ERVIN MARC GARCES CATRE

![]()


SITE DEVELOPMENT PLAN CREATED WITH ADOBE PHOTOSHOP, SITE AERIAL PERSPECTIVE CREATED WITH LUMION, AND BOTH ARE DESIGN REQUIREMENTS FOR THESIS IN THE UNIVERSITY


























AND COMMERCIAL PROJECTS CREATED WITH SKETCHUP V-RAY





CREDITS TO: OWNER OF PERSPECTIVE (NSCR-CP02 PROJ.)
>Implement safety protocols and standards during construction
>Created CSHP (Construction Safety and Health Program) and other safety documents required to the company during the construction.
>Conducted safety meetings and tool-box talk.
>Supervised workers in installation of steelworks, formworks. and postpour rectifications.
>Supervised workers in pre-fabrication of steelworks following plans to detail.
>Conducted quality inspection of steelworks and formworks during installation and prior for approval of consultants on-site
>Conducted inspection for post-pour concrete rectifications.
>Coordinated and received for-construction shop drawings and other documents necessary to construction.























