Smallholme Cable Route

Page 1

Notes: Based upon Ordnance Survey map with Permission of Emapsite.com Copyright Reserved Green Energy International Trinity House Newby Road Stockport SK7 5DA

Key: Application Site Boundary

Two cable route options are currently under discussion. The final preferred route will be informed by landowner preference, further engineering input, survey work and environmental assessment.

Construction Access

Indicative HDD Compound Indicative HDD Bore Alignment 1

Indicative HDD Bore Alignment 1

Indicative HDD Bore Alignment 2

The two options shown are: Option 1: an east-west HDD route, constructed in two stages from a central temporary HDD compound, with limited trenching where required. Option 2: a southern route broadly following the stream corridor, subject to ecological, hydrological and engineering review. Title:

Wyseby Hill Solar Farm, Porposed Cable Route Options Scale: 1:2000@A0 Date 19/02/26 Drawn: MB Checked: LO’F Drawing Number GEI-2026-CROj