Asset Plan 2022-2032

Page 1

Asset PLAN 2022–2032


Acknowledgement of country Golden Plains Shire spans the Traditional lands of the Wadawurrung and Eastern Maar people. We acknowledge them as the Traditional Owners and Custodians. Council pays its respects to Wadawurrung Elders past, present and emerging. Council also respects Eastern Maar Elders past, present and emerging. Council extends that respect to all Aboriginal and Torres Strait Islander People who are part of the Golden Plains Shire.

Image: Sunset over Bunjil’s Lookout in Maude. Artwork: ‘Wabdallah’ by Shu Brown


Document Control CT Management Group P/L PO Box 1374 GEELONG VIC 3220

Document: Golden Plains Shire Council Asset Plan - Draft v1.1.docx

Phone: (03) 5221 2566 Email: admin@ctman.com.au Web: www.ctman.com.au

Author: Adam Lehmann

Project Manager: Malcolm McKenzie

Date: February 2022 Synopsis: Asset Plan for infrastructure assets prepared in accordance with the Local Government Act 2020.

DISTRIBUTION SCHEDULE Version No.

Date

Distribution

Reference

Draft 1.0

February 2022

Golden Plains Shire Council

Draft issued for comment

Draft 1.1

March 2022

Golden Plains Shire Council

Draft issued for comment

SCHEDULE OF ADOPTION Version No.

Date

Comment

Reference

The Asset Plan is owned and managed by Golden Plains Shire Council 2 Pope Street Bannockburn VIC 3331 This document is copyright of the Golden Plains Shire Council. Apart from any use as permitted under the Copyright Act, no part may be reproduced by any person without prior written permission from Golden Plains Council.

Asset Plan 2022-2032 | Golden Plains Shire Council

1


Kelly Road, Bannockburn

2

Asset Plan 2022-2032 | Golden Plains Shire Council


CONTENTS 1. INTRODUCTION

4 7. The Changing Shire

22

1.1 About Golden Plains Shire

4

7.1 Challenges and Opportunities

22

1.2 Infrastructure Managed by Council

5

7.2 Resilience in Challenging Times

25

1.3 The Purpose of the Asset Plan 2022-2032

6

1.4 Scope of the Asset Plan 2022-2032

6

8. Funding for Long-Term Sustainability

26

8.1 Asset Investment Strategy

26

8.2 Financial Summary

28

3. Asset Management Planning

10 9. Monitoring and review

32

3.1 What is Asset Management?

10

9.1 Reporting

32

3.2 Why is Asset Management Important?

10

9.2 Improving Council’s Evidence Base

32

3.3 Asset Planning Framework

11

3.4 Asset Management Plans

12

3.5 Relationship to the Asset Plan 2022-2032

12

APPENDIX A: Financial Projections

35

4. Strategic Context

14

4.1 Strategic Planning Principles

14

4.2 Long-Term Resource Planning

16

4.3 The Regulatory Framework

16

5. Council Services

18

5.1 Services Supported by Assets

18

5.2 Levels of Service

18

6. Community and Stakeholders

21

6.1 Community Engagement

21

6.2 Council’s Approach to Meeting Community Needs

21

2. Council Assets

8

Asset Plan 2022-2032 | Golden Plains Shire Council

3


1. INTRODUCTION 1.1

About Golden Plains Shire

Golden Plains Shire covers an area of 2,705 square kilometres and is situated between two of Victoria’s largest regional cities, Geelong and Ballarat. The Geelong Ring Road and Western Highway, along with reliable rail connections, enable strong connectivity to Melbourne.

Golden Plains is one of the fastest growing regions in Victoria. The Shire’s current population is 24,249 people across 56 rural communities and is expected to increase to 42,193 people by 2041. This is a growth rate of around 2.6% per annum.

The Shire’s economy is supported by a strong agricultural sector, with a history of wool, sheep and grain production. Golden Plains Shire is currently experiencing strong growth in intensive agriculture, including poultry, pigs, beef, and goat dairy, as well as the expansion of viticulture. Beaufort

Ballarat

Haddon Smythes Creek Nin�ngbool

Ballan

Smythesdale

Mid land

Cambrian Hill Ross Creek

Skipton

Scarsdale

Linton

Pi�ong

Napoleons

Hw y

Durham Lead

Newtown

Garibaldi

a Sc eor Wallinduc

a c-Ballarat

ad Ro ale Pi�ield d rs

ol

Lismore-Sk iption R oa

d

Ro a

d

Happy Valley Enfield Piggoreet Staffordshire Reef Roke woo Springdallah d-Sk ipto n Mannibadar Cape Clear Ro Berringa ad

C

Illabarook

Rokewood Junc�on

m Lis Willowvale

Corindhap

Werneth

Elaine

Mount Mercer

Dereel

Golden Plains

Durdidwarrah

Meredith

Maude

d

Ham ilto

Barunah Park

Teesdale

nH wy

Wingeel

-Banno

d lan Roa

a Ro rd

Cressy

Shelford She lford

Lethbridge

d zR lit e ig

Berrybank

Anakie

St

Rok ew Warrambine oo d-S he lfo

Lismore

Steiglitz She Oaks

Bamganie

g-Bal Geelon

Rokewood

Grenville

Russells Bridge

ckburn R Sutherlands Creek oad

Bannockburn Hesse

Inverleigh

Gheringhap Batesford Murgheboluc Stonehaven

Geelong Winchelsea

4

Asset Plan 2022-2032 | Golden Plains Shire Council

sH nce Pr i

wy


1.2

Infrastructure Managed by Council

Golden Plains Shire Council is the custodian of approximately $590 million worth of infrastructure assets on behalf of our community. These community assets range from significant structures such as roads and buildings through to park furniture and play equipment. These assets are fundamental to supporting the delivery of Council’s services. Residents, business owners and visitors alike can enjoy a safe, clean, and vibrant Shire and live the life of their choice. Our infrastructure assets are critical to delivering these experiences.

Council’s Asset Plan provides a strategic and financial view of how Council will manage its infrastructure assets over the next 10 years and beyond. The long-term costs of owning and operating infrastructure assets continue to be a financial challenge and requires Council to take a whole of life approach to managing its infrastructure. Council prioritises achieving the best outcomes for the Golden Plains community, including future generations, while promoting resilience and economic, social, and environmental sustainability.

The Local Government Act 2020 requires municipalities to prepare a suite of strategic management plans, including a Long-Term Financial Plan and an Asset Plan.

Buildings $62.3 Footpaths and trails $18.4

Open Space $17.1

Stormwater drainage $8.2

Bridges and major drainage structures $51.5

Melbourne

Werribee

Unsealed roads $77.0

Kerb and channel $4.5

Sealed roads and carparks $351.0

Figure 1 - Infrastructure Asset Portfolio Value ($’Million)

Asset Plan 2022-2032 | Golden Plains Shire Council

5


1.3

The Purpose of the Asset Plan 2022-2032

The Asset Plan 2022-2032 has been prepared to meet the requirements of section 92 of the Local Government Act 2020, noting that Council must have an Asset Plan in place by 30 June 2022. It is a general overview document that summarises the key elements of the individual Asset Management Plans that Council has developed for each of its major asset classes. The purpose of the Asset Plan 2022-2032 is to: • Show how Council will responsibly manage its assets to meet the service delivery needs of the Golden Plains community into the future in a costeffective way. • Define the services to be provided, the service standards that Council aims to achieve, and the measures uses to monitor performance. • Summarise the operating and capital expenditure requirements for Council’s infrastructure assets.

1.4

• Ensure that there is integration between Council’s asset management planning outcomes and its strategic objectives, Long-Term Financial Plan 2021/22-2031/32 and Annual Budget. • Maximise alignment with Council, regional and government strategies, policies and plans that effect the management of infrastructure assets. • Make sure that Council complies with its legislative obligations. The development of the Asset Plan 2022-2032 is dependent and relies upon Council’s understanding of the performance of its assets and a number of key assumptions. Assumptions and forecasts will change based on enhancement of Council’s asset knowledge along with ever-evolving internal and external drivers. Ongoing development and review of the Asset Plan 2022-2032 will promote the viability and long-term use of assets in line with the aspirations of the community and Council’s strategic objectives. This Asset Plan will be actively monitored and updated to reflect any major changes.

Scope of the Asset Plan 2022-2032

While Council manages an extensive portfolio of assets, the Asset Plan 2022-2032 only covers infrastructure that is under the control and is recognised as an asset of Council. These infrastructure assets include: Asset Class Sealed roads and carparks Kerb and channel Gravel roads Bridges and major drainage structures Footpaths and trails Buildings Stormwater drainage assets Open space assets

Quantity 999.5km sealed roads (including pavement and sealed surfaces), various on-street and off-street carparks 58.5 km of kerb and channel 734.5km unsealed roads 141 bridges and major culverts 162km of footpaths and other trails 208 buildings including public halls, pavilions, libraries, corporate buildings, heritage buildings, public toilets 1,977 stormwater pits, 52.5 km of underground drains, open drains Playgrounds, skate parks, lighting, park furniture, playing courts, sporting ovals, fencing, irrigation systems, etc.

Total

4,504 76,997 51,485 18,410 62,287 8,231 17,109 589,991

Table 1 - Summary of Council Infrastructure Assets 6

Replacement Value ($’000) 350,968

Asset Plan 2022-2032 | Golden Plains Shire Council


Avenue of Honour, Linton Asset Plan 2022-2032 | Golden Plains Shire Council

7


2. Council assets Council measures the performance of its infrastructure through ongoing condition assessments. The information below gives an overview of the current state of these assets according to the average condition of each asset class. Council’s aim is to maintain the current performance of its infrastructure over the period of the Asset Plan 2022-2032.

Buildings Total Replacement Cost: $62.3 million Current Average Network Condition: Good

Open Space Total Replacement Cost: $17.1 million Current Average Network Condition: Good

Sealed Roads and Car Parks Total Replacement Cost: $350.9 million Current Average Network Condition: Fair

8

Asset Plan 2022-2032 | Golden Plains Shire Council

Bridges and Major Drainage Structures Total Replacement Cost: $51.5 million Current Average Network Condition: Fair


Unsealed Roads Total Replacement Cost: $76.9 million Current Average Network Condition: Fair

Stormwater Drainage Total Replacement Cost: $8.2 million Current Average Network Condition: Good

Footpaths and Trails Total Replacement Cost: $18.4 million Current Average Network Condition: Good

Kerb and Channel Total Replacement Cost: $4.5 million Current Average Network Condition: Excellent

Condition Descriptions Excellent Good Fair Poor Very Poor

As new Adequate for now Needs some maintenance Approaching end of life Asset unserviceable

Asset Plan 2022-2032 | Golden Plains Shire Council

9


3. Asset Management Planning 3.1

What is Asset Management?

Asset management refers to the coordinated series of activities that monitor and maintain things of value— in this case, physical assets. This involves balancing risk, cost, opportunities and performance to realise the value of an asset fully and effectively over its entire lifespan.

Asset Management The right assets, in the right place, at the right time, managed by the right people.

Ultimately, asset management is a way to align strategic planning with infrastructure and service delivery in the real world. What assets do people need? How can these assets be made to last the longest and perform the best?

3.2

Why is Asset Management Important?

Infrastructure is at the heart of everything that Council does. As infrastructure assets can provide services over extended periods of time, the choices Council makes today can impact the quality of life of future generations. Asset management provides us with the ability to understand the immediate, medium- and long-term impacts of decisions and provide solutions on how to mitigate the risks.

The benefits of good asset management include: • Improved cost efficiency by looking at the costs of assets over their entire lifecycle. • Being able to target critical assets to ensure performance is maintained and risks are managed. • Better understanding of what levels of service can be achieved for different costs. • Ensuring infrastructure networks are appropriately funded for the long term. • Improving customer satisfaction by matching the services and assets Council provides with the community’s expectations and willingness to pay.

Planning Planning is the first stage of the asset lifecycle. This stage establishes asset requirements based on evaluation of needs and options.

Creation This begins the lifecycle of the asset. Once an asset is identified, acquired, or constructed it can be monitored throughout its entire lifecycle.

Figure 2 - Asset Lifecycle 10

Asset Plan 2022-2032 | Golden Plains Shire Council

Operations & Maintenance

Replacement or Disposal

Operations, maintenance and monitoring.

At the end of the asset’s lifecycle.

This stage indicates the application and management of the asset, including ongoing maintenance and monitoring.

If there is still a need for the asset, it is renewed, and the lifecycle recommences. If not, the asset is sold, repurposed or recycled.


3.3

Asset Planning Framework

The objective in managing assets is to meet the agreed level of service in the most cost-effective manner for the benefit of the community, both present and future. Asset management planning commences with defining stakeholder and legal requirements and needs. These needs inform Council’s corporate planning priorities which helps the organisation to develop its asset management policies, strategies and plans. The outcomes of this planning process inform Council’s Long-Term Financial Plan and Annual Budget.

Figure 3 - Asset Planning Framework

Asset Plan 2022-2032 | Golden Plains Shire Council

11


3.4

Asset Management Plans

Most of Council’s asset management activities are managed at an asset class level. Council has prepared individual Asset Management Plans that each cover a 10-year planning horizon to assist in the management of Council’s assets over their lifecycle. The plans summarise the operating and capital expenditure requirements for each asset class. The key elements of Council’s Asset Management Plans are: • Taking a life cycle approach to managing assets. • Developing a cost-effective management strategy for the long term. • Providing a defined level of service for assets. • Providing defined performance monitoring processes. • Understanding and meeting the demands of growth, legislative change, legal/statutory requirements and infrastructure investment.

The information linkages to the Asset Management Plans include: • The asset register data on location, size, age, value, condition and remaining life of its assets. • Performance relative to adopted service levels. • Projections of factors affecting future demand for services. • Correlations between maintenance and renewal, including asset condition/service performance models. • Data on new assets developed or are planned to be acquired by Council. • Data on assumed works programs and trends. • Budget, valuation and depreciation projections. • Lifecycle analysis data. • Risk, performance and cost data.

• Managing risks associated with the asset. • Providing long-term financial projections for asset sustainability. • Continuously improving asset management processes and practices. Council’s Asset Management Plans for each asset class have all been prepared in accordance with recognised best practice, with guidance provided by Council’s strategic direction. Each Asset Management Plan includes provision for renewal, acquisition, and operational and maintenance works that will provide infrastructure with the necessary resources in an endeavour to meet community expectations for agreed service standards and capacity. The Asset Management Plans outline processes and principles used to plan capital, renewal and maintenance works for key assets and prioritise capital works for each asset class.

12

Asset Plan 2022-2032 | Golden Plains Shire Council

3.5

Relationship to the Asset Plan 2022-2032

The key planning and financial outputs from Council’s Asset Management Plans inform the Asset Plan 2022-2032. The Asset Plan 2022-2032 will guide Council in making decisions within its 10 year objectives. The result is a long-term planning framework, including expenditure forecasts that will assist in making informed decisions on future maintenance programs and renewal and capital projects. This information impacts Council’s Long-Term Financial Plan 2021/22-2031/22, Annual Budget, and annual plans.


Shelford Recreation Reserve Asset Plan 2022-2032 | Golden Plains Shire Council

13


4. STRATEGIC CONTEXT The delivery of services to the community is guided by the Golden Plains Community Vision 2040, Council Plan, strategies and policies. These also drive Council’s approach to asset management.

4.1

Strategic Planning Principles

The Local Government Act 2020 drives an integrated approach to planning and reporting to support strategic decision-making through:

Strategic planning provides Council with a clear direction, informs its resource planning, and helps to ensure Council delivers on its commitments.

• Recognising that planning is holistic and should be driven by the community.

Figure 4 shows how the Asset Plan 2022-2032 fits with Council’s other strategic planning documents.

• Providing a comprehensive view of Council’s available resources and commitments. • Enabling alignment of Council’s objectives and capabilities. • Supporting an understanding of medium- to longterm implications of Council’s decisions on resource allocation and performance. • Being outcome-focused.

Figure 4 - Integrated Planning Framework

14

Asset Plan 2022-2032 | Golden Plains Shire Council


Table 2 describes some of Council’s key strategic planning documents and how they relate to the Asset Plan 2022-2032. Key Element

Description

Relationship to the Asset Plan 2022-2032

Asset Plan 2022-2032

Outlines Council’s asset management priorities for the next 10 years and how it will manage its portfolio of assets to deliver services effectively and realise the Golden Plains Community Vision 2040.

Long-Term Financial Plan 2021/22–2031/32

Provides a long-term view of the resources expected to be available and how these will be allocated and prioritised over the next 10 years.

The Asset Plan 2022-2032 and LongTerm Financial Plan 2021/22-2031/32 are intrinsically linked. Required asset funding is identified in the Asset Plan 2022-2032. Available funding is guided by the LongTerm Financial Plan 2021/22-2031/32. The risks of any variance between the funding that is needed and what is available are addressed in the Asset Plan 2022-2032.

Golden Plains Community Vision 2040

The Golden Plains Community Vision 2040 identifies the aspirations and goals the community wants to achieve in the long term.

Helps Council to understand and prioritise its long-term asset needs.

Workforce Plan

Specifies the projected staffing requirements to deliver the outcomes outlined in the Council Plan 2021-2025.

Identifies the human capital required to implement organisational asset management and deliver services.

Council Plan 2021-2025

The Council Plan 2021-2025 reflects which community outcomes Council intends to contribute to during its fouryear term. While strongly aligned to the Golden Plains Community Vision 2040, it is not constrained to this agenda and may incorporate broader objectives.

The Council Plan 2021-2025 gives a basis for setting Council’s asset management objectives and defines asset requirements over the medium term.

Strategies

Help Council understand the specific initiatives and actions it needs to achieve its medium- to long-term objectives. The strategies shape Council’s services and identify the assets needed.

Informs future asset requirements that provide input into the long-term asset costs that inform the Asset Plan 2022-2032.

Annual Report

Transparent reporting process to ensure the public have access to regular and transparent information about how Council is performing.

Provides a mechanism to monitor and report on asset-related performance indicators promoting accountability and transparency.

Asset Plan 2022-2032 | Golden Plains Shire Council

15


4.2

Long-Term Resource Planning

The Asset Plan and Long-Term Financial Plan, along with the Workforce Plan, are the foundation of Council’s long-term resource planning. These plans work together to ensure that expectations are achievable and sustainable. There is direct integration between the Asset Plan 20222032 and Long-Term Financial Plan 2021/22-2031/32. The Asset Plan 2022-2032 informs the Long-Term Financial Plan 2021/22-2031/32 by identifying the amounts that are required to renew, maintain, and improve Council’s assets over their lifecycle.

4.3

The Long-Term Financial Plan 2021/22-2031/32 determines how much funding is available to support Council’s assets. It incorporates knowledge of the condition of its assets and risk assessment issues, as well as the impact of reviewing and setting intervention and service levels for Council’s infrastructure. When strategies or plans are being developed or reviewed, the estimated assets and resources required to implement them become inputs to the Asset Plan 2022-2032, Long-Term Financial Plan 2021/22-2031/32 and Workforce Plan.

the regulatory framework

Council operates in a complex legislative and policy environment that directly influences the way it does business. The principal legislation in Victoria governing the establishment and operation of councils is the Local Government Act 2020 (‘the Act’). This defines the purposes and functions of local government as well as providing the legal framework for establishing and administering councils.

The Act requires all councils to develop an integrated, longer-term, and transparent approach to planning organised around a 10-year community vision. This Asset Plan is an important part of Golden Plains Shire Council’s integrated planning framework. As well as the general powers and responsibilities given under the Act, Council is responsible for a wide range of services and functions under various other Acts of Parliament. In fact, Council has responsibilities under more than 120 different Victorian pieces of legislation.

Turtle Bend Bridge, Teesdale 16

Asset Plan 2022-2032 | Golden Plains Shire Council


Bannockburn Heart outdoor dining Asset Plan 2022-2032 | Golden Plains Shire Council

17


5. Council Services Everything that Council does is focused on achieving community outcomes. All activities outlined in the Asset Plan 2022-2032 aim to deliver the results required to achieve these outcomes, contribute to strategies and meet its legislative requirements. Likewise, all Council capital and operating expenditure is directed towards a level of service that moves the community closer to these outcomes now or at some future point.

5.1

Services Supported by Assets

Council’s assets exist to enable the provision of a broad range of services for community benefit. Council’s ability to effectively manage its assets has a direct impact on the quality of services enjoyed by the community. Council is continuously looking to improve the ways that it plans its services. This is to make sure that they are aligned with its goals, has clear and measurable outcomes, and responds to community expectations and affordability. Bannockburn Cultural Centre

5.2

Levels of Service

Asset planning enables the relationship between service standards and the cost of the service to be determined (i.e., quality vs. cost relationship). This relationship can then be evaluated in consultation with the community to determine the minimum levels of service for which people are prepared to pay. Levels of service provide the basis for planning life cycle management strategies and work programmes. Clear levels of service give Council the ability to monitor and report on its performance. Council’s aim is to continue to advance the municipality without diminishing its net level of service over the long term.

18

Asset Plan 2022-2032 | Golden Plains Shire Council

Levels of Service Levels of service are used to define the quality of assets and services against which performance can be measured.


5.2.1 Level of Service Relationship to Asset Management Planning One of the cornerstones of sound asset management planning is to provide levels of service that current and future communities want and for which they are prepared to pay. Before developing detailed asset management strategies, agreed levels of service need to be established between Council and the community with consideration given to the following: • Council’s strategic mission and objectives • Legislative requirements • Technical constraints • Financial and practical constraints A key objective of Council’s asset management planning is to match the levels of service provided by assets with the expectation of customers, corporate goals, and legislative requirements. This requires a clear understanding of customer needs and preferences. Council recognises the importance that levels of service play in optimising the lifecycle management of its assets and Council continues to work towards achieving the required service levels in practice. The development and monitoring of actual service levels will be one of the foundations of future improvement to Council’s asset management planning processes.

Images from top to bottom: Bannockburn footpath Dereel Hall Netball courts and change rooms, Linton Recreation Reserve Asset Plan 2022-2032 | Golden Plains Shire Council

19


The Well, Smythesdale

20

Asset Plan 2022-2032 | Golden Plains Shire Council


6 Community and Stakeholders Many people directly use and rely on Council’s assets in their daily activities. In addition, Council’s stakeholders include a wide range of people and groups who, although not using Council assets directly, have shared or competing interests in how it manages these assets. Council has a broad group of stakeholders who have varying needs.

6.1

Community Engagement

It is important that Council understands the expectations of its stakeholders so it can manage its assets effectively. Council’s Community Engagement Policy outlines its commitment to community engagement. It details the principles that guides Council to deliver sustainable outcomes for the Shire, through shared problemsolving, open dialogue and meaningful participation. The policy seeks to foster a deeper culture of public participation, provide a common language and strengthen engagement. Council is committed to transparent and informed decision-making in relation to the management of its assets and services through engagement with the community. Council uses a variety of engagement tools and platforms for the community to provide feedback on projects and allow them to have their say in developing policies, programs and capital works.

6.2

In addition, the Golden Plains Community Vision 2040 and Council Plan 2021-2025 were both developed with input from the community via a process of deliberative engagement. In accordance with guidance from Local Government Victoria, deliberative engagement is not required for this first Asset Plan. While this is the case, Council will be seeking feedback on the Asset Plan 2022-2032 from the community via participatory engagement means following Council’s Community Engagement Policy and Community Engagement Framework. Future versions of the Asset Plan 2022-2032 will be prepared following a deliberative engagement approach.

Council’s Approach to Meeting Community Needs

Council has many strategies that guide its delivery of services and assets, including the Council Plan 2021-2025, which informs the organisation’s work during the four-year Councillor term. Through these plans, Council’s service managers, planners and designers build on the things the Shire does well while responding to opportunities for improvement. These documents explain how Council improves services and assets to meet changing community needs.

Asset Plan 2022-2032 | Golden Plains Shire Council

21


7. THE CHANGING SHIRE 7.1

Challenges and Opportunities

Local, national and global trends all have the potential to impact the future outlook of Golden Plains. Council needs to understand these trends, harness their benefits and adaptively respond to preserve the health, vibrancy and resiliency of Golden Plains Shire.

Bannockburn Heart 22

Asset Plan 2022-2032 | Golden Plains Shire Council


Some of the main issues facing the provision of Council’s assets and services are outlined in Table 3. Issue

What does this mean for asset management and service delivery?

Social Demand Population Trends The present population of Golden Plains Shire is 24,249 people and is expected to grow to more than 42,193 people by 2041, This is a growth rate of around 2.6% per annum.

Council will need to expand its services and assets to cater for its growing community. Council will need to make a financial investment in infrastructure so that its assets are of a suitable capacity to cater for growth and that exemplary urban renewal is achieved. The variable rate of growth across the Shire will impact the rate of demand for services and infrastructure across different districts.

Demographic Change By 2026, forecasts indicate a 15.0% increase in population under working age, a 45.6% increase in population of retirement age, and a 20.3% increase in population of working age. Changing Community Needs The community expects Council to be able to quickly respond to emerging needs, without knowing how long the demand might last.

Change in the age structure of the population will mean it is critical for Council to plan age-based facilities and services. A changing demographic will mean that Council will need to maintain a focus on providing assets that promote access and equity. Council will need to plan assets that are responsive and adaptable to meet shifting stakeholder needs. Council will need to seek to form strategic alliances with service delivery partners to enhance non-asset based service delivery solutions in turn optimising the use of Council’s asset portfolio.

Built Environment Ageing Infrastructure One of the biggest financial challenges facing Council is the cost of renewing its ageing infrastructure. Council’s assets have been built and developed in the past. Many years on, this period of development has created a large peak in the need to invest in asset maintenance and renewal. Rapid Technological Change The world is becoming more connected. People, businesses and governments are increasingly moving online to connect, deliver and access services, obtain information and to perform day-to-day activities.

Technological advancement is rapid, with digital technologies shaping and reshaping the way Council operates. There will be fundamental changes in the way stakeholders will engage with Council in the future. These changes will affect how services are delivered and, by extension, the facilities and assets that are needed. The Council Plan 2021-2025 gives a basis for setting Council’s asset management objectives and defines asset requirements over the medium term.

These changes will affect how Council delivers services and how it manages its assets.

Asset Plan 2022-2032 | Golden Plains Shire Council

23


Issue

What does this mean for asset management and service delivery?

Economic Demand Diminishing Income The overall low rate environment due to rate-capping and potential freezing or reduction in grant funding may lead to a reduction in income available to Council. Increasing Cost of providing Services Cost increases to items such as electricity, petrol and raw materials impact on the Council. For the Council, this occurs within an expectation of doing more with less or improving efficiency to ensure more can be achieved with less money. Delivering on Community Expectations while keeping it affordable There is ongoing pressure from the community for higher quality assets and services to be provided for most Council activities. Smoother roads, modern technology and convenience are some examples. The expectation is for a higher level of service for the same amount of money – in other words, doing more with less.

Reduction in income due to rate-capping, availability of grant funding, and hardship responses to significant events such as the COVID-19 pandemic have the potential to materially affect Council’s financial sustainability. This will impact the way Council invests in its assets and services in the future. Council will need to aim to continually balance the affordable provision of services against the needs of the community.

Community expectations can be influenced by numerous drivers such as generational change, legislation, environmental standards, facilities experienced elsewhere and new technology. Council assets must cater for the expectations of the community by remaining accessible, well maintained and fit for purpose. Assets that meet these expectations cost money, and must be balanced and prioritised against building the Shire’s future and the ability of the community to pay.

Political and Regulatory Influence Legislative and Policy Influence Council operates in a complex legislative and policy environment that directly influences the way it does business: • There is an expectation that Council will continue to deliver services, even when State and Federal government funding is withdrawn. • The cap on rate increases means its ability to control revenue is constrained. • Compliance and reporting requirements are increasing.

24

Asset Plan 2022-2032 | Golden Plains Shire Council

Council needs to meet its statutory obligations while being conscious of maintaining affordability and financial sustainability. This requires good decisions to be made to manage competing funding demands across a broad range of projects, programs and services. Cost shifting by the Victorian and Federal Governments to the entire Victorian local government sector will continue. This will push Council to increasingly to rely on rates and charges only to fund existing and new services and programs.


Issue

What does this mean for asset management and service delivery?

Natural Environment Climate Change

Assets will need to be built and renewed to a standard that can withstand the impacts of climate change. This may require different materials, methods of construction and other innovative approaches.

Australia is already experiencing the impacts of climate change. In the future, it is expected to cause increased vulnerability to bushfire, storm damage to infrastructure, decreased water quality and security of water supply, and reduced summer outdoor activities due to higher temperatures.

There may also be increased expectation for leadership from Council to make use of sustainable energy sources and to provide assets that are environmentally efficient. Council will need to give recognition to the upstream impacts of the materials and services we use in the design and construction of our infrastructure. The sourcing of more local, recycled content will minimise the use of virgin materials and reduce the amount of waste entering landfill.

Natural Hazards

Council will need to recognise climate change risks and examine the vulnerability of our asset network. When disasters occur, Council needs to focus energy and resources on supporting the recovery of the community.

The district is at risk from natural hazards such as flooding, landslips, storms and bushfire. These events can strike without warning. Such events can potentially cause significant unbudgeted costs, beyond the capacity of the Council to cope.

Council assets will need to be rebuilt to a higher standard in the expectation that risks will only increase in the future.

Table 3 - Summary of Key Challenges and Opportunities

7.2

Resilience in Challenging Times

Council’s community infrastructure assets are essential to the delivery of basic public services and even more so in changing urban landscapes. Council’s services face a multitude of potential risks, whether it is from poor planning, climate change or public health crises such as the ongoing COVID-19 pandemic. Good asset management lends itself to sound fiscal management by supporting long-term financial sustainability and ultimately ensuring that Council’s investment in its assets will adequately serve present and future generations.

The COVID-19 pandemic has called for Council to be agile and flexible in the support of the community where most needed. Council has adapted to innovate new ways of keeping safe and connected while maintaining its high standard of service delivery. Council’s Asset Management Framework, including its systems, tools, and processes, means that Council is well positioned to act when needed. As the organisation’s asset management proficiency continues to improve so will the resilience of its assets and services to future threats and hazards.

Asset Plan 2022-2032 | Golden Plains Shire Council

25


8 Funding for Long-Term Sustainability The main theme underpinning the Asset Plan 2022-2032 and broader asset management planning principles is ensuring responsible stewardship of Council assets to meet the needs of tomorrow’s community. This acknowledges the many and varied factors that influence the delivery of the community’s infrastructure. Some of these challenges are legacy issues, others are simply the demands of a progressive society that is constantly seeking to improve. Either way, Council is responsible for ensuring that its infrastructure contributes to achieving its long term aspirations and supports a healthy, wellconnected and prosperous community.

8.1

Asset Investment Strategy

Looking ahead to the next 10 years, Council’s approach is to be prudent in its investment decisions using a holistic lifecycle approach to asset management. This means that Council will aim to plan its assets so that they will continue to support quality living, economic development and the environmental integrity of Golden Plains Shire in the long term.

Inverleigh Main Street Drainage Before and After

In planning and providing infrastructure requirements in the next 10 years, Council will aim to: Optimise asset life through timely and effective maintenance

There is no one-size-fits-all care programme for all assets. Council will continue to use a mix of approaches, including preventive maintenance, reactive maintenance, run-to-failure (breakdown maintenance), predictive maintenance and risk-based maintenance for critical assets.

Continue to replace ageing infrastructure

Through a robust asset renewal programme, Council will progressively replace assets as they reach the end of their useful life. The rate of asset renewal is intended to maintain the overall condition of the asset system at a standard that reflects its criticality and age profile and ensures that the community’s investment in infrastructure is sustained.

Maintain current levels of service

Using a holistic lifecycle approach to asset management, Council’s decisions will be data driven to maximise the performance and life of its assets without diminishing the net level of service over the long term.

Manage the impacts of growth and land use change

Our strategic plans will provide guidance on future asset needs by identifying location and scale of growth. Contributions from development will be taken to fund necessary infrastructure so that growth pays for growth, and costs are not unfairly borne by established communities.

Comply with legislative requirements

Council acknowledges and will action legislated standards in infrastructure planning and development.

Provide long-term affordable services

Council’s financial strategy will continue to reflect the balancing of ratepayer affordability against community needs and aspirations.

26

Asset Plan 2022-2032 | Golden Plains Shire Council


Rate-capping constrains Council’s ability to control revenue. In the rate-capped environment, greater emphasis is required on the maintenance and renewal of existing assets as opposed to the improvements or development of new assets. Council’s Revenue and Rating Plan addresses its reliance on rate revenue and provides options to actively reduce that reliance to ensure ongoing financial sustainability.

Council Rate Cap The Minister for Local Government sets local council rate caps. The cap is the maximum amount Council can increase its general rates and municipal charges within a financial year. The rate cap set for 2022/23 is 1.75%.

8.1.1 Spending Categories For the purposes of the Asset Plan 2022-2032, spending on Council infrastructure is categorised as follows: Expenditure Category

Activity Maintenance

Ongoing work required to keep an asset performing at the required level of service.

Operations

Recurrent expenditure that is continuously required to provide a service.

Renewal

Returns the service potential or the life of the asset up to that which it had originally.

Upgrade

Enhancements to an existing asset to provide a higher level of service.

Recurrent

Renewal

Growth

Description

Expansion

Extends or expands an existing asset at the same standard as is currently enjoyed by residents, to a new group of users.

New

Creates a new asset that provides a service that does not currently exist.

Table 4 - Expenditure Categories Classifying Council’s expenditure in this way helps to plan its budgets and track how Council spends on its assets and services.

Asset Plan 2022-2032 | Golden Plains Shire Council

27


8.1.2 Investment Evaluation Council follows an investment philosophy that: • Ensures that capital investment for infrastructure assets aids in the achievement of its strategic objectives. • Aids the development of a service needs directed long-term capital works program, to better inform its Long-Term Financial Plan 2021-22-2031/32. • Ensures capital investment delivers best value. • Ensures that capital investment is financially sustainable, and in accordance with asset management principles for the whole life cycle costs of its infrastructure. • Builds a robust capital infrastructure asset investment system, that is impartial and priority-based for allocating its resources.

8.2

• Places an emphasis on allocating funding for renewing assets. Funding for upgrades, extensions and new projects will only be considered after renewal requirements are identified and considered. • Enhances transparency and public confidence in its capital investment decision-making process. Council’s approach provides a means of evaluating and appraising proposed infrastructure investments, as well as setting priorities within the context of its long-term asset and service needs. It is important that investment decisions on our infrastructure are based on the ability to fund the upfront capital costs and also include allowances for the ongoing operational, maintenance and future replacement costs.

Financial Summary

Lifecycle costs are essentially how much money Council will need to spend on an asset over the course of its useful life. This includes costs from the time an asset is acquired or built, while it is in use, including maintenance, to the time it is either disposed of or replaced. The cost to buy, use and maintain assets adds up and future costs needs to be forecast over the long term so that Council can plan to budget for this expenditure in coming years.

Recurrent

Operating costs (i.e., asset maintenance and care) are determined according to Council’s levels of service and frequency of its various activities (e.g. mowing, street sweeping, etc.).

Renewal

Renewal costs are determined using Council’s analysis tools that predict when an asset needs to be replaced based on its current condition and an understanding of how it ages and deteriorates over time.

Growth

The priority and amount of funding Council needs to allocate to improving its assets are guided by Council’s various strategies, plans and understanding of community expectations. The selection of discretionary projects such as these must pass through Council’s investment evaluation processes before they are selected for inclusion on its capital works program.

There are a number of ways Council determines when and how much it needs to allocate to fund the lifecycle costs of its assets.

Table 5 - Asset Lifecycle Cost Determination 28

Asset Plan 2022-2032 | Golden Plains Shire Council


Figure 5 shows Council’s planned expenditure across its infrastructure assets included in the Asset Plan 2022-2032 over the next 10 years. The line in the graph represents the anticipated budget needs required to achieve lowest lifecycle costs, the bars indicate the funding that is forecast to be available from Council’s Long-Term Financial Plan 2021/22-2031/32. The gap between these informs the discussion on achieving the balance between services, costs and risk to achieve best value outcomes.

Figure 5 - Projected Total Asset Expenditure

This is further summarised in Table 6, which shows the total planned expenditure related to renewal, growth and recurrent activities over the next 10 years for each asset class. Asset Class

Renewal ($’000)

Acquisition ($’000)

Recurrent ($’000)

Total ($’000)

Road and Car Parks

24,186

34,390

32,308

90,885

Buildings

2,575

22,772

17,336

42,684

Bridges

21,582

1,250

2,254

25,086

Footpaths

1,550

2,500

891

4,941

Drainage

3,000

1,330

5,719

10,049

Open Space

4,150

12,606

22,794

39,550

Total

57,043

74,849

81,303

213,195

Council plans to spend an estimated total of $213.2 million on its assets over the 10 years. Of this: • Around 27% ($57 million) is renewal expenditure for replacement of assets that are reaching the end of their lives. • Around 35% ($74.9 million) relates to expenditure to meet growth or additional future demand. • Around 38% ($81.3 million) relates to caring for Council assets through ongoing maintenance and other activities to make sure that they are safe and functional.

Table 6 - Forecast Expenditure by Asset Class

Asset Plan 2022-2032 | Golden Plains Shire Council

29


The spending of Council on its assets represents a significant investment made on behalf of the community and is fundamental in enabling Council to meet everchanging demands and to safeguard future use of its infrastructure. Council has made every effort to accurately determine the financial outlays necessary to renew, improve and care for its infrastructure for the next 10 years. The outlays made in the Asset Plan 2022-2032 have been determined based on the affordability assessments made in Council’s Long-Term Financial Plan 2021/22-2031/32 and represents the investment that is required to maintain its existing levels of service.

The Asset Plan 2022-2032 outlines a fuller picture of the future demand on Council’s assets so that it can make informed decisions around prioritisation of its finite funding resources. Actual funding will be guided by the Long-Term Financial Plan 2021/22-2031/32 and determined in its Annual Budget. Projected funding allocations may change depending on shifting priorities, Council’s need to react to immediate or emerging issues, or as grant opportunities become available. The Asset Plan 2022-2032 will therefore be agile and responsive to make sure it is reflective of Council’s plans and is closely integrated with its LongTerm Financial Plan 2021/22-2031/32. Appendix A provides a detailed breakdown of the projected expenditure requirements for each infrastructure asset class over the next 10 years.

8.2.1 Managing the Funding Gap Based on projections of the future lifecycle costs of Council’s assets over the next 10 years, it needs to spend a total of $297.9 million to maintain its planned levels of service. When compared with how much Council is budgeting to spend in its Long-Term Financial Plan 2021/22-2031/32 ($213.2 million), Council is faced with a total funding gap of $84.7 million.

Asset Renewal Gap In simple terms, the asset renewal gap is the difference between the current level of actual expenditure on renewing existing assets and the level of funding necessary to replace its assets when they need to be.

This shortfall is largely as a direct result of the projected renewal gap across all of its infrastructure assets. Council also acknowledges that it has areas to improve its long-term infrastructure planning and integrating the financial outcomes of this with Council’s Long-Term Financial Plan 2021/22-2031/32.

The imperative is to ensure that Council’s assets are safe, fit for purpose and meet the needs of the community. Council will strive to responsibly fund the renewal of its assets in the future. This is so it can minimise the impact to the community of the costs of unsustainable asset provision by proactively renewing and maintaining assets.

If Council does not appropriately manage this gap, Council could be faced with risks of:

Council has many options available to manage the asset renewal gap:

• Continued deterioration of its assets.

• Improving the quality of information – Knowing what condition assets are in, how long they last for, and how they are used will give Council greater confidence in asset renewal projections.

• Poor performing assets. • Asset failure. • A decline in public confidence and community satisfaction. • Compromised public safety and associated liability. • Loss of financial and economic viability.

30

Asset Plan 2022-2032 | Golden Plains Shire Council

• Clearly defining levels of service in consultation with the community will guide when assets need to be replaced enable discussion about long-term affordability.


• Improving efficiency is part of Council’s ongoing commitment to continuous innovation. Operational efficiencies with how Council manage its assets, including day-to-day maintenance, construction, replacement and longer-term planning can reduce the overall costs. • Continue its advocacy efforts to attract support through government grants to increase the available sources of funding and reduce the cost burden. • Adapting or consolidating existing assets to maximise multiuse potential could result in the rationalisation of unnecessary assets. • Forming or strengthening alliances with strategic partners to find opportunities for finding non-asset solutions to the delivery of services. This can reduce costs. • Reviewing the distribution of Council’s own available funding so that it can prioritise spending towards the replacement of assets. Images from top to bottom: Painted Bus Shelters, Scarsdale Bannockburn Heart tables and BBQ

Nimmons Bridge, Newtown Asset Plan 2022-2032 | Golden Plains Shire Council

31


9 Monitoring and Review The Asset Plan 2022-2032 will be reviewed following Council elections, in accordance with the Local Government Act 2020. Intermediary reviews of the Asset Plan 2022-2032 may be undertaken as improvements are implemented or major financial decisions are made. This is to make sure that it retains consistency with Council’s strategic goals and objectives, with regard to: • The available financial resources of Council. • Long-term works programs that are reviewed annually. • The consideration of any external factors that are likely to influence the Asset Plan 2022-2032.

9.1

Reporting

Council’s Asset Management Plans are continuously monitored and are formally reviewed and updated every four years. Reporting on service levels and other performance measures will be undertaken as part of Council’s Annual Report.

9.2

Improving Council’s Evidence Base

The Asset Plan 2022-2032 has been developed based on existing processes, practices, data and standards. Council is committed to striving towards best asset management practices and is always working to improve knowledge about its assets and enhance the tools used to manage them. As data and systems improve, so too will the analysis and information on which the Asset Plan 2022-2032 is based. It is intended that the Asset Plan 2022-2032 should always reflect as closely as possible the actual practices used in managing Council assets. Only in this way will Council be best able to ascertain the long-term needs for our infrastructure. The approach to the implementation of Council’s capability improvements is discussed in its respective Asset Management Plans.

32

Asset Plan 2022-2032 | Golden Plains Shire Council

Images from top to bottom: She Oaks Road, Maude Sharp Road, She Oaks Reserve Road, Rokewood


Federation Bridge, Inverleigh

Asset Plan 2022-2032 | Golden Plains Shire Council

33


Slate Quarry Road Bridge, Meredith

34

Asset Plan 2022-2032 | Golden Plains Shire Council


Appendix a - financial projections Roads and carparks The projected capital and recurrent expenditure associated with Council roads and carparks over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

2,938

2,997

3,056

3,118

3,186

3,256

3,328

3,401

3,476

3,552

32,308

Renewal

2,591

1,955

2,155

2,155

2,355

2,355

2,555

2,555

2,755

2,755

24,186

Acquisition

6,440

3,200

3,250

3,350

2,750

2,900

3,000

3,100

3,200

3,200

34,390

Total

11,969

8,152

8,461

8,623

8,291

8,511

8,883

9,056

9,431

9,507

90,885

Goals for Investment

What do the projections tell us?

To provide residents, visitors, road users and others with a safe and fit for purpose road network.

Projections indicate that there is an annual average shortfall of $5.7 million when comparing how much Council is forecast to spend as outlined in the Long Term Financial Plan 2021/22-2031/32 and Council’s assessment of lifecycle costs over the next 10 years.

Current and Upcoming Projects and Initiatives > Meredith-Shelford Road Stages 3 to 5 (road widening) > Kopkes Road, Haddon (road widening) > Haddon School Road – Racecourse Road (intersection improvement)

Council has incrementally increased its expenditure on roads however it needs to do more to make sure it is investing sufficient funds to maintain current service levels over the long term.

> Happy Valley Crossing Road – Linton-Naringhil Road (intersection improvement). Asset Plan 2022-2032 | Golden Plains Shire Council

35


BUILDINGS The projected capital and recurrent expenditure associated with Council buildings and facilities over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

1,478

1,529

1,583

1,638

1,696

1,755

1,817

1,880

1,946

2,014

17,336

Renewal

175

175

175

250

250

250

325

325

325

325

2,575

Acquisition

837

3,440

3,340

3,465

3,015

2,915

1,040

2,640

1,040

1,040

22,772

2,490

5,144

5,098

5,353

4,961

4,920

3,182

4,845

3,311

3,379

42,684

Total

Goals for Investment

What do the projections tell us?

To ensure Council buildings and facilities are safe, suitable and accessible to the broad range of people who use them.

Projections indicate that there is a cumulative shortfall in funding of $5.4 million over the next 10 years.

Current and Upcoming Projects and Initiatives > Major Facility Renewal > Minor Facility Renewal > Building Blocks – Three-year-old Kindergarten > Disability Action Plan > Future Building Design 36

Asset Plan 2022-2032 | Golden Plains Shire Council

Council’s challenge is to strike a balance between maintaining the condition of its buildings as they age and deteriorate and providing facilities that are accessible and meet the service needs of the growing and changing community.


Bridges and Major Drainage Structures The projected capital and recurrent expenditure associated with local bridges and major drainage structures over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

205

209

213

218

222

227

232

232

243

248

2,254

Renewal

1,882

2,200

1,900

2,000

2,100

2,100

2,300

2,300

2,400

2,400

21,582

Acquisition

100

100

100

100

100

150

150

150

150

150

1,250

Total

2,187

2,509

2,213

2,318

2,422

2,477

2,682

2,687

2,793

2,798

25,086

Goals for Investment

What do the projections tell us?

To ensure that bridges and major drainage structures in Golden Plains Shire are sound, safe and functional.

Financial projections indicate that Council will be investing the funds it needs to maintain and renew the bridges on local roads.

Current and Upcoming Projects and Initiatives > Hendersons Bridge (design underway) > Frenchmans Bridge (design underway) > Russells Bridge > Pollocksford Bridge (shared with Surf Coast Shire Council)

This is in recognition of the importance of the local bridges. They are key elements of the road network and represent a major investment of community resources. Because of their location over natural and other obstacles, any bridge failure has the potential to severely restrict road traffic with consequent inconvenience and economic loss to the community.

Asset Plan 2022-2032 | Golden Plains Shire Council

37


Footpaths and Trails The projected capital and recurrent expenditure associated with pathways over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

81

83

84

86

88

90

92

94

96

98

891

Renewal

155

155

155

155

155

155

155

155

155

155

1,550

Acquisition

250

250

250

250

250

250

250

250

250

250

2,500

Total

486

488

489

491

493

495

497

499

501

503

4,941

Goals for Investment

What do the projections tell us?

To provide a connected network of paths and trails that allows for the safe movement of pedestrians and offers recreational opportunities.

Based on the assessment of the long-term lifecycle costs for local footpaths and trails, Council is projecting a cumulative funding shortfall of $17.5 million.

Current and Upcoming Projects and Initiatives

A large proportion of this shortfall is driven by the longterm aspirations to upgrade and extend its extensive network of trails and shared paths. Council needs to formalise plans and continue to advocate for grant funding to helps achieve its goals.

> Linton Primary School – new path > Various footpath renewal > James Place, Bannockburn (gravel footpath) > Bannockburn-Shelford Road (asphalt footpath)

38

Asset Plan 2022-2032 | Golden Plains Shire Council


Drainage The projected capital and recurrent expenditure associated with stormwater drainage network over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

520

530

541

552

564

576

589

602

615

629

5,719

Renewal

100

100

200

200

300

300

400

400

500

500

3,000

Acquisition

180

100

100

100

100

150

150

150

150

150

1,330

Total

800

730

841

852

964

1,026

1,139

1,152

1,265

1,279

10,049

Goals for Investment

What do the projections tell us?

To protect the community from flooding and improve the quality of stormwater run off discharged to natural watercourses.

Council acknowledge that it has work to do to understand the performance of the drainage network and make sure it is allocating sufficient funds towards the management these assets.

Current and Upcoming Projects and Initiatives > Drainage investigations > Drainage upgrades (locations TBD) > Common Road Swale Drain Upgrade

The financial projections in the Asset Plan 2022-2032 will be further refined as knowledge of the condition and capacity of the drainage system improves. This will help in optimising the replacement and upgrade of parts of the network that are in most need.

Asset Plan 2022-2032 | Golden Plains Shire Council

39


Open Space The projected capital and recurrent expenditure associated with open spaces including parks, reserves, playgrounds, sports fields, etc. over the next 10 years is shown here.

Financial Projections

Planned Expenditure 2022

2023

2024

2025

2026

2027

2028

2029

2030

2031

Recurrent

2,073

2,114

2,156

2,200

2,248

2,297

2,348

2,400

2,452

2,506

22,794

Renewal

425

425

350

375

375

375

400

475

475

475

4,150

Acquisition

2,041

1,570

2,320

1,725

1,975

475

1,000

500

500

500

12,606

Total

4,539

4,109

4,826

4,300

4,598

3,147

3,748

3,375

3,427

3,481

39,550

Goals for Investment

> Bannockburn Heart Stage 2

To enhance the Shire’s public open space to enrich quality of life and promote social connectedness.

> Meredith Skate/BMX/Play (Design)

Current and Upcoming Projects and Initiatives

What do the projections tell us?

> Northern Streetscape Implementation

Council is faced with a small shortfall in funding for its open space assets. Immediate plans are to review how funding is allocated between Renewal and Growth so that there is better balance between improving and enhancing public open spaces and being able to replace ageing assets when needed.

> Refurbishment of Playgrounds > Shire Beautification > Open Space Strategy Implementation > Ross Creek Play and Active Recreation

40

Asset Plan 2022-2032 | Golden Plains Shire Council

> Netball/Tennis Court Renewal


Netball Courts, Bannockburn Asset Plan 2022-2032 | Golden Plains Shire Council

41


Cover image: Enfield Playground Upgrade Back cover: Bannockburn Skate Park

2 Pope Street, Bannockburn, VIC 3331 19 Heales Street, Smythesdale, VIC 3351 PO Box 111, Bannockburn, VIC 3331 5220 7111 enquiries@gplains.vic.gov.au goldenplains.vic.gov.au

CUSTOMER SERVICE HOURS Bannockburn Customer Service Centre 8.30am to 5pm, Monday to Friday The Well, Smythesdale 8.30am to 5pm, Monday to Friday

@GPSCouncilNews lovegoldenplains GoldenPlainsShire GoldenPlainsMayor


Turn static files into dynamic content formats.

Create a flipbook
Asset Plan 2022-2032 by Golden Plains Shire Council - Issuu