Town of Easton 2026 Comprehensive Plan
February 19, 2026
Town of Easton
2
February 19, 2026
Table of Contents 1. INTRODUCTION
1
a. Purpose and Legal Framework
1
b. Planning Background, Scope and Use of this Plan
4
c. Easton’s Role and Identity
4
d. Foundations and Data Sources
5
e. Planning Process and Public Engagement
7
f. Vision
10
2. LAND USE
12
a. Purpose
12
b. Land Use Goals, Issues and Policy Considerations
17
c. Zoning And Community Character
24
d. Future Land Use Framework
26
e. Special Districts and Place Types
28
f. Goals and Objectives
29
3. PLACE (COMMUNITY CHARACTER)
32
a. Purpose
32
b. Historic and Cultural resources
32
c. Contemporary Architecture
37
d. Civic Architecture and the Public Realm
38
e. The Case for Traditional Neighborhood Zoning
38
f. The Role of Major Retail in Easton in 2025
41
g. Town Gateways and Corridors
43
k.Goals and Objectives
44
4. ECONOMIC DEVELOPMENT
48
a. Purpose
48
b. Business Development
51
c. Tourism and Downtown
51
d. Commercial Redevelopment
52
Town of Easton
3
February 19, 2026
e. Community Development
53
f. Goals and Objectives
53
5. HOUSING
55
a.Purpose
55
b. Housing Issues and Policy Considerations
56
c. Existing Housing Programs
59
d. Housing Affordability
63
e. Fair Housing
70
f. Potential New Housing Programs / Policies
71
g. Goals and Objectives
73
6. TRANSPORTATION
75
a. Purpose
75
b. Transportation Issues and Policy Considerations
75
c. Organizational Framework
76
d. Integration of Land Use and Transportation Planning
76
e. Complete Networks
77
f. Transportation Impact Analysis (TIA)
80
g. Road System
80
h. Complete Streets
83
i. Airport
83
j. Port
86
k. Rail
87
l. Pedestrian and Bicycle Plan
87
m. Public Transportation
91
n. Transportation Map and Proposed Improvements
91
o. Goals and Objectives
97
7. COMMUNITY FACILITIES AND SERVICES
103
a. Purpose
103
b. Utilities
104
c. Solid Waste
106
d. Medical and Hospital Facilities
106
Town of Easton
4
February 19, 2026
e. Public Schools
108
f. Libraries
109
g. Community Centers
110
h. Public Safety
111
i. Goals and Objectives
113
8. PARKS
116
a. Purpose
116
b. Existing Parks
116
c. Future Parks
121
d. Connectivity and Green Infrastructure
123
e. Goals and Objectives
125
9. ECOLOGY
126
a. Purpose
126
b. Water Resources
126
c. Water Source Protection
129
d. Stormwater Management & Point & Nonpoint Source Loading Status and Remediation
130
e. Mineral Resources
135
f. Biodiversity
136
g. Goals and Objectives
137
10 SUSTAINABILITY
140
a. Purpose
140
b. Climate Change
43 1
c. Mitigation Strategies
144
d. Adaptation Strategies
145
e. Sustainable Built Environment
148
f. Food Security
149
g. Financial Sustainability
149
h. Social Sustainability
158
h. Goals and Objectives
159
11 MUNICIPAL GROWTH
161
a. Purpose
Town of Easton
161
5
February 19, 2026
b. Growth Rate Discussion
162
c. Existing Growth Capacity (Infill and Redevelopment)
168
d. Future Growth Areas and Annexation
172
e. Smart Growth and Land Preservation
175
f. Public Services and Infrastructure Needs
176
g. Service Adequacy Considerations
179
h. Water Supply
181
i. Recreation
183
j. Financing Mechanisms
184
k. Rural Buffers and Transition Areas
186
l. Burden on Services for Areas Outside of Town but Under Town’s Responsibility
188
m. Sustainable Growth and Agricultural Preservation Act of 2012
188
n. Protection of Sensitive Areas
190
o. A Growth Management Strategy for Easton
191
p. Goals and Objectives
198
12 Implementation
200
a. Introduction
200
b. 2025 - 2035 Growth Strategy
200
c. Achieving the Vision
201
d. Goals and Objectives
212
13 Appendices
215
a. Appendix 1 - Historical Development & Growth Dynamics . Appendix 2 - Public Survey Results b c. Appendix 3 - Historic Annexation List d. Appendix 4 - Nutrient Loading Analysis Summary e. Appendix 5 - Planned Water & Wastewater Capital Projects
Town of Easton
6
16 2 223 255 260 264
February 19, 2026
1.INTRODUCTION “Make no little plans. They have no magic to stir men’s blood and probably themselves will not be realized. Make big plans; aim high in hope and work...” — Daniel Burnham Envisioning the future and identifying the steps necessary to achieve it is essential in long range planning, particularly the establishment of a community’s Comprehensive Plan. That Plan will have a greater chance of being realized if it is prepared with wide scale and broad-based input from community members. It is our framework for this Comprehensive Plan update. Those interested in the evolution of the Planning process in Easton, the different techniques used in Comprehensive Plan Updates, and how our philosophy was shaped by, and aligned with, policies at the State level, including those advocating for Smart Growth, are encouraged to review the archive of Comprehensive Plans maintained on the Town of Easton Planning Department’s web page (see https://eastonmd.gov/186/Comprehensive-Plan). A. PU RPOSEAND LE GAL FRAMEWORK
The Land Use Article of the Maryland Annotated Code delegates planning and land use regulatory powers to the Town of Easton. When these powers are exercised, they must be exercised in accordance with the applicable provisions of the statute. Accordingly, this Comprehensive Plan for Easton is prepared in compliance with Sections 3.05, 3.06, 3.07, and 3.08 of the statute. Sections 3.05 and 3.06 address the Plan’s content and organization, and Sections 3.07 and 3.08 address procedures for the Plan’s review and adoption. The Easton Comprehensive Plan serves as the Town’s foundational document for land use policy, infrastructure planning, and long-range civic investment. This document fulfills the requirements of the Maryland Land Use Article (§3-201 et seq.), which mandates that municipalities prepare and adopt a comprehensive plan to guide the coordinated and efficient development of their jurisdiction. In April 2025, Maryland enacted new legislation creating 8 Sustainable Growth Planning Principles, modernizing and replacing the former 12 Planning Visions. These new principles reflect the State’s
Town of Easton
1
February 19, 2026
shift from Smart Growth to Sustainable Growth to achieve more balanced land use and development. Sustainable Growth focuses on policies addressing economic, social, and environmental factors for both current and future generations. These eight Planning Principles are designed to make sustainable growth policies simpler, clearer, and easier for everyone involved in planning and development to use effectively.
The new Planning Principles are summarized below: Maryland’s Planning Principles 1. Land:Optimize productivity ofworking landscapes,includingfarmsandforests, and fisheries, and prioritizedevelopment within populationcentersthat are in proximity to existing infrastructure and facilities. 2. Transportation:Prioritize transportation networksthat createenergy efficient,affordable, andreliable accessto jobs, housing, and services. 3. Housing:Enable a mix of quality housing typesandaffordabilityoptions to accommodate all who want to live in the state. 4. Economy:Allow foradaptive reuse,mixed–use, andcontext appropriatenew development that responds to changing markets and innovations. 5. Equity:Engageall sectors of the communityin plandevelopment to ensurediverse voices are heard and the needs ofunderserved populationsare prioritized.
Town of Easton
2
February 19, 2026
6. Resilience:Integrate resiliency measures that willminimizetheimpactsof rapid and unexpectednatural– and human–caused threatson communities. 7. Place:Provide forpublic spacesthat encouragesocialinteractionand valuecultural, historical, andnatural resources. 8. Ecology:Protect and restoresensitive ecologicalsystemsand conservenatural resources, including forests, agricultural areas, and waterways. These Principles ensure that local planning efforts align with State funding, capital improvement programs, and resource conservation policies. The Plan is also designed to coordinate with Talbot County’s planning framework. The 2026 Easton Comprehensive Plan establishes Town policies relative to the most desirable development patterns for present-day Easton as well as the Easton of the future, including potential growth areas for the Town. It identifies areas for living and working activities and related services that are required to assure a quality environment for all residents. Implementation proposals are included as methods for coordinating public and private development activities. Together these influence Town development form and function. Attention is also given to the Town's role in the development of Talbot County. The Town Council is responsible under Maryland law for adopting the Plan. The Town Planning Commission is responsible for drafting the Plan and thereafter for general administration and enforcement of the Plan. All development proposals are reviewed for conformance to basic policies and programs identified by the Plan. Additionally, after adoption, a Comprehensive Plan serves as: ●
A unified statement of desirable development policies.
●
A framework within which development issues can be evaluated and public policy effectuated consistent with the Town’s long-range growth and development goals and objectives.
●
An information document for local elected officials, citizens, developers and special interest groups concerning critical development issues and policies.
Easton’s Comprehensive Plan is a cornerstone of the complex process of guiding future development in the interest of the public. Adoption of the Plan constitutes an important step in
Town of Easton
3
February 19, 2026
directing development in a manner that maintains and enhances Easton’s special and unique sense of place. B. PL ANNING BACKGROUND, SCOPEAND USEOFTHIS PL AN
Easton’s modern planning era began with the 1997 Comprehensive Plan, which was developed in response to community concerns about uncoordinated growth, loss of open space, and weakening of traditional neighborhood character. That Plan introduced a new framework based on community identity, compact form, and public participation. The 2010 Plan built upon that foundation, introducing five core growth strategies: contain sprawl, increase density, build neighborhoods, improve design, and manage growth rate. These strategies guided the Town’s zoning reforms and capital improvement priorities for more than a decade. This 2026 Plan affirms those guiding principles and introduces a sixth strategy: encourage more sustainable development patterns. This addition reflects emerging concerns about climate change, infrastructure efficiency, fiscal resilience, and equitable access to housing and opportunity. Looking back over the past decades of the modern planning process, most of the overarching themes of this 2026 Plan originally appeared in the one that was adopted in 1997. This Plan provides a policy framework to guide Easton’s development through 2035. It is organized into thematic chapters covering land use, community character, infrastructure and services, environmental stewardship, housing, transportation, municipal growth, and implementation. Each chapter includes guiding principles, context, objectives, and recommendations. The Comprehensive Plan is used by the Planning Commission, Town Council, staff, and the public to guide development review, budget decisions, capital investments, and updates to zoning and subdivision ordinances. It is also used by State and regional agencies in assessing funding eligibility and regulatory compliance. The Plan is intended to be updated as needed to remain current with demographic trends, regulatory changes, and community priorities. C. EA STON’S RO LEAND IDENTITY
Easton is the economic, governmental, and cultural center of Talbot County and Maryland’s Mid-Shore region. As the County seat, it houses the region’s major hospital, courthouse, library, and other key institutions. Easton supports a population of a little over 17,000 residents, with services that extend to tens of thousands more from the surrounding area.
Town of Easton
4
February 19, 2026
Easton is frequently recognized as one of the best small towns in America. The Town is defined by its walkable historic downtown, traditional neighborhoods, and compact form. Its character is shaped by architectural continuity, preserved open space, and a strong civic tradition. Easton is situated at the crossroads of U.S. Route 50 and Maryland Route 322, giving it strategic access to the Chesapeake Bay, Annapolis, Washington, and Baltimore. Its rural setting and cultural amenities make it both a desirable place to live and a key regional destination. Easton’s growth over the past century reflects its increasing role as a regional center and its attractiveness as a place to live and invest. For an overview of Easton’s historical development and growth dynamics, and that of the region, see Appendix 1. D. FOUNDATIONSAND DATA SOURCES
This Plan is based on a range of data, analysis tools, and prior studies that provide a foundation for its goals and recommendations. Sources include the U.S. Census Bureau, Maryland Department of Planning, Talbot County Geographic Information Systems (GIS), local infrastructure capacity studies, and Easton’s building permit and land use data. The Plan also incorporates fiscal analysis tools such as Urban3 value-per-acre assessments to evaluate development patterns. Taken together, these tools provide a comprehensive and evidence-based foundation for land use policy, infrastructure planning, and growth management. One demographic change evident in (although not unique to) Easton is the growth of the Hispanic population. The chart below shows how these components of Easton’s population have changed since 1990 when Hispanics were first reported separately. Particularly noteworthy is the absolute growth in the Hispanic population as evidenced by the fact that while the total African American population has been stable since 1990, the percentage that this number represents of the total Town population has shrunk considerably. Conversely the Hispanic population growth has been dramatic both in absolute numbers and as a percentage of the Town’s overall population (from 0.4% to 14.4%).
Town of Easton
5
February 19, 2026
Year
Total Population African American
frican A American %
ispanic or H Latino
ispanic or H Latino %
1990
9,372
2,521
26.9%
337
0.4%
2000
11,708
2,746
23.5%
404
3.5%
2010
15,9945
2,742
17.2%
1,570
9.8%
2020
17,101
2,467
14.4%
2,454
14.4%
TABLE 1 AFRICAN AMERICAN AND HISPANIC POPULATION CHANGE, 1990-2020 SOURCE : US Decennial Census for Year identified
Easton and Talbot County have a high concentration of people over age 65. In 2010 Maryland Department of Planning produced the following map illustrating this:
Map 1: Maryland Senior Population by County
Town of Easton
6
February 19, 2026
American Communities Survey data for 2021 indicates that senior citizens remain a significant portion of the local population. It found that while the state percentage of the population that was 65 or over in 2021 was 16.3%, Talbot County’s was 29.9% and the Town of Easton’s was 24.9%. E. PL ANNING PR OCESSAND PU BLIC EN GAGEMENT
Work on this Comprehensive Plan update began in 2021 with a review of the 2010 Plan’s implementation outcomes. Through 2022, 2023 and 2024, Town staff and consultants gathered data, conducted mapping and zoning analysis, and assessed growth capacity. Community engagement began in 2023 and continued into 2025, including public open houses, stakeholder workshops, online surveys, and formal public hearings. Since 1997, each subsequent update of the Comprehensive Plan has continued to refine the Town’s growth strategy, summarized in the 2010 Plan as: • Contain Sprawl within an Urban Growth Boundary • Increase Density • Build Neighborhoods • Improve Design • Manage the Rate of Growth The 2026 Plan adds a sixth component to this Growth Management Strategy: • Encourage More Sustainable Development Patterns Key themes identified through public input included the need for workforce housing, reinvestment in the downtown core, traffic and multimodal transportation improvements, protection of neighborhood character, and preservation of Easton’s agricultural and open space edges. The Planning Commission oversaw the process and incorporated community feedback into all major chapters and policy recommendations. Community Feedback Process Highlights The community input phase of this Plan Update asked the public about the continued relevance or appropriateness of each component of the Growth Management strategy. The results were clear: each received something between moderate to very strong support for continuing to be included in the next Planning Period (2026-2036). As a result, this Plan Update begins with the premise that
Town of Easton
7
February 19, 2026
there is no desire to throw any of these strategies out. Rather, the objective is to build on these ideas, refine and improve them where possible, and update them based on new information or issues where necessary. In a nutshell, this is the context and spirit of this Plan update. The results of the questions about Town’s Growth Management strategy are summarized in the following charts (for each response, 1 = Strongly Disagree and 5 = Strongly Agree):
Town of Easton
8
February 19, 2026
Detailed survey results from the public outreach program are provided in Appendix 2.
Town of Easton
9
February 19, 2026
F. VISION
This Plan’s Vision for the future of Easton can be summarized as “A Return to our Roots.” This suggests that we desire the future growth and development of our Town to occur in a more Traditional sense, not in the modern constructs of suburbia. Furthermore, we envision our Town to continue to function as the main population center of Talbot County and one of the major Towns on the mid-Shore, along with Cambridge, Denton, Salisbury, Centreville, and Chestertown. We will be a significant place of employment, entertainment and shopping, but on our scale, not that of National Retailers. We have no desire to become THE major shopping destination for the region stretching from the Bay Bridge to Chestertown, to Salisbury and the Delaware State line. We are happy to be THE destination for the citizens of Talbot County and one of several options for people in the region described above, but nothing grander than that. The “Return to our Roots” theme stems from our desire to develop much more like we did from our earliest days until the beginning of the Post World War II era than from the 1940’s through roughly the present. We want the same kind of density, mix of land uses, and general character of the earlier days and we want to move away from homogenous uses, cookie-cutter, mass produced looking subdivisions, strip development along our highways, and the general “looks like anywhere Suburban America”. We want to be urban, not suburban, although urban on an Eastern Shore of Maryland scale. To that end, this chapter is the perfect companion to Place Element, where this whole theme is discussed in greater detail. This Vision and theme is the same as that set forth in the 2010 Plan. Considering that in terms of the growth of the Town, little changed from 2010 to today, this makes sense. Specifically, in 2025, just as in 2010, Easton finds itself in a period of slow growth, with a housing affordability problem, and with public support for our overall growth strategy. In some ways though, it will be more challenging to implement this strategy, given that there are at least a few factors that are different in 2026 than they were in 2010. These differences include the increased severity of the housing affordability issue, and recent purchases of large parcels of land by the Town of Easton and Talbot County, which while advancing land preservation/parks and open space goals, also remove hundreds of acres of land from consideration of potential new housing. Lastly, there is the existence of the Lakeside at Trappe subdivision located a mere five minutes from our southernmost Town boundary. In 2010, and really for decades, Easton has been “the only game in town” in terms of residential development. Now, there is significant “competition” in the form of this 2,000 unit subdivision. How that affects the absorption rate of home sales (and prices) in Town of Easton
10
February 19, 2026
Easton is unknown at this point, but potentially a significant factor in both our growth strategy and housing affordability during this planning period.
Town of Easton
11
February 19, 2026
2.LAND USE TO HAVEGOODFARMINGORGOODLANDUSEOFANYKIND,YOUHAVEGOTTOHAVELIMITS.
— Wendell Berry A. PU RPOSE
At its heart, a Comprehensive Plan remains first and foremost a land use plan. This Land Use Element provides the foundation upon which later plan elements are based. It is the blueprint for the future development of the Town. Together with the Municipal Growth Element, the Land Use Element outlines policies for the orderly and planned development of the Town. The use of land within the Town is the result of many physical, economic and social forces. The Land Use Element reflects an attempt by the Town to equitably balance the attainment of Town goals and objectives for development with private property rights and interests. The Land Use Element addresses issues and identifies Town policies relative to residential, commercial, and industrial development as well as the provision of lands for parks and open spaces. It analyzes the appropriate mix of uses in the short and long term given projected growth. It will address reversing and rectifying what are now viewed as poor land use decisions (made not just in Easton but throughout the nation) that were made in the past, primarily since the late 1940’s. In short, it lays the groundwork that will be repeated throughout the Plan for ensuring that future growth is not in the form of auto-centric, isolated, suburban style subdivisions but rather takes the form of multi-use, integrated, and connected neighborhoods. At its founding in 1710, Easton was located at the headwaters of the Tred Avon River. Current visitors to Easton may well be confused by that statement and wonder why the Town moved from that location. Actually the Town did not move. Rather, the river changed. It does still exist in this area, but has been reduced to a stream that has been enclosed in culverts in the vicinity of Talbottown Shopping Center and the Easton Utilities Electric Generating Plant. Directing growth is a critical task facing local governments throughout the country today. Many communities view growth as essential to their economic health. Communities without growth may be forced to continually raise taxes on existing residents and businesses since the tax base does not expand. On the other hand, unchecked, unmanaged growth can also cause many problems.
Town of Easton
12
February 19, 2026
Achieving the right balance of land uses is critical in avoiding these problems. For example, a community that focuses primarily on residential growth may become a bedroom community where the residents are forced to travel to other places for everything from work to shopping. A community with an overabundance of commercial development invites traffic congestion. And unless the community has adequate design standards, whatever development occurs may not be aesthetically pleasing. Further, as part of Talbot County, Easton has been designated as a growth area so that the rural nature of the County can be protected and preserved through restrictive zoning.
i. Existing Land Use Patterns Easton’s current land use pattern reflects both its historic compact form and the evolution of development along its edges. The older parts of town feature walkable, mixed-use neighborhoods with civic, institutional, and small-scale commercial uses integrated into the residential fabric. These areas, such as the downtown core and nearby traditional neighborhoods, exemplify the kind of development the Town aims to preserve and replicate. In contrast, the newer areas along the Town’s fringe exhibit more suburban, automobile-oriented patterns. These include large-footprint retail, isolated office or institutional campuses, and conventional subdivisions with limited street connectivity. In some cases, land use and zoning remain mismatched, and legacy industrial or underused commercial areas present opportunities for reinvestment.
Town of Easton
13
February 19, 2026
Map 2 Existing Land Use Map
Town of Easton
14
February 19, 2026
Map 3 is an insert showing graphically the growth of the Town over time. This map was first included in the 2004 Comprehensive Plan and has been updated to show changes over time. In many ways the most interesting aspect of this information may be what has occurred since 2004. In short, we followed our Plan. There were only three annexations approved during the 2004 - 2010 Planning period. The same information listing every Annexation throughout the Town’s history is included in Appendix 3. Two of these were shown as Priority 1 Growth Areas in the 2004 Plan. The third was not, but there was a Comprehensive Plan Amendment approved to make it a Priority 1 Area. There have been 11 Annexations throughout the current Planning Period, but it is important to note that it has been 13 years rather than the previously mandated six years as a result of the amendment to that provision of the State Land Use Article. Notably, all eleven annexed properties were indicated as Priority 1 Growth Areas in the 2010 Plan. One other annexation was reviewed in the 2004 - 2010 Planning Period, but it was rejected because the Plan indicated the area as a Priority 3 Growth Area, therefore it was determined by both the Planning Commission and the Town Council to be inconsistent with the Plan. Lastly, one Annexation request was also denied in the most recent Planning Period. That one was for a Priority 1 designated area, but it was denied over concerns centered around unknown impacts (primarily, traffic) that might occur with future development/redevelopment of the properties in question.
Town of Easton
15
February 19, 2026
Map 3 - Historic Annexations
Town of Easton
16
February 19, 2026
B. LA ND USE GO ALS, ISSUESAND PO LICY CONSIDERATIONS
Easton’s land use strategy is grounded in a practical understanding of land availability, infrastructure capacity, and fiscal impacts. With limited undeveloped space remaining within Town boundaries, strategic infill and redevelopment are essential to future growth. The Town’s land use goals remain consistent with the core principles outlined in the 1997 and 2010 Comprehensive Plans: preserving neighborhood character, maintaining a compact development pattern, and focusing growth within a defined boundary supported by infrastructure and public services. The foundation for future land use decisions begins with understanding current land use patterns. A key indicator is shown in the table below, which presents the acreage of each zoning district established under the 2021 Zoning Ordinance, along with estimated amounts of unimproved land within each district.
Town of Easton
17
February 19, 2026
Table 2 AVAILABLE LAND BY ZONING CLASSIFICATION Zoning
Total Acreage
stimated Unimproved E Acreage**
A-1
65
24
R-10A
2199
107
R-10M
117
62
R-7A
332
6
Total Residential
2713
199
CBD
131
3
CG
391
33
CL
153
122
Total Commercial
675
158
BC
502
113
I
815
45
Total Industrial
1317
158
PUD
1373
217
HC
100
0
RH
233
233
G/I
101
0
MXW
76
17
otal Floating, Mixed-Use & T Governmental/Institutional Districts Total all Districts
1883
467
6588
1,398
ercentage of P Total Town Area
41.18%
10.25%
19.99%
28.58%
**Not all unimproved acreage is conducive to development,i.e. environmental factors, open space, etc. Source: Estimates originally prepared by Brent Spicer, Easton Utilities Commission, onJanuary3,1994,andupdatedtoincludenewannexationsand rezonings. Estimates of unimprovedacreagepreparedbyCurrentPlannerZachSmithonSeptember23,2009. UpdatedforthisPlanbyNicholas
Johnson on March 17, 2023.
Achieving a healthy, vibrant community depends on balance—and the first step is assessing whether Easton’s current land use is already out of balance. Table 7 highlights a key issue: the limited supply of unimproved land within Town limits. This constraint means future growth must
Town of Easton
18
February 19, 2026
be met through annexation in designated Future Growth Areas, redevelopment within the existing boundary, or both. Buildout analysis confirms that under current zoning, Easton can accommodate only modest additional residential and nonresidential development without annexation. As such, policies that promote higher density, infill, and redevelopment are essential. In areas where infrastructure exists but capacity is limited, targeted investment in water, sewer, and transportation systems will be necessary. Growth must occur where public systems can support it efficiently and where the design enhances walkability, access to services, and long-term fiscal sustainability. The 2026 Plan emphasizes that sustainable land use planning is not only about where growth happens, but how. The Future Land Use Map and supporting policies direct development to areas already served by public infrastructure while discouraging inefficient sprawl that burdens the community with long-term maintenance costs. Each land use category in the Plan reflects both function (e.g., residential, commercial, open space) and expectations for form, intensity, and infrastructure compatibility. These categories aim to reinforce planning goals while allowing flexibility for context-sensitive design and public input during development review. While the 2004 Plan explored the ideal mix of residential, commercial, and industrial uses, the 2010 Plan omitted that discussion, acknowledging the subjectivity of such targets. The original intent was never to cap any land use type, but rather to flag imbalances. At the time, it was clear—both from data and public input—that Easton had significantly more commercial development than typical for a town its size. Public input for the 2026 Plan suggests that imbalance persists, likely worsened by the national decline of traditional retail and the accelerated shift to online shopping during the COVID-19 pandemic. Addressing this imbalance will require thoughtful land use strategies that reflect modern economic trends while supporting a more diversified, resilient community fabric.
i. Retail Uses Public input for this Plan revealed what seems at first to be a contradiction: while Easton is perceived as over-commercialized, many residents also expressed a desire for more variety in retail and food establishments. This apparent conflict begins to make sense when we examine Easton’s
Town of Easton
19
February 19, 2026
commercial landscape by subcategory. Not all retail is equal, and the perception of over-commercialization is likely tied to certain types of retail, not the concept itself. Easton’s retail environment can be broadly grouped into four categories: Neighborhood Retail, Regional Retail, Transient-Oriented Retail, and Downtown Retail. Each plays a distinct role in the Town’s land use future. • Neighborhood Retail o This type of small-scale, walkable retail is nearly absent outside the Town Center. o Most older neighborhoods in Easton are exclusively residential in nature and overwhelmingly single family detached in type. Where appropriate, a mechanism should exist to at least allow the consideration of small, limited-scale neighborhood-serving shops to reinforce a sense of place and reduce car dependence in these communities. o New residential developments should integrate, or at least accommodate, neighborhood-scale commercial uses—small retail nodes at the intersection of well-defined neighborhoods. o Planning must ensure such retail remains neighborhood-serving in scale and does not evolve into broader commercial centers. Properly located and scaled, neighborhood retail can reduce local traffic rather than increase it. • Regional Retail o This is the dominant retail form in Easton and the primary contributor to its unusually high per capita retail space—estimated at 80 square feet per person, roughly double the level recommended in the 2004 Plan. o It is also the most frequently cited concern in public feedback about over-commercialization. o Future regional retail development will be limited to:
Town of Easton
▪
Undeveloped commercially zoned land,
▪
Redevelopment of existing shopping centers.
20
February 19, 2026
o No expansion of regional retail areas is proposed in the Future Land Use Map. o Any new regional retail must comply with strict design standards. Done well, it can reinforce local character; done poorly, it risks making Easton indistinguishable from “Anywhere, USA.” • Transient-Oriented Retail o This category includes gas stations, fast food, and quick-service retail that serve through-traffic as well as residents. o While new growth opportunities are limited, redevelopment potential is strong—especially along Route 50. o This retail type is valued by residents and workers for its convenience (e.g., lunch spots, fuel). o Like regional retail, it requires careful design regulation to improve Easton’s visual character and avoid corridor sprawl. o Future expansion will focus on: ▪
Improving undeveloped commercial sites near the Town’s northern edge,
▪
Redevelopment along the Route 50 corridor.
• Downtown (Town Center) o Easton’s Downtown is the heart of the community, with its historic buildings, government offices, the courthouse (dating to 1794), the Avalon Theatre, museums, restaurants, inns, and specialty shops. o While space for new development is limited, there are opportunities for targeted redevelopment and infill. o A Plan for Downtown Redevelopment and Infill, adopted in 2009, guides this work and is discussed further in the Economic Development chapter. o Preserving and strengthening existing businesses will be key to keeping Downtown vibrant and maintaining Easton’s unique character.
Town of Easton
21
February 19, 2026
Easton’s perceived over-commercialization stems largely from an oversupply of regional-scale retail. At the same time, residents are asking for more neighborhood-serving, diverse, and vibrant commercial experiences, especially in underserved parts of town. Future land use policy should support a balanced commercial mix, regulate scale and design, and encourage development that reinforces neighborhood identity and local character. Table 2 summarizes these commercial retail types. For purposes of comparison, “Neighborhood” aligns with the category described above, while “Community” and “Regional” fall under the broader discussion of regional retail.
Table 3: Shopping Center Characteristics by Type Source: Adapted from Urban Land Institute (1982); Lynch and Hack (1984); Leung (1989)
ii. Residential Uses Residential Land Uses are generally not described in terms of a ratio. In fact, to the contrary, the needs of the other land uses are often projected based on ratios involving the number of residential
Town of Easton
22
February 19, 2026
units (or population) in the community. The discussion about residential land uses tends to focus more on the arrangement, appearance, variety, and density of this land use. That is discussed thoroughly in the Place and Housing Elements. Suffice it to say that we continue to see things changing for this land use. We do not envision the future of Easton as a series of disconnected, isolated, monotonous subdivisions. Rather we want to see a seamless, attractive, interesting, Sustainable Growth inspired Easton; one Easton, not a collection of suburban residential enclaves.
iii. Industrial The discussion in the 2004 Plan did not talk about a ratio of industrial land acreage or square footage to residential units, but rather talked about jobs to housing ratio. For this land use, the 2004 Plan concluded that there were more jobs in Easton than the population would suggest is necessary. However, as the 2010 Plan noted, there were a number of factors that skewed this estimate. These included: • a large proportion of Easton’s population is retired - there are a lot of dwelling units for which no jobs are necessary • a shifting in the focus of jobs away from the manufacturing and traditional “industrial” type jobs towards service-oriented jobs • tourism has become more important in Easton and more jobs are found in the food and hospitality sectors of the job market • Easton is the governmental center of Talbot County – this results in many government jobs, as well as jobs in allied professions such as legal, real estate, accounting, surveying and engineering, etc. • As the largest community on the Mid-Shore, Easton is a hub for medical services, entertainment, retail, etc. • Easton serves as an employment hub for a much larger area than Talbot County The 2010 Plan stated “It is clear that there has been a gradual erosion of the availability of this[industrially-zoned] land for classic industrial uses by allowing more and more commercial and service uses.” Changes were made to the Town’s Zoning Regulations in recognition of this issue. Also, a partially developed Industrial Park (Talbot Commerce Park) was annexed into Town in this Planning period, to provide Town infrastructure, which has accelerated its build-out. Finally, in response to this diminishing supply of industrial property, the Town obtained a US Department of
Town of Easton
23
February 19, 2026
Commerce grant to extend and install utilities to the Town-owned Mistletoe Hall property, facilitating its development as a Commerce and Business Park. Many of the jobs in Easton are filled by residents of jurisdictions other than Easton, impacting our transportation system. The other side of the coin of having so many people commuting into Easton for work is the fact that many Easton residents are commuting out of town to work. Thus, jobs which better meet the needs of Easton residents would be of great benefit in reducing traffic and the associated environmental impacts. For this reason specifically there are industrial areas proposed on the eastern side of Town for development in the long-range planning period. The benefits of mixed land uses will be a recurring theme throughout this Plan, particularly in the Place and Transportation Elements. In short, mixed uses: • Increase housing options for more diverse household types. • Provide more transportation options. • Reduce automobile dependence. • Create a truer sense of place than single-use suburban style development. • Activates urban areas throughout more times of the day. • Provide greater opportunity for social interaction. • Reduce a community’s carbon footprint by encouraging walking and biking as an alternative to automobile use. • Increase the safety of the neighborhood by putting more eyes on the street. The 2026 Plan adds greater emphasis on sustainability, fiscal efficiency, and redevelopment. Land use policy is increasingly tied to infrastructure investment, public space, transportation networks, and economic productivity. New fiscal tools, including value-per-acre modeling, help the Town assess where land use patterns generate long-term public value relative to cost. C. ZONING AN D COMMUNITY CHARACTER
i. Rethinking Zoning and the Built Environment Much has been written in recent years about the “sins” of modern planning and the failures of the built environment in many American communities. Movements like Smart Growth, New Urbanism,
Town of Easton
24
February 19, 2026
and Neo-Traditional Planning emerged in response to development patterns that sacrificed livability, character, and sustainability in favor of automobile-dependent sprawl. Sprawl has been characterized by low-density, single-use development; monotonous subdivisions; congested roads; and the loss of farmland and forests. These patterns stand in stark contrast to the compact, walkable, mixed-use neighborhoods this Plan seeks to promote.
1. How Did We Get Here? A major reason for these outcomes lies in the very tools used to regulate growth—most notably, zoning. While zoning was originally intended to protect public health and safety—such as separating housing from noxious uses—it has evolved into a rigid system that over-segregates land uses and suppresses the integrated, mixed-use development patterns of traditional towns. The roots of zoning date back to 1867 in San Francisco, with broader adoption following the landmark 1926 Supreme Court decision in Village of Euclid v. Ambler Realty Co., which upheld the constitutionality of zoning. Since then, the tool has become ubiquitous—but not without consequences. In Easton, as in many places, zoning has too often discouraged the very types of communities we value. Wide separation of uses, minimum lot sizes, and restrictive codes have made car-dependent subdivisions the default. The time has come to rethink this model.
2. Is It Time to Abandon Zoning? Not entirely. Zoning still has a role in protecting residents from heavy industry and incompatible land uses. However, Easton should reform its Zoning Ordinance to encourage mixed-use, walkable, and human-scaled neighborhoods—especially in undeveloped areas within the Town’s Growth Area. For example, commercial uses and workplaces that are compatible with nearby housing should not be excluded. Residential densities should be increased and minimum lot sizes reduced to support more efficient and livable neighborhoods. At a minimum, new development should meet the State’s Smart Growth Priority Funding Area threshold of 3.5 units per acre (net)—with higher densities encouraged in appropriate areas.
3. Value-per-acre modeling In 2024, the Planning/Economic Development Firm Urban3 modelled the fiscal impacts of land uses on the Eastern Shore in general, and then in Talbot County specifically. The basis of Urban3’s
Town of Easton
25
February 19, 2026
methodology involves examining “value per acre” for the area being analyzed. The findings of this effort are summarized more thoroughly in the Sustainability Chapter of this Plan. A full copy of the report can also be found on the Eastern Shore Land Conservancy’s website, at: https://www.eslc.org/urban3/. From a Land Use perspective,suffice it to say that the Urban3 study suggests that the fiscal sustainability of development patterns is yet another reason to support future development of a Traditional Neighborhood form as opposed to the suburban archetype that has become more prevalent over the course of the past five or six decades. D. FUTURE LA ND USE FRAMEWORK
This Plan organizes Easton’s future growth into a series of land use categories that describe the general pattern, scale, and intent for development. These categories guide zoning decisions and help ensure that growth occurs in appropriate locations and forms. While this Plan is not a zoning map, it provides the foundation for future amendments to the Zoning Code and Subdivision Regulations. Future land use designations are not intended to be parcel-specific or regulatory. Rather, they provide a generalized vision for how areas of the Town should evolve over time. Zoning changes and site plan approvals will be guided by these designations but must also consider compatibility, capacity, and design quality. The Future Land Use Map contained and described more thoroughly in the Implementation Element, provides a graphic representation of the desired pattern of land uses within the Town. The Future Land Use Map identifies where residential, commercial, mixed-use, open space, and institutional development is anticipated. These areas are tied to infrastructure readiness, access to services, and their ability to support complete neighborhoods.
Town of Easton
26
February 19, 2026
Map 4 - Future Land Use
Town of Easton
27
February 19, 2026
There is one proposed addition to the overall limits of the Town’s Future Growth Area. During the course of the past planning cycle, it has become increasingly apparent that there would be advantages to having the Town-owned property that is the site of our Wastewater Treatment Facility to be located within Town Boundaries. This would require Annexation and in order for any future Annexation to be consistent with this Plan, the land for said annexation needs to be included in our Future Growth Area. Thus, this Plan proposes to expand the Growth Boundary to the east from its present limit to the WWTP site. The only additional land besides the WWTP that would be brought into the Growth Area as a result of this change would be Seth Forest and the bed of Chesapeake Avenue as it passes along the southern border of the property. Given that these properties are State-owned and Town-owned, and the purpose for which each is used, there is essentially no possibility that such an action would increase the development potential of the Future Growth Area. See Table 2 on page 18 for detailed definitions and acreage summaries by zoning category. E. SPECIAL DISTRICTSAND PL ACE TYPES
The Future Land Use Framework includes several key districts that serve as focal points for the Town’s identity and growth strategy. These include: ● Downtown Easton – walkable, civic and cultural hub with mixed-use development. ● East End/Dover Road Corridor – commercial node with opportunities for infill and street-front redesign. ● Port Street Corridor – targeted for redevelopment with housing, employment, and civic amenities. ● Hospital District – medical and institutional anchor, with supportive residential and commercial uses. ● Poplar Hill Farm - 120 acre parcel purchased by Talbot County in 2025. Formerly viewed as a key site for future growth, it is designated for Institutional use, reflecting its ownership by the County. This could mean a host of things, including active or passive parks and/or new County government facilities. It is also large enough that a portion could be subdivided and sold for private development to raise funds for the governmental use of the bulk of the property. If so, the appropriate use in this location would be residential, although a very small-scale commercial or mixed-use component to serve the numerous strictly residential developments in
Town of Easton
28
February 19, 2026
the area (e.g., Cooke's Hope, Thread Haven, and now, effectively (with the closure of the restaurant and Club House), Easton Club. These districts will benefit from targeted planning efforts, including small area plans, design guidelines, and infrastructure investments. Of particular importance this planning cycle is the Hospital District and actually, there are two. One is the location of the current hospital and the second is the location of the new facility now under active construction. The Hospital relocation and expansion to the northern end of the Town’s Growth Area requires special consideration of a number of factors or issues, including: ● What is the most appropriate reuse/redevelopment of the current hospital site? ● What is the likely future for the various medical facilities located on Dutchman’s Lane and Idelwild Avenue? Do they eventually relocate closer to the new facility? If so, when is this likely to occur? What then is the most appropriate use/reuse of these facilities? ● The new hospital site is remote from the rest of Town and surrounded by undeveloped land, an industrial park, and the Talbot Community Center and associated recreational facilities. Given this, what is the most appropriate land use for the unimproved parcels surrounding and in close proximity to the new hospital? How can the new hospital be better connected and integrated with the bulk of the Town of Easton? F. GO ALSAND OB JECTIVES
The following goals and objectives guide Easton’s future land use policy. These reflect the vision and values adopted in the 2026 Plan and build on the foundations established in 2010 and earlier. Goal #1: Limit the geographic outward expansion of Easton. Objectives: ● Reaffirm the current Urban Growth Boundary (UGB) and use it to guide annexation and utility extensions. ● Coordinate with Talbot County and various land preservation and environmentally-aligned organizations to secure easements and other long-term protection devices on properties along and in close proximity to the Urban Growth Boundary on the County side of the line. ● Establish annexation policies that include criteria for development readiness, consistency with the Comprehensive Plan, and expected phasing or pacing of growth.
Town of Easton
29
February 19, 2026
● Explore incentive annexation to gain control of land on the town’s border that might have previously been developed under Talbot County rules and regulations to facilitate more appropriate redevelopment or expansion on such parcels. ● Slow the demand for more land by increasing the density of future residential areas. At a minimum, the State of Maryland’s minimum acceptable density for qualification as a Priority Funding Area of 3.5 units (net) per acre should be achieved in these developments. ● Consider adoption of an Adequate Public Facilities Ordinance (APFO) if the rate of growth is exceeding the current or planned capacity for specific types of infrastructure. ● Follow a Capital Improvement Program which will allow the Town to provide a rational basis for implementing improvements and increase funding opportunities, in a planned manner to locations where growth may be prioritized. Goal #2: Make Easton more walkable and connected / achieve a more balanced and integrated mix of uses. Objectives: ● Encourage development patterns that promote walkability, including higher densities, mixed-use areas, and traditional neighborhood form. ● Support neighborhood-scale commercial development and live/work spaces that reduce the need for automobile trips. ● Improve pedestrian and bicycle infrastructure and ensure it is included in all new development and redevelopment projects. ● Encourage connections between neighborhoods and commercial areas through a fine-grained street network and active transportation routes. ● Consider allowing diversification of land uses within older, developed subdivisions through the addition of small, neighborhood-scale retail, civic and open space elements to existing residential subdivisions. ● Amend the Town’s Zoning Ordinance to change the focus from regulation by building use, to building type and site impact. ● Simplify the process for developers to achieve the Town’s objectives
Town of Easton
30
February 19, 2026
Goal #3: Use land efficiently and sustainably. Objectives: ● Prioritize infill and redevelopment of vacant or underutilized sites within the Town’s boundary. ● Balance new development with infrastructure capacity, using water, sewer, transportation, and stormwater data to guide land use decisions. ● Use fiscal modeling tools, such as value-per-acre assessments, to evaluate the long-term sustainability of proposed land use changes. ● Discourage low-density development at the fringe of Town that generates higher infrastructure costs and undermines compact growth goals. ● Explore options to expedite permit approvals for permitted uses if extraordinary design improvements are included.
Town of Easton
31
February 19, 2026
3. PLACE (COMMUNITY CHARACTER) “WESHAPEOURBUILDINGSANDAFTERWARDOURBUILDINGSSHAPEUS.” – Winston Churchill
A. PURPOSE Improving the quality of Easton’s built environment has been a central goal since the Town adopted Vision-based Planning in the 1997 Comprehensive Plan. Since then, the Town has taken multiple steps to elevate development standards. It added site planning and architectural requirements for specific uses, upgraded landscaping standards, overhauled sign regulations—cutting freestanding sign height in half—and imposed size and strict design limits on big-box retail and shopping centers. Town officials also began opposing formulaic “corporate-franchise architecture,” as recommended in the 1997 Plan. The 2004 Plan reaffirmed the need for higher design standards and extended the focus from commercial to residential development, culminating in the adoption of Design Guidelines for New Construction. The 2010 Plan updated Easton’s design principles, revising several and adding one new principle based on observed development trends. This Plan continues that process, proposing additional refinements based on the past 15 years of experience and public feedback. This chapter also revisits the topic of big-box retail—a longstanding concern since the 1997 Plan, which was amended in 2000 to address the issue directly. It further explores how zoning shapes Easton’s character and proposes ways to modernize outdated zoning and subdivision tools. In particular, it revives the concept of “Traditional Neighborhood Development ”—first proposed in 2004 but not pursued in 2010—as a viable framework for future growth areas. Finally, it expands the Town’s Growth Management Policy to emphasize the importance of both infill and redevelopment, with new recommendations to ensure compatibility with existing neighborhoods.
B. HISTORICAND CULTURALRESOURCES TheHistoryoftheTownischronicledintheBackgroundChapterofthisPlan. Animportantpartof what makes Easton so unique and so special is the number and quality of historicbuildingsand settings. This subsection talks about the importance of thesehistoricandculturalresourcesand makes recommendations for how they can further be protected.
Town of Easton
32
February 19, 2026
ThehistoryofEastoncanbeseeninitshistoricbuildingsandneighborhoodswhichdatebackover severalcenturies. PhysicalremindersofearlyhistorygivedepthandrichnesstotheTown,topast events and to people’s lives. Easton has a substantial and well-documented stock of historic structures, streetscapes, sites, and settings. Some 944 parcels in the Historic District have been surveyed and documented. Preservationandrehabilitationofthesestructuresandstreetscapesenhancesthehistoriccharacter of the town, stabilizes neighborhoods, protects property values, and attracts visitors to Easton. Continued historic preservation will provide Easton with a number of aesthetic and economic benefits, including: ▪ Promotion of a strong sense of community pride and tradition; ▪ Community revitalization through the restoration and adaptive reuse of older s tructures; ▪ Increased property values and tax revenues as a result of renovationandrestoration; and ▪ Increasedrevenuesfromtourismactivitiesgeneratedbyaninterestinhistoricbuildings and sites. In a way that’s more difficult to quantify, historic preservationallowsthelegacyofthepasttobe protectedandremembered;itallowsforthepasttobeintegratedwiththepresentandremindsus that the old has a useful place alongside the new. Easton recognizes the importance of its historic resources and supports and encourages preservationandrehabilitationeffortsbyprivateowners,nonprofitsandlocalgovernments.Private houses andpublicbuildingsareoftencarefullyrestored.Newusesarefoundforhistoricbuildings which no longer serve their original functions.
The preservation of historic buildings and
structures includes consideration of the integrity of the location, neighborhood, design, setting, materials and workmanship. As more and more focus for future growth is on infill and redevelopment opportunities, such adaptive reuse of historic buildings will become increasingly prevalentandimportanttomaintainingthehistoriccharmandauthenticityoftheTowningeneral, and the historic district specifically.
Town of Easton
33
February 19, 2026
The “Stories of the Chesapeake” Certified Heritage Area encompassesheritagesitesandplacesin Talbot and adjacent counties which were designated a certified heritage area by the Maryland HeritageAreaAuthorityonApril20,2005. ThisprogramrecognizesEastonasofferinganumberof heritage resources of importance to the region. Easton is alsoa“TargetedInvestmentZone”,astatedesignationthatpermitsthetowntogetstate financial support for a certified heritage area. National Register Historic District The National Register of Historic Places, an inventory of historic resources, is maintained by the National Park Service. Listing in the National Register provides recognition to sites, buildings, structures, objects,anddistrictsthataresignificanttoAmericanhistory,architecture,archaeology, engineering,orculture. AnEastonNationalRegisterHistoricDistrictwassurveyed,nominated,and approved in 1980. In addition to providing recognition of significance, listing in the National Register mandates consideration in the planning of any federal or federally-assisted project and provides eligibility for federal and state tax credits for historic preservation projects. EastonHistoric District TheTownhasaHistoricDistrictCommissionandhastwomuseums,(theAcademyArtMuseumand theHistoricalSocietyofTalbotCountyMuseum).ItalsohasthehistoricAvalonTheatrewheremany cultural andcommunityeventstakeplace.TheEastonHistoricDistrictwascreatedinthelate70s and expanded in 2005. The seven-memberHistoricDistrictCommissioniscomposedofvolunteer citizens with interest or specific expertise in historic preservation and appointed to three-year terms by the Mayor. The Commission reviewsproposedexteriorchangestoanysite,structure,or appurtenance in the defined district, according to an approved and published set of guidelines, which were recently updated bytheCommission. Inadditiontothereviewofproposedprojects, inclusion intheHistoricDistrictalsoprovideseligibilityforastatehistoricpreservationtaxcredit to property owners who undertake historic preservation projects, whether or not the property produces income.
Town of Easton
34
February 19, 2026
Map 5 : Easton Historic District
Town of Easton
35
February 19, 2026
Easton’s Historic District includes buildings encompassing a wide spectrum of type and use, including commercial (Washington Street, upper left), institutional (Christ Church, upper right and Talbot County Court House, middle right), and residential structures (middle left and bottom right and left.
Town of Easton
36
February 19, 2026
GE NTRIFICATION A specific issue that requires special attention in the Historic District in general and in the Hill neighborhood specifically, is gentrification. The Hill is a small neighborhood within the Historic District. Its significance can not be overstated and is perhaps best described on the Historical Marker recently placed near the Rail-Trail and Dover Street intersection. It states: “Founded in 1788, the Hill is one of the oldest free African American neighborhoods in the U.S. still in existence today. Many African Americans in Easton and Talbot County were free from slavery long before the Civil War ended. Free people of color lived alongside white neighbors, working as merchants, sailors, carpenters, midwives and farm laborers. They worked to buy freedom for their relatives while pursuing full equality and liberty for themselves.” Unfortunately, The Hill also happens to contain many of the structures most in need of repair/rehabilitation in Easton. Public and private efforts are ongoing to make such repairs. While this is undoubtedly a positive trend, it comes with the risk of gentrification - that rising housing prices resulting from these improvements (as well as the associated increased property tax bill as a result of rising property values) will necessitate some long-time residents (perhaps multigenerational) having to relocate. Property values may further be impacted by redevelopment of the adjacent industrial areas along the Rail Trail; though an important strategy for sustainable infill development the magnet effect of new infrastructure, housing, and amenities cannot be ignored. The Town should explore programs and partnerships that promote housing tenure and affordability to protect this significant cultural cornerstone.
C. CONTEMPORARY AR CHITECTURAL STANDARDS Though it is important to show reverence and recognition of Easton’s historic development in contemporary projects, it should not be misconstrued as a desire to see historic architecture emulated without intention throughout the town. Rather, today’s designs - regardless of location - should contribute to the ongoing history of Easton in recognition that our current time will one day similarly be considered a historic period. Easton’s streetscapes should thus feature a variety of creative designs that, regardless of their time period, are built ‘in conversation’ with their neighbors. Put simply, contemporary designs should have identity and intention. Designs should:
Town of Easton
37
February 19, 2026
● Strive to create place-based spaces and interesting, human-focused environments ● Provide physical and social connections to the community, respecting historical context ● Recognize landmarks and natural features as important determinants of design ● U tilize design approaches such as color, texture, massing, richness of materials and finishes, scale, proportion, and rhythm to create unique places ● Illicit curiosity and emotional responses that the community will treasure ● Serve as an investment in the Easton community and its culture
D. CIVIC AR CHITECTUREANDTHE PU BLIC RE ALM As a member of the community itself, the government should embody the same standards of architectural excellence that we expect of the public. Civic buildings—such as schools, libraries, churches, and public offices—anchor neighborhoods and contribute significantly to Easton’s visual character. These structures should be architecturally prominent and well-integrated into the street network. Design of new civic buildings must reflect their role as public landmarks. Similarly, the quality of the public realm—sidewalks, plazas, parks, signage, and street trees—greatly affects how the Town is experienced. These spaces must be maintained, connected, and appropriately designed for their surroundings.
E. THE CASEFOR TRADITIONAL NE IGHBORHOOD ZONING Though the role of architecture cannot be understated in the broad appeal of Easton’s downtown, it is equally important to recognize how the structure of the town core promotes its charm and value. Easton’s older neighborhoods, especially those surrounding Downtown, are defined by connected streets, narrow lots, modest setbacks, front porches, and architectural variety. These walkable patterns support interaction and resilience. New development should extend this structure through compatible lot dimensions, public space orientation, and housing diversity. The 2004 Comprehensive Plan outlined a model for a Traditional Neighborhood Development (TND) District, designed to encourage the kinds of mixed-use, compact neighborhoods Easton values. That proposal was ultimately rejected—not due to disagreement with its content, but because it removed the Town Council and public hearing from the review process. This created
Town of Easton
38
February 19, 2026
opposition, despite the fact that the standards themselves reflected the community’s vision. At present, creating these types of neighborhoods requires use of the Planned Unit Development (PUD) process, which developers tend to avoid due to its complexity, cost, and unpredictability. Instead, the easier path—conventional subdivision and site plan review—too often yields suburban-style sprawl. This mismatch has led to a system where the easiest projects to approve are those the community least desires, while more thoughtful, desirable development faces the highest barriers. In the wake of the TND District’s defeat, some elements were integrated into Easton’s base zoning and subdivision regulations—such as anti-monotony standards and greater lot design flexibility. Still, nearly two decades later, the limitations of the current approach remain apparent. The Planning Commission now recommends revisiting this issue and reintroducing a TND District or alternative “by-right” option with clear design standards. The goal is to reverse the regulatory imbalance, making it easier—not harder—for developers to build the types of neighborhoods Easton wants.
Town of Easton
39
February 19, 2026
3.E.1 MODEL CODEFOR TRADITIONAL NE IGHBORHOOD DEVELOPMENT Traditional Neighborhood Development Zone Minimum Lot size:
5,000 sq. ft. single-family detached 3,000 sq. ft. single-family attached
Maximum Lot size:
12,500 sq. ft. single-family detached 7,500 sq. ft. single family attached
Minimum Setback:
5’ (0’ for commercial uses)
Maximum Setback:
15’ (10’ for commercial)
aximum Block M Length:
480’
Density (per net acre): Minimum - 4.0 du/ac Maximum – 12 du/ac ll subdivisions shall include a variety of housing types, open space, civic space, office or A industrial, and neighborhood commercial space in accordance with the following schedule. At least 3 of the 5 land uses shall be provided at the ratio specified: Land Use
Ratio
esidential - Middle R Housing
A minimum of 10% of the units proposed
Common Open Space 35% including a minimum of 1200 sq. ft. per dwelling unit for parks eighborhood N Commercial
inimum: 26 square feet gfa per dwelling unit (See Table 9 in Land M Use Chapter for characteristics of Neighborhood Commercial) Maximum: 52 square feet gfa per dwelling unit
Civic Space
300 square feet per dwelling unit
Office or Industrial
187.5 square feet gfa per dwelling unit
Town of Easton
40
February 19, 2026
Traditional Neighborhood Development Zone ubdivisions prepared in accordance with these standards shall be processed per the Town of S Easton Subdivision Regulations. ubdivisions with single-family detached residential plus only two of the land use elements at S the ratio outlined above (or with three or more of the land uses but at less than the prescribed ratio) may be approved by the Easton Town Council via the PUD process. ubdivisions with single-family detached residential and only one or none of the additional S land use elements shall be prohibited. enderings or conceptual architectural elevations shall be provided for each building type in R the neighborhood and shall be subject to approval by the Planning Commission. Neighborhoods should reflect architectural diversity. For all intents and purposes, they should appear as if multiple builders constructed them, whether or not this is in fact the case. minimum of 75% of the lots shall have access via an alley. Garages on lots with alleys shall A be detached or rear/side-accessed attached. Lots without alleys shall minimize the impact of garages by locating them behind the front plane of the house, or if in front of the house, accessed from the side.
Table 4: Traditional Neighborhood Development (TND) Zoning District Parameters
he potential new TND Zoning District described above is primarily envisioned as applicable for the build-out of T our Future Growth Area. However, a significant focus of this Plan is on directing growth for the next ten years to existing neighborhoods in the form of Infill Development, Redevelopment, and Adaptive Reuse. Development of this nature will likely require an approach other than TND. ne possible alternate regulatory approach that received public support during the public review and comment O process was the use of Form-Based Codes (FBCs). FBCsstand in contrast to traditional or Euclidean Zoning in that they emphasize the design/form of buildings and their relationship to the public realm much more so than the use of the property. The bookForm-Based Codesdescribes them as “A method of regulating development to achieve a specific urban form. Form-Based Codes create a predictable public realm primarily by controlling physical form, with a lesser focus on land use, through city or county regulation.” hatever option the Town ultimately pursues to implement in this Plan following its adoption, one thing is clear: W a new approach to land development regulation will be necessary to create the future Easton that this Plan envisions. Such a new Code(s) should address the following objectives: ● P ermitting a variety of housing types and appropriate densities to improve missing middle options and housing affordability. ● Harmoniously blend multi-family and middle housing within residential and commercial blocks. ● Soften the impact of large-scale retail in commercial corridors through better design and pedestrian-oriented placement. ● Ensure building scale, massing, and placement create a walkable, inviting streetscape ● Design streets and sidewalks as safe, functional spaces for all users - bicyclists, pedestrians, vehicles, and transit.
Town of Easton
41
February 19, 2026
● Promote development patterns that are environmentally resilient and fiscally sustainable. I n order to best facilitate the future Easton that this Plan describes, the Town commits to initiating the study of FBCs and other alternative regulatory frameworks within two years of the adoption of this Plan by the Town Council.
F. THE RO LEOF MA JOR RE TAILIN EA STONIN 2025 Easton has a long and complex history with major retail development. In 2000, the Town imposed a temporary moratorium after receiving applications for over 766,000 square feet of proposed major retail space. This pause led to amendments to the 1997 Comprehensive Plan and significant changes to the Zoning Ordinance. The Ordinance defined “Major Retail” as any single-use retail establishment with 25,000 square feet or more of gross floor area, and created a new Planned Major Retail floating zone to regulate such uses. Projects over 65,000 square feet were prohibited. Stringent design standards were also added for major retail and shopping centers. The 65,000-square-foot cap was a compromise. Some residents and stakeholders argued it was too restrictive, while others believed it was too permissive. At the time, the Giant grocery store and the original Lowe’s (now Kohl’s) were roughly this size, helping to define the threshold. The role of large-scale retail continued to generate debate through the 2004 and 2010 Comprehensive Plans. Public input collected during these updates revealed a consistent preference for limiting major retail in Easton. In a 2000–2001 survey, nearly half of respondents said such uses should “never” be added. In 2010, more than a third felt the Town already had too many shopping centers, and over 65% supported holding firm on design standards, even if it meant losing a preferred retailer. Based on this sustained feedback, the 2004 Plan removed the hard cap on square footage but maintained a regulatory threshold at 25,000 square feet, requiring all larger projects to undergo case-by-case review through the Planned Major Retail process. The intent was to retain flexibility while emphasizing design, compatibility, and the broader land use context. The 2026 Plan again solicited public input, and responses were largely consistent with previous surveys. A strong majority said Easton has “about the right amount” of regional-scale retail, with twice as many respondents saying there is too much rather than too little. Support remains high for prioritizing Downtown Easton over other commercial areas, and for maintaining high design standards.
Town of Easton
42
February 19, 2026
Given these findings, the Town recommends no major changes to the Town’s retail policies. Major retail uses will continue to play a limited role, and new or expanded projects will only be encouraged under specific conditions: • Priority should be given to redevelopment or redesign of existing shopping centers, especially where projects result in improved site design, circulation, or conversion to mixed-use. • Regional retail should serve primarily Talbot County, and secondarily nearby areas in Caroline, Dorchester, and Queen Anne’s Counties. Easton does not aim to become a regional shopping hub for a wider area. • Applicants proposing relocation or replacement of an existing major retail store must submit a detailed reuse plan for the vacated site. Easton’s approach to major retail has consistently reflected community values: a desire for design quality, modest scale, and economic alignment with the Town’s role as a local, not regional, retail center.
G. TOWN GA TEWAYSAND CORRIDORS Visitors arriving in Easton form impressions of the Town based on its major corridors. These include U.S. Route 50, MD 322, Washington Street, and Port Street. The design and appearance of these areas—buildings, signage, landscaping, and public infrastructure—play a central role in shaping Easton’s identity.
Town of Easton
43
February 19, 2026
Significant improvements have been made to some corridors through site plan negotiation and design review. revised layouts, upgraded materials, and improved orientation. However, many areas still require reinvestment. The new ARC of the Chesapeake and Doverbrook Apartments, for example, exhibit exemplary additions to two major town corridors. Going forward, the Town will adopt corridor-specific standards and explore overlay zones to guide incremental upgrades. Figure 1 below is copied from the Draft East End Small Area Plan and depicts how a portion of Dover Road could be redeveloped in a way that is generally more consistent with the principles of this Plan, and which could visually (and, presumably, economically) enhance this major corridor.
Town of Easton
44
February 19, 2026
Figure 1: Potential Dover Road and Rail Trail Redevelopment
H. GOALSAND OB JECTIVES Goal #1: Encourage mixed-use, traditional neighborhoods over single-use subdivisions Objectives: ● Reintroduce the proposed Traditional Neighborhood Development (TND) Zoning District as the default zoning for undeveloped and annexed land in Easton. ● Continue reviewing and updating the design and anti-monotony standards first adopted in 2006.
Town of Easton
45
February 19, 2026
● Restructure the development review process to streamline approvals for traditional neighborhood developments while increasing scrutiny and difficulty for conventional suburban subdivisions. ● Explore the potential regulatory reforms necessary to produce the type of development envisioned by this Plan in conjunction with the next comprehensive review of the Town’s Zoning Code. Goal #2: Improve the appearance of existing development Objectives: ● Partner with the State Highway Administration to enhance landscaping along state highways, especially the Route 50 corridor. ● Use the Forest Conservation Account to retrofit landscaping in older streetscapes where plantings are sparse or missing. ● Require any renovation or change-of-use project needing site plan approval, a PUD amendment, special exception, or variance to fully comply with current design standards—no grandfathering of outdated designs. ● Require new landscaping or improvements along U.S. Route 50 for all adjacent new development or redevelopment. ● Enforce requirements for landscaping and maintenance associated with approved development projects. ● Refine and work with Design Standards that ensure that Easton stands out as a unique place rather than looking like “Anyplace USA.” Goal #3: Raise the design quality of all new development Objectives: ● Fully apply Easton’s recommended Design Principles to all new development. ● Prohibit new construction that relies on corporate franchise architecture. ● Adopt comprehensive design standards for all new development, including residential projects and infill/redevelopment. ● Review and update the Design Guidelines for New Construction outside the Historic District. Town of Easton
46
February 19, 2026
● Strengthen landscape standards, emphasizing native species and improved screening of unattractive site features. Goal #4: Promote infill and redevelopment Objectives: ● Evaluate the effectiveness of the Zoning Code’s Planned Redevelopment Overlay District—including its boundaries, standards, and process—to determine whether it offers sufficient incentives. ● Identify and pursue non-zoning-based incentives, in partnership with relevant agencies, to support infill and redevelopment. ● Prepare Small Area Plans for Easton neighborhoods to tailor redevelopment strategies to local needs and conditions. Goal #5: Encourage continued restoration, adaptive rehabilitation and preservation of historic structures, sites, streetscapes, and settings and encourage compatible infill in the Historic District. Objectives: ● Educate residents/realtors and property owners about the benefits, boundaries and requirements of the Historic District review process and design standards and about the availability of state and federal tax credits for historic preservation projects. ● EstablishaLocalTaxIncentiveprograminEastonthatencourageshistoricpropertyowners to rehabilitate their property. This local tax incentive will complement existing state and federal tax incentives that encouragehistoricrehabilitation/restoration.Some19counties and municipalities in Maryland already have some form of local tax incentive. ● Encourage a “Rebuilding Together” chapter in Easton or Talbot County. This is a national organization whose objective is no cost repairs to homes of low income, over 60 home owners. ● Modify the Historic Commission’s Guidelines by adding specific guidance and criteria for adaptive reuse projects.
Town of Easton
47
February 19, 2026
Goal #6: Continue to support the Easton Historic District. Objectives: ● Ensure consistent enforcement of Easton’s Historic District by utilizing the services of variousstaffswithinthetownadministration. Aconsistentlyenforcedhistoricdistrictisthe most effective historic district for fostering investment and economic development. ● Provide in-service training for the staff and Historic District Commission
members.
● InvestigateCertifiedLocalGovernmentstatuswiththeMarylandHistoricalTrusttoprovide eligibilityforgrantsforcontinuingeducationforstaffandmembersoftheHistoricDistrict Commission, as well as other projects. ● InvestigateaprojecttoresurveytheHistoricDistrict.Anewsurveywillupdateinformation containedintheoriginalNationalRegisternominationandfacilitateenhancedprocessingof applications. Such a survey could also lead to a new nomination to expand the National RegisterDistrict,includingneighborhoodsthatdidnotmeetthecriteriaforlistingin1980, butnowmaynearlythreedecadeslater. Suchaprojectcouldbesupportedbygrantfunding and could potentially be done under the auspices of a partner organization.
Town of Easton
48
February 19, 2026
4. ECONOMIC DEVELOPMENT TH EULTIMATERESOURCEINECONOMICDEVELOPMENTISPEOPLE.IT ISPEOPLE,N OTCAPITALORRAWMATERIALSTHAT DEVELOPANECONOMY. PETER DR UCKER A. PU RPOSE
conomic and community development are vital to the health of a town because they foster E sustainable growth, improve quality of life, and strengthen its position as a desirable place to live and visit. The nonprofitEaston Economic Development Corporation(Easton EDC) provides economic and c ommunity development services to the Town of Easton. The Easton EDC also manages the Main Street District and Arts & Entertainment Districts, as well as the Easton Visitor Center. A Board of Directors has been established, with representatives from the community, the Mayor of the Town of Easton and one designated Councilmember. I n 2025, the Easton EDC adopted a forward-looking Strategic Plan that identifies four key Strategic Priorities aimed at fostering sustainable growth, improving quality of life, and strengthening Easton’s position as a premier destination on Maryland’s Eastern Shore. This Comprehensive Plan is aligned with those priorities and incorporates them into Easton’s long-term development framework. I n addition, this Plan recognizes that Easton’s economic development strategy must reflect regional collaboration. Therefore, it integrates the priorities and initiatives of both the Talbot County Department of Economic Development and Tourism and the Mid-Shore Regional Council. This collaborative approach ensures that local efforts are supported by broader regional initiatives and that resources are coordinated for maximum impact. s in many Comprehensive Plans, economic development analysis often depends heavily on A quantitative data such as tables and charts. While this Plan minimizes the overuse of such tools, essential insights are drawn from Census data (see Tables 5 and 6 ). Key findings include: ● I ncome levels in Easton are below those of Talbot County and the State of Maryland, with a corresponding higher rate of poverty. ● E ducational attainment in Easton lags behind both the county and state, especially in the percentage of residents with bachelor’s degrees or higher. ● E aston has an aging population, with a significantly higher percentage of residents aged 65 and older compared to state averages.
Town of Easton
49
February 19, 2026
● C ommute times in Easton are slightly shorter than regional and state averages, reflecting local employment opportunities. ● T he homeownership rate in Easton is lower than Talbot County and the State, which may reflect affordability challenges or housing stock limitations. Table 5 - Select Economic Characteristics Source: 2020 Census, U.S. Census Bureau PER CAPITA ollars) d MEDIAN
INCOME
(2022
HOUSEHOLD INCOME
EASTON T ALBOT CO.
MARYLAND
$43,844
$52,555
$49,865
$75,198
$81,667
$98,461
11.5%
10.2%
9.6%
58.3%
55.7%
66.6%
51.3%
49.5%
62.7%
(2022 dollars) PERSONS IN POVERTY, PERCENT
I NCIVILIANLABORFORCE,TOTAL,PERCENT OF POPULATION AGE 16+, 2018-2022 I N CIVILIAN LABOR FORCE, FEMALE, PERCENT OF POPULATION AGE 2018-2022 TOTAL
16+,
RETAILSALES,2017 ($1,000)
TOTAL RETAIL SALES PER CAPITA, 2022
$598,129 $716,678 $84,966,185 $25,278
$18,691
EAN TRAVEL TIME TO WORK (MINUTES), 24.9 M WORKERS AGE 16+, 2018-2022
26.4
32.0
IGH SCHOOL GRADUATE OR HIGHER, 90.1% H PERCENT OF PERSONS AGE 25+, 2018-2022
92.2%
91.0%
ACHELOR’S DEGREE OR HIGHER, PERCENT 39.3% B OF PERSONS AGE 25+, 2018-2022
41.5%
42.2%
LL A EMPLOYER REFERENCE YEAR 2022
1,403
104,151
Town of Easton
FIRMS,
$45,801
813
50
February 19, 2026
Table 6 below provides a broader comparison of Easton, Talbot County, and the State of Maryland in a number of economic and non-economic characteristics. able 6 - Comparison of Easton, Talbot County and State of T Maryland in Selected Demographic Characteristics from the 2020 Census (and 2023 ACS) Subject
Easton
Talbot County
Maryland
Total Population
17,101
37,526
6,177,224
% Female
53.6%
52.2%
51.4%
% < 18
21.8%
18.3%
22.0%
% 65+
26.8%
30.5%
17.3%
% White
69.9%
82.1%
57.2%
Black % or African American
16.1%
12.9%
31.6%
Total Households
7,195
16,270
2,318,124
Average Household Size
2.32
2.29
2.60
otal T Units
ot N Reported
19,861
2,572,412
58.9%
72.9%
67.5%
Median Age
Housing
% Owner-occupied edian value of M owner-occupied homes
$328,000 $382,000
$380,500
Growth Rate (%) in 90’s 24.9%
10.7%
10.8%
Growth Rate (%) in 00’s 36.2%
11.7%
9.0%
Growth Rate (%) in 10,s 7.2%
-0.7%
7.0%
Town of Easton
51
February 19, 2026
B. BUSINESS DEVELOPMENT
diverse and resilient business mix is essential to the sustainability of Easton’s economy. A Overdependence on a single sector can expose the Town to economic fluctuations and job losses. Easton’s strategy emphasizes resilience by investing in workforce development, nurturing entrepreneurship, and supporting both legacy businesses and emerging industries. he Easton EDC Strategic Plan (FY 2026–2028) underscores the importance of business retention, T expansion, and recruitment—particularly for high-wage industries. Initiatives include: ● F acilitating leadership forums and industry roundtables to identify infrastructure needs, workforce trends, and business challenges. ● D eveloping an Easton Business Recruitment Packet that highlights incentives, infrastructure, real estate opportunities, and the benefits of Easton’s location and community character. ● M arketing key sites like Mistletoe Hall and other strategic locations for development, ensuring readiness for new investment. ● P artnering with the Town of Easton, Talbot County, and local institutions to coordinate incentives and implement joint marketing campaigns. ● P romoting infill development and redevelopment—particularly projects that support affordable workforce housing in proximity to job centers. ● D iversifying funding streams by pursuing federal, state, and philanthropic grants as well as private sponsorships and innovative funding models. C. TOURISMAND DOWNTOWN
ourism remains a cornerstone of Easton’s economy—contributing not only through visitor T spending but also by enhancing the Town’s visibility and quality of life. As a year-round destination with a thriving cultural and culinary scene, Easton has the opportunity to further develop its tourism sector in strategic and sustainable ways. he Easton EDC has identified several priorities to strengthen Easton’s brand as the Eastern Shore’s T premier destination: ● C reate a data-informed tourism marketing strategy that targets regional and national audiences, tailored to Easton’s unique offerings. ● E nhance the visual appeal and accessibility of Downtown Easton with improved signage, plantings, banners, and public art. ● A ctivate the Easton Visitor Center as an educational and experiential hub for tourists and residents alike.
Town of Easton
52
February 19, 2026
● C ollaborate with surrounding jurisdictions (e.g., St. Michaels, Oxford, Talbot County) to launch joint tourism campaigns and shared event calendars. ● S upport authentic local experiences and signature events that highlight Easton’s history, arts, food culture, and community spirit. D. COMMERCIAL RE DEVELOPMENT
Easton is at a point where a number of our shopping centers are for one reason or another, viewed as prime candidates for redevelopment. Such reasons include age of the center, maintenance challenges, tenant mix, or overall utility of the center. Potential redevelopment could be as simple as facade upgrades, new color schemes, updated signage, etc., to complete demolition and reconstruction. This redevelopment could bring Easton numerous economic benefits including new business establishments, additional jobs, and additional revenue. Furthermore, it could add future opportunities for mixed use residential offerings as well as beautify many older sites around town. Potential candidates for such upgrades include: ● Easton Plaza (site of Bowling Alley and Amish Farmer’s Market). With abundant parking located between Marlboro Avenue and the buildings in this shopping center, there are a variety of options to add or relocate buildings closer to Marlboro. This would dramatically improve the streetscape and move from an older suburban shopping center form of development towards a more traditional Town-center pattern, which could also shift the perception of Marlboro from a separate and distinct shopping corridor to more of an extension of Downtown. ● Chesapeake Village (site of Ruby’s Cake Shop and Domino’s Pizza). This small neighborhood shopping center is located uniquely where Dover Road and Dover Street separate and form the triangular park adjacent to the Rail Trail, where Easton’s community Christmas Tree resides. The East End Small Area Plan that is being developed concurrently with this Comprehensive Plan devotes a fair amount of attention to this park and envisions an upgrade and/or expansion of it. A potential redevelopment of the shopping center could enhance the utility of both the center and the park, to the benefit of each as well as to the East End neighborhood and Dover Road corridor. ● Easton Marketplace (site of Kohl’s and Lowe’s). Although a relatively new shopping center, the recent closing of the Ruby Tuesday’s restaurant, the existence of a remaining pad site (to the east of Aspen Dental) and the abundance of parking (particularly between Kohl’s and
Town of Easton
53
February 19, 2026
Marlboro) there would seem to be ample opportunities to add new tenants to this center through a combination of adaptive reuse of buildings and new construction. E. COMMUNITY DEVELOPMENT
successful economic development strategy must also build community wealth and pride. The A Easton EDC Strategic Plan recognizes that broad resident engagement and civic participation are essential to long-term prosperity. Priorities incommunity development include: ● E xpand outreach and transparency through newsletters, public presentations, and direct engagement with neighborhood groups, clubs, and schools. ● L aunch a formal volunteer program with training, leadership opportunities, and recognition efforts to build local ownership and capacity. ● H ost a calendar of inclusive events that reflect Easton’s cultural richness and foster community connectedness. ● E valuate civic engagement and quality of life through periodic surveys, helping to align future investments with public needs and values. F. GO ALSAND OB JECTIVES
GOAL #1: Nurture a healthy and diverse local economy in Easton. Objectives: ● C onduct leadership forums and focus groups with local industries to guide economic strategies ● Market and support strategic sites like Mistletoe Hall ● D evelop a comprehensive business attraction and retention strategy in coordination with Easton EDC ● Prioritize redevelopment projects that support workforce housing ● Expand grant writing capacity and partnerships to fund economic initiatives GOAL#2: Maintain and recreate a vital Downtown. Objectives: ● Increase awareness, usage and value of the Easton Visitor Center ● I mprove visitor wayfinding, visual appeal, and access to downtown attractions coordinating with Easton EDC to market downtown events and tourism opportunities
Town of Easton
54
February 19, 2026
GOAL #3: Engage the community in Easton’s economic future. Objectives: ● Seek community input via community charrettes ● C ommunity outreach and communication via in-person presentations, and print and electronic media ● Launch a town-wide volunteer program ● Use placemaking surveys to assess civic engagement and guide future priorities
Town of Easton
55
February 19, 2026
5. HOUSING HOMEISTHENICESTWORDTHEREIS –LA URA IN GALLS WILDER A. PU RPOSE
Providing safe, decent, and sanitary housing for all residents is essential. When a community neglects this, housing conditions deteriorate, businesses may close, and the overall appearance of communities can fuel a growing sense of despair. Easton offers a wide range of housing types, from colonial era to nineteenth-century homes near Downtown to public housing such as Graham’s Place and the recently rebuilt Doverbrook apartments, as well as subdivisions such as Cooke’s Hope, Easton Village, Hunters Mill and Mulberry Station. Today, even more than housing quality, the rapidly rising cost of housing has become a hot button issue for both residents, employers and commuters. Housing first became an element of Easton's Comprehensive Plan in 2004. It is now a mandatory element of Maryland comprehensive plans rather than an optional element. Many of the issues, other than rapidly rising housing costs, associated with this Element remain essentially the same today in 2026 as they were in 2004. State law now specifies what this element must address: (a) (1)
In this section the following words have the meanings indicated.
(2)
"Affirmatively further fair housing" has the meaning stated in § 2-401 of the Housing
and Community Development Article. (3)
"Area median income" has the meaning stated in § 4-1801 of the Housing and
Community Development Article (4)
"Low-income housing" means housing that is affordable for a household with an
aggregate annual income that is below 60% of the area median income. (5)
"Workforce housing" has the meaning stated in § 4-1801 of the Housing and
Community Development Article. (b)
Town of Easton
A housing element may include goals, objectives, policies, plans, and standards.
56
February 19, 2026
(c)
A housing element shall address the need for affordable housing within the local
jurisdiction, including: (1)
workforce housing; and
(2)
low-income housing. (d)
(1)
Local jurisdictions have a duty to affirmatively further fair housing through
their housing and urban development programs. (2)
The housing element of a comprehensive plan that is enacted or amended on or after
January 1, 2023, shall include an assessment of fair housing to ensure that the local jurisdiction is affirmatively furthering fair housing. On request of a local jurisdiction, the Department of Planning, in consultation with the
(3)
Department of Housing and Community Development, shall provide technical assistance for the purpose of developing the housing element of the comprehensive plan. (4)
This subsection does not require a local jurisdiction to take, or prohibit a local
jurisdiction from taking, a specific action to affirmatively further fair housing. (Md. Code, LU § 3-114) B. HOUSING ISSUESAND PO LICY CONSIDERATIONS
Easton has many housing issues, but they can all be generally categorized as one of three problems: housing cost, housing quality, and housing availability. To some extent these problems are interrelated. Housing affordability has become so significant an issue that the Town formed an ad hoc Attainable Housing Task Force to examine the problem and make recommendations to address it. The Task Force worked on the issues during this Comp Plan update process and produced a draft report in May of 2024. The Final Report was presented to the Town Council at two Workshops in November and December of 2025.The Report’s Executive Summary includes the following: The Housing Task Force Final Report provides an analysis of Easton’s housing landscape, demographic shifts, economic trends, and affordability challenges. The report also expands on the demographic, market, and workforce overview briefly provided to the Task Force at their May 23, 2024 meeting. Any data-driven insights provided herein are intended to inform
Town of Easton
57
February 19, 2026
housing policies and initiatives recommended by the Attainable Housing Task Force. aimed at ensuring equitable and sustainable housing opportunities. Key Findings Population Growth & Demographics
1.
• Easton experienced rapid population growth between 1980 and 2010, but growth rates have slowed significantly since 2010. • The town's population is aging, with a 42% increase in residents aged 55+ since 2000, while the percentage of younger adults (25-44) has declined by 40%. • The Hispanic population has grown significantly, increasing from 3.5% of the total population in 2000 to 14% in 2020, while the Black population’s share has declined. 2.
Housing Market Trends • Since 2000, single-family detached homes have dominated new housing developments, limiting the availability of more affordable housing types such as townhomes and multi-family units. • Home prices have risen sharply, with Easton’s median home value increasing by 131% since 2000. • Rental costs have also increased, with median rents in 2025 exceeding the affordability threshold for households earning less than 100% of Easton’s Area Median Income (AMI).
3.
Affordability Challenges • Homeownership is increasingly out of reach for middle-income families, with the home price-to-income ratio rising from 3.03 in 2000 to 4.4 in 2024, indicating a decline in affordability. • Over 50% of renters in Easton are cost-burdened, spending more than 30% of their income on housing. • Racial disparities persist, with Hispanic and Black households facing the greatest housing cost burdens and lowest homeownership rates.
4. Town of Easton
Economic & Employment Factors 58
February 19, 2026
• Job growth in Talbot County has remained stagnant since 2000, increasing at an annual rate of just 0.18%. • The local economy has shifted toward lower-paying service jobs, making it harder for workers to afford housing in Easton. • A significant portion (42%) of the workforce commutes from neighboring counties, highlighting the disconnect between housing costs and local wages. Easton faces significant housing challenges, particularly in affordability, supply diversity, and demographic shifts. Without strategic interventions, rising housing costs and demographic imbalances could threaten the town’s long-term economic sustainability and community inclusivity. This report serves as a foundation for developing policies that ensure a balanced, affordable, and thriving housing market for all residents. Easton risks becoming a place where those who work here can no longer afford to live. This challenge will only grow if the Town’s tourism and hospitality sectors expand as expected. A lack of affordable housing already affects essential workers — cashiers, restaurant staff, government employees, teachers, nurses, emergency responders, elder care aides — who increasingly find Easton out of reach. This has broad implications for Easton’s future. Economically segregated communities weaken social and cultural cohesion. They also burden the transportation system. As workers seek housing in neighboring counties like Dorchester and Caroline, they become commuters, adding to traffic congestion. The Town also faces economic and workforce risks if these workers eventually take jobs closer to home. Easton has long recognized the importance of housing quality. The Town enforces the International Building Code and staffs a Building Department that includes a Building Official (who conducts plan reviews), two field inspectors, a rental housing/property maintenance inspector, and a secretary. To maintain livability in rental housing—especially older units—Easton launched its Rental Housing Inspection Program in 1995. The program requires landlords to obtain licenses and submit to regular inspections. It was comprehensively reviewed and updated in 2008 to strengthen its effectiveness.
Town of Easton
59
February 19, 2026
C. EX ISTING HOUSING PR OGRAMS
In Easton, housing is primarily provided by the private sector. However, a few public and nonprofit programs offer limited affordable housing, including efforts by the Housing Commission of Talbot County, subsidized private developments like Chatham Village Apartments, and homes built by Habitat for Humanity of Choptank, Inc. The Housing Commission of Talbot (Formerly the Easton Housing Authority) recently converted their portfolio from public housing to a voucher based program. As a result, they do not own any more public housing. Instead, they have an inventory of 79 voucher based units in Easton. They administer 159 Housing Choice Vouchers. They also have 9 units of net-zero housing on Port Street (Nicholas Landing), 12 units of affordable housing on Pleasant Alley and 4 duplex units on Port. Street. Habitat for Humanity of Choptank, Inc. has built more than 25 homes in Easton using its volunteer-driven model. Future homeowners contribute substantial "sweat equity" during construction and later assist other Habitat families. With donated or discounted land and no labor costs, overall housing costs are kept low. And, the Town Council has expanded affordable housing by requiring developers of discretionary projects—like annexations or PUDs—to include on- or off-site affordable units or contribute to the Town’s Affordable Housing fund as a condition of approval. A key step in addressing housing issues was the creation of the Easton Affordable Housing Board in 2005. Appointed by the Town, the Board develops policies and criteria for affordable housing and oversees units acquired by the Town through development approvals. Early efforts focused on establishing guidelines and a selection process for purchasing these units. A more recent Program that has proven to be successful is the Board’s Renovation Program. Through this program, homeowners may apply for a grant, no interest deferredloan or low interest loan depending on their income, for approved renovations to improve the energy efficiency, safety, and livability of their home. This helps homeowners with these costs, which in turn help lower monthly utility bills, and allows them to remain in their homes longer.
i. Local Housing Costs and Issues The full Attainable Housing Task Force Report contains detailed information on local and regional housing costs and affordability data. Highlights are presented in sections which follow.
Town of Easton
60
February 19, 2026
TheZillow Home Value Index (ZHVI) for Talbot County reflects the general direction of home values in our community since the year 2000.Nationally, home prices peaked in September 2006, then began to decline later that year and into 2007. By 2008, the housing market had collapsed, triggering a broader financial crisis known as the Great Recession (2007–2009). The market hit bottom in 2012, followed by a slow recovery through 2016. Talbot County followed a similar trend. As shown above, the Zillow Home Value Index (ZHVI) peaked at $420,000 in September 2006, then fell 21% by 2009. It bottomed out at $280,000 in September 2012. From there, values steadily rose, reaching $334,000 by the end of 2019—a 19% increase. Between 2015 and 2019, the ZHVI grew at an average annual rate of 2.4%. Beginning in 2020, home values surged 43%, reaching $478,000 by the end of 2024 — an average yearly increase of about 9%. It is important to note that while the ZHVI offers a helpful snapshot of housing trends in Talbot County, it is not a replacement for professional appraisals. This report analyzed median home sale prices in Talbot County for 2000, 2010, 2020, and 2024 using Bright MLS data from the Mid-Shore Board of Realtors. Figure 34 compares these values with the ZHVI, showing both followed similar trends over time. Percentage differences between the two sources, ranging from 13% in 2000 to just 2% in 2024, with an average gap of 7%. Both
Town of Easton
61
February 19, 2026
ZHVI and MLS offer reliable insights into long-term housing trends. In summary, the high cost of single-family detached homes in Easton poses significant affordability challenges — particularly for first-time buyers and workers in lower-wage professions with limited income growth potential.
ii. Housing Costs and Income In 2024, Talbot County’s Annual Median Income (AMI) was $106,500. The Easton Affordable Housing Board adjusts this figure annually to better reflect local incomes; in 2020, Easton’s AMI was $98,065. Given the small gap between the two, Talbot County’s home price-to-income ratio serves as a useful affordability metric for Easton. Based on MSBR data, the 2024 ratio was 4.4, meaning it takes 4.4 years of median income to purchase a median-priced home. This marks a sharp decline in affordability from 2000, when the ratio was 3.03. Even after the Great Recession, the ratio climbed to 4.12, showing a continued trend toward less affordable housing. Another key measure of affordability is how income growth compares to rising home prices over time. In Talbot County between 2000 and 2010, home prices grew much faster than incomes, leading to a sharp decline in affordability, likely driven by the housing boom before the Great Recession. From 2010 to 2020, growth slowed, and income slightly outpaced home prices, reflecting post-recession recovery and a cooler housing market. However, from 2000 to 2024 overall, home prices once again outpaced income growth, signaling a renewed affordability gap similar to the early 2000s.
iii. Rental Market In Easton, 40% of households are renters, a five-point drop since 2010. The current rental vacancy rate is 5.3%, significantly higher than the 1.4% homeowner vacancy rate. In 2010, those rates were 4.8% and 5.2%, respectively. The sharp decline in homeowner vacancies reflects a tight housing market, likely
Town of Easton
62
February 19, 2026
driven by strong demand for higher-end homes and a limited supply of affordable, diverse options. Demographic shifts may also play a role: older adults—more likely to own homes—are staying in place, while younger adults face growing barriers to homeownership, contributing to reduced turnover and tighter supply. The rental vacancy rate, at 5.3%, falls within the healthy range of 5–7%, suggesting a balanced rental market with more unit availability compared to the much tighter for-sale housing market. The recent uptick in planned multi-family residential development may help counter rising prices in both the ownership and rental markets. Contributing factors include slower housing absorption since 2010, a tight ownership market, and a shift toward higher-priced inventory. Multi-family units offer more affordable alternatives for households priced out of homeownership and expand the rental supply—helping to stabilize or even reduce rents and improve affordability for renters. Since 2000, Easton’s median gross rent has consistently exceeded those of nearby Denton and Cambridge, reflecting its status as a more premium rental market. The most significant increase occurred between 2000 and 2010, when median rents rose by 74%. During that time, 92% of new housing construction was single-family detached or attached units—limiting rental supply amid growing demand. Although the sharpest rise happened in that decade, rents have continued to climb steadily through 2023. Compared to surrounding counties, Easton’s median rent is 94% of Talbot County’s but only 73% of Queen Anne’s. When rents are broken down by price range, there's a clear shortage of units affordable to extremely low-income households—those earning under $25,000 annually. This gap particularly affects individuals at risk of homelessness or in need of transitional housing. However, there is a relatively strong supply of units in the
Town of Easton
63
February 19, 2026
$500–$999 range, which remain affordable for households earning up to about $45,000 per year. D. HOUSING AF FORDABILITY
i. Cost Burdened Households Cost-burdened households are those spending more than 30% of their gross income on housing. This strain often forces families to choose between housing and essentials like food, healthcare, transportation, or savings—undermining their overall well-being. According to 2023 ACS data, half of Easton homeowners with a mortgage pay $2,000 or more per month in housing costs. Yet only 29% are considered cost-burdened—spending over 30% of their income on housing. This indicates a relatively high income level or greater affordability tolerance among homeowners in Easton. This also highlights that housing costs in Easton are relatively high, even for middle-income households. At 80% of Easton’s 2024 AMI ($98,065), a household should spend no more than $1,961 per month on housing to stay below the cost-burdened threshold. Many homeowners exceed this amount yet still fall just under the 30% limit, indicating that even middle-income families are feeling pressure. In fact, ACS data shows that 62% of owner-occupied households earning under $75,000 are cost-burdened, compared to just 9% of those earning $75,000 or more—underscoring the growing affordability gap. While middle-income homeowners face growing pressure in Easton’s housing market, the situation is even more severe for renters — particularly those with lower incomes. In 2023, 50% of renters were cost-burdened, compared to 29% of homeowners. This sharp disparity underscores the greater affordability challenges renters face by spending a disproportionate share of their income on housing. The result is increased financial instability, housing insecurity, and strain on overall well-being.
Town of Easton
64
February 19, 2026
ii. Affordable Home Price According to HUD’s FY 2024 Income Limits Summary, Talbot County’s Median Family Income (MFI) for a family of four is $106,500—11% above the average for Maryland’s Eastern Shore (excluding Cecil County) and the third highest in the region, following Queen Anne’s and Kent counties. Talbot County’s MFI has grown steadily since 1990, reflecting long-term economic progress. The sharpest increase occurred between 1990 and 2000, with a 65% gain. Overall, from 1990 to 2024, the MFI has risen by 203%. The current MFI is based on the 2018–2022 ACS 5-year estimate of $100,321, adjusted for inflation using Congressional Budget Office projections and rounded to the nearest $100. HUD uses MFI to establish income thresholds by household size, categorizing households as Extremely Low, Very Low, or Low Income. These thresholds determine eligibility for a range of housing assistance programs, including Public Housing, Section 8 vouchers and project-based assistance, Section 202 housing for older adults, and Section 811 housing for people with disabilities. In Easton, the Affordable Housing Board adjusts the County’s MFI to better reflect local economic conditions. For FY 2024, Easton’s adjusted MFI is $98,065. This figure is used to set eligibility and affordability standards for Town housing programs. Based on this adjusted MFI, a four-person household earning \$98,065 per year can afford a home priced at approximately $277,000—assuming 35% of gross income is spent on housing costs. This estimate factors in mortgage principal and interest, property taxes, homeowners insurance, private mortgage insurance (PMI), and HOA dues, based on a 5% down payment and a 6.95% 30-year fixed interest rate. It should be noted that this figure differs from the 30% used by the Town’s affordable Housing Board. That is because this calculation is based on the following definition: “Affordable Owner Expense: Housing cost that does not exceed one-twelfth of 35% of 100% of the Easton Area Median Income, adjusted for household size to include Principal and Interest, Taxes, and Property Insurance (PITI); Private Mortgage Insurance (PMI); and Homeowner Association dues.” The calculation above assumes $200 monthly for both HOA dues and property insurance, and applies a property tax rate of 1.29% per $100 of assessed value, based on a 3-year trailing average ZHVI of $419,647. In contrast, the median home price in Easton in 2024 was $450,000, according to MarketStats by Showing Time (Mid-Shore Board of Realtors)—38% above what a median-income household can
Town of Easton
65
February 19, 2026
afford. Even the average price for an attached home, such as a townhome, exceeds affordability by 21%. A household would need to earn approximately $137,000, or 140% of Easton’s adjusted AMI, to afford a home priced at $420,000. These figures highlight the growing gap between incomes and home prices—and the pressing need for more affordable housing options in Easton.
iii. Affordable Rental Price HUD calculates Fair Market Rents (FMRs) to establish payment standards for rental assistance programs such as the Housing Choice Voucher Program. For FY 2025 in Talbot County, FMRs are based on average gross rents from the 2018–2022 ACS, adjusted for inflation and local market conditions. If the calculated value falls below the Maryland state minimum, HUD raises it accordingly. Bedroom-specific ratios are then applied to the adjusted two-bedroom rent to determine FMRs for other unit sizes. These figures are listed in Table 7 below.
Table 7: HUD FY 2024 Income Limits Summary
A renter household is considered cost-burdened if it spends more than 30% of gross income on rent. For a four-person household earning 60% of Easton’s adjusted AMI ($58,839), affordable rent—net of a $100 monthly utility allowance—is approximately $1,371 for a three-bedroom unit. As of March 2025, Zumper reports the average rent for a three-bedroom in Easton is $2,400, a 10% increase over the previous year. About 75% of rents fall between $1,501 and $3,000. The median rent for a two-bedroom is $2,499, and across all unit types, the median monthly rent is $2,549—27% higher than the national average. For apartments specifically, the average rent is $2,699, with two-bedroom apartments averaging $2,044.
Town of Easton
66
February 19, 2026
As shown in Table 8, a four-person household earning 60% of Easton’s AMI cannot afford a one-, two-, or three-bedroom rental in Easton without being cost-burdened. To afford the median rent of $2,525, a household would require a significantly higher income.
Efficiency FY 2025 FMR $1,210
ne-Bedroo T O wo-Bedroo T hree-Bedro m m om
our-Bedro F om
$1,257
$2,338
$1,392
$1,951
Table 8: FY 2025 FMRs by Unit Bedrooms
iv. Exclusionary Zoning and Its Impact on Housing Choice and Affordability Exclusionary zoning refers to land-use regulations that limit the types of housing allowed in certain areas—often under the guise of preserving neighborhood character or managing growth. Common tools include minimum lot sizes, building height limits, and restrictions on multi-family housing. While these regulations may be well-intentioned, their effect is often to increase housing costs and limit access for lower-income individuals and families. Consider a half-acre lot zoned for single-family homes with minimum lot size requirements. A developer purchasing this lot might theoretically choose among three options: • A modest 1,200 sq. ft. starter home suited for first-time buyers or downsizing retirees; • Seven attached townhomes that could offer more affordable ownership options; or • A large, upscale single-family home marketed to affluent buyers. However, existing zoning likely prohibits higher-density development—such as townhomes—through restrictions on lot coverage, density, or allowed housing types. As a result, the developer, constrained by regulations and seeking to maximize profit, will almost certainly choose to build a large luxury home. Although each townhome would yield a smaller individual profit, the combined revenue from multiple units would exceed that of a single high-end home. But zoning doesn’t allow this option. This disconnect highlights a broader issue: the housing a community builds isn’t always the housing it needs. While there is demand for large homes in Easton and Talbot County, there is also unmet
Town of Easton
67
February 19, 2026
demand from essential workers, young professionals, growing families, and older adults seeking more manageable living spaces. These groups benefit from a mix of housing types—if zoning allows them. The challenge lies in enabling diverse housing choices that still respect the character and scale of existing neighborhoods. In unincorporated Talbot County, the situation is more restrictive. The County’s Comprehensive Plan prioritizes preserving shoreline, waterways, and farmland—important goals—but pursues them in part by limiting the extension of sewer systems outside designated growth areas and by maintaining exclusionary land-use policies. County zoning regulations prohibit most housing types other than single-family detached homes, often on large lots with low height and coverage limits. These low-density rules restrict supply, inflate land and construction costs, and make development of affordable units unfeasible. The result is a development pattern that supports only high-end housing, effectively pricing out lower- and middle-income residents. This drives housing segregation based on income—and, as shown in Figures 47, 48, and 49, such segregation often correlates with racial, generational, and workforce disparities.
Town of Easton
68
February 19, 2026
igure47:TalbotCountyMedianValueofOwner-OccupiedHousingUnitsin F 2020 by Census Tract
Town of Easton
69
February 19, 2026
Figure 48: Talbot County Black Population by Census Tract
Town of Easton
70
February 19, 2026
Figure 49: Talbot County Hispanic Population by Census Tract
E. FAIR HOUSING
In 2021, the Maryland Land Use Article was amended to require that all comprehensive plans include a “Fair Housing Assessment” to ensure that they “affirmatively further fair housing.” This refers to the obligation to prevent housing discrimination and proactively address segregation and other barriers that limit housing access based on race, color, religion, sex, age, national origin, familial status, or disability. As defined in Section 2-401 of the Housing and Community Development Article, this includes taking active steps to create inclusive communities where housing opportunity is not restricted by these characteristics. The Housing Goals and Objectives at the end of this chapter include recommended actions to meet this requirement. These focus on preserving Easton’s existing affordable housing, increasing the supply of new housing, and preventing the displacement of low- and moderate-income households. The Town of Easton is committed to fostering an inclusive and equitable community where all residents have fair access to housing opportunities. This commitment is central to our vision of a vibrant, diverse, and thriving town.
Town of Easton
71
February 19, 2026
In line with the Federal Fair Housing Act, the Maryland Fair Housing Act, and applicable local ordinances, Easton prohibits housing discrimination based on: • Race (including associated traits like hair texture and protective hairstyles) • Color • Religion • Sex (including sexual orientation and gender identity) • Familial status (including families with children, pregnant individuals, and legal custodians of children under 18) • National origin • Disability (physical or mental) • Marital status • Source of income • Military status The Town will actively work to eliminate discriminatory practices, support diverse neighborhoods, and ensure that all residents can find housing that meets their needs. Fair and equal treatment will continue to be integrated into our planning, policymaking, and community development efforts. F. PO TENTIAL NE W HOUSING PR OGRAMS / POLICIES
Easton faces two distinct housing challenges. The first is a shortage of housing for low- and extremely low-income individuals and families. These housing needs often intersect with broader social and familial challenges, making them persistent. Despite this, the Town must continue—and expand—efforts to provide housing for this group. The Housing Authority of Talbot County remains the primary provider, but the Town should also support groups like Habitat for Humanity of Choptank and similar organizations that offer safe, decent, affordable homes. One approach worth revisiting is a local Self-Help Housing Program, modeled after a successful initiative on the lower Eastern Shore led by former Delegate Rudy Cane. Similar to Habitat’s model, the USDA-supported program enables very low- and low-income families to build their own homes together under supervision, contributing a set share of labor (typically 65%). This reduces costs
Town of Easton
72
February 19, 2026
and makes homeownership feasible. Easton previously sought funding for this program through the Community Legacy Program, but the request was denied. Renewed efforts could help bring it to fruition. The second housing issue is the lack of inventory for first-time and move-up homebuyers. Easton’s recent residential developments increasingly target high-income buyers, leaving fewer options for moderate-income households. This growing gap in the market reduces opportunities for economic mobility and long-term community diversity. Worsening this situation is the geographic segregation of housing by income. Easton is evolving into a town of income-stratified neighborhoods—very low-income households in one area, working-class residents in another, and wealthier residents elsewhere. This kind of separation undermines community cohesion, as discussed in the Community Character Element. One solution is to require all new residential developments to include a set percentage of homes at varied price points. A notable precedent was set in the Easton Village on the Tred Avon project, which originally committed 10% of both attached and detached units as affordable housing. These units were to be integrated into the community, indistinguishable from market-rate homes, and subject to resale restrictions to maintain affordability. However, the financial burden of real estate taxes and HOA fees eventually led the developer to substitute in-lieu contributions to the Town’s Affordable Housing Fund. Developers have also met affordable housing obligations by building units off-site or contributing to the Fund. While this has provided some affordable homes, it has diluted the original goal of integrating housing types within neighborhoods. To create a more consistent and equitable approach, the Town’s Affordable Housing Board proposed an Inclusionary Zoning Ordinance, an idea first supported in the 2010 Plan. Since then, the concept has been studied by the Board and the Attainable Housing Task Force, leading to a proposed ordinance presented to the Town Council in early 2025 and currently (October 2025) pending potential action. Additional housing policy options under consideration include: • Expanding “Missing Middle” housing types to offer more varied and affordable units. • Creating Traditional Neighborhood Zoning that allows smaller lots, mixed uses, and compact, walkable development by-right.
Town of Easton
73
February 19, 2026
• Modifying the development review process to streamline approvals for projects that align with the Town’s affordable housing goals. These initiatives aim to address both affordability and equity while supporting a more integrated, inclusive housing market in Easton. G. GO ALSAND OB JECTIVES
Goal #1: Ensure that housing in Easton is safe, sanitary, structurally sound, and enhances neighborhood character. Objectives: ● Maintain strong funding, staffing, and training for the Town’s Building Inspection Department, and expand the Rental Housing Inspection Program. ● Collaborate with state, county, and nonprofit partners to direct housing rehabilitation funds to eligible low- and moderate-income households. ● Implement design standards that promote a mix of housing types and visually integrate affordable housing into the community. ● Encourage development patterns that support neighborhood identity, walkability, transit access, and efficient use of infrastructure. ● Preserve natural features and community character through thoughtful open space design, landscaping, and environmental protections. Goal #2: Expand the supply of low-income housing in Easton. Objectives: ● Support the Housing Authority of Talbot County and Easton Affordable Housing Board in creating both rental and ownership opportunities for low-income households. ● Amend the Zoning Ordinance to encourage private-sector apartment development and allow flexible reuse of existing or historic structures. ● Partner with Habitat for Humanity of Choptank and similar groups to identify and secure sites for new affordable homes.
Town of Easton
74
February 19, 2026
● Launch a Town-led Self-Help Housing Program to assist low-income families in building their own homes.
Town of Easton
75
February 19, 2026
6. TRANSPORTATION "OURDECISIONSABOUTTRANSPORTATIONDETERMINEMUCHMORETHANWHEREROADSORBRIDGESOR TUNNELSORRAILLINESWILLBEBUILT. THEYDETERMINETHECONNECTIONSANDBARRIERSTHATPEOPLE WILLENCOUNTERINTHEIRDAILYLIVES —A NDTHUSHOWHARDOREASYITWILLBEFORPEOPLETOGET WHERETHEYNEEDANDWANTTOGO" — ELIJAH CUMMINGS
A. PU RPOSE
Transportation is a primary driver of land use—and Easton is no exception. The earliest settlements in Talbot County were located near navigable waters out of necessity. Easton’s industrial buildings, now seemingly out of place, were originally located along a rail line that served the area starting in the mid-1800s. More recently, the Town’s expansion to the east has been shaped by proximity to U.S. Route 50, a major regional highway. The link between transportation and development is deeply rooted in human history, with communities forming along coasts, rivers, and trade routes. In the modern era, particularly following World War II, American transportation planning has focused overwhelmingly on accommodating private automobiles. This auto-centric approach has brought convenience but also a host of unintended consequences—environmental degradation, social inequities, and inefficient land use patterns. The Transportation Chapter aims to: ● Reinforce the Town Council’s strategic commitments to mobility, access, and connectivity. ● Update goals, policies, and strategies to support multimodal improvements across Easton and its growth area. ● Advance a “Complete Networks” approach—one that tracks and improves transportation options across all modes, with an emphasis on safety, connectivity, and equity. B. TRANSPORTATION ISSUESAND PO LICY CONSIDERATIONS
Easton recognizes the need to rebalance its transportation system by supporting a multimodal network that includes walking, bicycling, transit, air travel, and automobiles. A diverse and well-integrated transportation system allows people of all ages, abilities, and incomes to travel
Town of Easton
76
February 19, 2026
safely and efficiently. It also supports economic development, environmental sustainability, and a high quality of life. C. OR GANIZATIONAL FRAMEWORK
The goals and policies in this chapter are organized into five key areas: 1. Integration of Land Use and Transportation Planning 2. Complete Networks 3. Non-Motorized Transportation 4. Single-Occupancy Vehicles 5. Transportation Planning Requirements These areas are guided by six core themes that emphasize the interdependence of transportation, land use, the environment, and social equity. These themes build upon and reinforce the broader goals of this Comprehensive Plan: 1. Limit sprawl by coordinating land use and transportation planning. 2. Provide safe, sustainable, and well-connected mobility options for all users. 3. Expand infrastructure for pedestrians, cyclists, and shared modes of transportation. 4. Reduce reliance on single-occupancy vehicles (SOV). 5. Maintain and improve roads, trails, and other key infrastructure. 6. Prioritize equity in transportation planning and project implementation. These themes and their related policy areas will be explored in greater depth in the following sections. D. INTEGRATIONOF LA ND USEAND TRANSPORTATION PL ANNING
As the primary population, employment, and service center in Talbot County, Easton serves not only its 18,000 residents but also thousands of county and regional residents who rely on the Town for work, shopping, and daily activities. This results in a transportation network that must accommodate significant regional demand, much of it originating outside the Town’s corporate limits.
Town of Easton
77
February 19, 2026
The affordability of housing in surrounding areas, combined with personal preference and regional employment dynamics, means that many people choose to live outside of Easton but commute in. According to 2020 U.S. Census data, only about 3,200 of the Town’s 11,860 workers lived in Easton. More than 8,600 commuted in from elsewhere. At the same time, over 2,400 Easton residents commuted out of town for work. The 2022 update showed that out of 12,232 workers in Easton, 9,190 were inbound commuters and 2,322 were outbound. In total, more than 11,000 people commute into or out of Easton each workday, underscoring the Town’s regional significance and the burden on its transportation infrastructure. This level of regional traffic presents clear challenges. Easton’s planning efforts must manage congestion while also promoting land use patterns that support infill development, maintain a compact urban form, and encourage transportation alternatives to the private automobile. Higher residential densities, such as those already found in parts of Easton, create opportunities for more efficient transportation options—like public transit, walking, and bicycling. These modes become more cost-effective and feasible as density increases. For this reason, Easton must continue to align its land use and transportation policies to: • Support compact, higher-density development in and near employment and service centers. • Encourage infill and redevelopment in walkable, connected neighborhoods. • Incentivize development patterns that reduce reliance on car travel. A more integrated approach to land use and transportation planning will help Easton accommodate regional demand while preserving the Town’s form, character, and quality of life. E. COMPLETE NE TWORKS
Easton’s transportation planning strategy prioritizes a Complete Networks approach—addressing the needs of all users, including pedestrians, cyclists, drivers, and transit riders—rather than focusing solely on automobiles. This approach builds on the principles of the Complete Streets movement but expands them with annual progress tracking, system-wide assessments, and a commitment to equity and accessibility across modes.
Town of Easton
78
February 19, 2026
While transit options in Talbot County remain limited, Easton must plan for future multimodal infrastructure, including the potential expansion of transit services as the Town grows. Complete Networks planning also supports Easton’s goals for compact, walkable neighborhoods and reduces the demand for continuous road expansion by offering viable alternatives to the single-occupancy vehicle (SOV). The Town aims to produce an annual inventory and performance assessment for each modal system—pedestrian, bicycle, vehicle, and transit—while also reporting on system-wide progress and needs. These assessments help guide investment priorities and align infrastructure improvements with development goals.
i. Non-Motorized Transportation A key component of Easton’s Complete Networks strategy is the continued development of safe, convenient infrastructure for pedestrians and bicyclists. This includes constructing new sidewalks, crosswalks, and bikeways, as well as integrating these elements into all new public and private street projects. The Easton Bicycle and Pedestrian Master Plan (originally included in the 2010 Plan and intended to be updated following this Plan’s adoption) serves as the blueprint for this effort. It identifies: • A Primary Pedestrian Network with recommended sidewalk and intersection projects prioritized by need and feasibility. • A Primary Bicycle Network and recommended bikeway projects prioritized similarly. These plans are considered an extension of the Plan. Their implementation is essential to enhancing non-automotive mobility in Town and promoting active transportation options.
ii. Transit and Single-Occupancy Vehicles The Town continues to improve conditions for walking and biking while encouraging fewer vehicle trips, particularly those made by single occupants. This does not imply eliminating private vehicles—Easton will continue to support a well-functioning road network—but recognizes that auto-centric development is not sustainable for the long term. Census data shows Easton’s transportation network is heavily impacted by regional inflows and outflows of workers, shoppers, and service users. In this context, the construction of pedestrian and
Town of Easton
79
February 19, 2026
bicycle infrastructure serves not only Easton residents but the broader regional community by reducing congestion and expanding travel choices. Although private vehicles will remain the dominant mode for most regional users over the next two decades, technological shifts—such as car- and ride-sharing, remote work, and autonomous vehicles—are reshaping the transportation landscape. Easton will continue to monitor and adapt to these changes while maintaining a strong emphasis on walkable, connected, and multimodal planning. Recognizing that congestion during peak periods is unavoidable in certain corridors, Easton is no longer planning to “build its way out” through continuous widening of roads and intersections. Instead, the Town prioritizes improvements that enhance transportation options, increase efficiency, and create safe, comfortable streets for all users.
iii. Maintaining and Improving Infrastructure Easton integrates transportation planning with infrastructure investment to maximize cost-efficiency. When utilities such as water, sewer, or stormwater systems require upgrades, the Town seeks to coordinate these projects with transportation improvements—such as adding bikeways or sidewalks identified in the Bicycle and Pedestrian Master Plan. For example: • Asphalt resurfacing triggers sidewalk and curb ramp upgrades under the Americans with Disabilities Act (ADA). • Road repaving can be paired with re-striping to add bike lanes. • Utility corridor improvements may coincide with placemaking initiatives if funding is aligned. In many cases, improvements can be funded through non-transportation sources (e.g., utility capital budgets), allowing the Town to expand multimodal infrastructure without drawing exclusively on transportation funds. Private development also plays a role. All new development and redevelopment projects are required to contribute to the cost and construction of infrastructure needed to support growth. These projects are reviewed for compliance with local and state transportation standards and must address connectivity, safety, and overall network performance.
Town of Easton
80
February 19, 2026
F. TRANSPORTATION IMPACT AN ALYSIS (TIA)
Under the Town’s Development Regulations, a Transportation Impact Analysis (TIA) is required for certain development projectsexpected to generate significant traffic or those located near intersections where safety and congestion are already concerns. The TIA evaluates and identifies deficiencies and recommends mitigation strategies if needed. The TIA process begins with a scoping phase prior to the formal submission of a traffic study where the Town and the applicant agree upon the methodologies based on the intensity of the proposal. The study evaluates the project's impact on the surrounding network, identifies deficiencies, and recommends mitigation strategies. When applicable, additional requirements may be imposed by MDOT. Just as a comprehensive street network is necessary for efficient and safe vehicular flow at an acceptable standard, it must also serve bicyclists, pedestrians, and transit riders. To encourage alternative modes of transportation and ensure mobility for all users, the Town envisions expanding the scope of TIAs to include a multi-modal impact analysis where pedestrians, cyclists, and transit riders are treated as equal traffic. Future TIAs will be aligned with the Town's anticipated Complete Streets classification system. This ensures that the impact analysis accounts for all modes of travel, not just traffic counts and the infrastructure design identifies the specific types of bicycle and pedestrian facilities appropriate for the street's classification. To support the Town’s goals for a seamless network all new development abutting substandard public streets is required to upgrade adjacent street segments to current multimodal standards where feasible. These standards ensure that as Easton grows, its transportation infrastructure is safe, accessible, and multimodal, and fiscally sustainable by requiring development to contribute its fair share to the public realm. G. RO AD SYSTEM
U.S. Route 50 has been the single most influential force shaping Easton’s growth and development patterns over the past several decades—particularly commercial growth. The opening of the Chesapeake Bay Bridge in 1952 gave millions of Western Shore residents direct access to the Eastern Shore, driving a surge in beach traffic. Entrepreneurs responded by developing fast-food restaurants, gas stations, and other roadside services along Route 50 to attract these pass-through travelers. Route 50 also fundamentally altered development patterns in Easton. What began as growth along a bypass corridor eventually drew more commercial uses toward it, with residential development
Town of Easton
81
February 19, 2026
filling in between the highway and the historic core. Most of this post-1950s growth was auto-oriented and single-use in nature, diverging from traditional neighborhood design. A fiscal analysis by Urban3 (see Figure 2) highlights key differences between pre- and post-1952 development. First, relatively little land was developed before the Bay Bridge opened. Second, land developed prior to 1952 consistently generates significantly higher fiscal value per acre than post-bridge development. Together, these trends reinforce the link between infrastructure and land use patterns, and the higher fiscal return of compact, traditional development over suburban sprawl. FIGURE 2 - Taxable Value per Acre on the Eastern Shore pre and post Bay Bridge
While Route 50 has benefited many businesses, its impacts are mixed. Excessive access points and the highway’s attempt to function both as a high-speed regional corridor and as a local service road have created serious traffic congestion, safety concerns, and neighborhood disruption.
i. Route 50: Fixes and Futures Easton’s residents overwhelmingly oppose rerouting Route 50 onto the Easton Parkway—a position consistently confirmed in every Comprehensive Plan survey since the 1990s. The Parkway was built in the 1960s to serve west Talbot residents by providing north-south mobility around Easton, not through it. Converting it into a new Route 50 would undermine this function, add signalized
Town of Easton
82
February 19, 2026
intersections, and risk significant environmental impacts—particularly near MD 33 and MD 333. The Parkway cannot and should not serve as a high-capacity bypass. Instead, the most favored long-term solution remains a new, limited-access bypass located well east of Easton—similar in scope to the Salisbury Bypass. This would alleviate congestion within Town, reduce through-traffic delays, and provide an opportunity to repurpose the existing Route 50 corridor as a local “Business 50.” That transformation would allow for street narrowing, improved safety, and redevelopment of the corridor into a more attractive, multi-modal gateway. Until such a bypass becomes feasible, the Town will continue to work with the State Highway Administration (SHA) to improve the existing Route 50 corridor through landscaping, intersection upgrades, and access management.
ii. East–West Access A long-standing problem in Easton is the lack of effective east–west connectivity. The Parkway helps bypass downtown for north–south traffic, but offers little help to those moving across Town between neighborhoods on either side of Route 50. As a result, east–west travel often funnels through residential streets, creating congestion, cut-through traffic, and neighborhood complaints. Some improvements have been made—such as traffic signal synchronization along Route 50—but larger solutions are needed. One promising idea is to relocate MD 309 so it connects with Route 50 at the point where the former railroad crosses. From there, it could run along the rail corridor before rejoining its existing alignment. This would not only improve east–west connectivity but also eliminate the problematic intersection near the airport, where a grade-separated interchange would conflict with flight paths. The concept, originally proposed by SHA, has support from local and regional officials and should be advanced.
iii. Planning and Coordination Planning for future road improvements is complex and expensive—especially when multiple jurisdictions are involved. Within Easton’s limits, roads are managed by the Town, Talbot County, and the State of Maryland, each with different objectives. For example, the State’s priority for Route 50 is efficient regional travel, while Easton and the County prioritize local mobility and safety. Effective intergovernmental coordination is essential to reconcile these priorities and deliver meaningful improvements.
Town of Easton
83
February 19, 2026
It’s also important to recognize that Route 50 is now a major freight corridor. A 2022 State of Maryland report on the Rural Opportunities to Use Traffic Technology Enhancements (ROUTE) initiative noted that Route 50 carries over 10,000 trucks per day and supports $14 billion in annual commodity flow. Freight delays exceed 107,000 hours annually, costing roughly $51 million in lost time and fuel. The corridor is critical for agriculture, tourism, supply chains, and national security assets such as Wallops Island. Going forward, Easton must continue advocating for road improvements that balance local mobility, regional freight needs, and safety—while staying focused on long-term goals to reduce auto dependency and enhance quality of life through better multimodal transportation options. H. COMPLETE STREETS
Easton is in the process of developing a Complete Streets framework to ensure the design and operation of streets safely accommodates all users—pedestrians, cyclists, transit riders, motorists—regardless of age or ability. This approach reflects a shift away from traditional car-centric design toward one that balances the needs of all travel modes and emphasizes safety, accessibility, and community character. Complete Streets prioritize local needs and neighborhood scale, rather than solely focusing on the rapid movement of through-traffic. Features may include sidewalks, bike lanes, bus stops, safe pedestrian crossings, median islands, curb extensions, traffic calming measures, and green stormwater infrastructure. When designed well, Complete Streets promote safer travel, improved mobility, public health, and placemaking—all critical to Easton’s long-term livability. In January 2025, the Town of Easton initiated its formal Complete Streets planning process by contracting with the transportation engineering firm Wallace Montgomery (WM). This first phase of work lays the foundation for a long-term shift in how Easton designs, prioritizes, and evaluates street infrastructure. The overall Complete Streets planning effort is anticipated to span several years and phases of development and implementation. I.
AIRPORT
Easton is uniquely served by a general aviation airport within its town limits. Easton Airport (Newnam Field – ESN), located just west of MD Route 662 and south of Airport Road, is owned and operated by Talbot County. The facility is managed by an Airport Manager under the direction of the County Council, with input from a five-member Airport Advisory Board.
Town of Easton
84
February 19, 2026
Designated in the FAA’s National Plan of Integrated Airport Systems (NPIAS), Easton Airport is eligible for federal funding. As a general aviation facility, it supports a range of private, corporate, and public service aviation needs. It features two intersecting paved runways: • Runway 04/22: 5,500 feet long • Runway 15/33: 4,000 feet long Both have full parallel taxiways and instrument approaches. An FAA contract air traffic control tower operates on-site. The airport supports approximately 220 based aircraft, including single- and multi-engine planes, jets, helicopters, and gliders. Four Fixed Base Operators (FBOs)—Easton Jet Service, Maryland Air, NexGen Flight Solutions, and Trident Aviation—offer a wide array of services, including: • Aircraft fueling (100LL and Jet A) • Aircraft parking (tie-downs, T-hangars) • Air charter services • Rental cars, hangar space, and catering • Flight planning tools, weather centers, and a public café • Meeting space and fitness amenities Additional aviation-related businesses offer aircraft repair, sales, and unique experiences such as biplane rides through Aloft Biplane Rides. Flight instruction and rentals are provided by Trident Aviation and Easton Aviation. The airport also plays a key public safety role. The Maryland State Police base a medevac helicopter at the site for emergency medical transport, search and rescue, and law enforcement missions. Talbot County EMS operates five Advanced Life Support units from the airport, improving response times and access to critical care.
i. Operational Statistics Easton Airport (ESN) ranks among the top three busiest general aviation airports in Maryland, reflecting its critical role in the region’s transportation and economic systems. According to the Maryland Aviation Administration and recent reports, ESN supports a high volume of aircraft activity and contributes significantly to the local economy. Town of Easton
85
February 19, 2026
Based Aircraft (2023) • Single-engine aircraft: 143 • Multi-engine aircraft: 24 • Corporate jets: 20 • Helicopters: 3 • Total: 190 based aircraft Annual Aircraft Operations (2023) • Local general aviation: 44% • Transient general aviation: 31% • Military: 20% • Air taxi: 5% • Total operations: 73,543 annually
ii. Economic Impact A 2023 statewide study of airport economic impacts found that Easton Airport generated: • 542 total jobs • $36.9 million in personal income • $11.3 million in state and local tax revenue • $91.4 million in total business revenue These numbers demonstrate that the airport is not only a transportation asset but a major economic driver for Talbot County and the broader Mid-Shore region.
iii. Land Use Compatibility and Community Impacts As the airport has grown in operations and prominence, conflicts with adjacent residential neighborhoods have also increased—most notably related to noise, traffic, and the perception of encroachment. In response, Talbot County has enacted zoning measures and acquired avigation easements on surrounding properties to limit incompatible uses and protect aviation operations.
Town of Easton
86
February 19, 2026
The County plans to continue securing such easements to preserve the airport's long-term functionality. On the Town side, while the land immediately surrounding the airport is zoned for industrial uses—which is generally compatible with aviation—there are currently no special airport-related zoning protections in place. The Town may consider revising its zoning ordinance in the future to incorporate airport overlay or compatibility districts to better manage potential land use conflicts, particularly in areas close to approach and departure paths. Within Easton’s jurisdiction, the primary concern is not safety but nuisance—especially in the North Easton neighborhoods and adjacent unincorporated County lands. Aircraft noise, fumes, and vibrations are ongoing quality-of-life issues for nearby residents. A balanced approach is needed: residents should acknowledge the presence of a long-standing regional airport, while the airport should seek to channel expansion and high-impact operations toward non-residential, industrial, and undeveloped land to mitigate disturbances.
iv. Mission and Outlook The airport’s mission emphasizes service, safety, and community responsibility: Talbot County’s Easton Airport is and will remain the Mid-Shore’s premier non-commercial general aviation airport, providing outstanding service and support for private, corporate, and government tenants, transient aircraft users, and the Talbot County community at large. It will be a good neighbor by being sensitive to environmental concerns and will support education, emergency services, medical evacuation, and law enforcement activities. The airport will prioritize safety and security while aligning with the goals of the County’s Comprehensive Plan. The Town of Easton supports the continued operation and thoughtful growth of Easton Airport and recognizes its importance for economic development, public safety, and regional mobility. However, the Town also emphasizes the importance of equitable land use planning to minimize impacts on residential communities and ensure long-term compatibility between aviation operations and surrounding neighborhoods. J.
PO RT
Port facilities for the Town of Easton are located at Easton Point, a triangular peninsula bordered on two sides by the Tred Avon River. The area commonly referred to as Easton Point extends inland to
Town of Easton
87
February 19, 2026
the Easton Parkway, although much of the land remains outside the corporate limits of the Town. The only parcels within Town boundaries include the former Public Works yard (now repurposed as a Waterfront Park), the Talbot County Public Works and Emergency Management offices, the Londonderry Retirement Community, and a few small intervening parcels. The current mix of land uses at Easton Point is varied. At the tip of the peninsula is a small marina and a heavily used public boat ramp. There are also several industrial users that rely on river access for the delivery of bulk materials. Along the corridor closer to the Parkway are the County’s Public Works facility (now in the process of relocating) and the Londonderry senior living complex. Other intervening parcels include low-density residential properties and aging infrastructure, including the old Town Public Works yard. The long-term future of Easton Point remains uncertain. The area has been widely recognized for its redevelopment potential, given its waterfront access and proximity to downtown. Many stakeholders envision a shift away from heavy industrial use toward a more mixed-use, recreational, and residential vision. This could include expanded marina facilities, improved public waterfront access, parks and open space, and higher-density residential and commercial development. This vision was further articulated in the Easton Point/Port Street Small Area Plan, referenced in the Implementation Chapter. That plan sets forth a framework for potential annexation, infrastructure improvements, and land use changes, should redevelopment opportunities materialize in the future. K. RA IL
Rail service to Easton and the broader Talbot County area has been discontinued for many years. Most of the former rail rights-of-way have either been retained by the Maryland State Rail Administration or reverted to private ownership. As a result, the restoration of freight or passenger rail service is not anticipated during this planning period; however, old rail beds serve as good bones for the Town’s Bicycle and Pedestrian network, which is exploited below. L.
PE DESTRIANAND BICYCLE PL AN
Too often, transportation planning focuses narrowly on roadways, with minimal attention to non-automobile modes. Walking—our most basic form of transportation—is frequently overlooked, along with the infrastructure that supports it. Easton is actively working to change that. As part of
Town of Easton
88
February 19, 2026
the Town’s broader “Complete Streets initiative” pedestrian and bicycle networks are now a central focus of infrastructure planning and investment. In Easton’s older neighborhoods, sidewalks have long been a defining feature. In recent years, many of these areas have benefited from targeted sidewalk upgrades and streetscape enhancements. Since the early 1980s, the Planning and Zoning Commission has required sidewalks in all new subdivisions. However, some neighborhoods developed in the 1950s through 1970s lack this infrastructure entirely, forcing pedestrians to share roadways with vehicles—a significant safety concern. These areas are now priorities for retroactive sidewalk installation.
i. Bicycle Infrastructure Bicycle travel is also receiving greater attention in Easton’s transportation framework. Bicycling offers a low-cost, sustainable transportation option and is increasingly eligible for federal and state infrastructure funding. Projects such as bike lanes and multi-use trails are particularly well-suited to Intermodal Surface Transportation Efficiency Act (ISTEA) grants and Maryland's transportation funding programs, which now require comprehensive plans to address pedestrian and bicycle mobility.
Town of Easton
89
February 19, 2026
Map 6: Proposed Bicycle Network
Town of Easton
90
February 19, 2026
M. PU BLIC TRANSPORTATION
The Town of Easton currently does not operate its own public transportation system, and no municipal transit services are expected to be introduced during the current planning horizon. However, residents and workers do have access to Delmarva Community Transit (DCT), a regional transit service operated by Delmarva Community Services, to which the Town contributes annually. DCT provides two fixed routes through Easton—Route C and Route D—operating from 7:15 a.m. to 5:15 p.m. A St. Michaels Shuttle also runs from 6:00 a.m. to 5:30 p.m. Fiscal Year 2023 ridership was: • Route C: 8,337 riders • Route D: 5,868 riders • St. Michaels Shuttle: 6,030 riders While ridership has declined since 2010 (particularly on Route C), public transit remains a vital service for many residents, including seniors, workers, and individuals without access to a car. Looking ahead, the Town remains open to exploring expanded transit options, including potential service increases from DCT or other providers. As part of the State Agency review process associated with the Draft of this Plan, Maryland Transportation officials commented that many communities of about the same population as Easton have been able to maintain a circulator bus system. This is something we should explore further during this Planning period as, among other benefits, this is potentially one way in which the disparate parts of Easton can be brought closer together (and, in a relatively sustainable manner). Easton should also begin discussions with State transportation agencies regarding travel demand management strategies, such as official Park-and-Ride facilities. Currently, some residents are informally using business parking lots for commuter parking—an indicator of unmet demand that may justify the creation of designated facilities. It is also important to remember that while not every project is appropriate for construction of a new road, all are important for consideration of expanded or enhanced connectivity. A prominent example of such projects is the new Hospital. This facility would seem to be a logical candidate for a transit stop given its role as an important community service, as well as major employer. At a minimum, any hospital employees who currently walk to the existing site on South Washington Street will need a new transit option to get to work at the new location.
Town of Easton
91
February 19, 2026
N. TRANSPORTATION MA PAND PR OPOSED IMPROVEMENTS
The Transportation Map illustrates key proposed enhancements to Easton’s multimodal transportation network. These improvements, summarized below, are conceptual at this stage—exact designs, funding mechanisms, and construction timelines are largely undefined. Most projects are expected to be completed in conjunction with adjacent property development or funded through the Town’s impact fees or a combination of Town, County, or State resources. These proposals are also subject to revision as the Complete Streets Study is finalized.
Town of Easton
92
February 19, 2026
Future Map 7: Road Network
Town of Easton
93
February 19, 2026
1. Grade-Separated Crossing of Route 50 One of Easton’s highest priorities is addressing local traffic delays caused by congestion on US Route 50. A grade-separated crossing would significantly improve east-west connectivity. 2. East Side Residential Collector Grid Replacing a single collector route previously proposed in the 2004 Plan, the Town now supports a grid network of local streets on the eastern side of Easton. This approach—mirroring the traditional street grid of the historic town center—supports connectivity and disperses traffic flow. The Complete Streets Study will further evaluate this concept. 3. June Way Extension This project would extend June Way from Waylands Subdivision south to connect with Fisher Range Road, eventually forming part of the East Side Collector Grid mentioned above. 4. Clifton Road Improvements Clifton Road would be extended to connect Dover Road and Chesapeake Avenue, offering residents of North, Middle, and South Clifton an alternative route that avoids Route 50. 5. East Side Route 50 Service Road A new service road behind businesses along the east side of Route 50 (between Matthewstown and Chapel Roads) would allow internal circulation without repeated entries onto Route 50, relieving traffic congestion and improving safety. 6. Chapel Road/Route 50 Intersection Improvements This busy intersection will require capacity enhancements to accommodate future development, including Easton Commons and surrounding parcels. Recent upgrades have included signal rephasing; further improvements are expected based on evolving traffic conditions. 7. Norris Taylor Drive This new signalized access road, developed with the Royal Farms and Burger King projects, improves circulation on the west side and enhances access to John F. Ford Park. It may support a future West Side Service Road extending Calvert Street north to Chapel Road through the RTC property.
Town of Easton
94
February 19, 2026
8. East-West Connector This long-standing proposal envisions connecting Marlboro Avenue with Creamery Lane, Aurora Park Drive, Magnolia Street, and eventually Route 50 via the RTC property. Portions of the route could continue across Route 50 to Elliott Road and Mulberry Drive. Phased implementation is expected, using impact fees and potentially beginning with pedestrian or bicycle improvements before full street construction. 9. Route 50 Intersection Upgrades (Goldsborough and Dover Streets) These intersections continue to rank among the worst in Easton in terms of congestion and delay. Improvements are essential even if the East-West Connector is completed. Dedicated turn lanes and expanded capacity should be explored, and additional right-of-way acquisition may be necessary. 10. “Five Corners” Intersection This unusual convergence of five roads (Washington, Harrison, Idlewild, Peachblossom) near Idlewild Park is a persistent congestion point. A roundabout is under consideration, along with a new smart signal system designed to improve flow and reduce delays in the near term. 11. Tristan Drive to Oxford Road Connector This proposed route would connect Tristan Drive with MD Route 33 (Oxford Road), creating a new east-west corridor and reducing pressure on the existing Parkway/Oxford Road intersection. Coordination with Talbot County is needed, especially in light of the County’s recent acquisition of the adjacent Poplar Hill Farm property. Given current ownership of the property by Talbot County, it is anticipated that this road will primarily serve as access to parking for the Town’s Woodland Park located on an adjacent parcel. 12–15. Rails-to-Trails System Extensions Significant trail system expansions are proposed in all directions: 12. Northward, across Route 50, following the historic railbed. 13. Southward, across Easton Parkway to link with other trail systems. 14. Eastward, along Chesapeake Avenue. 15. Westward utilizing the pedestrian bridge over the Tred Avon River funded by Easton Village developers and potentially on towards St. Michael’s.
Town of Easton
95
February 19, 2026
Segments of these trail extensions have already been completed in recent years, and the Town intends to continue these enhancements as opportunities arise.
(16) Beechwood Drive Extension This proposed extension involves the segment of Beechwood Drive located adjacent to the Lakelands project. It would connect the current dead end to Dutchman’s Lane, just east of Easton Club East. Where feasible, this extension should include a multi-use trail to enhance non-motorized mobility. (17) Hemlock Lane Extension Hemlock Lane currently terminates within The Woods at Stoney Ridge subdivision. This proposal would extend the roadway eastward to connect with the proposed Beechwood Drive Extension, forming part of the broader East Side Residential Collector Grid. This grid system, which prioritizes multiple interconnected local streets rather than single large collectors, is intended to improve east side circulation while discouraging excessive cut-through traffic. (18) Chesapeake Avenue Corridor A public right-of-way for Chesapeake Avenue already exists and offers a significant opportunity to provide east–west access across a largely undeveloped area between Dutchman’s Lane and Chilcutt Road. In the short term, construction of a pedestrian/bike trail along this corridor would benefit nearby neighborhoods. As development occurs, additional right-of-way acquisition should allow for a co-located roadway that could ultimately intersect Route 50 at or north of Idlewild Avenue. This extended Idlewild could then serve as the new vehicular connection, while Chesapeake Avenue would support a grade-separated pedestrian and bicycle crossing. (19) Bay Street to Marlboro Avenue Connector This proposal would formalize an existing informal connection currently used by drivers via a network of parking lots and private drives. The connector would provide improved access to Talbot County government offices located in the Bay Street Condominiums. While not a major traffic route, this connector would improve circulation and reduce confusion for local traffic and visitors. (20) Industrial Park Road Extension
Town of Easton
96
February 19, 2026
Industrial Park Road currently serves the Clifton Industrial Park, annexed into Easton in 2007. This extension would push the road southward to meet the proposed Chesapeake Avenue alignment. Once built, it would create a valuable north-south connection for residents of Stoney Ridge, Easton Club East, and future neighborhoods, offering an alternate path to Dover Road via a signalized intersection at Teal Drive. (21) Idlewild Avenue Extension Idlewild Avenue currently terminates at US Route 50. This proposed extension would continue Idlewild across Route 50, ideally via a grade-separated crossing, to meet the proposed Chesapeake Avenue corridor. Such a connection would relieve pressure on nearby intersections at Dutchman’s Lane and Dover Road, improve east-west connectivity for vehicles, and provide opportunities to separate pedestrian and bicycle movements from highway traffic. O. GO ALSAND OB JECTIVES
Goal #1: Provide a Functional and Efficient Road Network. Objectives:. ● Maximize the capacity, safety, and efficiency of the existing street and highway system. ● Improve access to, and movement within, the Central Business District. ● Improve the Route 50 circulation system, focusing on separating through and local traffic. ● Consolidate driveway access points on Route 50 and develop an intersection control plan to reduce left turns. ● Build a connected network of local roadways to support existing communities and planned development, while reducing local reliance on Route 50. ● Develop a Small Area Design/Transportation Plan to evaluate optimal street and trail networks on Easton’s east side and Growth Area. ● Discourage strip development and promote clustering of development at designated nodes along Route 50. ● Improve east-west access throughout the Town, including at Goldsborough and Dover intersections.
Town of Easton
97
February 19, 2026
● Require gridded street systems in new development with provisions for pedestrians and bicycles. ● Where feasible, retrofit existing subdivisions to create new road connections and improve connectivity. ● Work to reduce the growth of commercial access points on Route 50. ● Coordinate closely with SHA on improvements to all streets that intersect Route 50. ● Improve the appearance and function of Route 50 frontage areas; prioritize solutions that enhance the existing corridor rather than shifting traffic to Easton Parkway. ● Support long-term efforts to construct a Route 50 bypass east of Town, paired with converting the existing Route 50 to a multimodal boulevard. ● Enhance public transportation options and services. ● Evaluate feasibility and location of a formal park-and-ride lot in Easton. Goal #2: Expand the Town’s Trail System and Support Active Transportation. Objectives: ● Collaborate with MDOT to pursue funding and design for a grade-separated pedestrian and bicycle crossing of Route 50 at Chesapeake Avenue. ● Implement the goals and recommendations of the Bicycle and Pedestrian Master Plan. ● Coordinate trail improvements and connectivity with Talbot County and regional partners. ● Include safe and effective crosswalks as part of all major intersection improvements on Route 50 and Easton Parkway. Goal#3: Manage Airport Growth While Minimizing Community Impacts. Objectives: ● Guide land use near the airport to avoid incompatible development that could restrict future airport operations. ● Coordinate with Easton Airport officials to review and refine policies aimed at mitigating noise and other impacts on adjacent neighborhoods.
Town of Easton
98
February 19, 2026
Goal #4: Link Land Use and Transportation to Support Smarter Growth. Objectives: ● Use this Comprehensive Plan, Small Area Plans, and mixed-use districts to incentivize infill and prioritize multimodal transportation. ● Build a Transportation Network Model and develop a Comprehensive Transportation Plan as an adjunct to this Comprehensive Plan. ● Promote compact land use patterns and higher-density development near transit corridors. ● Acknowledge that congestion may occur in denser areas, but prioritize safety, connectivity, and multimodal access over capacity expansion. ● Develop a strategic transit plan linking key destinations such as employment centers, schools, parks, and shopping. ● Encourage active transportation over driving to improve health and reduce environmental impacts. ● Support transit-oriented development (TOD) along primary transit routes by: ○ Identifying zoning, densities, and land use patterns; ○ Requiring design review for all new development; ○ Promoting mixed-use development and discouraging auto-oriented uses; ○ Encouraging development patterns which reduce on-site parking requirements and encourage shared parking; and ○ Requiring bicycle parking for new development. ● Coordinate TOD efforts with transit providers to maintain or enhance service levels. ● Collaborate with Talbot County on unified multimodal infrastructure standards for the Easton Growth Area. ● Require Multimodal Traffic Impact Studies to consider nearby transportation corridors and intersections, not just those within and immediately adjacent to proposed projects. Goal #5: Provide Safe, Well-Connected, and Sustainable Transportation Options.
Town of Easton
99
February 19, 2026
Objectives: ● Fill missing gaps in the multimodal transportation network for all users, including pedestrians, cyclists, transit riders, freight, and private vehicles. ● Design transportation improvements that prioritize safety for vulnerable users. ● Ensure mobility options for people with special transportation needs, including children, seniors, low-income populations, and persons with disabilities. ● Expand the required scope of Traffic Impact Studies to include an analysis and discussion of the impacts of proposed projects on all modes of transportation so that our transportation network becomes truly multimodal. Goal #6: Increase Infrastructure for Non-SOV Travel. Objectives: ● Integrate Bicycle and Pedestrian Master Plan recommendations into public street improvements where feasible. ● Require all new development to build sidewalks along public streets per Town standards, with separation from traffic where possible. ● Accommodate bicyclists on arterial streets identified in the Master Plan, constructed with permeable materials where feasible. ● Establish an administrative waiver process for cases where required improvements would serve no clear public purpose. ● Prioritize Safe Routes to School through coordination with Talbot County Public Schools. ● Provide incentives for private development to construct sidewalk and bikeway infrastructure. ● Use Transportation Demand Management (TDM) and Transportation System Management (TSM) strategies to improve efficiency and safety. ○ TDM Actions: ■ Educate the public about walking and biking options. ■ Implement compact, transit-supportive development strategies.
Town of Easton
100
February 19, 2026
■ Track and report progress toward shifting mode share away from SOVs. ■ Require Commute Trip Reduction programs for large developments. ■ Support carpooling and ridesharing initiatives. ■ Reform parking standards to improve pedestrian environments.
○ TSM Actions: ■ Complete bike and pedestrian networks to improve public health and reduce emissions. ■ Explore bike share programs and local connectivity improvements. ■ Identify and pursue funding sources to implement multimodal improvements. Goal#7: Reduce Reliance on Single-Occupancy Vehicles (SOVs). Objectives: ● Decrease SOV trips while encouraging trips made by walking, biking, transit, and ridesharing. ● Track transportation mode share using standardized Census data and report five-year averages annually. ● Work with County and State partners to develop a local Commute Trip Reduction program. ● Advocate for stronger MDOT support of sidewalk, bikeway, and transit investments—particularly along state highways serving Easton. Goal #8: Maintain and Improve Streets, Trails, and Related Infrastructure. Objectives: ● Use Complete Street standards to ensure transportation concurrency for new development, avoiding unnecessary road widening for vehicle traffic. ● Allocate sufficient funding for maintenance of sidewalk, bikeway, and roadway systems.
Town of Easton
101
February 19, 2026
● Design and construct transportation facilities to avoid or mitigate environmental impacts, consistent with Critical Areas Ordinance requirements. ● Develop improved metrics for analyzing new vehicle traffic impacts on pedestrians, bicyclists, and transit service. ● Apply multimodal street design standards to all new development. ● Request County and State highway projects to include pedestrian and bike safety improvements. ● Retrofit existing streets with green infrastructure and traffic calming where appropriate. Goal #9: Address Transportation Equity in All Projects. Objectives: ● Provide equitable access to pedestrian and bicycle infrastructure through inclusive public engagement and targeted capital investment. ● Invest in underserved neighborhoods to expand pedestrian and bicycle facilities. ● Ensure all residents—regardless of age, income, race, or ability—have opportunities to participate in and benefit from transportation investments. ● Develop outreach materials in multiple formats and languages to engage all segments of the Easton community.
Town of Easton
102
February 19, 2026
7. COMMUNITY FACILITIES AND SERVICES “INVESTMENTININFRASTRUCTUREISALONGTERMREQUIREMENTFORGROWTHANDALONGTERMFACTORTHATWILL MAKEGROWTHSUSTAINABLE.” CHANDA KOCHHAR A. PU RPOSE
Community Facilities and Services form the backbone of Easton’s infrastructure and quality of life. This chapter addresses the key public services and utilities that support daily living, guide development, and ensure public health and safety. These include water and sewer services, solid waste management, police, fire and rescue, and other essential facilities. The chapter provides a concise overview of the facilities currently serving Easton, along with a discussion of future needs based on projected growth. It incorporates community input gathered during the Plan Update process and outlines goals and objectives to ensure that Easton’s public services keep pace with development. While newer elements such as Water Resources and Municipal Growth may overlap with topics in this chapter, the Comprehensive Plan ensures all statutory requirements are addressed—even if they appear in separate chapters. For Community Facilities, the State of Maryland provides the following guidance: Maryland Statutory Requirements A
Community Facilities Element must:
(a) Project the most appropriate and desirable patterns for the location, character, and extent of public and semi-public buildings, land, and facilities—on a schedule that extends as far into the future as is reasonable. B.
It may also include planning for: • Places of worship • Fire stations • Hospitals
Town of Easton
103
February 19, 2026
• Institutions • Jails • Libraries • Parks and recreation areas • Police stations • Schools and educational facilities • Cultural facilities • Social welfare and medical facilities • Other public offices or administrative buildings Some of these topics are addressed in this chapter; others appear in separate sections of the Plan. Regardless of where they are discussed, their evaluation is consistent with Easton’s population projections, growth policies, and infrastructure strategies. Easton’s public services and utilities play a critical role in the Town’s physical, economic, and social development. Continued growth—especially in key economic sectors—depends on the capacity of public and private utility systems to meet the needs of both current and future residents. A core goal of the Town is to maintain and expand community facilities and services that protect public health and safety while enhancing quality of life. This must be done within the Town’s fiscal limits and in coordination with its broader growth management goals. As the region’s commercial and employment hub, Easton must also account for service demands generated by surrounding communities—not just those of Town residents. B. UTILITIES
Easton's utility systems are primarily managed by Easton Utilities, a municipally owned entity responsible for electricity, water, sewer, natural gas, and broadband services. Established in 1923, Easton remains the only municipality in Maryland to own and operate all its utilities—a structure that continues to offer local control, operational efficiency, and responsive service. Easton Utilities is governed by a three-member Easton Utilities Commission. Two commissioners must be residents of Easton; the third must reside within the electric service area. All are appointed
Town of Easton
104
February 19, 2026
by the Mayor with the advice and consent of the Town Council. A full-time President/CEO manages day-to-day operations and implements Commission policies.
i. Electricity Electric service in Easton is provided by Easton Utilities to over 11,000 customers within a 54-square-mile service territory. Electricity is sourced both from onsite generation facilities and from the PJM Interconnection, a regional transmission organization. This allows Easton Utilities to choose the most economical and reliable power source on an hourly basis. The Town’s installed generation capacity is 66 megawatts—more than sufficient to meet current demand. Historically, Easton Utilities was the sole electricity provider. However, recent annexations have brought some areas into service territories of Choptank Electric Cooperative and Delmarva Power & Light. As annexation continues, coordination among these providers will become increasingly important. Service area transfers may be necessary to ensure consistent, efficient service and to avoid overlapping service in single developments. These boundary adjustments require mutual agreement among the utilities involved.
ii. Water and Sewer Easton Utilities also manages the Town’s water and wastewater systems. Water is drawn from deep freshwater aquifers via a network of wells, while sewer service is provided through a system first constructed in 1911. The Town’s original wastewater treatment plant was built in 1938 along the Choptank River. A major upgrade occurred in 1988 with the introduction of an Overland Flow Treatment system—then the fifth largest in the country. In 2007, Easton brought online a new enhanced nutrient removal (ENR) facility, with sufficient capacity to meet projected needs through 2051 (as detailed in the Municipal Growth and Water Resources Elements). Additional information regarding water and wastewater system capacity status, as well as projections of the adequacy of these systems, may be found in Sections 9B and 11G and H of this Plan. All new water and sewer extensions must align with the Talbot County Water and Sewer Plan and are funded entirely by the developer. Service is only extended to properties within Easton’s corporate limits. Decisions to annex land should weigh the long-term financial, infrastructure, and planning implications of extending water and sewer services.
Town of Easton
105
February 19, 2026
iii. Natural Gas Easton's Gas Department, acquired in 1923, is the only municipally owned gas utility in Maryland. The original coal-based system was replaced in 1966 with a natural gas supply via Eastern Shore Natural Gas Company. Gas is piped in from the Federalsburg area and distributed to over 4,500 customers through 100 miles of steel and plastic mains. The system delivers approximately 525 million cubic feet of gas annually within an 8.5-square-mile service area.
iv. Internet and Broadband Easton Velocity, a division of Easton Utilities, provides high-speed broadband, cable, and phone service. Its hybrid fiber-coaxial and expanding fiber-to-the-premises network offers advanced connectivity options, including commercial service packages of up to 10 gigabits per second. Easton Velocity plays a central role in supporting digital equity, remote work, telehealth, education, and economic growth. As a publicly owned service, it offers competitive pricing, reliable local support, and infrastructure investment aligned with Easton’s long-term goals for connectivity and community development. C. SOLID WASTE
Solid waste collection in Easton is provided by the Town. Since 2011, waste has been hauled to the Mid-Shore Regional Landfill in Caroline County, replacing the former site on Barkers Landing Road. To offset disposal costs, Easton implemented a residential disposal fee in 1993 to cover landfill tipping charges. Recycling services include both curbside collection for residents and drop-off containers ("igloos") located at the former landfill site and other convenient locations around Town. These services are essential to managing Easton’s waste stream and reducing landfill dependency. D. ME DICALAND HOSPITAL FACILITIES
Hospital services in Easton are provided by the University of Maryland Shore Medical Center (UMSMC). As one of the Town’s most critical institutions, the hospital has a twofold impact: it provides essential healthcare services and serves as a major employer and economic engine. However, its physical presence within a residential neighborhood has also created longstanding land use challenges.
Town of Easton
106
February 19, 2026
As the hospital has expanded over time, it has outgrown its original site and now occupies multiple properties within the Idlewild Avenue and Dutchman’s Lane corridor. This fragmentation has led to conflicts with nearby residents, including increased traffic, parking demand, and the encroachment of institutional uses into residential areas. While coordination with the Town has mitigated some impacts, the fundamental land constraints remain unresolved. In response, the University of Maryland Medical System (UMMS) identified a new site for a regional medical facility near the Talbot County Community Center, just outside the current Town boundary and adjacent to the Easton Airport. Originally proposed in 2008, the project was delayed but has now received local and State approvals to move forward. This long-anticipated facility represents a major investment in the health and wellbeing of Easton and the broader Mid-Shore region. Beyond patient care, it promises to attract additional medical offices, labs, rehabilitation centers, and support services—strengthening Easton’s role as a regional hub for healthcare. Key planning considerations remain: • Development in the areas surrounding the new hospital site o To include an examination of issues such as the appropriateness of the existing zoning for adjacent areas / connectivity to other parts of town / airport issues / traffic, etc. • Future of the current hospital site: o The existing facility and surrounding medical corridor are strong candidates for a future Small Area Plan, which should guide redevelopment and potential land use changes. • Relocation of support services: o The shift of medical offices and clinics toward the new hospital may leave Idlewild and Dutchman’s Lane with underutilized or outdated facilities. • Housing for healthcare workers: o As noted in the Housing chapter, access to affordable housing is a pressing issue for Easton’s workforce—including those in the healthcare sector. Enabling more
Town of Easton
107
February 19, 2026
workers to live in Town can ease commuting pressures, support recruitment and retention, and improve emergency staffing capacity. o As the new regional hospital becomes reality, Easton must plan thoughtfully for the transition—not just for the facility itself, but for the neighborhoods, services, and workforce it affects. E. PU BLIC SCHOOLS
Public Schools in Talbot County are funded and administered by the County government. The Town has two “roles” in this process. First, as the major population center in Talbot County, we are a significant source of students attending public schools. Second, three of the County’s public schools, plus the Board of Education Main Offices, are located within the Town’s jurisdiction. Although the Town has no role in terms of providing public school service, we work cooperatively with the County to supply them with the most updated demographic information for their use in preparing the Annual Educational Facilities Master Plan. The 2025 version of this document,describes the state of, and outlook for, the Easton schools, including the impact of the The Blueprint for Maryland’s Future and can be viewed at the Talbot County Public School’s website: https://www.talbotschools.org/documents/about/admin-services/plant-operations/779051 Looking ahead as far as it does (i.e. ten years), the Educational Facilities Master Plan (EFMP) indicates that the Talbot County Public School system can accommodate expected growth in Easton, albeit barely, at the middle and high schools, and the just constructed elementary school would require additional capacity either through a physical addition or through redistricting.. Unanticipated growth would pose even more problems, depending on the nature of any such residential developments. The Educational Master Plan notes that there are a number of residential developments planned in the Easton area, but that these are primarily planned to target the high-end or age-restricted markets. Age-restricted developments obviously impose very little demand on public school systems as there are few, if any, children in these types of projects. High-end projects may very well have children living in the development, but oftentimes these children attend one of Easton’s private schools, thus the impact of these developments on the public school system is also diminished. Enrollment at non-public schools in Talbot County now totals approximately 932 students, which is 17.1% of the total K-12 student enrollment in the County. This takes substantial pressure off of public school utilization but may bear watching as if the economic situation deteriorates these students represent potential new impacts on the public school system if
Town of Easton
108
February 19, 2026
their parents, by choice or necessity, switch from private to public school education for their children. History suggests that the impact on Easton’s public schools may not even be as much as described in the EFMP. This conclusion is arrived at by looking at Easton’s change in population and public-school enrollment in the years 2000 and 2020. In 2000, Easton had a total population of 11,708, with a public-school enrollment of 2,892. By 2020, these numbers had grown to 17,101 and 3,072 respectively. That is a difference of 180 additional students enrolled in Easton’s public schools from an overall population increase of 5,393. Looking ahead to the total buildout of the 2023 Town boundaries (an estimated 6,752 new people), if the same ratio of student population: total population can be assumed, this increase of 6,752 people would yield just 225 new students in Easton’s public schools. The counterpoint to this though may come from the changing demographics noted in the EFMP. Specifically, it noted the growth of the Hispanic student population in Talbot County’s Public Schools. This mirrors the increase in the overall Hispanic population in Easton, which, as noted in the Plan Background Chapter, has grown from 3.5% of Easton’s population in 2000, to 14.4% in 2020. F. LIBRARIES
Library service in Talbot County is provided by the Talbot County Free Library (TCFL), the main branch of which is in Easton at the corner of Dover and West Streets. In addition to the traditional library resources provided here, the Easton branch is an important community resource, providing a series of community events, study rooms, and a moderately sized meeting room. According to the Library’s website, the TCFL receives 76% of its funding from Talbot County and other local governments, 12% from grants and friends support, 6% from the State of Maryland, and the balance from TCFL Foundation and Donations. The FY 2022 TCFL Annual Report includes the following statistics (NOTE: these figures are for the full system, not just the Easton Branch): • 23,528 Library Card Holders • 84,608 physical visits • 14,179 reference questions answered
Town of Easton
109
February 19, 2026
• 7,701 computer users • 13,982 Wi-Fi users • 383,411 Virtual Library Visits • 970 Uses of the Meeting and Study Rooms by Outside Organizations • 125,172 physical volumes • >1,000,000 virtual volumes • 405 Adult, Teen & Children's Programs with total attendance of 16,831 The TCFL has developed a Strategic Plan through the year 2025 is provided and available for review at:https://www.tcfl.org/about/?content=strategicplan. All told, TCFL is a valuable and multifaceted community resource. G. COMMUNITY CENTERS
Public buildings shape a community’s sense of identity and permanence. As noted by Ed McMahon of the Conservation Fund—who spoke in Easton during a past Comprehensive Plan Visioning session—governments should set the tone for quality development through their own civic architecture. In “Better Models for Development in Virginia”, McMahon wrote: “Public buildings and spaces create identity and a sense of place. They give communities something to remember and admire... Public buildings with civic stature, quality materials, and prominent settings project a sense of permanence and human scale that expresses the dignity and importance of public institutions.” Historically, town halls, courthouses, libraries, and schools were among a community’s most attractive and prominent buildings. Over time, however, this standard has too often eroded, with newer public facilities resembling warehouses or being sited along strip corridors outside town centers. Easton has largely resisted this trend. Most of its key public buildings remain downtown, including some notable examples of quality civic architecture. That said, the Town has come close to losing this pattern. In recent decades, Talbot County has considered bids for new administrative office sites outside the town center, and the U.S. Postal Service nearly relocated its facility before ultimately opting to renovate in place.
Town of Easton
110
February 19, 2026
A major success story is the Easton Utilities Commission’s Customer Service Center, completed in 2000. This landmark project is a model of context-sensitive, high-quality design that fits seamlessly into the historic fabric of downtown. It exemplifies how civic buildings can reinforce community character and contribute to the vitality of Easton’s core.
The Easton Utilities Commission’s Customer ServiceCenter Looking ahead, Easton may soon need to expand or replace its Town Office at 14 South Harrison Street. While the current building—a former firehouse and police station—is a strong example of adaptive reuse, it may no longer provide sufficient space for staff and operations. Should a new Town Office be required, the Town should follow the precedent set by the Easton Utilities building: locate it in the downtown core and ensure it reflects a high standard of civic design that instills community pride. H. PU BLIC SAFETY
Many issues related to public safety fall within the realm of a community’s overall quality of life that is the subject of the Community Character Chapter. As a part of this Element, it is appropriate to
Town of Easton
111
February 19, 2026
address issues such as the adequacy of existing police services, the expected future needs of the police force, and the need for new offices, substations, etc. The 1997 Comprehensive Plan quoted the International City Managers Association’s recommended ratio of 1.75 police personnel per 1,000 people served. That standard was the subject of criticism from previous Police Chiefs. Therefore the 2004 Plan utilized a different standard, that of the International Center of Prevention of Crime, which finds that the national average across the U.S. is 3.36 officers per thousand people served. With 48 sworn officers in a Town of approximately 17,100, Easton falls between the two referenced guidelines. There are some factors in Easton that suggest being towards the upper end of the recommended range is appropriate. First, Easton is a regional center for employment, entertainment and commerce. Thus, the population served is much higher than simply the resident population of the Town. Second, Easton's citizens have repeatedly called for strong and active community policing. Finally, Easton is subject to extremely heavy volumes of seasonal traffic traveling between Ocean City and the Baltimore-Washington metropolitan area and Easton itself has a modest tourism industry. Factors such as these place a stronger demand on police resources than may normally be found in another municipality of a similar size. Considering the above, we believe police staffing is adequate for the present time and growth in the number of sworn officers along the rates that Easton has recently experienced should be adequate for the future. The Easton Volunteer Fire Department provides fire protection in the Town of Easton and the surrounding County area. The department is an all-volunteer organization with financial support from the Town and County. The Fire Department discontinued providing ambulance service as of December 1, 2002. The ambulance equipment and supplies were sold to Talbot County. The County is now the primary provider of emergency services throughout the County including the Fire Department’s service area. There is a State Fire Marshal responsible for Fire Code enforcement in the Town and County. Fire Protection services should be expanded throughout the Plan period as the Town and County's population continues to increase. As a result of growth in and around the Town a new fire substation was constructed on Matthewstown Road on the lot of the Town’s water tower. This location offers better access to US Route 50 and is located in proximity to development activity. One of the consequences of uncontrolled growth, either in terms of rate or location, is the increased potential that Easton would have to move from an all-volunteer Fire Department to a paid
Town of Easton
112
February 19, 2026
department in order to continue to provide acceptable coverage. This would have negative impacts both in terms of the loss of the community spirit that is engendered by the Volunteer Fire Department as well as financial implications, including possible (if not probable) tax increases. Advanced Life Support (ALS) services have been established in Talbot County. ALS provides 24-hour emergency response by trained paramedics and cardiac rescue technicians. ALS services are provided by volunteer and paid staff. Funding for ALS is derived from the County, fundraising activities and private donations. ALS service has also been experiencing difficulty in securing funds for equipment needs related to an increasing number of calls. In assessing the adequacy of fire and emergency management services for Easton’s future, it is necessary to look at more than just population projections. Traffic projections, particularly for US Route 50, have a great influence on both the number of accidents that on that highway as it traverses our Town as well as the ease (i.e. speed) with which emergency responders can reach their destinations. The form of development is also extremely important when it comes to emergency response time. Studies show that emergency responders can cover more households within a given response time in neighborhoods with a more traditional style of development (i.e. multiple connections). This means that response time from a given fire/rescue station is lower when the community is predominantly built in this form of development. On a larger scale, it also means that the need for additional substations is lessened when the community is built in the traditional pattern as opposed to a suburban style of development. I.
GO ALSAND OB JECTIVES
Goal #1: Deliver High-Quality Community Facilities and Services. Continue to provide well-maintained, reliable public facilities and services to support health, safety, and quality of life for all who live, work, or visit Easton. Objectives: ● Ensure that the cost of facilities and services is shared equitably among the Town, developers, and end users. ● Require developers to upgrade any deficient facilities serving annexed areas to Town standards, based on proportional impact.
Town of Easton
113
February 19, 2026
● Mandate that all users contribute their fair share toward capital improvements through existing and future funding tools. ● Align the provision of services with the Town’s adopted growth management policies. ● Deliver services and facilities equitably across all neighborhoods and businesses. ● Require all development to pay for necessary infrastructure extensions, using the Impact Fee Ordinance and any new mechanisms adopted. ● Promote orderly, staged growth by targeting utility extensions to priority areas and enabling cost recapture from future development. ● Encourage the establishment of a general or specialized satellite college campus in Easton. Goal 2: Coordinate Town Services with Other Agencies. Improve collaboration with county and regional agencies to ensure consistent and efficient delivery of services. Objectives: ● Work with Talbot County to update the Master Water and Sewer Plan to reflect service-ready projects within Easton’s growth areas. ● Support Easton Utilities in coordinating electric service boundaries with Delmarva Power and Choptank Electric to avoid service overlap. ● Continue using a Capital Improvement Program (CIP) to align Town projects with those of partner agencies. Goal 3: Set a High Standard for Public Buildings. Ensure public facilities reflect the civic identity and long-term investment of the community. Objectives: ● Construct buildings using high-quality materials and timeless architectural design. ● Design public facilities with adequate space and capacity for future expansion. ● Prioritize siting public buildings in or near downtown Easton, except for small neighborhood-specific facilities. ● Advocate for Talbot County to also locate its public facilities near the Town Center.
Town of Easton
114
February 19, 2026
● Assess the need for a new or expanded Town Office to meet growing operational needs.
Town of Easton
115
February 19, 2026
8. PARKS "EVERYBODYNEEDSBEAUTYASWELLASBREAD,P LACESTOPLAYINANDPRAYIN,W HERENATUREMAYHEALANDGIVE STRENGTHTOBODYANDSOUL."
- JOHN MU IR A. PU RPOSE
One of the most critical components in maintaining and enhancing a community's quality of life is its system of parks, recreation, and open space. The careful location of parks and open space areas and preservation of the Town's natural resources as a complement to existing development can be a useful tool in guiding the Town's development into a logical, orderly and environmentally sensitive pattern. In addition to recreational and aesthetic benefits, open spaces provide a framework for various land uses. Properly located, they become boundaries and buffers between conflicting uses of land and a nucleus for building neighborhood areas. Natural features can be preserved as valuable scenic and environmental attributes of the Town. A park system and recreational program can also go a long way toward resolving the age-old problem of a community offering nothing for young people "to do." This chapter examines the current state of Easton's Parks and Recreation system and proposes methods by which it might be improved. It also calls for the advancement of a Town-wide system of “green infrastructure.” This refers to the parks and open space areas, as well as the paths and corridors that link these areas. It also proposes areas for new parks to be developed in the future as the Growth Area becomes developed.
RKS B. EXISTING PA The Municipal Growth Element analyzed the adequacy of the Town’s overall parks from an acres per capita perspective, based on a State-suggested ratio. It found that the current park system meets this standard and that we would continue to exceed the threshold throughout the buildout of the Growth Area by merely relying upon the open space requirements of the Town’s Subdivision Regulations. This chapter looks more closely at the state of Easton’s Parks and Recreation system overall and makes recommendations for improving and enhancing it so as to further sustain and improve the quality of life for Town residents and visitors.
Town of Easton
116
February 19, 2026
Easton’s park system has grown from 14 to 30 parks since 1997—more than doubling in number and expanding the footprint of public space from 236 to 458 acres. Table 8 represents an inventory of existing Town parks and open space areas. One of the most notable points is that there are a fairly large number of parks (30) in Easton. This is even more significant in that when this Table was originally created for the 1997 Plan, there were 14 entries on this Table. Clearly the expansion and development of our Park system has been a significant achievement over the last three decades. Such improvements include enhancements at Idlewild and Moton Parks, two Rail-Trail extensions, the addition of Easton Point Park, and the development of North Easton Park into a first class sports complex, to the degree that it has since hosted a number of State and Regional Championship Tournaments. More recently, even during the drafting of this Plan, the Town has opened its first Dog Park in Downtown (Brewers Lane), opened a new Skate Park/Pump Track at the North Easton Sports Complex, and acquired, Easton Woodland Park, a large (197 acres) tract of land dominated by mature forest that will preserve this land for passive recreation. Table 8: Easton Park Inventory TYPES AND AREAS
SIZE (ACRES)
OWNERSHIP FACILITIES
0.540
Town
rinking fountain D Benches
1.07
Town
Memorial Bricks
0.316
Town
enches B Fountain
197
Town
Planned trails and conservation area.
1.78
Town
Playground/Benches
1.9
Town
Playground/Pavilion
Passive Parks rain Station Park T 46 Pennsylvania Avenue Memorial Walk 100 W. Dover Street Thompson Park 30 W. Dover Street Easton Woodland Park eighborhood Parks N Hunters Mill Park 8633 Camac Street Ian “Mac” Morrell Park (Chapel East) 29452 Zinnia Court atthewstown Run Park M 29650 Aldan Street
4.11
Town
layground P Picnic Area and Table Baseball/Softball Field Open Space Little Free Library
S toney Ridge Park 29288 Corbin Parkway
19.8
Town
layground/Picnic Area P Open Space/Benches
olton Park G 29416 Golton Drive
0.791
Town
Playground
Town of Easton
117
February 19, 2026
Table 8: Easton Park Inventory TYPES AND AREAS
SIZE (ACRES)
OWNERSHIP FACILITIES
ulberry Station Park M 8764 Mulberry Drive
3.169
Town
layground P Open Space Benches
S pur Lane Park 8688 Spur Lane
0.783
Town
Open Space
aylands Park 29667 W Penny Lane
0.859
Town
layground P Picnic Area Benches
rettridge Park B 29593 Country Lane Way
2.76
Town
Open Space
ickers Park (Easton V Village)
8.839
Town
anoe/Kayak Launch C Bocce Ball Area Pavilion
Town
estrooms AED station R Softball Fields Track Picnic Area, Barbecue Grills & Tables Tennis Courts Basketball Court Football Field Playground Children’s Park Area Ornamental Fountain/Garden Areas Gazebo/Pavilion Little Free Library
Town
estrooms Track R Picnic Tables, Barbecue Grills & Pavilion Playground Basketball Court Soccer Field Volleyball Area Benches Little Free Library
Town
ayak launch K Boat Ramp and associated parking Drinking Fountains Benches
Community Parks
I dlewild Park 116 Idlewild Avenue
oton Park M 501 Port Street
12.0
12.2
aston Point Park E 672 W. Glenwood Avenue 13.021 801 Port Street
Town of Easton
118
February 19, 2026
Table 8: Easton Park Inventory TYPES AND AREAS
SIZE (ACRES)
OWNERSHIP FACILITIES
J ohn F. Ford Park 100 Plum Street
58.0
Town
Rails-To-Trails
.75 miles 2 (north/south) 0.90 miles (east/west)
Town
estrooms R AED station Playground Track Exercise Stations / Equipment Open Space Drinking Fountains Drinking fountains Walking/Bicycling Path Benches Frederick Douglass Mural
Special Areas estrooms AED stations R Concession stands (4) Baseball Fields Playgrounds (4) Football/Soccer/Lacrosse/Field Hockey Fields Field Lights Picnic Area Gazebo/Pavilion Batting Cages Bounce Back Wall Skate Park/Pump Track Restrooms Gated Small & Large Areas for off-leash play Drinking Fountains Benches
James Clark North A Easton Sports Complex 1078 N. Washington Street
26.2
Town
aston Dog Park E 109 Brewers Lane
0.507
Town
10.0
Quasi-Public
I ndoor Facilities* (9) Tennis Courts (6) Pickleball Courts Deck Tennis
Quasi-Public
I ndoor Facilities* (4) Indoor Tennis/Pickleball Courts (3) Outdoor Tennis Courts
2.8
County
Outdoor Swimming Pool
VFW
5.0
Quasi-Public
aseball Field* B Open Space Fields
The Elks
13.2
Quasi-Public
Athletic Fields*
Others MCA of the Chesapeake Y (Main Facility) MCA of the Chesapeake Y (Lynn Rich Tennis Center) George P. Murphy Swimming Pool
Town of Easton
119
February 19, 2026
Table 8: Easton Park Inventory TYPES AND AREAS
albot County T Community Center
SIZE (ACRES)
51
OWNERSHIP FACILITIES
County
I ndoor Facilities: Ice Rink Curling Rink Basketball Courts Pickleball Courts Volleyball Courts thletic Fields A Playgrounds Concession Area Pavillion
Easton Point Landing
0.50
County
oat Ramp B Pier Fishing/Crabbing
Mount Pleasant
6.46
County
pen Space O Fields
Easton Village Trail
.02 miles 1 (including pedestrian bridge to Easton Point)
Town
Walking Trail
S ource:Town of Easton Parks & Recreation Annual Plan, 2024 & Easton Comprehensive Development Plan, 2010. Multiple entities are responsible in some way for Easton’s overall Park System. The Planning and Zoning Commission obtains land for parks through the subdivision process as one of the requirements for subdivision is the provision of 1,200 square feet of parkland per dwelling unit. The Commission also is involved in the specifics of where the parks should be located, how many there should be, etc… for a subdivision during the review process. Once the land is obtained, it becomes the responsibility of the Easton Park Advisory Board to recommend how that parkland should be improved. This group operates with the assistance of a full-time Parks and Recreation Director who also is responsible for Easton’s parks and recreation plans, programs and activities. The ongoing maintenance of Town parks is the responsibility of the Department of Public Works, providing trash pick-up, grass cutting, landscaping, and installation and maintenance of equipment, furniture, etc. With a growing system of parks, this area of responsibility grows proportionally as well.
Town of Easton
120
February 19, 2026
The Mayor and Town Council have the important role of prioritizing the development of the Town’s park system, primarily through the budget process. They determine which improvements are implemented (and when) and occasionally also approve funds for the acquisition of park land. These tend to be the larger, regional-scale parks as opposed to the smaller neighborhood parks that are more customarily obtained by the Planning and Zoning Commission through the subdivision process. Finally, Town of Easton, Talbot County Parks and Recreation, along with other towns and entities in the County, work collaboratively on issues of mutual interest and concern. This includes coordinating programs, activities and events; and, formulating plans and policies for public recreation and for the acquisition and preservation of land for public recreation and open space. Easton participates day-to-day via its partnership and ongoing communications with the County Parks and Recreation Director. In addition, a member of the Easton Parks Advisory Board represents Easton on the Talbot County Parks Advisory Board and provides direct linkage between the Town and County as it relates to parks and recreation. C. FUTURE PA RKS
One area in which it is crucial for the Planning Commission and Park Board to work together is the planning for future park sites. The Park Board is more acutely aware of specific demands and needs in terms of our overall park system. By being aware of such needs, the Planning Commission can be proactive in addressing them through the park dedication requirements of the Subdivision process. Furthermore, special needs (e.g., a new regional-scale park) can be considered by both the Planning Commission and Town Council during the review of discretionary approvals, such as Planned Unit Developments and Annexations. Previous iterations of The Comprehensive Plan have made a number of recommendations regarding future parks, many of which have come to fruition. Such parks included the original Rail-Trail, the expanded Rail-Trail, the development of the John F. Ford Park, and a Waterfront Park on Easton Point. Key priorities over the course of this 2026 Plan’s time span include the following: ● Build-out Easton Woodland Park, including a multi-modal accessway, parking area, conservation area, trails, and restrooms.
Town of Easton
121
February 19, 2026
● Continue build-out of Easton Point Park as described in the Port Street Small Area Plan. Additional amenities to include: a new boat ramp, living shoreline, boardwalk/promenade, and parking area. ● Perpetual upgrades to existing Town parks (i.e., programs, grounds, and amenities) to enhance user experiences and increase utilization rates. ● Extension of the rail trail through Moton Park, across Rt. 322 (Easton Parkway) at Glenwood Ave., and connecting to the bridge over the Tred Avon River at Easton Point Park and Easton Village. ● Seek funding for the extension of the rail trail crossing Route 50 to the east side of Town in the vicinity of Chesapeake Ave. {It is hoped that future rail trail extensions will eventually connect to a wider-scale County-initiated Trail System.} ● Consider creating an active community-sized park on the east side of Route 50. Explore the possibilities of requiring future developers to build or fund such a park. ● Seek funding and location for construction of a new indoor sports facility. A project of this scope and scale will likely require a location that is along or easily accessible to a major transportation corridor. Possibilities include a portion of the John F. Ford Park and/or the adjoining property to the east, or (depending on the interest of Talbot County) the Talbot Community Center site or the property the County purchased in 2024, formerly known as the Poplar Hill Farm. The following suggestions from previous Plans have not been achieved but are still relevant today: ● The Town should work with the State of Maryland to promote and help ensure the preservation of Seth Forest. The Town should also ask the State to consider the possibility of making this property more usable by enhancing forest trails. ● (Not depicted on Future Land Use Map) In the long-range planning period (i.e. Year 2035) a new Community Park, on the scale of Idlewild or Moton, should be considered on the eastern side of Town, east of U.S. Route 50. This is the portion of Town anticipated to accommodate the majority of future growth and as such, a community park may be warranted. Furthermore, this area may not necessarily be provided by any one development. As an alternative, the area for the park might be pieced together by adjoining subdivisions (i.e., Hunter’s Mill Playground and Gannon Range open space). Such a park
Town of Easton
122
February 19, 2026
should be a consideration during the review of any development proposals on the east side of Town. As pointed out in the Municipal Growth Element of this Plan, State guidelines for parkland indicate that the park needs of the existing Town population are above State guidelines and that the land needed to satisfy the needs of the potential future population of the Town should be met via the subdivision process. In addition, more recreational land lies immediately adjacent to the current Town boundaries at the previously mentioned Seth Forest and a public golf course (Hog Neck). These two areas represent an additional 121 acres at the Seth Demonstration Forest and 265 acres at Hog Neck Golf Course. D. CONNECTIVITYAND GR EEN INFRASTRUCTURE
The concept of green infrastructure was first introduced to the Easton Comprehensive Plan in 2004 when the term was still relatively new in the field of planning. It refers to the system of parks and open spaces in a community, as well as the linkages or connections between these areas. A community’s green infrastructure is important because just as the more commonly known infrastructure (i.e. roads, water, sewer, etc…) is essential to support a community’s physical development, so too a community’s green infrastructure supports its ecological functions. It also is important for making communities more livable. The Conservation Fund defines green infrastructure as “the Nation's natural life support system - a strategically planned and managed network of wilderness, parks, greenways, conservation easements, and working lands with conservation value that supports native species, maintains natural ecological processes, sustains air and water resources, and contributes to the health and quality of life for America's communities and people.” There are numerous benefits provided by a system of green infrastructure. These include both ecological and economic benefits. From an ecological perspective the benefits include: ● Ensuring plant and animal biodiversity. o Creating pathways to allow for interchange between native plant and animal communities. o Maintaining the health of native ecosystems and landscapes by sustaining their physical, chemical, and biological processes.
Town of Easton
123
February 19, 2026
● Filtering pollutants from air, water, and soil. o Helping to cool streams and soil through shading. o Buffering developed areas from floodwaters. The economic benefits include: ● Increasing property values as homes located near parks and greenways sell for more than those that are not. ● Raising the community’s quality of life. o Communities that have planned systems of open space, including greenways, parks and trails, generally develop the reputation of being desirable places to live. o Seattle, Washington, Boulder, Colorado, Portland, Oregon and Raleigh North Carolina are examples of such places. ● Attracting businesses. o The communities cited above, not coincidentally, also have had great success in attracting new businesses as oftentimes a community's quality of life is a key factor for businesses when deciding where to relocate or open a new business. o Increasing tourism and tourism-based businesses. ● Attracting environmentally sensitive development and developers specializing in that niche. Given these benefits, as well as the existing skeletal system of green infrastructure, it seems like a “no-brainer” for Easton to develop a more formal and planned green infrastructure system. Such a system will also further sustainability goals discussed in more detail in the Sustainability chapter of this Plan. Elements of this Green Infrastructure system are discussed in the Economic Development Chapter of this Plan where the AKRF Plan for the redevelopment of Downtown Easton is described. Two of the more significant projects proposed in that plan involve the day-lighting of Tanyard Branch and the development of a “green ring” of heavily treed streets and open spaces around downtown.
Town of Easton
124
February 19, 2026
E. GO ALSAND OB JECTIVES
Goal #1: Meet the park and recreational demands of all of Easton’s citizens. Objectives: ● Continue to study and monitor the demand for various park and recreation uses (above and beyond National Standards, which the Town largely meets). ● Coordinate the work of the Planning and Zoning Commission, Park and Recreation Advisory Board, and Town Council in acquiring and planning parks. ● Coordinate park planning, programs, and activities with Talbot County Parks and Recreation and other local organizations (i.e., schools and YMCA) to prevent duplication of amenities/services, pool resources and ensure that between the various entities, all of Easton’s recreational needs are satisfied. ● Seek funding to finish the design and buildout of an eastward expansion of the Rail-Trail in the right-of-way for Chesapeake Avenue, including a grade-separated bicycle/pedestrian crossing of Route 50, and require future developers of land bordering Chesapeake Avenue to build (or fund) a Rail-Trail in right-of-way. ● Seek funding opportunities to continually build-out and upgrade various Town parks, particularly Easton Woodland Park and Easton Point Park. ● Seek funding opportunities to locate and build an indoor sports facility. ● Revise the Town’s Subdivision Regulations to better define what does and does not count as meeting parks and/or open space requirements associated with conventional subdivisions. Goal #2: Provide a system of green infrastructure (see Future Land Use Map). Objectives: ● Identify appropriate open space areas to serve as green centers or anchors and connect them through a series of pathways and green corridors. ● Plan future parks, open spaces and corridors in a manner that compliments and helps to build a green infrastructure system. ● Encourage green space connectivity and access.
Town of Easton
125
February 19, 2026
9.ECOLOGY TH EMORECLEARLYWECANFOCUSOURATTENTIONONTHEWONDERSANDREALITIESOFTHEUNIVERSEABOUTUS,THELESS TASTEWESHALLHAVEFORDESTRUCTION.
- RA CHEL CARSON A. PU RPOSE
The Ecology Element integrates water resources, mineral resources, and biodiversity considerations into Easton’s Comprehensive Plan. This section fulfills state requirements under HB 1141, which added the Municipal Growth and Water Resources Elements to comprehensive plans, ensuring the Town has adequate water supply, wastewater capacity, and stormwater management to meet current and projected needs. B. WATER RE SOURCES
House Bill 1141 (HB 1141), first implemented with Easton’s 2010 Comprehensive Plan, introduced two new required plan elements: the Municipal Growth Element and the Water Resources Element. This chapter addresses the latter, which ensures that Easton can meet projected population needs with adequate water supply, wastewater capacity, and stormwater management—while protecting the capacity of local waterways to assimilate stormwater from both point and non-point sources. As noted in the Municipal Growth Element, three required elements—Municipal Growth, Water Resources, and Community Facilities and Services—address water, sewer, and stormwater issues, with related considerations also appearing in the Land Use Element. While some overlap is inevitable, the Water Resources Element is more narrowly focused on three core questions: 1. Is there sufficient water supply to meet current and future needs? 2. Is there sufficient wastewater and septic capacity to meet current and future needs? 3. What impacts, if any, will meeting these needs have on water resources? Although this analysis parallels that in the Municipal Growth Element, the Water Resources Element provides more detailed evaluation specific to water, wastewater, and stormwater systems.
Town of Easton
126
February 19, 2026
T own Service Policy A longstanding policy governs Easton’s approach: municipal water and wastewater services are not extended beyond Town boundaries. Developers seeking these services must annex into the Town, and all development within Town limits is required to connect to the municipal system. As a result, private wells and septic systems are rare inside Town boundaries. Two exceptions exist: 1. Ratcliffe Farm Subdivision – A 15-lot, large-lot waterfront subdivision permitted to use private wells and septic systems. 2. Existing Annexed Properties – Fewer than a dozen homes annexed into Town while served by private wells and septic systems; these may remain as such until a connection to municipal service becomes necessary. Because service areas align almost exactly with Town boundaries, this Plan does not include a separate water and wastewater service area map. The only current exceptions to the policy of not serving properties beyond Town limits are: ● The North and South Clifton subdivision (off Route 50) ● One property on St. Michael’s Road that receives municipal water but not wastewater service. ater Supply and System W As described in the Community Facilities and Services Chapter, Public water service in Easton is provided by the Easton Utilities Commission (EUC), a public utility organized and existing under the Charter of the Town of Easton. Since 1914, EUC has supplied clean, reliable drinking water to residents, operating under rigorous monitoring and quality control by certified staff. EUC currently serves over 7,000 customers through 122 miles of water mains and 788 fire hydrants. Water is drawn from five deep wells—three tapping the Magothy Aquifer (1,000 feet) and two tapping the Upper Patapsco Aquifer (1,200 feet) that feed a modern treatment facility on Glebe Road. The system’s two elevated storage tanks each hold 1 million gallons, providing fire protection, consistent pressure, and sufficient reserve for future needs. The Municipal Growth Element projects a system expansion—adding a new production well—around 2043 to meet a maximum daily demand exceeding 4.0 MGD. Given the Town’s
Town of Easton
127
February 19, 2026
build-out is expected beyond 2040, only modest upgrades should be needed thereafter, with ample time for planning and funding. astewater Service and Capacity W Wastewater treatment for the Town is provided by the Easton Utilities Commission (EUC) at the municipal wastewater treatment plant (WWTP). The plant operates under a Maryland Department of the Environment (MDE) discharge permit and is designed to meet Enhanced Nutrient Removal (ENR) standards, significantly reducing nitrogen and phosphorus levels before effluent is discharged to local waterways. The wastewater system includes a 4.0 MGD Enhanced Nutrient Removal facility completed in 2007. Current use is2.3663 MGD (59% capacity). At projected1.75% annual growth, capacity will be reached in 2055, or 2051 (four years sooner) with the planned regional hospital fully operational by 2035 (5% of capacity). Capacity expansion planning will begin once flows exceed 3.20 MGD (anticipated in 2031). Since this is modestly higher growth rate than this Plan anticipates, it should be even longer before these various thresholds are realized. Current Capacity: ● Design Capacity: 4.0 million gallons per day (MGD) ● Current Average Flow: Approximately 2.4 MGD (59% of permitted capacity) Future Capacity Planning: The Municipal Growth Element projects that Easton’s build-out will occur beyond 2040. Given current flow levels and the planned improvements to plant efficiency, no major capacity expansions are anticipated in the near term. However, long-term planning includes: ● Evaluating potential upgrades to accommodate higher peak flows. ● Exploring advanced treatment technologies to further reduce nutrient discharges. ● Coordinating with MDE to ensure discharge limits remain protective of downstream water quality.
Town of Easton
128
February 19, 2026
Septic System Policy: As noted earlier, Easton maintains a strict policy prohibiting private septic systems within the Town except for a small number of grandfathered properties. This policy ensures wastewater is treated at the municipal WWTP, where nutrient removal can be managed and monitored. C. WATER SOURCE PR OTECTION
One required component of the Water Resources Element is to assess current and future water sources and outline strategies to prevent pollution or over-allocation. For Easton, this is challenging because: ● Water sources lie outside Town jurisdiction. ● Aquifers are shared regionally with other high-demand users. Talbot County’s Draft Water Resource Element summarizes the issue: ● Aquifer Dependence and Stress: Most public and private systems draw from confined aquifers (notably the Aquia and Piney Point) used widely across the Eastern Shore. USGS reports water-level declines of tens to hundreds of feet, raising concerns about long-term supply. ● Recharge Limitations: Many aquifer recharge zones lie outside the Eastern Shore, limiting local replenishment. ● Surface–Groundwater Connection: Large withdrawals can reduce base flows in streams and rivers, affecting both water quantity and quality. ● Data Gaps: There is no comprehensive regional analysis of cumulative groundwater demand. Project-level studies fail to capture broader impacts. ● Coastal Plain Study: MDE, MGS, and USGS are working on a Coastal Plain Aquifer Study to better assess supply and sustainability. Until completed, accurate yield estimates remain elusive. lanning Assumptions P In the absence of definitive aquifer capacity studies, this Plan assumes the MDE-issued groundwater permit for EUC represents the maximum safe yield of the system. This approach ensures that
Town of Easton
129
February 19, 2026
permitted withdrawal limits are treated as the threshold for sustainable water use until better regional data is available. D. STORMWATER MA NAGEMENTAND PO INTAND NO NPOINT SOURCE LO ADING STATUSAND
RE MEDIATION The Town’s stormwater management program is designed to meet the requirements of Maryland’s Stormwater Management Act of 2007 and to comply with the State’s National Pollutant Discharge Elimination System (NPDES) permit requirements. These regulations emphasize Environmental Site Design (ESD) practices, which reduce runoff by mimicking natural hydrology. Key strategies include: ● Installing bioretention cells, rain gardens, and permeable pavement. ● Preserving and restoring natural drainage features and non-tidal wetlands. ● Requiring new developments to meet stricter post-construction stormwater quality and quantity standards. ● Encouraging retrofits in older developed areas to reduce nutrient and sediment loads. Recent and proposed projects include a regional sediment pond, inlet filter bags, constructed wetlands, and BMP retrofits. Easton applies Chesapeake Bay Critical Area pollutant reduction standards Town-wide, targeting both new development and redevelopment to reduce nutrient loads. Future development in Easton’s growth areas will be required to integrate ESD techniques early in site planning, ensuring stormwater is managed at the source. Easton’s Stormwater Management Ordinance regulates runoff to reduce flooding, erosion, and water quality impacts. New development and most redevelopment must implement stormwater controls per the State Design Manual. Special standards apply in the Tanyard Branch watershed, which drains to impaired waters in the Choptank River system. Easton's Stormwater Management Ordinance was created to protect public health, safety, and welfare by establishing requirements and procedures to manage the negative impacts of increased stormwater runoff. The goal is to: ● Minimize damage to public and private property ● Reduce the environmental effects of development ● Control stream channel erosion
Town of Easton
130
February 19, 2026
● Reduce local flooding ● Maintain pre-development runoff conditions as closely as possible after development These measures aim to safeguard the community and environment by managing stormwater runoff effectively. The Stormwater Management Ordinance is summarized below: Scope o land development for residential, commercial, industrial, or institutional purposes is N allowed without implementing stormwater management measures to control runoff. These measures must align with the Design Manual and be constructed according to an approved plan for new developments or redevelopment policies. Exemptions The following activities are exempt from stormwater management requirements: ● Agricultural land management activities ● Additions or modifications to existing single-family homes (under certain conditions) ● Developments disturbing less than 5,000 square feet ● Land developments regulated by specific state laws ● The Town Engineer may require stormwater controls in cases of cumulative effects
from previous exemptions. Waivers / Watershed Management Plans Stormwater management waivers may be granted under certain conditions: ● For projects in areas with developed watershed management plans ● For projects with direct discharges to tidal waters that do not increase stormwater
discharge by over 10% for 2-year and 10-year storms ● If stormwater will be handled by an existing regional facility designed for such loads
ualitative control waivers apply to in-fill development or redevelopment where stormwater Q management is not feasible, or under specific site conditions. Redevelopment edevelopment projects are exempt from certain volume requirements if they do not increase R stormwater discharge. However, they must reduce site impervious areas by at least 20%, or implement stormwater practices to manage that area. If reducing impervious areas is not possible, off-site BMPs or other alternatives may be considered.
Town of Easton
131
February 19, 2026
Variance variance from stormwater management requirements may be granted by the Town Engineer A in cases of exceptional circumstances, where strict adherence would result in unnecessary hardship. The full ordinance can be accessed here: https://eastonmd.gov/DocumentCenter/View/86/Stormwater-Management-Ordinance-PDF The State’s updated Stormwater Management Design Manual will require Easton to amend its Stormwater Management Ordinance, with significant changes likely to focus on the waiver provisions. Stormwater in Easton contributes both point and non-point source loads to local waterways. The Town’s system collects, filters, and conveys runoff to the wastewater treatment plant (WWTP) on the Choptank River. Runoff that bypasses the system flows into the Choptank or Miles River watersheds—Easton lies within three 8-digit watersheds: Miles, Upper Choptank, and Lower Choptank. All are nutrient-impaired per the Maryland Department of the Environment (MDE), with the Lower Choptank having an established Total Maximum Daily Load (TMDL) limit. Although no TMDL implementation plan currently applies directly to Easton, the Town enforces the Chesapeake Bay Critical Area’s 10% pollutant reduction standard townwide. This ensures that new development improves water quality relative to pre-existing conditions, though older developed areas remain problem zones. Much of the older development drains into Tanyard Branch, a tributary of the Tred Avon River, via storm drains installed around 1905. T anyard Branch Focus Area A large portion of Easton drains into Tanyard Branch, making it a priority for enhanced stormwater management: ● Development in the basin must limit post-development runoff rates to pre-development rates for both 2-year and 10-year storm events. ● Alternatively, developers may fund or construct equivalent watershed improvements. ● Waivers are granted only if impacts are negligible, as determined by the Town Engineer.
Town of Easton
132
February 19, 2026
The Town, in partnership with Talbot County, is implementing several grant-funded projects along Tanyard Branch, including: ● A regional sediment pond and inlet filter bags to capture litter. ● A constructed wetland at Easton Utilities’ administration site. ● A replacement conveyance system with sediment removal devices and subsurface BMPs, aligned with the Rails-to-Trails network. astewater Treatment Plant (WWTP) Capacity W Talbot County’s Water Resources Element projects that Easton’s WWTP has sufficient nitrogen and phosphorus discharge capacity to support growth through 2030 and beyond. Projections (assuming 1% annual growth) indicate available capacity in 2030 of: ● Nitrogen (TN): 21,314 lbs/year ● Phosphorus (TP): 913 lbs/year F ertilizer and Nutrient Sources While agriculture within Town limits is minimal, farmland in the Future Growth Area is a potential nutrient source. Upon annexation and development, nutrient loads from farming are expected to decrease. However, lawn fertilizers in developed areas—both existing neighborhoods and future subdivisions—remain a concern. Maryland now requires retail sale of only non-phosphorus lawn fertilizers, which should help mitigate impacts. utrient Loading Scenarios N The Maryland Department of the Environment (MDE) Nutrient Loading Spreadsheet was used to model three future growth scenarios: Scenario uild-Out / 3% B Growth Scenario 2 Scenario 3
rowth Rate & G Horizon 30 years % growth / 30 1 years 1% growth / 30 years
evelopment D Pattern High greenfield conversion 75% infill, 25% greenfield 50% infill, 50% greenfield
Notes epresents maximum R foreseeable growth Planning Commission’s preferred pattern More greenfield development than Scenario 2
Results show that higher infill development reduces nutrient loading, while higher greenfield shares increase agricultural conversion impacts.
Town of Easton
133
February 19, 2026
Stormwater runoff is a major nonpoint source of nutrient and sediment pollution. In Easton, impervious surfaces such as roads, parking lots, and rooftops prevent water from soaking into the ground, increasing runoff volume and pollutant transport to local streams and rivers. Nutrient Loading Analysis Nutrient loading analysis evaluates the impact of projected land use changes on nitrogen and phosphorus levels in Easton’s waterways. Using land use, septic, and best management practice (BMP) scenarios, the Town assessed potential nutrient contributions from both nonpoint sources (NPS), such as stormwater runoff and agriculture, and point sources (PS), such as wastewater treatment facilities. The table below summarizes the modeled nitrogen and phosphorus loads, as well as impervious cover, for each scenario. The baseline (2007 LU, 2007 BMPs) reflects existing conditions at the start of the study period, while the remaining scenarios represent alternative build-out and management strategies. Scenario
T otal Nitrogen Load (lbs/yr) 2007 LU, 2007 BMPs 102010 2007 LU, Trib Strat BMPs 102010 Scenario 1 (3% Growth) 109158 Scenario 2 (1% Growth: 97205 75% Infill, 25% Greenfield) Scenario 3 (1% Growth: 96852 50% Infill, 50% Greenfield)
T otal Phosphorus Load (lbs/yr) 9353 9353 10015 9531
I mpervious Cover (acres) 0 1865 3497 2449
9521
2485
Key Findings ● Nitrogen Loads: o Scenario 1, with full build-out and targeted BMPs, results in the highest total nitrogen load, exceeding baseline levels. Scenarios 2 and 3, which assume more balanced growth and mitigation, show slightly lower total nitrogen loads.
Town of Easton
134
February 19, 2026
● Phosphorus Loads: o Variations between scenarios are relatively small, with only modest reductions achieved through BMPs. ● Impervious Cover: o Scenarios with higher-density development produce more impervious cover, influencing stormwater runoff volumes and pollutant transport. The results emphasize that growth patterns and BMP implementation both directly affect nutrient loads. Compact development combined with effective stormwater management and agricultural BMPs can help limit nutrient increases. E . CRITICAL AREAS
he Town of Easton does not have a significant amount of waterfront within our corporate limits. T Furthermore, in recognition of the environmental benefits as well as to comply with regulations, the Town now prohibits the establishment of private lots within the Critical Area Buffer. Such areas must be a separate lot maintained in Town ownership or controlled by a conservation-minded not-for-profit organization. he State of Maryland and local governments restrict development within the Critical Area, T primarily through enhanced stormwater management and nutrient reduction requirements. Development in the Critical Area is not strictly prohibited, but is allowed on a limited basis depending on the development intensity of the site. The vast majority of Critical Area lands are classified as Resource Conservation Areas and are permitted to develop at a residential density of 1 dwelling unit per 20 acres. More intense development is possible in Limited Development Areas or Intensely Developed areas. Additionally, Critical Area regulations provide a mechanism for properties to be reclassified, either from RCA to LDA or IDA or from LDA to IDA, via a process known as Growth Allocation. hen the Critical Area law was enacted, each affected jurisdiction received an amount (or “pot”) of W Growth Allocation available to them based on the amount of shoreline within the jurisdiction. Since Easton had an even smaller amount of waterfrontage at that time, we received a relatively modest amount of Growth Allocation and it has essentially been used, largely due to having to use much of it to accommodate the Easton Club Development after originally been told that its development was "grandfathered" and thus not cost us acreage from our available growth allocation. s a result, today Easton must rely on Talbot County granting Growth Allocation to Easton from its A overall pot in order to approve a project that is essentially at a density of greater than 1 unit per 20 acres (or is a non-residential or mixed-use project). This presents something of a conundrum whereby on the one hand, Easton has utilized all of its growth allocation and must depend on the
Town of Easton
135
February 19, 2026
l argesse of Talbot County in order for development projects to advance. On the other hand, Talbot County has an abundance of Growth Allocation and from a sustainability and environmental perspective, the application of growth allocation ought to occur within municipalities, on state-of-the-art wastewater treatment systems and where the Buffer is protected to a larger degree than regulations require by not being permitted on private property. F. MINERAL RE SOURCES
Eastern portions of Easton and future growth areas overlay sand and gravel deposits. Extraction is not appropriate in developed areas but may be considered in undeveloped growth areas as an initial site preparation step. Continuous operations are discouraged. Developers must maintain adequate topsoil on building lots to support landscaping and avoid post-construction soil degradation. This element serves three purposes: ● Identify undeveloped land that should remain in reserve for potential mineral extraction. ● Recommend appropriate uses for such land after extraction. ● Establish policies and regulations that balance mineral extraction with other land uses and prevent its preemption where feasible. Historically, Easton’s Comprehensive Plans have given little attention to mineral resources. The 1989 Plan noted that surface mining does not occur in Town and claimed no potential resources exist—a statement now known to be only partially true. Mapping in the 2005 Talbot County Comprehensive Plan (Map 8-1) identifies sand and gravel–bearing units across much of eastern Talbot County. The western edge of this deposit zone runs through Easton, meaning roughly one-third to one-half of the Town—and all eastern future growth areas—lie over potential sand and gravel reserves. While extraction will not be allowed in already developed areas, it may be appropriate in undeveloped growth areas within or adjacent to Town. Where feasible, sand and gravel should be removed early in the development process, prior to construction, to make efficient use of resources. However, ongoing extraction operations are incompatible with the Town’s land use goals and will not be permitted. A related concern is the stripping and sale of topsoil prior to development. Without replacement, new property owners inherit compacted, poor-quality soil unsuitable for lawns, gardens, or landscaping. To prevent this, developers must finish lots with sufficient topsoil depth to support
Town of Easton
136
February 19, 2026
healthy vegetation. If replacement proves too costly, the intent is to discourage its removal in the first place. G. BIODIVERSITY
Easton is located on the Delmarva Peninsula, an expansive coastal plain region situated between two large estuaries and the Atlantic Ocean. Despite its proximity to several large metropolitan areas, this unique geography and a rich tradition of land preservation have made Delmarva’s mix of upland and wetland ecosystems a critical stronghold for the Mid-Atlantic’s native and migratory species. Though much of the work to be done in conserving the region’s biodiversity lies in protecting and restoring habitats outside of developed areas around regional wildlife hubs and corridors, municipalities also have a role to play in promoting beneficial species and mitigating human impacts to wildlife that do not recognize political boundaries. Vegetation is a crucial component of habitat viability, with native plants providing both shelter and forage for species in town. Unfortunately, Easton’s native species have been underserved by exotic ornamental landscaping typically provided with suburban development, such as the invasive Bradford pear. Modern standards for landscaping have effectively changed this trend with new developments, though ongoing efforts will be needed to replace dying and nuisance street trees with beneficial native varieties. Quality habitat should be considered not only on a site-by-site basis, but as a holistic network of green infrastructure to allow safe passage of sensitive species throughout the town. Forest conservation regulations protect substantial forest tracts needed by Delmarva Fox Squirrel and Forest Interior Dwelling Species of birds. In conjunction with vegetative buffers along water bodies, they provide the basis for municipal-scale hubs and corridors. By thoughtfully designing our open spaces, buffer yard landscaping, and trail corridors to minimize gaps between habitats similar to pedestrian crossings, Easton can build a robust network of wildlife mobility. Because wildlife are not confined to the natural areas of the town, though, the built environment should similarly consider its impacts. Both native and migratory birds are particularly sensitive to two mainstays of municipal development: glass and light. Light pollution disorients birds, and their inability to see standard glass windows leads to deadly flight collisions. Frequent testimony from citizens at hearings for site plan and architecture review echo this concern. To this end, we recognize the need for updated architectural and lighting standards to protect birds. Notably, glass
Town of Easton
137
February 19, 2026
should be treated with etchings or glazings that are safely visible mid-flight, and outdoor lighting should be shielded, downward-facing, and low-intensity. The built environment should also be limited and designed with respect to identified populations of sensitive species in the area. Easton is home to colonies of roof-nesting Least Terns, with zones around identified locations such as Easton High School, the US Post Office Sorting Center, and Giant supermarket subject to development and maintenance restrictions in accordance with state guidelines. Further, two historic waterfowl concentration areas can be found at Papermill Pond and a portion of Peachblossom Creek; developments in proximity to these areas should provide substantial buffers for both resident and migratory species. H. GO ALSAND OB JECTIVES
Goal #1: Protect and Sustain Easton’s Water Resources. Objectives: ● Maintain a reliable, high-quality public water supply to meet current and future needs. ● Coordinate with Easton Utilities, MDE, and regional partners to safeguard aquifers from contamination and over-allocation. ● Limit water and wastewater service to properties within Town boundaries, requiring annexation for new connections. ● Ensure all development connects to the municipal system; phase out private wells and septic systems as feasible. Goal #2: Ensure Adequate Wastewater Treatment Capacity. Objectives: ● Maintain treatment plant performance to meet nutrient discharge limits and accommodate projected growth. ● Implement infrastructure upgrades in line with long-term capacity needs identified in the Water Resources and Municipal Growth Elements. ● Support measures that reduce nutrient loads from septic systems within current and future growth areas.
Town of Easton
138
February 19, 2026
Goal #3: Manage Stormwater to Protect Water Quality. Objectives: ● Enforce updated stormwater management standards consistent with the State’s Design Manual. ● Apply enhanced stormwater requirements in sensitive basins, especially Tanyard Branch. ● Reduce point and nonpoint source pollutant loads through BMPs, retrofits, and grant-funded improvements. ● Promote natural filtration and green infrastructure in public projects and private development. Goal #4: Protect and Wisely Use Mineral Resources. Objectives: ● Identify and safeguard potential sand and gravel deposits in future growth areas for possible extraction prior to development. ● Prohibit ongoing extraction operations in developed areas or where incompatible with surrounding uses. ● Require developers to maintain or restore topsoil depth to support healthy landscaping and prevent long-term soil degradation. Goal #5: Reduce Nutrient Loading to Local Watersheds. Objectives: ● Implement land use strategies that reduce nitrogen and phosphorus runoff from development and agriculture. ● Prioritize infill and redevelopment to minimize conversion of farmland and forest. ● Support public education on responsible fertilizer use and promote non-phosphorus lawn products. ● Coordinate with County and State agencies to track and meet TMDL and Chesapeake Bay pollutant reduction goals.
Town of Easton
139
February 19, 2026
Goal #6: Protect and enhance Easton’s biodiversity by conserving habitats, promoting native species, and reducing human impacts on wildlife. Objectives: ● Preserve and restore key habitats, especially forest tracts, wetlands, and wildlife corridors. ● Prioritize native vegetation in landscaping and replace invasive or nuisance species with beneficial varieties. ● Design open spaces, buffers, and trails to create continuous networks for wildlife movement. ● Implement bird-safe building and lighting standards to reduce collisions and light pollution. ● Limit and carefully design development near sensitive species habitats, including Least Tern colonies and historic waterfowl areas, with appropriate buffers and restrictions. ● Develop an Urban Forestry Plan to expand the Town’s tree canopy.
Town of Easton
140
February 19, 2026
10 SUSTAINABILITY "SUSTAINABILITYISAJOURNEY,N OTADESTINATION. WEMUSTCONSTANTLYSTRIVETODOBETTER,T OBEBETTER STEWARDSOFTHEEARTHANDALLITSINHABITANTS"
— UNKNOWN A. PU RPOSE
Sustainable development has been defined as development that meets the needs of the present without compromising the ability of future generations to meet their own needs. The American Society of Landscape Architects makes the following points about sustainable (urban) development: Urban development should be guided by a sustainable planning and management vision that promotes interconnected green space, a multi-modal transportation system, and mixed-use development. Diverse public and private partnerships should be used to create sustainable and livable communities that protect historic, cultural, and environmental resources. In addition, policymakers, regulators and developers should support sustainable site planning and construction techniques that reduce pollution and create a balance between built and natural systems. New sustainable urban developments or re-developments should provide a variety of commercial, institutional, educational uses as well as housing styles, sizes and prices. The provision of sidewalks, trails, and private streets, connected to transit stops and an interconnected street network within these mixed-use developments provides mobility options and helps reduce pollution by reducing vehicle trips. Walking, bicycling, and other mobility options should be encouraged throughout the urban mixed-use core and mixed-use neighborhoods with easily accessed and well-defined centers and edges. Fortunately the itemized list of characteristics or outcomes of sustainable urban development in the description above are all perfectly consistent with the Vision of the future Easton that this Plan contemplates. Furthermore, while the idea of tackling global climate change may seem daunting, if not impossible, the actions described above are do-able. In fact, in Easton we have been moving in
Town of Easton
141
February 19, 2026
such a direction for the past several decades. This merely presents one more reason to continue to pursue such a vision. The Brundtland Commission of the United Nations (1987) published the report, “Our Common Future” and defined sustainable development, as repeated in the intro to this chapter, as “development that meets the needs of the present without compromising the ability of future generations to meet their own needs.” Since then, the definition of sustainability has expanded to include balance and coordination among the “Three E’s” of environment, economy, and equity as well as development that minimizes the negative impact on the environment and other systems. Many issues or aspects of sustainability are far beyond the scope of the Town of Easton to address. Actions needed to address climate change, for example, have been subject to International Treaties and will require global support and cooperation in order to make meaningful progress. However, there are actions that Easton can take to anticipate and accommodate the effects of climate change and there are a number of other issues besides climate change that determine just how sustainable our future community will be. During the Public Input phase of this Plan Update, the scope of possible sustainability issues was evident from the feedback we received. In particular, one exercise invited citizens to “use sticky dots to indicate which of the following issues/items are important to you and should be addressed in the Town’s updated Comprehensive Plan under the heading of Climate Change and Sustainability.” Table 13 below summarizes the responses from this exercise. TABLE 13 SUPPORT FOR SUSTAINABILITY ISSUES TO BE ADDRESSED IN THIS PLAN Issue
of Dots Placed in # Support of Addressing the Issue
ir Temperature that is projected to rise by 2.5 A degrees above normal average by 2050 (NOAA data)
12
llowing for more live/work or mixed-use units A in Town
25
llowing small farms in town for local food A production
21
Bicycle safety, e.g., bike lanes and trails
30
Clean Rivers and Streams
37
Town of Easton
142
Comments
February 19, 2026
onnecting new neighborhoods to existing C neighborhoods to improve walkability
21
onverting the Town’s vehicle fleet to Low C Emission Vehicles
23
Electric Vehicle charging station availability
23
ood stores that are walkable for in-town F residents
40
aintenance of town amenities, like parks, M street trees, public bathrooms, etc.
29
edestrian safety, e.g., sidewalks and road P crossings
29
recipitation (annual rain volume) that has been P above average for the last 26 years and is continuing to rise, with storms increasing in volume and severity
22
Public Access to waterfront for a variety of uses
37
aising the tax rate to increase funding for R public education
21
elative sea level rise that is projected to be R between 1 and 2 feet by 2050 (NOAA data)
23
Safer access across Route 50
27
treet trees for cooling, shade, water retention, S and beautification
40
I ncentives for Green Building and Solar/Renewable Energy
24
Item written in by citizen
Services during extreme events
7
Item written in by citizen
Composting option
16
Item written in by citizen
olar Panels over big parking lots and big S 11 rooftops of commercial and residential buildings
Item written in by citizen
Community Garden
1
Item written in by citizen
Renewable Energy Sources for Easton Power
16
Item written in by citizen
More pollinator-friendly solar
2
Item written in by citizen
Town of Easton
commenter added: “Reason to keep A waterfront as a public park and not build housing and boat ramps for the wealthy.”
ommenter added, “Please think of ;less C advantaged people.” Should be noted that school funding is a County, not Town, responsibility.
143
February 19, 2026
The range of responses and level of concurrence with many of the options as expressed via this exercise was impressive and suggests there may well be community support for a more sustainable future Easton. While the responses are varied by subject, there are at least a few general themes that can be summarized as follows: • Plan for, and mitigate, the impacts of climate change. • Facilitate a more sustainable built environment. • Protect the environment. • Renewable Energy options • Food Security The balance of this chapter will discuss Sustainability in each of these five categories. B. CLIMATE CHANGE
In the 2022 Planning Advisory Service (PAS) Report, “Planning for Climate Mitigation and Adaptation,” the authors note that the United States is facing a number of “existential threats” but notes that only one of them - climate change - has the potential to “destroy human livability of the entire planet.” According to the former President of the American Planning Association, Leo Asuncion, Jr., in a 2021 statement on the UN Climate Change Conference, “Now is an essential moment where global commitments, national policies, and local planning must all work together to meet the demands of confronting and combating climate change and its impacts on people, places, and our planet.” (emphasis added) The same PAS Report goes on to state that an effective response to the global challenge that is climate change will require fundamental and systemic changes to the built environment and “inevitably must be addressed policy by policy and project by project in our local communities.” Ultimately, local governments need to shift to, and embrace the concept of, sustainable development in order to make a difference. In general terms, planning responses to climate change fall into two categories: mitigation planning and adaptation planning. Mitigation planning involves planning for and taking actions that reduce the levels of Greenhouse Gas (GHG) emissions in the atmosphere or enhance carbon sinks (i.e. things that absorb more GHGs than they emit). Climate adaptation planning involves actions that reduce the vulnerability of people, places, and ecosystems to the impacts of climate change. The
Town of Easton
144
February 19, 2026
most effective approach will inevitably utilize both mitigation and adaptation techniques and strategies. C. MITIGATION STRATEGIES
The sources of US GHG emissions, by sector, are shown in the following chart:
The largest share is represented by the Transportation Sector, which covers all journeys by road, rail, water and air. This sector generated 29% of US GHG in 2019. Of the total GHG emitted from this sector, 58% of them are generated from the fossil fuels burnt for light-duty vehicles (i.e., cars, pickup trucks, sport utility vehicles (SUVs), vans, and minivans), with an additional 24% from medium and heavy duty trucks. The good news on this front is that there are actions that can be taken from a planning perspective to drive these numbers down. These range from site-specific actions, such as providing adequate infrastructure for charging electric vehicles, to bigger-picture and philosophical changes, such as planning for future growth that is less automobile dependent by incentivizing new growth that occurs in the form of compact, walkable, mixed-use communities that provide a variety of housing choices and offer services within easy walking distance of neighborhoods. While the Transportation sector is the one most directly related to planning, in terms of the possibility to reduce GHG emissions, it is not the only one. To that point, the following are potential mitigation strategies that communities can implement that more broadly can reduce GHG emissions:
Town of Easton
145
February 19, 2026
• Increasing the use of renewable energy and access to alternative fuels. • Providing options for active transportation. • Designing energy-efficient buildings and resilient infrastructure. • .Protecting and enhancing natural systems and water resources. • Maximizing co-benefits of ecosystem services and green infrastructure solutions. • Purchasing climate-friendly products. • Educating the public on socioeconomic and public health impacts of climate change. The energy supplier to the vast majority of Easton properties is the Easton Utilities Commission (EUC). Broadly speaking, EUC is pursuing a number of sustainable goals and objectives. Notably, this includes their “Sustainability Campus.” Of note to the topic of renewable energy, the EUC Sustainability Campus includes a solar array, described by EUC as: Perhaps the biggest effort to offset greenhouse gas emissions was the installation of the 2MW solar field at Easton’s Sustainability Campus located adjacent to the wastewater treatment facility. The array generates more than enough electricity to power the entire treatment plant. On average, 20% of the electricity generated by the panels is fed back onto the local electric grid. Commissioned in 2017, the nearly 10-acre site was constructed for a total of $4 million. Through a grant by Maryland Department of the Environment, 75% of the construction costs were covered, making Easton Utilities’ total investment $1 million. This partnership allowed the project to be both cost and environmentally effective, benefiting the community by avoiding almost 1,672 metric tons of CO₂e emissions per year. The Town should continue to support EUC’s sustainability and renewable energy initiatives. Beyond that, we can and should explore options for additional solar arrays. In the context of a growing town like Easton, this can be a challenge since arrays can consume large amounts of land. However, there may be opportunities to co-locate panels on the roofs of large buildings or in large surface parking lots. D. AD APTATION STRATEGIES
The risks posed by climate change include rising sea levels and storm surges, heat stress, extreme precipitation, inland and coastal flooding, drought, increased aridity, water scarcity, and air pollution, all of which will have negative impacts on an individual’s health, livelihoods, and assets, as
Town of Easton
146
February 19, 2026
well as the community's economy and ecosystems. Adaptation strategies are essential to reducing vulnerability to both the likely everyday, as well as the more extreme or dangerous, outcomes of climate change. The following flowchart depicts the multiple impacts of climate change on Transportation, the consequences of those impacts, and some adaptation strategies that can be employed (both to reduce impacts and to reduce consequences):
The area where adaptation policies can most directly be impacted by Comprehensive Planning is the general area of land use. This is especially the case when contemplating future growth areas. Preventing future development from occurring in vulnerable locations, such as along waterways, in floodplains, or non-tidal wetlands, is an easy proactive approach to climate change adaptation. It is coincidentally consistent with the essence of this Plan. This is important because as the previously referenced PAS Report notes, comprehensive land use planning that anticipates likely climate impacts can accomplish the following community-wide goals: • Encouraging coordinated transportation and housing investments, so that people can afford to live in safe conditions with transportation choice in case of emergency. • Promoting green infrastructure and sound watershed management, which can reduce stormwater runoff, mitigate the urban heat island effect, and improve public health.
Town of Easton
147
February 19, 2026
• Rehabilitating wetland riparian or estuarine habitats that provide natural ecosystem services, such as flood protection. • Reducing the long-term cost of development by building in areas that are less vulnerable to climate impacts and costs. Impacts can also be made at the individual building level. For example, increased frequency and severity of heat waves pose additional risks for occupants of homes without cooling methods. Very young children, the elderly (who represent a high percentage of Easton’s population), and those with infirmities are most susceptible to heat strokes and other health risks associated with extreme heat. High-performance green buildings can have both mitigation and adaptation co-benefits. Adaptation practices are ideally implemented at the time of construction, but mitigation to existing buildings can occur in the form of retrofitting existing homes and buildings with additions such as green roofs or sun shading, water storage space, and smart ventilation. Finally, it is important to note that although there are specific actions that a community may pursue in the realm of climate adaptation, monitoring and evaluation of adaptation policies and actions can be challenging for a number of reasons. The Planning for Climate Mitigation and Adaptation PAS Report, lists the following cautions with regards to monitoring adaptation:
Town of Easton
148
February 19, 2026
E. SUSTAINABLE BUILT EN VIRONMENT
The aspect of sustainability that is most directly relevant to a Comprehensive Plan, and which is addressed throughout this Plan, is that of the built environment. This includes planning-related areas such as encouraging more energy efficient buildings, to fundamental principles of land use planning such as prescribing a future development pattern that is more sustainable than that which has occurred in the last half-century or so. With regards to future development patterns, the measure of success will overwhelmingly come from what happens in our Future Growth Area. Accommodating more growth in the form of Infill and Redevelopment of the existing Town boundaries will help achieve this goal, but given the nature of this type of development, the stage has essentially already been set. Infill/Redevelopment will be more sustainable in that such development is generally more accommodating of active modes of transportation and is closer to the shopping and services that residents need, thus facilitating such active transportation. However, barring a fundamental (and very large) change in the scope and nature of density of development in the vicinity of Downtown, and despite strong public support for focusing future growth on this aspect, there is a limit to how much can be accommodated in this manner. Eventually, and likely sooner rather than later, the overwhelming majority of growth will occur in what are now “greenfields” in our Future Growth Area. Improving sustainability of the development of these areas will largely dictate Easton’s overall success (or lack thereof) in improving the sustainability of the Town as a whole. The elements that will lead to a more sustainable form of development in the future are covered throughout this Plan, so they will not be discussed in detail here. In particular the Implementation Chapter discusses in detail recommended options for achieving this goal. For the purposes of this chapter, simply listing the options to improve the sustainability of future greenfield development will suffice, and they include: • Permitting/encouraging/requiring mixed-use development. • Facilitating residential development at a higher density and with a wider variety of housing options. • Maximizing connectivity to other future development. • Providing, where possible, connectivity to existing development. • Facilitating and accommodating active modes of transportation.
Town of Easton
149
February 19, 2026
F. FOOD SECURITY
The UN Food and Agricultural Organization (FAO) describes a sustainable food system as “a food system that delivers food security and nutrition for all in such a way that the economic, social and environmental bases to generate food security and nutrition for future generations are not compromised. This means that: • It is profitable throughout (economic sustainability); • It has broad-based benefits for society (social sustainability); and • It has a positive or neutral impact on the natural environment (environmental sustainability).” As a growing and vibrant Town, there is little actual agricultural activity occurring within the corporate limits of Easton. However, land that is annexed into Town is often agricultural and sometimes remains as such for several years. There is certainly nothing wrong with this practice of allowing farming as essentially a temporary or interim use until landowner/developer motivation and/or market forces dictate that it is time for the property to develop. Furthermore, the Town envisions the Talbot County side of our Growth Boundary to consist of farms and forests and supports their efforts to permanently preserve these areas. On a smaller scale, within the Town limits sustainable food systems can be supported through gardens. These can be located on private property for the use and enjoyment of the resident of the property, or in the form of a community garden. One such community garden exists in the East End Neighborhood of Easton, just outside of Downtown (see picture below). This option is especially appropriate in the more densely developed sections of Town where land may be too scarce for individual private gardens. G. FINANCIAL SUSTAINABILITY
Beyond these environmental and general quality of life aspects of sustainability, future development patterns have even more diverse sustainability implications. One such aspect is the financial sustainability of such development, and ultimately the Town as a whole. In short, there are a
Town of Easton
150
February 19, 2026
multitude of potential development scenarios possible for any given parcel of land in the Growth Area. Some will result in significant revenue for the Town, but might also impose large new costs. Others may not cost that much to serve, but may also contribute very little in the way of new revenue. From the perspective of financial sustainability, development that justifies its cost by providing a net positive fiscal impact to the Town ought to be prioritized over that which will ultimately be a net drain on Town resources. Although it can certainly vary depending on the local government’s tax structure and policies, residential development in general, and specifically single-use, low-density residential development, tends to cost local governments more to serve than it produces in new tax revenue. On the other hand, mixed-use and non-residential development can be cash flow positive for local governments. One way to view/measure such impacts is on a value per acre (VPA) basis. An assessment of Easton’s VPA was conducted in 2024 by the firm Urban3 and its results are summarized in the Land Use Chapter of this Plan. Value-per-acre modeling In 2024, the Planning/Economic Development Firm Urban3 modelled the fiscal impacts of land uses on the Eastern Shore in general, and then in Talbot County specifically. The basis of Urban3’s methodology involves examining “value per acre” for the area being analyzed. The following is excerpted from the Urban3 study for Talbot County. Highlights from the Urban3 study for Talbot County include: ● Mixed use projects provide the highest property value per acre ● Higher density development is significantly more productive than less dense land uses ● Understanding how different land uses affect property tax revenue will allow Easton to make informed development decisions that maximize revenue productivity that can then be used in providing services such as public safety and continuing economic development ● Using the Value Per Acre (VPA) model allows communities to link fiscally productive areas with their associated land use types ● Using a moderate to high productivity sample development, such as mixed use commercial or missing middle housing types, as an example for how to build in the future can guide community conversation, vision, processes, and future regulations
Town of Easton
151
February 19, 2026
● Urban3 has seen that funding for infrastructure systems(roads, sewer, water, stormwater) is insufficient in covering the lifecycle expenses for these systems. Certain users of these systems may not be paying for the true cost of what it takes to serve them (meaning other users are subsidizing them). Adjust fees, with geography in mind, to adequately cover the costs of operation and maintenance or encourage infill development rather than servicing new areas.
Town of Easton
152
February 19, 2026
Urban3 modeling has helped the Town evaluate where existing development patterns provide strong return on public investment. Compact, walkable neighborhoods generate more tax revenue
Town of Easton
153
February 19, 2026
per acre and require less infrastructure to support than low-density fringe development. This analysis supports land use decisions that promote long-term sustainability. As Easton grows, the town can shape its development and financial outcomes. Urban3 created three growth projection scenarios for Poplar Hill, Four Seasons, and Gannon Range, using existing land use values and building types (see Figure 14) applied to site plans from Easton (Figure 15).
Figure 14. Example properties used in projections scenarios for the Town of EastonSource: Maryland Department of Planning (2024), Google Maps
Town of Easton
154
February 19, 2026
Figure 15. Example site plans used for projections scenarios for the Town of Easton Source: Maryland Department of Planning (2024), Google Maps
Town of Easton
155
February 19, 2026
Figure 16 analyzes the Four Seasons site for potential single family residential development, comparing attached and detached building types. If developed as single family attached units like those on Jasper Lane, the site's taxable value could increase by 743 times. In contrast, traditional single family detached homes would yield a smaller increase. Building type and development pattern should be considered to maximize property tax revenue for Easton.
Town of Easton
156
February 19, 2026
Figure 17 presents a summary of scenario projections for each site, including development type and potential property tax revenue for Easton. Although Poplar Hill (now owned by Talbot County) may not develop as planned, its scenario provides a model for future mixed-use developments in Easton.
Key Takeaways ● How can Value Per Acre (VPA) be increased? o Understand Current Revenue and Spending Patterns ▪ Urban3’s analysis examines how land use is related to economic cash flow in the Town of Easton and its operational capacity. Identifying the effects of various land uses on property tax revenue provides information for development decisions aimed at increasing revenue productivity that supports public services such as safety and economic initiatives. o Repeat What Works ▪ Reviewing the Value Per Acre (VPA) model enables communities to link fiscally productive areas with certain land use types. Using examples from moderately to highly productive developments, such as mixed-use commercial properties or missing middle housing, may serve as reference points for future community planning, discussions, procedures, and regulations. o Increase Density Incrementally
Town of Easton
157
February 19, 2026
▪ Permitting higher density offers a straightforward method to increase VPA, as raising the value relative to acreage results in a higher value per acre. Adding one or two stories to structures can significantly affect productivity. Typically, density modifications are implemented through changes in land development regulations, which may prompt differing opinions. ▪ As Easton develops further, the town will have the opportunity to decide on the direction of growth and its financial outcomes. Utilizing Urban3's analysis, Easton can identify and apply productive land use patterns and building types. ● How can VPA be increased and costs reduced? o Understand the Cost to Maintain Infrastructure Systems ▪ Urban3’s observations indicate that funding for infrastructure systems (including roads, sewer, water, and stormwater) often does not cover their full lifecycle expenses. ▪ Some users might not be bearing the entire cost required for their services, resulting in cross-subsidization. ▪ Adjusting fees geographically may help ensure coverage of operation and maintenance costs or promote infill development over expansion into new areas. The Eastern Shore Land Conservancy maintains a resource page on the work of Urban 3 on the Eastern Shore. For additional information on the Urban3 Analysis, please see ESLC’s website at: https://www.eslc.org/urban3/ Although it can certainly vary depending on the local government’s tax structure and policies, residential development in general, and specifically single-use, low-density residential development, tends to cost local governments more to serve than it produces in new tax revenue. On the other hand, mixed-use and non-residential development can be cash flow positive for local governments. One way to view/measure such impacts is on a value per acre (VPA) basis. An assessment of Easton’s VPA was conducted in 2024 by the firm Urban3 and its results are summarized in the Land Use Chapter of this Plan.
Town of Easton
158
February 19, 2026
H. SOCIAL SUSTAINABILITY Another aspect of sustainability that can be affected by development patterns is that of social/cultural equity. Social equity in development patterns refers to ensuring fair and just distribution of resources, opportunities, and public services across all segments of a community. It involves addressing disparities in access to things like housing, healthcare, education, transportation, and employment, aiming to prevent certain groups from being left behind. Consideration of social equity in planning and future land use patterns is important for a number of reasons, including the following: • Reduced Poverty and Inequality - By addressing the root causes of poverty and inequality, social equity contributes to a more just and prosperous community. • Increased Social Cohesion - When people feel that they have equal opportunities and access to resources, it fosters a sense of community and belonging. • Greater Resilience - Equitable communities are better equipped to withstand economic and environmental shocks. • Sustainable Development - Social Equity is an essential component of sustainable development, ensuring that progress benefits all members of society, both present and future. The Town of Easton is committed to ensuring equitable access to transportation facilities and services for all residents, regardless of race, color, national origin, sex, income, or ability. This commitment is formalized through the Title VI Annual Update Accomplishment Report, prepared by the Department of Public Works and submitted to the Mayor each year. The report outlines actions taken to comply with the Title VI of the Civil Rights Act of 1964 and the Civil Rights Restoration Act of 1987 (P.L. 100.259). The Town’s Title VI policy affirms that no person shall be excluded from participation in, denied the benefits of, or subjected to discrimination under any program or activity receiving federal financial assistance. The report includes a policy statement reaffirming the Town’s dedication to non-discrimination and its responsibility to uphold these standards across all departments, programs, and projects.
Town of Easton
159
February 19, 2026
Environmental justice principles are embedded into the Town’s multimodal transportation planning. In particular: ● The Bicycle and Pedestrian Master Plan weighted social equity factors—including proximity to low-income housing, access to social services, and connectivity to transit—when evaluating and prioritizing projects. ● Transit planning emphasizes improved service for historically underserved and transportation-disadvantaged populations. Through these practices, Easton ensures that investments in infrastructure contribute to more equitable mobility, safety, and access for all residents.
I. GO ALSAND OB JECTIVES Goal #1: Address Climate Change through Mitigation and Adaptation. Objectives: ● Reduce greenhouse gas emissions through compact, walkable, mixed-use development. ● Expand renewable energy production and EV charging infrastructure. ● Improve building energy efficiency and resilient design. ● Protect and restore natural systems that act as carbon sinks. ● Prevent development in vulnerable areas such as floodplains and wetlands. ● Integrate green infrastructure to manage stormwater and heat impacts. ● Retrofit buildings to withstand extreme weather and reduce energy demand. Goal #2: Promote a Sustainable Built Environment. Objectives: ● Focus growth in infill and redevelopment areas before greenfields. ● Require mixed-use, higher-density neighborhoods with diverse housing types. ● Ensure new growth is connected to existing development and supports active transportation.
Town of Easton
160
February 19, 2026
● Maximize street and trail connectivity in all new projects. ● Utilize the Town’s Forest Conservation Account and other sources to add landscaping along heavily traveled corridors. Goal #3: Support Food Security. Objectives: ● Preserve farmland and forests within the Growth Boundary. ● Allow interim agricultural use on undeveloped annexed land. ● Encourage private and community gardens, especially in denser neighborhoods. Goal #4: Ensure Financial Sustainability of Development. Objectives: ● Prioritize projects with a positive net fiscal impact. ● Promote land uses with high value per acre (VPA). ● Encourage mixed-use and higher-density development to reduce service costs. ● Adjust fees to reflect the true cost of infrastructure and services. Goal #5: Advance Social Sustainability and Equity. Objectives: ● Ensure equitable access to housing, transportation, and public services. ● Apply Title VI and environmental justice principles to all Town programs. ● Prioritize infrastructure investments in underserved neighborhoods. ● Include equity considerations in project evaluation and planning.
Town of Easton
161
February 19, 2026
11 MUNICIPAL GROWTH “If you don’t know where you are going, you might end up someplace else.” — Casey Stengel A. PU RPOSE
The Municipal Growth Element (MGE) outlines how the Town of Easton will manage future physical expansion in a coordinated, efficient, and sustainable manner. It identifies areas for potential annexation and development, explains rationale and reasoning behind future growth, and assesses whether the Town has the necessary infrastructure and services to support that growth. This chapter fulfills the requirements of Maryland’s House Bill 1141 (2006), which amended the Land Use Article to require a comprehensive growth strategy as part of every municipal plan. It integrates Easton’s growth management approach with the broader land use policies set forth in this Comprehensive Plan. The Maryland Land Use Article requires this element to address the following: 1. Areas anticipated for future growth outside the current municipal limits; 2. Historic growth patterns of the Town; 3. Development capacity within current Town boundaries, including infill and redevelopment potential; 4. Additional land needed to accommodate projected demand at densities aligned with long-term policy; 5. Infrastructure and services required to support growth in new areas, including: a. Public schools (meeting State-rated capacity standards); b. Libraries; c. Public safety and emergency medical services; d. Water and sewer systems; e. Stormwater management (to protect water quality);
Town of Easton
162
February 19, 2026
f. Recreational facilities; 6. Anticipated financing strategies for public services and infrastructure; 7. Rural buffers and transition zones; 8. Impacts on services and infrastructure that the Town may need to provide for growth just outside its boundaries; 9. Measures to protect sensitive environmental areas affected by new development; 10. Population growth projections; and 11. A vision for Easton’s future character and how long-term growth policy supports it. This 2025 update builds on the Municipal Growth Element introduced in 2010, incorporating new data, insights from recent growth patterns, and the updated priorities of this Plan. B. GR OWTH RA TE DISCUSSION
The pace of Easton’s growth has been a recurring point of debate in the last three Comprehensive Plan updates. Historically, the Town relied on the free market to determine growth. However, in the 2010 Plan, the Planning Commission concluded that continued growth at the historic rate of around 3% annually threatened the Town’s traditional character and made it harder to address key challenges such as traffic congestion and environmental impacts. That Plan established a preferred target of 1% annual growth, supported by an Annexation Policy designed to limit rapid expansion through controlled Priority Growth Areas. This 2026 Plan renews this approach. It is, however, important to clarify what is intended by the establishment of a 1% annual growth rate as our target. This Plan is not concerned with limiting growth solely for the sake of doing so. Rather, we recognize that there is an amount or pace of growth at which the negative characteristics of development become difficult-to-impossible to keep up with. 1% may not necessarily represent that threshold, but it can serve as a checkpoint such that if/when we exceed such growth, we can and should assess how well we are (or are not) managing those negative characteristics, such as traffic, environmental impacts, infrastructure and service capacities and the like. This calls for active monitoring to ensure growth occurs at a pace that Town infrastructure and services can accommodate without undue strain, and may include recommendations for pursuing what, if any, measures are necessary to slow future growth.
Town of Easton
163
February 19, 2026
Historic Growth Patterns From its incorporation in 1710 through 1917, Easton remained a small, compact town. By 1965, it had grown primarily in a north–south direction but was still bounded by US Route 50 and the future MD Route 322 (Easton Parkway). Expansion beyond these limits began in 1966 and accelerated in the 1970s after full annexation of the Parkway/Route 50 corridor. Maps illustrate this outward spread, but they don’t show an equally important change—the shift in development form. Like much of the country, Easton moved away from walkable, compact, traditional patterns toward a more suburban, auto-oriented layout. Reversing this trend has been a consistent focus of recent Comprehensive Plans and remains a central objective of this Plan, as discussed further in the Place Element. A map showing Easton’s corporate limits at various points in time was shown in 3.1,XX, Existing Land Use Patterns. While annexations expanded the Town’s footprint (see Appendix 3 for a list of annexations), the form of development shifted from walkable, compact patterns to more suburban, auto-oriented layouts. Recent Comprehensive Plans have sought to reverse this trend, emphasizing a return to traditional, connected urban forms.
Population Projections Population growth trends are detailed in the Plan Background Chapter. With the Growth Boundary in place, the Town’s ultimate population is largely predictable, assuming current patterns of density, residential/non-residential balance, and household size. Based on the adopted Growth Boundary and current assumptions about density, land use mix, and household size (2.19 persons per household, 2020 Census), Easton’s ultimate buildout capacity is estimated at 17,594 dwelling units, or 38,531 residents. The timing of reaching that capacity depends on growth rates: ● At 3% annually, (the figure used in the 2004 Plan) buildout would occur in about 27 years (2052). ● At 1% annually, (the figure identified as a preferred target in the 2010 Plan) buildout would occur in approximately 80 years (2105) ● At a 1.75% rate, buildout would take closer to 45 years (2070). The likely population growth rate depends on a host of factors. However, it can be useful to look back at historic growth in order to look forward to project such growth. The following table and
Town of Easton
164
February 19, 2026
chart were prepared with the assistance of Google Sheets , using growth in the Town from 1960 through 2020 to project the future growth of the Town through 2050, using linear regression analysis provided via the FORECAST function in Sheets. Such growth would correspond to a 1.12% annual growth rate over the 30 year period from 2020-2050, and a 1.5% average annual growth rate for the 90 year period (1960-2050).
Year
Population
1960
6337
1970
6809
1980
7536
1990
9372
2000
11708
2010
15945
2020
17101
2030
18506
2040
21572
2050
23940
Town of Easton
165
February 19, 2026
The Forecast function predicts a future value based on existing values using linear regression to project future data points along a line that best fits the historical data. It can be used to forecast sales, plan a budget, or predict future trends or short-term increases or decreases. Linear forecasting is suitable for stable environments where predictable, incremental changes occur, whereas exponential forecasting is better for rapidly expanding or contracting trends driven by compounding factors. Linear regression should beused cautiously when used for population projections because population growth is often more complex. Still, when limited to a short-term projection and with so many unknown variables (e.g., which direction and by how much interest rates will change, the impact of Lakeside at Trappe on the Easton housing market, the impact of the last of the Baby Boomer generation reaching retirement age, etc.), looking to the past to make predictions about future growth seems reasonable. The Sheets GROWTH function is similar to FORECAST with the notable difference that it projects exponential growth. It's used for forecasting datathat follows an accelerating pattern, such as sales, population, or investment growth, by calculating y-values for a specified exponential curve. Using this function to project Easton’s future growth, yields the following:
Town of Easton
166
February 19, 2026
Year
Population
1960
6,337
1970
6,809
1980
7,536
1990
9,372
2000
11,708
2010
15,945
2020
17,101
2030
19,416
2040
23,125
2050
27,543
Town of Easton
167
February 19, 2026
This model predicts a 1.6% average annual growth rate for the future 30 year period (vs. 1.12% via the linear model). This Plan proposes a revision to the way it uses growth rates. After a decade where the average annual growth rate has dropped to 0.7%, the concept of aiming for a “targeted” or “preferred” growth rate for the Planning period has been dropped. Instead, the directive relative to our Growth Rate is not so much an attempt to limit (or increase) any particular rate, but rather to consistently monitor the rate/amount of growth we are experiencing so that whatever growth that does occur, is at a rate that does not overly tax the Town’s infrastructure and services. We believe that, for this Planning period at least, this can best be addressed by adhering to an Annexation Policy that does not allow for an exceedingly high rate of growth, which would be one characterized as significantly at variance with the 1.12% projected growth for several years. This can be monitored through observation of the number of dwelling units approved annually. This monitoring should be a key characteristic of the Planning Commission’s Annual Reporting responsibilities. Beyond reporting though, effective growth management requires an assessment of the data. A sustained observed significant deviation from the targeted rate of growth of 1% annually may necessitate actions to either encourage (if a prolonged period of slow or negative growth is observed) or limit (if
Town of Easton
168
February 19, 2026
expected growth is observed to have been exceeded) future growth from that point in time. This becomes especially critical if observations suggest that Easton’s population is, in fact, behaving more like the exponential (GROWTH) model as opposed to the linear (FORECAST) model. An important aspect to consider when contemplating future growth rates is the number of units approved but not yet built, sometimes referred to as the “development pipeline.” As of May 12, 2025, that number stood at 843. While that basic total number is important to know (and, obviously, readily observed), what is more difficult to predict is when those units will be built, referred to as the “absorption rate.” A myriad of factors influence the absorption rate, including: the number of different projects represented by the total number of units, the types of units, the demand for those units, interest rates, price points,, competition in the region, and so on. The pipeline and absorption rate are important because they can further support the policy to strictly limit annexation, particularly annexation for residential purposes. That is borne out by the calculation of the number of dwelling units that the historic 1.12% growth rate would yield over the 10 year planning period. This number is approximately 875 units. Thus, with 843 units already in the development pipeline, assuming they could be built in this planning period (and not accounting for factors such as the relative demand for certain housing types, locations, etc.), the housing that would be required to correspond to 1.12% annual growth can be completely met by the buildout of existing approved projects plus a small handful of additional units. Essentially, the pipeline inventory is such that it could supply the housing associated with the projected growth of the next 10 year planning period. This is even more likely given that we are targeting a 1% annual rate of growth. C. EX ISTING GR OWTH CAPACITY (INFILLAND RE DEVELOPMENT)
Easton’s current boundaries contain enough developable land to meet much of the projected residential and nonresidential growth for the next 20 years. However, demand—especially for mixed-use and employment-related space—may eventually outpace this capacity. Managing growth will require annexations that are carefully aligned with the Plan’s land use vision, infrastructure capabilities, and fiscal priorities. A recent requirement for Comprehensive Plans is to estimate the capacity for residential development within existing Town boundaries. This analysis considers three categories: undeveloped land, infill parcels, and sites with potential for redevelopment. To complete this assessment, several assumptions were applied:
Town of Easton
169
February 19, 2026
● Urban density baseline: Future development is assumed to occur at higher densities than in recent years, with a minimum of 3.5 dwelling units per acre—the threshold for designation as a Priority Funding Area (PFA). ● State guidance: Methodology follows the Maryland Department of Planning’s Models and Guidelines publication Estimating Residential Development Capacity. ● Local experience: Assumptions are informed by Easton’s past development review processes. The following table details the step-by-step calculation of estimated residential development capacity within current Town limits.
Table 9 Development Capacity within Easton 2025 Town Limits Category
Details
stimated E Units
0
riority Development P Areas (per 2010 Plan)
Includes Areas 2, 3, 4, 7, 8 * total estimated units: 644 644
1
ther Parcels with Infill O Potential
nimproved parcels ≥ 1 acre, PR District parcels, and U <1 acre parcels * total: 512
512
2
pproved or Pending A Projects
nder Construction (189) + Under Review (415) = U 604
604
3
owntown Residential D Development Potential
Per AKRF study = 100 units
100
4
Redevelopment Potential
arcels w/ improvements <$50k; net new units (9) + P figures from the Redevelopment Target Areas table below (875) = 884
884
5
TOTAL Infill/Redevelopment/Build-out Potential (as of June 11, 2024)
2744
* Area 2 corresponds to the site of the Four Seasons project (252 units). Area 3 is the Poplar Hill property (now owned by Talbot County and assumes no future residential units. Area 4 is Ashby Commons (Now essentially built out so assumes no new units). Area 7 is the “Alvin Lapides Property” (Estimated 60 units). Area 8 is Easton Point (Estimated 332 units per Port Street Small Area Plan).
Town of Easton
170
February 19, 2026
Table 10 Redevelopment Target Areas Project/Area
Acres
otential Residential Units P (acres x 30 du/ac x 0.75)
Hospital
14.84
334
Easton Plaza (Parking lot)
12.456
280
Perdue - Brookletts
6.548
147
Brookletts Building
1.787
40
Perdue - Maryland Ave
2.36
53
Safeway
1.46
2 1 (net, after deducting 12 units already included in the AKRF Study)
NOTE: The units for the Perdue sites and Safeway are based on approved projects. Our best estimate is that Easton can accommodate approximately 2,744 additional dwelling units within existing Town limits—without annexing new residential land (except for portions of Easton Point noted in Area 8). This does not mean all 2,744 units will necessarily be built before new land is needed. Several factors will reduce the actual yield: ● Environmental constraints may limit development on some parcels, even if they appear suitable on paper. ● Unwilling landowners may choose not to develop in the near term. ● Market pressures could drive the need to open growth areas earlier, particularly if restricted supply inflates housing prices and worsens Easton’s affordability challenges. While the current Planning period does not require new annexation for residential growth, the Town must remain prepared to expand strategically when capacity within the boundary becomes constrained. he 2,744-unit estimate represents a modest increase from the 2,492 units projected in the 2010 T Plan. The gain is primarily due to: ● Adding Easton Point (Area 8) as a Priority Development Area. ● A more refined redevelopment analysis, incorporating specific high-potential properties. This gain was partially offset by the removal of Area 3 (Hospital-owned Oxford Road site) following its purchase by Talbot County.
Town of Easton
171
February 19, 2026
At the targeted growth rate of 1.75% annually, the existing capacity could accommodate roughly 18 years of growth—far exceeding the 516 new units added between 2010 and 2020. This suggests that the existing Town limits are sufficient for the next decade. However, capacity estimates are theoretical. Real-world constraints—such as lower-than-maximum densities, redevelopment challenges, and political or economic barriers—mean the actual buildout may be lower. Housing affordability in Easton is already strained, and increasing supply remains a key strategy for addressing it. Additionally, this analysis does not include potential policy-driven increases in capacity. For example, allowing multifamily development in General Commercial and Limited Commercial zones could yield up to 1,240 additional units on the 155 currently unimproved acres in those districts (at 8 du/ac), excluding further redevelopment potential on improved parcels. Infill and Redevelopment as Growth Strategies The 2010 Comprehensive Plan estimated that Easton could accommodate roughly 2,500 new housing units through infill development and redevelopment—growth that could occur without annexing additional land. Pursuing this strategy offers multiple benefits: ● Preserves open space by reducing pressure to convert greenfields. ● Improves mobility for residents who do not or cannot drive, by placing more housing near services and transit. ● Lowers infrastructure costs since extending services within town is typically less expensive than building new systems for outlying areas. ● Expands housing variety, especially smaller, lower-maintenance units that appeal to smaller households and lower-income residents. ● Enhances neighborhood vitality by encouraging reinvestment and adding new amenities. ● Supports environmental goals through energy conservation and reduced land consumption. ● Aligns with Maryland Smart Growth policies, reinforcing sustainable development within existing town boundaries.
Town of Easton
172
February 19, 2026
Compatibility Considerations for Infill While infill and redevelopment bring clear benefits, they must be managed carefully. These projects are typically surrounded by existing neighborhoods and must be designed to complement them. The following principles should guide infill and redevelopment: ● Ensure compatible housing types with the surrounding neighborhood. ● Incorporate traffic calming measures where appropriate. ● Adopt design guidelines to promote visual and functional compatibility. ● Maintain a continuous pedestrian network for walkability. ● Support neighborhood-scale commercial uses, where appropriate, to provide walkable access to basic services. ● Address parking creatively, considering nearby on-street spaces, public lots, and shared-parking arrangements instead of relying solely on private lots. Realistic Limits and Strategic Focus During the public engagement process for this Plan update, many residents expressed strong support for infill and redevelopment as preferred growth strategies. While this is consistent with sustainability goals, the supply of vacant land within the built-up areas of Easton is limited. Achieving significant new growth solely through infill would require a level of intensity that could fundamentally alter the character of established neighborhoods. A more realistic approach is to: ● Promote targeted infill and redevelopment in and around Easton’s historic core. ● Support adaptive reuse of existing buildings where feasible. ● Encourage denser, walkable development in suitable infill areas outside the historic core but within the 2025 Town Boundary. This strategy balances growth, preservation, and community character while maximizing Easton’s capacity to grow without unnecessary outward expansion.
Town of Easton
173
February 19, 2026
D. FUTURE GR OWTH AR EASAND AN NEXATION
As noted previously, Easton’s longstanding policy is that municipal services, including water and sewer, are extended only to properties within the corporate limits. This policy encourages annexation prior to development and reinforces a compact growth pattern. The Town does not support extension of services to development in the County. Growth is to occur at the edges of Easton in a contiguous fashion, coordinated with infrastructure capacity and consistent with community character The area between the April 2004 Town boundary and the established Growth Boundary became Easton’s designated Future Growth Area. The 2004 Plan divided this area into three sequential priority levels for annexation, ranging from near-term to long-range. The 2010 Plan retained this three-tiered system: ● Priority 1 – Boundary Refinement Areas: Mostly already developed under Talbot County jurisdiction, suitable for annexation to correct boundary irregularities ● Priority 2 – Intermediate Growth Areas and ● Priority 3 – Long-Range Growth Areas: Not expected to be needed for development during that planning period Much of the Boundary Refinement Area was already built out under County zoning and septic system regulations. Annexation of these areas has generally been driven by the desire for Town water or sewer service, with limited potential for new development except for redevelopment or moderate intensification. Although the 2010 Plan map showed about 1,200 acres in this category, much of it was not actually available for new growth. Shift in Approach for 2026 In place of the tiered priority framework, this Plan adopts Annexation Policies that evaluate proposals based on merit rather than preset classifications. This approach allows for more flexible, needs-based decision-making. While Annexation is not viewed as necessary during the Planning Period, those Annexation proposals that are submitted will be assessed on whether they: ● Fill a geographic or infrastructure gap in the Town boundary. ● Can be efficiently served with water, sewer, and other public services.
Town of Easton
174
February 19, 2026
● Address identified needs for land use, housing, or public facilities as outlined in this Plan. ● Align with the character, scale, and infrastructure pattern of adjacent neighborhoods. ● Provide benefits that outweigh potential negative impacts (e.g., traffic, demand on services, etc.) This policy-driven approach maintains growth management objectives while allowing the Town to respond to changing conditions and emerging opportunities.
Town of Easton
175
February 19, 2026
Map 8: Growth Areas
As mentioned in the Land Use Element, this Plan proposes one adjustment to the Growth Boundary, to bring the Town’s Wastewater Treatment Plan within the Growth Boundary, rather than in the
Town of Easton
176
February 19, 2026
Greenbelt (or beyond). Such an action would facilitate an Annexation in the future, bringing a Town-owned facility within Town limits. This has advantages from an administration standpoint. It also potentially opens up additional avenues for State funding in the future, to the extent that such finding is restricted to being spent within Priority Funding Areas. E. SMART GR OWTHAND LA ND PR ESERVATION
Easton’s growth policies are designed to complement Talbot County’s efforts to preserve agricultural land, protect water resources, and guide growth to appropriate locations. The Town and County will continue to collaborate on shared planning tools, greenbelt preservation strategies, and infrastructure coordination to prevent sprawl and leapfrog development. Growth must align with infrastructure capacity and public investment planning. The Town will use annexation agreements to secure developer-funded infrastructure where needed, and will coordinate with Easton Utilities, the MDE, and other agencies to ensure adequate facilities for new development. Future annexations must demonstrate readiness and fiscal viability. With the adoption of the Urban Growth Boundary in the 2004 Plan—reaffirmed in the 2010 Plan—the question of how much land is available for development is no longer open-ended. Regardless of market demand, the Town now has a finite, fixed supply of land for future growth. However, because this Plan looks forward over a 30-year horizon, it is important to assess whether that supply will be exhausted within the planning period or whether growth areas will remain available at the end of that timeframe. To do so, we apply a process similar to the analysis used to estimate development potential within the current Town boundaries, using the same assumptions and methodology to project build-out conditions in the designated Growth Areas. To do so, an exercise similar to that performed to assess the development potential of land within the existing Town boundary will be conducted as follows:
Total acreage of Future Growth Area = 3,880 acres Less acreage already developed and/or non-residential – 1,300 = 2,580 acres x 3.5 du/ac x 0.75 (underbuild factor) = 6,773 du’s
Town of Easton
177
February 19, 2026
This exercise indicates that the Growth Area has the potential to accommodate 6,773 new residential units. This information can be combined with other calculations already made to give us more useful information, such as:
Without the confinement of the Growth Boundary, if we grow even at the maximum targeted 1.75% average annual compound rate, in 2070, Easton would, all other things being equal, have reached approximately the 17,594 dwelling units representing our residential build-out capacity. At the 1.12% we have grown at on an annual basis for the past 60 years, it will take approximately 72 years to reach this built-out state. For the purposes of the statutory requirement of projecting a ten-year build-out capacity, Easton certainly has no issues in this regard. F. PU BLIC SERVICESAND INFRASTRUCTURE NE EDS
This section was first introduced in the 2010 Comprehensive Plan to address the projected impacts of growth on a broad range of public services and infrastructure. In earlier Plans, many of these topics were covered under the Community Facilities and Services element, while others—typically managed at the County level—were not addressed at all. Beginning with the 2010 update, the Town incorporated these areas into its planning framework, evaluating how anticipated growth will affect key services. This Plan continues that approach, updating each subsection with current data, trends, and policy considerations. Public Schools Public schools in Talbot County are funded and administered by the County government. The Town of Easton plays two key roles in this system:
Town of Easton
178
February 19, 2026
● Population Source – As the County’s major population center, Easton generates a substantial share of the student population. ● Facility Host – Three of the County’s public schools, plus the Board of Education’s main offices, are located within the Town. As described in Section 7.E of this Plan, although the Town does not operate schools, it works closely with the County to share updated demographic data for use in preparing the Annual Educational Facilities Master Plan (EFMP). Capacity Outlook: The EFMP projects that the County school system can accommodate anticipated growth in Easton over the next decade, though capacity will be tight at the middle and high school levels. The newly constructed elementary school will also require either a physical addition or redistricting to meet demand. Unexpected surges in population could create additional strain, depending on the nature of residential growth. Development Mix: Most residential projects in the development pipeline are either high-end or age-restricted communities: ● Age-restricted housing generates little to no public school enrollment. ● High-end housing may have children, but many attend private schools. As of 2022, 17.1% of Talbot County’s K–12 students (about 932 students) are enrolled in private schools. This significantly reduces public school utilization; however, an economic downturn could shift many of these students into the public system, increasing demand. Historic Enrollment Trends: Between 2000 and 2020, Easton’s population grew from 11,708 to 17,101—a gain of 5,393 people—while public school enrollment increased by only 180 students (from 2,892 to 3,072). Based on this ratio, the projected population growth from build-out within the 2023 Town boundaries (an additional 6,752 people) would yield roughly 225 new students in public schools. Demographic Factors: One factor that could alter this pattern is the changing composition of the Town’s population. The EFMP notes a growing Hispanic student population, paralleling Easton’s broader demographic
Town of Easton
179
February 19, 2026
shift—from 3.5% Hispanic in 2000 to 14.4% in 2020—which may influence future enrollment patterns. Libraries The state of library service in Talbot County is described in Section 7.F of this Plan. In terms of future needs, the American Planning Association suggests a ratio of 0.6 to 0.65 square feet of library space per capita. According to the MD Department of Assessment and Taxation, the TCFL is 28,174 square feet in size. This would satisfy the needs of a population of approximately 45,000. That is well in excess of even the ultimate build-out population for Easton, and while the library serves residents beyond Easton, they also have branch facilities beyond Easton. There clearly are no growth-related implications for library services during this Planning Period. Public Safety As described in Section 7.H, public safety in Easton encompasses police, fire protection, and emergency medical services. This subsection focuses on service adequacy, anticipated needs, and facility requirements. Police Services he 1997 Comprehensive Plan referenced the International City Managers Association (ICMA) T standard of 1.75 police personnel per 1,000 residents. The 2004 Plan update the Town used the International Center for Prevention of Crime benchmark—3.36 officers per 1,000 residents—reflecting the U.S. national average. With 48 sworn officers serving a population of approximately 17,101 (2020), Easton falls between the two referenced guidelines. The ICPC suggests we need 57 officers, while the ICMA pegs the number at 30. Local conditions justify staffing at the higher end of the range: ● Easton functions as a regional hub for employment, commerce, and entertainment, serving a population well beyond Town residents. ● Residents value strong community policing. ● Seasonal traffic between Ocean City and the Baltimore–Washington area, along with modest local tourism, creates higher service demands. Given current trends, existing staffing levels are considered adequate, and gradual increases proportional to growth should meet future needs.
Town of Easton
180
February 19, 2026
Fire Protection The Easton Volunteer Fire Department serves the Town and surrounding areas, funded jointly by the Town and County. In 2002, ambulance service transitioned to Talbot County, which now operates the countywide emergency medical system. Fire Code enforcement is the responsibility of the Maryland State Fire Marshal. Growth in and around Easton prompted the construction of a new fire substation on Matthewstown Road, providing better access to US Route 50 and proximity to new development. Uncontrolled growth—either in pace or location—could require transitioning from an all-volunteer to a paid department, with both fiscal and community impacts, including likely tax increases. Emergency Medical Services Advanced Life Support (ALS) operates countywide with volunteer and paid staff, funded by the County, fundraising, and donations. While 24-hour service is available, ALS faces equipment funding challenges due to increasing call volumes. G. SERVICE AD EQUACY CONSIDERATIONS
Evaluating future public safety needs involves more than population forecasts. Key factors include: ● Traffic volumes: Higher traffic on US Route 50 increases accident rates and can slow emergency response. ● Development patterns: Traditional, well-connected street networks reduce response times and the need for additional substations, while suburban patterns with limited access points can strain resources. Water and Sewerage Facilities The adequacy of Easton’s water and wastewater systems through 2040 is detailed in the Community Facilities and Services and Water Resources elements of this Plan. For the purposes of this Municipal Growth Element, the focus is on capacity and improvements required to serve future growth identified in this Plan. Growth Projections and Service Demand The Future Land Area Needed to Satisfy Demand analysis projects approximately: ● 6,800 new dwelling units in growth areas outside the Town limits (6,773 calculated)
Town of Easton
181
February 19, 2026
● 3,100 new units within existing Town limits (3,083 calculated) ● 727 existing units outside the Town but within the Growth Area Service capacity planning must account for both residential and non-residential demand, which varies greatly by use type. While residential water and wastewater usage is predictable, non-residential uses—especially industrial operations—can create disproportionate demand. Wastewater The Easton Wastewater Treatment Facility (WWTF), brought online in 2007, has a treatment capacity of 4.0 million gallons per day (MGD). As of December 31, 2023, average daily flow was 2.463 MGD. ● Projected Capacity Limit: At a 1.75% annual growth rate, the WWTF is projected to exceed capacity in 2054. Growth at a 1.0% annual rate adds approximately 20 years until capacity is reached. ● Expansion Capability: The WWTF site has sufficient space for capacity expansion, anticipated to be modest in scale. ● Hospital Impact: The planned regional hospital will add 0.101 MGD in Phase 1 and up to 0.2 MGD at full buildout—approximately 5% of current capacity. This could advance the need for expansion by two years (from 2051 to 2049). ● The Easton Utilities Tariff requires that all new connections to the system pay a water and wastewater capital charge. In addition to the capital charge, developers are required to construct certain sections of distribution and collection systems. The Wastewater Master Plan (update in progress) confirms nutrient removal capacity is adequate to support planned 1.75% growth through 2045 and beyond. However, the following components will require upgrades once flows exceed 4.0 MGD: ● Headworks ● Flow Equalization ● Secondary Clarifiers ● UV Disinfection
Town of Easton
182
February 19, 2026
● Post-Aeration H. WATER SUPPLY
Easton is currently served by five production wells providing a total production capacity of 4.0 MGD (including redundancy for the largest well out of service). A new well received federal grant funding in 2026 and will be constructed by the US Army Corps of Engineers and turned over to Easton Utilities, it is anticipated that the well will be constructed in FY27. ● Current Use: Average daily flow is 1.90 MGD, with a maximum day demand of 3.36 MGD. ● Future Needs: The Water Master Plan projects the need for a new well in 2043 and a new 1.0 million-gallon storage tank in 2051 to serve the Growth Area. ● CIP Coordination: The Capital Improvement Plan is updated annually to prioritize and fund system upgrades. Planning and Coordination Both the Water Master Plan and Wastewater Master Plan are being updated to ensure Easton Utilities can meet service needs for the full Growth Area. Strategic capital improvements, coordinated with growth patterns, will ensure the Town can: ● Maintain service reliability ● Meet nutrient reduction requirements ● Serve new residential, commercial, and institutional development efficiently Charts summarizing planned water and wastewater capital projects are included in Appendix 5. Stormwater Management Systems A full discussion of stormwater management policies, regulations, and watershed impacts is provided in the Water Resources Element of this Plan. As in many older communities, Easton’s stormwater infrastructure reflects a wide range of standards, depending on the era in which different areas were developed. Earlier development often occurred before modern stormwater standards were in place, resulting in inconsistent performance across the Town. Today, all development in Easton must comply with the Stormwater Management Ordinance, which regulates both the quantity and quality of runoff.
Town of Easton
183
February 19, 2026
● Quantity Standard: Post-development runoff may not exceed pre-development levels. ● Quality Standard: Easton applies the 10% pollutant reduction standard from the Chesapeake Bay Critical Area Program to all land within Town limits, not just Critical Area properties. The Town also encourages innovative, low-impact development practices. Bio-retention, rain gardens, and other green infrastructure are increasingly required in major projects, such as Lowe’s and Waterside Village. Challenges in Older Developed Areas The greatest stormwater challenges occur in long-established neighborhoods built before current regulations. In these areas, the Town pursues retrofit projects to improve performance and water quality. These efforts are carried out through: ● Private Development Requirements – Requiring adjacent redevelopment projects to address existing stormwater issues. ● Town-Led Retrofits – Initiating capital projects to upgrade systems in older neighborhoods. ● Partnership Projects – Working with environmental organizations and Talbot County to secure grant funding for targeted improvements. A recent example is the Tanyard Branch Retrofit Project, which includes construction of a sediment pond on the Town-owned RTC Park parcel. This project will: ● Improve water quality entering the Tred Avon River headwaters ● Reduce localized flooding in historically flood-prone neighborhoods Future Capacity Stormwater management is not expected to be a limiting factor for Easton’s future growth, provided: 1. New development continues to meet State and local standards 2. Redevelopment incorporates modern stormwater techniques and is coordinated with adjacent new development
Town of Easton
184
February 19, 2026
3. Strategic retrofits in older areas are implemented as funding becomes available Through continued regulatory enforcement, proactive retrofitting, and intergovernmental collaboration, Easton can ensure stormwater systems support both water quality and quantity goals and planned growth. I.
RE CREATION
A full assessment of Easton’s park system is provided in the Parks and Recreation Element of this Plan. In the Municipal Growth Element, the focus is on parkland needs generated by future growth—both within the existing Town boundaries and in the eventual build-out of the Growth Area. Until 2022, the State of Maryland recommended parkland be provided at a ratio of 30 acres of parkland per 1,000 residents, with half under municipal ownership. Based on this standard: ● Current (2020 Census) Population – 17,101 → 513 acres needed (257 acres Town-owned) ● Build-out of Existing Town Limits → 716 acres needed (358 acres Town-owned) ● Full Build-out Including Growth Area → 1,178 acres needed (589 acres Town-owned) As of February 14, 2024, Easton contains an estimated 910.45 acres of parks and open space (plus Hyde Park, Elliott Road Apartments, and Vickers Park). This meets current needs and will remain sufficient to accommodate the build-out of existing Town boundaries without acquiring additional parkland. In 2022, local jurisdictions (through the County Land Preservation, Parks, and Recreation Plans) were allowed to define their own criteria for determining if they are meeting their acquisition goals. The 2022 Talbot County LPPRP includes the following park equity analysis for the Town of Easton: Easton is the County’s largest municipal area with 44.2% of the population living within its boundaries. Based on the State equity layers of concentrations of children and older adults, and households with income levels below the poverty threshold, there is one area of Easton that is considered Medium High Need. Within this area, there are well distributed park locations which offer a variety of amenities and features.. Other areas of Medium to Medium-Low need also have access to parks within a ½ mile radius. Overall, Easton’s network of parks provides equitable access to parks and open
Town of Easton
185
February 19, 2026
space for its residents ,particularly within the population centers where need is higher, there are few barriers to access. These parks provide access to sports fields, playgrounds,and a public swimming pool. Consideration should be given to other factors which could pose barriers including walkable routes to parks. The town is currently involved in developing a master plan of walking trails that will connect more areas of the town and increase access to parks and open spaces. Easton’’s Rail to Trail also provides access between the population centers and the town’s sports field complex located on the western edge of the town. Future Needs for Growth Area Build-Out The Town’s subdivision regulations—requiring developers to provide 35% of site area as common open space and 1,200 square feet per dwelling unit for parks/playgrounds—are expected to meet the Town’s Parks and Recreation needs for the Growth Area. Considerations Beyond Acreage Standards While Easton meets—and is projected to continue meeting—State parkland standards, certain factors may require additional planning and land dedication: ● Geographic Distribution: A regional-scale park may be desirable on the east side of Town to create equitable access. ● Specialized Facilities: Demand for organized sports fields exceeds what the per-capita standard assumes, as Easton serves as the County seat and a regional recreation hub. Adjacent Recreational Assets Easton also benefits from two large recreational sites just outside the Growth Boundary, which functionally serve Town residents: ● Seth State Demonstration Forest – 124.5 acres ● Hog Neck Golf Course – 275.9 acres These assets, though not within Town limits, help meet broader recreational needs and relieve some future demand pressures.
Town of Easton
186
February 19, 2026
J.
FINANCING ME CHANISMS
Easton’s current analysis shows that existing and planned infrastructure can accommodate the projected 2,500 new homes within current Town boundaries, as well as portions of the Future Growth Areas identified for potential annexation. All new development requires basic infrastructure, including: ● Water and sewer service ● Stormwater management ● Roads and transportation access ● Parks and playgrounds Consistent with current practice, the Town should require developers to fund the infrastructure necessary to serve their projects. Additional long-term needs to support planned growth include: ● Water system upgrades ● Wastewater treatment capacity expansion ● Police staffing increases ● New or expanded parks and recreation facilities ● Public safety enhancements, including new equipment, personnel, and facilities Leveraging External Funding State and County financial assistance should be pursued to upgrade infrastructure in redevelopment areas. Programs such as Community Legacy can support street and streetscape improvements, while Neighborhood Conservation programs can help modernize infrastructure to facilitate reinvestment. Cooperative use of Program Open Space and the Maryland Municipal Parks Program can offset park acquisition costs beyond those secured through the development review process. Annexation as a Tool The annexation process—being a discretionary legislative action—provides an opportunity to secure land for parks, public facilities, and other community amenities through annexation agreements. This should remain a standard practice for strategically expanding community assets alongside growth.
Town of Easton
187
February 19, 2026
Impact Fees Both Talbot County and the Town of Easton have enacted Impact Fee Ordinances since adoption of the 2004 Comprehensive Plan. Easton’s fees fund parks and recreation, municipal facilities, transportation, police, and fire services needed for new development. Talbot County’s fees apply countywide and support library, parks and recreation, public school, community college, general government, and transportation services. Maintaining these mechanisms ensures that the cost of growth is borne by new development rather than existing taxpayers. K. RU RAL BUFFERSAND TRANSITION AR EAS
Both the Town of Easton Comprehensive Plan and the Talbot County Comprehensive Plan designate a Growth Area surrounding the Town’s municipal boundaries, with a greenbelt located immediately outside this area on the County side. The greenbelt works in concert with the Urban Growth Boundary to prevent outward sprawl into rural parts of the County. An Urban Growth Boundary functions as the opposite of sprawl—establishing a clear, permanent edge between the built environment and the countryside. At full build-out, this boundary will create a distinct transition between “in Town” and “in the country,” avoiding a blurred, low-density suburban fringe. The Town partners with Talbot County and with agricultural and forest preservation organizations to maintain and protect the greenbelt. A significant portion of this land is already preserved, as shown on Map 8: Protected Lands in and Around Easton’s Greenbelt.
Town of Easton
188
February 19, 2026
Map 9: Protected Lands
Town of Easton
189
February 19, 2026
L.
BURDENON SERVICESFOR AR EAS OU TSIDEOF TOWNBUT UNDER TOWN’S
RE SPONSIBILITY Currently, Easton does not provide municipal services or infrastructure outside its corporate boundaries, with the exception of fire and rescue services. These services are delivered by a volunteer organization rather than the Town itself. As noted earlier in this chapter, the form and pace of development directly influence the demands placed on fire and rescue resources. Uncontrolled, low-density growth greatly increases the likelihood that Easton would need to transition from a volunteer fire department to a paid service—bringing significant financial and staffing implications. In contrast, managed growth in a compact, traditional, urban-scale pattern helps preserve the viability of a volunteer-based system. M. SUSTAINABLE GR OWTHAND AG RICULTURAL PR ESERVATION AC TOF 2012
In 2012, the Maryland General Assembly enacted the Sustainable Growth and Agricultural Preservation Act, requiring all jurisdictions to map existing and planned sewer service areas and classify them into service tiers. For Easton, this process was straightforward. The Town Council adopted its Tier Map in December 2012, designating three categories: ● Tier I – Existing sewer service. ● Tier II – Planned for sewer service within the Municipal or Growth Area. ● Tier IIA – Municipal or Growth Area, not yet included in the County Water and Sewer Master Plan. This Tier Map was incorporated into the Comprehensive Plan in 2016 and is shown as Map 10 below:
Town of Easton
190
February 19, 2026
Map 10: Easton Sewer Tier Designations
Town of Easton
191
February 19, 2026
N. PR OTECTIONOF SENSITIVE AR EAS
The Town of Easton prioritizes identifying sensitive environmental areas early in the development review process so they can be avoided, protected, or enhanced. The same standards will apply to any future development within the Growth Area. ● Streams and Buffers – A 100-foot buffer is required from perennial streams (50 feet for intermittent streams) to protect water quality and habitat. ● 100-Year Floodplain – While Easton contains few floodplain areas, they are regulated under the Town’s Floodplain Ordinance, which is consistent with both the National Model Floodplain Ordinance and the National Flood Insurance Program. Given the limited size of these areas, most sites allow development to be located outside the floodplain. ● Habitats of Threatened and Endangered Species – These areas are identified as early as possible in the review process. Site plans are adjusted as needed to provide maximum protection. For properties outside the current Town limits, identification should occur during the annexation stage. ● Steep Slopes – Rare in Easton. Most occur within stream buffers or the Chesapeake Bay Critical Area and are already protected. ● Agricultural and Forest Lands for Resource Protection or Conservation – While agriculture is not prohibited in Easton, growth will inevitably convert much of the agricultural land in the Growth Area to development. The Town does not actively preserve farmland, but does maintain a strong commitment to forest conservation. Easton’s Forest Conservation Program ensures valuable forest resources are protected, particularly those along streams or associated with non-tidal wetlands. Regulations now require such protected lands—whether forest, wetland, or buffer—not to be located on individual private lots. Instead, they must be placed in separate parcels held by the Town, a homeowners’ association, or a conservation entity. In developing the Growth Area, the Town will maintain these policies and look for opportunities to expand protected forest lands. A notable example is the Seth Demonstration Forest, part of Easton’s Greenbelt. It borders Easton Club East and undeveloped land to the north, where a future large-scale park is envisioned. Forest Conservation areas in Easton Club East connect directly to
Town of Easton
192
February 19, 2026
Seth Forest, creating an expanded and more cohesive forest area. Future enhancements could include additional forest preservation, tree planting, and amenities such as a woodland garden. O. A GROWTH MA NAGEMENT STRATEGYFOR EA STON
The Implementation Chapter of this Plan summarizes the Growth Strategy for 2025-2035 and notes that it will largely be accomplished through, generally speaking, six major initiatives that are envisioned to advance the Vision of this Plan. This Municipal Growth Element seems an appropriate place to first summarize the overall factors shaping our evolving growth management strategy. In contemplating a growth management strategy for Easton, it is necessary to first consider what the community feels is undesirable with the current state of growth and development. In doing so, it is apparent that there are many great aspects to the Town. What drives the desire for a growth management strategy is the recognition of trends contrary to these aspects. These include: ● Development that is too wasteful. Density in the older, historic parts of Easton is two to three times as dense as that found in many of the subdivisions of the last 40 to 50 years and yet, these older historic parts of Easton are consistently identified through public input as the best parts of Easton. ● Commercial development that is too ubiquitous. That is to say, it is virtually indistinguishable from that in any other community. ● Growth that is spreading outward too quickly. There is concern amongst many residents that Easton is spreading too far, too fast. Much of this problem relates to the first point above. That is, since density is so low in Easton, more and more land is necessary to accommodate even a constant rate of growth. To this point, public input in the early stages of this Plan’s preparation indicated a clear and strong preference for accommodating the majority of growth during this Planning cycle in the form of Infill, Redevelopment, and Adaptive Reuse rather than on newly annexed Farmland and Forests. ● The construction of single-use subdivisions rather than neighborhoods. Again, this causes a need for more land and also necessitates increased automobile usage. With this as the backdrop, the following Growth Management Strategy for Easton is proposed. It is identical to that which was first proposed in the 2010 Plan, with one notable addition and a modification.
Town of Easton
193
February 19, 2026
Contain Sprawl with an Urban Growth Boundary (UGB) The first step in Easton’s proposed Growth Management Strategy is designed to contain the seemingly endless outward expansion of the Town. This is accomplished through the establishment of an Urban Growth Boundary (UGB), as first implemented in the 2004 Plan Update. An UGB is essentially “a line in the sand.” On the Town side of this line, town-scale development will occur. On the other side of the line, development is much less dense. In Easton and Talbot County’s case, the difference will be even more dramatic because both jurisdictions are proposing that the UGB be bounded on the County side of the line by a greenbelt. This would be a green ring surrounding the future ultimate Town limits consisting of forests, wetlands, and farms. This greenbelt would become a top priority area for land preservation programs and initiatives at the County level. The UGB is depicted on the Growth Area and Future Land Use Maps. It has been sized to correspond to the size of a community that we ultimately feel comfortable with in terms of the ability of Easton to maintain its charm and quality of life. What this translates into in terms of future populations depends on the density of development within the UGB as well as how successful we are in terms of encouraging revitalization and infill redevelopment. What this population is or when we achieve it is less important than ensuring that when we get there, Easton is the kind of place that current and future residents will be proud to call home. The location of the UGB was based upon consultation with the Talbot County Planning Commission, current development trends, anticipated trends due to goals and objectives suggested in this Plan and logical boundaries established by property lines, roadways and natural features. Thus while it is viewed as a permanent dividing line demarcating urban and rural development, the precise location of the UGB will be examined again in 10 years as part of the next Comprehensive Plan update, just as it has been in association with this Plan revision. This 2010 Plan Update proposed no changes to the UGB and this Update does not as well. It has, in fact, remained unchanged since the adoption of the 2004 Plan with one exception. That was the expansion of the growth area (and thus the Growth Boundary and Green Belt) to accommodate the site of the proposed future Hospital and the Talbot Community Center. While the establishment of an Urban Growth Boundary and Green Belt can achieve the objective of containing the outward expansion of the Town’s urban footprint, the character of Easton of the future could still be a wide variety of things, depending on what is allowed or encouraged to happen on the in-Town side of the boundary. Filling in the growth area with single-family detached homes at the 2.0 du/ac or so density of many of the subdivisions built since 1980 would be an inefficient, Town of Easton
194
February 19, 2026
unsustainable use of this land. On the other hand, dramatically increasing density in the name of greater sustainability could also lead to a future Easton that would be out of the expressed desired character for our community. Increase Density Perhaps the most readily apparent difference between the Downtown area that so many people love and hope to see replicated and the newer “suburban” scale development that has occurred more recently, is the density of these two types of development. Accomplishing the first step in the Growth Management Strategy, establishing an Urban Growth Boundary, will accomplish little if within its borders development continues at a scope and scale such as we have seen for much of the last 30-50 years. The most telling indictment of Easton’s recent densities is the fact that in and of themselves, they would not even come close to qualifying as Priority Funding Areas under the terms of the State’s guidelines. The minimum density necessary to qualify as such is 3.5 dwelling units per acre (net). Easton’s more recent developments have a density of just less than 2 dwelling units per acre. This has a number of implications, including promoting the suburban style of development that is generally disparaged throughout this Plan, representing a wasteful use of land, and inefficiently serving the resulting homes with various utilities and public services. In order to reverse this trend, a previous Plan proposed the creation of a new zoning district that would be assigned to all future residential areas. The Plan even suggested the development standards for this new district. As described in a previous chapter of this Plan, this new Traditional Neighborhood Zoning District was proposed but never adopted by the Town Council. Instead, changes were made to the existing R-10A and R-7A zoning districts as well as to the Subdivision Regulations, in an attempt to get some of the suggested changes added to our existing development standards. In an effort to increase the likelihood that future development patterns are more traditional and less suburban, the TND concept has been reintroduced in this Plan Update, as described in the Place Chapter. Build Neighborhoods This concept has been a recurring theme throughout this Comprehensive Plan. It was discussed extensively in the Place chapter and touched upon in several other places. The key is to ensure that this approach is the easiest one under which to develop and that the more recently commonplace
Town of Easton
195
February 19, 2026
suburban type of development is the difficult method that would only be approved under truly unique and extenuating circumstances. Assuming these changes in future development patterns can be achieved, only part of the problem will be addressed. Easton will still ultimately be left with a suburban-style middle surrounding a truly traditionally developed core with a neo-traditional style collection of neighborhoods on the periphery. Undoubtedly, the biggest challenge facing the Town is in creating ways to “retrofit” the suburban-style subdivisions to make them denser, more connected, and more mixed use. This will be difficult and ultimately may never be fully achieved, but some things can be done to improve the situation, and some were implemented following the original suggestion for such changes in the 2004 Plan. These include: ● Permit additions to be made to single-family houses to create granny flats or duplexes as an outright permitted use. This change was made to the Ordinance, but little development activity of this type has occurred. ● Effectively narrow streets by striping or using a textured surface to create a pedestrian/bicycle lane. This concept was illustrated in the Quality Community Survey and the results were striking. The image of the existing wide street (in this case, Corbin Parkway) received a -1.7 rating. The computer-simulated image with a textured bike lane on both sides of the street received a +2.5 rating. This has not been accomplished, although the concept has been discussed for possible implementation at another location. Furthermore, over the course of the past year, the Town’s Engineering Department has begun striping some of our major in-Town roads to better define parking and traffic lanes and to “calm” traffic. Aurora Street and Brooklets Avenue serve as two examples where this has been accomplished.
Town of Easton
196
February 19, 2026
Corbin Parkway Existing Situation
Corbin Parkway “calmed” with paving
● Permit more neighborhood scale commercial uses by special exception in residential zoning districts. This has recently been accomplished for offices, which are allowed by Special Exception in the R-10A and R-7A Zoning Districts. A number of supplemental standards apply in order to assure that the neighborhood is not adversely impacted. Similar standards can and should be added for whatever other commercial uses might be permitted in the suburban-style subdivisions (since hopefully the newer developments will be mixed-use in nature to some degree). There has been no further progress on this recommendation beyond the limited office uses that are allowed as discussed above. ● Budget for and strategically purchase houses as they become available in order to demolish them and redevelop the sites for civic or park use. This has not been accomplished or even discussed since the last Plan. The current economic climate makes it difficult for the Town to consider such investments, even though more opportunities exist to purchase such properties at reasonable prices in such times. Going forward this is a concept that should at least be discussed for possible implementation. ● Allow for residential uses more generally in commercial zoning districts. When discussing the encouragement of mixed uses, the notion of allowing commercial uses in residential developments is often raised. However, it may be more feasible to add residential uses to commercial areas. Allowing multi-family housing in commercial zoning districts seems particularly appropriate given two recent apartment projects, on Brant Court and Elliott Road, in a shopping center/industrial park and along a commercial corridor, respectively. ● Explore options for the development of vacant land adjacent to “suburban” style subdivisions. In such scenarios requiring a TND style development may not always be
Town of Easton
197
February 19, 2026
compatible with the adjacent suburban form of development. In such locations, something that can serve as a transition between these two types of development is appropriate. They may, for example, contain some of the lower unit count middle housing types but not, perhaps, the higher unit counts or at the overall density we anticipate in the TND form of development. Improve Design The steps outlined above will go a long way towards making Easton a better place to live. The establishment of a UGB will contain the outward spread of development and the establishment of a greenbelt in the County adjacent to this UGB will offer some permanence to this limit. Increasing the density within the Town will improve the appearance and function of neighborhoods as well as decrease development pressures on other areas in and around the Town, not yet as ready to be developed. Building neighborhoods rather than subdivisions or developments will dramatically improve the livability of Easton and will decrease traffic by offering more goods and services within walking distance of where people live. Still, with all these changes, the Town will not generate a “sense of place” feeling unless improvements are made to the way the built environment looks. This issue was discussed extensively in the Place chapter of this Plan and recommended Design Principles for 2025 found in the Implementation Chapter is primarily intended to address this issue, so there is little need to repeat that material here. The challenge of this Comprehensive Plan is to ensure that this effort to achieve improved design continues, in fact advances even more, rather than retreats. In order to accomplish this, the following recommendations are offered: ● Vigorously and consistently promote and require compliance with the “Design Principles for Easton” as described in the Community Character Element. ● Update/Create Design Guidelines for various types of development (including residential). ● Utilize Forest Conservation monies and off-site plantings to enhance sparsely landscaped areas along Route 50 and the Easton Parkway. ● Develop a Tree or Urban Forestry Plan outlining areas proposed for new tree plantings, identifying sites/locations suitable as receiving areas for off-site planting that developers cannot accommodate on their properties, and establishing priorities and tools for establishing the “Green Ring” around downtown called for in the AKRF Downtown Study.
Town of Easton
198
February 19, 2026
● Accept (if not solicit) annexation requests from those businesses located on Route 50 north of the current Town Boundary and require conformance with the Town’s architectural, signage, and landscaping requirements as a condition of annexation, in order to improve this key visual gateway into Town. Plan in Accordance with the Rate of Growth The issue of actively and purposely controlling Easton’s rate of growth has been the subject of a great deal of debate for each of the last three Comprehensive Plan Updates, including this one. Historically the Planning Commission and Town Council have elected to allow the free market to determine Easton’s growth rate. However, in the 2010 Plan the Planning Commission decided that indeed the dominant theme of that Plan to retain and/or return to an older way of doing things in Easton was endangered by a continued rate of growth in the range that we had experienced in the previous 20 years or so. The fear was that at 3% growth (or more) development pressures are so great that it becomes more and more difficult to achieve all the goals relative to the type and form of development we want to see. Furthermore, growth at such a rate makes some of our most challenging problems, such as improving traffic conditions, or lessening our impact on the environment, even more difficult to achieve. As a result, the Planning Commission and Town Council ultimately enacted a Plan which identified a preference for a 1% annual rate of growth. They also recognized that by merely stating that we want to achieve growth closer to our long-term average of 1%, absolutely nothing changes to make that happen. The Commission and Town Council discussed this issue at great length and ultimately decided that, for that Planning period, the issue should most appropriately be addressed by adhering to an Annexation Policy that does not allow for an exceedingly high rate of growth. The Priority Growth Areas were viewed as suited to do this. The only potential shortcoming of this policy is the rate at which infill/build-out occurs. For this reason, the staff was directed to explore policies and tools which could achieve a specified targeted growth rate, in the event that growth gets out of control. This Plan proposes revisions to this policy. First, after a decade where the average annual growth rate has dropped to 0.7%, the concept of aiming for a “targeted” or “preferred” growth rate for the Planning period has been dropped. Instead, the directive relative to our Growth Rate is not so much an attempt to limit (or increase) any particular rate, but rather to consistently monitor the rate/amount of growth we are experiencing so that whatever growth that does occur, is at a rate that does not overly tax the Town’s infrastructure and services. Such a rate of growth is believed to be in accordance with the long-term compound rate of 1.12% and therefore an annual rate of 1% is
Town of Easton
199
February 19, 2026
reaffirmed as the appropriate target for establishing the threshold at which the Town would be alerted to take a close look at the impacts of growth at that time and investigate, if deemed necessary, legal policy and regulatory remedies to safeguard against the effects of the externalities of an unsustainable rate of growth . Encourage More Sustainable Development Patterns The one addition to the Town’s overall growth management policy presented in this update is to encourage more sustainable development patterns. As discussed in the Sustainability Chapter, this should be considered broadly to include environmental and economic sustainability. It should also be noted that a more sustainable Easton helps to achieve a more sustainable Talbot County. For example, Easton functioning as a growth center improves the chances of Talbot County successfully avoiding sprawling development throughout unincorporated parts of the County and enhances the likelihood of successful agricultural preservation. Environmental sustainability can be advanced by such actions as protecting and enhancing natural features of proposed development sites and planning for development with sea-level rise in mind. Development with a mix of uses and which accommodates multiple modes of transportation can also enhance environmental sustainability by decreasing vehicle miles travelled, thereby improving air quality (in addition to the overall transportation system benefits). Economic sustainability can be thought of in at least a couple of different ways. One is the cost to serve new development. By this measure, infill and redevelopment is clearly preferred over new “greenfield” development and new greenfield development that is more compact and more proximate to existing development is preferred over more sprawling and isolated projects. Another way to consider economic sustainability is the net fiscal benefit to the Town. That is, what forms or types of development provide more to the Town in terms of new revenue, after factoring in the cost to provide services to those same developments? P. GO ALSAND OB JECTIVES
oal #1: Support Compact, Contiguous Growth that Strengthens Easton’s Form: Easton will G grow in a manner that preserves its cohesive urban structure, avoiding scattered or inefficient development patterns. Objectives:
Town of Easton
200
February 19, 2026
● U se annexation to close gaps in the Town boundary and reinforce logical development edges. ● R equire new development to extend existing street and utility networks in a coordinated manner. ● Prevent leapfrog development that bypasses undeveloped land adjacent to the Town. oal #2: Align Growth with Available and Planned Infrastructure: Growth will occur where G infrastructure capacity is sufficient or can be provided efficiently, ensuring fiscal responsibility and service quality. Objectives: ● E valuate annexation and development proposals for their impact on water, sewer, stormwater, transportation, and public facilities. ● C oordinate annexations with the Town’s Capital Improvement Plan and Easton Utilities’ investment schedules. ● R equire that necessary infrastructure be in place or fully funded prior to development approval. ● M onitor the rate of growth to minimize the likelihood of developing more rapidly than the Town’s infrastructure can accommodate. oal #3: Leverage Annexation to Advance Public Benefit: Annexation will be used as a tool to G secure public amenities and community enhancements alongside private development. Objectives: ● R equire annexation agreements to dedicate land for parks, greenways, trails, and public facilities. ● Negotiate for developer contributions toward infrastructure, open space, and civic uses. ● E nsure new development reflects the Town’s design standards and community character goals. oal #4: Coordinate with Talbot County to Preserve Rural Lands and Guide Growth: Town G and County will work together to maintain the Urban Growth Boundary, protect the surrounding greenbelt, and promote efficient land use. Objectives: ● Continue joint planning efforts to manage the interface between Town and County land uses. ● S upport agricultural and forest land preservation tools to maintain a distinct edge between urban and rural areas. ● A lign growth management policies to prevent sprawl and ensure coordinated service delivery.
Town of Easton
201
February 19, 2026
12
IM PLEMENTATION
“A plan without action is not a plan. It's a speech.” ~ T. Boone Pickens A. INTRODUCTION
The quote cited above all speaks to the necessity to link planning with action. The bulk of this Plan frames the context of the present day and outlines the Plan for the future. If the Plan is to avoid the fate of "sitting on the shelf and gathering dust”, this final chapter on Implementation will likely be largely responsible. This 200+ page document is the result of years of extensive public input and contains one Town-wide Vision, dozens of goals, hundreds of Objectives, and numerous explicit and implicit additional strategies and policy considerations. The sheer breadth and length of any comprehensive plan can make it difficult to execute; therefore, this Implementation Chapter focuses on six Major Initiatives to focus on over the next ten years, that touch on many of the goals of this plan and that if achieved, will place us firmly on track to realize the vision for Easton in 2035 and beyond. The Implementation chapter turns the vision of the Comprehensive Plan into action. It identifies tools, responsible parties, and timeframes needed to move from policy to practice. Implementation depends on both long-term commitment and consistent coordination across public and private stakeholders. This chapter offers a framework to guide that work. B. 2026 - 2036 GROWTH STRATEGY
Throughout the course of developing this Plan, the Planning Commission has grappled with the question of what the appropriate strategy should be for accommodating the expected growth during the life of this Plan. The rationale for targeting 1.75% growth rather than 1% has previously been discussed. In short, this was picked for a number of reasons including an expectation that there is some demand in our housing market that will naturally result in more growth, that 1.75% corresponds to a rate that the Town can comfortably handle in terms of administrative processing, and the Town’s infrastructure is more than adequate to accommodate such growth. A 1% rate of growth, however, remains a key component of the Town’s growth management strategy as it is Town of Easton
202
February 19, 2026
suggested that it corresponds to a rate of growth with which the possibility of significant negative impacts associated with that growth warrant special observation to safeguard against their coming to fruition. Another aspect of growth is where it will occur. This Plan has described the options for future growth in terms of inward-looking options (i.e., Infill Development, Redevelopment, and Adaptive Reuse) or the more outward-focused options of annexing more of the Future Growth Area to accommodate future “Greenfield” development applications. The question of how much of our growth should come from these options during this Planning period was a focus of the public input phase, where an overwhelming preference for Infill/Redevelopment options was expressed. The Municipal Growth Element of this Plan estimates that 2,745 additional housing units can be constructed within the existing Town limits of Easton. These would all be considered of the inward-focused type of development. Given this convergence of a preference for Infill/Redevelopment and the ability to accommodate the residential growth needs of this 10 year Planning cycle, the Planning Commission has determined that it is both possible and appropriate to not prioritize annexation of additional lands for residential development until at least the next Comprehensive Plan Update. This statement is made with a number of caveats. One, it assumes that development in the pipeline proceeds through to project completion. Two, it assumes that there will be sufficient landowners willing to develop or redevelop their properties to accommodate the remaining projected growth for the next 10 years. Finally, it does not preclude new annexation. Boundary refinement annexations should be welcomed at any time, as should property identified in adopted Town Small Area Plans (e.g., Easton Point) and proposed for development consistent with those Plans. Non-residential annexations are also not expected to be necessary during the Planning Period, although Annexations proposed for the purpose of new job creation (i.e., Industrial projects) might reasonably be considered one of the “extraordinary circumstances” warranting an exception to this policy. Lastly, it does not definitively preclude annexing new land for residential development. It does, however, suggest that doing so would be limited strictly to development proposals of extraordinary quality that have minimal adverse impacts to the environment or the Town’s fiscal sustainability, and that adequately address the aforementioned annexation policies.
Town of Easton
203
February 19, 2026
C. AC HIEVINGTHE VISION
This Comprehensive Plan for Easton lays out a future that accommodates significant growth, but does so in a manner with which we are comfortable. It acknowledges mistakes of the past, specifically in decreasing density beginning in about the 1950’s and allowing a suburban-style of development to take root in Easton in the 1970’s and 80’s. It calls for a marked departure from these mistakes and a return to the traditional small-Town Eastern Shore style of development that shaped this community for 250 years. Easton is not a suburban community like those found on Maryland’s Western Shore or in numerous other metropolitan areas. We are a small but growing community in the heart of a rural, agricultural and maritime region. Ubiquitous power centers and strip shopping centers are not part of what we are about. Neither are cul-de-sacs, disconnected streets and subdivisions that might as well be gated because they are so isolated. Clearly Easton has some of these types of development and the people who live, work, or shop there are no less valued members of our community than anyone else. We simply have decided such developments are an inappropriate form of development going forward in Easton. In order to achieve the Vision laid out in this Plan, much help will be required. Fortunately Easton is blessed with a well-educated and involved citizenry. The level of involvement of many of these citizens throughout the process of preparing this and previous Plans has been described elsewhere in this document. In order to make the Easton we have all said we want, these same people and more must continue with this same level of commitment, interest and caring for our community. The authors of this Plan will eventually become less active and ultimately pass away, but the Vision we have created and the policies set forth herein will share this community well beyond our years here. If we want our children and our grandchildren to care about Easton as much as we all do, we need to maintain the passion and commitment to this Plan and its Vision. By the same token, the Town should be as clear as possible to those seeking to move to Easton in the future about the kinds of things we envision. Ultimately the final responsibility lies with those contemplating a move here, but the Town can help make our goals, policies, and plans more clearly known so that this decision about whether to locate to Easton is as informed as possible. We should strive to communicate in as many means and mediums as possible. Our website should be easily navigable and up-to-date and we should look into means of communicating that are just now exploding in other realms, such as blogging, podcasts, streaming audio (or video) of meetings, social
Town of Easton
204
February 19, 2026
networking sites, etc., so that all existing and future residents have the greatest possible opportunity to participate in shaping our community in the future. MAJOR INITIATIVES In order to realize the Vision of this Plan for Easton in the year 2035 and beyond, a myriad of actions are necessary. However, significant progress towards that future can be made through a combination of actions, policies, etc., that can be combined and categorized into six major initiatives. These initiatives are: 1. Zoning Reform 2. Complete Streets 3. Improve Design 4. Promote Infill and Redevelopment 5. Manage Growth by Annexation 6. Small Area Planning ZONING REFORM Every Comprehensive Plan is (or should be) followed up with a comprehensive review and, as necessary, update to the jurisdiction’s Zoning laws. Zoning reform takes this exercise to another level, by critically examining the Zoning Code to identify obstacles to the creation of the development patterns and building types that the community desires. Such an effort is undertaken in recognition that while it is important to describe the type of built-environment the community aspires to, if the zoning laws do not allow for such patterns to actually be built, then it is very unlikely that anything will change before it is time to draft the next Comprehensive Plan. Zoning Reform in Easton will likely involve looking, at a minimum, at the aspects of our Zoning Code: ● The creation of the Traditional Neighborhood Development zoning district that was described in the Place Chapter.
Town of Easton
205
February 19, 2026
● The allowance of mixed-use buildings and developments in a wider variety of circumstances and via simpler review processes. ● The inclusion of standards to create a more walkable Easton. ● The refinement of public input opportunities associated with development projects so that it occurs earlier in the process, before significant engineering, design, and survey costs are incurred by the developer. Genuine neighborhood participation at this stage of the development process should give neighbors a greater chance to shape their community. For developers who are authentically engaged in such a process, it can also help them identify, early in the process, the scope and character of development that is appropriate for the neighborhood and can increase the level of public support for the project when it is officially submitted for review. ● Providing for a wide-spectrum of housing options, reflecting the variety of housing needs in Easton. In addition, this will also involve examining the development standards associated with each housing type to ensure that they accommodate the housing types with which they are associated. ● Introducing requirements to ensure that development is financially sustainable and will ultimately contribute more in taxes and revenue to the Town than it costs taxpayers to serve the project. Complete Streets Complete streets were defined and described in the Transportation Element. A description of Easton’s Complete Street’s early efforts was also included. If the effort is continued it will lead to, at least, the following changes: ● A transportation system that better accommodates all modes of transport, not primarily (or solely) the automobile. ● A better connected community, leading to easier social interaction, more travel options, and better emergency services response times. ● New (and retrofitted) roads that are designed appropriate to their context and purpose. ● Prioritizing safety over speed. ● Enhancing the appearance of neighborhoods thereby leading to increased property values.
Town of Easton
206
February 19, 2026
● Improved public health as it becomes easier and safer to walk in neighborhoods. IMPROVE DESIGN A common and recurring theme throughout this Plan is the desire to improve various aspects of the built environment in Easton. This is so much the case that we created a chapter, Place, that largely addresses this issue. We also place a great deal of emphasis on the Design Principles for Easton section of that chapter. Design issues cover a vast spectrum, from site details such as signage and landscaping to Town-scale issues such as the character of neighborhoods that are allowed to be built in the future. Some of the issues and actions that improving design might involve include: ● Requiring developers to more genuinely address and adhere to the Design Principles for Easton. ● Updating Design Guidelines, especially for properties outside the Historic District. ● Examining design-related supplemental standards of the Zoning Code to ensure that they remain relevant to 2025 development practices and considering appropriate additions to the list of such requirements. ● Evaluating our Landscaping and Signage standards to ensure that they contribute to the design standards envisioned for new development in Easton.
2026 Design Principles for Easton Development in Easton often exceeds by-right zoning, requiring Town staff, boards, commissions, and the Council to review proposals against the Comprehensive Plan. Though this open-ended approach to development review provides flexibility in evaluating an application, its breadth can obscure expectations for applicants and disempower approving bodies in their decision-making and lead to conflicting interpretations of the Plan. To provide clarity, past Plans introduced Design Principles—a framework for applicants and reviewers. Previously located in the Community Character chapter, they now span the entire Plan and are included here in the Implementation chapter, reflecting their importance as an evaluation tool. They are not ranked by priority but organized for coherence.
Town of Easton
207
February 19, 2026
Principle 1: Neighborhoods Are Places to Live, Not Just Sleep In keeping with the objectives of the Plan pertaining to community character, fiscal sustainability, and parks, projects in Easton should provide an integrated mix of uses in a return to a pattern of Traditional Neighborhood Development. Characteristics include: ● N eighborhoods should reflect Traditional Neighborhood Development, where homes, destinations, and public spaces are interwoven. ● Provide non-residential uses at or near the neighborhood center. ● Scale these uses to meet community needs, including nearby areas lacking amenities. ● Design shops, cafés, or civic spaces as welcoming “third places” for the public, not private perks. ● Open spaces should be accessible, generous, and encourage active living. ● A void: highway strip centers, large retail with housing tucked behind, or isolated “leftover” open space without purpose.
Principle 2: Streets are for People, not just Automobiles Many problems with contemporary development stem from automobile dependence, which produces sprawl, isolation, and fiscal strain. This principle advances the Plan’s Transportation, Ecology, and Sustainability goals by emphasizing development patterns that serve people first, not cars. Projects should therefore follow these design standards: ● Streets should function as Complete Streets, safe for walkers and cyclists as well as drivers. ● Traffic calming should be built into design, slowing drivers naturally. ● Arterials should minimize driveways to protect traffic flow and safety. ● P arking should be secondary: placed behind buildings, reduced in scale, and balanced with bicycle parking. ● Subdivisions should include alleys for service access. ● Developments should be walkable and oriented toward existing pedestrian corridors. ● Build at densities that can eventually support transit. ● A void: disconnected sidewalks, front-dominant garages, parking lots lining the street, or arterial-width streets in neighborhoods.
Principle 3: Neighborhoods Should Connect Neighborhoods should be linked to surrounding areas wherever possible. Strong connections create resilient traffic networks with multiple routes for daily travel and emergency access. They also expand opportunities for residents to reach jobs and retail, supporting Easton’s economic
Town of Easton
208
February 19, 2026
development goals and fostering a stronger sense of community across town. New developments should be evaluated with these considerations in mind: ● Provide multiple points of access for all modes. ● Use grid-like street patterns where conditions allow. ● Link to adjacent existing and future developments and continue the grid pattern. ● Connect open spaces into the broader green infrastructure system.
Principle 4: Neighborhoods Should Offer Diverse Housing This principle supports the Plan’s Housing objectives. Beyond the socioeconomic benefits of attainable housing, it seeks to create streetscapes that echo Easton’s historic pattern of incremental, varied development. Projects should be evaluated on how well they integrate a mix of uses and provide housing in a wide range of forms, types, sizes, and price points within the same neighborhood. Evaluating whether a project meets this principle should consider: ● Affordable units should blend in design with their neighbors. ● Prominent facades should mix housing types, sizes, and styles. ● Provide unit types and prices not already met in nearby areas. ● Adaptive reuse of underused non-residential buildings for housing is encouraged. ● A void: monotonous typologies, segregation of unit types, projects offering only single-family and apartments, townhomes without variation, or price ranges excluding households below 100% of AMI.
Principle 5: Environment Should Shape Design Consistent with Smart Growth principles, focusing development within Town limits reduces pressure on surrounding farmland, habitats, and sensitive environmental areas. Even so, Easton still has a responsibility to mitigate impacts inside its boundaries. Development should work with—rather than against—the environmental realities of each site. In line with the Plan’s Ecology and Sustainability goals, proposals should be evaluated against the following criteria: ● Greenfield development must justify the conversion of valuable land. ● Prioritize brownfield redevelopment and adaptive reuse. ● Preserve and integrate topography, streams, and natural features into site design. ● Use existing vegetation and supplement with native species. ● Design lighting and buildings to reduce bird strikes.
Town of Easton
209
February 19, 2026
● Require energy-efficient, durable building practices. ● Address flooding, heat, and other climate-related risks. ● Improve stormwater runoff quality.
Principle 6: Development Should Be Fiscally Sustainable Land is a limited resource, and its conversion carries unavoidable environmental costs. Developments should therefore demonstrate long-term value to the community, measured against the expense of maintaining infrastructure and services. This principle reflects a Smart Growth approach to infrastructure planning and supports development patterns identified through Easton’s Value Per Acre analysis as fiscally beneficial to the Town. In line with the Land Use, Community Facilities, and Sustainability elements of the Plan, applications should be evaluated using the following considerations: ● Projects must balance the cost of infrastructure and services with long-term community benefit. ● Require fiscal impact studies for major subdivisions and greenfield projects. ● Encourage infill and adaptive reuse. ● Size parking appropriately based on demands and redevelop underused lots. ● A void: sprawling low-density projects, leapfrog growth, unfunded infrastructure obligations, or excessive parking.
Principle 7: Easton Is a Unique Place Easton’s rich history and its incremental, individualized development pattern are worth protecting and should guide modern projects. The goal is not to replicate the historic district’s aesthetic, but to honor Easton’s identity by creating distinctive, memorable places that inspire pride and curiosity. Applicants should therefore consider: ● New development should honor Easton’s legacy while adding something distinct and lasting. ● Create designs that are modern yet harmonious with surrounding character. ● Restore and adaptively reuse historic structures where possible. ● Preserve historic or unique site features. ● Design open spaces to be engaging and interactive. ● Use multiple builders in large projects to encourage variety. ● Employ repetition only when purposeful and expressive. ● Keep signage informative, not overwhelming.
Town of Easton
210
February 19, 2026
● A void: template-based developments, strip retail, brand-driven architecture, cheap historic imitations, or redevelopment that displaces existing communities.
In short, developers should create places that reflect Easton’s present moment—unique spaces the community will value and remember, just as we now recognize and treasure our historic downtown and neighborhoods.
Principle 8: Be a Good Neighbor No property in Easton exists in isolation. Land use and development decisions should be made with respect for the people who live, work, and play nearby. Easton residents value collaborative placemaking, which—when used constructively—can produce stronger designs and more positive outcomes. Beyond process, sites should be developed with courtesy toward neighbors and awareness of potential impacts. In this spirit of community-oriented development, evaluators should expect: ● Development should contribute positively to its surroundings and foster community. ● Engage neighbors early, especially for large projects. ● Align projects with small area plans and charrette outcomes. ● I nclude improvements and amenities that benefit both project residents and the broader community. ● Use open space to buffer incompatible uses. ● Minimize noise, light, and other negative impacts. ● T his principle is not a tool for blocking density or innovation but a reminder of the value of collaboration and mutual respect. his principle is not meant to block higher densities or innovative designs. Instead, it should foster T frank dialogue among community members about their goals and needs. PROMOTE INFILL AND REDEVELOPMENT The public clearly stated, and the Planning Commission strongly agrees, that the bulk of new growth over the upcoming planning period can and should be accommodated through infill and redevelopment. Specific actions to advance this initiative may include: ● Reimagining the Planned Redevelopment Overlay District to ensure that it both enables the type of redevelopment desired and does so in a manner that is minimally disruptive to surrounding neighborhoods. Town of Easton
211
February 19, 2026
● Encourages Brownfield redevelopment both through the land use/zoning aspect of ensuring that the desirable reuse is permitted (or at least possible) and through the financial feasibility aspect by working with developers to identify potential funding sources. ● Working with owners of outdated strip shopping centers to facilitate their redevelopment consistent with the Vision of this Plan. ● Adopting a Small Area Plan for the site of the current hospital and working with the eventual new property-owner to facilitate the ideas/desires expressed in that Plan. MANAGE GROWTH BY ANNEXATION The flip side to encouraging the bulk of growth over the next ten years to occur in the form of infill and redevelopment is the discouragement of growth through annexation. As indicated throughout this Plan, we believe that it is entirely possible to accommodate all anticipated residential growth for the next ten years without having to annex new lands into the Town. We further believe that this should be the Town’s policy for the next ten years. However, there are a number of mitigating factors that suggest it would be unwise to absolutely preclude the possibility of annexations. Such factors include: ● Owners of logical infill or redevelopment sites may, for whatever reason, not be interested in the development/redevelopment of their properties. ● It may be desirable to annex land within the growth area in order to also annex a longstanding County subdivision (e.g., Crofton, Old Beechwood, Old Stoney Ridge) and not violate State Annexation law regarding contiguity or the creation of enclaves of non-municipal land surrounded by municipal land. ● Some limited annexation is actually called for in official Town Small Area Plans (portions of Easton Point in the Port Street Small Area Plan, for example). Given that Annexation is a legislatively discretionary action of the Town Council, this can be accomplished through the development of, and adherence to, a set of appropriate annexation policies. To that end, the following policies are suggested as appropriate for Easton during this planning period, in the event that the Town Council is of a mind to entertain a potential Annexation request:
Town of Easton
212
February 19, 2026
● Proximity to Town Boundaries should be a significant consideration. Any area annexed must be adjacent to the Town, preferably for a considerable distance and on more than one side. The higher the degree of contiguity, the higher the preference should be given to the parcel. ● Land on which a future amenity or public facility is identified (in this Plan, a Small Area Plan, or functional Plan such as EUCs Water & Wastewater Master Plan or the soon-to-be completed Town Complete Streets Plan) should be given favorable consideration. This is especially true when the need for such amenity or facility is significant and/or imminent. ● Developers/Landowners who propose to provide land for amenities or public facilities which are specified in the Plan or in other Town Plans as being needed, but have no specific location attached thereto, should be afforded favorable consideration. ● Land that facilitates the annexation of long-standing enclave Boundary Refinement Area, if applicable, should be given strong preference over other areas. ● Annexations which include an affordable housing component should take precedence over those that do not. ● Proposed annexations should include aspects that provide some form of benefit to the Town. This could take the form of job creation, a demonstrable positive fiscal impact or the provision of the regional-scale park on the east side of Town mentioned elsewhere in this Plan. ● Annexations must propose to minimize harm to sensitive environmental features, which should be protected and enhanced rather than ignored or eliminated. ● Projects which propose to develop pursuant to the Traditional Neighborhood style of development or serve as a transition between existing suburban development and future Traditional development should be prioritized over additional strictly suburban development. ● Projects that “align” with Town infrastructure with regards to timing, location, etc., should be given priority over more isolated and remote projects. ● Projects that propose to provide Capital Improvements for a future multi-modal transportation system should take precedence over those that do not.
Town of Easton
213
February 19, 2026
● Annexation of Town-owned properties, or requests initiated by the Town, should be considered favorably, provided they are consistent with the goals and objectives of this Plan. Annexations should be the exception rather than the rule during the 2025-2035 plan cycle and no exception should be made unless the proposed annexation is consistent with these policies and clearly demonstrates that if approved, the Annexation will have a net positive fiscal impact on the Town.. Furthermore, satisfying some or even all of the criteria above does not guarantee that the request will be approved as Annexation remains a discretionary power of the Town Council nor does it ensure a favorable recommendation from the Planning Commission. SMALL AREA PLANNING Small Area Plans have been utilized in Easton for decades. These Plans function as an extension of the Comprehensive Plan. Because they focus on a smaller geographic area, more specific recommendations can often be made than in the overall Comprehensive Plan, sometimes right down to the parcel-specific level. Currently we have three active Small Area Plans. The most recent is the Port Street/Easton Point Plan. Although little development activity has occurred since that Plan was adopted, it was not so long ago as to be considered irrelevant. Furthermore, the Vision it advances is still considered appropriate and desirable for the area. The other two adopted Small Area Plans are those for the Downtown or Town Center and the East End. These are both somewhat more dated. The East End Plan is in the process of being significantly revised. Given the passage of time and the changes that have occurred in Downtown Easton since that Plan was adopted, it seems appropriate to begin planning and budgeting for a replacement of it during this upcoming planning period. Given the growth dynamics in the Town and our Future Growth Areas, a number of candidates for Small Area Plans come to mind for future planning. These include: ● The site of the current hospital and its immediate surroundings. ● The general area of the new hospital. ● Idlewild and Dutchman's corridors (where so many medical offices are located and which may potentially relocate closer to the new hospital). ● Marlboro Avenue Corridor (potential redevelopment). ● Route 50 Corridor (redevelopment, design and access improvements).
Town of Easton
214
February 19, 2026
● Future Growth Areas (a closer examination of discrete subsection of the growth area to consider more detailed land use suggestions). D. GO ALSAND OB JECTIVES
GOAL #1: Ensure that future development, proposed development related programs and redevelopment projects are implemented consistent with the spirit of this Comprehensive Plan generally, and are evaluated for consistency with the 2026 Design Principles for Easton specifically. OBJECTIVES: ● Provide an analysis of the implementation progress of the Comprehensive Plan’s Goals and Objectives each July as part of the Annual Report of the Easton Planning & Zoning Commission. ● Audit the Town’s Zoning Ordinance and Subdivision Regulations to insure that future growth of the Town occurs in a system of neighborhoods rather than a collection of single-use, suburban style subdivisions, and that sufficient tools exist to facilitate Infill, Redevelopment and Adaptive Reuse of buildings. ● Develop, evaluate and refine Design Standards for all types of development in all parts of Town. ● Work with various local groups in order to prepare Small Area Plans similar to that done by the East Side neighborhood several years ago. Where the institutional capacity exists, these neighborhood plans can be largely prepared by the neighborhood groups themselves. GOAL #2: Realize the benefits of revitalization through focusing on Smart Growth in order to make our older neighborhoods more affordable, more attractive, more varied, walkable, safer and healthier, utilizing existing infrastructure. OBJECTIVES: ● Target public investment in infrastructure and infrastructure upgrades to already developed areas since opportunities to acquire such infrastructure from new development are rare. ● Support efforts to revitalize neighborhoods through infrastructure grants, housing rehabilitation loans and programs, environmental clean-ups, etc.
Town of Easton
215
February 19, 2026
● Establish policy that builds on the strengths of existing housing stock, thus preserving Easton’s history and sense of place GOAL #3: Research and, where appropriate, enact policies and measures that enable implementation of the Vision and spirit of this Comprehensive Plan. OBJECTIVES: ● Research the legality of various methods of limiting growth to achieve an annual growth rate of no more than 1% per year. ● Evaluate the effectiveness of existing rules and regulations in achieving the design goals and principles of this Plan. GOAL #4: Coordinate planning efforts for areas and issues of mutual concern to the Town of Easton and Talbot County. OBJECTIVES: ● Work with County Planning officials to ensure that areas designated for future growth of the Town are treated similarly by the Plans of both jurisdictions. ● Continue to work cooperatively with Talbot County to determine the feasibility and practicality of an Inter-jurisdictional Transfer of Development Rights (TDR) Program, should the Talbot County TDR ever be revived. GOAL#5: Facilitate an informed and involved citizenry. OBJECTIVES: ● Investigate methods to ensure that significant future projects (e.g. roads, community facilities, parks, etc.) are known by prospective homebuyers prior to the finalization of the sales process. ● Explore more and innovative ways to inform and involve the general public in planning issues. ● Create a Citizen’s Planners Academy to inform and educate interested members of the public about planning and planning issues and provide a pathway to increased civic involvement through membership on various
Town of Easton
216
February 19, 2026
13
Town of Easton
APPENDICES
217
February 19, 2026
APPENDIX 1 - HISTORICAL DEVELOPMENT AND GROWTH DYNAMICS
Town of Easton
218
February 19, 2026
Historical Regional Population Growth
Easton
Talbot County
Eastern Shore
1960 Population
6,337
21,578
243,570
Easton %
100
29.4
2.6
1970 Population
6,809
23,682
258,329
Easton %
100
28.8
2.6
1980 Population
7,536
25,604
296,620
Easton %
100
29.4
2.5
1990 Population
9,372
30,549
343,769
Easton %
100
30.7
2.7
2000 Population
11,708
33,812
395,903
Easton %
100
34.6
3.0
2010 Population
15,945
37,782
449,226
Easton %
100
42.2
3.5
2020 Population
17,101
37,526
456,815
Easton %
100
45.6
3.7
Town of Easton
219
February 19, 2026
Compound Annual Growth Rates, 1960-2020:
2000-2020
Easton: 1.67%
1.91%
Talbot County: 0.93%
0.52%
Eastern Shore: 1.05%
0.72%
Absolute Growth 1960-2020:
2000-2020
Easton: 10,764 (170%)
5,393 (46.1%)
Talbot County: 15,948 (73.9%)
3,714 (11.0%)
Eastern Shore: 213,245 (87.5%)
60,912 (15.4%)
Town of Easton
220
February 19, 2026
Population Growth, Easton and Selected Communities (2000-2024)
2020 Census
2022 ACS
2010 Census
Change % 2010-2020
Change % 2020-2022
EASTON
17,101
17,342
15,945
7.2%
1.4%
Centreville
4,724
4,700
4,285
10.3%
-0.5%
Cambridge
13,096
13,058
12,326
6.2%
-0.3%
Hurlock
2,070
2,284
2,092
-1.1%
10.3%
Denton
4,848
4,836
4,418
9.7%
-0.2%
St. Michaels
1,049
1,523
1,029
1.9%
45.2%
*- 2020 figure is from the Decennial US Census and is as of 8/1/2020
2022 figure is an estimate from theAmericanCommunitiesSurvey(aUSCensusproduct) and is as of 7/1/22)
2010 figure is from the Decennial Census and is as of 4/1/2010
Town of Easton
221
February 19, 2026
TOWN OF EASTON HISTORIC POPULATION
Town of Easton
YEAR
POPULATION
1800
1,000
1810
NA
1820
NA
1830
NA
1840
1,358
1850
1,413
1860
NA
1870
NA
1880
3,005
1890
NA
1900
3,074
1910
3,100
1920
3,400
1930
4,092
1940
4,536
1950
4,836
1960
6,337
1970
6,809
1980
7,536
1990
9,372
2000
11,708
2010
15,945
2020
17,101
222
February 19, 2026
HOUSEHOLD INCOME DISTRIBUTION, 2020 (in 2021 inflation-adjusted dollars)
Income Category
Number of Households
Percent
Less than $10,000
289
4.1%
$10,000 - $14,999
248
3.5%
$15,000 - $19,999
385
5.59%
$20,000 - $24,999
300
4.3%
$25,000 - $29,999
327
4.7%
$30,000 - $34,999
208
3.0%
$35,000 - $39,999
188
2.7%
$40,000 - $44,999
221
3.2%
$45,000 – $49,999
232
3.3%
$50,000 - $59,999
527
7.5%
$60,000 - $74,999
656
9.4%
$75,000 - $99,999
1,051
15%
$100,000 - $124,999
842
12%
$125,000 - $149,999
374
5.3%
$150,000 - $199,999
518
7.4%
$200,000 or more
648
9.2%
Median Household Income
Per Capita Income =
Persons in Poverty = 9.8%
= $72,771
$40,265
Source: U.S. Bureau of Census, American Communities Survey
Town of Easton
223
February 19, 2026
Table 5 Median Household Income Easton
Talbot County
Maryland
1999
$36,464
$43,532
$52,868
2007
$46,378
$56,057
$68,080
2022
$72,771
$79,349
$91,431
Source: U.S. Bureau of Census, American Communities Survey
Town of Easton
224
February 19, 2026
APPENDIX 2 - PUBLIC SURVEY RESULTS
Town of Easton
225
February 19, 2026
Survey #1 - Big Picture Issues 1 Where do you live?
2. Interest in Easton?
Town of Easton
226
February 19, 2026
3. Easton’s population is (From 1 = Too Small to 5 = Too Large)
4. Easton’s Rate of Growth is (From 1 = Too slowly to 5 = Too Rapidly)
Town of Easton
227
February 19, 2026
5. The geographic size of the Town is (1 = Too small to 5 = Too Large)
Town of Easton
228
February 19, 2026
6.
Percentage
of
Future
Growth
that
should
be
Infill/redevelopment vs. new Greenfield Development Top 5 Responses: 80/20 Infill (119) 50/50 (83) 100% Infill (67) 75/25 (52) 90/10 and 70/30 (42 each)
. AmountofRegional-ScaleRetailShoppinginEaston(*-InEaston, 7 this has generally come to refer to shopping centers and/or single retail stores in excessof65,000squarefeetoffloorspace(roughlythesizeofourGiantorBJ’s,for example) is (1 = Too little to 5 = Too Much):
8. WhichofthefollowingshouldbepoliciesoftheTowninlightof limate Change Impacts: C
Town of Easton
229
February 19, 2026
9. Your one “audacious” idea to improve Easton: Some of the most commonly recurring responses included: ● Boathouse ● Public Waterfront ● Affordable Housing ● Develop Port Street/Waterfront ● Keep Easton small/unique/historic ● More Downtown parking/parking garage ● Control/Limit Growth ● Redevelop/Reuse old/vacant buildings
0.OneThingmissinginEastonthatyouwouldliketoseeaddedin 1 next 10 years: Most frequently noted suggestions were: ● Trader Joe’s (Far and away the most common response) ● Public Waterfront Town of Easton
230
February 19, 2026
● Home Depot ● Steakhouse ● Costco ● Brewery ● Downtown Grocery Store
Survey # 2 - Quality of Life Issues
1. How importantisittomaintaineachofthecomponentsofthe overall Town Growth Strategy as stated in the 2010 Comprehensive Plan (1 = strongly disagree with the component to 5= strongly agree with the component):
Town of Easton
231
February 19, 2026
Town of Easton
232
February 19, 2026
2. Please consider each of the following factors often associated with a
community's quality of life and indicate the degree to which you think each factor affects current residents in terms of a decision to potentially locate here:
Town of Easton
233
February 19, 2026
Town of Easton
234
February 19, 2026
Town of Easton
235
February 19, 2026
Town of Easton
236
February 19, 2026
Town of Easton
237
February 19, 2026
3. Please name one thing that the Town should strive to add or improve in order to enhance the quality of life of our existing residents: The five responses most frequently mentioned were: ● Affordable Housing ● Grocery Store Downtown Town of Easton
238
February 19, 2026
● Public Waterfront ● Parking (Downtown) ● Walkability
4. What is the most important asset/resource/amenity for the Town to protect or enhance as we contemplate the future of our community? The top three responses were: ● Downtown Charm/Vibrancy/Character ● Green Spaces/Parks ● Historic Character 5.
Places most likely to show someone who has never been to Easton
before: irtually every response included Downtown in general and/or a V specific business or institution Downtown.
6. Where would you avoid showing these visitors?:
Frequently recurring responses included: ● Nothing/Nowhere ● Big Boxes ● Route 50 ● Port Street
. 7 The current Comprehensive Plan talks a lot about the desire for Easton to avoid monotonous, cookie-cutter, "Anyplace USA" (Suburban-Style) housing developments. Please indicate how important you think this Vision is for the future of Easton and then the importance of each of the following policies in Town of Easton
239
February 19, 2026
achieving this goal:
Town of Easton
240
February 19, 2026
Town of Easton
241
February 19, 2026
Town of Easton
242
February 19, 2026
8.
How should the current hospital site be redeveloped/reused?
Top Responses were: ● Affordable Housing ● Housing (in general) ● College ● Medical Use ● Mixed-use ● Park/Open Space
9. Whichofthefollowingwouldyousupportevenifitmeantatax increase?:
Town of Easton
243
February 19, 2026
Survey #3 - Quality of Life (More Questions)
Town of Easton
244
February 19, 2026
Town of Easton
245
February 19, 2026
For non-Easton residents:
Would you consider living in Easton? Why or why not? Yes Wish I could afford it. Lived here my whole life and was pushed our due to rent. Yes. If there wasn’t a housing challenge. yes if i could find something comparable to my house and affordable Yes, only if there was affordable housing. Town of Easton
246
February 19, 2026
Couldn't afford to Yes. I would love to but I cannot afford to live in Easton Ehhh most likely not. Stict ordinances, expensive housing. Yes, because Easton has more entertainment and a community more involved than surrounding counties. No, too much crime and too expensive Yes. Lived in town limits for 25 years and wouid moved back. No, it’s very stuffy. I used to live in Easton but moved to Cambridge because there are more young people and town activities, as well as better access to the water for people who don’t own waterfront estates. No, because I have retired. Yes because of the vibe of the town, especially downtown
What type of business or entertainment option would you like to see that isn't here right now? AI summarized responses: ● Entertainment: Many responses requested more entertainment options such as arcades, mini-golf, larger music/theater venues, comedy clubs, and indoor sports facilities, including an ice rink. There was also interest in adult-focused entertainment like adult arcades and safer bars/nightlife. ● Restaurants & Food Options: Respondents expressed a desire for a wider variety of restaurants, including specific chains like Shake Shack, Five Guys, Mod Pizza, Texas Roadhouse, Buffalo Wild Wings, and Trader Joe's. They also requested more diverse dining options (e.g., Greek, Mediterranean, African, Dominican/Puerto Rican, Thai, gastropub, lobster house), a bakery, and more affordable local restaurants. ● Retail & Services: Suggestions included a bigger Walmart, Costco, Home Depot, chocolate Town of Easton
247
February 19, 2026
shop, beauty and wellness spas, tattoo shops, and a cat petting business. ● Community Amenities & Infrastructure: Several responses highlighted the need for more activities for youth and teens, a splash pad park, bike lanes, a bus system, and public transportation to locations like DC. There was also a request for a place of worship not Christian related. ● Other: A few respondents mentioned a gun range, a brewery, or indicated that they already have what they need in Easton.
What words describe your impression of Easton? ● Town Atmosphere: Many described Easton as charming, quaint, small, and quiet, with a peaceful, friendly, and laid-back vibe. ● Demographics & Lifestyle: Several responses noted Easton as a retirement community geared towards retirees and wealthy members, with a "rich white people" or "preppy" impression. ● Amenities & Walkability: Some respondents highlighted cosmopolitan amenities, walkability, and a sense of safety. ● Perceived Issues: A few responses mentioned high prices, a perception of being crime-ridden and run down, or being "unduly self satisfied." ● Overall Impression: Easton was broadly seen as a nice, beautiful, and enjoyable town, with some calling it "perfect" or stating "everything works."
Town of Easton
248
February 19, 2026
Town of Easton
249
February 19, 2026
Town of Easton
250
February 19, 2026
Town of Easton
251
February 19, 2026
Town of Easton
252
February 19, 2026
Town of Easton
253
February 19, 2026
Town of Easton
254
February 19, 2026
APPENDIX 3 - HISTORIC ANNEXATION LIST
Town of Easton
255
February 19, 2026
HISTORICAL ANNEXATIONS NO.
DATE
ANNEXATION
AREA
TOTAL (CUM.)
SQ. MILE (CUM.)
(AC)
1
3/12/1786
1785 John Needles Survey
94.500
94.500
0.14766
2
Nov. 1806
John M. G. Emory Survey
24.200
118.700
0.18547
3
1/26/1880
J. M. Tharp Survey
186.300
305.000
0.47656
4
1916
Kastenhuber Survey
195.352
500.352
0.78180
5
1927
Community Park
45.00
545.352
0.85211
6
June 1951
Wm. H. Corkran Survey
445.339
990.691
1.54795
7
2/02/1961
Hughlett Street
4.551
995.691
1.55507
8
6/02/1961
Part of Marlboro
20.000
1015.242
1.58632
9
7/05/1962
Easton Motels – Rte 50
2.400
1017.642
1.59007
10
5/02/1963
Marlboro
17.618
1035.260
1.61759
11
2/17/1965
Brookwood
3.502
1038.762
1.62307
12
4/29/1965
Mecklenburg
101.524
1140.286
1.78170
13
8/20/1965
Third Haven Heights
12.065
1152.351
1.80055
14
9/02/1965
Applewood Court
6.288
1158.639
1.81037
15
12/03/1965
North Glenwood
10.020
1168.659
1.82603
16
6/02/1966
Hallowell
16.431
1185.090
1.85170
17
6/30/1966
The Easton Parkway
164.694
1349.784
2.10904
Town of Easton
18
6/30/1966
Maryland National Bank
4.673
1354.457
2.11634
19
6/30/1966
Frankford
214.196
1568.653
2.45102
256
February 19, 2026
Town of Easton
18
6/30/1966
Maryland National Bank
4.673
1354.457
2.11634
20
12/01/1966
Pennsfield
176.840
1745.493
2.72733
21
3/02/1967
Witt Woodland
198.889
1944.382
3.03810
22
6/02/1967
Mulberry Hill
385.948
2330.330
3.64114
23
10/21/1967
Glenwood Heights
136.404
2466.734
3.85427
24
8/02/1968
Trippe Avenue
12.528
2479.262
3.87385
25
10/30/1969
Maryland State Police
8.630
2487.892
3.88733
26
10/01/1970
Airport Industrial Park
241.786
2729.678
4.26512
27
12/03/1970
Idlewild Lots
4.049
2733.727
4.27145
28
4/30/1970
North Clifton
5.549
2739.276
4.28012
29
11/04/1971
Carroll’s Addition
24.547
2763.823
4.31847
30
6/01/1972
Golt Farm
129.354
2893.177
4.52059
31
4/05/1973
Idlewild Lots
5.740
2898.917
4.52956
32
4/19/1973
South Beechwood
36.546
2935.463
4.58666
33
11/01/1974
West Galloway
15.529
2950.992
4.61093
34
1/02/1975
Poplar Hill
174.358
3125.350
4.88336
35
6/05/1975
Central Clifton
24.189
3149.539
4.92115
36
7/02/1976
North Clifton
30.703
3180.242
4.96913
37
7/23/1976
Stoney Ridge Farm
222.976
3403.218
5.31753
38
10/01/1976
Reward Farm
110.705
3513.923
5.49050
39
11/05/1976
Ashby Woodland
43.338
3557.261
5.55822
40
2/03/1978
Elliott Road
5.993
3563.254
5.56758
41
3/02/1978
Idlewild Farm
128.626
3691.880
5.76856
42
1/18/1979
Easton Airport
595.809
4287.689
6.69951
43
4/02/1981
Woodland Farm
309.686
4597.375
7.18340
44
3/03/1983
Lutheran Church – Rte 50
6.006
4603.381
7.19278
45
9/18/1986
Craft Farm
102.670
4706.051
7.35320
46
12/05/1986
Mulberry Hill/W. Galloway
233.844
4939.895
7.71859
47
7/02/1987
William Favinger
10.260
4950.155
7.73462
48
3/03/1988
John O. Brooks
31.551
4981.706
7.78392
49
5/23/1989
County Roads Facility
6.080
4987.786
7.79342
257
February 19, 2026
Town of Easton
18
6/30/1966
Maryland National Bank
4.673
1354.457
2.11634
50
4/06/1990
Londonderry
25.430
5013.216
7.83315
51
1/13/1991
Ewing – Dover Rd.
2.130
5015.346
7.83648
52
2/17/1991
RGA/Davis – Denton Rd.
27.900
5043.246
7.88007
53
5/03/1991
Dudrow (N. Glenwood)
187.850
5231.096
8.17359
54
6/18/1992
Ward/Benhoff – Dover Rd.
13.595
5244.691
8.19483
258
February 19, 2026
Town of Easton
55
8/16/1993
Lyon’s Farm
217.100
5461.791
8.53405
56
3/18/1995
Cooke’s Hope
162.365
5624.156
8.78774
57
10/23/1995
Public Works Facility
15.451
5639.607
8.81189
58
2/03/1996
Swann Farm
80.540
5720.147
8.93773
59
7/24/1996
Celeste Industries (Jettison)
-16.322
5703.825
8.91223
60
11/24/1996
Swann Haven L.P.
30.442
5734.267
8.95979
61
11/24/1996
Wickersham Farm
162.570
5896.837
9.21381
62
5/30/1997
Talbot Bible Church
10.361
5907.198
9.23000
63
12/07/1998
Trippe’s Creek/Cheston L.P.
217.851
6125.049
9.57039
64
1/18/1999
Charles O. Parks
7.598
6132.647
9.58226
65
4/17/1999
Swann Haven L.P.
75.743
6208.390
9.70061
66
6/25/1999
Ratcliffe Manor
386.440
6594.830
10.30442
67
4/30/2000
Ratcliffe Manor Lane
3.176
6598.006
10.30939
68
8/26/2001
Town Properties (4)
7.926
6605.932
10.32177
69
10/15/2001
Swann Farm
79.014
6684.946
10.44523
70
7/26/2002
Hoffman
52.291
6737.237
10.52693
71
7/26/2002
UP Associates
23.084
6760.321
10.56300
72
7/3/2003
Kennedy Street
26.866
6787.187
10.60498
73
6/11/2005
West Glenwood
30.192
6817.379
10.65216
74
5/15/2006
Londonderry
13.492
6830.871
10.67324
75
8/03/2007
Clifton Industrial Park
35.41
6866.281
10.72856
76
8/11/2011
Hyde Park
117.994
6984.275
10.91293
77
7/1/2012
Spring
17.170
7001.445
10.93976
78
10/5/2012
McNeal
2.469
7003.914
10.94362
79
10/20/2014
Talbot Commerce Park
125.057
7128.971
11.13902
80
3/2/2015
Aphena
22.136
7151.107
11.17360
81
8/19/2017
Easton Point (multiple properties)
6.533
7157.640
11.18381
82
9/22/2017
Celeste
4.446
7162.086
11.19076
83
10/2/2017
J. D. Oliver
3.960
7166.046
11.19695
84
8/3/2020
Dutchman’s Lane
7.681
7173.727
11.20895
85
5/3/2021
Harrison
1.637
7175.364
11.21151
86
7/20/2023
Town Properties (2)
4.899
7180.263
11.21916
259
February 19, 2026
Town of Easton
APPENDIX 4 - SUMMARY OF NUTRIENT LOADING ANALYSIS
260
February 19, 2026
Nutrient Loading Analysis Spreadsheet - Summary Results
Land Use and Septic Systems
(See Scenario Descriptions Below) 2007 LU, Trib Strat BMPs
Scenario 1 Trib Strat BMPs
(Acres)
Development
2007 LU, 2007 BMPs (Acr es) 0
Agriculture
0
Forest
0
Water
0
112
112
112
112
Other
0
684
904
904
904
Total Area
0
11,354
11,354
11,355
11,354
Residential Septic (EDUs) Non-Residen tial Septic (EDUs)
0
557
56
269
269
0
375
38
188
188
Town of Easton
Scenario 3 Trib Strat BMPs
(Acres)
Scenari o 2 Trib Strat BMPs (Acres)
8,246
5,252
5,382
4,927
279
3,274
3,143
1,813
1,813
1,813
1,813
3,818
261
February 19, 2026
(Acres)
Total Nitrogen Loading Scenario 3 Trib Strat BMPs
(Lbs/Yr)
Scenari o 2 Trib Strat BMPs (Lbs/Yr)
22,900
49,572
31,535
32,322
0
42,567
2,441
28,178
27,038
0
2,507
2,507
2,507
2,507
Other Terrestrial NPS Total Terrestrial Load
0
4,145
5,473
5,473
5,473
0
72,119
59,992
67,692
67,339
Residential Septic (EDUs) Non-Residen tial Septic (EDUs) Total Septic Load
0
4,912
348
1,677
1,677
0
1,180
89
421
421
0
6,092
436
2,098
2,098
Total NPS Nitrogen Load
0
78,210
60,429
69,790
69,437
Total PS Load
0
23,800
48,729
27,415
27,415
Total Nitrogen Load (NPS+PS)
0
102,010
109,158
97,205
96,852
Development NPS Agriculture NPS Forest NPS
Town of Easton
2007 LU, 2007 BMPs (Lbs/ Yr) 0
2007 LU, Trib Strat BMPs
Scenario 1 Trib Strat BMPs
(Lbs/Yr)
262
February 19, 2026
(Lbs/Yr)
Total Phosphorus Loading Scenario 3 Trib Strat BMPs
(Lbs/Yr)
Scenari o 2 Trib Strat BMPs (Lbs/Yr)
2,441
5,451
3,414
3,507
0
3,977
224
2,690
2,588
0
34
34
34
34
Other Terrestrial NPS Total Terrestrial Load
0
500
651
651
651
0
6,953
6,360
6,789
6,779
Total PS Load
0
2,400
3,655
2,742
2,742
Total Phosphorus Load (NPS+PS)
0
9,353
10,015
9,531
9,521
2007 LU, 2007 BMPs
2007 LU, Trib Strat BMPs
Scenario 1 Trib Strat BMPs
Scenari o 2 Trib Strat BMPs
Scenario 3 Trib Strat BMPs
0
1,865
3,497
2,449
2,485
0
4,927
279
3,274
3,143
0
1,705
1,705
1,705
1,705
Development NPS Agriculture NPS Forest NPS
2007 LU, 2007 BMPs (Lbs/ Yr) 0
2007 LU, Trib Strat BMPs
Scenario 1 Trib Strat BMPs
(Lbs/Yr)
(Lbs/Yr)
Impervious Cover and Open Space
Total Impervious Cover Agriculture Forest
Scenario Description Year 2007 with 2007 Level of BMP Implementation Year 2007 with TS BMP Implementation cenario 1 Build-out (or 3% Growth 2040) S Scenario 2 - 2040 1% Growth, 75% infill, 25% greenfield Scenario 3 - 2040 1% Growth, 50% infill, 50% greenfield
Town of Easton
Scenario List 2007 LU, 2007 BMPs 2007 LU, Trib Strat BMPs Scenario 1 Scenario 2 Scenario 3
263
February 19, 2026
APPENDIX 5 - PLANNED WATER AND WASTEWATER CAPITAL PROJECTS
Town of Easton
264
February 19, 2026
E ASTON WATER SYSTEM CAPITAL IMPROVEMENT PROJECTS PROJECT PROPOSED COMMENTS DESCRIPTION FISCAL YEAR New Water Services & Meters FY2026 $304,000 Replace Hydrants FY2026 $40,000 Replace Valves FY2026 $90,000 Easton Watermain Replacement FY2026 $1,051,000 Judas St. & Port St. Looping Water Mains/Blow-offs FY2026 $32,000 SCADA, PLC & Security Upgrades FY2026 $60,000 Well No. 12 Security Fence FY2026 $16,000 Corrosion Inhibitor - FY2026-2027 $88,000 Sequestering Agent Well No. 12 – Replacement of FY2027 $250,000 Pump and Column Pipe Cast Iron Water Main and Valve FY2027 $1,167,000 Replacements New Water Treatment Plant FY2027-2028 $12,000,000 (Commerce Drive) UMMS Water Main Extension FY2027-2028 $3,433,000 Hydrant Rehab & Storz Connect. FY2027-2028 $836,000 New Well No. 14 FY2027-2028 $2,625,000 Looping Water Mains/Blow-offs FY2027-2031 $173,000 New Water Services FY2027-2031 $175,000 New Water Meters FY2027-2031 $1,370,000 Replace Hydrants FY2027-2031 $215,000 SCADA, PLC & Security Upgrades FY2027-2031 $132,000 UMMS Water Tank FY2028 $3,124,000 Well No. 6 – Replacement of FY2028 $130,000 Pump and Column Pipe Well No. 8 – Replacement of FY2028 $130,000 Pump and Column Pipe Cast Iron Water Main and Valve FY2028 $1,167,000 Replacements Matthewstown Tank FY2029 $500,000 Refurbishment or Demo Cast Iron Water Main and Valve FY2029 $1,228,000 Replacements Cast Iron Water Main and Valve FY2030 $1,157,000 Replacements Well No. 7 – Replacement of FY2031 $140,000 Pump and Column Pipe Town of Easton
265
February 19, 2026
ast Iron Water Main and Valve C Replacements
FY2031 $1,290,000 E ASTON SEWER SYSTEM CAPITAL IMPROVEMENT PROJECTS PROJECT DESCRIPTION PROPOSED COMMENTS FISCAL YEAR Windmill Pump Station and Force FY2026 $9,809,000 Main Replacement Windmill Interceptor Sewer FY2026 $1,900,000 Refurbishment Clifton Pump Station – Refurbish FY2026-2027 $234,500 Pumps, Grinders, Replace ATS, VFDs, Relocate Bypass Piping Calvert Pump Station – Refurbish FY2026-2027 $200,000 Pumps, Grinders, Replace ATS, VFDs SCADA, PLC & Security Upgrades FY2026-2031 $191,500 New Wastewater Laterals FY2026-FY2031 $371,00 WWTF - Bio. Reactor #2 Refurb. FY2027 $481,000 WWTF - Secondary Clarifiers FY2027 $580,000 #1 & #2 Refurbishment WWTF - Tertiary Treatment FY2027 $938,000 Sand Filter Refurbishment WWTF - Primary & Secondary FY2027 $614,000 Lagoon Flow Control Refurbishment Calvert Pump Station – Replace FY2027 $200.000 Pumps, Refurbish Grinders WWTF - Influent Box and Headworks FY2027 $263,000 – Gates and Actuators Wastewater Pumps Station – FY2027 $42,000 Generator Replacement Sewer Main Replacement – Arcadia FY2027 $200,000 St UMMS Pump Station & Forcemain FY2027 $12,100,000 South Pump Station – Refurbish FY2027-2028 $125,500 Pumps, Grinders, Replace VFDs, ATS WWTF - Influent Box and Headworks FY2028 $110,500 – Fine Screens Rehab WWTF - Sludge Dryer FY2027-2028 $8,900,000 Design & Replacement North Pump Station – Refurbish FY2028-2029 $143,000 Pumps, Grinders, Replace VFDs, WWTF – Lagoon Diversion Structure FY2029 $45,000 Corrosion Control WWTF - Bio. Reactor #1 Refurb. FY2031 $500,000 Easton I&I Mitigation Project – FY2027 through FY2034 $11,900,000 Refurbish Manholes & Sewer Mains
Town of Easton
266
February 19, 2026
Town of Easton
267
February 19, 2026
Town of Easton
268
February 19, 2026