Skip to main content

Soul Residences - Maintenance Schedule

Page 1

Soul Residences | Maintenance Schedule Trade

Description

Frequency

Carried out by

Stormwater

Check and remove silt and debris from balcony drain point under pavers

Every 3 months

Occupant

Sewer

Check all pipes for firm connection and leaks and make good as required

Every 2 years

Licensed Plumber

Sewer

Pour 5 litres of water into the laundry floor waste to restore the water seal

Every 3 months

Occupant

Check for leaks in taps, toilets, and other obvious faults

Every 3 months

Occupant

Yearly

Licensed plumber

Check for leaks in taps and traps under seat and laundry tabs

Every 3 months

Occupant

Inspect Thermostatic mixing valves / Tempering valves for leaks or damages

Yearly

Licensed plumber

Inspect hot water system, pipework, valves and circulator. Clean and remove debris, check hot water flue for corrosion and make clear of any obstruction.

Yearly

Licensed plumber

Tighten holding bolts and hinges on toilet seats, check for leaks and correct operation of toilet

Every 3 months

Occupant

Air Conditioner

Test and clean condensate tray and drain (rectify any blockages or water leaks)

Yearly

Mechanical Services Technician

Air Conditioner

Check for wear and tear and for excessive vibration and noise

Every 6 months

Mechanical Services Technician

Air Conditioner

Clean foils, fan blades and scrolls

Every 6 months

Mechanical Services Technician

Air Conditioner

Maintain refrigeration system

Yearly

Mechanical Technician

Air Conditioner

Report on general condition of equipment

Yearly

Mechanical Services Technician

Hydraulic

Cold water

Hot water

Sanitary Appliances

Inspect building pressure pump and cold water pipework. Ensure all pumps are operational with no active faults

Mechanical


Turn static files into dynamic content formats.

Create a flipbook