PORTFOLIO 2024 1.1

Page 1


FRITZ CARPENTER

Fritz Carpenter

142 Redstone BLVD Redstone CO 81323

fritz.carpenter@ucdenver.edu

970-824-9421

Studio 3: Geologic Center

Studio 2: Urban Housing

Studio 4: Cripple Creek

PROFESSIONAL

Cooper Subgrade Calculations

Cooper Details | 40 Maple Lane Details

40 Maple Lane Floor Plan

FRONT RANGE GEOLOGIC CENTER

CU DENVER FALL 2023

INSTRUCTOR: WILL KONING

INDIVIDUAL PROJECT

The geologic center aims to educate students and visitors alike by providing in depth information of Colorado’s front range landforms through stratigraphy and sediment analysis stations. Visitors tour around large section cuts of rock ranging in age from 220 mya to 560 mya in the Dakota, laramide and niobrara formations.

FRONT RANGE GEOLOGIC CENTER

~67- 90 MYA

Hard sedimentary anticline and a remnant of the Laramide Orogeny 67 million years ago which uplifted the rocky mountains

~100-180 mya

Thousands of dinosaurs and amphibious fossils found amongst layers of this late cretaceous shale layer. Oil and natural gas deposit abundant

FORMATION

~200-330 mya

Part of the Fort Hays limestone structural unit that runs north south from Central Wyoming to New Mexico. Stratigraphy is grey-blue shale and yellow chalks.

SITE PLAN

GEOLOGIC TIMELINE OF FRONT RANGE

MYA

PLIESTOCENE COOLING OF FLUIDS

PRECAMBRIAN ROCK, SUPERGROUP DEVELOPMENT OF PARENT SUBGROUPS LARAMIDE OROGENY

NIOBRARA AND DEVONIAN SHALES
NIOBRARA
SCALE:

PROFESSIONAL WORK

WALL C ALCULATIONS

2X12STRINGERS

NOTES ON EXISTING STRUCTURE:

WALLS-

EIFS USED ON ALL EXT WALLS, SOFFITS PARAPETS R-21 BATT NS 2X6 EXT WALLS, W 6 M L VAPOR BARRIER, 1 2" GYP BOARD ROOF-

EPDM BALLASTED(CHANGED TO MECHAN CALLY FASTENED 2022) ROOFING ON FIBER BOARD ON 3/4" CDX ON JOISTS, W/2 LAYERS OF 6 1/2" (R-44) BATT INS W/6 MILL VAPOR BARR ER 1/2" GYP BOARD CEILING

PARAPET = 103 -2 3/4"

ROOF = 102 -2 3/4" T O TJI = 101'-11 1/4" 2X8 PARAPET WALL

Kitchen = 100 -0"

Landing = 98 -3/4"

Liv ng = 96 -1 1/2"

DRYWALL RETURN @ HEAD + SIDES S LL = PAN FLASH NG

1 1/4" OVERALL COAT STUCCO 1/4" SCRATCHCOAT 1/2" FOAMBOARD 3/4" OSB TAPED @SEAMS

Exist ng Entry = 89'-3"

Mech/Laundry = 89'-1"

Garage + Entry FF = 87'-10"

Entry Slab = 87-8 1/2"

Lower = 84 -5"

FTG = 83 -11 1/4"

VERIFY STEEL OR LVL BEAM 2X10

EPDS MEMBRANE

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
PORTFOLIO 2024 1.1 by fritzcarpenterdesign - Issuu