Skip to main content

Doosan P158 PU158 Valve adjustment procedure and specifications

Page 1


valve lash clearance adjustment procedure and specifications Page 1 of 2

Valve clearance adjust procedure

After letting the #1 cylinder’s piston come at the compression top dead center by turning the crankshaft, adjust the valve clearances.

Loosen the lock nuts of rocker arm adjusting screws and push the feeler gauge of specified value between a rocker arm and a valve stem and adjust the clearance with adjusting screw respectively and then tighten with the lock nut.

As for the valve clearance, adjust it when in cold, as follows.

Doosan Generator Engine Model Intake Valve Exhaust Valve P158L DP158L PU158L

Adjusting Sequence of Valve Clearance

This is a precision method, but it takes more time.

* 8 Cylinder Engine 158 PU158 P158 P158L P158F P158Ti PD158L PU158 PU158LE PU158 PU158Ti

* 10 Cylinder Engine P180 PU180 P180 P180L P180F P180Ti PD180L PU180 PU180LE PU180LE PU180Ti

Engine

Doosan Generator Engine Parts contact: Email: EngineParts@HeavyEquipmentRestorationParts.com alternate email: EngineParts2@gmail.com

Heavy Equipment Restoration Parts LLC 4730 118th Ave Fennville Michigan 49408 USA

Phone: 269 673 1638

Text: 269 760 8652

Website: www.HeavyEquipmentRestorationParts.com

valve lash clearance adjustment procedure and specifications Page 2 of 2 Doosan 8 cylinder engine Doosan 10 cylinder engine Doosan 12 cylinder engine

- No. 1 Cylinder is located at the side where cooling water pump was installed.

Doosan Generator Engine Parts contact:

Email: EngineParts@HeavyEquipmentRestorationParts.com alternate email: EngineParts2@gmail.com

Heavy Equipment Restoration Parts LLC

4730 118th Ave Fennville Michigan 49408 USA

Phone: 269 673 1638

Text: 269 760 8652

Website: www.HeavyEquipmentRestorationParts.com

Turn static files into dynamic content formats.

Create a flipbook