Nissan Sunderland eHGV Charging Hub
HV/LV infrastructure & charger layout design for Nissan's eHGV fleet transition.
Enable Design delivered integrated civil and electrical detailed design for Nissan Sunderland’s eHGV charging hub, supporting Gridserve’s ZEHID Electric Freightways programme. The design included charger foundations, ducting, cable routes, HV/LV interfaces, earthing and operational layouts within a live manufacturing environment.
Completed Civil & Electrical Concept to Detailed Design
Client: Gridserve / Nissan UK Haulier Consortium
Scope: Civil, structural and electrical design for eHGV charging infrastructure and HV/LV integration.
Scale: 7 ABB eHGV chargers supplied from a dedicated 2.5 MVA transformer.
Role: Principal Designer from detailed design through to construction support and as-built delivery.



Civil Infrastructure
Design of charger foundations, kerbing, drainage tie-ins, duct routes and bay infrastructure. Civil layouts were coordinated with existing levels, buried services and HGV movement requirements to support safe operation and buildability.

EV Charging Infrastructure
Charger positions, maintenance pads, cable containment and operational bay layouts were developed around eHGV access, charging demand and safe vehicle movements.
Power Systems Design
HV/LV distribution design including feeder pillar integration, transformer interface, cable routing, earthing strategy and single line diagrams for the eHGV charging installation.
Construction
Integration
Design coordination and construction-stage support helped manage site constraints, buried services, buildability queries and as-built drawing close-out.
Maritime Transport Tamworth Depot - eHGV
Charging Hub & 11 kV Grid Connection
Integrated eHGV charging and 11 kV grid connection design for freight operations.
Enable Design delivered multidisciplinary civil, electrical and DNO/IDNO design for a high-capacity eHGV charging hub at Maritime Birch Coppice, Tamworth. The design integrated charger bay layout, foundations, ducting, HV/LV infrastructure, metering, earthing and adoption interfaces within a live freight terminal environment.
Completed Civil & Electrical Concept to Detailed Design
Client: Gridserve / Maritime Transport
Scope: Multi-disciplinary civil, electrical and DNO/IDNO design for a 5-bay eHGV charging hub.
Scale: 5 × 360 kW chargers, 2 MVA substation and LV feeder network.
Role: Lead designer from concept design through to as-built delivery.
Key Challenge: Maintaining depot operations whilst protecting existing 11 kV infrastructure.




Civil & Site
Site layout, swept-path analysis, charger foundations, duct routes, resurfacing and utility easement protection.
Systems Design
HV/LV design coordination including the 2 MVA package substation, LV feeder infrastructure, cable schedules, SLDs, earthing, metering and protective design interfaces.
5 × 360 kW charger layout, bay geometry, 8 m cable reach, swept-path analysis and depot integration.
DNO / IDNO
Coordination with NGED, ICP Services and Last Mile covering the 11 kV point of connection, IDNO adoption, MPAN/asset registration, legal plans, metering updates, design acceptance and energisation/ as-built support.
GXO Enfield Depot EV Charging Infrastructure
EV Charging / HV-LV Design / Private Power Integration
HV/LV integration supporting fleet electrification without a new DNO connection.
Enable Design supported the delivery of high-capacity EV charging infrastructure at GXO’s Enfield depot, integrating new charging demand with the site’s existing private electrical network. the design focused on integrating new charging demand with the existing LV/substation infrastructure, providing a site-led power solution without requiring a new DNO connection.
Completed Civil & Electrical Concept to Detailed Design
Client: Gridserve / GXO
Scope: EV charging infrastructure, HV/LV integration, charger civils, cable routing and earthing.
Scale: 3 × 360kW eHGV chargers integrated with existing private electrical infrastructure.
Role: Civil and electrical design, infrastructure integration and construction support.
Key Challenges: Integrating over 1MW of charging demand into an existing private electrical network.


Civil Infrastructure
Design of charger foundations, ducting, cable routes and parking bay interfaces were developed to integrate high-capacity EV charging within an operational depot environment.
Private Power Integration
LV/HV coordination focused on integrating new charger supplies with the site's existing electrical infrastructure, including the intake, switchboard and substation interface.
EV Charging Infrastructure
The charging layout was coordinated around HGV movements, depot operations, cable routing constraints and available site capacity to provide a practical, buildable charging solution.
Construction Integration
Design coordination and constructability reviews supported the installation of new charging infrastructure around existing utilities, private electrical assets and live depot operations.
Why Enable Design for EV Charging?
Civil-engineering-led EV charging design, backed by HV/LV, DNO/IDNO and construction-stage experience.
Proven Delivery
EV / eHGV Schemes
End-to-End Design Delivery across live depot, logistics and manufacturing environments, including Nissan Sunderland, Maritime Tamworth, GXO Enfield and John Gilbert Way.
Civil-Led EV Design Charger Bases, Ducting & Layouts
Practical civil design for charger foundations, duct routes, bay layouts, swept paths, drainage interfaces, resurfacing and safe vehicle movements.


HV/LV Integration From POC to Charger
Experience coordinating HV/LV distribution, substations, feeder pillars, cable schedules, earthing, SLDs and charger supply interfaces.
DNO / IDNO Ready
Adoption & Connection
Mindset
Designs developed with POC, adoption, metering, legal plans, asset registration, MPAN/EVCP paperwork and energisation requirements in mind.
Design + Delivery Insight
Buildable from Day One
Civil, electrical, planning and construction knowledge in one coordinated teamreducing interface risk between design, approval and site delivery.



Ready to Deliver Your Next EV Charging Project?
Enable Design supports EV charging projects from early layout development through to detailed civil, electrical and grid connection design. We help clients coordinate charger infrastructure, HV/LV interfaces, DNO/IDNO requirements and construction-ready design information for buildable, future-ready charging schemes.