Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2017 13 January 2017 Water War Room
Summary of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces Planned Water Volume (MCM) 2017
Measure JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
9
9
9
9
9
9
8
8
8
8
8
8
Total
1. Primary measures 1.1Water diversion via pumping from Prasae Reservoir
Planned PS - KY Planned PS- NPL Actual PS-KY Actual PS-NPL
1.2 Divert Water from Bangpakong River + Private Pond
138.0
6
6
6
6
6
6
13 JAN 2017
2.73
2.73
17 JAN 2017
1.04
1.04
Planned
1.0
3.41 5.55 5.74 5.55
21.25
Actual 1.3 Divert Water from Klong Pra Ong Chaiyanuchit Total
Planned Planned
15
16
15
15
15
15
8
11.41 13.55 13.74 13.55
8
159.25
WATER SITUATION OF BANGPHRA, NONGKHO RESERVOIR
Water situation of Nongplalai, Dokkrai and Klongyai Reservoirs
Source of data: Royal Irrigation Department
Water situation of Prasae Reservoir
Source of data: Royal Irrigation Department
Water situation of Dokkrai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongplalai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Klongyai Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Bangphra Reservoir (by Year)
Source of data: Royal Irrigation Department
Water situation of Nongkho Reservoir (by Year)
Source of data: Royal Irrigation Department
PROGRESS OF WATER SHORTAGE
PREVENTION AND MITIGATION MEASURES IN
RAYONG AND CHONBURI PROVINCES On 30 Dec 2016
Prasae – Nongpalai project ITEM PROCESS DETAILS PUMP STATION WORK CIVIL WORK 99.03% - Architecture work just only land scape left MECHANICAL - Start Commissioning Test On 4 OCT and stop test on 7 OCT 100.00% WORK because found crack and water leakage nearby Air Chamber - PEA delivered 115 kV. to system on 28 SEP 2016 ELECTRIC SYSTEM 99.97% - Electric pole work around the project left SCADA 99.55% - Communication System not complete HEAD TANK WORK CIVIL AND - Architecture work just only land scape left and laying concrete MECHANICAL 100% pipe for drainage WORK - Remaining installing lightning rod and the installation of street ELECTRIC SYSTEM 99.95% lighting inside project area. SCADA PIPE WORK PIPE LAYING WORK
95.85%
100%
Remaining installing the transmitter Communication System -
Completed pipe laying Completed installation Cathodic Protection
Work progress for whole project Actual 99.78 % Delay from plan 0.22 %
Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.)
Nongpalai – NongKho Route no.2 pipe laying project Objective : Increase capacity to supply water for Borwin - Pluak Daeng area about 60 MCM/ year. Component: 1.Temporary pumping station construction and install pump 2.Pipe lying size 1,200 mm. length 10.1 km. and 700 mm. length 11.2 km. 3.SCADA Work Process: on 30 Dec 2016 - Plan 99.08% - Delay from plan 0.92% PIPE: - Pipe size 1,200 mm. finished - Pipe size 700 mm. finished PUMP STATION: work process on this section about 100%
Nongpalai – NongKho Route no.2 pipe laying project (Cont.) ITEM PROCESS DETAILS PUMP STATION WORK (Temporary) CIVIL AND MECHANICAL 100% - Complete WORK ELECTRIC SYSTEM 100% - Complete PIPE WORK PIPE LAYING - Remaining construction valve cap (On progress) and recovery 98.49% WORK pipe laying area