Assignment 3: Project Performance Due Week 6 and Worth 230 Points
Build on the project from Assignment 2. This assignment consists of two (2) sections: an MS Project
exercise and a Project Performance paper. You must submit both sections as separate files, labeled
appropriately. Create and/or assume all necessary assumptions needed for the completion of this
assignment.
Paper For Above instruction
Section 1: MS Project Exercise
Update the project schedule in MS Project to account for the following changes: Develop a network
schedule for your project using either the arrow diagramming method or the precedence method. Conduct
a forward pass, and identify the critical path and total float.
Section 2: Project Performance Paper
Write a six to eight (6-8) page paper in which you:
Summarize your project, including key objectives, projected costs and resources, and a high-level timeline.
Create a Responsibility Assignment Matrix (RAM) for your project and justify your response.
Outline the network schedule for your p