Skip to main content

Frankston Times 18th February 2025

Page 1

Frankston

GET YOUR

FREE TV GUIDE INSIDE!

An independent voice for the community

Your weekly community newspaper covering Frankston, Frankston South, Karingal, Langwarrin and Seaford

DOWNLOAD 3MP FROM THE APP STORE OR GOOGLE PLAY

FREE

Tuesday 18 February 2025

For all advertising and editorial needs, call 03 5974 9000 or email: team@baysidenews.com.au www.baysidenews.com.au

Langwarrin welcomes new ambulance station A NEW ambulance station in Langwarrin has officially opened, providing paramedics with state-ofthe-art facilities. The new 24-hour ambulance on McClelland Drive features a four-bay garage for ambulances, four rest and recline areas, training facilities, a fully equipped kitchen and improved security and car parking. The new station replaces the 1970-built station on Warrandyte Rd, which, at the time was one the smallest in the metropolitan region. “The bigger and better branch has been custombuilt with the modern and safe facilities paramedics need to do their job and respond to life-threatening cases in the community,” Ambulance Victoria interim CEO Andrew Crisp said. “It’s great to see this growing area in Melbourne’s southeast receive such a welcome upgrade that will service the community well into the future. Crisp added that the gives local paramedics a safe and modern home-base they can truly be proud of.” Crisp last week joined Hastings MP Paul Mercurio MP and Frankston MP Paul Edbrooke MP to open the new multi-million-dollar facility, PARAMEDICS celebrate the official opening of the new ambulance station in Langwarrin. Picture: Supplied

Cost for Nepean Boulevard revealed Brodie Cowburn brodie@baysidenews.com.au THE state and federal governments will be asked to put in $10 million each towards the Nepean Highway Boulevard redevelopment project. Frankston Council named the Boulevard project as one of its advocacy priorities ahead of the upcoming federal election. At their last meeting they released the costings for the project. Council projects that works on the Kananook Creek Park and Gateway Site will cost $4.2 million, Comfort Station works will cost $2.8 million, central median landscaping will cost $2.3 million, Overton Road signalised crossing and intersection will cost $3.1 million, the Waterfront

Shared User Path Connection will cost $2.4 million, and the Southern Path Connection and Median Planting will cost $5.2 million. Frankston Council has allocated $5.2 million in its long term infrastructure plan for the development of the Nepean Boulevard Precinct, and has already spent a little more than $2 million to work on central median greening on Nepean Highway near Overton Road and adjacent to the Frankston waterfront play space. The motion agreed to by Frankston councillors at their last meeting reads that the $20 million “does not represent the entire cost of the Master Plan implementation but discrete Signature Projects within the Master Plan.”

LARGE

MEDIUM

SMALL

Ergonomic Self Adjusting Lumbar Support 3 Size Options • Headrest Adjustment • Comfort Tilt 145 Leather Colours • Over 500 Easy Care Fabrics Including Warwick • 6 Timber Colour Finishes • 8 Base Options

MILAN Recliner

Pricing from

$2399

HomeCo Peninsula 1128-1132 Nepean Hwy Mornington | 03 5973 4899 | luducoliving.com.au


Turn static files into dynamic content formats.

Create a flipbook
Frankston Times 18th February 2025 by Mornington Peninsula News Group - Issuu