Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015 18 December 2015 Water War Room

0


OVERVIEW OF WATER Chachoengsao Reserve Pond P2

P4 P3

P5

13

P6

Private Pond

Samnakbok Reserve Pond

Bang Phra res. 47.09

82

P-BPN P8

RAYONG-CHONBURI AREA 17 DECEMBER 2015

Chonburi

Rayong

Bangphra

Nongkho

Dokkrai

Nongplalai

Klong Yai

Prasae

117.00

21.40

71.40

163.75

40.10

248.00

47.09

7.34

70.52

161.34

34.82

256.37

40%

34%

99%

99%

87%

103%

35.04

6.34

67.52

147.84

31.82

236.37

-

-

0.21

0.33

-

Reservoir capacity (MCM) Current storage volume (MCM) Percentage of reservoir capacity Useable storage volume (excluding Dead Storage) (MCM)

Inflow into reservoir (MCM)

P7

P9

P1

SITUATION IN

7.34

Nong Kho res.

P10

28

0.54

-

Water volume compared -0.94 -0.17 -1.10 +1.75 -2.50 to previous week -4.83 (-decrease, +increase) -1.11 -1.84 (MCM) Total water volume in 54.43 MCM 266.69 MCM each area (39.3 %) (96.9%) Note: * When storage volume falls below 15.2 MCM, it is not possible to transfer water from Klongyai Reservoir to Nongplalai Reservoir

256.37

34.82

Prasae res.

Khlong Yai res. 161.34 P11Pla Lai res. 70.52 Nong P12 P-NP3

Dok Krai res.

P14

P

P13

28

120 P7

P15

180

P16

Raw Water Pipe Line (EW)

Source of data: Royal Irrigation Department

Demand 2558 (MCM.) Supply (MCM.) Pump Station Raw Water Pipe Line (RID)

Existing Pipe Network

Existing Pipe Network

Constructing Pipe Network

1 Constructing Pipe Network


SUMMARY OF WATER SHORTAGE PREVENTION AND MITIGATION MEASURES IN RAYONG AND CHONBURI PROVINCES Planned water volume Measure

Planned

1. Primary measures 1.1 Water diversion via pumping from Prasae Reservoir

2015 Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Total

7.5

7.5

9.0

9.0

9.0

15.0

15.0

15.0

15.0

15.0

117

Actual

Stop divert water 17 Dec 2015 12 Oct 2015

6.61

8.86

8.69

8.32

9.22

1.2 Pump water from Rayong River back to Nongplalai Reservoir using RID’s Wat Lahanyai pump station.

8.75

2.66

1.0

1.0

1.3 Pump water from Rayong River

Plan

1.4 Water transfer from Bangpakong River + Private Pond

1.0

Actual

2. Pump water from PraOngchaiyanuchit canal

Plan

4.5

56.65

2.0 0.5

0.5

4.5

1.5

1.0 14.5

Stop divert water 10 Nov 2015

Actual

Total

3.0

3.53

7.5

7.5

9.0

9.0

9.0

1.71

3.86

6.23

0.85

10.0

13.0

14.5

17.0

Stop divert water 16 Oct 201514.03

12.65 14.0

Stop divert water 27 Nov 2015

13.5

103.0

27.53

2


Simulation of water volume in main Rayong Reservoirs

17 Dec ‘15 Water Volume: 266.69 MCM.

3


WATER SITUATION

OF

BANGPHRA, NONGKHO RESERVOIR

4


WATER SITUATION

OF

NONGPLALAI, DOKKRAI

Source of data: Royal Irrigation Department

AND

KLONGYAI RESERVOIRS


WATER SITUATION

OF

PRASAE RESERVOIR

Source of data: Royal Irrigation Department

6


WATER SITUATION

OF

DOKKRAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

NONGPLALAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

KLONGYAI RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

BANGPHRA RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


WATER SITUATION

OF

NONGKHO RESERVOIR (BY YEAR)

Source of data: Royal Irrigation Department


PROGRESS OF WATER SHORTAGE

PREVENTION AND MITIGATION MEASURES IN

RAYONG AND CHONBURI PROVINCES ON 15 DEC 2015

12


Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (1)Prasae-Nongplalai Pump Station: Completed pouring concrete, lean concrete base for support pump and motor, intake channel, roof work. Now a days work are 1.1 Control electricity room 1.2 pouring concrete for stair 1.3 pouring concrete retaining wall Overall: delay from plan 34.07%

(2)Pipe laying for 30 km section: Completed pipe jacking across Route 344 and joined the main pipe only 0.5 km. pipe laying left. (3)Head Tank: Installing Slip Form which already 100% of work process. Completed anchorage head for posttension system 100%. The process to install stair out side tank about 70%, install Metal Bellow tools and steel pipe. Overall delay from plan 25% (4)Sub_115 kv: Completed install steel support for electric tools. Start pouring concrete cable trash. Overall delay from plan 9.83%

*Remarks: between negotiation with supplier


Summary of the water volume, and progress of water shortage prevention and mitigation measures in Rayong and Chonburi Provinces for 2015-16 (cont.) (1)

(3)

(2)

(4)

(3)

14


Summary progress of Tabma reservoir Objective For increase water supply in Rayong area not less than 47 MCM/year Project Construct pumping station nearby Rayon River and Tabma canal. For divert and keep water inside Tabma reservoir then send the water into EW pipe line system. Budget: Water Volume: Construction period: Due date:

2,202.7 million baht 47 MCM/year 60 months 31 Dec 2015

Work progress (Plan) : Actual: Delay from plan:

97.08 % (15 Dec 58) 71.66 % 25.87 %

Remarks: The project don’t have work of process because of heavy rainfall.

15


End of Presentation