Skip to main content

Avon Green Infrastructure Proposed Design Concepts

Page 1

Summary of Concepts 1. Subsurface Infiltration at Miller-Tracy Memorial Playground • Install a modular, subsurface infiltration system underneath grassy area during playground remodel

2. Impervious Cover Retrofit at Hendricks St and Fagan Dr • Remove excess pavement in Fagan Dr cul-de-sac and add permeable grid pavers to parking lot adjacent to Sylvester Field and across from the Avon Police Station

3. Cul-de-sac Improvements at Everett St • Convert turn-around to a hammerhead, remove excess pavement, and add an infiltration basin Town of Avon Green Infrastructure Proposed Concepts

Page i.


Turn static files into dynamic content formats.

Create a flipbook
Avon Green Infrastructure Proposed Design Concepts by Fuss & O'Neill - Issuu