Studio Four Final Boards

Page 1

CONSTRUCTED TO DECONSTRUCTED: MASTER PLAN - PRIMARY CHANNEL PROFILE OF APPROX 3.5 M / SQ: BETWEEN 2 - 3.5 M WIDE BY 1 - 1.75 M. - SECONDARY CHANNEL UP TO 34 M / SQ WITH INUNDATION OF LOWER PATHS.

N

100 M NARROWER, WINDING PRIMARY CHANNEL (FOR DAILY FLOWS BELOW 300ML / DAY) WITH HIGHER VELOCITY FLOW. SECONDARY CHANNEL FOR FLOWS ABOVE 300ML / DAY INCLUDES RETENTION PONDS.

50 M

0M

10 M

SMALL ‘CHILL’ SPOT

WATER ENTRANCE POINT

MAJOR GREENSPACE

LITTER TRAP & RETENTION POND

DENSE PLANTING

SEDIMENT POND (1.5 - 2.0 M DEEP)

SPARSE PLANTING/OPEN SPACE

MACROPHYTE ZONE (0.2 - 0.4 M DEEP)

MEDIUM DENSITY PLANTING

WATERCOURSE

SEMI-AQUATIC PLANTING - PRIMARY CHANNEL PROFILE OF APPROX 3.5 M / SQ: BETWEEN 3 - 5 M WIDE BY 1.2 - 0.8 M. AQUATIC PLANTING/CHANNEL

- SECONDARY CHANNEL UP TO 34 M / SQ WITH INUNDATION OF LOWER PATHS.

ROUTE DIAGRAM

100 M DETAIL & BEGINNING OF CONSTRUCTED WETLAND.

DEDICATED BIKE ROUTE DEDICATED PEDESTRIAN ROUTE (ABOVE DO NOT FLOOD AT PEAK FLOW.) SECONDARY ROUTE - ALL USERS POINT OF TRANSITION BETWEEN ROUTES

WHEN WATER FLOW FALLS BELOW 100ML / DAY, PAVED AREA THROUGH AQUATIC PLANTING/CHANNEL FUNCTIONS AS TERTIARY ROUTE.

- PRIMARY CHANNEL PROFILE OF APPROX 3.5 M / SQ: BETWEEN 3 - 5 M WIDE BY 1.2 - 0.8 M. - SECONDARY CHANNEL UP TO 34 M / SQ WITH INUNDATION OF LOWER PATHS.

GRADUALLY WIDENING, FLATTER CHANNEL AS GEOMETRY BECOMES MORE ‘CONSTRUCTED’. LITTER TRAPS, RETENTION & SEDIMENT PONDS, AND MACROPHYTE ZONES FORM A CONSTRUCTED WETLAND TO PARTIALLY CLEAN STORM WATER.