Eastside Community Park City Commission Meeting Major Site Plan Application | LDC Section 10-5.3(C)

Wednesday October 14, 2026


Project Team Design-build delivery: one team responsible for design, permitting and construction

OWNER

DESIGN-BUILDER

A R C H I T E C T

Parks & Recreation Department

Design-Build General Contractor & Engineer of Record

Architect of Record

Project Manager: • James Gorvetzian City Planning contact: • Robert W. Johnson III, Senior Planner Community Development Department

• •

Ekrem Uzman, PE, MSCE, CGC Can Karatuna, BS in Civil Engineering

• • • •

Stéphane L’écuyer, AIA Jean Francois Gervais, AIA, LEED Alexander Baramily, AIA Nicolas Tremblay

1900 Glades Road, Suite 500 Boca Raton, FL 33431 (305) 792-0015

(954) 597-3533

Eastside Community Park | City Commission Meeting | October 14, 2026

(561) 990-3333


The Site Former Shaker Village clubhouse parcel on the canal - already City-owned park land

Current condition of the property

Eastside Community Park | City Commission Meeting | October 14, 2026

ADDRESS

5699 W. Commercial Blvd (re-addressed 2 The Common), Tamarac, FL 33319

PARCEL

Folio 4941 11 01 0170 | approx. 2.53 acres (110,206 sf)

OWNER

City of Tamarac

ZONING

RC - Recreation. Parks, playgrounds and municipal facilities are permitted uses

ACCESS

Existing driveway from The Common; frontage on W. Commercial Blvd

WATER

Canal frontage on the south and east - pier and observation deck proposed

TODAY

Vacant former clubhouse site - to be redeveloped as a public neighborhood park


Elevation selected by CMO Stone-textured base, impact-rated glazing, warm wood-tone cladding and aluminum louvers


West Stairs added after Fire Department’s review Stone-textured base, impact-rated glazing, warm wood-tone cladding and aluminum louvers


West stairs and BSO private entrance


East Stairs and Park Restrooms Entrance


General Park view


Revised Site Plan per DRC Comments Community Center

Two-story, approx. 12,700 sf, on the canal side of the site

Parking

50 on-site spaces with ADA and EV-ready spaces, off The Common

Tennis Court

Fenced and lit, northwest corner

Basketball Court

Full court, northeast corner

Playground

Approx. 6,000 sf, ages 2-5 and 5-12, shaded, synthetic turf

Pavilion

Along the multi-use trail

Pier & Observation Deck Canal edge, ADA accessible

Multi-Use Trail

10-ft concrete loop with benches, trash receptacles and distance markers

Eastside Community Park | City Commission Meeting | October 14, 2026


Community Center - First Floor Neighborhood services under one roof, with a lobby that opens to the canal and observation deck • Two-story building, approx. 12,700 sf total • Public lobby with clear views to the canal and deck • Parks & Recreation satellite office with reception • Broward Sheriff's Office (BSO) community substation with its own exterior entrance • Dedicated HOA meeting/conference room • Community Lounge • Aerobics / classroom • Two accessible family restrooms from the park exterior for patrons, • Elevator, storage, IT and support rooms • Observation Deck and Fishing Pier First floor plan (design development) Eastside Community Park | City Commission Meeting | October 14, 2026


Community Center - Second Floor Rentable community rooms for residents, with floor-to-ceiling glass facing the water • Two rentable flex rooms for 50 and 100 guests • Operable folding wall combines them into one room for larger community events • Warming kitchen and food/drink staging with service window • Second aerobics / classroom • Restrooms, storage for tables and chairs • Bridge overlooking the twostory lobby • Exterior stairs to the park

Second floor plan (design development) Eastside Community Park | City Commission Meeting | October 14, 2026


Occupancy Load Calculations Maximum Floor Area Allowances per Occupant


Park Amenities Outdoor recreation for every age group - all ADA accessible and connected by the trail

Playground - ages 2-5 and 5-12, shaded

Sport Courts One tennis court and one full basketball court, fenced, with LED sports lighting on timers controlled from the building

Sports courts

Playground Approx. 6,000 sf, inclusive play, three or more slides, adaptive swing, synthetic turf safety surface with shade structures

Multi-Use Trail 10-ft wide concrete loop: benches, Big Belly receptacles, distance markers, bottle-filling station, two art display pads

Eastside Community Park | City Commission Meeting | October 14, 2026

Fishing pier and observation deck

Pavilion & Gazebo 20-ft hexagonal picnic shelter with tables and grill; gazebo and nature interpretation kiosk

Smart Park Public Wi-Fi, security cameras and digital elements per City technology standards

Pier & Seawall ADA fishing pier and observation deck designed to be unobtrusive to neighboring homes

Monument Sign City-standard monument sign at the entrance


Designed with the Neighborhood in Mind How the plan addresses the things neighbors usually ask about

Managed by Parks & Rec.

Traffic & Parking

Lighting

All parking is on-site (50 spaces) with the existing access from The Common. (20) Bicycle parking and pedestrian connections encourage walking from nearby homes.

Full cut-off LED fixtures meeting Tamarac Sec. 10-4.9; court lights on timers and controlled from the building.

Park hours and room rentals set and managed by City Parks & Recreation. Courts are located on the north side of the site, away from canal-front residences.

Minimum 25-ft setbacks on all sides; two-story building (roof parapet at 37 ft, 40 ft and 42 ft) against a 60-ft RC zoning maximum.

Drainage & Flooding

Trees & Landscape

Construction Impacts

Safety

Stormwater is retained and treated on site under an SFWMD / Broward County permit; finished floor set above the base flood elevation plus freeboard.

Invasive species removed, all new canopy replaced per Broward County Chapter 27; perimeter buffers and native plantings.

Work sequenced to avoid disturbing adjacent properties; erosion control, dust and noise controls, and County construction-hour limits enforced.

BSO community substation in the building, security cameras and lighting throughout the park.

Eastside Community Park | City Commission Meeting | October 14, 2026

Setbacks & Height


Application and Review Process Where we are and where you can participate

1

2

Pre-Application Staff Conference

Major Site Plan Submittal & DRC

Completed

City staff review of the concept

3

4

5

6

7

Neighborhood Meeting

Planning Board Public Hearing

City Commission

Agency Permits

Building Permit & Construction

Completed

Completed on September 16, 2026

Completed on October 7, 2026

Tonight October 14, 2026

Concurrent

Target permit spring 2027

Development Review Committee - staff review of site plan, landscape, engineering, architecture

Public input; written summary and recording go to the City

Public hearing with mailed notice to owners within 150 ft and signs posted on site

Public meeting – final site plan action

SFWMD, Broward County (environmental, engineering, traffic), FDOT, Fire Rescue, utilities

Approx. 14-18 months of construction; completion anticipated 2028

Eastside Community Park | City Commission Meeting | October 14, 2026


Thank you

Renderings and drawings are conceptual / design-development and subject to City review and permitting.