Skip to main content

April The Current Quarterly Magazine

Page 1


CUT HIDDEN ENERGY COSTS

Smarter Energy & Data Solutions. Measurable Saving tips.

Explore the insights inside

Reducing Loses

Improving Performance Future-ready Infastructure

Reducing Energy Costs, with Smarter, Safer Systems

EVANS

Powering a Greener FutureSafely, Reliably, Independently

Evans Energy delivers the design, installation and maintenance of commercial solar PV & EV charging systems helping businesses reduce energy costs and transition to low-carbon operations.

FLEXIBLE DELIVERY THAT WORKS FOR YOU

BUILT-IN SAFETY AS STANDARD

All PV systems include emergency shut down linked to the building’s fire alarm system instantly de-energising in an emergency to protect occupants & first responders.

EV CHARGINGINSTALLATION & FUNDING SUPPORT

We design, install & maintain commercial EV charging infastructure, from small workplace schemes to large scale deployments.

We also support clients in accessing available funding, including the OZEV grant, helping reduce upfront costs and accelerate adoption.

ONGOING MAINTENANCE & PERFORMANCE

Our support continues long after installation, with maintenance packages designed to protect system performance and safety.

WHY CLIENTS CHOOSE EVANS ENERGY

Direct engagement (no margin on margin)

End-to-end delivery

Fully compliant & safety led

Access to OZEV funding

OZEV FUNDING SUPPORT

Helping businesses unlock funding and accelerate the shift to low-emission vehicles OUR MAINTENANCE INCLUDES

& visual inspections

Poorly maintained systems can present serious risks. Regular inspection is essential to ensure safe, efficient operation & protect your system.

Delivering Reliable, High-Performance Data Infastructure

Evans Group’s Data Services division delivers fully compliant, high quality data infastructure ensuring reliable, future-ready connectivity across a wide range of sectors

KEY PROJECT STATS

200+

Cat6A data points installed

OM4 fibre backbone throughout

Fully tested & certified (AEM TestPro)

25-YEAR manufacturer’s warranty

PROJECT SPOTLIGHT: TREDEGAR PRIMARY SCHOOL

We delivered a full data infastructure installation at Tredegar Primary School, creating a robust and scalable network across the entire site.

Over 200 Excel Cat6A data cables were installed across multiple data cabinets, all interconnected via OM4 fibre optic cabling

Every installation was rigorously tested and certified using an AEM TestPro cable tester, with the system backed by a 25-year manufacturer’s warranty

The result is a high-performance backbone designed for longterm reliability.

ASEAMLESS CONNECTIVITY ACROSS THE SITE

In addition to structured cabling, we installed wireless access points throughout the building ensuring consistent, high-speed coverage across all areas.

ENERGY WASTE

THE HIDDEN ELECTRICAL COSTS IN YOUR

BUILDING

In commercial environments, electrical systems are under constant demand. From HVAC and plant equipment to IT infastructure and lighting, the load on systems is significantly greater and more complex than in domestic settings

While most systems are designed to meet compliance standards, this doesn’t always mean they are operating efficiently or without risk. Here are some of the most common electrical issues we encounter on commercial sites:

THE IMPACT OF OVERLOOKED ISSUES

1

OUTDATED OR INEFFICIENT LIGHTING

Lighting remains one of the biggest contributors to unnecessary energy use Common issues:

Legacy flurescent or halogen fittings

Lights operating outside occupancy hours

Poor zoning or lack of controls

Upgrading to LED and introducing occupancy or daylight controls can reduce lighting energy consumption by 50-80% in many commercial environments

FINAL THOUGHT

2 3

EQUIPMENT RUNNING OUTSIDE OPERATIONAL HOURS

It’s common to find systems running when buildings are unoccupied:

HVAC systems

Plant equipment

Small power loads

POOR POWER QUALITY

Issues such as:

Voltage imbalance

Harmonics from modern equipment

Inefficient load distribution ....can lead to increased energy consumption

A simple review of the schedules and controls can deliver quick wins with no capital cost

Power quality monitoring helps identify inefficiencies that are otherwise invisible in standard energy bills

4 5

AGEING ELECTRICAL INFASTRUCTURE

Older systems often operate less efficiently and may not be suited to modern demands: Increased issues

Overheating Reduces systems performance

LACK OF VISIBILITY & DATA

Managaing energy is simply not knowing where it’s being used.With sub-metering or monitoring: Waste goes unnoticed

Trends aren’t identified

Improvements are difficult to measure

An Electrical Installation Condition Report (EICR) combined with load analysis can highlight opportunities for upgrade and optimisation

Installing sub-metering provides actionable data to support energy reduction strategies and investment decisions

In commercial environments, electrical issues rarely appear overnight, they develop over time. The difference between reactive maintenance and proactive management is often the difference between minor intervention and major disruption

A structured approach to inspection, testing and monitoring ensures systems remain not just compliant but resilient, efficient and fit for purpose

WALES OFFICE

59 Waterloo Rd

Cardiff

CF23 9BL

Tel: 02920 493307

SOUTH WEST OFFICE

Aztec West 2530

Ground Floor

Bristol BS32 4AW

Tel: 01173 790960

TECHNICAL TRAINING CENTRE

Unit 2

East Moors Business Park

Cardiff

CF24 5JX

www evanselectricalltd co uk

info@evanselectricalltd co uk

Next issue in August

WITH FURTHER UPDATES

NEXT ISSUE: STAY AHEAD WITH EVANS

In our next issue, we’ll be sharing more insights on:

Project Updates & Case Studies Real world results

Fire & Security Division Integrated, compliant fire protection

Facility Services

Reliable, multi-disciplinary maintenance & support

Turn static files into dynamic content formats.

Create a flipbook
April The Current Quarterly Magazine by EvansElectricalltd - Issuu