Skip to main content

Douglasville Comprehensive Transporation Plan Project Fact Sheet

Page 1


CITY OF DOUGLASVILLE COMPREHENSIVE TRANSPORTATION PLAN

PROJECT FACT SHEET

1. Improve Safety for All Modes 3. Expand Multimodal & Transit Options 5. Promote Equity, Accessibility, & Quality of Life

Enhance the efficiency, connectivity, and reliability of the transportation network for all users.

2. Improve Mobility & Connectivity

Reduce crashes and improve safety for drivers, pedestrians, bicyclists, and transit users.

Provide a balanced transportation system that supports transit, walking, and biking as viable alternatives to driving.

4. Support Economic Vitality & Freight Movement

Ensure the transportation system supports economic development and efficient freight access.

Douglasville is updating your comprehensive transportation plan (CTP) for 2025 which outlines transportation projects over a 5, 10, and 30-year time horizon, based on the community needs and priorities. Belows are the project goals: Project Managers:

Ensure all residents—including underserved and transit-dependent populations—have equitable access to transportation and opportunities.

6. Advance Sustainability & System Preservation

Maintain existing infrastructure in good condition while promoting environmentally responsible and resilient transportation solutions.

RSO-1 Hwy 78 / Veterans Memorial Hwy
RSO-5 Eastside Elementary and Burnett Elementary
RSO-7 Vehicular Railroad Crossing Upgrade - Hwy78 & Rose Ave
RSO-4 & 6 Chicago Ave
RSO-8 Hwy 78 / Veterans Memorial Hwy
RSO-3 Riverside Pkwy
RSO-2 Campbellton St
RSO-7 Vehicular Railroad Crossing Upgrade - Hwy 78 & Cedar Mt
RSO-7 Vehicular Railroad Crossing Upgrade - Hwy 78 & W Strickland St
II-2 Rose Ave at Selman
II-5 Fairburn Rd at Hospital Dr
II-8 Thornton Rd at Blair Bridge Rd
II-6 Reynolds Rd at Stewart Mill
II-3 Chicago Ave at Cedar Mountain Rd and Westwood Rd
II-4 Prestley Mill Rd at Saddlebrook Way
II-7 Summerlin Pkwy at Lee Rd
II-1 Hwy78 at Rose Ave
RC-2 &3 Hwy 5
RC-1 Rose Ave
RC-4 Blairs Bridge Rd
RC-5 John West Rd
RC-6 Riverside Pkwy
PB-04 Church St
PB-05 Grady St
PB-12 Cooper St
PB-08 Chapel Hill Rd
PB-09 Selman Ave
PB-07 John West Rd
PB-10 Steward Pkwy
PB-11 Duncan St
PB-06 Bill Arp Rd

PB-13 & 23

PB-14 Eastside Elementary and Burnett Elementary

Dorris Rd
PB-15 Malone St
PB-17 SR 92
PB-16 W Stewart Mill Rd
PB-20 Willing Workers Community Club Park
PB-28 Pinecrest Dr
PB-25 Selman Dr
PB-26 Campbellton St
PB-29 Prestley Mill Rd
PB-31 Riverside Pkwy
PB-30 Hwy 78
PB-27 Autry Cir Boulevard
PB-21 Pope Rd
PB-18 Rose Ave Segment 1
PB-19 & 24 Rose Ave Segment 2

NEXT STEPS

Turn static files into dynamic content formats.

Create a flipbook
Douglasville Comprehensive Transporation Plan Project Fact Sheet by DouglasvilleGA - Issuu