CAI Property Card
Manchester By The Sea, MA
GENERAL PROPERTY INFORMATION
LOCATION: 4 BUTLER AV
ACRES: 0.4591
PARCEL ID: 1 0 33
LAND USE CODE: 101
CONDO COMPLEX:
OWNER: CAMPANELLI JOSEPH
CO - OWNER: CAMPANELLI ELYSE
MAILING ADDRESS: 4 BUTLER AVE
ZONING: B
BUILDING EXTERIOR
BUILDING STYLE: CONVENT`NL
UNITS: 1
YEAR BUILT: 2024
FRAME: WOOD
EXTERIOR WALL COVER: WOOD SHING
ROOF STYLE: GABLE
ROOF COVER: ASPHALT
BUILDING INTERIOR MANCHESTER, MA 01944
PATRIOT ACCOUNT #: 27
SALE INFORMATION
SALE DATE: 8/24/2020
BOOK & PAGE: 38853-320
SALE PRICE: $660,000
SALE DESCRIPTION:
SELLER: SCHMIDT,HOLLY
PRINCIPAL BUILDING AREAS
GROSS BUILDING AREA: 4,071
FINISHED BUILDING AREA: 2,604
BASEMENT AREA: 1,302
# OF PRINCIPAL BUILDINGS: 1
ASSESSED VALUES
LAND: 313,600
YARD: 0
BUILDING: 337,000
TOTAL: $650,600
INTERIOR WALL: DRYWALL
FLOOR COVER: HARDWOOD
HEAT TYPE: FORCED H/A
FUEL TYPE: GAS
PERCENT A/C: 100
# OF ROOMS: 7
# OF BEDROOMS: 3
# OF FULL BATHS: 3
# OF HALF BATHS: 0
# OF ADDITIONAL FIXTURES: 1
# OF KITCHENS: 1
# OF FIREPLACES: 0
# OF METAL FIREPLACES: 0
# OF BASEMENT GARAGES: 1
SKETCH PHOTO
www.cai-tech.com
22.
LEGEND LEGEND
HEADERS
Manos Landscaping LLC
PO Box 285
Manchester by the Sea, MA 01944 US +18776266701
finance@manoslandscaping.com www.manoslandscaping.com
INVOICE
BILL TO
Joey & Elyse Campanelli
4 Butler Avenue
Manchester-by-the-Sea, MA 01944
DOCUMENT #
JMA-2005-001_v1.2_031825
INVOICE 4386 DATE 03/19/2025
TERMS Due on receipt
DUE DATE 03/19/2025
RENDERING VERSION
NOTE: OUR EXPECTATIONS IS THAT WE WILL NOT HIT LEDGE. IF WE DO, WE WILL ASSESS SITUATION IF ARRISES MANOS LANDSCAPING RECOGNIZED ONE OF THE HIGHTEST 5-STAR GOOGLE RATING NORTH OF BOSTON 2024 FOR HARDSCAPE AND LANDSCAPING
DAILY CONSTRUCTION
AUTOMATICALLY TIME-STAMPED VIDEOS, SENT TO THE CLOUD AND SAVED TO YOUR "COMPANYCAM" APPLICATION ACCOUNT
03/24/20253D Patio and Garden Bed Designs Renderingss 0.502,000.00 1,000.00
03/24/20253D Pool, Patio and Garden Bed Designs Rendering Credit -0.502,000.00 -1,000.00
03/24/2025SOD
1.Sod Front House. Area is approx. 1,120 sq.ft.
Includes removing 18"-24" inches of construction earth and replace with 6 yards of Black Earth Loam (Rated #1 loam in Massachusetts). This is necessary for successful sod growth 0.501,745.00 872.50
03/24/2025Garden Bed Install2.Install approximately 51 shrubs and perennials in "FRONT OF HOUSE" and 0.504,815.00 2,407.50
03/24/2025Peastone
03/24/2025Fence Install
"FRONT ENTRANCE". We select specific plants to ensure they can withstand the sun's reflection from the house without damage. Remove the existing construction soil and replace it with Black Earth Loam to promote healthy growth.
Here’s the list per Rendering RJMA2025-001_v1.0_031425:
Hydrangea (smoothe blue/white- 9
Dwarf Fountaiin Grass - 8
Blue Switchback Grass - 4
Dwarf Zebra Grass - 5
Meyer Lilac - 1
Boxwood Green Velvet- 3
Peonies - 21
Peony Rings (will install once full bloom) - 7
This price might vary depending upon availability.
3.Grade and install 344 sq. ft. of compacted road pack and peastone on the right side of the house. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks.
4.Install one (1) cedar panel fence section and one (1) cedar gate door for propane and maitenance access. Includes all hardware This is the pricing as of now if the tarriff situation changes then there will be an increase in price on cedar material, additional cost if we encounter ledge. 0.501,500.00
03/24/2025Fence Install Ken to give client 1,100 credit -0.501,100.00
03/24/2025Asphalt
5. Install new asphalt drivewa per design renderings. Approx 1,536 sq.ft. Inclues 8 inches of road pack base and 28 cubic yards of aspalt.
This includes removal of existing asphalt. Includes old asphalt disposal to Miles River.
Includes assessing existing base under old asphalt. In most cases, we replace the entire sq.ft so we can warranty the driveway. If there is a stump or ledge underneath, this would compromise the installation down the road. There 0.508,500.00 4,250.00
03/24/2025Trellis
03/24/2025Peastone
03/24/2025Patio Install
03/24/2025Patio Install
will also be disposal costs of earth debris to Miles River
6.The design team suggests installing the upper section of a trellis arch above the outdoor shower to create a charming space for weaving outdoor white bulb strands, perfect for hanging light bulbs during the summer evenings.
7.Grade and install 310 sq. ft. of compacted road pack and peastone under the deck. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks.
8.Install outdoor shower paver landing with drain entering small french drain for water run off. We will provide samples.
Decorative Paver Stone Patio pad Installation 81 sq.ft. including cuts.
Includes: Drain Kit Road Pack
3/4 Stone Sand
Plastic Edging and Spikes Poly Sand 0.502,926.00 1,463.00
9.Install patio landing outside the outdoor shower area. Grass conditions will not survive due to all the foot traffic.
Blue Stone Patio pad Installation 81 sq.ft. including cuts.
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand 0.503,078.00 1,539.00
03/24/2025Walkway Install10.Install Blue Stone Steping stones walkway (set in grass) starting at the corner of garage and then 90 degree turn towards bottom step of deck stairs. Approx 13 qty 24" x 18" pieces in size and 2 qty 3" x 24" corner pieces.
Note: If walkway is more desireable, that would be roughly 200 sq.tt. Roughly $7,600 0.503,000.00 1,500.00
03/24/2025Walkway Install11.Install bluestone walkway from bottom of stairs parrell to basement door.
Blue Stone Walkway Installation 84 sq.ft. including cuts. Using 4- Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand
03/24/2025Walkway Install12.Design team recommends installing walkway from the basement door to 90 degree walkway to deck steps. To have this done after would disturb the whole back yard.
Blue Stone Walkway Installation 40 sq.ft. including cuts. Using 4- Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand
03/24/2025Walkway Install12.CLIENT HAS DECIDED TO NOT TO DO ANY WALKWAY OR STEPPIING STONE PATH UNDER DECK
03/24/2025Walkway Install12.Design change from a solid walkway to bluestone stepping pathway.
03/24/2025Walkway Install13.Install walkway to front door from driveway.
Blue Stone Walkway Installation Approx 18 sq.ft. including cuts. Using 4-Piece Set: 12" X 12"
03/24/2025Loam and Seed
03/24/2025Drainage
03/24/2025Irrigation
03/24/2025Irrigation
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack
3/4 Stone
Sand
Plastic Edging and Spikes
Poly Sand
14.Loam, grade and seed back yard area approx 60' x 30'. Commercial full sun seed
15.Install two (2) french drains diverting water designated two areas: Includes Drainage Pipe and 3/4 stone
1.Corner of Garage and Outdoor Shower.
2.Corner of front right side of house
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
03/24/2025Landscape Lighting17.Ken suggested a lighting allowance of $2,000. We are crediting $2,200. Ken and team to make appointment next week to show a lighting demo of each fixture at dusk. No labor cost for this event. -0.502,200.00
03/24/2025Landscape Lighting17.Outdoor Landscape Ligting per Rendering RJMA-2025001_v1.0_031425.
Comes with Wifi App. 200 W Transformer
Installation by Manos
03/24/2025Irrigation
18.Install backflow system to utilize irrigation system. Client to contact New England Gas Systems. They are the best Heating & Water Company on the North Shore. Cost is roughly 10.00 0.00
$1,500. We can set up the installation for you.
03/24/2025Electrical Installation19.Cranson electric or Josh Contractor to install two GFIC outlets for Irrigation and landscape lighting transformer. Rougly $300-$400 depending upon basement run from breaker box.
03/24/2025Cobbles
03/24/2025Admin, Delivery, Equipment Fee, Disposal Fee & 3D Design
We can set up the installation for you.
20.Install Approx 60Jumbo Cobbles (10" x 7" x 4"Cobbles along left side of driveway (looking in from Butler Road and front door entrnce border
21.No Charge for 3D Design
Includes the following:
Blue Stone Delivery Pavers for Shower
Road Pack Delivery x5
Sand Delivery x4
Poly Sand Delivery (for Blue stone Joints)
Edging/Spikes for Blue stone and pavers
Jumbo Cobbles Delivery
Loam Deliver x4
New Asphalt Delivery
Old Ashpalt Disposal Fee
Old Asphalt Disposal Delivery Fee x5
Old Earth debris Disposal Fee
Older Earth debris Delivery Fee x5
Fence Delivery Fee (Not Included) 3/4 Stone x4
Landscape Fabric
Plumbing Supplies
Peastone Delivery
Irrigation Supplies Delivery
Landscape Lighting Delivery
EQUIPMENT 1 - Skid Steer (Front loader) Fee and Delivery Fee
EQUIPMENT 1 - Excavator Fee and Delivery Fee 0.507,000.00 3,500.00
03/24/2025Estimated Tax
22.This is only an estimate. Final Tax will be calculated at the end of project
Manos Landscaping LLC
PO Box 285
Manchester by the Sea, MA 01944 US
+18776266701
finance@manoslandscaping. com
www.manoslandscaping.com Estimate 2007
ADDRESS
Joey & Elyse Campanelli 4 Butler Avenue
Manchester-by-the-Sea, MA 01944
NOTE: OUR EXPECTATIONS IS THAT WE WILL NOT HIT LEDGE. IF WE DO, WE WILL ASSESS SITUATION IF ARRISES
MANOS LANDSCAPING RECOGNIZED ONE OF THE HIGHTEST 5-STAR GOOGLE RATING NORTH OF BOSTON 2024 FOR HARDSCAPE AND LANDSCAPING
DAILY CONSTRUCTION AUTOMATICALLY TIMESTAMPED VIDEOS, SENT TO THE CLOUD AND SAVED TO YOUR "COMPANYCAM" APPLICATION ACCOUNT
1.Sod Front House. Area is approx. 1,120 sq.ft.
Includes removing 18"-24" inches of construction earth and replace with 6 yards of Black Earth Loam (Rated #1 loam in Massachusetts). This is necessary for successful sod growth
03/24/2025 Garden Bed Install
03/24/2025 Peastone
03/24/2025 Fence Install
2.Install approximately 51 shrubs and perennials in "FRONT OF HOUSE" and "FRONT ENTRANCE". We select specific plants to ensure they can withstand the sun's reflection from the house without damage. Remove the existing construction soil and replace it with Black Earth Loam to promote healthy growth.
Here’s the list per Rendering
RJMA-2025-001_v1.0_031425:
Hydrangea (smoothe blue/white9
Dwarf Fountaiin Grass - 8
Blue Switchback Grass - 4
Dwarf Zebra Grass - 5
Meyer Lilac - 1
Boxwood Green Velvet- 3 Peonies - 21
Peony Rings (will install once full bloom) - 7
This price might vary depending upon availability.
3.Grade and install 344 sq. ft. of compacted road pack and peastone on the right side of the house. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks.
4.Install one (1) cedar panel fence section and one (1) cedar gate door for propane and maitenance access. Includes all hardware
This is the pricing as of now if the tarriff situation changes then there will be an increase in price on cedar material, additional cost if we encounter ledge.
03/24/2025
03/24/2025 Asphalt
03/24/2025 Trellis
03/24/2025 Peastone
03/24/2025 Patio Install
5.Install new asphalt drivewa per design renderings. Approx 1,536 sq.ft. Inclues 8 inches of road pack base and 28 cubic yards of aspalt.
This includes removal of existing asphalt. Includes old asphalt disposal to Miles River.
Includes assessing existing base under old asphalt. In most cases, we replace the entire sq.ft so we can warranty the driveway. If there is a stump or ledge underneath, this would compromise the installation down the road. There will also be disposal costs of earth debris to Miles River
6.The design team suggests installing the upper section of a trellis arch above the outdoor shower to create a charming space for weaving outdoor white bulb strands, perfect for hanging light bulbs during the summer evenings.
7.Grade and install 310 sq. ft. of compacted road pack and peastone under the deck. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks.
8.Install outdoor shower paver landing with drain entering small french drain for water run off. We will provide samples.
Decorative Paver Stone Patio pad Installation 81 sq.ft. including cuts.
Includes: Drain Kit Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand
03/24/2025 Patio Install 9.Install patio landing outside the outdoor shower area. Grass conditions will not survive due to all the foot traffic.
Blue Stone Patio pad Installation
81 sq.ft. including cuts.
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes
Poly Sand
03/24/2025 Walkway Install 10.Install Blue Stone Steping stones walkway (set in grass) starting at the corner of garage and then 90 degree turn towards bottom step of deck stairs. Approx 13 qty 24" x 18" pieces in size and 2 qty 3" x 24" corner pieces.
Note: If walkway is more desireable, that would be roughly 200 sq.tt. Roughly $7,600 1 3,000.00 3,000.00
03/24/2025 Walkway Install 11.Install bluestone walkway from bottom of stairs parrell to basement door.
Blue Stone Walkway Installation
84 sq.ft. including cuts. Using 4-Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes
Poly Sand 1 3,192.00 3,192.00
03/24/2025
03/24/2025
Walkway Install 12.Design team recommends installing walkway from the basement door to 90 degree walkway to deck steps. To have this done after would disturb the whole back yard.
Blue Stone Walkway Installation
40 sq.ft. including cuts. Using 4-Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack
3/4 Stone Sand
Walkway Install 13.Install walkway to front door from driveway.
Blue Stone Walkway Installation Approx 18 sq.ft. including cuts. Using 4- Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack
3/4 Stone Sand
Plastic Edging and Spikes Poly Sand
03/24/2025 Drainage
03/24/2025 Irrigation
03/24/2025 Irrigation
03/24/2025 Landscape Lighting
15.Install two (2) french drains diverting water designated two areas: Includes Drainage Pipe and 3/4 stone
1.Corner of Garage and Outdoor Shower.
2.Corner of front right side of house
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
17. Ken suggested a lighting allowance of $2,000. We are crediting $2,200. Ken and team to make appointment next week to show a lighting demo of each fixture at dusk. No labor cost for this event.
03/24/2025 Landscape Lighting
03/24/2025 Irrigation
17. Outdoor Landscape Ligting per Rendering RJMA-2025001_v1.0_031425.
Comes with Wifi App. 200 W Transformer
Installation by Manos
18.Install backflow system to utilize irrigation system. Client to contact New England Gas Systems. They are the best Heating & Water Company on the North Shore. Cost is roughly $1,500. We can set up the installation for you.
03/24/2025 Electrical Installation
03/24/2025 Cobbles
03/24/2025
Admin, Delivery, Equipment Fee, Disposal Fee & 3D Design
19. Cranson electric or Josh Contractor to install two GFIC outlets for Irrigation and landscape lighting transformer. Rougly $300-$400 depending upon basement run from breaker box.
We can set up the installation for you.
20.Install Approx 60Jumbo Cobbles (10" x 7" x 4"Cobbles along left side of driveway (looking in from Butler Road and front door entrnce border
21.No Charge for 3D Design
Includes the following:
Blue Stone Delivery
Pavers for Shower
Road Pack Delivery x5
Sand Delivery x4
Poly Sand Delivery (for Blue stone Joints)
Edging/Spikes for Blue stone and pavers
Jumbo Cobbles Delivery
Loam Deliver x4
New Asphalt Delivery
Old Ashpalt Disposal Fee
Old Asphalt Disposal Delivery Fee x5
Old Earth debris Disposal Fee
Older Earth debris Delivery Fee x5
Fence Delivery Fee (Not Included) 3/4 Stone x4
Landscape Fabric
Plumbing Supplies
Peastone Delivery
Irrigation Supplies Delivery
Landscape Lighting Delivery
EQUIPMENT 1 - Skid Steer (Front loader) Fee and Delivery Fee
EQUIPMENT 1 - Excavator Fee and Delivery Fee
03/24/2025 Estimated Tax
03/24/2025
22.This is only an estimate. Final Tax will be calculated at the end of project
TOTAL $39,324.56
THANK YOU.
Accepted By Accepted Date
Manos Landscaping LLC
PO Box 285
Manchester, MA 01944 US (877) 626-6701
finance@manoslandscaping.com www.manoslandscaping.com
INVOICE
BILL TO
Joey & Elyse Campanelli
4 Butler Avenue Manchester-by-the-Sea, MA 01944
INVOICE 4386 DATE 03/19/2025
TERMS Due on receipt DUE DATE 03/19/2025 DOCUMENT #
NOTE: OUR EXPECTATIONS IS THAT WE WILL NOT HIT LEDGE. IF WE DO, WE WILL ASSESS SITUATION IF ARRISES
MANOS LANDSCAPING RECOGNIZED ONE OF THE HIGHTEST 5-STAR GOOGLE RATING NORTH OF BOSTON 2024 FOR HARDSCAPE AND LANDSCAPING
DAILY CONSTRUCTION
AUTOMATICALLY TIME-STAMPED VIDEOS, SENT TO THE CLOUD AND SAVED TO YOUR "COMPANYCAM" APPLICATION ACCOUNT
03/24/2025SOD
1.Sod Front House. Area is approx. 1,120 sq.ft.
Includes removing 18"-24" inches of construction earth and replace with 6 yards of Black Earth Loam (Rated #1 loam in Massachusetts). This is necessary for successful sod growth 11,745.00 1,745.00
03/24/2025Garden Bed Install2.Install approximately 51 shrubs and perennials in "FRONT OF HOUSE" and "FRONT ENTRANCE". We select specific plants to ensure they can 14,815.00 4,815.00
03/24/2025Peastone
03/24/2025Fence Install
withstand the sun's reflection from the house without damage. Remove the existing construction soil and replace it with Black Earth Loam to promote healthy growth.
Here’s the list per Rendering RJMA2025-001_v1.0_031425:
Hydrangea (smoothe blue/white- 9
Dwarf Fountaiin Grass - 8
Blue Switchback Grass - 4
Dwarf Zebra Grass - 5
Meyer Lilac - 1
Boxwood Green Velvet- 3
Peonies - 21
Peony Rings (will install once full bloom) - 7
This price might vary depending upon availability.
3.Grade and install 344 sq. ft. of compacted road pack and peastone on the right side of the house. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks. 11,025.00 1,025.00
4.Install one (1) cedar panel fence section and one (1) cedar gate door for propane and maitenance access. Includes all hardware This is the pricing as of now if the tarriff situation changes then there will be an increase in price on cedar material, additional cost if we encounter ledge. 11,500.00 1,500.00
03/24/2025Fence Install Ken to give client 1,100 credit -11,100.00
03/24/2025Asphalt
5.Install new asphalt drivewa per design renderings. Approx 1,536 sq.ft. Inclues 8 inches of road pack base and 28 cubic yards of aspalt.
This includes removal of existing asphalt. Includes old asphalt disposal to Miles River.
Includes assessing existing base under old asphalt. In most cases, we replace the entire sq.ft so we can warranty the driveway. If there is a stump or ledge underneath, this would compromise the installation down the road. There will also be disposal costs of earth debris to Miles River 18,500.00 8,500.00
03/24/2025Trellis
03/24/2025Peastone
03/24/2025Patio Install
03/24/2025Patio Install
6.The design team suggests installing the upper section of a trellis arch above the outdoor shower to create a charming space for weaving outdoor white bulb strands, perfect for hanging light bulbs during the summer evenings.
7.Grade and install 310 sq. ft. of compacted road pack and peastone under the deck. Use two rolls of commercial landscape fabric, laid in a crisscross pattern, to prevent weed growth through the cracks.
8.Install outdoor shower paver landing with drain entering small french drain for water run off. We will provide samples.
Decorative Paver Stone Patio pad Installation 81 sq.ft. including cuts.
Includes: Drain Kit Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand 12,926.00
9.Install patio landing outside the outdoor shower area. Grass conditions will not survive due to all the foot traffic.
Blue Stone Patio pad Installation 81 sq.ft. including cuts.
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand 13,078.00 3,078.00
03/24/2025Walkway Install10.Install Blue Stone Steping stones walkway (set in grass) starting at the corner of garage and then 90 degree turn towards bottom step of deck stairs. Approx 13 qty 24" x 18" pieces in size and 2 qty 3" x 24" corner pieces.
Note: If walkway is more desireable, that would be roughly 200 sq.tt. Roughly $7,600 13,000.00 3,000.00
03/24/2025Walkway Install11.Install bluestone walkway from bottom of stairs parrell to basement door. 13,192.00 3,192.00
Blue Stone Walkway Installation 84 sq.ft. including cuts. Using 4- Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand
03/24/2025Walkway Install12.Design team recommends installing walkway from the basement door to 90 degree walkway to deck steps. To have this done after would disturb the whole back yard.
Blue Stone Walkway Installation 40 sq.ft. including cuts. Using 4- Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24"
Includes: Road Pack 3/4 Stone Sand
Plastic Edging and Spikes Poly Sand 11,520.00 1,520.00
03/24/2025Walkway Install12.CLIENT HAS DECIDED TO NOT TO DO ANY WALKWAY OR STEPPIING STONE PATH UNDER DECK
03/24/2025Walkway Install12.Design change from a solid walkway to bluestone stepping pathway.
03/24/2025Walkway Install13.Install walkway to front door from driveway.
Blue Stone Walkway Installation Approx 18 sq.ft. including cuts. Using 4-Piece Set:
12" X 12"
18" X 18"
12" X 24"
24" X 24" 1675.00 675.00
03/24/2025Loam and Seed
03/24/2025Drainage
03/24/2025Irrigation
03/24/2025Irrigation
Includes:
Road Pack
3/4 Stone
Sand
Plastic Edging and Spikes
Poly Sand
14.Loam, grade and seed back yard area approx 60' x 30'. Commercial full sun seed
15.Install two (2) french drains diverting water designated two areas: Includes Drainage Pipe and 3/4 stone
1.Corner of Garage and Outdoor Shower.
2.Corner of front right side of house
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
16.Install Irrigation system. Pipe under driveway to be installed to run irrigation pipe and landscaping lighting to back and side yard
Installation by Manos
03/24/2025Landscape Lighting17.Ken suggested a lighting allowance of $2,000. We are crediting $2,200. Ken and team to make appointment next week to show a lighting demo of each fixture at dusk. No labor cost for this event. -12,200.00 -2,200.00
03/24/2025Landscape Lighting17.Outdoor Landscape Ligting per Rendering RJMA-2025001_v1.0_031425.
Comes with Wifi App. 200 W Transformer
Installation by Manos 14,200.00 4,200.00
03/24/2025Irrigation
18.Install backflow system to utilize irrigation system. Client to contact New England Gas Systems. They are the best Heating & Water Company on the North Shore. Cost is roughly $1,500. We can set up the installation for you. 10.00 0.00
03/24/2025Electrical Installation19.Cranson electric or Josh Contractor to install two GFIC outlets for Irrigation and landscape lighting 10.00 0.00
03/24/2025Cobbles
03/24/2025Admin, Delivery, Equipment Fee, Disposal Fee & 3D Design
transformer. Rougly $300-$400 depending upon basement run from breaker box.
We can set up the installation for you.
20.Install Approx 60Jumbo Cobbles
(10" x 7" x 4"Cobbles along left side of driveway (looking in from Butler Road and front door entrnce border 11,002.00
21.No Charge for 3D Design
Includes the following:
Blue Stone Delivery
Pavers for Shower
Road Pack Delivery x5
Sand Delivery x4
Poly Sand Delivery (for Blue stone Joints)
Edging/Spikes for Blue stone and pavers
Jumbo Cobbles Delivery
Loam Deliver x4
New Asphalt Delivery
Old Ashpalt Disposal Fee
Old Asphalt Disposal Delivery Fee x5
Old Earth debris Disposal Fee
Older Earth debris Delivery Fee x5
Fence Delivery Fee (Not Included)
3/4 Stone x4
Landscape Fabric
Plumbing Supplies
Peastone Delivery
Irrigation Supplies Delivery
Landscape Lighting Delivery
EQUIPMENT 1 - Skid Steer (Front loader) Fee and Delivery Fee
EQUIPMENT 1 - Excavator Fee and Delivery Fee 17,000.00
03/24/2025Estimated Tax
03/24/2025Misc
22.This is only an estimate. Final Tax will be calculated at the end of project 11,474.00 1,474.00
NOTES