MACHINERY AND EQUIPMENT
Get control over costly compressed air Use wireless testing to increase safety Take charge of equipment history records
Vol. 27, No. 1
EASA Ontario garners international attention
FEBRUARY 2011
Daredevil techs tackle wind turbine maintenance
Sky-High Challenge WHAT’S NEW p01 Feb11 MRO Cover.indd 1
SAFETY
CONDITION MONITORING 07/02/11 8:14 AM
2
P R O D U C T
SP TLIGHT
Machinery & Equipment MRO
Bearing isolator is designed to protect the environment
Garlock Sealing Technologies Online Reader Enquiry No. 306
t
Washdown motor line resists contamination
Baldor offers a broad range of washdown and paint-free motors and controls, all-stainless motors and speed reducers, linear motors and controls, and servo motors and controls. Washdown motors include AC, DC, JM pump motors, inverter duty, vector duty, SmartMotors, AC servo and a choice of finishes. Super-E premium-efficient designs are available in every configuration. The motors suit applications requiring high-pressure cleaning with caustic solutions. Easy to clean and sanitize, the all-stainless speed reducers come with solid or hollow bore outputs in three frame sizes through 5 hp. Baldor Electric
Online Reader Enquiry No. 308
t
Irwin Vise-Grip curved-jaw locking pliers feature a self-energizing lower jaw, offering a powerful grip with no slipping or stripping. There is no need for heavy input pressure, as the jaws tighten for maximum grip as torque is applied to the tool. Two core models are available, the Fast Release, featuring a one-handed, triggerless release and anti-pinch, non-slip ProTouch grips, and the Original, with a classic trigger release. Constructed of high-grade, heattreated alloy steel, the pliers establish multiple contact points with the work piece, which contributes to the tight grip. They are available in lengths of 5 in., 7 in. and 10 in. Irwin Tools
t
An environmentally friendly bearing isolator designed for flooded and oil mist applications has been introduced by Garlock. The EnDuro design core features a bi-concave surface incorporated within a fluorocarbon stator, providing long life and reliable bearing protection. The seal prevents the loss of potentially environmentally harmful bearing lubrication, while also preventing contamination ingress in flooded or oil mist environments. Featuring three different sealing technologies in one compact, selfcontained unit, the bearing isolator is designed to quickly and easily replace contact lip seals and traditional bearing isolators. It is available in shaft sizes ranging from 0.875 in. to over 6 in., with flanged, flangeless and custom configurations offered.
Curved-jaw locking pliers have extra-strong grip
February 2011
Lift lineup upgrades improve user comfort
Southworth Products has redesigned its Dandy Lift line of lifter/transporters for increased convenience and comfort. The Multi-Grip position handle allows users to select the most comfortable hand position for the job at hand, while the Qwik-Grip lowering handle has an oversized, open-triangle design that makes it accessible from almost any position. The large, open-loop design of the 180-degree access foot
Online Reader Enquiry No. 319
Invest in Gold
pedal allows the pedal to be pumped from different angles, while providing solid contact regardless of footwear. In addition, the company offers two redesigned models of its portable auto-levelling platforms, the Dandy Levelers. Southworth Products Online Reader Enquiry No. 320
Absorbent promotes protection of the environment
Enviro-Dri absorbent from Can-Ross compr ises highly absorbent, wood-fibre granules coated with a fire-resistant material to comply with regulations related to the transportation of dangerous goods and landfill leachate requirements. Completely crystalline silica free, the product can be used for the quick, efficient clean-up of oil, grease, water and other non-aggressive liquids. It consists of 40% cellulose fibres that are made of wood waste that otherwise likely would end up in a landfill. Packaging is available in paper or plastic. Can-Ross Environmental Services Online Reader Enquiry No. 321
Digital hydraulic tester is compact
Electric motors consume 63 percent of all electricity used in U.S. industry. Designed and built to meet or exceed NEMA Premium® efficiency standards, Baldor•Reliance® Super-E® motors run cooler, last longer and cost less every minute they operate.
• Energy Efficient • Unmatched Quality
Fractional to 15,000 Hp, Baldor•Reliance Super-E motors reduce your electricity costs with a return on your investment that’s as good as gold.
• Superior Reliability
baldor.com
• Quickest Delivery Available
479-646-4711
Omega’s digital HFP-110/120 hydraulic tester is a compact, lightweight, self-contained, portable tester with laboratory accuracy. Designed for fast diagnostic troubleshooting of all types of mobile or stationary hydraulic systems and components, the device makes all flow pressure and temperature measurements simultaneously from one point. The large, 3-1/2-digit LCD display makes for easy measurement reading. This CE compliant tester has additional features that include pressure relief disc protection and low-battery/overrange indicators. Applications include hydraulic system testing, and hydraulics testing in automotive and manufacturing industries. Omega Online Reader Enquiry No. 322
©2010 Baldor Electric Company
Reader Service No. 115
p02-03 MRO Feb11 Spotlight.indd 2
MRO
Our printed reader reply cards have been phased out. Please use our Online Reader Reply Card at www.mromagazine. com/rsc to request additional details directly from suppliers.
01/02/11 7:09 AM
400,000 + square foot manufacturing operation. 400 + dedicated employees. 1 unwavering commitment to customer service.
Let one of our application engineers survey your plant and assess your chain drive applications. We inspect chain alignment, take-up, sprocket wear, elongation, and properly matched chain to avoid mis-feeds or jams. Our final report will offer key recommendations on how to improve chain drive performance with documented cost savings to help you run your plant at peak efficiency.
Call 800-435-0782 today to schedule your IN-PLANT SURVEY with an Application Engineer from Drives. Now that’s extreme customer service! Fulto n , I l l I n o I s • P h o n e : 8 0 0 - 4 3 5 - 0 7 8 2 • www.drIvesInc.com roller chaIn • c o n ve y o r & e n g I n e e r e d c l a s s c h a I n • PrecIsIon attachment chaIn Reader Service No. 116
p02-03 MRO Feb11 Spotlight.indd 3
01/02/11 7:09 AM
4
C O N T E N T S
Machinery & Equipment MRO
February 2011
in this issue features
departments
Sky-high challenge:
Editor’s Notebook / 6
Servicing the wind / 13
Industry Newswatch / 8
The installation of wind power facilities
Business Briefs / 12
is booming, yet Canada’s wind turbine
Mr. O, The Problem Solver / 12
maintenance infrastructure is in its infancy.
The Safety File /19 Using wireless testing to
Maintenance
increase MRO safety / 15
Management / 20
A wireless datalogging multimeter allows
CMMS Solutions / 21
a user to set up a laptop at a centralized location
MRO on the Road / 25-26
and then sequentially obtain readings through-
p20
out a site without relocating the computer, and without getting his or her hands into a dangerous situation.
Product News Product Spotlight / 2 MRO Components / 22
columns
Focus on Safety / 24
The electrical menace / 19
p23
How to properly handle safety issues with electrical equipment in hazardous areas.
Big change means a major leap of faith / 20
Follow along with Step 37 in a journey to World-Class Maintenance at the Plentya Paper Company as the maintenance team
p13 Compressed air isn’t free? / 16
There is an attitude that since it’s just air and because it’s used every day, it’s free, even if there are obvious system leaks. Unfortunately, compressed air is an extremely expensive utility. Here’s how to get control over your compressed air systems to reduce energy costs and your facility’s carbon footprint.
takes a major leap towards transforming the organization.
editor’s selections
Achieving success with maintenance records / 21
Here’s how to get maintenance staff to accurately record work order information so equipment history records will be of value.
Len Coad / 8
p24
MRO and safety show in Toronto attracts 2,000 delegates / 25
p23
Acklands-Grainger hosts The Works, billed as Canada’s largest maintenance repair and operations (MRO) and safety show.
p8
‘It is really hard to find a Canadian company to come in and competently work on wind turbines.’ Trevor Smith / 13
‘With Bluetooth, MRO professionals can monitor readings at a safe distance from hazardous locations.’
EASA’s Ontario Chapter maintains international spotlight / 26
The annual general meeting of the Ontario Chapter of the Electrical Apparatus Service Association was a great start for the year for the group’s members.
‘An offshore wind industry in Ontario would create permanent green jobs in the operations phase.’
André Rebelo / 15
p22 Cover photo: Maintenance techs working on this wind turbine at a major Ontario wind farm need more than mechanical and electrical skills.
‘Of the energy required to produce compressed air, less than 20% of input energy is left for use. That means 80% of what is paid for is used up before it’s put in the distribution system.’ Doug Waetjen / 16
Untitled-2 1 p04-07 MRO Feb11 Cont_Editorial.indd 4
03/02/11 9:07 AM
Reader Service No. 117
Untitled-2 1
31/01/11 1:06 PM
p04-07 MRO Feb11 Cont_Editorial.indd 5
01/02/11 7:12 AM
6
E D I T O R’ S
N O T E B O O K
Machinery & Equipment MRO
February 2011
Can maintenance be a profit centre?
W
e all know the need for maintenance will never go away. And it seems that every maintenance department in the country needs more money to meet its targets. But what if you could tell management that if it let you have the budget you really want, the maintenance department could end up saving the company a lot of money, putting more profit on the bottom line? That would get their attention. And it should give you all the assets you need for a successful and smooth-running maintenance operation. First of all, the concept behind this scenario is based on the fact that a small amount of money saved generally puts a large amount of money on the bottom
line of a corporate spreadsheet. Ralph W. “Pete” Peters of the Maintenance Excellence Institute puts it into perspective, as follows. Based on an assumption that an organization’s net profit ratio is 4%, that means it needs $25 of sales for each $1 of net profit generated. That also means if you could save $40,000 in the maintenance department, for your company that would be the same as having an extra $1 million in sales revenue. The bean counters would certainly like those numbers. But how? There are several avenues to explore to enhance a maintenance budget: Improving craft productivity, increasing equip-
ment uptime, reducing maintenance storeroom inventory, getting better pricing from suppliers, or improving equipment life are just some plausible examples. For example, by using a computerized maintenance management system (CMMS) to improve craft utilization – having the right skills and carrying the right tools to the right job at the right time – could result in a net gain of craft productivity of 20%. If your shop has 40 craftsmen averaging a wage of $35,000 a year, that 20% increase could save $280,000 a year. Or you may instead forgo the labour savings and get the backlog of work orders cleared and have more time for predictive/preventive maintenance, versus breakdown work. Clearing all those outstanding work orders would likely result in increased equipment uptime. Say downtime was reduced 25% (from 8% to 6%). In an operation where the value of downtime was estimated to be $800,000 annually, a 25% increase in uptime would put
$200,000 of value on the bottom line. Being better organized also can reap large financial benefits. If the inventory of spares in the maintenance storeroom could be cut by 25% — for example, from $1 million to $800,000 — the carrying costs for all those extra items would be eliminated. Assuming carrying costs of 30%, that $200,000 savings would put $60,000 on the bottom line. Of course, you may want to use these savings to invest in a CMMS, training, or test and measurement equipment that will give you the improved troubleshooting capabilities and productivity gains you need. In this case, the cash on the bottom line can come later, but meanwhile, you’ll be well on your way to a smooth-running operation and to achieving a world-class standard in maintenance – without begging the boss for a bigger budget each year. It’s certainly worth a try. Bill Roebuck, Editor & Associate Publisher
MACHINERY AND EQUIPMENT
MAINTENANCE, REPAIR AND OPERATIONS
FEBRUARY 2011 Volume 27, No. 1 Established 1985 www.mromagazine.com www.twitter.com/mromagazine EDITORIAL Bill Roebuck, Editor & Associate Publisher 416-510-6749 broebuck@mromagazine.com Ellie Robinson, Art Director Contributing Editors Richard G. Ensman Jr., Simon Fridlyand, Carroll McCormick, Peter Phillips, Angela Webb, Cliff Williams BUSINESS
machine tools x foundries x metalworking machinery x lawn & garden x speed reducers medical x instruments x transmissions x kilns x mining x pharmaceutical x HVAC x hoist transportation x agriculture x washdown x construction x gear box x pumps x steel mills railway x band saws x aggregates x pulp & paper x spindles x grinders x textiles x vibrating screen x hand tools x electric motors x power generation x compressors x automation x idlers
Just some of the places you’ll find Koyo bearings. wind turbines x automotive x conveyors x aerospace x stamping x recreation vehicles blowers x food & beverage x winches x cranes x excavator x fans x robotics x sander x mixer back-up roll x paver x printing press x debarker x head pulley x dryer x track roller x planer oil & gas x clean room x extreme environments x forestry x return rolls x traction motors x tunnel boring x rock crushers x rolling mills x work rolls x smelting x sawmills
Nick Naunheimer, Publisher 416-510-6868 nnaunheimer@mromagazine.com Eric Achilles Cousineau, Adv. Sales Manager 416-510-6803 eachilles@mromagazine.com Kimberly Collins, Advertising Production 416-510-6779 Melinda Marasigan, Subscription Enquiries 416-442-5600 x3548 Machinery & Equipment MRO is published six times a year to help improve the effectiveness, productivity and practical knowledge of maintenance professionals in Canada’s manufacturing, utilities and resource industries. Editorial & sales offices: 12 Concorde Place, Suite 800, Toronto, ON M3C 4J2; tel: 416-510-6868, 1-800-268-7742; fax: 416-510-5134. Subscription rates. Canada: 1 year $57.95, 2 years $92.95. United States: 1 year $85.95. Elsewhere: 1 year $85.95. Single copies $10 (Canada), $16.50 (U.S.), $21.50 (other). Add applicable taxes to all rates. On occasion, our subscription list is made avail able to organizations whose products or services may be of interest to our readers. If you would prefer not to receive such information please contact us via one of the following methods — phone: 1-800-668-2374, e-mail: privacyofficer@businessinformationgroup.ca, fax: 416-442-2191, mail to Privacy Officer-Business Information Group, 12 Concorde Place, Suite 800, Toronto, ON Canada M3C 4J2. ©2011. Contents of this publication are copyright and may not be reproduced in whole or in part in any form without written consent of the publisher. The publisher cannot assume responsibility for the validity of claims in items reported or advertised. Machinery & Equipment MRO is published by BIG Magazines LP, a div. of Glacier BIG Holdings Company Ltd. Bruce Creighton, president, BIG; Alex Papanou, vice-president, BIG. Publications Mail Agreement No. 40069240. Return postage guaranteed. ISSN 0831-8603 (print). ISSN 1923-3698 (digital). Return undeliverable Canadian addresses and change of address notices to: MRO Circulation Dept., 12 Concorde Place, Suite 800, Toronto, ON M3C 4J2 .
Making bearings since 1921.
MRO, USPS 012-846 is published six times per year by Business Information Group. US office of publication: 2424 Niagara Falls Blvd., Niagara Falls, NY 14304-0357. Periodicals Postage Paid at Niagara Falls, NY. US postmater: Send address changes to Machinery and Equipment MRO, PO Box 1118, Niagara Falls NY 14304.
Tel: 1.800.263.5163••••••Fax: 1.877.326.5696••••••Email: info@koyo.ca••••••www.koyo.ca
We acknowledge the financial support of the Government of Canada through the Canada Periodical Fund (CPF) for our publishing activities.
Audit Bureau of Circulations
PEMAC
Reader Service No. 118
KOYO 8.125x10.875 2.indd 1 p04-07 MRO Feb11 Cont_Editorial.indd 6
2902-MAXX
28/01/11 4:14 PM 01/02/11 7:12 AM
Reader Service No. 119
2902-MAXXDrive-ad-MRO-OL.indd 1 p04-07 MRO Feb11 Cont_Editorial.indd 7
9/14/10 10:01:30 AM 01/02/11 7:12 AM
8
I N D U S T R Y
N E W S W A T C H
Machinery & Equipment MRO
February 2011
Ottawa, ON — The development and operation of offshore wind energy in Ontario could, between 2013 and 2026, create an average of 3,900 to 4,400 jobs per year during the construction phase. It would also produce peak employment of 600 permanent positions in the operations and maintenance of offshore wind turbines. These outcomes are based on reaching 2,000 megawatts (MW) of new generation capacity over 15 years, a conservative estimate of the market potential for an Ontario offshore wind industry. The emergence of such an industry would add between $4.8 billion and $5.5 billion to Ontario’s economy during the 2013-2026 period, according to a Conference Board of Canada report assessing the potential contribution of offshore wind generation to the province’s electricity supply, employment and economic activity. Ontario has made a long-term commitment to renewable electricity, in part to eliminate generation from coal-fired plants. The government’s Feed-in-Tariff (FIT) program has attracted the interest of the global wind power industry. Offshore wind is one of the renewable generation sources permitted in the FIT program, which offers long-term contracts at guaranteed prices for qualifying projects. “An offshore wind industry in Ontario — one that develops enough projects to be sustainable in the longer term — would create both short-term construction employment and permanent green jobs in the operations phase,” said Len Coad, director, Environment, Energy and Technology Policy, The Conference Board of Canada. “Should development progress as anticipated, it is likely that new industries will develop in the province to service the needs of the growing sector.” The study, which was financed by Vestas Offshore A/S, quantifies the combined direct, indirect, and induced economic effects on economic indicators, such as real gross domestic product (GDP), employment, income and government revenues. The analysis finds that, over the 2013 to 2026 period, the development of Ontario’s offshore wind industry would lead to a cumulative total of $10.044 billion in real capital investment and operations spending.
Stockphoto/Thinkstock
p08-12 MRO Feb11 News_CoNews.indd 8
The contributions to GDP identified in the study are based on the share of local procurement, which is required to be a minimum of 50% under the FIT program. In the base case scenario of 55% being sourced locally, $4.8 billion is added to the Ontario economy; under a scenario where 63% of inputs come from local procurement, $5.5 billion in real GDP is generated. In its analysis, the Conference Board assumes that seven projects in Ontario would add 2,000 MW of offshore wind capacity by 2026 (which is 5.7% of the total current generating capacity in Ontario of 35,000 MW). This would comprise about 20% of the renewable energy target announced in Ontario’s Long Term Energy Plan; the plan calls for renewable capacity from wind, solar and bioenergy to rise from 1,657 MW in 2010 to 10,700 MW in 2018. The potential offshore wind projects identified by the Conference Board study would contribute 1,014 MW of that growth in renewable capacity by 2018, plus an additional 986 MW in the longer term. There are currently no offshore wind farms in operation or under construction in North America. Two major Ontario projects — both in Lake Ontario near Kingston — are progressing toward implementation, which together would add 714 MW of capacity. The report, Employment and Economic Impacts of Ontario’s Future Offshore Wind Power Industry, is publicly available at www.e-library.ca.
UBC STUDY LINKS SHIFT WORK TO HIGHER RISK OF WORK INJURY Vancouver, BC — With shift work on the rise, so too may be the risk of workplace injury. A recent study by researchers from the University of British Columbia (UBC) concluded that Canadians who work night and rotating shifts are almost twice as likely to be injured on the job as those working regular day shifts. The study examined data on 30,000 Canadians collected as part of Statistics Canada’s Survey of Labour and Income Dynamics. Trends in work injury were compared among workers involved in different types of shift work from 19962006. The findings showed that even though the overall rate of work injuries in Canada decreased during this time, the rate of injuries for night shift workers remained stable. The study found that night shift work was associated with a higher incidence of work injury for both women and men. However, only women had a higher risk of work injury related to rotating shifts, increasing their risk overall compared to men. The researchers suggest that because women are more likely to have childcare and household responsibilities, they may have more difficulties adjusting to shift work and getting enough goodquality sleep. Shift work can disrupt nor-
Stockphoto/Thinkstock
Wind energy projects leading to permanent MRO jobs
Offshore wind turbines in Ontario could lead to 600 MRO jobs.
mal sleep patterns and cause drowsiness or fatigue, which can lead to workplace injuries. In the past few decades, the number of Canadians working shift work has risen substantially. The number of women working shifts increased by 95% during the study period, mainly in the health care sector — almost double the 50% increase of men, occurring mostly in manufacturing and trades. Injuries related to shift work come with a hefty price tag. In 2006, 307,000 work-related injury claims associated with shift work represented more than $50.5 million in costs to Canada’s workers’ compensation system. The study authors recommended that governments and employers consider policies and programs to help reduce the risk of injuries among shift workers. Although an obvious solution to the risks of shift work would be to eliminate it altogether, this may not be a practical option for many workplaces. According to the Canadian Centre for Occupational Health and Safety (CCOHS), there are two basic levels where improvements can be made to help reduce the effects of shift work: 1) The organizational level: primarily through the design of shift schedules, education and better facilities, including conducting a risk assessment for every task to be performed during a specific shift 2) The individual level: helping workers to get better sleep, eat a healthier diet, and reduce stress. More information and comprehensive advice on how to cope with shift work and prevent related injuries can be found on the CCOHS website at www.ccohs.ca/ oshanswers/ergonomics/shiftwrk.html.
ALBERTA HIGH-SCHOOL STUDENTS RECEIVE SCHOLARSHIPS TOWARDS TRADES EDUCATION Edmonton, AB — More than 280 Alberta high-school students have been recognized with a scholarship to continue their apprenticeship training after high school and become certified journeypersons. The Registered Apprenticeship Program (RAP) scholarships are designed to recognize student achievement on the job and in the classroom. The scholarships provide $1,000 to each recipient. “RAP helps high-school students make the link between the classroom and future careers,” said Andy Neigel, president and CEO of CAREERS: The Next Generation, an industry-driven private/public partnership dedicated to the career development of Alberta’s youth. “As a result of these scholarships, more students are entering the post-secondary world and the workforce poised and motivated for success.” As part of the program, high school students obtain hours of on-the-job training and work experience as credit toward both an apprenticeship program and a high school diploma while earning an income. This year, more than 1,800 Alberta high school students are participating “A strong workforce of skilled tradespeople will shape Alberta’s future,” said Ray Massey, chairman of the Alberta Apprenticeship and Industry Training Board. The Government of Alberta, along with industry partners, funds the scholarships awarded to Alberta high school graduates who participated in the Registered Apprenticeship Program and are pursuing careers in the trades. The program also includes Top Employer, Top Instructor and Top Apprentice awards. For more information, visit www.tradesecrets.gov.ab.ca.
01/02/11 11:05 AM
B
I N D U S T R Y
9
N E W S W A T C H
Machinery & Equipment MRO
INDUSTRY PROFITABILITY EXPECTED TO RISE IN 2011 Ottawa, ON — Corporate profitability is expected to improve over the course of 2011, based on a strong increase in The Conference Board of Canada’s monthly Leading Indicator of Industry Profitability. The index increased by 0.6% in December 2010, its biggest one-month gain dating back to 2001 (the earliest that data is available). Following six months of decline, the leading indicator has risen for three consecutive months. Still, the overall index has some catching up to do. Between March and September, it declined by 2.4% and it finished 2010 about 1% lower than in December 2009. “The recent improvement of the index is thanks to stronger non-residential investment, a rising stock market and increasing raw material prices,” said economist Maxim Armstrong. “Thirty-eight of the 49 industries covered by this indicator recorded increases in December, which is the most since July 2010. Having positive profit indicators in four out of every five industries is another welcome sign, as it corresponds with periods of strong economic growth.” Firms in the primary sector are poised for a profitable year. Demand for several raw materials has boosted both sales and prices. The agriculture and forestry industry and the mining industry posted the biggest increases of their index in December compared to a year earlier — 12.3% and 10.6% respectively. The strong Canadian dollar has a significant effect on profitability in most of the industries covered by the leading in-
dicator — the impact is positive for some industries and negative for others. In 2010, the exchange rate was much less volatile than in previous years, but the Canadian dollar remained very high by historical standards and is expected to remain at or near parity with the US dollar in 2011. The Conference Board’s Leading Indicator of Industry Profitability is constructed from high-frequency data series. The indicators are designed to be predictive of movements in corporate profitability six months hence. An industry leading index is created for the economy as a whole, as well as for 49 individual sectors within the economy, thus providing coverage for most of the private business activity that takes place in Canada.
Stockphoto/Thinkstock
Stockphoto/Thinkstock
February 2011
GUIDE TO BEARING APPLICATIONS IN CEMENT PROCESS PUBLISHED Glen Ellyn, IL — The Educational Services Committee of the Bearing Specialists Association (BSA) has released the second in a new series of industryspecific educational publications, referred to as Industry Briefs. It’s titled Cement Process. The Industry Briefs are intended to enhance the association’s existing Bearing Briefs by identifying bearing selection specifics used by individual industries. The Cement Process brief details the use of bearings in cement processing and is available for downloading from the BSA website, www.bsahome.org, under Tools You Can Use. Specifically, the Industry Brief maps continued on page 10
BSA’s new brief examines the various processes used in the cement industry.
www.ca.nsk.com 1.877.994.6675
When you think “Innovation”, you think about a better way to do the job. We think about industry-specific solutions to your motion and control challenges, like NSK’s Molded-Oil™ bearings. This innovative product not only delivers high performance in water and dust-contaminated applications, but also extends bearing life and eliminates the need for relubrication. When it comes to innovative products designed to increase efficiency in food industry applications, Think NSK.
B A L L
B E A R I N G S
|
R O L L E R
B E A R I N G S
|
L I N E A R
M O T I O N
P R O D U C T S
|
T E C H N I C A L
S E R V I C E S
Reader Service No. 120
p08-12 MRO Feb11 News_CoNews.indd 9
01/02/11 11:05 AM
M
10
I N D U S T R Y
N E W S W A T C H
Machinery & Equipment MRO
continued from page 9 the cement manufacturing process and identifies particular requirements for bearings. For example, in the clinker cooler, the brief points out: “Pillow block and flange-mounted spherical and tapered roller bearings are typically found on screw conveyors, belt conveyors and bucket elevators. Large fans may utilize Babbitt-lined, oil-lubricated sleeve bearings. Smaller fans utilize pillow block spherical bearings.” Additional processes included in this brief — such as crushing, homogenization and fuel handling — are given comparable consideration. The Educational Services Committee hopes to address bearing selection specifics in various additional industries in subsequent Industry Briefs. BSA is an international service and educational organization of distributors representing a total of almost 100 companies distributing factory-warranted ball,
February 2011
roller-, and anti-friction bearings, and invited manufacturers of bearings and related products. For more information, visit www.bsahome.org.
was Sergio Guy. Prior to his The most recent recipiearly and untimely passing, ent, Michel Rioux, estabGuy was highly regarded lished PEMAC’s MMP proboth personally and profesgram in the French lansionally for his values, ethics guage domestically and inPEMAC NAMES LATEST and commitment. His devoternationally. He has over AWARD RECIPIENT tion to his family, to his 10 years of industry experiToronto, ON — PEMAC (the Plant Enwork, and to volunteerism ence in both the private and gineering & Maintenance Association was an inspiration, and he para-governmental sector, of Canada) has presented its 2010 Serdedicated countless hours to and has worked in the field gio Guy Memorial Award to Michel establishing PEMAC as one of production and mainteRioux, a professor and director of the of Canada’s leading profesnance engineering as an enOperations and Logistics Engineering sional associations. gineer and manager. program and Maintenance ManageIn recognition of Guy’s Rioux’ fields of interest, ment Professional (MMP) certification principles, his commitment within the framework of Michel Rioux. program at Ecole de Technologie Suto PEMAC, and his exemhis research, courses, sempérieure (ETS) in Montreal. plary contributions to the inars and collaborations maintenance profession, PEMAC annuAs an association, PEMAC strives to with the industry, include operations ally honours a worthy recipient with the personify the highest degree of profesoptimization, logistics, reliability analSergio Guy Memorial Award. sional excellence and integrity through ysis, physical asset management and The award recognizes the efforts of its membership and executive. In the project management. His focus is on an individual who has made significant the development, improvement and early years of PEMAC, many visionary contributions to both the profession technology transfer of various diagpeople laid the foundation for this comand the association. nostic, analysis and decision-making mitment to excellence. One such member tools with a view to improving company performance. “His personal and professional attributes of leadership, dedication and visionary contributions set him apart from his peers,” says Norm Clegg, PEMAC’s executive director. Voice recordings because PEMAC is a national not-for-profit pen and paper aren’t association providing leadership, edualways handy cation and certification in mainte320 x 240 resolution nance, reliability and physical asset because you said bigger management practices. Its MMP eduis definitely better cation and certification program is now delivered through the continuing eduRugged design because cation or contract training departments not every job happens at selected colleges, institutes and univerground level sities in Canada using in-class, on-site or live on-line formats in both official languages. For more information, visit www.pemac.org.
C
M
Y
CM
MY
CY
MARKET FOR FLUID HANDLING PUMPS TO GROW 6.5% ANNUALLY
Based on you. Built by Fluke. The job site is where real life sparks real innovation. And because we start by listening to real-world pros like you, we know how to build real-world tools. Get faster, safer, and smarter.
See the innovations you’ve inspired, www.fluke.com/2innovate Phone 800-363-5853 Where to buy at www.flukecanada.ca Introducing a thousand innovations for a thousand jobs. Nothing unnecessary. Nothing wasted. Just the best tools, based on you, built by Fluke.
Fluke. ©2010 Fluke Corporation. AD 3852144A
Reader Service No. 121
p08-12 MRO Feb11 News_CoNews.indd 10
Not just infrared. Infrared you can use.TM
Cleveland, OH — World fluid handling pump demand is forecast to rise 6.5% annually through 2014 to $69 billion (US). In most developing countries, pump market growth in real (inflationadjusted) items will decelerate relative to the 2004-2009 period. However, this rate of increase will still exceed the average global pace. Industrialized nations will see pump sales growth rebound in real terms from depressed 2009 levels. Overall advances in the pump market will be restrained by decelerating price hikes, as raw material costs moderate. These and other trends are presented in World Pumps, a new study from The Freedonia Group, an industry market research firm. Although growth in developed parts of the world — the US, Canada, Japan, Western Europe and Australia — will not be as strong as in most industrialized areas, it will still be quite healthy by historical standards, according to Freedonia. Process manufacturing will be the fastest growing pump market between 2009 and 2014. In addition, more stringent environmental regulations will help generate demand for more efficient and betterperforming fluid handling pumps, such as seal-less centrifugal models. The utilities market is also expected to record impressive growth, as spending on water and energy transportation network construction expands rapidly in many industrializing nations. World Pumps (published 11/2010, 454 pages) is available for $6,100 (US). For more information, visit www.freedoniagroup.com. MRO
CMY
K
01/02/11 11:05 AM
Motor Ad - Blue.pdf 1 05/04/2010 11:49:32 AM
Stainless Steel Motors Brake Motors 2 Speed Motors Single Phase Motors
C
M
Y
CM
MY
CY
CMY
K
Forced Vent Motors Explosion Proof Motors Permanent Magnet Motors Servo Motors
We do metric best. Lafert North America’s success is based on three key ingredients: Quality, Versatility and Service. We stock the widest range of IEC metric equipment including induction motors, coolant pumps, and metric gearboxes. With our wide line of products, numerous locations throughout North America, flexibility in providing custom work and 24/7 service, we will reduce your downtime and most importantly your customers’.
www.lafertna.com sales@lafertna.com
Toll Free: 1.800.661.6413 U.S. & Canada Fax: 1.905.629.2852
5620 Kennedy Rd. Mississauga, ON L4Z 2A9 Canada
Reader Service No. 122
p08-12 MRO Feb11 News_CoNews.indd 11
01/02/11 11:06 AM
12
I N D U S T R Y
N E W S W A T C H
Machinery & Equipment MRO
February 2011
Business Briefs
News and views about companies, people, product lines and more. • Gordon A. Duncan, former presiric motors. Now, with more than 30 dent of industrial distributor Kineyears experience in all aspects of cor LP, has established a new the electric motor industry, Sonmanagement consulting company, sogno has returned to the Lafert NA sales team. Lafert NA distribSPAR Consulting Inc., Toronto. utes metric motors, pumps and Areas of expertise for the company gearboxes. For more information, are strategy, acquisitions, manufacvisit www.lafertna.com. turer-distributor relations, pricing and management team develop- Gord Duncan. • Acklands-Grainger Inc., Richmond Hill, ON, Canada’s largest ment. “I believe that if you develop distributor of industrial, safety and fasan effective Strategy, hire the right People, tener supplies, has entered into an asset and empower them to take Action, you will purchase agreement to acquire the Nova get the right Results,” explains Duncan. He Scotia and New Brunswick business of can be reached at gordduncan1@gmail.com. Wolseley Industrial Products (Amal• Almost 20 years ago, Connie Sonsogno gamated) Inc., Mississauga, ON, a disleft Lafert North America, Mississauga, tributor of industrial, construction, MRO ON. And now she’s back. During her time and safety products. Acklands-Grainger away, she continued to work in the power expects an incremental sales contribution transmission industry, specializing in met-
of approximately $14 million from this acquisition over the next 12 months. • Stoney Creek, ON-based Mueller Flow Control changed its name to Flocor Inc. on Jan. 20, 2011. “Our name may be new,” says Kevin Fullan, vice-president and general manager, “but our management team and employees remain firmly in place. Our warehouse and office locations, phone numbers and contact people also stay the same. Our new tagline, ‘The Piping Products People’, says everything about us.” Its products include commercial, industrial, waterworks, fire-protection and specialty piping. • Kaydon Corporation Bearings Division has unveiled a new website, www.kaydonbearings.com, and a new brand message. “The new site ... provides more information and a clean, easy-to-navigate design,” said Brian Walters, Kaydon Bearings marketing manager. “It features an improved search function, more product and market information, and additional drawings, specifications and downloads.” It also
introduces Kaydon Bearings’ new brand message: Kaydon infinite bearing solutions. “Research showed that our customers value our exceptional engineering expertise and willingness to create virtually infinite solutions for complex bearing challenges,” said Jeff Manzagol, president. “Our new brand conveys that, while also underscoring our position as inventor and leader in thin-section bearings and as North America’s leader in slewing ring bearings.” • The Bearing Specialists Association (BSA) welcomed 14% more attendees from a record number of companies to its 2011 Winter Meeting, held Jan. 16-18, 2011, at the Hyatt Regency Grand Cypress in Orlando, FL. John Dunlop, senior project engineer with the American Wind Energy Association, shared information about the role of bearing products in wind energy. BSA’s 2011 Annual Convention, ‘Growing Together: 45 Years Strong,’ takes place April 29-May 2, 2011, at the Hyatt Lost Pines near Austin, TX. MRO Mr.0 The Practical Problem Solver
Fighting hydraulic hammer and vibration in hydraulic lines
It’s a wrap.
Loctite® QuickTape® 249™ Threadlocker Tape • Introducing the first threadlocker in tape form! • Locks nuts and bolts against vibration loosening • Seals against corrosion and leakage • No mess, no waste • Can be pre-applied • A must for every toolbox! QuickTape® - the same reliable performance you’ve come to expect from Loctite® liquids and sticks - neat and easy to apply.
Mr. O’s thanks for this tip go out to Harold Paulson, design manager at Hemlo Equipment. For more information, he can be reached at harold@ hemloequipment.com.
®
another “gotta have” product from Loctite®. Henkel Canada Corporation 2225 Meadowpine Blvd. Mississauga, Ontario, L5N 7P2 1-800-263-5043
For a sample, visit www.useloctite.com/mro Except as otherwise noted, all marks in this AD are trademarks and/or registered trademarks of Henkel and/or its affiliates in the U.S. and elsewhere. ® = registered in the U.S. Patent and Trademark Office. © Henkel Corporation, 2011. All rights reserved. AD-111-11 (11/02)
Reader Service No. 123
p08-12 MRO Feb11 News_CoNews.indd 12
Problem: A large industrial plant located about 300 km east of Thunder Bay, ON, had a new 5,000-psi hydraulic system installed. There were some last minute changes to the pump location and a number of hoses had to be shortened and re-located. There had been a lot of hydraulic hammer noticed before the changeover and the management felt that this anticipated problem should be addressed at the same time. Solution: Hemlo Equipment Ltd. of Marathon, ON, was asked to design and install a system that would solve both problems. The design consisted of a table made with 1-in. pipe and Kee clamps, with a 1/2-in. x 4-ft x 16-ft plywood top. Unistruts were laid on top of the table so that they were free to move. Gates G6K, SAE 100R15, 6,000-psi hydraulic hose and couplings were used. The fittings at both ends were 45º elbows, in order to allow the smoothest possible flow. The anticipated hose failures were avoided by: 1. Using 45º fittings at each end, rather than 90º fittings, in order to allow smoother flow of the hydraulic oil in the system. 2. Letting the Unistrut metal framing float on top of the table, allowing it to move, rather than trying to fight the hammer and vibration. The system has been in regular use for six years without a hose failure.
Do you have a solution for a maintenance problem? Send it in and if it’s published, we’ll send you a Mr. O Problem Solver T-shirt. Include your address, telephone number, print complete details and, if possible, add a sketch to help explain your tip. Send your tips to Mr. O, Machinery & Equipment MRO, 12 Concorde Place, Suite 800, Toronto, ON M3C 4J2.
01/02/11 11:06 AM
T R E N D S
I N
13
M A I N T E N A N C E
February 2011
Machinery & Equipment MRO
BY CARROLL MCCORMICK
Sky-High Challenge Servicing the Wind
THE INSTALLATION OF WIND POWER FACILITIES IS BOOMING, YET CANADA’S WIND TURBINE MAINTENANCE INFRASTRUCTURE IS IN ITS INFANCY.
P
Photo courtesy Challenger
erched on hilltops and other especially windy sites across Canada, wind turbine generators (WTGs) are contributing 4,055 megawatts (MW) to Canada’s power grid — enough to power over one million homes. Output is steadily rising as new projects come on line and as old WTGs are replaced with higher-output models. The Canadian Wind Energy Association (CanWEA), source of the 4,055 MW figure, lists 111 wind farms and sites, and 2,309 WTGs – located everywhere but New Brunswick, the Northwest Territories and Nunavut. However, assuming a generous average 1.5 MW/turbine, the actual number of turbines could in fact be closer to 2,700. Despite the amount of hardware out there, it seems that the opportunities for MRO (maintenance, repair and operations) providers have barely begun. Most wind farms are less than a decade old — just seven of the wind farms on the CanWEA list predate the year 2000 — and many machines are just starting to come out of their original equipment manufacturer (OEM) maintenance service warranties. “In Canada, manufacturers have a strong hold on warranty service. We do not have any service technicians working for us currently. I work directly with our OEM,” explains Trevor Smith, maintenance supervisor of a large Ontario wind farm (he requested that we withhold the farm’s name). “The WTG maintenance industry is in its infancy,” he emphasized. “It is really hard to find a Canadian company to come in and competently work on wind turbines,” says Smith. “One problem I see with the industry now is the lack of local repair loops. With large pieces of equipment, there are a lot of components and not a lot of local repair loops. We are trying to get manufacturers to outsource equipment, such as gear-
p13-18 MRO Feb11 Features.indd 13
Above left: Thousands of wind turbines have sprung up across Canada in the past decade. Bottom left: Removing and returning a 30-tonne generator to its 80-metre high perch requires rigging skills and huge cranes. Above: Technicians need to have special skills for turbine repairs and must prepare for emergency descents by rope.
Photo courtesy Carlsun
boxes, to more local companies.” Almost all of the big turbine equipment suppliers, such as Enercon and Vestas, have two- to 10-year warranty maintenance service contracts, or longer, according to Jason Van Geel, president and general manager of Carlsun Energy Solutions, headquartered in Port Elgin, ON. “Every project starts this way.” Carlsun, along with Cambridge, ONbased Moventas Ltd., are notable exceptions to this OEM lock on MRO work. Moventas, one of the world’s largest manufacturers of wind turbine gears, does gearbox inspection, repairs and rebuilds for Canadian WTG owner-operators. Carlsun, founded in 2005, divides its expertise roughly equally between working as a general contractor for WTG installations and being the provider of non-construction services. “We are among the very few companies in Canada approved by equipment suppliers to work on their WTGs,” says Van Geel. That said, the company’s expertise is the replacement of major components, not MRO, at least as of yet. So far, there are a few other small-tomedium Canadian companies equivalent to non-OEM type MRO providers, such as
United States-based Energy Maintenance Service LLC of Gary, SD, or Outland Energy Services of Canby, MN. There are none of the size of, for example, the massive non-OEM independent company, EnXco, based in San Diego, CA, according to Mark Eagle, wind gear and field service manager, Moventas. (EnXco has a Canadian affiliate, EDF EN Canada, based in Toronto.) Maintenance and servicing The main equipment in a WTG, for example, the gearbox, generator, pitch and yaw motors and hydraulic systems, are contained in the nacelle — a boxy structure to which the blades are attached — that is perched on top of the tower. For scheduled inspections and lubrication, which take about two days for each turbine, the WTGs must be shut down. Maintenance schedules are manufacturer-specific. Some recommend a sixmonth service schedule for some components, such as filters and for lubrication, with more extensive inspections on a 12month schedule. The chance of an unscheduled, forced visit for maintenance within any six-month period is about 30%, according to Smith. Scheduled servicing is mainly lubrica-
tion: grease, oil, hydraulic fluids for yaw and pitch systems, and for drive trains. “There are moving parts everywhere. They need lubrication and maintenance,” Van Geel explains. “When servicing gearboxes, Moventas’ techniques include endoscope inspections and vibration analysis, done every couple of years. WTGs are special workplaces. Technicians must climb 80 metres or so up the inside of the towers to reach the nacelles. Tools for up-tower repairs are selected for their size and weight. Technicians must carefully plan for each repair to avoid excessive downtime. Space inside the nacelle is limited and major components are extremely heavy: a 1.65 MW generator, for example, weighs 55 tonnes. Gearboxes weigh up to 30 tonnes. For the record, blades weigh roughly 7,500 kg apiece and might be 49 m long. A nacelle and the hardware it contains typically weighs between 81,600 kg and 82,600 kg and an entire WTG can weigh over 317,500 kg. A minor overhaul would involve a generator alignment or lubrication pump replacement. Some equipment can be disascontinued on page 14
01/02/11 7:42 AM
14
T R E N D S
I N
M A I N T E N A N C E
Machinery & Equipment MRO
February 2011
On-line monitoring Nacelles may only be visited with a buddy and The belting you now use is costing you more you there are stringent safety protocols. Dailythan inspecthink. findtherefore, out just how much you could be saving tions To are, impractical. Manufacturers visit www.gates.com/foodgrade and use our easy online CLEAN SIMPLY REPLACE MODULAR BELTING offer at least basic on-line monitoring, generically Gates Mectrol food grade belting is designed as an Gates Mectrol PosiClean belting is a dropcalculator easy-to-clean replacement for the food processing in replacement for most 1” and 2” plastic referred to as SCADA (supervisory control and industry. From replacing plastic modular belting to modular belting. Thanks to the smooth design APPLICATION DRIVES fabric belts more the benefithan ts will make you’llYOUR spend less labor and less water duringUS The belting you now use is costing you youyou rethink the time and energy spent on conveyor belting. Plus, cleaning and sanitation processes. data acquisition). The OEM SCADA at the wind unlike could other bluebe belts, Gates Mectrol food grade POSICLEAN think. To find out just how much you saving BUILT FOOD GRADE TOUGH IT ALL ADDS UP. belting has a sealed Kevlar or aramid cord for No longer do yousynchronization have to look forselect broken1” or 2” For ultimate farmdowntime wherematters Smith works include vibration Because and each minute ofdoes not A poultry processing plant asked VISIT visit www.gates.com/foodgrade and use our FOOD easy online minimal stretch. hinges or pins may for have contaminated tooth pitch.that Perfect dropping in to existing GRADE BELTING scheduled maintenance is precious, Gates Mectrol Gates to replace plastic modular FOOD GRADE BELTING yourmodular product chain or thatpulleys. require replacement. analysis of major components, except to prevent abfood grade belting has sealed Kevlar® or aramid conveyor belts with an efficient POSICLEAN , FLATCLEAN™, CENTERCLEAN™ Your motor bearings will thank you as the Mcalculator tension members to limit belt stretch. Compared ® cleaning and sanitation solution. CENTERCLEAN POSICLEAN , FLATCLEAN™, CENTERCLEAN™ weight is significantly less with PosiClean. It to flat belting and monolithic belts,of thisequipment, limits the normal operation such as Converting toblade PosiCleanoversaves them For self-tracking positive drive select the CC8 or is also quieter, lowering the noise level on the time you spend adjusting belting tension. Plus, $148,000. Per Year. CC40. Our processing floor.tooth profile helps to maintain pulley Gates Mectrol construction is water “The monitoring system speed orpolyurethane tower oscillation. grooves free of debris as well as easily handles and chemical resistant – ready to stand up to the BUILT FOOD GRADE TOUGH Here’s how their savings IT ALL ADDS UP. high acceleration/deceleration. harshest of cleaning products. Because downtime matters and each minute of stacks up:normal opA poultry processing plant asked is designed to keep the machine within ULTIMATE CERTIFICATION scheduled maintenance is precious, Gates Mectrol FLATCLEAN Gates to replace plastic modular food grade belting has sealed Kevlar® or aramid Fraying edges on flat belts are a thing of the United States conveyor belts with an effi cient Department of Agriculture erating parameters,” Smith explains. tension members to limit belt stretch. Compared past. 0.125 inch thickness control makes FC12 Equipment Acceptance: cleaning and sanitation solution. LEAVE IT TO CLEAN IT to flat belting and monolithic belts, this limits the • Meatsaves and poultry Converting to PosiClean them processing equipment today’s choice when time and money matter. Designed specifically for wash down environments, More sophisticated condition$19K monitoring systime you spend adjusting belting tension. Plus, • Dairy equipment $148,000. Per Year. Gates Mectrol food grade is ready to be cleaned in ® CUSTOMIZATION, FLATCLEAN™, CENTERCLEAN™ Gates Mectrol polyurethane construction is water POSICLEAN place (CIP). No matter if your sanitation schedule tems, however, are slowly gaining Add a fl ight at whatever interval necessary to and chemical resistant – ready to stand up to the Here’s how their savings dictates continuous cleaning or a stop and wash +acceptance on harshest of cleaning products. stacks up: United States Food and Drug Administrationcarry your product up an incline. For product procedure, not having to remove the belt saves time $27K that could fall of the belt, select a sidewall on Canadian wind farms. Moventas offers its ConMaterial Requirements: and costs. one or both sides. Accordion shape allows the • Wet food contact belt to smoothly go around the pulley without dition Management System (CmaS), LEAVE IT TO CLEAN IT putting stress on the flange. + which monDesigned specifically for wash down environments, WATER =stores WASTE and analyzes data for seven key pa$19K itors, $102K Gates Mectrol food grade is ready to be cleaned in Beyond being a precious resource, water can be place (CIP). No matter if your sanitation schedule expensive to use and discard. The smooth design rameters: temperature, vibration, load, presdictates continuous cleaning or a stop and wash allows belting to be pressure washed while left on + VISIT procedure, not having to remove the belt saves time $27K FOOD GRADE BELTING table. On average this equates to 1/2 the cleaning sure, RPM, oil and and costs. time and 45% reduction in waterageing usage and the cost oil particle content. YOUR APPLICATION DRIVES, US more than you POSICLEAN FLATCLEAN™, CENTERCLEAN™ M of water disposal. Add this to not having to heat as FASTENING/INSTALLATION The company with savings GDF much water and the savingsrecently really add up. won a contract $148K in annual + POSICLEAN uldWATER be saving OPTIONS = WASTE $102K synchronization select 1” or 2” For ultimate Suez (a Belgo-French energy company with Beyond being a precious resource, water can be e our easy • Vulcanized Weld – For the strongest end tooth pitch. Perfect for dropping in to existing expensive to useonline and discard. The smooth design connection, weld the belt. Specify your length and headquarters in Houston, TX) modular chain pulleys. North American allows belting to be pressure washed while left on EASIER CLEANING the factory will weld or for the convenience of on-site table. On average this equates to 1/2 the cleaning installation, select field welder for a simple in 100 Canadian WTGs. CENTERCLEAN time and 45% reduction in water usage and the cost toGates install CMaS butt weld. PosiClean is extremely length stable For self-tracking positive drive select the CC8 or of water disposal. Add this to not having to heat as LIMITED STRETCH eliminating the need for retensioning. much water and the savings really add up. CC40. Our tooth profile helps to maintain pulley $148K in annual savings SKF Canada, which already has on-line mongrooves free of debris as well as easily handles • Field Weld – PosiLace™ – When there isn’t REDUCED TIME AND EXPENSE LL ADDS UP. high acceleration/deceleration. in more than 1,000 WTGs a lot of take-upitoring on your conveyorsystems or when you EASIER CLEANING try processing plant asked need to remove the belting, PosiLace is your FLATCLEAN to replace plastic modular answer. On PC20, a single pin limits the is chance for worldwide, working to crack the Canadian Fraying edges on flat belts are a thing of the contamination while allowing for simple removal. yor belts with an efficient LIMITED STRETCH past. 0.125 inch thickness control makes FC12 ng and sanitation solution. market. Its WindCon product detects failure • Mechanical Fasteners – From wire hooks today’s choice when time and money matter. erting to PosiClean saves them to metal staples, standard conveyor fasteners are 000. Per Year. modes for equipment on variables such as alignavailable when metal contamination isn’t an issue. REDUCED TIME AND EXPENSE CUSTOMIZATION Add a flight at whatever interval necessary to ment defects, shaft deflection, clutch and bear’s how their savings carry your product up an incline. For product ks up: that could fall of the belt, select a sidewall on ing defects, and gear damage and wear. It is curone or both sides. Accordion shape allows the belt to smoothly go around the pulley without xxxx rently running a single pilot project, but SKF is putting stress on the flange. Water usage K and wastewater ready for much more action: Its remote diagnosdisposal savings tics centre in its new Solution Factory in Edmon+K Labor Savings EASIER CLEANING ton is equipped for remote data capture, analyLIMITED STRETCH sis and diagnostics reporting. from not FASTENING/INSTALLATION heating 4,452,000 + Savings OPTIONS gallons - amount of Despite the acceptance of on-line monitoring REDUCED TIME AND EXPENSE 2K water saved • Vulcanized Weld – For the strongest end systems in other industries, Canadian wind connection, weld the belt. Specify your length and farm operators appear not to have wholeheartthe factory will weld or for the convenience of on-site installation, select Gates field welder for a simple edly embraced them yet. “In the wind industry, butt weld. PosiClean is extremely length stable eliminating the need for retensioning. 8K in annual savings the top priority is to build new capacity. Remote • Field Weld – PosiLace™ – When there isn’t lot of take-up oncosting your conveyor or when you monitoring and predictive maintenance strateThe belting you now aneed use is to remove the belting, PosiLace is your answer. On PC20, a single pin limits the chance for gies are still being developed, since significant you more than you think. To find out just contamination while allowing for simple removal. [numbers of WTGs] are still under warranty or Mechanical Fasteners – From wire hooks how much you could •tobe saving visitfasteners are metal staples, standard conveyor just after the end [of them],” says Hugues Martel, available when metal contamination isn’t an issue. division manager, Reliability Systems, SKF www.gates.com/foodgrade and use Canada. “[But] the earlier that some preventive our easy online calculator. and corrective maintenance tasks can be schedm No. xxxx uled, the more you can save money. For example, some bearings can be changed in the nacelle if F o r m o r e i n f o r m a t i o n , c o ntact us at you detect the problem early enough. The business case for condition monitoring on wind farms is driving down the cost of doing maintenance.” ®
®
®
™
FOOD GRADE BELTING ™
Water usage and wastewater disposal savings
of their experience, their ability to excel, their attitude and their personalities ... getting along at the top of the towers. Personality is really big.” A WTG technician has multiple specializations in, for example, mechanics, electrical systems, electronics and hydraulics, Smith explains. “You cannot have someone who is just an electrician. They need a broad understanding of systems.” Possibly the best-equipped place in the world to receive training on wind turbine systems, if Greg Peterson is right, is in Lethbridge, AB. He is the program administrator for the International Wind Energy Academy, and the industrial and technical training department, at Lethbridge College. The Lethbridge College International Wind Energy Academy has been offering a 32-week wind turbine technician program since 2004 and has graduated about 150 technicians to date. “It is probably the most comprehensive Photo courtesy Moventas
Removing and returning a 30-tonne generator to its 80-metre high perch requires rigging skills and huge cranes.
sembled and lowered from the nacelle with a builtin service crane. “Newer and larger turbines tend to be more serviceable,” says Moventas’ Eagle. A gearbox replacement would be a major exercise. A specialist company like Carlsun might bring in a 650-tonne hydraulic crane to remove a gearbox and replace it with a spare. Moventas, on the other hand, would remove and repair or overhaul the faulty gearbox in its own shop. Eagle describes some of the main challenges working on WTGs. “Besides the obvious problems associated with working 90 metres up in the air, the space up-tower is very limited. Moving around the equipment is difficult and takes a toll on the body and sometimes even one’s patience. Good housekeeping is a must and goes a long way to reduce fatigue and speed up the job. When the winds are high, it’s too dangerous to perform some procedures.” Workplace safety quickly comes out in conversation. “There are very stringent safety qualifications. Safety is tied with technical qualifications in greatest importance and is a very significant department in our company,” says Van Geel. Safety training includes learning how to execute high-angle emergency descents by rappelling from the nacelle.
YOUR APPLICATION DRIVES US POSICLEAN®
For ultimate synchronization select 1” or 2” tooth pitch. Perfect for dropping in to existing modular chain pulleys.
CENTERCLEAN™
Photo courtesy Moventas
Photo courtesy Moventas
continued from page 13
For self-tracking positive drive select the CC8 or CC40. Our tooth profile helps to maintain pulley grooves free of debris as well as easily handles high acceleration/deceleration.
FLATCLEAN™
Fraying edges on flat belts are a thing of the past. 0.125 inch thickness control makes FC12 today’s choice when time and money matter.
CUSTOMIZATION
Add a flight at whatever interval necessary to carry your product up an incline. For product that could fall of the belt, select a sidewall on one or both sides. Accordion shape allows the belt to smoothly go around the pulley without putting stress on the flange.
Labor Savings
FASTENING/INSTALLATION OPTIONS
Savings from not heating 4,452,000 gallons - amount of water saved
Water usage and wastewater disposal savings
• Vulcanized Weld – For the strongest end connection, weld the belt. Specify your length and the factory will weld or for the convenience of on-site installation, select Gates field welder for a simple butt weld. PosiClean is extremely length stable eliminating the need for retensioning.
Labor Savings
®
Savings from not heating 4,452,000 ® gallons - amount of water saved
™
™
Form No. xxxx 8/10
Form No. xxxx 8/10
EASIER CLEANING LIMITED STRETCH
REDUCED TIME AND EXPENSE
Reader Service No.124
p13-18 MRO Feb11 Features.indd 14
Multiple skills needed Historically, according to Smith, who is is an aircraft mechanic by training, WTG technicians have come from diverse backgrounds. “When I first started, I met linemen, electricians, millwrights, mechanics … one was a farmer with phenomenal skills. The focus was on the breadth
Top: Mark Eagle, wind gear and field service man• Field Weld – PosiLace™ – When there isn’t of take-up on your conveyor or when you ager with Moventas, takes a break ina lotthe cramped need to remove the belting, PosiLace is your answer. On a single pin limits the chance for confines of a tower-top nacelle. Bottom: APC20, technicontamination while allowing for simple removal. cian inspects a 50-plus tonne gearbox. • Mechanical Fasteners – From wire hooks to metal staples, standard conveyor fasteners are available when metal contamination isn’t an issue.
training program that we have seen,” Peterson says. “The key to it is the extensive scope of equipment that we train students on. Our equipment includes 250-kW to 1.8-MW generators and gearboxes, training units for hydraulic systems and sensors, a training tower, a nacelle safety simulator and blades.” Students come from as far away as South Korea, China and Australia to take the program and graduates can go directly to work in the wind turbine maintenance industry, Peterson says. “The program is 100% driven by service companies [OEMs]. An advisory committee, which includes wind industry OEMs, reviews and makes recommendations on the curriculum.” OEMs will put graduates through additional specific training on their own systems and equipment. The future for technicians and non-OEM service companies would seem bright. As of last August, according to CanWEA, there were 72 new projects, with a total capacity of 8,695.2 MW, that had signed purchase power agreements and/or that were under construction. That means there will be roughly another 5,800 WTGs that will need servicing, and the counter keeps on spinning. For example, Alberta alone has an estimated 11,500 MW of proposed wind applications, and environment ministers across the country are plugging wind power as MRO their clean-energy salvation. Montreal-based Carroll McCormick, an awardwinning writer, is the senior contributing editor for Machinery & Equipment MRO. Reader Service No. 400
01/02/11 7:43 AM
d -
C O N D I T I O N February 2011
Machinery & Equipment MRO
Using wireless testing to increase MRO safety BY ANDRÉ REBELO
T
esting requirements vary greatly for professionals working in plant maintenance, repair and operations (MRO). Whether you work for a manufacturing facility, a contract MRO company, or are in a specialized industrial setting, one thing remains relatively constant: chances are that when it comes to performing essential electrical testing and monitoring, nine times out of 10, you’re reaching for your digital multimeter (DMM). Advances in design, functionality, safety and accuracy have improved the usefulness and value of the DMM tremendously. Increased selection in the marketplace has also led DMM manufacturers to push innovation to increase the versatility of their testers and meters. Still, take a scenario where you need to monitor or datalog readings over a period of time. You soon discover that several perennial safety problems persist with even the latest test equipment. In many cases, for example, the proximity to hazardous voltage or moving components is inevitable. In essence, you’re as close to dangerous connections or components as your test leads permit. Monitoring readings can be hazardous. You can step away to safety if you initiate datalogging, but you’re limited to reviewing readings after you’ve retrieved the DMM following the monitoring period. In some cases, a technician might wish she could clone herself to get the job done right. Consider a situation where a remote task is required, such as opening or closing a breaker, activating equipment to simulate a typical load, or flipping a remote switch. In most of these cases, to monitor or datalog resulting trends on one’s DMM, the help of a second person is needed. At some jobsites, this is a non-issue if there are other workers nearby. But in the MRO world, many technicians are working on their own, often during off-shifts. From a convenience and versatility perspective, many technicians add the processing power of a laptop computer to make datalogging more sophisticated and useful. The downside is that if testing is needed at a number of spots at a jobsite, you now have extra hardware to lug around and set up repeatedly at each measurement point. Multimeter companies have taken note of these limitations, and DMMs have officially entered the world of wireless versatility. A little over a year ago, a major DMM maker introduced a meter with a detachable display for remote, wireless viewing of readings. What you could previously read only on the fixed display of a DMM, you can now take with you and read from a distance. It’s a clever step in the right direction in terms of remote monitoring. Another company’s wireless DMM introduction took the technology a step further with remote streaming of data back to a laptop or PC for real-time monitoring or datalogging. That development came from Extech Instruments, which added the Extech EX540 as a new addition to its EX500 series of industrial multimeters. The new meter offers wireless connectivity to a laptop or PC using a USB receiver with a range comparable to Bluetooth (10 metres). The EX540 transmits real-time data for monitoring, trending
p13-18 MRO Feb11 Features.indd 15
15
M O N I T O R I N G
and analysis (using included software) on one of two available frequencies (433 MHz or 914 MHz). With it, MRO professionals can both monitor and datalog readings at a safe distance from hazardous locations. AdditionalA wireless datalogging multimeter allows a user to set up a laptop at a centralized location and then ly, it is easier to perform remote sequentially obtain readings throughout a site withtasks such as powering up a deout relocating the computer. vice from a control panel that is not nearby. From a time-saving perspective, the EX540 permits a readings throughout a site without relouser to set up a laptop at a centralized cating the computer. location and then sequentially datalog
The EX540 is a true RMS DMM that, in addition to wireless datalogging, can log up to 10,000 readings internally and also reads voltage, current, resistance, capacitance, frequency, duty cycle (dwell), continuity, diode testing (2.8V), and even temperature. Its accuracy is rated at 0.06% and it has a Category IV overvoltage safety rating, protecting users even on outdoor wiring. Beyond the gee-whiz effect of a heavyduty wireless datalogging multimeter, MRO managers can now expand how they think about testing scenarios and logistics, not to mention how jobs can be performed more quickly and easily. For the invaluable versatility and added safety of remote monitoring and datalogging, the wireless datalogging multimeter has arrived and is here to stay. MRO André Rebelo is with Extech Instruments, Waltham, MA. Online Reader Enquiry No. 404
Let us help you save time and money! YOUR SAFEST, MOST EFFICIENT ALTERNATIVE TO TOXIC SOLVENT PARTS WASHING! Bio-Circle is a complete, cost-effective and hassle-free solution which: � Cleans your parts without risks of health hazards. � Comes with a complete on-site maintenance program performed in 21 precise steps by our qualified technicians. � Is compliant with ISO 14000, ISO 18000, ACCP and Canadian food industry standards � Has been adopted by thousands of industrial customers worldwide!
Call us today at
1-888-592-5837 for a free demo at your plant and get your welcome gift! www.biocircle.com www.walter.com ®BIO-CIRCLE and BIO-CIRCLE & Design are trademarks of Surface Technologies IP AG, used under licence
Reader Service No. 125
01/02/11 7:43 AM
16
F O C U S
O N
C O M P R E S S O R S
Machinery & Equipment MRO
Compressed air isn’t free?
February 2011
There is an attitude that since it’s just air and because it’s used every day, it’s free, even if there are obvious system leaks. Unfortunately, compressed air is an extremely expensive utility. Here’s how to get control over your compressed air systems to reduce energy costs and your facility’s carbon footprint. BY DOUG WAETJEN
I
t is amazing that while there is so much discussion in various media about energy and carbon reduction, most plant personnel fail to realize that there are incredible opportunities for cutting energy waste and carbon gases right under their proverbial noses. These are opportunities that could dramatically improve their company’s competitiveness. In fact, many management personnel fail to realize that it isn’t always necessary to commit to major capital-intensive programs that produce long-term returns on investment. They often are either not aware of — or just overlook — inexpensive projects with short-term, almost immediate returns that will improve energy efficiencies in their plants. One project is to look for and repair leaks in utilities such as compressed air and steam. Such projects often provide a very fast and dramatic return on investment. In some cases, they have translated into hundreds of thousands (and as high as millions) of dollars per year with-
out a major capital investment. Compressed air is one utility that offers tremendous savings potential. The problem is that there are many plant personnel who don’t quite understand that compressed air isn’t free. There is the attitude that since it’s just air and it’s used every day, it’s free and doesn’t require much attention, even if there are obvious leaks. Unfortunately this is far from the truth. Compressed air is an extremely expensive utility. In fact, back in 1995, the US Department of Energy instituted a Compressed Air Challenge to help industry reduce the use of compressed air by 10% by 2010. It had stated that compressed air is one of the most costly utilities in plants and of all the compressed air produced in the US, 30% was lost to leaks. It estimated the annual cost to be around $3.2 billion! (Results from that program have not yet been released.) Why is compressed air so costly? It is extremely expensive to produce and it is very inefficient to use. Of the energy re-
Wasteful and costly practices in plants include leaving tank valves open.
quired to produce compressed air, less than 20% of input energy is left for use. That means 80% of what is paid for is used up before the compressed air is put in the distribution system. Here’s an example of how inefficient compressed air is. If we compare the cost of running a one horsepower electric motor to a one horsepower compressed-air motor,
the former might cost $200 per year while the latter could be $1,500 per year. One simple approach for those facilities that use compressed air is to schedule routine compressed-air audits and leak surveys. Compressed-air leak surveys often disclose the cost of wasted air affecting the electric bill ranging form tens of thousands to hundreds of thou-
1-888-847-7190 www.canross.com
Reader Service No. 126
p13-18 MRO Feb11 Features.indd 16
Reader Service No. 127
01/02/11 7:43 AM
F O C U S
O N
17
C O M P R E S S O R S
February 2011
Machinery & Equipment MRO
sands of annualized dollars. Table 1 shows how costly compressed air leaks can be. While the numbers relate to one leak, imagine the cost of hundreds of leaks with sizes ranging from 1/16 of an inch up to 3/4 of an inch. Leaks and misuse While design and compressor efficiency are important factors to consider regarding system efficiencies, there are two other contributing factors to excessive energy consumption in a compressed-air system: leaks and misuse. On the plant level, there are many workers who are under the assumption that air is free and for this reason air is often misused and wasted. Air leaks are ignored. It is not uncommon to walk through a plant where the tell-tale loud hissing sounds associated with gross leaks are heard and taken for granted as background noise. If leaks are too loud to be tolerated, we have seen rags or duct tape wrapped around them to reduce the sound level and make it more acoustically comfortable for the personnel in the area. Abuses have also been observed. At times personnel have placed air hoses in a position to continually cool their working space. In one instance, an enclosed metal box was set up in a plant with an air hose run through the top, positioned to continually blow air on soda pop cans to keep them cool! Engineers have also misunderstood the inefficiency and cost associated with compressed air. Some common wasteful and costly practices in plants include using compressed air to blow on and cool bearings, or to continuously blow on conveyors
Table 1: Air Leak Cost Leak DIA
Air-Loss CFM/Day
CFM Loss/Day
Loss/Day
Loss/Year
1/64
0.45
576
$0.13
$48.00
1/32
1.60
2,304
$0.51
$186.00
3/64
3.66
5,270
$1.16
$424.00
1/16
6.45
9,288
$2.04
$744.00
3/32
14.50
20,880
$4.59
$1,674.00
1/8
25.80
37,152
$8.17
$2,981.00
3/16
58.30
83,952
$18.47
$6,738.00
1/4
103.00
148,320
$32.63
$11,904.00
5/16
162.00
233,280
$51.32
$18,721.00
3/8
234.00
336,960
$74.13
$27,036.00
The cost of one leak, based on its size. Note: Based on 100 PSI, $0.22/MCF, 8,760 hours/year.
to clean them. We have seen drain valves left open with warnings placed on the tanks stating: “Do not close this valve, keep it open.” Solutions to reduce waste One simple, inexpensive approach to reducing compressed air waste in facilities is to embark on an educational campaign. Meetings are often a good start, where the cost of energy waste and its impact on operating costs in particular can be discussed. Personnel can be asked to help identify misuse and be encouraged to inform their co-workers. Motivational signs can be placed around the plant to illustrate wasteful behaviour and suggest changes. Newsletters can be used to promote a campaign. A suggestion box can be set up and rewards or awards given to the most effec-
tive suggestion. In some cases, monetary rewards based on the value of the suggestion have been given to personnel. As part of the misuse or misapplication of compressed air, a survey can be undertaken to look at alternatives to compressed air. For example, instead of blowing compressed air on a bearing, try a fan. Instead of mixing or agitating with air, try an electric mixer. Keeping in front of the issue and looking around for alternative resources can help reduce the electric bill noticeably. Leak surveys Since about 30% of all the compressed air produced is lost to leaks, it is imperative for a facility to incorporate a compressedair leak survey program. Not only is this a non-capital intensive, relatively inexpensive approach, the results can be gained
as quickly as the leaks are repaired. Energy consumption, specifically the reduction of electricity usage, also will have an impact on a plant’s carbon footprint. Compressed air leak detection surveys require planning, personnel, training, equipment, identification, reporting and follow-up. Without planning, a survey program can be ineffective. Planning includes consultation with plant management and plant personnel, and observation and review of the compressed-air system. A walk-through is recommended for any survey. This is performed to help set up the survey, breaking it down to small workable units. Safety issues can be observed, and route logistics can be planned that include where to begin and where to end in a particular section. A walk-through can also help plan what equipment will be needed. Are keys needed to open cabinets; flashlights necessary for dimly lit areas; or ladders, lifts or special equipment required to reach piping in ceilings? Personnel should understand the goals of the program and should understand how to conduct a leak survey. Training provides personnel with the knowledge and methods needed to effectively perform a survey. Properly trained inspectors learn how to plan for and conduct a compressed air leak survey using inspection techniques that avoid problems such as misidentification or improper labelling, which might lead to costly mistakes and unreliable results. They also learn how to use reporting tools to calculate and demonstrate survey savings. continued on page 18
Relax. HYDRex is on tHe job.
TM
#1 in Bearing Isolators www.inpro-seal.com
Count on the worry-free performance of HYDREX hydraulic fluids to keep your equipment running smoothly. HYDREX lasts up to three times longer and offers up to twice the wear protection of the leading hydraulic oil brand.† For you, that
YOUR SAME-DAY SHIPMENT SPECIALISTS
means greater equipment uptime,
When your equipment is down, you need a partner that ships a solution to you same-day…not some day. At Inpro/Seal, we recognize the high cost of downtime facing our customers; that’s why we’ve designed our operations to support quick–turnaround of our custom–engineered bearing protection products.
increased productivity and better energy efficiencies.†† And less to worry about with minimal sludge build-up, long change-out intervals
With manufacturing locations in North America and the United Kingdom, we’re able to offer industry– leading products with unparalleled response time and service to customers around the globe. The right technology…right when you need it.
and protection against equipment wear. Improve your bottom-line — get HYDREX working in your operation today.
Call 1-866-335-3369
lubricants.petro-canada.ca Petro-Canada is a Suncor Energy business
™ Trademark of Suncor Energy Inc. Used under licence. † Measured against the number one selling North American hydraulic oil brand. †† Energy efficiencies apply to multigrades only. LUB 2303E (2010.03)
Reader Service No. 128
ED p13-18Artist: MRO Feb11 Features.indd Production
Date:
17
June 1, 2010
Revision #:
Reader Service No. 129
3
SC:
Y
01/02/11 7:43 AM
18
F O C U S
O N
C O M P R E S S O R S
Machinery & Equipment MRO
February 2011
continued from page 17 Using ultrasonic detection of leaks Using the right equipment for the job will add to the effectiveness of the survey. The most common tool for compressed air leak surveys is an ultrasonic detector. These instruments sense the high-frequency components of turbulence produced by air leaks. Directional in nature, ultrasound is a localized signal that makes it relatively easy to locate the source of the leak. If the instrument is not sensitive enough, some midsized leaks might be missed. If there are accessibility issues, such as leaks in ceilings or in layers of pipes, or behind walls or under ground, special modules that adapt to these situations should be considered. Identification of leaks is very important. The leak should be tagged and if possible photographed to assist those who are responsible for the repair to locate and perform the repair. A big, brightly coloured tag can help. If possible, a tagging system should be used to correlate with
Table 2 Year to Date
$56,227.99
Air Leaks Repaired
Month
Identified Leaks Cost Avoidance
Repaired Leaks Cost Avoidance
% Complete
CFM
Cost
August 2008
$26,743.99
$5,146.91
19%
29.8
$5,146.91
July 2008
$19,853.88
$1,895.60
10%
11.0
$1,895.60
June 2008
$9,630.12
Some software allows for the summation of surveys over time, demonstrating the cumulative annualized cost savings. Note in the columns stating Identified leaks Cost Avoidance and Repaired Leaks Cost Avoidance that it is only when a leak is repaired that the savings are realized.
Table 3 Carbon Dioxide CO 2 (lb)
Nitrogen Oxide NO (lb)
Suphur Dioxide SO 2 (lb)
Identified Avoidance
Realized Avoidance
Identified Avoidance
Realized Avoidance
Identified Avoidance
Realized Avoidance
211,199
40,645
265
51
506
97
156,787
14,970
197
19
375
36
76,050
96
182
Reporting features can include demonstration of reduction of the carbon footprint gases that are associated with the energy cost of leaks.
Trying to control your operating costs? Consider Canada’s Largest Industrial Distribution Network for your MRO supplies.
Over 260 Locations Coast to Coast Across Canada
THE IDI ENTREPRENEURIAL ADVANTAGE
• Cross Canada coverage • Over 2000 technically trained staff • North American affiliations • Central distribution facility • Supply chain integration • • Local decision making • Technical support & product training • Multiple commodity groups • Electronic catalogue • E-commerce •
PRODUCTS SUPPLIED BY IDI MEMBERS
• Bearings • Industrial supplies • Power transmission products • Fluid power products • Janitorial supplies • Safety supplies •
NATIONAL AND REGIONAL CONTRACT EXPERIENCE
• E-commerce ordering • Vendor managed inventory • Electronic funds transfer • Activity based costing • Receipt driven payment • • Consolidated billings & single invoicing • Product sourcing consolidation • P-card purchasing • Business process re-engineering • • Electronic communication • Vending machines • FOR MORE INFORMATION CONTACT
IDI Independent Distributors Inc., 6581 Kitimat, Unit 12, Mississauga, ON L5N 3T5 Tel: 905.858.0988 Fax: 905.286.0686 email: info@idiind.com Reader Service No. 130
p13-18 MRO Feb11 Features.indd 18
location, component, pressure, CFM or even the cost of the leak. Leak reporing Any survey needs reporting. A report can be a form of leak management. A leak report should be useful on many levels. The report helps identify specific leaks and the number of leaks, and provides identifying numbers that can correlate to a work order and the location of the leaks. Some reports will also include a summary of identified and actualized cost avoidance figures, along with identified and actualized carbon footprint reduction numbers. The actualized figures include leaks that have been repaired and represent the real savings of a survey. Unfortunately there have been instances where good intentions resulted in costly mistakes simply because surveys were performed with no allowance for the planning of leak repairs. Some software allows for the summation of surveys over time, demonstrating cumulative annualized cost savings. Other reporting features can include the demonstration of the reduction of the carbon footprint gases that are associated with the energy cost of leaks. Tables 2 and 3 are examples of this type of reporting. It is necessary that all parties responsible for the leak survey be on the same page. Communication is essential. Maintenance managers and planners must understand the necessity of leak repair and a workable schedule must be set. For example, if 200 leaks are found in a survey and the report is given to those responsible for the repairs without an explanation, there is the possibility that these leaks might be looked on as an additional 200 work orders and left unattended. If discussions of the repairs include the participation of the repair team, a method could be established to break the repairs down into small, workable chunks — starting with the most costly leaks first or pairing leaks that are close together, making leak repair more efficient. Inclusion and communication will lead to cost savings and a successful program. A follow-up review of the listed repairs will help assure leaks have in fact been repaired and no new leaks have developed due to the repairs. This should also include a review of system pressures that need to be restored to their original settings. Finally, a review of the entire survey will help set up the logistics for all subsequent surveys. A compressed air leak survey is a truly ‘green’ way to improve profitability. MRO Doug Waetjen is with UE Systems Inc. Online Reader Enquiry No. 405
01/02/11 7:43 AM
T H E
S A F E T Y
19
F I L E
February 2011
Machinery & Equipment MRO
The Electrical Menace How to properly handle safety issues with electrical equipment in hazardous areas.
A
BY SIMON FRIDLYAND
n area in any industrial facility classified as hazardous is one in which the atmosphere contains, or may contain, flammable or explosive gases, dusts or fibres. In this type of area, a fire or explosion could occur when three basic conditions are fulfilled: 1. Flammable gas, vapour, dust or fibres must be present. 2. The combustible material must be mixed with air in the proportion required to produce a flammable mixture. 3. A source of ignition must act to ignite the mixture. This can be any source that could release sufficient energy to cause ignition. A spark or even a hot surface may release the incendiary energy. Generally, a potential source of ignition from an electrical system is any spark or hot component that releases energy sufficient to ignite the combustible mixture surrounding it. The ignition source may occur in any of four mechanisms: a) discharge of capacitive circuits, b) interrupting (opening) of inductive circuits, c) opening or closing of resistive circuits with slow intermittent interruption, increasing the ignition capability (hazard), and d) hightemperature sources. Ignition mechanisms may occur in relay contacts, switch contacts, fuses, short circuits (from damage or component failure), and arc-over between components or conductors. However, the components or circuits that present a potential ignition source may be designed in a variety of ways in order to prevent the ignition of a hazardous atmosphere. Three basic approaches are used individually or in combination to prevent the ignition of hazardous atmospheres: 1. Intrinsically Safe/Non-incentives Equipment: Eliminates the ignition source by designing equipment that cannot cause ignition when in contact with flammable or explosive atmospheres. 2. Gas Purge/Hermetic Sealing: Controls the atmosphere surrounding the potential ignition source so those components are enveloped within a non-hazardous atmosphere. 3. Flame-proof/Explosion-proof Housing: Contains the explosion within the housing, preventing the ignition of the surrounding atmosphere. Regulations require than an area classified as hazardous be established by an engineer. In Ontario, for example, drawings of a classified area shall be stamped by a professional engineer operating under a Certificate of Authorization issued by the Association of Professional Engineers of Ontario (APEO). The electrical inspector from an electrical inspection agency (Ontario’s Electrical Safety Authority — ESA — for example) reviews the installation drawings for wiring methods in each classified area of a plant or other industrial facility, and any safety devices such as dust collectors, ventilating equipment, etc., that might have an impact on the installation methods with reference to the stamped drawings. The electrical inspector ensures that the wiring and equipment installed conforms with the requirements of each area. Any time electrical equipment is destined to go into a classified area, regulations state it shall be reviewed by a professional engineer before it is
built. There are two reasons for this. First, Ontario Electrical Safety Code Bulletin 18-1-15, as well as Ontario Regulation 851 Section 7, stipulate that a PSR (Pre-start Health and Safety Review) is required when dealing with flammable liquids, potentially explosive processes or dust collectors. A Pre-Start Health and Safety Review is required if — in a factory other than a logging operation — a provision from the regulation and the circumstances described exist: (a) When a new apparatus, structure or protective element is to be constructed, added or installed, or a new process is to be used, or
it is ready to be immediately operational, as the PSR will come with the equipment. The second reason for the review relates to the fact that electrical field evaluation agencies do not do field evaluations of electrical equipment in hazardous areas. Therefore, the design of the equipment has to be reviewed by a professional engineer before it is built, and the client advised as to whether to use approved and certified electrical components acceptable to the ‘Authority Having Jurisdiction in Canada’, or whether it must conduct additional tests by testing laboratories accredited by the Standards Council of Canada. Generally, both of these tasks are combined to reduce and minimize the expenses associated with the compliance process. MRO Simon Fridlyand, P.Eng., SAFE Engineering Inc., specializes in industrial health and safety issues and PSR compliance. He can be reached at simonf@safeengineering.ca. Online Reader Enquiry No. 403
ONE ONE SOURCE ONE SYSTEM ONE SOLUTION
Hydraulic Hose, Fittings and Equipment Whether the application is construction, mining, agriculture, manufacturing or transportation, we have the hose to meet and exceed the diverse needs of our customers. Veyance Technologies is your one source, one system, one solution provider with innovative hydraulic hoses and products that meet major global standards. For more info, call 1-888-275-4397, or visit www.goodyearep.com The GOODYEAR (and Winged Foot Design) trademark is used by Veyance Technologies, Inc. under license from The Goodyear Tire & Rubber Company. Goodyear Engineered Products are manufactured and sourced exclusively by Veyance Technologies, Inc. or its affiliates. ©2009 Veyance Technologies, Inc. All Rights Reserved.
Reader Service No. 131
GY_Hydraulic_Fullpage_MRO.indd 1 p19-21 MRO Feb11 MaintMgmtCMMSSafety1.indd 19
(b) When an existing apparatus, structure, protective element or process is to be modified, and one of the following steps must be taken to obtain compliance with the applicable provision: (i) New or modified engineering controls are used. (ii) Other than new or modified measures are used. (iii) A combination of new, existing or modified engineering controls and other new or modified measures is used. Since a PSR is required, it makes sense to work with the equipment manufacturer at the design stage. It is possible for purchasers to pass on the responsibility for PSRs to their suppliers before the shipment is accepted by using the services of an engineering consulting firm. The firm can work with suppliers and end-users during the manufacture of the equipment, advise the supplier about the local compliance requirements, and co-ordinate any potential issues with the endusers. This approach ensures that when equipment arrives at its final destination,
10-08-18 10:16 PM 01/02/11 7:33 AM
20
M A I N T E N A N C E
M A N A G E M E N T
Machinery & Equipment MRO
BIG CHANGE MEANS A MAJOR LEAP OF FAITH
February 2011
BY CLIFF WILLIAMS
Follow along with Step 37 in a journey to World-Class Maintenance at the Plentya Paper Company as the maintenance team comes closer to achieving its goals. ©iStockphoto.com/Todd Media, Inc
This article is part of an ongoing series. The introduction appeared in Machinery & Equipment MRO’s February 2005 issue and the series has run in every issue since. Previous instalments are archived online at www.mromagazine.com. In this issue, we pick up where we left off in the December 2010 edition, as maintenance manager Bob Edwards takes a major leap towards transforming the organization.
A
s Carol, our reliability manager, worked on setting up the new operator routes in our computerized maintenance management system (CMMS), and Fred, our production manager, was ready to roll them out, that was when Pete — one of the millwrights — stopped me in the maintenance shop. “Bob, I hear that Fred is going to get his guys to record their routes in the CMMS. Is that right?” “Yes, I think he’s going to do it this week. Why do you ask?” “Well, I was thinking about it and I thought it would be a good idea to give them some tools so that they can give back meaningful information — you know, something like the vibe pen we use.” “That’s not a bad idea, Pete, but I think we had better crawl before we try and run.” “Just a suggestion,” he added. I thought about what Pete had recommended and it did seem like the next logical step to take, but I knew we had to prepare the ground for something as different as this would be. There would be maintenance guys who resented giving over responsibility to the machine operators, and there would be operators who wouldn’t want to take on the responsibility, but I decided I would mention the idea to Fred. Carol was very excited when she came into my office. “I’ve set up the delay codes in the CMMS so the guys will be able to record the reasons for delays! You remember how we talked about getting the experienced guys to write procedures so the new guys would have a shorter learning curve? Well, I’ve found a way of linking procedures to the equipment, so that as we build the library, the guys will be able to link to all of the procedures for a piece
p19-21 MRO Feb11 MaintMgmtCMMSSafety1.indd 20
of equipment and choose the one they us some time before we get a lot of data on want. I also took the liberty of setting up the delays in getting jobs done. The procea Standing Work Order for Pete, Ted and dures will improve knowledge, but we will Ivan, so those millwrights can start destill have the problems with authority — veloping procedures.” and I don’t think we’ll make gains quickly “That’s progress! We really are on a enough unless we take a leap of faith.” roll and Pete actually came up with an “Okay Bob, what do you suggest we do?” idea that should be our next goal.” “Let’s copy what they do at the mill we As I told her about Pete’s suggestion, visited in Wisconsin. They allow the Fred walked into my office and caught tradespeople to call in contractors or the end of the conversation. other trades and start work without get“Wait a minute, Bob, we’ve only talked ting permission from the maintenance about recording what we do now — not manager or their own supervisors — esabout doing new things.” pecially on the off-shifts.” “That’s why they’re called goals, Fred “That’s a big move!” Joe exlaimed. — something to aim for. How can we “That’s why it’s called a leap! Wisconhelp you?” sin reviewed every call for the first few “I just wanted to confirm everything months and shared the findings with evis ready to go, as I want to tell Joe, our eryone. They found that pretty much all plant manger, about it at the Project 600 of the decisions that were made were cormeeting this afternoon.” rect, so they stopped reviewing and re“Yes, everything is set up. I should pull enforced the fact that the only thing that something together for couldn’t happen was the meeting as well.” to keep the mill down When Fred left, and wait for someone Carol picked up on else. It works very Pete’s suggestion. well there, so I think Seize the moment “It’s not as big a we can start with letstep as you and Fred ting them call in conBelieve in yourself seem to think. What tractors or extra help Use the good people we’re going to do is ask when it’s obvious, and around you that the operators use build from there.” their senses on their “Okay, as long as walk-around. By giving them a vibe pen you keep your finger on the pulse of what’s and maybe our ultrasonic wand, we’re happening, Bob,” said Joe. “And Fred, just going to help them quantify their obyou’re going to have to clearly communiservations.” cate with your shift people so they under“That’s a valid point. I’ll just have to stand what’s involved.” think about it.” As we were leaving the meeting, At the Project 600 meeting, Joe exFred walked beside me and he was plained that we were making progress clearly agitated. and the Corporates were impressed, but “I just don’t get you, Bob. You talk to they wanted to see 600 tonnes per day me about teams and involvement, and very soon. “We are victims of our own yet when I was in your office this mornsuccess, so we need to step up the pace. ing and brought up the subject of the What have you guys got in the pipeline?” Project 600 meeting, you never men“We’re going to have the operators retioned anything about giving your guys cord their routes in maintenance’s the right to call in people!” CMMS,” offered Fred. “That’s because I didn’t even think I reviewed what we had talked about about it until now! Joe’s speech about at the corporate meeting and what Carol speeding things up made me realize that had found regarding the newer guys waiting to get the sort of info we need is a needing guidance to prevent rework. waste. Think about the times you’ve been “One of the things I’ve been thinking called in the middle of the night just to about is the topic of authority, which we had confirm what the guys at the plant had detalked about with Corporate. It could take cided needed to be done. I know pretty
Key Points
much every one of my calls were that way — so I figured that there was no point in waiting. You think you were surprised? Wait until the guys get to hear about this!” I went straight to Carol’s office to let her know what had taken place and had her schedule a meeting with the guys the very next morning. At the meeting, I explained what had happened at the Project 600 meeting. “I’ll sit with a couple of you today and we’ll develop some guidelines about when and who to call in if the need arises. We’ll get a list of telephone numbers for you — won’t we, Carol?” “The contractors’ phone numbers are in the CMMS and we already have staff home numbers posted in the lunchroom.” “How are people going to know who to call?” asked Steve, another one of the millwrights. “Like I said, Steve, we’ll discuss that. Do you want to be involved? I don’t think that it will be that complicated — if the problem is in Stock Prep, you’d call the stock prep guys. We’ll create some criteria for when to call contractors, such as ‘Do we know the exact problem?’ and so on.” Surprisingly, when I mentioned the operators entering their routes in the CMMS, there was more of a commotion. “I’m not too sure about this.” It was Ivan from Stock Prep this time. “Giving them vibe pens and everything?” I looked at Pete, but he obviously didn’t want to make eye contact. “I don’t know what Pete said, but we haven’t really talked about that in any detail. What would be the objections? It’s only like taking their senses and quantifying them,” stealing from Carol’s earlier comments to me. “What do we do with the time that we used to spend doing the vibration routes?” “Well, some of you can help with the writing of procedures, and who knows, we could buy some equipment and do the detailed vibration work that John, our vibration consultant, did. In fact, you’d be welcome to suggest any other valueadded work.” This seemed to be good enough, as the grumbling died down and the guys headed off to their jobs. “Wow, Bob, you really are making decisions on your feet,” commented Carol. “When I mentioned the operators using their senses yesterday, I know you hadn’t thought about taking the work from John. I’ve set up something in the CMMS so that we can capture any downtime from the offshifts as a separate code item, so we can do a review. Also, I’ve created a draft of the operator report that includes vibration readings and ultrasonics, just in case.” Carol really was turning out to be a great help, and if I was honest, I wasn’t that mad at Pete, even though he’d pushed me further than I had intended to go. When I got home that evening and talked to my wife, Sandy, about my day, she seemed quite pleased. “I think you are so far into it now, Bob, you may as well take a look at the final picture and just plough straight ahead. “You’re getting close to your goals and it may take just a few more leaps to get you there. What is obvious is that you’ve built a good foundation for those leaps.” MRO Cliff Williams is the corporate maintenance manager at Erco Worldwide, Toronto, ON, and a consultant with TMS - Total Maintenance Solutions Inc., Markham, ON. Your comments on this series are welcomed. He can be reached by e-mail at williamscliff@rogers.com. Online Reader Enquiry No. 401
01/02/11 7:33 AM
C M M S
21
S O L U T I O N S
February 2011
Machinery & Equipment MRO
©Hemera/Thinkstock
Achieving success with maintenance records Here’s how to get maintenance staff to accurately record work order information so equipment history records will be of value.
O
ver the past year, we have seen a dramatic increase in the use of CMMS systems. Hundreds of maintenance departments are embarking on a quest to record equipment history through work orders created in their maintenance software. Preventive maintenance, breakdowns, repairs and projects are all being entered into their CMMS databases. However, without performing ongoing updates, the equipment history aren’t very useful. Craftspeople are either recording the work order information on a printed work order or entering it directly into the software. Specific information such as employee labour, parts used and comments are expected to be entered into the appropriate fields in the program. In the case of preventive maintenance (PM), maintenance people are expected to fill out inspection sheets, record equipment-related data and provide any useful information found during the PM work. Of course we know the better that this data is captured and documented in the software, the more reliable and usable the equipment information is to the maintenance team. The question we often get is, how do you get maintenance people to accurately record the work order information, either on the hard copy or in the CMMS? Maintenance managers often ask: how do we know if craftspeople are actually doing the work or just pencil whipping the PM sheets? Well, I’m going to share with you a few things that have worked at many facilities. The first decision that needs to be made is whether maintenance people will record the information on paper or enter the data directly into the CMMS. To determine the answer, several considerations need to be discussed. Let’s look at entering work order information directly into the CMMS by the maintenance worker or supervisor. 1. What is the computer skill level of your maintenance team? Can the staff effectively enter information into the software? Or will it be a struggle for them because of their limited typing skills? 2. If you’re going to let them enter data directly into the software, do you have enough software licenses to allow multiple users? If you don’t have enough licences,
p19-21 MRO Feb11 MaintMgmtCMMSSafety1.indd 21
BY PETER PHILLIPS
then the maintenance crew won’t be able to access the software when they need to. 3. Are you willing to give people time each day to enter their work orders, or is their time better spent out on the shop floor? It will take 30 minutes to an hour each day for them to enter and close their work orders. Can you accept this? 4. If maintenance supervisors are going to enter the data, do they have time to do it or will you need a clerk to enter it? Justifying an extra person to the bean counters so he or she can enter and close work orders is not always an easy task. A lot of the problems regarding inaccurate or missing work order information are related to time. Whether it’s the supervisor or the maintenance person entering the data, we know that everyone is busy already. Many argue that the craftspeople are the best choice for entering the information. However, relying on them is not always the best answer. On a busy day, they can get call after call to make repairs to equipment. By the end of the day, they’ll have six to 10 work orders to enter into the software. So where will the time come from to get these entered? If there’s no time left at the end of the day, then the work orders will wait until the worker’s next shift to be entered, if at all. In some places, craftspeople record repair work orders in maintenance logs or on paper work orders and the supervisor enters them into the CMMS. In facilities with small maintenance teams, this works fairly well. However, once organizations have more than five or six maintenance people, the number of repair and PM work orders to record becomes too much of a burden for the supervisor. When the number of work orders per week reaches 50 or more, the supervisor will not likely have time to get them into the software. At this point, the whole idea of having an accurate equipment work order history falls apart. So what are some solutions? In cases where the craftspeople record the information on paper, some standards need to be established. The maintenance log or paper work order needs to be formatted so that all pertinent data is captured. It needs to have space to record the: • Equipment worked on
• The description of the work • Parts used • Tradesmen that performed the work and the work time • Specific comments from the craftsmen about the job. PM work orders that are generated by the CMMS also need to be in a format that is easy to read and provides ample space to record the findings of the tradesperson. When it comes to the actual PM inspection instructions and procedures, there needs to be sufficient space for the maintenance person to verify they have completed everything on the list. There needs to be places for them to record temperatures and other readings. Requiring them to record specific data further encourages the maintenance team to do a thorough job. For example, instead of numbering the instructions like this: 1. Check motor drive belt condition. 2. Inspect motor coupling. 3. Check motor amperage; you could insert a check box so that the person has to verify with a checkmark that the inspections were completed. l Check motor drive belt condition. l Inspect motor coupling. l Check and record motor amperage: ___ Phase 1 ___ Phase 2 ___ Phase 3. At the end of the work order, include a place for them to sign off with their initials and the date. The check boxes, recordings and initials make the tradesperson take responsibility for what they have done. They will make sure the job has been completed properly because their name is on it. At this point, a clerk can enter both the repair and preventive maintenance work orders, thereby ensuring the quali-
ty and integrity of the information. Sharing responsibility Here’s another option, used in more advanced facilities: the operators of the equipment actually enter repair work orders into the CMMS right from their production/equipment work area. When a repair is necessary, the operator calls maintenance to the machine using a two-way radio or a PA system. By the time the maintenance technician repairs the machine and goes back to the shop, the operator has already entered the work order into the CMMS. Now all the technicians need to do is add their time, parts used and comments, and close the work order. This sharing of responsibility to get the repair work into the CMMS works really well. Both parties share the burden of getting valuable equipment work order history into the software. These PM work orders also can be completed by the technicians in the CMMS or in some cases entered by a clerk and reviewed by the maintenance supervisor. The secret to getting reliable data entered into the software is to make the maintenance people responsible to gather it. Train them to do it correctly, monitor their progress and reinforce their efforts when necessary. Then you’ll be on your way to having valuable equipment history at your fingertips. MRO Peter Phillips of Trailwalk Holdings, a CMMS consulting and training company based in Nova Scotia, can be reached at 902-798-3601 or by e-mail at peter@ trailwalk.ca. Online Reader Enquiry No. 402
When it really matters,
trust Tsubaki.
Our latest Hook-up
Get hooked on our Cable Carrier Systems Cableveyor systems support cables and hoses that supply electrical, hydraulic and pneumatic power to moving machine parts. For more than half a century Tsubaki has been a market leader in the manufacture of this important component. The innovation and reliability you have come to expect from Tsubaki has been strengthened with the recent acquisition of KabelSchlepp GmbH of Germany. Completing the breadth of product, Tsubaki now offers complete kits including hi-flex continuous bending cables and hoses already installed in a complete Cableveyor strand. When it really matters, trust Tsubaki.
Tsubaki of Canada Limited, 1630 Drew Road, Mississauga, ON L5S 1J6 Tel: 905.676.0400 / Fax: 905.676.0904 / Toll-Free: 1.800.263.7088 e-mail: info@tsubaki.ca
Reader Service No. 132
01/02/11 7:34 AM
22
P R O D U C T
N E W S
Machinery & Equipment MRO
February 2011
What’s new…
Electric walk-in oven incorporates many safety features
The No. 877 500°F electric walk-in oven from Grieve suits a variety of heatprocessing applications. Incoloy sheathed tubular elements (140 kW) heat the workspace, while a 17,500-cfm, 30-hp recirculating blower provides a combination airflow to the workload. This jumbo walk-in oven features an aluminized steel interior and exterior, 4-in.-thick insulated walls, exceptionally heavy-duty walls with high-temperature stainless steel spring insert door gaskets, a brushed stainless steel control panel face and rear-mounted heat chamber. Workspace dimensions measure 108 in. wide by 144 in. deep by 84 in. high. The Grieve Corporation
in products, systems, components and accessories for machinery and equipment maintenance, repair and operations.
t
Profile rail linear guide suits basic linear motion applications
Thomson 400 series of profile rail linear guides is a cost-effective solution engineered to deliver accurate, reliable and compliant linear motion in automation applications. The series is available in 4-m lengths, in sizes from 15 mm to 45 mm in 5 mm increments, for extended joint-free rail transfer, even in smaller-sized applications. Rated to handle loads ranging from 9,800 N up to 129,500 N, the guides are suitable for uncomplicated factory and laboratory automation, packaging, food and beverage, life science and certain medical applications. They are interchangeable with other profile rail systems. Thomson Online Reader Enquiry No. 312
t
Synchronous belt drive system needs no maintenance
tubes, which are difficult to install, heavy, and take up warehouse/freight space. Available in 1/4-in., 3/8-in. and 1/2-in. I.D., it operates in temperatures ranging from minus 65°F to plus 300°F. Maximum operating pressure is 4,000 psi (3/8-in. and 1/2-in. I.D.) and 5,000 psi (1/4-in. I.D.). Parker Hannifin Online Reader Enquiry No. 301
Vision-based sensor provides error-proofing functionality
Balluff’s Sharpshooter, combining vision capability and photoelectric sensor simplicity, is a cost-effective, compact vision-based sensor designed for production errorproofing. It features a vision imaging system to provide both presence/absence and complex inspection functions while using a simple software setup and sensorlike hardware platform. Its ability to store up to 20 jobs internally and switch swiftly between different projects makes it especially suitable for assembly lines that handle several product versions. TRC Ltd. Industrial Sales & Mfg. Online Reader Enquiry No. 302
Hose is formed to fit application design
Parflex XDH hose from Parker Hannifin helps technicians route hoses over, under and through confined spaces. This extremeduty hose is shaped to fit the routing path
motors
MaxMotion 1HP to 300HP NEMA Premium Efficiency Motors
brake to provide inching speeds of 5:1 to 60:1. The drive includes a brake motor with a low-speed drive built in, for precise low-speed control with continuous high torque, as well as high-speed capability, in one compact package. Additional benefits include the simplicity of a mechanical drive, which is easily maintained by local mechanical maintenance staff and
Mechanical two-speed drive package is easy to maintain
Force Control Industries has introduced a two-speed drive package that can be added to the back of a standard motor
not affected by electrical line spikes, lightning or other electrical issues. Two versions are available: the Posidyne drive, which is air or hydraulically actuated, and the MagnaShear electrically actuated drive. Applications include transfer or lift systems, rotary components, car spotters, cranes, winches and more. Force Control Industries Online Reader Enquiry No. 303
Collars and couplings match conveyor system needs
Standard and custom collars and couplings in a wide range of designs for building and maintaining conveyor drive systems and frame structures are available from Stafford Manufacturing. Included are hex and square bore collars for positive drive applications, flange collars for mounting equipment, rigid couplings for connecting motors and shafts, threaded bore collars for adjustability, mounting collars for sensors and cameras, and standard round bore collars. Available machined from ma-
MaxMotion 1HP to 50HP JM-JP Close Coupled Motors
MaxMotion 1/3HP to 20HP Stainless Steel Motors
* Availability * Expertise * Warranty * Complete product benefits at www.motors.mep.ca 1-877-812-7788
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 22
easy to use, the Microgage Roll Alignment kit is suited for use in paper and textile mills, converting lines, printing presses, plastic bag lines and coating lines. Measurements can be made of both vertical and horizontal roll alignment, with an accuracy of 0.001 in., on machines with rolls and idlers high overhead, as well as on long lines that incorporate many stations. The kit includes all the fixtures and parts for most roll alignment projects. Pinpoint Laser Systems Online Reader Enquiry No. 305
Precision wedge mount supports heavy loads
A series of four precision wedge mounts from Advanced Antivibration Components is designed for precision levelling for heavy loads. Two mounts are designed for clean-room use and two for general industrial applications. Two gentle inclines on the wedge produce a large lifting force with small input of torque. During the level adjustment, the head of the bolt does not move axially, improving operation and safety. Identified as the
V11Z90MHW series, the mounts have a load capacity range of 12,364 lbF to 15,736 lbF. Applications include large air compressors, rolling machines, transfer machines, gas turbines, nuclear reactors, and buildings and structures. Advanced Antivibration Components Online Reader Enquiry No. 307
Reader Service No. 133 MEP.indd 1
Online Reader Enquiry No. 304
Pinpoint Laser Systems has developed a roll alignment kit to facilitate the alignment of rollers, idlers, take-up reels, shafts and web-handling systems. Compact and
— Quality motors for every application
MaxMotion Three Phase, All-in-One 56C Frame w/removable feet
terials such as steel, stainless steel, aluminum, brass, bronze, Delrin, nylon and high-temperature alloys, the components come in sizes ranging from 1/4-in. I.D. to 16-in. I.D. Machine tolerances to 0.0005 in. can be achieved depending on material and configuration. Stafford Manufacturing Corp.
Roll alignment kit makes quick positional measurements
t
Online Reader Enquiry No. 313
Online Reader Enquiry No. 309
t
Baldor’s synchronous belt drive system uses Dodge HTR and HTRC Tracker belts, which have a reinforced parabolic profile tooth design, allowing the belt to sit deeper in the sprocket. The angle of these belts allows synchronous transmission of power, eliminating slippage and speed variation on high-torque applications. The neoprene rubber belts are manufactured with a glass-fibre cord that provides good tension stability and prevents moisture from being absorbed. With no belt shrinkage or stretch, the belt will not have to be re-tensioned, making it virtually maintenance free. The HTR belt offers average strength, while the HTRC belt is a higher-strength belt. Baldor Electric
and quickly snaps into place, eliminating the risk of damage and speeding up the installation process. It is suitable for repeatable hydraulic applications and is an effective way to eliminate hard metal
10/7/10 2:27:26 PM
01/02/11 7:50 AM
P R O D U C T
23
N E W S
February 2011
Machinery & Equipment MRO
Power solutions receive cUL certification
Online Reader Enquiry No. 311
t
Wago has announced that UL and cUL certification is complete for 27 models within the company’s Epsitron family of power supplies. Certification applies to the following 787 series lines: Electronic Circuit Breakers (ECBs), Pro-Power Supplies, Uninterruptible Power Supply and Redundant Modules. Four-channel ECBs separately protect up to four current paths, up to 10A at 24 VDC each, for power supplies without topboost. Suitable for multiple loads from a single power supply, the devices independently program load-appropriate current ratings and trip times. Wago Corporation
from 1/4-in. I.D. to 4-in. I.D. a nd operate in t emp eratu res up to 260°C/500°F. Parker Hannifin
Online Reader Enquiry No. 314
Threadlocker secures large fasteners in high temperatures
Loctite 263 threadlocker is a highstrength, single-component anaerobic threadlocker from Henkel that is designed to permanently lock and seal threaded fasteners up to 1 in. in diameter. For use in a wide range of heavyduty industrial applications, this highviscosity red threadlocker cures on fasteners treated with thread lubricants and anti-corrosion/protection fluids without cleaning. It can be used on both active and passive metal surfaces, including stainless steel and plated material, without the use of a primer. Once
Thermal imager has wide application range
The InfReC R300 high-definition thermal imager from NEC Avio Infrared Technologies includes such capabilities as thermal movie recording to SD card in radiometric format, thermal/visible integrated images in composite/split-screen display, panoramas, autofocus and 3.1-megapixel visible camera. Weighing just 1.3 kg (2.8 lb) with battery, it provides an ergonomic design for easy and flexible operation in the field, and includes a separate viewfinder with luminous and tilting LCD monitor, allowing the user to hold the camera and capture images from any angle. Applications are many, and include electrical maintenance, biotechnology, semiconductors, energy audits, R&D, machinery PPM, building inspections and quality control. Soltec Online Reader Enquiry No. 318
fully cured and in service, the product prevents fastener loosening and leakage caused by shock and vibration, and withstands temperatures up to 360°F. It is available in 0.5-ml capsules, 10-ml tubes, and 50-ml, 250-ml or 1-l bottles. Henkel Online Reader Enquiry No. 421
Our printed reader reply cards have been phased out. Please use our Online Reader Reply Card at www.mromagazine.com/rsc to request additional details directly from suppliers.
MRO
Parts washer catalogue contains comprehensive information
Graymills’ Parts Washer Catalogue displays the company’s full line of aqueous, solvent, ultrasonic and bioremediation parts washing equipment. Parts washer features and specifications are included, along with a cleaning fluid reference chart for identifying specific applications. Also included are sections on selecting the right parts washer and choosing your cleaning action. Graymills
Get Inspired.
Get Connected.
Get Moving.
Online Reader Enquiry No. 310
Vibration tester provides instant mechanical troubleshooting
t
The Fluke 810 vibration tester helps mechanical maintenance teams locate and diagnose common mechanical problems and prioritize repair actions with no prior machine history. This easy-to-use, cost-efficient troubleshooting tool identifies the problem and its location and uses a colour severity scale to focus attention on the high maintenance priorities, controlling unplanned downtime, preventing recurring problems, setting repair priorities and managing resources. It comes with tri-axial accelerometer, magnet mount, mounting pad kit, accelerometer quick-disconnect cable, laser tachometer and storage pouch, smart battery pack with cable and adapters, shoulder strap and adjustable hand strap, Viewer PC software, USB to USB cable, user information and carrying case. Fluke Electronics Canada Online Reader Enquiry No. 317
Stainless steel braided PTFE convoluted hose has long flex life
Parker Page International Hose has introduced stainless steel braided convoluted hose assemblies in SCW and SCWV designs. The convoluted tubing is made from virgin PTFE in natural or static dissipative style tubing. Unlike metal tubing, which is susceptible to stress and cracking in f lexing applications, these designs showed no signs of stress cracking after prolonged f lex testing. The SCWV hose is constructed with a heavier wall than the SCW hose and in open pitch style for added kink resistance and reduced permeation without reducing f lexibility. The assemblies are manufactured in sizes
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 23
The Components. The Systems and Controls. Design Expertise. Today’s market demands cleaner, greener, more efficient applications. Stay competitive with the newest technologies and leading-edge education for the fluid power, power transmission and motion control industries. All in one place, once every three years.
Las Vegas, USA
Register today: IFPE.com
March 22-26 Co-owned by the National Fluid Power Association and the Association of Equipment Manufacturers.
Reader Service No. 134
01/02/11 7:50 AM
24
P R O D U C T
N E W S
Machinery & Equipment MRO
February 2011
What’s new in safety Ultra-compact noise monitor is comfortable to wear
Polarized eyewear reduces glare
that weighs just 2 oz. The device can be worn comfortably all day, attached to a shirt, overalls or hardhat. Its 64-kB memory stores up to 180 hours of data. Casella USA
The CEL-350 dBadge micro noise dosimeter has been introduced by Casella USA. About the size of a flip phone, this extremely compact safety tool is designed to measure the noise exposure of an employee over the working day to uncover dangerous areas and to assure compliance with strict OSHA, NIOSH or ISO regulations. Features include a built-in display, cable-free architecture, simultaneous measurement of both OSHA and ISO parameters and fast battery recharging, all packed into a housing
Online Reader Enquiry No. 325
Online Reader Enquiry No. 329
t
Winter work footwear helps prevent falls
Workers in Canada in the winter need boots that will protect them from slips and falls on icy surfaces. Dyna-Spike footwear from Dynamic Safety, designed with Vibram soles, provides the worker with four interchangeable spikes to suit the particular environment. Aggressive ice-gripper sharp metal spikes are for use in extreme outdoor
AEM_4840_IFPE_EduAd_2011_7x10_FNL.pdf
1
8/13/10
Gateway Safety’s 4X4 Polarized protective eyewear is a suitable eye protection solution for outdoor workers who face significant glare from bright sunlight. The dual lenses also eliminate eye-damaging ultraviolet radiation from the sun. The eyewear has a durable yet lightweight wrap-around frame with dual polycarbonate lenses, designed to look like modern sunglasses. Comfort features include a soft nosepiece and flexible temple tips, while the anti-scratch coating helps maintain a clear view of the jobsite. These features encourage daily compliance. Gateway Safety
conditions, while ice-grabber metal spikes give better stability and adherence on icy surfaces, and small plastic golf spikes are designed for use on snow and wet grass. Each sole has a flat street cap for when spikes are not required, providing anti-slip protection inside the plant. Dynamic Safety International Online Reader Enquiry No. 326
3:10 PM
Get Inspired.
Get Connected.
Get Moving.
Safety palm button can work with gloved hand
Ergonomic safety press actuators combine both ergonomics and safety. Safety palm buttons from Pepperl+Fuchs offer an ergonomic alternative to mechanical pushbuttons and activate with a light touch, reducing the risk of repetitive motion injuries. Approved by US and Canadian UL safety standards, the sensors are designed to be immune to most radio frequency interference and offer continual self-checking electronics. Some models can be used with heavy gloves. Vickers-Warnick Online Reader Enquiry No. 327
2011 safety catalogue contains many additional products
MSC Industrial Direct has added over 1,100 items to its 2011 safety products catalogue. Containing more than 860 pages, this comprehensive catalogue features over 43,000 personal and facility safety-related products. The expansion includes a variety of gloves from HexArmor. High-visibility vests, hard hats, cut-resistant gloves, clothing and matting have been added from ProSafe. Also featured is a larger variety of arc flash safety products through the expansion of such brands as Stanco. Available in print, the catalogue also can be viewed on the Internet at www. mscdirect.com. MSC Industrial Direct Online Reader Enquiry No. 315 C
M
Y
CM
MY
CY
CMY
K
STAY AHEAD OF THE TECH CURVE Learn the “next thing coming” solutions to integrate now into your design applications. Over 100 education presentations will focus on the newest technologies, research and developments for the fluid power, power transmission and motion control industries. All in one place, once every three years. Register Now: IFPE.com
Las Vegas, USA
March 22-26 Co-owned by the National Fluid Power Association and the Association of Equipment Manufacturers.
Reader Service No. 135
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 24
Machineguarding system provides protection from intrusion
A mo du l a r, m achine-guarding system that is rugged, secure and easy to install for protecting all types of machinery in multiple industries has been introduced by Wireway Husky. The Matrix Guard system features welded wire mesh modular panels, reinforced with in-line folded f lutes for rigidity, and high-strength, seam-welded tubular steel stiffening posts. All of the panel hardware installs into slots in the tubular posts in one step. Designed to be configured and installed locally to easily accommodate f loor or wall irregularities, the system is anchored to the f loor by 3/8-in.-thick foot pads and can include a wide variety of lockable swing and slide doors. Wireway Husky Online Reader Enquiry No. 316
MRO
Our printed reader reply cards have been phased out. Please use our Online Reader Reply Card at www.mromagazine.com/ rsc to request additional details directly from suppliers.
01/02/11 7:50 AM
M R O
O N
T H E
25
R O A D
MRO and safety show in Toronto attracts 2,000 delegates Toronto, ON — Acklands-Grainger Inc., a distributor of industrial, safety and fastener products, recently hosted The Works, billed as Canada’s largest maintenance repair and operations (MRO) and safety show, at the Toronto Congress Centre. The annual event — held in Toronto for the first time — brought together more than 2,000 invited customers, 250 manufacturers and 800 AcklandsGrainger team members from across the country to provide a forum for attendees to discuss pressing industry trends, as well as display thousands of new products. Now in its fifth year, the show previously had been held in Edmonton and Saskatoon. “Faced with a challenging economic climate, companies are looking to trim costs in new ways to improve their bottom line,” said Sean O’Brien, president of Acklands-Grainger, which is based in Richmond Hill, ON. “Companies can realize significant savings by partnering with a supplier like Acklands-Grainger, who can serve as a single source for MRO supplies, reducing product acquisition and storage costs.” The Toronto event saw 38 new vendors participate, many of whom are in the safety products market, a segment that represents one-third of Acklands-Grainger’s sales. “We like to keep the show new, relevant and fresh,” said O’Brien. In addition to the trade show, the distributor hosted a variety of seminars, offering expertise in topics ranging from ways to improve environmental performance and helping businesses better manage process costs associated with purchasing, to ensuring compliance with appropriate government regulations, and how to save time and money through e-commerce solutions. “Our goal was for everyone to leave with stronger relationships and increased knowledge of how AcklandsGrainger and our partners can help them improve their business results and I’m confident that this was achieved,” said O’Brien. “We like to talk about solutions, not just about the distribution of products. We look at what value we can bring to the table.” One example of that is the introduction of women’s sizes to the clothing listed in the distributor’s massive catalogue, this year weighing in at 4 kg. The 2011 red book, as it’s called, lists 110,000 items and features a new section, Women in the Workplace. Founded in 1889, Acklands-Grainger is Canada’s largest distributor of industrial, safety, and fastener products, with over 120,000 in-stock products available from 170 branches and six distribution centres coast to coast. Its parent company, W.W. Grainger Inc., Lake Forest, IL, with 2009 sales of $6.2 billion, is North America’s leading broad-line supplier of maintenance, repair and operating products, and it has an expanding presence in Asia and Latin America. Acklands-Grainger plans to soon open a new distribution centre in Saskatoon, SK, as well as add four new branches this year, the first of which will be located in Kitchener, ON. For more information, visit www.ackMRO landsgrainger.com/info.
1
2
3
5
4
6
7
1. Walter Surface Technologies from Montreal was on hand, displaying its Bio Circle parts cleaning technology. 2. Ansell demonstrated the cut resistance of a pair of work gloves being turned in a container with a half-dozen sets of sharp blades mounted inside. 3. Automated dispensing machines that provide commonly used maintenance and safety supplies near the point of use were a popular attraction at the show. 4. A delegate reviews the scheduled seminars that were held during the event. 5. Court Carruthers, Grainger International president, and James Benic, an Acklands-Grainger regional director from Winnipeg, MN, chat at the show. 6. Acklands-Grainger vice-presidents Henry Buckley from Burnaby, BC, and John Kaul from the Richmond Hill, ON, head office, gave presentations at the show. 7. Some exhibitors offered hands-on demonstrations of their products, such as this drilling setup at the Milwaukee tool booth.
For all those who need to set things in motion... ...KTR has the solution for you.
KTR Corporation ● 122 Anchor Road ● Michigan City, IN 46360 ISO 9001:2008 CERTIFIED Phone: 219-872-9100 ● Fax: 219-872-9150 ● email: ktr-us@ktr.com
www.ktr.com
Reader Service No. 136
The most advanced family of clamp meters ever. The new 381 true-rms AC/DC clamp meter is full-featured with the industry’s first detachable remote display. The 376 was made for testing high current applications in tough industrial locations. Both ship with the new iFlexTM flexible current probe to fit into tight spaces and expand their measurement range to 2500A ac.
Based on you. Built by Fluke. qtr page Ads (4).indd 1
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 25
Machinery & Equipment MRO Photos by Bill Roebuck
February 2011
www.flukecanada.ca/clamps Reader Service No. 137
11-01-09 11:24 PM
01/02/11 7:50 AM
M R O
O N
T H E
R O A D
Machinery & Equipment MRO
February 2011
EASA Ontario Chapter maintains international spotlight
1
2
BY ERIC ACHILLES COUSINEAU AND BILL ROEBUCK
Toronto, ON — The annual general meeting of the Ontario Chapter of the Electrical Apparatus Service Association (EASA), which took place at the Metropolitan Hotel in Toronto, January 21-22, 2011, was a great start for the year for the association members. Not only is the Ontario Chapter in the international spotlight with the EASA organization because its current international chairman is one of its own members — Sandi Howlett of Ainsworth Inc. in Toronto — another one of its members, Mike Dupuis of Monelco expects to be joining the International board of the association on a path that also will lead him to become the organization’s chairman. “I’ve been fortunate enough to sit on the International board with Sandi, and she has always represented EASA with the best interests of the members in mind,” said Dupuis, who is currently the association’s director for Region 8 (Canada). “She has worked hard in helping our association grow and prosper.” Howlett was in attendance at the chapter’s AGM, where she helped with the induction of new members to the group’s board of directors. Incoming officers elected for the chapter’s 2011-12 term include Jason McGrutters of Gateway Electric as secretary, Gerald O’Reilly of Lafert North America as treasurer, Sid Seymour of Seymour-Smith Electric as vice-president, and Anthony Lekkas of Stanford Electric Rebuilders as president. Steve Coleman of Leeson Canada was appointed Affiliate Co-ordinator and also serves on the board. Brian Larry of Larry Electric Motor Service, who has held the post of president for the past three years, becomes immediate past president. Howlett offered the new team her best wishes for a successful term. Afterwards, Mike Dupuis took the stage to offer Brian Larry thanks on behalf of the chapter members for doing a great job as president. He presented him with the Ontario Chapter Past-President’s Ring, en-
closed in a special box engraved ‘Precious’. The event also was the venue for a training program, Mechanical Repair Fundamentals of Electric Motors, 2nd Edition (with 50% more content than the original edition), presented by Tom Bishop, EASA International’s senior technical support specialist. Bishop travelled from St. Louis, MO, to bring his expertise to Toronto, where 28 technicians attended the two-day course. The association also hosted a two-day trade show during its meeting. Cash giveaways added to the excitement of the tabletop show, with $2,000 in vendorsponsored giveaways being drawn throughout the event. Larry thanked the group’s past presidents for mentoring him throughout his six years of serving on the Ontario Chapter board. “I would encourage anyone to run for a position on the executive as it has been a truly rewarding experience for me,” he said. He also commended Peter Tedesco of Electro-Wind Supply on his efforts for organizing the trade show and other events for members and affiliates over the years. Special thanks were also given to Lafert North America for its event sponshorship and support of EASA events over the years, and also to Swiger Coil System for its sponsorship of the 2011 AGM lunch. As the new president, Lekkas closed the meeting at a wrap-up dinner-dance by thanking everyone for electing him, and said he was proud to step up to the challenge of doing as good of a job as Larry and his predecessors had done. Upcoming EASA event dates announced during the meeting include the Ontario Chapter Spring Meeting, April 29-20 in Windsor, ON; the 2011 International Convention, taking place June 26-28 in Denver, CO; and the Ontario Chapter Fall Meeting, Sept. 9-10, in Collingwood, ON. For more information, visit www.easaontario.ca or easa.com. MRO
3
4
6
1. Outgoing president Brian Larry with incoming president Anthony Lekkas. 2. EASA International chairman of the board Sandi Howlett talked about her past year as the first female to lead the association and her theme of “Aspire to Leadership.” 3. EASA president Brian Larry and his wife Diane are backed by Ontario Chapter board members Jason McGrutters, Gerald O’Reilly, Sid Seymour and Anthony Lekkas. 4. The MEP Drives booth was staffed by (l-r) Richard Berezowski, Lynne Lecoupe and Craig Hollis. 5. Brian Larry shows off his new ring. 6. Sandi Howlett puts the chain of office on newly installed chapter president Anthony Lekkas. 7. Peter Tedesco, the chapter’s affiliate co-ordinator, is thanked by Brian Larry for his work in organizing the event’s trade show. 8. Leeson Canada’s products garnered lots of attention from show visitors. 9. Jack Hamilton and Len Cosley represented Motor Diagnostic Systems and MDS Canada. 10. Wearing company shirts at the Leeson Canada booth were (l-r) Stephen Coleman, Brian Crane, Jennifer Ip, Michael Tough and Dan McKelvie. 11. Jacques Levy of Lovato Electric displayed a wide selection of products on his table. 12. Lafert North America brought along a selection of its black-painted metric motors. 13. Electro-Wind went all out with its professional display booth and a full complement of staff.
10
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 26
11
Photos: Eric Achilles Cousineau and Bill Roebuck
26
5
7
8
12
9
13
01/02/11 7:51 AM
We see less downtime in your future. At NTN, we are dedicated to help you get the most out of your rotating machinery. Our people contribute to this vision every day. Invite us to roll up our sleeves with you.
Reader Service No. 138
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 27
01/02/11 7:51 AM
EMO Laser- Laser
1/9/08
12:41 PM
Page 1
UNMATCHED ENGINEERING EXCELLENCE FROM THE SCHAEFFLER GROUP Belt Tension Measuring Device LASER.TRUMMY2 The robust, handy LASER.TRUMMY2 is an optical-electronic instrument for measuring and setting optimum belt tension (strand force). Optimum belt tension, like precise alignment of the belt pulleys is an essential precondition for achieving the maximum possible life of the belt drive. There is also less wear of the drive components, energy costs are reduced and cost-Effectiveness is increased. The user-friendly LASER.TRUMMY2 can be used in many locations and is comprised of a cableless measurement probe, a measurement probe with a cable for difficult to access locations and a microprocessor that indicates relevant measurables for belt tension either as frequency [Hz] or force [N]. By means of an impulse (for example by striking the stationary belt), the tensioned belt is excited to natural vibration. The individual static natural frequency thus generated is measured within seconds by the
Current Solutions in Electric Machinery Rolling bearings with ceramic coating provide insulation against the passage of electrical current and prevent corrosion leading to bearing failure – one of many advantages offered by Schaeffler Group with INA and FAG products for electric machinery. Schaeffler innovations in surface finishes has resulted in ball bearings that exhibit extremely low noise. Tested, high-grade Arcanol electric motor grease facilitates optimal bearing operation and lifetime, while Schaeffler X-life cylindrical roller bearings are designed to contend with increasingly high loads. Through continuous product innovation, Schaeffler stays current and sets the standard for rolling bearing solutions in electric motors and machinery. SCHAEFFLER GROUP
TRUMMY2 sensor using clock pulse light and displayed. In order to calculate the strand force of the belt drive, the belt mass and length are entered in the microcomputer before measurement. TRUMMY2 uses these to calculate the strand force, which is then compared with the specified nominal value. In comparison with systems operating for example by sound waves, this new measurement technique using clock pulse light offers a superior solution, since the measurement result cannot be distorted by disruptive influences. Reader Service No. 139
Belt Pulley Alignment Device LASER.SMARTY2 LASER.SMARTY2 is an economical measuring device for the alignment of belt pulleys and chain sprockets. The use of SMARTY2 promotes reduced wear of belt drives, bearings and seals. Less vibration is generated and the running time and reliability of the machinery is increased. The measuring device can be mounted in just a few seconds. The laser beam can be clearly seen on the target marks. Once the laser beam is adjusted to coincide with the slots in the target marks, the machine is correctly aligned. In addition to optical targets, SMARTY2 with a digital target. In this case, adjustment values are shown in the display in real time. Misalignments are presented in degrees and the parallelism offset in millimetres. The SMARTY2 emitter and target marks are easily mounted magnetically, but the lightweight devices can also be easily attached to non-magnetic drive pulleys using a strong, double-sided adhesive tape. Features and advantages: • Parallelism and misalignment of both pulleys displayed • Significantly quicker and more precise than conventional methods • Suitable for both horizontally and vertically mounted machinery • Only one person required for alignment For additional information about LASER.SMARTY2 or LASER.TRUMMY2, contact your local Schaeffler representative or visit www.fis-services.com. Reader Service No. 140
INDUSTRIAL
Reader Service No. 141
www.schaeffler-group.com
p22-28 MRO Feb11 ProdsAcklandsEasa.indd 28
01/02/11 7:51 AM