTING DUST COLLECTING PLANT (A)
PRECIPITATORS
Contributing Property
Property
Effect A 1% increase in dust burden will increase emissions by 1?.
Dust Burden (Ash Per Unit Gas Volume)
Ash Specific Ultimate
Gas Flow Per Unit Heat Release
Carbon/Hyd rogen Ratio Moisture Level
A 1? increase in gas flow per unit heat release will increase emissions by 1 . 5 * .
Ash Resistivity
-
A resistivity change of 1 order of magnitude would suggest an increase in emissions by a factor of 2 .
Energy Analysis
Sulphur
(B)
General trend for reducing vity as sulphur increases, one order of magnitude per change. Below ]% sulphur, vity is dominated by other
resistipossibly sulphur resistifactors.
FABRIC FILTERS
Property
Contributing Property
Effect
Dust Burden
Ash Specific Energy Ultimate Analysis
Differential Pressure will with dust burden.
Gas Flow Per Unit Heat Release
Carbon/ Hyd rogen Ratio Moisture Level
A 1? increase in gas flow per unit heat release will increase differential pressure over the filter bags by 1%.
increase
AL-07
—196— 8.
CONCLUSIONS A wide variety of coal properties are of importance in determining
the
impact of a particular coal on a specific
properties operations.
are
intrinsic
in
In optimising
product should be selected
the coal,
others
a mine product,
should
also
be
power station on the coal.
these
by the
mining
affected
it must be recognised
recognised
that
the
accordingly.
that
there
is
an
influence
Operating methods and procedures will
the performance of a coal in a specific plant. include operational
Some of
are
to the specific requirements of the target power
station and the product quality determined It
power plant.
considerations
in the
of
the
influence
It is therefore necessary to
evaluation of
the most
economic
product description for a particular customer.
AL-08
6. HYDROGEOLOGY
+ 198 EXPLORATION FOR GROUNDWATER SOURCES AND HAZARDS IN COAL MINING William H. Morton
Hi
ABSTRACT The occurrence of groundwater can have a significant affect on coal mine design and operating costs. The value of this affect can and should be assessed at a preliminary level during resource evaluation since drillhole analysis is required which can be achieved at little extra cost to an existing drilling program. However; the coal exploration geologist must develop an interest in and some knowledge of the testing procedures required in order to ensure responsible data is collected. This paper discusses the importance of groundwater resources to coal mining and outlines the data collection which can be achieved by the coal geologist as an integral part of his normal duties provided minimal additional time is allowed by management.
* Principal Consultant, Australian Groundwater Consultants Pty Limited, 273 Alfred St., North Sydney
199
EXPLORATION FOR GROUNDWATER SOURCES AND HAZARDS IN COAL MINING
1.
WATER AND MINING
Coal mines in common with other mining operations, have the necessity of a water supply and occasionally the problem of managing excess water within the workings. Water supply is required for dust suppression, coal washing, fire fighting, domestic and plant usage and in some cases, in very large quantities for power station cooling and boiler feed. At the same time, excess mine water may have to be removed from mine workings if it creates or aggravates geotechnical problems or causes special maintenance on mine machinery or time delays in mine travelling. In addition, mine water may need to be treated to be acceptable for disposal. These aspects are important factors in the economic feasibility of a mine and it is desirable therefore, that investigations into water resources and, in particular, into groundwater occurrence should proceed in parallel with coal reserve delineation. Total water resource utilisation concepts then can be employed in planning the mining and, if appropriate, the power generation operations. 2.
WATER SUPPLY REQUIREMENTS
Water supply requirements vary with climate, with various chemical standards of water usage and with the location of the mine. Table 1 sets out the major water requirement ranges as derived from experience, and the predominant controls over these requirements which can vary markedly through the year and through the life of the mine. TABLE 1: WATER REQUIREMENTS AND CONTROLS ML/d
Per Unit
Coal Washing
0-0.2
1000 tonne
Controls
Town Water Supply
0.2-0.6
1000 people
Standards
Dust Suppression
0-0.5
hectare
Salinity
Power Station Cooling
80-160
1000 MW
Water Temp/ Salinity
Fire fighting/suppression
0.1-0.3
hectare
Separate storage
Lithology
WM 1
-
200
-
3. MINE WATER PROBLEMS Apart from the simple cost of pumping water out of the mine, four broad categories of problems created by mine waters are recognised. These are increased mining cost, hazardous mining or geotechnical conditions, disposal problems for contaminated waters, and environmental impact on surrounding land. 3.1 Mining Cost Wet conditions cause mining costs to rise because of (i) increased maintenance on mining machinery (15-30%), (ii) exclusion of the use of dry explosives (200-1600%), (iii) provision of sump pumps with protection against aggressive water and high suspended solids content (waters entering mine excavations are often acidic and commonly brackish so as to be aggressive to most mine machinery), (iv) dangerous working areas which reduce productivity, (v) flooded roadways which increase travel time around mine, (vi) flow to sumps causing erosion and deposition of silt and sand on coal benches and faces, resulting in an increased need for washing or an increased as-mined coal "ash" content. 3.2 Hazardous Mining and Geotechnical Conditions Unrelieved hydrostatic pressure is a common cause of slope failure and floor, roof or bench heave in mines. To offset these conditions, suitable slope angles must be adopted and/or provision made to leave material of strength in the floors and roofs or as pillars to avoid failures. These requirements can represent major costs and frequently much coal is sterilised by such designs. Excess mine water requires efficient mine drainage and sump storage. Because mine designs generally require a downdip progress, this allows inflows to accumulate at the working face with consequent slowing down of production. Further, travel roads must be kept dry to reduce the time, and to maintain the safety, of movement of personnel. A problem occasionally encountered in coal mines is that influent water may also release gases to the mine workings. These gases may include methane and hydrogen sulphide and if not drained in advance of development can create further hazards and expense in the maintenance of properly ventilated conditions. WM 2
-
201
-
It is evident that dewatering and depressurisation of groundwaters in advance of the mining face is desirable and can alleviate some of the need for expensive geotechnical control; however, the hazards need to be well evaluated in advance and remedies incorporated into mine design. Often it is possible to vary mine design to avoid areas of extreme water hazard or inflow without resorting to dewatering or depressurisation. 3.3
Disposal Problems
Water entering mines, in addition to having a natural dissolved salt load, may become acid and take into solution hazardous metals or become turbid, coloured and sediment laden once in the mine.
Disposal of such waters in significant quantities to local streams is
normally not acceptable without settlement, filtration or chemical treatment.
Re-use
around the mine is an option in many cases, but it is then necessary to accurately predict inflows to allow an efficient mine water management plan. 3.4
Environmental Impacts
Mine excavations become the new base level for groundwater flow around them and, thus,generate a variously large or small area of water level depression which can interfere with local town water supply wells, cause saline intrusion or water quality changes, dry out wetlands and swamps as well as cause land subsidence and base level stream flow decline. The degree to which these effects are a problem depends on the nature of groundwater occurrences and the sensitivity of the environment and the other pressures present upon it. Failure to evaluate these possibilities and to identify in advance suitable management strategies can result in the development of serious problems and of high costs. 4.
INVESTIGATION TECHNIQUES
From the foregoing it is apparent that adequate groundwater studies must be undertaken in advance of mining to allow for proper project planning. 4.1
Drilling Data
The exploratory drilling program to assess coal reserves provide an excellent opportunity to gather preliminary groundwater data at very little cost. It is necessary only for the driller to be asked to record certain observations on his daily drilling sheets; this could be included as part of the specifications in his contract. However, it does require dedication and understanding on behalf of the coal geologist to make sure sensible records are being recorded and to pick up any opportunity to obtain further test data when significant water resources are encountered. WM 3
-
202
-
A list of useful data to be recorded by the contractor with assistance from the geologist as required is as follows:Penetration rate, or time to drill each 3 metre section.
Recorded with
information on the drilling technique and weight on the bit during drilling. Loss circulation zones. Caving zones. Artesian flow rates and shut-in hydrostatic pressures. Airlifted water yield rates for each successive 6 metre section as drilled. Electrical conductivity of drilling fluid or formation water at each 6 metre interval. Static water level or mud level measured before start of each shift and more frequently if possible, particularly at each coal seam.
Measured inside
drillrods. O n completion of drilling if the airlifted yield is less than 1 L/sec, the hole should be topped up to the surface with water and the water level decline measured at one minute intervals for 10 minutes and thereafter at 5 minute intervals for one hour. The original standing water level should be measured prior to testing. O n completion of drilling if the airlifted yield is greater than 1 L/sec, the hole should be airlifted for 10 minutes whilst measuring the total flow, then water level recovery measured inside the drillrods at minute intervals for 10 minutes and thereafter at 5 minute intervals for one hour. 4.2
Hydrogeological Data
The geological data collected during exploratory drilling programs can provide useful qualitative information on the occurrence, distribution and boundary conditions of underground reservoirs.
A detailed fracture pattern analysis may show up weaker rock
zones either under stress or of open cracks, and a regional overview may show up crustal tension cracks as topographic lineaments.
This data plus stratigraphic descriptions can
provide a first order assessment of the degree of anisotrophy of fracture permeability. These concepts are essential in understanding the groundwater flow system and in preparing accurate predictive models.
Downhole geophysical logs of boreholes, including resistivity, self potential, gamma, neutron-neutron or density, will generally identify aquifer zones and may indicate porosity and formation water salinity distribution. Drill cores can be logged to give orientation and frequency of fractures, and a description given of the fracture surface regarding the probable passage of underground water. WM 4
-
203
-
Geological profiles across the lease area and beyond can be prepared to include the position of the static water level surface and any faults, splits, pinch-outs, etc.. The depth of weathering is significant to groundwater interpretations as is the location and reduced level of any springs, rivers and lakes in relation to the outcrop or subcrop of coal seams and aquifers. 4.3
Monitoring Data
When exploration licences stipulate that all exploratory holes should be grouted on completion, there should be some consideration given to the value of utilising the holes as permanent geotechnical and hydrological observation points. Over any proposed mining area it is important to know the slope of the surface of the groundwater in the aquifer ie., the water table, and how this surface fluctuates with time, rainfall and runoff. A spread of exploratory holes should be retained as piezometers, with separate and cemented isolations to each aquifer, and the water level in these should be measured weekly or bi-weekly for one climatic year. At the same time records of rainfall and catchment(s) runoff should be collected. This data will be utilised in determining the amount of seasonal recharge or infiltration to the underground reservoir, and the likely variation of hydrostatic pressures for slope stability designs. 4.4
Hydraulic Parameters
Having established the location, shape and boundary conditions of any groundwater flow zones, it is then necessary to determine the parameters controlling
groundwater
movement. The size and vertical distribution of the hydraulic conductivity (permeability) is important, as is the bulk transmissivity and storativity of the total strata sequence as measured under long term pumping stress. A variety of testing methods are available and the final choice will depend upon site specific conditions and objectives. This is a critical design level of investigation and it is advisable at this stage to have the assistance of a specialist in groundwater hydrology. 5.
APPLICATION OF FIELD DATA TO MINE PLANNING AND DESIGN
The field data and observations are first to be used to develop a conceptual model of how the groundwater system operates in a dynamic state. This requires the use of the water table contours to determine hydraulic gradients and flow paths, and utilising the hydrogeological and hydrochemical data to determine flow boundaries and their nature.
WM 5
- 204 -
For a hardrock anisotropic aquifer, a groundwater hazard map can be prepared to show potential zones of higher flow and likely ground instability to be avoided in mine design. Finally, for any rock type a mathematical model can be designed to simulate the current groundwater reservoir behaviour, and to predict changes due to various mining methods, or to predict inflows at different times in the mine design life. 6. CONCLUSION Mine planning and construction requires a sound knowledge of the local and regional hydrogeological conditions. This knowledge can be used to reduce problems of inflow drainage and disposal, as well as for the provision of a water supply. Much of the data required for preliminary design assessment can be obtained during the resource evaluation drilling programs. The level of value of data depends upon the interest of the supervising coal geologist who should seek the responsibility for useful data collection and refer to a specialist hydrogeologist when groundwater is seen to be of significance in mine designs. 7. REFERENCE Australian Groundwater Consultants Pty Limited, 1984. Effects of Coal Mining on Groundwater Resources in the Upper Hunter Valley. New South Wales Coal Association Publication.
WM 6
—205—
AN OVERVIEW OF SOME GEOLOGICAL AND HYDROLOGICAL STUDIES CONDUCTED BY THE SECV FOR OPEN CUT BROWN COAL MINING IN THE LATROBE VALLEY, VICTORIA
J C BRUMLEY SENIOR ENGINEERING GEOLOGIST COAL RESOURCES DIVISION FUEL DEPARTMENT STATE ELECTRICITY COMMISSION OF VICTORIA SWANN HOUSE, 22 WILLIAM STREET MELBOURNE
3000
—206—
1
INTRODUCTION
This extended abstract presents an overview of a selection of geological investigations, with an emphasis on the hydrogeological studies which are conducted by the State Electricity Commission of Victoria (SECV) for the planning and operation of brown coal open cut mines in the Latrobe Valley, Victoria, One of the world's largest brown coal deposits is mined by the SECV for the generation of approximately 80% of Victoria's power requirements.
The
total coal resource in the Latrobe Valley is estimated at some 82 000 Mt of which some 47 000 Mt is classified as available from conceptual open cuts (VBCC, 1983).
Annual production is currently approximately 41 Mt, derived
from open cut mines at Yallourn, Morwell and Loy Yang (Figure 1).
A total
of some 900 Mt has been mined since the deposits were first worked in 1888.
FIGURE 1 : Latrobe Valley The major coal seams occur in the Latrobe Valley Depression (LVD) which lies within the on-shore portion of the Gippsland Basin as shown in Figure 1.
The LVD contains up to about 770 m of Tertiary sediments
comprising thick brown coal seams separated by clays and sands and some basalt flows along the western and southern margins of the Depression. illustrative N-S geological section through the LVD is shown in Figure 2 (Holdgate, 1987).
JCB-01
An
TRARALGON
SYNCUNE
YALLOURN
OPEN
CUT"
<s> <D
to
o
-J
C-.
0
CO 1
o
ro
FIGURE 2 : N-S Geological Section, Latrobe Valley (from Holdgate 1987)
—208—
The economic importance of the coal deposits is due mainly to their proximity to Melbourne (approx 140 km), the low overburden to coal ratio in the mining areas (usually less than 1:5), the thick and extensive nature of the coal seams, the remarkably low ash content (1-3%, dry basis) and the nature of the coal, overburden and interseam sediments, which allow mining by bucket wheel excavators without the need for blasting. These attributes are offset to some degree by a relatively high moisture content usually in the range of 53 to 67%, with a correspondingly low net wet specific energy (NWSE) of about 6.5 to 10.2 MJ/kg. There is also a need to relieve high artesian pressures which would otherwise cause instability problems in the deeper mines. The coal quality factors restrict the utilisation of the resource primarily to thermal power generation at the mine site, although a high potential exists for economic conversion to oil, the production of solar dried brown coal and for use as a feed stock of relatively pure carbon for industry. Other uses include the production of char and briquettes. The variable properties of the low rank coal and the associated stratigraphic complexities, present an interesting variety of geological and hydrogeological challenges to the mining and power generation activities. These challenges are effectively met by a responsive coal resource service at a cost amounting to less than 1% of the overall direct annual expenditure on open cut development and coal production. The major geological and hydrogeological inputs to this service involve stratigraphic, coal quality and groundwater resource evaluation studies. Geotechnical studies are not covered directly in this presentation, but are documented for instance by Washusen and Fraser (1982) and Ballard et al (1987). The organisational structure and methodology by which these studies are achieved is described by Barton (1982, 1985, 1987) and Gaulton (1982). Comprehensive documentation of the coal geology is given by Gloe (1976, 1984), Gloe and Holdgate (1987) and Holdgate (1987). Data management practises are summarised by Gill (1982) and Barton (1987), and drilling and sampling procedures by Gloe arid Badenhope (1976) and Barton (1987).
JCB-03
—209—
2
GEOLOGICAL STUDIES
2.1
Stratigraphy
Stratigraphic studies of the LVD form the basis for all resource evaluation and groundwater studies for planning and operating the open cut mines. They are the key to optimal resource utilisation. A typical example of the application of stratigraphy to regional coal seam and aquifer delineation is shown in Figure 2. This geological section was prepared by Holdgate (1987) on the basis of strategically placed investigation bores drilled between Yallourn and Churchhill. The new and existing borehole data, including geophysical logs, were interpreted to provide a significantly enhanced depiction of the strata in this area. The application of stratigraphy within the open cut areas is well illustrated by Holdgate's (1985) stratigraphic interpretation of the complex distribution of aquifer sands at Morwell Open Cut (MOC). Accurate delineation of the distribution and continuity of the sands is necessary to achieve effective placement of bores required to relieve the artesian pressures and to monitor the drawdown to ensure stability of the mine. The detailed stratigraphy also provides the basis for predictive mathematical model studies of the artesian dewatering requirements at the mine. 2.2
Coal Properties and Quality
Applied research into the chemical, physical and petrological properties of brown coal is carried out to achieve optimal utilisation of the coal resource. As described in the introduction, the coal is characterised by high moisture content, relatively low NWSE and low ash. Petrology studies incorporating physical, chemical and petrographic analyses of the range of brown coal lithotypes in Latrobe Valley coals have been documented by George (1975, 1982), and Allardice et al (1978). The studies have demonstrated a correlation of lithotypes with maceral composition (particularly liptinite), volatile matter, hydrogen content and specific energy (George 1982). For example, the relationship between total liptinite and lithotype for various coal seams is shown in Figure 3 (pers JCB-04
—210—
comm P Bolger).
Mapping of lithotypes in the coal face and in large
diameter bores has therefore become an important input to coal utilisation studies.
Lithotype
FIGURE 3 : Correlation of % total liptinite with lithotype for various coal seams. The nature of the ash forming constituents in the brown coal warrant special attention because, even though the ash content is low, severe fouling problems occur in the power station boilers.
Different ash
minerals can be formed from soluble salts and discrete mineral particles in the coal according to the combustion conditions (Kiss and King 1977).
The
ash is formed primarily from sodium, magnesium, calcium, aluminium, sulphur, iron and sodium chloride. Barton (1987) describes the methods used to analyse coal quality data.
One
of the major advances described is the use of geostatistics to enhance power station performance by predicting NWSE, ash, moisture, sodium and sodium in ash for specific blocks of coal.
Webster (1986, 1987) shows that
good correlation is obtained between the geostatistical predictions and the power station samples.
JCB-05
—211—
Interesting studies into the origin of ash in the Latrobe Valley brown coal have been carried out by Kiss et al (1985) and Brockway and Borsaru (1985). On the basis of the hydrogeological model of the LVD (Brumley et al 1981), evidence has been documented which suggests post depositional migration of inorganics through the coal seams under the influence of upwards leakage and surface discharge from confined aquifers in the LVD.
The studies
suggest that the distribution of inorganics results mainly from this seepage through the coal rather than from the inorganic constituents in the original plant material.
Brumley and Holdgate (1983) also suggest that
slow discharge of artesian groundwater played a significant role in maintaining the LVD coal forming environment in the absence of the periodic influx of water and sediment commonly associated with the accumulation of massive coal deposits. 2.3
Artesian Groundwater
Artesian water pressures at LYOC and MOC need to be controlled to ensure stability of the open cuts.
The SECV is also accountable for the regional
effect on the groundwater resources and the consequential regional subsidence. Artesian water is extracted from the aquifers and the reduction of aquifer pressures is monitored in a comprehensive network of bores around the open cuts.
Aquifer pressures have been reduced for up to 25 to 50 km east of
MOC due to the extraction since 1960 of some 530 GL which is equivalent to approximately two tonnes of water for every tonne of coal mined. Dewatering at LYOC commenced in 1984.
Up to some 18 GL per year will be
extracted, totalling approximately 200 GL by the year 2010.
Artesian
dewatering at LYOC will be more difficult than at MOC because of the complex stratigraphy of the Loy Yang Dome, the low permeability of the aquifers and the intersection of the aquifer sequence by the mine.
LYOC
dewatering will interact with that from MOC and will also contribute to the regional subsidence which now extends some 25 km from MOC. The amount of aquifer water extracted is strictly limited to that required for open cut safety.
The water is of excellent quality and is incorporated
into the water supply for the power station and mine works.
JCB-06
—212—
Mathematical modelling of the groundwater system was commenced by Fraser (1980) and further developed by Evans (1986) and Bolger (1987).
The recent
work has refined the prediction of the rate of dewatering from MOC and LYOC according to revised open cut development plans.
In particular, there is a
reduced requirement for dewatering at LYOC, which necessitates a comparable increase in dewatering at MOC.
Likewise, reduced dewatering at LYOC
indicates that regional potentiometric surface contours will not be lowered as much as previously estimated by Evans (1986). The major challenge in the groundwater studies is the development of a realistic hydrogeological model on which to base the predictive mathematical model studies of future open cut dewatering requirements and the regional effects thereof. Two basic components exist in any hydrogeological model. stratigraphy.
The first is the
The detailed delineation of the strata and their lithology
enables discrete aquifers and aquifer systems to be selected.
The Tertiary
sands, silts and gravels comprise the aquifers together with the jointed coal seams in the stress relieved areas around the open cuts.
Elsewhere,
the coal seams function as aquitards along with the clay strata.
The
categorisation of the strata into aquifers and aquitards is on a relative permeability basis and is somewhat subjective because a full spectrum of permeabilities actually occurs within the Tertiary sequence.
The
designation of the coal seams as regional aquitards contrasts with the major Australian black coal Basins in which the fractured coal seams invariably form the aquifers (Brumley 1985).
The Lower Cretaceous and
Palaeozoic rocks are also being studied to determine if they make a significant contribution as fractured rock aquifers to the groundwater system in the Tertiary strata. The second basic component of the hydrogeological model is the water balance.
To achieve realistic modelling of a groundwater system under
stress from major extraction, it is necessary to know the relative proportion of water yield derived from recharge, from the aquifers and from the aquitards.
By attributing approximately 90% of the volume of regional
subsidence to the yield from consolidation of the aquitards, Brumley and Reid (1982) demonstrated that aquitard yield represents approximately 30% of the total volume extracted from MOC.
The work was extended by Evans
(1986) to show a linear relationship between subsidence and pumpage with
JCB-07
—213— time (Figure 5).
The contribution from recharge was estimated by Brumley
and Reid (1982) and refined by Evans (1986) by calculating a "potentiometric yield" from the aquifer sequence and deducting this volume together with the aquitard yield from the total volume extracted from the LVD.
The balance of approximately 45% of the water extracted was
attributed to recharge.
The estimate was substantiated by field
identification of recharge areas (Brumley, 1981). 420
I40i— 130
-
•
120 MO
-
£ l O O
-
Pumpag®
330
- 300 ^
§90 j*
390
- 3 6 0
• Subsidence
-
270
2
:u " 240> -j 210 • O
7 0 -
M
180 o
M
150
3 , 4 0 W
-
3 0
-
20
-
120
o o
M
10 -
0
~
90
60 30 >
I 9 6 0 61
+
+
62 63
° 64 65
66
67
68
69
70
71
72
73
74
75
76
77
78
79 80
81
82
83
T I M E (Year)
FIGURE 4 : Cumulative volumes of subsidence and pumpage with time (from Evans 1986). This synthesis of stratigraphy, hydrogeology and monitoring of regional water levels and subsidence, forms the basic hydrogeological model upon which the predictive mathematical modelling for open cut dewatering is based.
Detailed strati graphic work in the complex Loy Yang area is
currently being carried out to improve the modelling for LYOC.
3
CONCLUSION
A selection of studies has been presented to provide an insight into the geological and hydrogeological work performed for planning and operating the open cut brown coal mines in the Latrobe Valley, Victoria.
4
ACKNOWLEDGEMENTS
The permission of the SECV to address this conference is appreciated.
The
contributions made by colleagues in providing material for this abstract is acknowledged.
JCB-08
—214— REFERENCES AT lard ice, D J; George, A M; King, T N W; and Kiss, L T, 1978. The Properties of Brown Coals from the Latrobe Valley - Results of Analyses and Tests. SECV, Research and Development Department, Rept No 357 (unpubl). Ballard, D K; Waghorne, E P; and Gleeson, H B, 1987. Brown Coal Supply for Electricity Generation Initial Operation at Loy Yang Open Cut. Coal Power '87, Aus IMM Annual Conference, Newcastle. Barton, C M, 1982. A Review of Brown Coal Geology by the State Electricity Commission of Victoria. Aust Coal Geology, Vol 4, Pt 2. Barton, C M, 1985. Factors Governing the Effective Planning and Conduct of Exploration and Geological Evaluation of Lignite Deposits. Proc. Conference on Lignite Mining in Thailand, EGAT Bangkok. Barton, C M, 1987. An update of Brown Coal Geology Practice in the State Electricity Commission of Victoria. Australian Coal Industry Research Laboratories Journal (In Press). Bolger, P F, 1987. Regional Groundwater Investigation of the Latrobe Valley, Stage III Mathematical Modelling Studies. SECV, Geological Report No 41 (unpubl). Brockway, D J; and Borsaru, R M, 1985. Ion Concentration of Profiles in Victorian Brown Coals. Proc. Int. Conf. on Coal Science, Sydney, NSW. Brumley, J C, 1981. General Hydrogeology of the Latrobe Valley Depression and the Effects of Aquifer Dewatering at Morwell Open Cut, Victoria. Proc. Seminar on Groundwater, April 8, Aust Geomechanics Society, Vic Group. Brumley, J C, 1985. Hydrogeological Aspects of Representative Major Black Coal Deposits in Australia. Advanced Surface Mining Technology Project Report. Warren Centre for Advanced Engineering, University of Sydney. Brumley, J C; Barton, C M; Holdgate, G R; and Reid, M A, 1981. Regional Groundwater Investigation of the Latrobe Valley 1976-1981. Joint SECV/DMEV Rept (unpubl). Brumley, J C; and Reid, M A, 1982. An Investigation of the Groundwater Resources of the Latrobe Valley, Victoria. Aust Coal Geology Vol 4 Pt (2). Brumley, J C; and Holdgate, G R, 1983. An Assessment of the Confined Groundwater of the Moe Swamp Basin, Victoria. Int. Conf. on Groundwater and Man, Sydney, Vol 1. Evans, R S, 1986. A Regional Groundwater Model for Open Cut Coal Winning in the Latrobe Valley, Victoria. AWRC Conf. Groundwater Systems w Under Stress, Brisbane. Fraser, C J, 1980. Latrobe Valley Regional Groundwater Investigation. Initial Mathematical Modelling Studies. SECV, Development Div Report (unpubl).
JCB-09
—215— Gaul ton, R J, 1982. The Role of the Mine Geologist in Brown Coal Winning. Aust Coal Geology, Vol 4, Pt 2. George, A M, 1975. Brown Coal Lithotypes in the Latrobe Valley Deposits. SECV, Exploration and Geological Div Penological Report No 17 (unpubl). George, A M, 1982. Latrobe Valley Brown Coal - Lithotypes: Materials: Coal Properties. Aust Coal Geology, Vol 4, Pt (1). Gill, B F, 1982. Data Processing of Bore Records. Vol 4, Pt 2.
Aust Coal Geology,
Gloe, C S, 1984. The Geology Discovery and Assessment of the Brown Coal A Huge Fortune in Chancery. Monograph II, Aust IMM. Gloe, C S; and Badenhope, F A, 1976. Drilling Investigations for the Loy Yang Project, Victoria, Australia. National Seminar on Open Cast Mining, Neyveli, India. Gloe, C S; and Holdgate, G R, 1987. Geology and Resources Monograph on Brown Coal. Coal Corporation of Victoria, Traralgon, Victoria (In Press). Holdgate, G R, 1985. Stratigraphy of the Morwell 2 Aquifer Sands in Sectors 3 arid 4 of the Morwell Open Cut. SECV, Exploration and Geological Div Report No 31 (unpubl). Holdgate, G R, 1987. Further Latrobe Valley Regional Groundwater Bore Cross-sections. Geological Report No 42, Coal Resources Division, Fuel Department, SECV. Kiss, L T; and King, T N, 1977. The Expression of Results of Coal Analysis: The Case for Brown Coals. Fuel, Vol 56. Kiss, L T; Brockway, D J; George, A M; and Stacy, W 0, 1985. The Distribution of Minerals, Inorganics, and Sulphur in Brown Coal. Proc. Int. Conf on Coal Science, Sydney, NSW. Victorian Brown Coal Council, 1983 (VBCC). Resource Development Study, Volume 3. The Brown Coal Resource. Washusen, J A; and Fraser, C J, 1982. Stability Control and Monitoring in Deep Latrobe Valley Open Cuts. Proc. Aus IMM Annual Conference, Melbourne. Webster, R, 1986. Preliminary Assessment of Geostatistical Coal Quality Predictions of Net Wet Specific Energy, Sodium and Soluble Aluminium for Loy Yang Power Station. SECV Coal Resources Div, Technical Note No 139 (unpubl). Webster, R, 1987. Preliminary Assessment of Geostatistical Coal Quality Predictions for Morwell Open Cut. SECV Coal Resources Div, Technical Note No 152 (unpubl).
JCB-10
—216—
7. GEOTECHNICAL STUDIES
—218—
DEVELOPMENT OF AN AUSTRALIAN COLLIERY ROADWAY SUPPORT NOMOGRAM USING ARTIFICIAL INTELLIGENCE COMPUTING
SYSTEMS
J, Shepherd, K.P. Walton and Z. Nemes-Nemeth
Australian Coal Industry Research Laboratories Ltd. P.O. Box 83, North Ryde, NSW 2113, Australia.
ABSTRACT A
system
for
gathering
observational
geotechnical data for
Australian colliery roadways has been devised.
Using an expert
system
computing technique and carrying out a pilot study on a
subset
of
predicted
roadway
data,
at
58%
relationship joint
a between
properties.
collieries
is
the
likely
accuracy,
roof conditions can be
using
only
,the
angular
compressive stress and joints, and other Further
analysis
of
the
expected to identify the critical
factors required in roof support analysis.
data
from 20
observational
—219— 1.
Background
Overseas
research
nomograms
for the prediction of roadway conditions and
has
resulted in the development of several
requirements, on the basis of the mining conditions. best
known
Tunneling
support
The three
systems are the Rock Mass Rating (RMR) 1 , the 2 Quality Index (Q) , and the National Coal Board such
Roadway
Nomogram 3 .
However
none
Australian
of
coal
these
systems
mining
industry.
geotechnical
framework
requirements
it
was
and
have
data
been In
base
adopted
order
to
by
the
provide a
for examining
support
decided to develop a computerised
Expert
System to form the basis of support design.
The
expert
capable on
the
predicting support needs in Australian
history.
Australian
mine,
is
should
It is based on observational data gathered coal
capable
conditions,
and
provide
assessing
mines and, when applied to a particular
of
"learning"
presented
from
examples of the local
adapting itself to suit these conditions.
It
a
for
relatively
conditions
prior
geotechnical analysis.
2.
rules,
collieries,
basis of the existing roof conditions and the previous
support from
system aims to provide a set of intelligent
of
quick to
and
cheap
proceeding
method with
further
Preliminary results and methodology
are
here.
Collection Of Roof Control Data
Statistics
roof control were
collected
from 20 collieries in New South Wales and Queensland.
The data
collected location
on
is
effecting
divisible
roof conditions, floor condition, roof
structure,
roof
geotechnical Figure
prevailing
stress
field.
roadway,
exhibiting
the
they
into various aspects as follows: site
and mining method, roof support details, roof support
deformation, roof
factors
type
1
information shows
lithology, and
the
an hypothetical
of factors of interest and how
interact.
JS-KW-ZN-01
—220—
F i g u r e 1. T y p i c a l m i n e r o a d w a y in e x c e s s l a t e r a l s o m e o f the f a c t o r s a f f e c t i n g r o o f c o n t r o l . 6. is compressive stress.
stress conditions, showing the m a x i m u m p r i n c i p a l
The data was collected in a systematic fashion, using an observational Using
this
techniques
method
involving
a
roadway
assessment
form.
form a database can be derived for analysis. are
also
valuable
preparation
for
any
Such strata
mechanics or support evaluation work.
For
the
purposes
of
support analysis it is imperative to be
able to compare the nature of the roof with support deformation and
behavi our ,
assessment
of
and
to
whether
be
able
support
to make an objective visual is functioning adequately and
providing
safe
roadway
necessary
to
devise
for
assessing
conditions
and
support, to ensure data consistency.
A system
of
was devised, based on quantitative measurements of
ratings
sag, rating
guttering
height,
conditions. a
set
support
of
It
was
guidelines
deflection
found
and
to
so on.
be
The
system used for roof conditions is provided in Table 1.
The example roadway shown in previous Figure 1 would be given a "4" roof rating.
JS-KW-ZN-02
—221—
Table 1.
Roof condition ratings in order of increasing
Index No.
severity
Roof Condition Description
1
Good, tight, no cracking/some
2
Dilated cracks/scaliness up to 0.3 metres in height
3
Heavy to very heavy*/gutter up to 0.5 metres in height /falls* up to 1.0 metre in height
4
Gutters greater than 0.5 metres in height/very heavy with falls up to 1.0 metres in height or gutters up to 0.5 metres in height
5
cracking
Falls greater than 1.0 metre in height *
Very heavy roof has sag estimated as greater than 0.2 metres. A fall is an opening higher than 0.3 metres.
Data collection was carried out with two specific aims:
i.
to examine areas of similar roof lithological
types
but with different support installed, and
ii.
to
examine
different roof condition types with or
without contrasting support types.
It
was
sets. was
considered that this approach would yield optimum data Unfortunately the stand-up time for the roadways
studied
generally unknown and therefore, the data does not account
for the time
2.1
factor.
Preliminary Data Analysis
Initial analysis of the data revealed that increasing the angle between
the
direction condition. varied been
maximum
(stress"RAD)
horizontal had
a
stress
and the roadway axis
debilitating effect on roadway
Also, at a constant stress'RAD, roadway
depending presented
on
roof bolt anchorage.
conditions
These results have
more fully elsewhere 4 , and are consistent with
those of other workers, which show a strong correlation
between
roadway
Southern
conditions
and
Coalfield, New South Wales
stress^RAD .
correlation may be identified
within
the
The present study shows that this statewide.
JS-KW-ZN-03
—222—
However,
traditional
additional
results.
by
statistical
analysis
yielded
few
Critical factors appeared to be disguised
the lack of time-dependent information and by the amount of
erroneous
or
noisy data.
It was apparent that information of
this nature required expert interpretation, preferably with the assistance
of
an
expert
system
to cope with the large data
sets. 3.
Expert System Development
3.1
The Principle Of Rule
Expert
systems
designed
to
are
Induction
a new, 5th generation computer
manipulate
databases.
Their
aim
concepts is
to
decision-making,
supplying
available
a human expert.
the
from
expert
system
can
rather
than
duplicate
answers
technique, numbers
or
human reasoning in
of a quality usually only
Like their human counterpart,
justify
answers
through
a chain of
reasoning.
Expert systems can be used as 'smart assistants', handling
capable
of
experts
to interpret the more difficult problems.
routine tasks efficiently, freeing human As they are
capable
of
be used to
justifying
decisions
they
can
deliver knowledge in a readily usable form. becoming
increasingly
also
Expert systems are
common in mining industry
applications,
such as methane risk prediction and shearer fault d i a g n o s i s 6 . The
structure
inference may
be
of
produced
expert.
The
expert
decisions
dealing
with
if-then-else The
an
expert
system
usually
consists of an
engine, capable of manipulating general rules, which from
rule
examples
induction
to
create
similar
of decisions provided by the process uses these examples of
a general decision procedure
circumstances,
often
in
the
for
form of
rules.
expert system building tool chosen for rule-generation was
Rulemaster 7 , generates
which
uses
the
ID3 algorithm 8 .
This algorithm
a tree of questions which will most efficiently
find
JS-KW-ZN-04
—223— a solution, based on the examples provided. agrees
with
all
decisions
reached
in
The generated tree the example set, and
generalises
to
space.
A
very useful side effect of this is that it becomes
reach decisions for other parts of the example
readily
apparent
which
criteria
are significant in reaching
conclusions, and which are superfluous or rarely used. The ID3 algorithm always selects the statistically most powerful indicator first, and therefore frequently occurring factors often appeared to overshadow features which might be real causes. It was necessary to structure the data set by removing such factors. Additionally, only one goal could be determined in each rule. It was therefore decided to divide the data into subsets, each of which could be used to establish a sub-goal. These sub-rules could then be integrated to form a more general rule, in this case predicting the support requi rements.
3.2
Prediction Of Roof Conditions From Joint Properties
The
effect
as
an
of joint properties on roof condition is used here
example
(Figure
2)
of
the
rule-making
process.
shows
the
role
collected joint data in
of
the
The flowchart
determining the overall support requirements of a roadway.
The
SUPPORT REQUIREMENTS
ROADWAY
EXPECTED ROOF
REQUIREMENTS
PERFORMANCE
ROCK
STRESS
JOINT
ROOF
ROOF
STRENGTH
CONDITIONS
SEVERITY
TYPE
STRUCTURE
JOINT
JOINT
JOINT
JOINT
LENGTH
TYPE
SPACING
TREND
Figuro 2.
PREVIOUS SUPPORT
CONDITION
JOINT"RAD
JOINT'STRESS
JOINT"FAILURE
AMOUNT OF JOINT CONTROL IN FAILURE
Flowchart showing role of j o i n t dat. in p r e d i c t i n g support r e q u i r . - n t s .
JS-KW-ZN-05
—224—
roof
conditions
geotechnical
suggested
data
are
by
used
joint
geometry
and
other
with factors such as the roadway
properties
and the previous support history, to provide a rule
governing
support
requirements.
The sub-rule predicting
roof
condition from joint and stress geometry is given in Figure 3.
This
rule
is
where
the
THEN
underlined
equivalent
to
statements
a series of IF THEN are
denoted
by
an
statements, arrow.
The
section of the decision tree would be intepreted as
follows:
If
and
joint*RAD<46
and
if
s tress ~RAD<72
rating
be
3.
This tree was generated from a
if
condition small
is joint controlled and if stress"RAD>22
will
then
the
roof
test data set of 65 examples of jointed roof, taken from
the Southern
To
failure
assist
Coalfield.
in
intepreting
the
tree,
rose
diagrams
were
constructed,
showing the angular relationships between
roadway
and
stress that were identified as significant by the
decision
making process.
associated
roof
(FAILUREJOINT CONTROLLED]
condition
joints,
Each geometrical relationship has an rating,
; [STRESS"RAD1 <22 : t J O I N T T Y P E j ZONE : - > (4, g o a l ) RECURRENT : - > (5, g o a l ) INDIVIDUAL : - > ( p r i n t s "II given II", >22 : [JOINT'RAD]
predicted
by
the
rule.
Y
no e x a m p l e goal)
<^6
N
STRESS"RAP] <72 : -> T 3 , g o a l ) >-72 : [STRESS*RADT^ <291 : -> (4, g o a l ) >=291 : -> (2, g o a l ) >46 : [ J O I N T T R E N D ] <43 : ( S T R E S S " R A D ] <275 : -> (3, g o a l ) >-275 : -> (5, g o a l ) >43 : -> (3, g o a l ) : [JOINT"RAD] <56 : I J O I N T " R A D ] <5 : -> (1, g o a l ) >-5 : I J O I N T T R E N D J <41 : ( S T R E S S " R A D ] <293 : -> (3, g o a l ) >-293 : - > (1, g o a l ) >-41 : - > (3, g o a l ) >56 : [ S P A C I N G ] <650 : => (3, g o a l ) >-650 : ( J O I N T T Y P E ] ZONE : «> (4, g o a l ) RECURRENT : -> (3 f g o a l ) INDIVIDUAL : J STRESS"RAD] <67 : => (4, g o a l ) >-67 : (JOINT"RAD] <79 : => (3, g o a l ) >-79 : -> (4, g o a l )
F i g u r e 3. Induced s u b - r u l e , p r e d i c t i n g roof c o n d i t i o n rating g e o m e t r y , w h e r e the c o n d i t i o n r a t i n g r a n g e s f r o m 1 to 5.
Figure
4b
Figure Figure
4c 4a
1 . ^Figure
Figure Figure
from
4d 4e
joint
JS-KW-ZN-06
—225— Selected
rose
diagrams
are
provided
in
Figure 4, with the
branches to which they refer indicated in Figure 3.
It
can
be
seen
stress
field
opinion
suggests
from Figure 4 that the joints and prevailing
form
stress'RAD
has
(Figures
4a,b,c).
minor
role
interactive
a
failure
debilitating
system.
joint
Even when expert
controlled,
increasing
effect on the roof conditions
Conversely, where joints appear to play a
in the failure mechanism, roof condition may still
deteriorate principal
an that
as
the
angle
compressive
between the joints and the maximum
stress decreases (Figures 4d,e).
Where
there is no evidence of excess lateral stress the presence of a joint zone may have a worse effect on the roof condition than a recurrent
joint
set
of
significant mechanistic
Examination that
the
Southern
similar spacing.
These results have
implications.
of the decision tree in previous Figure 3 suggests joint
trend may also be a significant factor in the
Coalfield.
Magnetic
bearings
of
43°
and
41°
JOINT CONTROLLED FAILURE MECHANISM
RAO
RAD
RAD
KEY
c. coof cating-2
a. coof cating-3 FAILURE MECHANISM NOT JOINT CONTROLLED
RAD
d. coof cating-3
RAO
e. coof cating-4
RAD
£. coof eating4 foe a joint zone 3 foe cecuccent joints
Figuce 4. Rose diagrams ;showing the relationships between joint, stress and roadway direction (RAD), <and roof condition rating, identified by the decision are the maximum and minimum lateral stresses. tree in Figure 3. 6. and1
JS-KW-ZN-07
-
2 2 6
-
r e s p e c t i v e l y , were identified as significant cut-off points for both j o i n t - c o n t r o l l e d and n o n - j o i n t - c o n t r o l l e d
failure.
of less than 4 3 ° were indicators of generally worse A
Trends
conditions.
balloon diagram of trend frequency (Figure 5) shows that two
of the three sets identified have trends less than 43°. The
decision
tree
shown
in
Figure 3 was used to generate a
small expert system capable of predicting the roof condition on the
basis
of the induced rules.
A section of a roof analysis
session is given in Figure 6, with user responses in u n d e r l i n e d type.
The rest of the text is produced by the expert
3.3
Implications For R e l i a b i l i t y
It
was
found
predicted were
that
with
predicted
conditions
in
sample
analyses roof conditions were
an accuracy of 58%. wrongly,
it
system.
was
H o w e v e r , where
conditions
found that 60% of the wrong
erred by only one rating, and most of these
were
in the "2" to "4" range.
seen
that
this
could represent a difference of less than 100
PftOJtCI Nit 013* J.I.I U,rnU
LOCALITY No. 1 BALLOON
ratings
From previous Table 1 it can be
JO-JUl-l w
Mmifiifluam 1
DENSITY
MM
joint controlled [y,n,xnal n joint"RAD 58 average spacing 300 Roof rating is 3 Enter 's' for stop or RETURN to continue : RETURN joint controlled [y,n,xna] n joint"RAD 78 average spacing 5000 Joint type is: zone recur rent individual NA [ a , b, c , d 1 c stress'RAD 500 joint'RAD 7_8 Roof rating is 3 Enter
's' for stop or RETURN to continue : RETURN
N = 65 ALPHA= 0 . 5 0 RAW D E N S I T I E S
joint controlled [y,n,xna] n joint"RAD 18 joint'RAD 18 joint trend 18 stress"RAD 85 average spacing 300 Roof rating is 3
ACIRL MINING RESEARCH
Enter 's' for stop or RETURN to continue : s
Figure 5 . Balloon density diagram of joint trends identified in the Southern C o a l f i e l d .
Figure 6 . Sample roof analysis session based on rules in decision tree in Figure 4. Angles in degrees and all other units in millimetres.
JS-KW-ZN-08
—227— millimetres inaccuracy system.
in
failure
in
the
height.
data
Therefore this could
collection
reflect
rather than in the
expert
It would suggest that with refinement the system would
certainly
be able to distinguish between the three broad
cases
of
interest
"2""),
most
poor
roof
72%
of
to
the operator; good
M
(a
5").
the "3" conditions were predicted accurately, the
fact
that
65%
consisted
of
"3"
conditions.
example
set
was
loaded
of
should
the
initial
possibly
example
set
This would suggest that as the
equally
conditions, accuracy in predicting
with
the
more
these would also
extreme
improve.
be noted however, that it is difficult to determine
whether
answers
common
ones.
anomalous
have
been
modelled
on
unusual examples or
Further structuring of the data set to eliminate
examples should yield increased
be stressed
reliabilty.
It must
that the reliabilty of such a system depends on the
veracity and scope of the
4.
(a "1 or
(a "3" or "4") and roof likely to fall
reflecting
It
roof
examples.
Conclusions
Observational
geotechnical data gathered
roadways
essential
is
investigation
as
into support
Geotechnical
data
a
for
underground
precursor
for
gathering must be
systematically
performed and this can be best achieved using the assessment
An
expert
system
assessment.
it
was
may
technique
be capable of providing a rapid, for
initial
roadway
support
The method could be tailored to suit
conditions.
consisting
roadway
form.
reliable
colliery
any
requirements.
of
Using
a
small
joint and compressive
possible
acccuracy of 58%.
to
predict
roof
pilot data
stress
local set,
information,
conditions
with an
Results suggest that reliability
could
JS-KW-ZN-09
—228—
be
substantially
i m p r o v e d by the u s e of f u r t h e r
s e t s and a d d i t i o n a l roof The
i n t e r a c t i o n of the n u m e r o u s v a r i a b l e s a f f e c t i n g
performance
is
factors
may
presence
or
ratio,
variables,
mechanistic
roof
of
amongst
Typically,
and
may
implications.
rock p r o p e r t i e s ,
joints
and
the
others.
Future work
using
therefore By
have
leading
of
significant
to
a
clearer effective
design.
Acknowledgements are g r a t e f u l for f u n d s from the D e p a r t m e n t of N a t i o n a l and
Energy
Development
and
Demonstration
(Reference 82/2111).
under
the
National
Program
Energy
Contract
Energy
Research No.
M i n e m a n a g e m e n t s a r e a l s o t h a n k e d for
g e n e r o u s h e l p a n d s u p p o r t in g a t h e r i n g d a t a for t h i s
525 their
study.
6.
References
1.
B I E N I A W S K I , Z . T . (1974) Geomechanics classification of rock masses and a p p l i c a t i o n in t u n n e l l i n g . A d v a n c e s In R o c k M e c h a n i c s , P r o c e e d i n g s Of The T h i r d Congress, Denver, vol.11(a). p.27-32.
3.
the
roadway
of the roof f a i l u r e m e c h a n i s m , it is h o p e d
Development
2.
roof
important
the e x p e r t s y s t e m w i l l c o n t r i b u t e to m o r e
support
We
stress^RAD, absence
understanding
5.
complex system.
e x p e r t s y s t e m can e x a m i n e the r e l a t i v e i m p o r t a n c e
these
that
a
be
width/height the
example
information.
its ISRM
B A R T O N , N . , L I O N , R . , AND LUNDE, J . (1974) Engineering classification of rock m a s s e s for d e s i g n tunnel support. ROCK M E C H A N I C S , v o l . 6 , p.189-236. NATIONAL COAL BOARD WORKING PARTY REPORT (1972) D e s i g n of m i n e l a y o u t s . Working Party Report, National Coal Board Department. p.13-18.
of
Mining
JS-KW-ZN-10
—229— 4.
SHEPHERD, J., RIXON, L.K., WALTON, K.P., HUMPHREYS, D.R. AND O'BEIRNE, T. (1987) Geotechnical methods for the evaluation of underground roadway conditions and support requirements, Australian Coal Industry Research Laboratories Ltd, Published Report 87-2,
5.
GALE, W.J. AND BLACKWOOD, R.L. (1987) Stress distributions and rock failure around coal mine roadways. INT. J. ROCK. MECH. MIN. SCI. & GEOMECH. ABSTR. vol.24 (3). p.165-173.
6.
COAL AGE (1987 ) Expert systems coming to mining. COAL AGE, vol.92 (.3). p. 54.
7.
MICHIE, D. , MUGGLETON, S., RIESE, C. AND ZUBRIL, S. ( 1984 ) Rulemaster: a second generation knowledge engineering facility. Proc. IEEE First Conference On Artificial Intelligence Applications, Denver, Colorado, December, pp. 591-596.
8.
QUINLAN f J.R. ( 1983) Learning efficient classification procedures and their application to chess end games. In: R.S. Michalski, J.G. Carbonell and T.M. Mitchell (eds.), "Machine Learning", Tioga, Palo Alto, CA. pp. 463-482 .
JS-KW-ZN-11
- 230 -
ASSESSMENT OF GEOTECHNICAL CONDITIONS AHEAD OF SURFACE COAL MINING - CASE HISTORIES FROM THE BOWEN BASIN. NIGEL H.H. GODFREY, GEOLOGIST, GOONYELLA MINE, BHP/UTAH COAL LIMITED, P.M.B., MORANBAH, QLD. 4744.
Abstract: Many years of successful operation of several very large and deep, opencut, strip coal mines, by BHP/Utah Coal Limited (and their antecedents), have seen the remedying of many problems related to pitwall instability and blasting/dragline digging conditions. This has largely been achieved by a small, in-house geotechnical team studying the geological background to the problems concerned - resulting in the production of suitable operational remedial measures in collaboration with the relevant mine staff. Many of the geological features which have been identified as adversely affecting operating conditions, particularly with regard to overburden excavation and pitwall instability, will be of general application at other mines. Some of these features are briefly outlined and further illustrated by way of case histories.
- 231 ASSESSMENT OF GEOTECHNICAL CONDITIONS AHEAD OF SURFACE COAL MINING - CASE HISTORIES FROM THE BOWEN BASIN
1.0.
INTRODUCTION
BHP/Utah Coal Limited have been operating a number of very large, open
cut strip coal mines in the Bowen Basin of Queensland for
deep,
periods
varying from 8 to 20 years (see Fig. 1).
Over
this time,
pitwall
stability
and
overburden
digging
have
been
recurring problems at certain of the mines (Boyd & Saunders '79,
Mallet
& Gerrard '80, Philp, Boyd,Eckersley * 81, Godfrey
'83),
and
studies
have
been
made to find the
and
hence
the
problems have
concerned.
been
done
Limited
by
in
Group,
the
These studies BHP-Utah
Coal
Services
either
collaboration
C.S.I.R.O.
causes
for
Technical
Geotechnical or,
remedies
with
alone, the
Division of Geomechanics
and/or consultants.
The
studies
which,
alone
established
a series of basic pre-conditions
or in combination,
contribute significantly
or
factors
to
pitwall
instability or poor digging conditions.
These
pre-conditions
geology
are
largely concerned with
and the weathering involved.
the
Accordingly,
nature
of
the
they also hold for
many other open cut coal areas in Australia.
The
factors pertaining have been amply covered elsewhere
(e.g.
'83), but some of the major ones are briefly shown here in diagram
Davies form
as background for the case histories which follow (see Fig. 2 and 9).
NG-01
- 232 2.0.
CASE HISTORIES
2.1.
Blasting
2.1.1.
Blasting - General
Blasting
is
geological
an
area
information
considerations
where appreciable cost savings can is properly used during
blast
be
made
if
design.
Major
(often ignored) are very briefly listed below and
shown
under in diagram form (Fig. 2). W A T C H FOR P A T C H E S OF SECONDARY CARBONATE C E M E N T A T I O N AND ESP FOR ZONE OF S U C H C E M E N T A T I O N IN B A N D 1 TO 3M T H I C K AT SS B A S E (POOR B A S E B L A S T LEAVES NEARLY UNDIGGABLE HARD SS)
H A P P I N G OF J O I N T S AND O T H E R D I S C O N T I N U I T I E S R E Q U I R E D , T O S H O W F R E Q U E N C Y AND C H A R A C T E R E . G . P E R S I S T E N C E , F I L L I N G , O P E N OR C L O S E D N A T U R E , F R E Q U E N C Y A N D O R I E N T A T I O N OF J O I N T S TO H I G H W A L L F A C E ; A L L C O N T R I B U T E T O B L A S T D E S I G N E F F I C I E N C Y .
INFERRED INHERE^ MAXIMUM STRESS DIRECTION FOUND BY S T E R E O N E T JOINT ANALYSIS OPTIMIZE BLAST D I R E C T I O N FOR DESIRED BLAST EFFECT WITH SMALLER POWDER FACTORS
(i) M A S S I V E S A N O S T O N E W I T H INFREQUENT BUT PERSISTENT J O I N T I N G T A K I N G U P M O S T OF O V E R B U R D E N D O W N TO OR 'WITHIN 1 TO 2M OF C O A L . H A R D B L A S T I N G EXCEPT WHEN W E A K .
( i i i ) 2 to 15M (AND O C C A S I O N A L L Y T H I C K E R ) U N I T S T H I N B E D D E D AND WELL JOINTED MUDSTONES/SILTSTONES; O F T E N W I T H C A R B O N A C E O U S PLANT R E M A I N S , O V E R L I E S C O A L , MAY NOT REQUIRE BLASTING. ( S A V E S COAL T O P W A S T A G E . ( B L A S T IS L O A D E D FOR O V E R L Y I N G SS AND MS IS 0 V E R 9 L A S T E D A L O N G W I T H COAL TOP))
(ii) BEDDED S A N D S T O N E S . CLEARLY B E D D E D , MAY HAVE S P A R S E , T H I N , SILTSTONE INTERBEDS. SOME B E D S M A Y BE H A R D E R C A R B O N A T E C E M E N TED (HARD D R I L L I N G ) . EASIER BLASTING BREAK U P . M A Y O C C U P Y O N L Y P A R T OF O V E R B U R D E N , OR BE P A R T I C U L A R P R O M I N E N T B E D D I N G UNIT WITHIN MASSIVE SANDSTONE PILE.
REPRESENTATIVE CALIBRATED DOWNHOLE SONIC-VELOCITY-LOGGING-INDICATED ROCK S T R E N G T H S U S E D TO A S S E S S O V E R A L L P R E S E N C E OF W E A K O R H A R D M A S S I V E S A N D S T O N E A N D B E D D E D S A N D S T O N E S FOR B L A S T P L A N N I N G . P R O D U C T I O N B L A S T H O L E C H I P P I L E S A L S O M O N I T O R E D FOR F U R T H E R I N D I C A T I O N OF R E L A T I V E D I S T R I B U T I O N OF R O C K T Y P E S P R E S E N T A N O F I N E R B L A S T D E S I G N C O N T R O L (DRILL P E N E T R A T I O N R A T E S t / O R R O T A R Y T O R Q U E V A R I A T I O N S P L U S V I S U A L I N S P E C T I O N AND N O T A T I O N ) .
MASSIVE CAPPING SANDSTONE L E F T „ INTACT
' E X T R E M E L Y OR STRONGLY^ • WEATHERED
S U B S I D I A R Y C O A L AND/ OR W E A K F I S S I L E MS HOSTS HORIZONTAL V E N T I N G OF EXPLOSIVE GASE
~ ^ THIN BEDDED .SILTSTONES „
. STRONGLY WEATHERED
MODERATELY/MILDLY WEATHERED
THIN LAYERED SILT/ M U D S T O N E S MAY N E E D M I N I M A L OR NO BLASTING M S / S S T MAY BE INCR CARBONATE CEMENTED DOWNDIP & NEED GREATER POWDER FACTOR
P O W D E R F A C T O R S R E D U C E D FOR O V E R B U R D E N M O S T L Y OF T H I N N E R BEDDED SILTSTONES.
^
•) EXPLOSIVE GAS VENT ALONG WEAK UNDERLYING BED/S LEAVES O V E R L Y I N G , M A S S I V E , S T R O N G SS INTACT. REQUIRES PRECISE DECKING, b ) 2 - 5 & 10M T H I C K L A Y E R E D SILTSTONES ABOVE COAL MAY NOT N E E D B L A S T I N G IF W E L L JOINTED. C) W A T C H FOR S I L T S T O N E S AS IN b ) A B O V E , B E C O M I N G M O R E CARBONATE CEMENTED AND HARDER DOWNDIP MAY N E E D I N C R E A S E D P O W D E R FACTOR.
F"RESH
J-1
t "TRESFL
-
(v) R O C K S W I T H H I G H D E G R E E S OF W E A T H E R I N G IN O V E R - B U R D E N S T A C K MAY BE DUG W I T H O U T B L A S T I N G . IF UNDERLYING ONLY MODERATELY W E A T H E R E D TO F R E S H R O C K S A R E T H I N B E D D E D L U T I T E S , C A N A L S O O F T E N BE DUG W I T H M I N I M A L OR NO B L A S T I N G
FIG.2.
r'T'ff
^
Vm
(vi) L A C U S T R I N E AND M I R E S E D I M E N T S B E T W E E N COAL SEAMS O F T E N R E Q U I R E M I N I M A L OR NO B L A S T I N G
C O M P O S I T E C O N C E P T U A L I Z E D H I G H W A L L S K E T C H D I A G R A M S S H O W I N G SOME OF V A R I O U S G E O L O G I C A L F A C T O R S B E A R I N G U P O N B L A S T E F F I C I E N C Y AND DRAGLINE DIGGING.
NG-02
a)
Overburden
is
blasted
- 233
-
which
could
be
removed
solely
by
and
rock
dragline (see Fig. 2). b)
design
must take
account of
discontinuity
Blast
patterns
(joints,
inherent
bedding,
stresses
faults) and styles
in
promoting optimum throw and fragmentation for least blast cost. (Hagan '80) c)
Blast
design
must
take account of rock types
strengths
in
force of column charge is wasted via sub horizontal
gas
sequences blasted (Hagan & Morphett d)
Explosive venting
1
and
86)
along minor coal seams and/or other weak strata.
Use
of
properly decked charges is important, (see Fig. 2). d)
Water in blast holes to
5m and 6m above coal reduces effectiveness
and/or leads to blast procedure complications. Some
case
histories involving blasting at BHP/Utah Coal Limited
strip
mines are: 2.1.2.
Goonyella
A two seam,
single pass coal extraction will begin in the north of
the
mine in 1990 over a pit length of some 2 kms. The
Bucketwheel
Excavator has previously removed the top 15 to 35m
overburden for the next 6 strips downdip.
A truck and shovel
is to remove overburden down to 5 to 10m above the Middle dragline, is
of
operation
Goonyella.
A
to remove the remainder down to the Middle Goonyella seam,
plus the interburden down to the Lower Goonyella seam (see Fig. 3). Prior to the latter,
however,
had to be made in hard, difficulties to
an
an initial 120m x 700m
with fragmentation,
optimum
excavation
massive sandstones (see Fig. 4).
has
After initial
improvement has been made by changing
blast direction derived from an
analysis
of
f
inferred
maximum stress directions within the sandstone (Godfrey 8 7 ) .
For this,
a
following
joint
procedures inferred
analysis using stereonet projections was outlined
in
made
Cohen C 7 9 ) and Coles Phillips
stress directions derived,
and ('71)
again using stereonet
maximum
projections
(see Fig. 5) and a preferred blasting direction recommended (see Fig. 6). NG-03
- 234 Increased fragmentation and decreased vertical lift has resulted and the method will be used wherever feasible in future (however, often, the set nature
of
blasting
the
highwall strike direction limits
direction
and
a
"best-fit-attainable"
use
of
suffice).
FIG. A.
the
philosophy
GOONYEILA MINE. CLEANSKIN PIT TWO SEAH OPERATION. SCHEMA FOR ORIGINAL START UP EXCAVATION.
NG-04
optimum has
to
- 235 -
N
N
/ Blast direction fi®. 6 : Stress directions and blast directions; c f . to batter escalation directions
stereonet plot -Major conjugate joint p l a n e set -stress analysis
2.1.3, Blackwater Engineering design input into blasting at Blackwater has been undertaken since
1983
(Price & Thomson
*83) using geological data
derived
from
whole of mine highwall mapping and downdip geological predictive studies '83 and f84).
(Godfrey has
resulted
An average 27% overall decrease in blast costs
so far and the application of geological
information is
seen as being signal to this success.
Application of many of the parameters so far mentioned, or shown in Fig, 2,has played a large part in this exercise. 2.1.4. At
Peak Downs Mine
this
mine
25 km long mine, water in blastholes in pits in the
half
blasting Godfrey
resulted
costs.
in 5% of the mine length
absorbing
southern
20% of the
Studies were undertaken in '84 and '85 (Davies
'85,
f
86) to determine the origins of this water for assessment of
remedial measures.
Sources for the water are shown in Fig. 7, below.
Coal
seam and unconsolidated Cainozoic material was permeability tested
using
falling
measurement
of
head tests in stand pipes in both cases
and
by direct
seepage in bench and water storage sump faces
Cainozoic. NG-05
for the
- 236 This
was
combined with surface mapping to define any
areas
and
geological
mapping
of bench and
potentially more permeable strata. be
supplying most of the water,
done
to
sump
likely
walls
to
recharge identify
When Cainozoic material was found to
a close spaced drilling programme
define the Cainozoic/Permian unconformity surface and
was
outline
underground drainage paths for water leakage onto the bench. Study findings and remedial measures are depicted in Fig.8.
1 . W A T E R IN B L A S T H O L E S VIA C O A L S E A M S COAL S E A M S ARE LOW P E R M E A B I L I T Y R E G I O N A L A Q U I F E R S C O N F I N E D BY E F F E C T I V E L Y I M P E R M E A B L E S A N D S T O N E O V E R B U R D E N . IF PIT IS K E P T D R A I N E D A F T E R C O A L E X T R A C T I O N S , E X P O S E D S E A M D R A I N S BY S E E P A G E A N D IS D E W A T E R E D TO B E L O W O V E R B U R D E N . SHOULD PITWATER SUBSEQUENTLY POND ABOVE EXPOSED SEAM L E V E L , PIEZOMETRIC SURFACE LEVEL REACHES E L E V A T E D P O S I T I O N IN O V E R B U R D E N . W A T E R IN B L A S T H O L E S M A Y R E S U L T , P A R T I C U L A R L Y IN B A C K R O W S .
W A T E R P O N D A G E IN SPOIL PERCOLATES TO S P O I L B A S E A N D COAL FLOOR
R A I N RUN OFF P L U S BASE I COAL FLOOR P O N D S IN P I T
WATER TRAVELS DOWN SPOIL B A S E A N D C O A L FLOOR ""
WATER
REGIONAL PIEZOMETRIC S U R F A C E FROM C O N F I N E D EAM A Q U I F E R
SPOIL WATER
FLOODED PITS PREVENT DEWATERING OF C O A L S E A M A N D T H I S M A I N T A I N S E L E V A T E D P I E Z O M E T R I C S U R F A C E IN OVERBURDEN. BLAST HOLES WHICH B R O A C H C O A L A R E F L O O D E D TO LEVEL OF T H I S P I E Z O M E T R I C S U R F A C E IN B L A S T H O L E S VIA C A I N O Z O I C U N C O N S O L I D A T E D S E D I M E N T S
CAINOZOIC PERMIAN UNCONFORMIT
LOW PERMEABILITY COAL SEAMS (4 t o 5 X 10 - 5 C M / S E C ) ( D Y S A R T U P P E R 1 I 2 ) ( B O T H FLOOR AND S E A M S ( D Y S A R T L O W E R 1 I 2 ) ARE H Y D R A U L I C A L L Y CONNECTED)
W A T E R S E E P S O U T OF C A I N O Z O I C B A S A L C L A Y E Y ;ANDS A N D G R A V E L S O V E R 1 2 - 1 8 M O N T H S , O N T O B E N C H iURFACE A B O V E U N C O N F O R M I T Y .
P I E Z O M E T R I C " S U R F A C E IN C A I N O Z O I C IS R E G I O N A L L Y H I G H (3 TO 6M B E L O W GR0Utt£) P R O B A B L Y DUE E N H A N C E D R E C H A R G E FROM R E C Y C L E D PITWATER
WATER ENTERS BLAST HOLES INDIRECTLY V I A SS J O I N T I N G A N D D I R E C T L Y FROM B E N C H S U R F A C E RUN OFF
W A T E R 2 TO 6M H I G H IN B L A S T H O L E S
P E R M I A N COAL MEASURES SEDIMENTS (LARGELY MASSIVE LITHIC SANDSTONES) D Y S A R T COAL S E A M SERIES
FIG. 7.
PEAK D O W N S - W A T E R
IN
W A T E R IN PIT D E R I V E D SEEPAGE
FROM R U N OFF
BLASTHOLES.
NG-06
PITWATER AVOIDS RECHARGE REGION - DISCHARGE TO CREEK NEAR SCML BOUNDARY
NEW DRAINAGE CHANNEL
V\\\
9M THICK SAND BED HERE IS PERCHED WATER PONDAGE. BED THINS TO SOUTH AND RESTRICTS DRAINAGE ^
A.
^ P I T W A T E R DISCHARGED V INT0 CREEK S ^ ^ * SHALLOW FLOOD^BASlfl -
PITWATER SEEPS THROUGH CREEK BASE TO OLD~ PALAEOCHANNEL
OLD DISCHARGE (SLOW) TO NEARBY BOOMERANG CREEK CROSSING LEASE
-
PITWATER PUMPED UP FROM PIT
M U)
BASAL SANDS AND CLAYEY SANDS HARBOUR PERSISTENT DISCHARGE FROM PALAEO VALLEYS
2J 0 1 O
FIG. 8.
PEAK DOWNS - YURA PIT WATER RECYCLING PATHS
- 238 2.2
Pitvall Instability geological features which contribute to this are shown in
Some series
of
generalized
composite
sketches
in
Fig.9,
below.
the Two
illustrative case histories follow.
©
MAJOR SPOIL FAILURE - TWO WEDGE MODE (ADAPTED FROM P H I L P - B O Y D AND E C K E R S L E Y ' 8 1 )
®
BOXCUT LOWWALL FAILURES. ( N . B . B 2 CAN A L S O O C C U R IN HIGHWALLS WITH PITWARDS DIPPING UNCONFORMITY SURFACE ( P O T E N T I A L FOR V E R Y L A R G E F A I L U R E S ) )
REMNANT LOW ALL^COAL WEDGE PASSIVE WEDGE SLIDES ALONG S H E A R Z O N E IN SATURATED SPOIL AT S P O I L B A S E
©
POROUS SATURATED BOTTOM SANDS OPEN \ T O WATER FLOW FROM U N C O N F I N E D REGIONAL ^AQUIFER
B O X C U T LI LOW WALL
>
ISPSSiPfV^
IRCULAR SLIP FAILURES WEAK CAINOZOIC
\ ALONG PRESHEARED BEDDING P L A N E IN C O A L FLOOR
1 . MAJOR FAILURES ALONG PRE-SHEARED BEDDING PLANES OR B E D D I N G H O R I Z O N SHEAR Z O N E S N E A R C O A L T O P OR H I G H E R IN L O W W A L L . H A Y H A V E L O W SHEAR RESISTANCE DUE SATURATION FROM O V E R L Y I N G P E R C H E D W A T E R P O N D A G E IN U N C O N S O L I D A T E D CAINOZOIC. FAILURE POTENTIAL E X A C E R B A T E D BY C L E F T P R E S S U R E S F R O M W A T E R IN J O I N T S B E H I N D LOWWALL OPENED BY OVERBURDEN DIFFERENTIAL STRESS RELIEF . MOVEMENT INTO P I T .
HIGHWALL FAILURES-LARGE POTENTIAL. <i> I N T A C T R U P T U R E IN C O H E S I O N P O O R UNCONSOLIDATED CAINOZOIC O R , HIGHLY WEATHERED PERMIAN (ii)SLIDE-OUT ALONG EXTENSIVE,PITWARDS DIPPING BASAL FAILURE PLANE (USUALLY, P R E - S H E A R E D B E D D I N G H O R I Z O N S IN SILTSTONES/CLAYSTONES)
©
FAILURE MASS SLIDES ^ - - E R O D E D PERMIAN ALONG SATURATED AND HIGHLY C 0 A L MEASURES WEATHERED UNCONFORMITY SURFACE DIPPING PITWARDS
2.
MINOR TO MAJOR FAILURES ALONG SATURATED PITWARDS DIPPING UNCONFORMITY SURFACE AS BASAL FAILURE PLANE: INTACT RUPTURE CIRCULAR SLIP FAILURES T H R O U G H W E A K , S A T U R A T E D C A I N O Z O I C IN PERCHED PONDAGE ZONES
HIGHWALL FAILURES - LIMITED POTENTIAL. (i) S I M P L E S L U M P I N G ANO S H E E T S L I D I N G IN C O H E S I O N P O O R M A T E R I A L AS © (i), BUT OUTCROP AVAILABLE LIMITS EXTENT ( i i ) B L O C K F A I L U R E S , S L I D E O U T OF J O I N T A N D / O R F A U L T L I M I T E D B L O C K S ON B A S A L O U T F A C E R P L A N E / S . ( C O M M O N IN P A R A L L E L F A U L T E D OR S T R O N G L Y J O I N T E D Z O N E S IN C O M P E T E N T R O C K )
EAR L I M I T SET Y JOINTING AND/OR
- WEAK PRE-SHEARED S I L T S T O N E OR C L A Y S T O N E BEDDING HORIZON DIPS PITWARDS AT 3* TO 2 0 * . IF E X T E N S I V E , PROMOTES VERY LARGE HIGHWALL FAILURES
(i)
A B O V E , IS O F T E N S T A R T E D BY I N I T I A L S L I D I N G ON W E A K , P I T W A R D S D I P P I N G , BASAL FAILURE PLANE
(C & D A B O V E , A D A P T E D A F T E R (ADAPTED A F T E R G Q N A N O ' 8 0 )
FIG. 9.
LOW COHESION SLUMPING I SHEET SLIDING' C O M P E T E N T ROCK! F A I L A S SEJ OF B L O C K
W i UNCONFORMITY ( - O R , C A N BE L I M I T OF H I G H L Y WEATHERED ROCK)
(ii) B E D D I N G P L A N E , J O I N T OR F A U L T P L A N E DIP I N T O PIT
DAVIES'83
C O M P O S I T E C R O S S S E C T I O N A L S K E T C H E S OF C O M M O N FAILURE MODES
PITWALL
NG-08
- 239 -
2.2.1. Perched Water Pondages and Boxcut Instability A
new 3 km long Isaacs Pit area at Goonyella mine was recently
Previous of
studies (Smith
several incised
down
to
the
83 and Ellery 185) established the existence
Quaternary to
lateral migration
opened.
f
Recent
palaeochannels.
of the nearby Isaac River,
the
Caused
by
palaeochannels
cut
Permian unconformity at up to 25m depths below current
ground levels. Three
of
these
southern half. Fig.
palaeochannels traverse the boxcut, with two
in the
They lie both west and east (downdip) of the boxcut (see
10) and contain perched water pondages of some magnitude.
saturated
10 -1cm/sec highwall
With
lower sand and gravel permeabilities of the order of 10 -4 to the
contained
stability
water
constitutes both a
lowwall
hazard for up to 300m lengths in the
and a
southern pit
half, by way of interaction with overburden characteristics as : (and see Fig. 9). 1)
Extensive high and lowwall failure via intact rupture of saturated, unconsolidated,
Quaternary
fluvial
sediments
in perched water
pondage zones. 2)
Highwall
failure
on wetted
up
Cainozoic/Tertiary
unconformity
surfaces dipping westwards into the pit in palaeovalleys. 3)
Very
extensive lowwall failure along a remarkably persistent (4.35
kms) thin, pre-sheared, bedding plane horizon in rhythmic laminated claystones lying 20 to 30cm above the Middle Goonyella seam. These rhythmites around
have
3 to
similar dips to the coal seam and
5 degrees into the pit in the
hence
dip at
lowwall with
local
increases to 10 and 15 degrees (Godfrey f87) (see Fig. 9 & 10) Methods of study included terrain evaluation and resistivity surveys and drilling, integrated with compilation of all previous pertinent data. An
attempt
pondage wide
has
been made to reduce the effect of
the
perched water
on boxcut lowwall stability by the dragline digging of
a 65m
drain 80m west of the boxcut and parallel to the southern half of
Isaac Pit (see Fig.
10). Whilst this has largely succeeded in draining
the
there
perched water,
has been severe slumpage of
unconsolidated Cainozoic in the drain walls.
NG-09
the
saturated
-
240
D R A I N A G E OF P E R C H E D W A T E R PONDAGE FROM SATURATED CAINOZOIC M A T E R I A L INTO DRAIN
E X T E N S I V E S L U M P A G E OF S A T U R A T E D ONSOLIDATED CAINOZOIC MATERIAL
ISAAC
PIT B O X C U T
LOWWALL
UNCONSOLIDATED SATURATED CAINOZOIC SEDIMENTS WET UP UNDERLYING PERMIAN CLAYSTONES. IF C A I N O Z O I C NOT DRAINED,MASSIVE LOWWALL F A I L U R E S L I D I N G O U T ON SATURATED PRE-SHEARED LAYER JUST ABOVE C O A L , S T E R I L I Z E S COAL
E M P L A C E M E N T OF A G R I C U L T U R A L P I P E FOR PERMANENT DRAINAGE H I N D E R E D BY D R A I N B A T T E R FAILURE PERSI STENT,EXTENSIVE THIN B E D D I N G P L A N E S H E A R 20 to 3 0 C M A B C V E C O A L . (VERY L O W S H E A R R E S I S T A N C E WHEN W E T ) . T O 10* R E G I O N A L D I P T O PERMIAN OVERCOAL LAMINATED RHYTHMITE AND SUB R H Y T H M I T E M U O S T O N E S (PITWARDS BOXCUT LOWWALL)
IN
1,000m
FIG.10.
G O O N Y E L L A M I N E , I S A A C P I T . S K E T C H P L A N A N D P E R S P E C T I V E D I A G R A M S H O W I N G D E T A I L S OF WATER PONDAGE AND GEOLOGY AND THEIR I N F L U E N C E ON B O X C U T L O W W A L L S T A B I L I T Y .
2.2.2.
Reverse Dip and Pitvall Instability
Isopach
and
PERCHED
structure contour maps of the principal
seam
mined
(the
Dysart seam) in Bauhinia pit, about two-thirds north along the 23 km long Saraji
Mine,
showed dip reversals
westwards
into the pit for about 1
km, variously, for strips 13 to 17 (see Fig. 11). Previous
studies
1m
thick
bedding
shear zones in laminated mudstones between 1 and 3m above
(Godfrey
'83) had shown widespread
coal
and, again, at between 8 to 10m above coal. planes
also
run
coal.
When
exposed in the highwalls,
\
to
Thin, shear split, bedding
for at least 600m pit lengths around ^m to 10m these seep water in places
generally overhang some 2 to 5cm.
NG-10
above and
- 241 The
shear
altered,
zones
often
swelling
lie in strongly weathered
clays.
zones
have
shown
them to have direct shear stress tested
order
of
= 0 to 10.5 kPa + 0 = 4.5° to 15° at 15 to
C
and
contain
Past studies of such bedding plane strengths
shears in the
20% moisture
contents (Godfrey '77, Toh and Kajewski f79).
At these strengths, even low angles of pitwards dip may promote highwall failure.
Accordingly,
drill holes was according
to
confirmation confirmed with
the
and
a
conducted
two-stage programme of 59 close spaced chip along
isopachs
delineation
a
derived
series
of
from
earlier
of the reverse
traverses, selected
dip.
drilling, Reverse
for
dip was
but no evidence of significant faulting (Godfrey '86).(Though
the opening of Strips 14 and 15 the reverse dip has been shown to
be combined with a normal fault of 3m westerly downthrow).
Extensive
highwall failure has occurred but foreknowledge of conditions
has enabled mine staff to plan coal extraction with minimal losses.
NORMAL FAULT PLUS REVERSE DIP
FIG. 11.
SARAJI MINE. BAUHINIA PIT. SKETCH OF ISOPACH MAP SHOWING REVERSE DIP AS INDICATED BY CLOSE DRILLING, PLUS, SECTION OF ONE DRILL TRAVERSE SHOWING REVERSE DIP INDICATED BY DRILLING,AND FAULT PLUS REVERSE DIP (AS WAS THE ACTUAL CASE)
NG-11
- 242 -
ACKNOWLEDGEMENTS Thanks are due to BHP/Utah Coal Limited for permission to prepare and publish the paper; Alan Davies, Bruce Ellery and Kim Stahl for helpful comment and Mrs. Ray Currey for typing. The opinions expressed are not necessarily those of the company, BOYD, G.L. & SAUNDERS, B.J. 1979: "Geological and geotechnical conditions influencing pitwall stability, Acacia and Bauhinia Pits, Saraji Mine", UDC Tech. Serv. Dept. Report S1839 (unpubl.) COHEN, C.J., 1979:"Geological Joint Survey, An Analysis for Optimum Quarry Bench Design to Maximise Fragmentation"; Quarry Mine & Pit, Vol 18, No.4. COLES-PHILLIPS, F., 1971: "The Use of Stereographies Projections in Structural Geology", pp 25-26, 3rd. Edn. Edward Arnold Ltd., London. DAVIES, A.L., 1983: "Geotechnical Conditions affecting Strip Coal Mining in the Bowen Basin". Proc Symp on Permian Geology of Qld. G.S.A. Qld. Div.". DAVIES, A.L., 1985: "Interim Report on Peack Downs Regional Ground Water Investigation 1984". UDC Tech.Serv. Report P2396 (unpubl.) ELLERY, B.I., 1985: "Geotechnical Study of Isaac Pit Boxcut Goonyella Mine". UDC Tech.Serv.Dept. Report G2454 (unpubl.) GODFREY, N.H.H., 1977: "Direct Shear Tests on Goonyella Overclay Shear Planes" UDC Tech.Serv.Dept. Report G1817 (unpubl.) GODFREY, N.H.H., 1982: "Downdip Overburden Study, Acacia and Bauhinia Pits, Saraji Mine". UDC Tech.Serv.Dept. Report S2196 (unpubl.) GODFREY, N.H.H., 1983: "Accompanying Notes to 1983 Highwall Maps & Downdip Fence Diagrams-Burngrove, Airstrip, Besgrove, Stewarton, Emu Creek and Tannyfoil Pits". UDC Tech.Serv.Dept. Report B2296 (Unpubl.) GODFREY, N.H.H., 1984: "1983 Downdip Overburden Investigation. Tolmie Deep Creek and Taurus Pits, Blackwater Mine". UDC Tech.Serv. Dept. Report B2355 (unpubl.) GODFREY, N.H.H., 1986: "Peak Downs Regional Investigation-Cainozoic Study - 1985". UDC (unpubl.)
Ground Water Geotech. Group
GODFREY, N.H.H., 1986: "Bauhinia Pit Overburden Investigation 1985/86, Saraji Mine". UDC Tech. Serv. Dept. Report S2500 (unpubl.) GODFREY, N.H.H., 1987: "Cleanskin Pit Two Seam Operation - Initial Ramp 10 Centre Excavation - Rock Stress Analysis for Fragmentation
- 243 -
Improvement11. UDC Goonyella Mine Internal Memo. GODFREY, N.H.H., 1987: "Low Wall Shear Plane - Ramp 1 South". Goonyella Mine Internal Memo.
UDC
HAGAN, T.N., 1980: "The Effects of Some Structural Properties of Rock on the Design and Results of Blasting". Proc. 3rd Aust-NZ Conf. on Geomechanics, Wellington,NZ, May 1980. HAGAN, T.N. and MORPHETT, R.J., "Design and Implementation of Bench Blasts in Complex Rock Formations". Proc. Int. Symp on Energy in Complex Rock Formations, Beijing, China, Nov f86. MALLET
C.W. and GERRARD, C.M., 1980: "Highwall & Spoil Pile Stability in Open Strip Mining, Bowen Basin, Queensland". C.S.I.R.O. Aust.Div. Appl. Geomech., Lecture 51.
PHILP, M.G., BOYD, G.L. & ECKERSLEY, J.D. 1981: "Stabilisation of Large Scale Spoil Piles in Deep Open Strip Coal Mines"; in Proceedings of the AIMM Symposium on Strip Mining - 45 metres and Beyond. Aust. Inst. Min.Metall., Melbourne, 131-144. PRICE, A.J. & THOMPSON, S.D. "Improvements in Drilling and Blasting Practice at Utah Development Company's Blackwater Mine, Queensland, Australia". Trans. Inst. Min. Metall. London. No.94 (Sect.A). Oct '85. SMITH, I.
"Goonyella Mine, Groundwater Study for Isaac Pit" Feb f83. Golder Assoc. Report No. 8263 - 0035 to UDCL Tech. Serv* Dept. (unpubl.)
T0H, C.T., & KAJEWSKI, R., 1979: "Direct Shear Test on Clay Filled Discontinuities from Goonyella". (CSIR0 Aust. Div. Appl. Geomech, Project Report 47 (unpubl.)
—244—
i
i
8. GEOPHYSICS
—246-
SURFACE SEISMIC TECHNIQUES by Derecke Palmer
Senior Geophysicist (Seismic) Geological Survey of N.S.W. Department of Mineral Resources G.P.O. Box 5288 SYDNEY 2001
—247— Current Usage Modern high resolution seismic for the National Coal Board HRS methods was recognised
(HRS) reflection methods were developed
in the UK in the 1970's. by A.M. Clarke
The need to develop
(1976) as a means of maximising
the benefits of mechanisation.
In Australia, there has not been widespread use of HRS methods, apart from the Broken Hill Proprietary Company Limited (BHP). major
Not only was BHP a
sponsor of the first HRS crew to come to Australia, but
it has also
contracted most of the surveys in this country to date.
Data Acquisition and Processing The quality of data obtained cases
higher
than,
that
been
achieved
with
small
base of the weathering. National
Coal
Fairbain
et.
conditions
anywhere
explosive
is as high as, and
else.
charges
The best
placed
in many
resolution
has
holes
the
in drill
at
These techniques were originally developed for the
Board al.,
in Australia
obtained
(Zidkowski
1986) and
and
Lerwill,
have
been
they
1979;
modified
(Harman, 1981, 1983, 1984; Palmer, 1987).
Ziolkowski, to
1979;
suit
Australian
Dominant
frequencies
are commonly between 100 Hz and 160 Hz.
Quite with
good
Elf Aquitaine King
resolution
the Mini - SOSIE
and
has
technique
been
in
Australia
(Registered Trade Mark, Societe
achieved
in many
areas
Nationale
(Production), which uses a surface energy source (King, 1979;
Greenhalgh,
1981;
Pinchin
et.
al.,
1983).
Dominant
frequencies
are commonly less than about 100 Hz.
Interpretation The detection HRS methods. claimed
of
faults was the major
In Australia
(Harman, 1984).
as the magnitude
of
resolution
impetus for the development
down to 3 m displacements
has
of
been
However the nature of the faulting is as important
the displacement.
Harman
(1981, p. 8) describes
the
benefits of knowing the direction of movement for the design of workings to cross the fault. Furthermore,
Harman
(1984) and
Palmer
(1987) describe
stratigraphic
features which can be very important in mine planning.
DP-2
—248— The major part of this presentation will demonstrate the resolution of structural
and
stratigraphic
which
not
readily
are
features
resolved
with
with
existing
other
HRS
geological
techniques, or
but
geophysical
methods.
Future Usage The numerous publications demonstrate that HRS methods are efficaceous in the
detection
and
resolution
of
structural
which influence coal mine planning. resolution
with
high
frequency
and
stratigraphic
features
Proposals for further improvements in
seismic
vibratory
energy
source
and
three
location,
field
dimensional methods are under consideration. Why then are HRS methods not used more extensively? Cost
is
often
given
as
a
reason.
Depending
upon
conditions, target depth, etc., costs can range from $5,000 to $10,000 per kilometre.
However even for a very detailed
survey, this amounts to less
than a few cents per mined tonne of coal, and so it is insignificant when compared with other costs of mining. It
would
appear
that
the
represents the major difficulty.
interpretation
of
the
seismic
sections
The interpretation of the high resolution
seismic sections requires both a thorough knowledge of the local geology as well
as
section.
an
appreciation
Currently
of
the
processes
which
produced
the
seismic
few earth scientists working in the coal industry have
both of these requirements. Accordingly depend
as much
more upon
use
of
HRS
the development
widespread
of
seismic
methods
in
the
interpretation
future
will
skills and
the adaptation of seismic stratigraphy to coal field geology, as well as to technical advances in resolution.
DP-3
—249— References
Clarke, A.M., and
much
1976, Why modern
exploration has
more
mining;
to
do
with
little
Colliery
to do with
Guardian
geology
Annual
Review,
vol. 224, p. 323-336.
Fairbairn, C.M., Holt, J.M., and Padget, N.J., 1986, Case histories of the use
of
surface
seismics
in
the
Geophysics,
ed . D.J.
Buchanan
series
6,
of
No.
Society
UK
and
coal
L.J.
Exploration
mining
industry
Jackson,
Geophysics
Geophysicists,
jLri
Tulsa,
Coal
reprint Oklahoma,
466 p.
Harman, P.G., coal
1981,
industry;
High
resolution
Australian
Coal
seismic
Geology,
reflection techniques
in the
Journal
Geology
of
the
Coal
Group of the Geological Society of Australia, vol. 3, p. 3-14.
Harman,
P.G.,
Australia
1983,
High
with
special
resolution
Queensland _in G.O.
Argall
Coal
Symposium,
Exploration
San Francisco.
Harman,
P.G.,
seismic
reference ed.
to
Papers Sydney,
reflection the
from
techniques
Blackwater the Fourth
in
Coalfield, International
Australia.
Miller
Freeman,
reflection
techniques
applied
30 p.
1984, High
in coalfields:
resolution
Cook Colliery
seismic
Queensland
- A case history;
Exploration
Geophysics, Bulletin, Aust. Soc. Explor. Geophys. vol. 15 p. 220-228.
King, D.W.,
1979, Min-SOSIE
seismic
profiling
in the Gloucester
Basin of
N.S.W.; Bulletin Aust. Soc. Explor. Geophys. vol. 10, p. 156-163.
King,
D.W.,
and
coal
deposits
Coal
Geology
Greenhalgh,
S.A.,
in Australia; Group
of
the
1981,
Mini-SOSIE
Australian Geological
Coal
seismic
Geology,
Society
of
profiling
of
Journal
of
the
Australia,
vol.
3,
p. 15-20.
Palmer,
D.,
1987,
High
resolution
seismic
reflection
surveys
for
coal;
Geoexploration, vol. 24.
DP-4
—250— Pinchin,
J. , Goleby,
reflection
survey
B.R.,
and
at W a m b o
Ryan,
D. , 1983,
Colliery,
Hunter
An
experimental
Valley, N.S.W.;
seismic Bulletin,
A u s t . Soc. Explor. Geophys. vol. 14, p. 36-42.
Ziolkowski, (ed.).
A.,
1979,
Seismic
Developments
in
profiling
Geophysical
Science Publishers Ltd, London, pp.
Ziolkowski,
A.,
resolution
and
Lerwill,
seismic
W.E.,
profiling
for
coal
on
Exploration
land _in A . A . Methods,
1,
Fitch
Applied
271-306.
1979. for
coal;
A
simple
approach
Geophysical
to
high
Prospecting,
vol. 26, p. 360-393.
DP-5
—251—
IN-SEAM SEISMIC - A TOOL FOR THE COAL INDUSTRY
J. F. DOYLE
B.H.P ILLAWARRA COLLIERIES, 2 6 ATCHISON STREET, WOLLONGONG
NSW
250
-252-
IN-SEAM SEISMIC - A TOOL FOR THE COAL INDUSTRY A Technology package including instrumentation, data processing software, field proceedures, numerical modelling and interpretation know-how has been developed for the routine application of in-seam seismology to the protection of underground coal mining operations. The technology has proven to be highly successful and has been integrated into the operations of B.H.P.'S Illawarra and Macquarie Collieries. The equipment is purpose designed for underground use which results in surveys being conducted quickly, at little inconvenience and at low cost. More than forty surveys have been conducted by BHP in Australia. Substantial real savings in production costs have been realised where ISS has identified mining conditions which would have otherwise impeded longwall operations.
INDRODUCTION Longwall mining is a mechanised method which is now widely accepted as the most efficient mining technique for underground coal extraction. Efficient as it is, the face machinery of a longwall constitutes a very inflexible system. Being capital intensive, its success depends on maintenance of high face productivity. Unexpected geological discontinuities, such as faults of seam thickness throw or less, can retard or interrupt completely a longwall production unit for a long period until the machinery can be relocated to a new area or the faulted area is traversed.
JD-01
—253—
Because of their relatively small magnitude, these geological discontinuities are difficult to detect by traditional surface seismic techniques. In-seam seismic or in-seam long hole drilling are presently the only two techniques available to detect small features ahead of the mine face. Since the late 1970s, it has been demonstrated that discontinuities, undetected by other m e a n s , can be predicted by in-seam seismic (ISS) techniques. The ISS technique involves generating a seismic signal at one point in the seam, and detecting transmitted or reflected signals at some other point in the seam. The signals are then analysed in a computer to determine the nature and location of the discontinuities. There are three methods of conducting in-seam seismic surveys. The first method, called the face-to-face method, was developed in the United Kingdom and West Germany. The second and third methods, face-to-borehole and borehole-to-borehole, have not been applied widely, yet they are particularly relevant in the Australian conditions, where panel advance is the usual means of underground development. The first method is aimed at mine production planning whereas the latter two are more useful during the earlier stages of exploration and mine development. A schematic diagram of the face-to-face survey technique is shown in Figure 1. In this method small explosive shots are set off in some holes drilled in underground
JD-02
—254—
workings, with detectors installed in other holes some distance away. A transformer detects the instant of shot firing and triggers the timing break circuit. The detectors then capture the seismic signals and transmit them to nearby digitiser modules where they are temporarily stored. At the completion of the shot all data is transferred to the control unit where they are displayed for Field examination and then stored to tape. A face-to-face survey is conducted in two parts: transmission and reflection surveys. The objective of the transmission survey is to determine the seismic velocity for analysis of data from the reflection survey. The reflection survey is aimed at locating reflectors, i.e. geological discontinuities. The field procedure of a borehole-related survey is quite similar to a face-to-face survey, except that the source and/or detectors are installed from the surface in boreholes. The recording station is located on the surface close to the borehole.
,
FIELD EXAMPLE In late 1984 silling associated with a known dyke caused development delays in 0 panel of Appin Colliery (Fig.2). Concern was felt as to the potential for major delays in the driving of P Panel through a potentially wider sill/dyke zone.
JD-03
—255—
A reflection
ISS survey was conducted
Panel west of the dyke.
from Blue Panel and 0
Results of this survey were made
available to mine management three weeks after the survey. With the aid of local geology and numerical
modelling
reflectors A and C (Fig. 3) were identified as reflectors
from
a full face of igneous sill.
as a
small scale feature.
Reflector D was identified
Based on the interpretation
presented,
stone driving contracts were awarded prior to the sill being exposed.
Examination of alternative mine
alternatives failed
scheduling
to produce a viable means of developing
the next longwall block north of P Panel. was taken to divert longwall development
The early
mine which has since been achieved with no loss of productivity. subsequently
ISS surveys were conducted
AND F«,
and confirmed
These two
shear zones as reflectors G.E.
The surveys have shown no geological
sufficientto
longwall
in 0 Panel and
in P Panel when it was developed.
surveys delineated
decision
to another area of the
impediment
impede the future development of longwall
blocks
to the north.
SAVINGS ACHIEVED THROUGH THE USE OF IN-SEAM SEISMIC
In-seam seismic technology is only one of a suite of techniques that must be considered underground geological hazards. long-hole drilling
in the prediction of
In-seam seismic surveys and
are the only techniques available that are
capable of results of sufficient accuracy and definition to satisfy the needs of a modern high productivity
longwall
No surface geological or geophysical method can satisfy
mine. this
JD-04
—256-
criteria.
Site c o n d i t i o n s and g e o m e t r y m u s t g u i d e
the
s e l e c t i o n and a p p l i c a t i o n of e i t h e r or b o t h t e c h n i q u e s to a specific
problem. In the A p p i n case study a gain of a p p r o x i m a t e l y
days was a c h i e v e d .
More intangible benefits were
40-50
gained
t h r o u g h the a d d i t i o n a l time that was made a v a i l a b l e for a c o n s i d e r e d d e c i s i o n a f t e r e x h a u s t i v e e x a m i n a t i o n of all a l t e r n a t i v e mine p l a n s .
A real gain of about one m o n t h was
m a d e by the e a r l y call for s t o n e d r i v i n g t e n d e r s m a d e
possible
by the remote p r o v i n g of the c o n t i n u i t y of the sill by
in-seam
sei s m i c . The e a r l y w a r n i n g a c c e l e r a t e d
the timing of the
d e c i s i o n to d e v e l o p a n e w l o n g w a l l area to the
south.
T h e loss of the p r o d u c t i o n of a p p r o x i m a t e l y
10 000
tonnes of coal from a l o n g w a l l f a c e at A p p i n r e p r e s e n t s a loss of r e v e n u e .
A n y p o s s i b i l i t y of an i m p e d i m e n t to the
continuity
of p r o d u c t i o n from the l o n g w a l l u n i t is s i g n i f i c a n t and m u s t demand
immediate
attention.
In-seam s e i s m i c is the g e o l o g i c a l tool s e l e c t e d as the m o s t s u i t a b l e m e t h o d of e a r l y w a r n i n g of the f e a t u r e s that now assume such i m p o r t a n c e
small-scale
in the m a n a g e m e n t
of
the l o n g w a l l m i n e s in B H P ' s I l l a w a r r a and M a c q u a r i e Collieries.
As w i t h most t e c h n i q u e s
its i n t e g r a t i o n
into the
g e o l o g i c a l and m i n e p l a n n i n g s y s t e m s of the h o s t c o l l i e r y paramount
to a c h i e v e the m a x i m u m b e n e f i t from its
is
application.
In-seam s e i s m i c is now a r o u t i n e p a r t of m i n e p l a n n i n g
within
JD-05
—257—
BHP and is applied from development roadways in such a manner as to achieve maximum protection to the mine plan.
Oigitisers
Current Transformer Field Control Unit Shot Firer
Figure 1
Face-to-face ISS Survey
JD-06
—258—
Fig. 2 - Appin Colliery - Mine situation December 1981),
JD-07
—259—
SCALE
IN METRES
ClMOfX AND HAAO SILL -
\PDH 14 SHCARCOCOAL
CINOE*
CINOE* iCINOE*-
|CINOE«:
Fig. 3 - Appin Colliery - Mine situation June 1985.
JD-08
- 260 -
DOWNHOLE AND CROSSHOLE SEISMIC: A NEW TOOL FOR DETAILED DEFINITION OF COAL SEAMS AND GEOLOGICAL CONDITIONS BY R. J. Whiteley, W. M. Holmes & R. D. Dowle
- 261 -
TITLE:
Downhole and Crosshole Seismics: A New Tool for Detailed Definition of Coal Seams and Geological Conditions.
AUTHORS AND AFFILIATIONS: Robert J. Whiteley
Senior Lecturer, School of Mines University of N.S.W.
W. Harvey
Associate Professor, School Electrical Engineering and Computer Science University of N.S.W.
Holmes
Robert D. Dowle
of
Doctoral Research Student, School of Electrical Engineering and Computer Science University of N.S.W.
CORRESPONDENCE: R.J. Whiteley,
Dept. of Applied Geology, School of Mines University of N.S.W. P.O. Box 1 Kensington, N.S.W. 2033.
EXTENDED ABSTRACT Effective mine planning and immediate response to unexpected geological conditions encountered during mining are essential for efficient exploitation of coal resources. In both situations major unknowns are the detailed configuration of the un-mined seam and geological features such as faults and igneous intrusions. A new high resolution seismic system has recently been developed in Australia which is capable of achieving sub-metre resolution of such features. This system has a bandwidth of upto 3kHz and uses energy sources and receivers within existing or specially sited shallow or deep drillholes. It improves subsurface resolution when compared with surface seismic reflection systems by a factor of at least ten. This improvement is achieved by hardware developments which include a modified marine sparker source and hydrophone receiver array in an adjacent hole. Fig. 1 shows a schematic of the in-field system. Downhole and crosshole seismic data are acquired digitally in the field on micro-computer. Specially designed processing software which includes beam steering, a technique which has been highly successful in radio astronomy and communications, allows coal 1
- 262 -
seams and geological features to be profiled from above or below or side-scanned. A complete tomographic data set may be acquired and subsets of the data include vertical seismic profiles which compare closely with integrated sonic logs, Yo-Yo reflection profiles for mapping sub-horizontal structures such as seams, side-scan reflection for profiling vertical structures such as dykes and borehole-to-borehole in-seam information. While the system is currently undergoing substantial refinement, to date successful field trials have been completed at three coal mines in the Hunter Valley, N.S.W. between drillholes upto 250 m apart with seams to 150 m depth. Figs. 2 and 3 show examples of upward and downward looking Yo-Yo reflection data from West Wallsend between successive pairs of in-line drillholes each 50 m apart, note RDH 2 is common to both pairs. In Fig. 2 clear continuous reflections have been obtained from both the shallow seams and the upper surface of the deep seam with some evidence of seam splitting in the shallow seams. In Fig. 3 seam continuity has been severely disrupted by an igneous dyke not yet encountered in the workings. The achievement of this downhole and crosshole seismic system represents an important breakthrough in the ability to define seam amd geological conditions prior to mining and, if integrated with other mine planning techniques principally drilling, will provide the Australian coal industry with a significant advantage over other coal producers.
2
- 263 -
lAlttWMt Tr\*c* R«e«l««r Hoi«
«Mt«r
Taftla'
ULsmlC '
Swire*
tac«Lv«r
(•9
Hydrophone
Array)
CmI RaClactors
Fig. j Downhole-crosshole v e r y h i g h resolution coal s e a m profiling between b o r e h o l e s . A n i m p u l s i v e s e i s m i c s o u r c e is in o n e b o r e h o l e , a n d a r e c e i v e r is in a n o t h e r , b o t h b e l o w the weathered layer. T h e s o u r c e a n d r e c e i v e r p o s i t i o n s w i l l be varied during the s u r v e y . The transmitted and reflected s i g n a l s a r e r e c o r d e d a n d a n a l y s e d in the i n s t r u m e n t t r u c k .
Pig Jj Processed Yo-Yo section between holes RDH1 end RDH2, which covers the a r e a of the I n t e r p r e t e d d y k e . The c l e a r d i s r u p t i o n s ( a r r o w e d ) of the c o a l s e a a i m a g e s c a n be i n t e r p r e t e d as a h a d i n g d y k e .
P r o c e s s e d r e s u l t s of a Y o - Y o s u r v e y b e t w e e n h o l e s RDH2 and RDH3, not covering the a r e a of the ' i n t e r p r e t e d dyke. Strong coal seam Images are e v i d e n t .
—264—
•265—
•266—
—267—
—268—
•269—
—270—
—271—
•272—
—273—