Skip to main content

FDKN

Page 1


fransiscadhyantikartikanugroho@gmail.com

https://www.linkedin.com/in/fransisca-dhyanti

Initial Artios

CAD

Initial packaging development

Packaging mass-prod ucingby vendor

Production start

Myfirstjobin2021was asapackagingengineer for Barbie at Mattel Indonesia, specifically the Collector line. Collector taught me about retainable packaging.

My moral dilemma raised, why was it only applied in Collector? Why not the cheaper ones? The packaging was also stopping peoplefromtouchingthe doll.

I then proposed to design a cheap and interactive window packaging for Barbie The Movie line, which successfullyreachedthe most sold numbers of theyear.

CockLauncher forTeenageBadmintonAthletes(2020)

Readmyresearchpublicationhere.

https://digilib.itb.ac.id/gdl/view_data/produk-pelatihan-atlet-bulu-tan gkis-muda-diklat/Fransisca-dhyanti?rows=34&per_page=2 InitialSketch

Prototyping with BRIN

Testingand Finalising

Thiscocklauncherwasdesignedtofocusonaccuracyandagility.

Thisbecamethefirstofficialcocklauncherof Badminton School ofRagunan,SouthJakarta,whichhashelpedteenathletespassto theprofessionalleague.

Precedent of local-made CPM

State of TheArt prototypes

Testing and finalizing prototype

Initial sketch

Prototyping

The tire brand that I handled, FDR, opens a boothannuallyin Pekan RayaJakarta.

Most of the displays were almost falling off because of the tire and rim's weight, and forces fromhumanhands.

Mysolutiontothiswasa reusable, sturdy protective display and a rimthatiseasytoputon displayandadjustableto anytirediameters.

This design was finally used in Pekan Raya Jakarta2022.

Publicationofthisproject isintheformofaprinted book, dedicated to Suryaraya Rubberindo Industries.

fransiscadhyantikartikanugroho@gmail.com

https://www.linkedin.com/in/fransisca-dhyanti

+62.858-6305-5105

Turn static files into dynamic content formats.

Create a flipbook