Skip to main content

PORTFOLIO 2020

Page 1

P ORTF OL IO DIANA DURAN 2020


PORTFO LIO DIANA DURAN 2020

A C A D E M I C

W O R K

NORDIC LOOP BLUE SKY VILLAGE CHROMTIC CHANGE ELIXIR CORNEL BIKE SHOP

C O M P E T I T I O N S BORDERS | UNDERGROUND BATH HOUSE SKY-BRIDGE COMPETITION PREMIO FELIX CANDELA | CASA AGAVE

P R O F E S S I O N A L

W O R K

THE CLASSICAL ACADEMY MONTE DEL SOL CHARTER SCHOOL TAOS PUEBLO | MULTI COMPLEX MASTERPLAN | WELLNESS CENTER ELEVATE


A C A D E M I C

W O R K


OSLO, NORWAY

NORDIC LOOP

WELLNESS & TRAINING CENTER OSLO | NORWAY 6.5 ACRES

The project responds to the vibrant city of Oslo; The wellness and training center was ambitioned as a connected loop, with the idea of continuous activity in mind. Three tracks that waive between levels to provide complex levels of difficulty for physical training. The tracks connect pedestrians, bicyclists, and skaters with a safe zone to travel, given that the site is a major traffic node in the city and it has not prioritized pedestrian use in the area. The project not only improves the well-being of the people but also creates a destination that completes the boardwalk at a relevant area of the city where locals and tourists enjoy what the city has to offer.


1.2 MILES

2.5 MILES

3.7 MILES

5 MILES

6 MILES

GYMNASIUMS ICE SKATING WORKOUT STUDIOS SKIING & SNOWBOARDING POOLS SOCCER

PROPOSED WELLNESS & TRAINING CENTER PEDESTRIAN PATH CARS BIKE ROUTE TUNNELS

CURRENT SITE CIRCULATION BROKEN PROMENADE AT AKER BRYGGE

PEDESTRIAN PATH CARS BIKE ROUTE TUNNELS

PROPOSED SITE CIRCULATION INTERIOR PROMENADE AT AKER BRYGGE

SITE SUN EXPOSURE GLAZING MAXIMIZATION


VIEWING

5

GROUP TRAINING SHOOTING PLATFORM SHOOTING PLATFORM

PHYSICAL THERAPY

RESTING AREA

SKIING TRAINING TRACK CROSS-FIT ZONE

4

SPINNING GROUP FITNESS

ENERGY BAR

STRETCH

PEDESTRIAN AND BIKE ENTRY & EXIT BIKING TRACK

3

CARDIO

GAME AREA HYDRATION ZONE HIGH IMPACT TRAINING

PEDESTRIAN AND BIKE ENTRY & EXIT TRAINER OFFICES STRETCH RUNNING TRACK

2

INFORMATION/ENTRANCE

!

SOUTH ENTRANCE RESTING AREA RENTAL SHOP GEAR SHOP EAST ENTRANCE HYDRATION ZONE DELIVERY

CLIMBING FIRST FLOOR

1

KIDS POOL ADULTS POOL & JACUZZIS SPA UNDERWATER SAUNAS RELAXING POOL

STORAGE SPRINT ZONE THE COURT LOWER LEVEL ICE SKATING RINK

LL


THIRD FLOOR - ATHLETES & CROSS-COUNTRY SKIERS TRAINING FLOOR

0’

25’

100’

50’

ENTRY TO TRACKS

EXIT FOR BIKES AND PEDESTRIANS

STAR

T

PEDESTRIAN AND BIKE ENTRANCE TO TRACKS

RESTROOMS ELEVATORS STORAGE

END

SECOND FLOOR - ACCESS TO TRAINING TRACKS 0’

25’

100’

50’

CHANGING AREAS

ADMINISTRATIVE AREA RECEPTION AREA RETAIL

LOBBY RESTING AREA TURF TRAINING RETAIL

RETAIL CLIMBING ROCK RETAIL

RESTING AREA

RESTROOMS ELEVATORS STORAGE

RESTING AREA

FIRST FLOOR - ACCESS FROM PROMENADE 0’

25’

100’

50’

DELIVERY AREA

KIDS POOL

FACILITY STORAGE SPLASH PATHS

RESTROOMS

SPORTS BAR

STORAGE RESTROOMS

SPA FUTSAL & HANDBALL

OLYMPIC & RECREATIONAL POOLS

RESTROOMS ELEVATORS STORAGE

ICE SKATING RINK

SAUNA

RELAXING POOL SAUNA

EXTERIOR SKIING AND SWIMMING PLATFORM

LOWER LEVEL - OTHER ACTIVITIES 0’

25’

50’

100’

SAUNA


SKIING TRACK ABOVE

PEDESTRIAN ENTRY

TRAINING PLATFORM

TRAINING PLATFORM CLIMBING WALL

ENLARGED PLAN - PEDESTRIAN ENTRY NOT TO SCALE

2

SECOND FLOOR - KEY PLAN


CYCLING TRACK SUPPLY AIR

CYCLING TRACK 30’-0”

RETURN AIR

TRAINING PLATFORM

RUNNING TRACK

4 RUNNING TRACK 15’-0”

LOBBY

FIRST FLOOR 0’-0”

RUNNING TRACK SECTION NOT TO SCALE

BUILDING SECTION NOT TO SCALE


BLUE SKY VILLAGE REFUGEE HOUSING ALBUQUERQUE | NEW MEXICO CAPACITY 100 PEOPLE


CITY OF ALBUQUERQUE ONE OF THE MOST DIVERSE CITIES IN THE US

63% FOREIGN-BORN NEW MEXICANS HAVE LEGAL IMMIGRATION STATUS

63%

40% FOREIGN-BORN NEW MEXICANS SPEAK OTHER LANGUAGE OTHER THAN ENGLISH AT HOME

40%

TIJERAS AVE. COOPER AV E

CE NT RA LA VE .

SITE

GOLD AV E

ALBUQUERQUE, NM

4TH ST REET

5TH STRE ET

6TH STRE ET

DOWNTOWN AREA 5% GENERAL SERVICES

DOWNTOWN

4% ASIAN 8% BLACK 14% AMERICAN INDIAN

GENDER

51% FEMALE

7TH ST REET

8TH STRE ET

SILVER AV E

49% MALE

RACIAL DIVERSITY

36% HISPANIC

38% WHITE

30% CONSTRUCTION

18% MANUFACTURING

33% BELOW POVERTY LINE 21% TOURISM, HOSPITALITY & RECREATION

CONTRIBUTIONS

26% ADMINISTRATIVE SUPPORT


MAIN LIBRARY

MAIN LIBRARY

BUS STOP

BUS STOP

PARKING

PARKING

EXST. BUILDING

CHURCH

CHURCH

PARKING RESTAURANT

RESTAURANT

0 30 ’

PARKING

’ 300

RESTAURANT

BREWERY

MECHANIC SERVICES

BREWERY

MECHANIC SERVICES

RESTAURANT

THEATER

THEATER

EXISTING SITE SURROUNDINGS

REDEFINED SITE CONDITIONS

MAIN LIBRARY MAIN LIBRARY

BUS STOP

BUS STOP

PARKING PARKING

CHURCH CHURCH

RESTAURANT

NOISE POLLUTION SOURCE

RESTAURANT

RESTAURANT RESTAURANT

BREWERY

MECHANIC SERVICES

BREWERY

MECHANIC SERVICES

THEATER THEATER

PROPOSED NOISE MITIGATION STRATEGY

PRIVACY STRATEGY - ROTATION OF CITY GRID

STRATEGIES IMPLEMENTED NOT TO SCALE

NOISE POLLUTION

PROPOSED USES PUBLIC RESIDENTS ONLY

RESIDENTIAL


ISOMETRIC VIEW NOT TO SCALE


TERRACE

RESTROOM

BATHROOM

KITCHEN

BEDROOM 1

BEDROOM 1

BEDROOM 2

STORAGE

KITCHEN

BATHROOM

BATHROOM

DINING ROOM

STORAGE

MASTER BEDROOM LIVING ROOM LIVING ROOM

STORAGE

BEDROOM MASTER BEDROOM

4’

0’

8’

GROUND PLAN

UNIT TYPE A - 1060 SF

UNIT TYPE A -1030 SF

UNIT TYPE A - 450 SF 0’

KITCHEN

0’

15’

4’

0’

4’

8’

8’

SECOND FLOOR PLAN

30’

0’

15’

30’

OFFICES

GIFT SHOP

TEST ROOM INTERNET ACCESS

WAITING AREA

EXAM ROOMS

GALLERY OFFICES LOBBY FRONT DESK

ADVOCACY CENTER 3,200SF 0’ 12’

ART GALLERY - 2,600SF 0’

15’

SECTION SECTION0’

24’

HEALTH CENTER - 1,700SF 0’

30’

4’ 0’

FRONT DESK

4’ 8’

8’16’ 16’

10’

20’


Khadegah fled his home in Darfur, Sudan. “I always think about my father, my mother and the rest of my family. I think about my former neighbors of 11 years. I don’t know if they’re alive or not”.

Achan is a widow who had eight children. Seven of her children died during the ongoing war in her home country of South Sudan. As a result, she was left with 8 orphans to take care of. Before the war, she was a peasant farmer in Sudan who cultivated and made crafts to sustain her big family.

CONCRETE CAP GREEN ROOF FOLIAGE GROWING MEDIUM GARDEN DRAIN AND WATER RETENTION LAYER TOP WATER PROOFING MEMBRANE RIGID INSULATION METAL DECK ROOFING BATT INSULATION

SECTION

SECTION

0’

0’

4’

8’

15’

CUSTOM MADE WINDOW EXTERIOR STUCCO FINISH 3” RIGID INSULATION 2X4 STEEL STUDS BATT INSULATION REINFORCED CONCRETE SLAB GYB. BOARD BATT INSULATION GYP. BOARD CEILING FINISH 2X4 STEEL STUDS 3” RIGID INSULATION 8” REINFORCED CONCRETE WALL

16’

30’

CONCRETE CAP GREEN ROOF FOLIAGE GROWING MEDIUM GARDEN DRAIN AND WATER RETENTION LAYER TOP WATER PROOFING MEMBRANE RIGID INSULATION METAL DECK ROOFING BATT INSULATION

CUSTOM MADE WINDOW EXTERIOR STUCCO FINISH 3” RIGID INSULATION 2X4 STEEL STUDS BATT INSULATION REINFORCED CONCRETE SLAB GYB. BOARD BATT INSULATION GYP. BOARD CEILING FINISH 2X4 STEEL STUDS 3” RIGID INSULATION 8” REINFORCED CONCRETE WALL

UPPER LEVEL TYP. WINDOWS ASSEMBLY ALUMINUM FRAME INSULATED E-GLASS

UPPER LEVEL TYP. WINDOWS ASSEMBLY ALUMINUM FRAME INSULATED E-GLASS

LOWER LEVEL TYPICAL WINDOWS ASSEMBLY ALUMINUM FRAME INSULATED E-GLASS PERFORATED PANEL

LOWER LEVEL TYPICAL WINDOWS ASSEMBLY ALUMINUM FRAME INSULATED E-GLASS PERFORATED PANEL


MARQUETTE AVE.

BROADWAY BLVD.

IAL ST. COMMERC

TIJERAS AVE.

GROUND LEVEL PLAN SCALE: 1” = 30’-0”

CHROMATIC CHANGE

CHROMATIC CHANGE DATA ANALYSIS & LEARNING CENTER ALBUQUERQUE | NEW MEXICO DIANA DURAN | ARCH 603

DATA ANALYSIS & LEARNING CENTER ALBUQUERQUE | NEW MEXICO F.

F.

F.

F.

F.

D.

D.

F.

F.

F.

D.

MARQUETTE AVE.

F.

C.

TOP OF ROOF 130’-0”

I. MECHANICAL EQUIPMENT

ST.

BROADWAY BLVD.

COMMERCIAL

LIGHTING

B.

POWER OPERATED LOUVER SYSTEM

A.

TINTED SKYLIGHT SYSTEM OBSERVATION WINDOW BIOLOGY WET LABORATORY

B. UPPER LEVEL 115’-0”

W18X40 WIDE FLANGE


Dr. Martin Luther King Jr. Ave.

The site is located approximately 200 ft away from the train tracks, that are used daily at least 8 times a day. This modes of transit could represent a challenge to new developments due to the constant vibrations of the area and sound pollution

Tijeras Ave.

Central Ave.

Albuquerque, New Mexico

Site

Diana Duran / Arch 603 / Fall 2019

HELPFUL INTERNAL ORIGIN

•

MFUL

POSURE TO NOISE DUE W OF TRAFFIC. ONCERN DUE TO THE AND PEDESTRIANS

HARMFUL

SITE IS IN CLOSE PROXIMITY TO INNOVATIVE HUBS LIKE LOBRAINFOREST AND DOWNTOWN DIFFERENT KINDS OF PUBLIC TRANSPORTATION ARE CONSTANTLY SURROUNDING THE SITE. COMMERCIAL, BUSINESS AND RECREATIONAL SPACES ARE LOCATED WITHIN A 2 MILE RADIUS OF THE SITE. LOCAL AND GOVERNMENTAL ENTITIES ARE ALSO IN CLOSE PROXIMITY

• • •

• • • •

STRENGTHS OPPORTUNITIES EXTERNAL ORIGIN

HADING IN THE AREA. FFECT IS VERY UE TO THE SUN D REFLECTIVITY E BUILDINGS

NESSES EATS

•

WEAKNESSES TREATS •

SITE HAS POTENTIAL TO BECOME A OPEN PUBLIC SPACE OR A EVENT SPACE. POTENTIAL BENEFIT FROM SOLAR ENERGY AND WIND HARVESTING. WATER RUNOFF CAN BE USED TO IRRIGATE XERISCAPES. OPPORTUNITIES TO CREATE SPACES THAT SUPPORT THE GROWTH OF THE INITIATIVE INNOVATE ABQ.

• • •

CONSTANT EXPOSURE TO NOISE DUE TO HEAVY FLOW OF TRAFFIC. SAFETY IS A CONCERN DUE TO THE LACK OF LIGHT AND PEDESTRIANS IN THE AREA. NO NATURAL SHADING IN THE AREA. HEAT ISLAND EFFECT IS VERY NOTORIOUS DUE TO THE SUN EXPOSURE AND REFLECTIVITY CAUSED BY THE BUILDINGS DOWNTOWN.

• •

SITE IS EXTENSIVE. LARGE PROJECTS COULD LAKE FROM FINANCIAL SUPPORT. NOISE AND VIBRATION CONTROL COULD LIMIT THE POTENTIAL USE OF THE SITE. LACK OF INCENTIVES FROM PUBLIC ENTITIES TO DESIGN THE AREA. SUN EXPOSURE

ONE CENTRAL

ALVARADO TRANSPORTATION CENTER

TRAINTRACK PEDESTRIAN OBSTABCLE

IVE. LARGE PROJECTS ROM FINANCIAL

MLK WESTBOUND

RATION CONTROL HE POTENTIAL USE OF

ABQ CONVENTION CENTER

TIVES FROM PUBLIC SIGN THE AREA.

VACANT LOT

RailEVENT RoadCENTER

TIJERAS AVE.

SUN EXPOSURE

MLK AVE.

GOV. INSTITUTION

VIEW TO SANDIAS

BER COUN

GOV. INSTITUTION

PRIMARY ROAD

SITE

GOV. INSTITUTION

ONE CENTRAL

BROADWAY BLVD.MLK EASTBOUND

VACANT LOT

Broadway Blvd.

MIX-USE DEVELOPMENT

VACANT LOT

MIX-USE DEVELOPMENT

ALVARADO TRANSPORTATION CENTER

VACANT LOT

MIX-USE DEVELOPMENT

RESIDENTIAL DEVELOPMENT

Dr. Martin Luther King Jr. Ave.

Tijeras Ave.

SECONDARY ROAD

LOBO RAINFOREST

O SANDIAS

BERNALILLO COUNTY OFFICES PRIMARY ROAD

Central Ave.

PEDESTRIAN ACCESS DIRECT VISUAL CONNECTION TO LOBORAINFOREST

ASTBOUND

W S

N

E

EPICENTER OF NOISE PEDESTRIAN ACCESS IS PREDICTED TO BE STRONGER ALONG BROADWAY DUE TO ALTERNATIVE TRANSPORTATION METHODS.

VEHICULAR ACCES WILL HAPPEN ALONG COMMERCIAL ST. & TIJERAS AVE.

A07

|

DIANA DURAN

|

EPICENTER OF VIBRATION BUS STOP TRAIN STOP

LA 556

|

FALL 2019


ST.

GROUND LEVEL PLAN SCALE: 1” = 30’-0”

SCALE: 1” = 30’-0”

TIJERAS AVE.

TIJERAS AVE. MARQUETTE AVE.

GROUND LEVEL PLAN SCALE: 1” =GARDEN 30’-0” VERTICAL

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

F.

SMALL CLASSROOM GROUND LEVEL PLAN COMMERCIA

SCALE: 1” = 30’-0”

D.

D.

D.

C.

BROADWAY BLVD.

F.

D.

D.

D.

LOWER LEVEL 84’-0”

L ST.

.

OADWAY BLVD.

100’-0” GROUND LEVEL PLAN

E.

I.

F.

C.F.

F.

I.

F.

F.

F.

F.

F.

F.

B.

8” CONCRETE SLAB ON GRADE

A.

CONCRETE FOUNDATION F.

C.

A.

D.

D.

D.

B.

B.

I.

F.

F.

F. F. TIJERAS AVE. B.

F.

B.

F.

F.

F.

B.

A.

B.

GROUND LEVEL PLAN F.

C.

D.

D.

D.

SCALE: 1” = 30’-0”

A.

A.

A.

I.

A.

B.

A.

B. F.

F.

F.

F.

F.

F.

C.

F.

F.

D.

D.

D.

SECOND LEVEL PLAN

F.

I.

TIJERAS AVE.

SECOND SCALE: 1/32”LEVEL = 1’-0” PLAN

A.

A.SECOND EXHIBIT A. EXHIBIT LEVEL PLAN B. COLLABORATION SPACE B.SCALE: COLLABORATION SPACE 1/32”LEVEL = 1’-0” GROUND PLAN C. SCIENTIST OFFICES C. SCIENTIST 1” OFFICES = 30’-0” D.SCALE: CHEMISTRY LAB D. CHEMISTRY LAB E. SUPPORT E. SUPPORT F. LECTURE A. EXHIBIT G. WASTE & RECYCLE F. LECTURE B. COLLABORATION SPACE G. & RECYCLE C. WASTE SCIENTIST OFFICES

D. E. F. G.

B.

A.

CHEMISTRY LAB SUPPORT LECTURE WASTE & RECYCLE

F.

SECOND LEVEL PLAN

F.

LIGHT COOLING AVERAGE COOLING MAJOR COOLING

SCALE: 1/32” = 1’-0” A. B. C. D. E. F. G.

EXHIBIT COLLABORATION SPACE SECOND LEVEL PLAN SCIENTIST OFFICES SCALE: 1/32” = 1’-0” CHEMISTRY LAB SUPPORT A. EXHIBIT LECTURE B. COLLABORATION SPACE WASTE & RECYCLE C. SCIENTIST OFFICES

F.

C.

F.

F.

F.

F.

F.

F.

D.

D.

D.

I.

B. L.

COOLING COOLINGDISTRIBUTION DISTRIBUTION

M.

A.

N.

B.

G. J.

K.

A.

D. E. F. G.

A.

B.

SCALE: 1/32” = 1’-0”

L.

CHEMISTRY LAB SUPPORT LECTURE WASTE & RECYCLE

M.

N.

A.

O.

A.

G.

A.

J.

I.

B.

K.

A. E.

N.

A.

G. J.

I.

B.

A.

COOLING COOLINGDISTRIBUTION DISTRIBUTION

K.

E.

H.

SECOND LEVEL PLAN L.

M.

N.

L.

A. EXHIBIT B. COLLABORATION SPACE C. SCIENTIST OFFICES D. CHEMISTRY LAB E. SUPPORT GROUND LEVEL PLAN F. LECTURE SCALE: 1/32” = 1’-0” G. WASTE & RECYCLE H. I. J. K.

A.

O.

SCALE: 1/32” = 1’-0”

A.

M.

O.

LIGHT COOLING AVERAGE COOLING MAJOR COOLING A.

L.

H.

J.

N.

K.

A.

G.

E.

H.

J.

A.

K.

A.

ATMOSPHERIC SCIENCES VIZUALIZATION OFFICES RESOURCE CENTER COMPUTING LABORATORY

M.

I.

B.

G.

A.

O.

L. M. N. O.

MEETING ROOM RECORDS DEPARTMENT OFFICES MECHANICAL ROOM

I.

B.

A.

O. E.

H.

I.

B.

E.

H.

GROUND LEVEL PLAN

A.

SCALE: 1/32” = 1’-0”

S.

T.

H. I. J. K.

ATMOSPHERIC SCIENCES VIZUALIZATION OFFICES RESOURCE CENTER COMPUTING LABORATORY

L. M. N. O.

L.

MEETING ROOM RECORDS DEPARTMENT OFFICES G. J. MECHANICAL ROOM

A.

S.

N. D.

R. E.

X.

W.

R. C.

F.

GROUNDLEVEL LEVEL PLAN GROUND PLAN SCALE: 1/32” == 1’-0” SCALE: 1/32” 1’-0”

U.

U.

V.

K.

G.

X.

M.

A.

A.

A.

O. C. Q.

R.

H. I. J. K.

H. ATMOSPHERIC SCIENCES I. VIZUALIZATION OFFICES ATMOSPHERIC SCIENCES J. RESOURCE CENTER VIZUALIZATION OFFICES K. COMPUTING LABORATORY

L. M. N. O.

RESOURCE CENTER COMPUTING LABORATORY A.

GROUND LEVEL PLAN

I.

B. MEETING ROOM RECORDS L. MEETING ROOM DEPARTMENT OFFICES M. RECORDS MECHANICAL ROOM

N. O.

E.

H.

DEPARTMENT OFFICES MECHANICAL ROOM Q.

C.

E.

P.

P.

H. I. J. K.

F.

S.

T.

A.

A.

F.

D.

SCALE: 1/32” = 1’-0”

D.

R. E.

ATMOSPHERIC SCIENCES VIZUALIZATION OFFICES RESOURCE CENTER COMPUTING LABORATORY

L. M. N. O.

X.

W.

U.

V. AA

MEETING ROOM RECORDS X. DEPARTMENT OFFICES MECHANICAL ROOM

HORIZONTAL CIRCULATION PUBLIC SPACE LECTURE CLASSROOMS SCIENTIST OFFICES LABORATORIES

R. C.

F. D.

R. E.

X.

W.

S.

T.

B.

G.

B. U.

V.

R.

C.

B.

HORIZONTAL CIRCULATION PUBLIC SPACE LECTURE CLASSROOMS HORIZONTAL SCIENTIST OFFICES CIRCULATION LABORATORIES

B. B.

PUBLIC SPACE VERTICAL CIRCULATION LECTURE SERVICE AREAS CLASSROOMS SCIENTIST OFFICES LABORATORIES

SCALE: 1/32” = 1’-0” H. P.I. Q. J. R. K. S. T. U.

WARMER AREA TEMPERATE AREA COOLER AREA

G.

X.

GROUND LEVEL PLAN LOWER LEVEL PLAN SCALE: 1/32” = 1’-0”

AA

C.

F.

D.

L. MEETING ROOM V.M. ANATOMY PREP RECORDS W.N. BIOTECH DEPARTMENT OFFICES X.O. STOCK ROOM ROOM MECHANICAL Y. PREASSURE CHAMBER Z. BIOINFORMATICS AA C. COFEE SHOP

E.

SERVICE AREAS

PROGRAM DISTRIBUTION

W.

U.

V.

Q.

R.

G. P.

Q.

E.

PROGRAM DISTRIBUTION

C.

F. P.

S.

T.

A.

F. D.

A.

C.

E.

P.

P.

R.

C.

D.

A. F.

E.

D.

X.

W.

U.

V.

Q. R.

WARMER AREA TEMPERATE AREA COOLER AREA

HEAT HEATDISTRIBUTION DISTRIBUTION

G.

X.

E.

D.

SCALE: 1/32” = 1’-0” P. EARTH SCIENCE LAB P. Q. R. S. T. U.

Q. R.

W.

V.

B.

U.

R.

G.

C.

F.

C.

Q.

B.

E.

P.

P.

A.

VERTICAL CIRCULATION B.

B.

SERVICE AREAS F.

B.

C. Q.

HEAT HEATDISTRIBUTION DISTRIBUTION

BREAKROOM BIOLOGY LAB

EARTH SCIENCE S. BIOLOGY PREP LAB T. ZOOGY PREP A. BREAKROOM U. BOTANY PREP BIOLOGY LAB D. A. BIOLOGY PREP ZOOGY PREP D. BOTANY PREP

X.

HORIZONTAL CIRCULATION PUBLIC SPACE LECTURE CLASSROOMS SCIENTIST OFFICES LABORATORIES

B.

B. D. B.

AA

AA

S.

T.

Q.

X.

A.

LOWER LEVEL PLAN

SCALE: 1/32” = 1’-0” LOWER LEVEL PLAN

C.

F. R.

C.

PROGRAM DISTRIBUTION

X.

Q.

X.

VERTICAL CIRCULATION B.

SERVICE AREAS

A.

C.

ATMOSPHERIC SCIENCES EARTH SCIENCEOFFICES LAB VIZUALIZATION BREAKROOM RESOURCE CENTER BIOLOGY LABLABORATORY COMPUTING BIOLOGY PREP ZOOGY PREP BOTANY PREP A.

VERTICAL CIRCULATION

S.

T.

B.

Q.

R.

V. W. X. Y. Z. AA C.

ANATOMY PREP BIOTECH STOCK ROOM

V. ANATOMY PREP PREASSURE CHAMBER C. BIOINFORMATICS W. BIOTECH COFEE SHOP ROOM X. STOCK P. Y. PREASSURE CHAMBER Z. BIOINFORMATICS AA COFEE SHOP

Q.

AA

Q.

P.

E.

P.

PROGRAM DISTRIBUTION

A.

B. E.

P.

A.

F.

B. F.

AA AA

B.

B.

B. B.

B.

LOWER LEVEL PLAN SCALE: 1/32” = 1’-0”

VERTICAL CIRCULATION

B. B.

P. EARTH LAB LOWERSCIENCE LEVEL PLAN Q. BREAKROOM SCALE: 1/32” = 1’-0” R.LOWER BIOLOGY LAB PLAN LEVEL S.SCALE: BIOLOGY PREP P. EARTH LAB 1/32”SCIENCE = 1’-0” Q. BREAKROOM T. ZOOGY PREP R. BIOLOGY LAB U. BOTANY PREP S. BIOLOGY PREP P. Q. R. S. T. U.

EARTH SCIENCE LAB T. ZOOGY PREP U. BOTANY PREP BREAKROOM BIOLOGY LAB BIOLOGY PREP ZOOGY PREP BOTANY PREP

V. ANATOMY PREP W. BIOTECH X. STOCK ROOM ANATOMY PREP Y. PREASSURE CHAMBER BIOTECH Z. BIOINFORMATICS STOCK ROOM AA COFEE SHOP PREASSURE CHAMBER

V. W. X. Y. V. ANATOMY Z. BIOINFORMATICS AA COFEE W. SHOP BIOTECH

X. Y. Z. AA

PREP

STOCK ROOM PREASSURE CHAMBER BIOINFORMATICS COFEE SHOP

HORIZONTAL CIRCULATION PUBLIC SPACE B. LECTURE CLASSROOMS SCIENTIST OFFICES LABORATORIES

B.

SERVICE AREAS B.

PROGRAM DISTRIBUTION


EXTRUDED ALUMINUM CAP WEATHERSEAL INSULATED THERMOCHROMIC GLASS SYSTEM STRUCTURAL STEEL SUPPORT STEEL PLATE CONNECTION TO STRUCTURAL BEAM COLORED GLASS PLANEL ALUMINUM FRAME POWER OPERATED LOUVER SYSTEM STRUCTURAL BEAM

1”

3”

6”

HIGH TRANSMISSION STATE (CLEAR)

LOW TRANSMISSION STATE (DARKEN)

ELECTROLYTE

ELECTROLYTE

PASSIVE COUNTER ELECTRODE

PASSIVE COUNTER ELECTRODE

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT AND SOLAR ENERGY TRANSMITED

LITHIUM IONS

LITHIUM IONS

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

VOLTAGE SOURCE

STAINLESS STEEL SEAMDRAINAGE GRILLE OUTDOOR CONCRETE FLOOR TILE WATERPROOFING FIXED TO CONCRETE SLAB

CONCRETE SLAB

4” DRAIN PIPE

0”

2”

6”

SECTION PERSPECTIVE 0’

5’

10’

20’

VOLTAGE SOURCE


EXTRUDED ALUMINUM CAP WEATHERSEAL INSULATED THERMOCHROMIC GLASS SYSTEM STRUCTURAL STEEL SUPPORT STEEL PLATE CONNECTION TO STRUCTURAL BEAM

HIGH TRANSMISSION STATE (CLEAR)

LOW TRANSMISSION STATE (DARKE

COLORED GLASS PLANEL ALUMINUM FRAME

ELECTROLYTE

ELECTROLYTE

PASSIVE COUNTER ELECTRODE

PASSIVE COUNTER ELECTRODE

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT AND SOLAR ENERGY TRANSMITED

POWER OPERATED LOUVER SYSTEM STRUCTURAL BEAM

EXTRUDED ALUMINUM CAP WEATHERSEAL INSULATED THERMOCHROMIC GLASS SYSTEM 1”

3”

6”

STRUCTURAL STEEL SUPPORT STEEL PLATE CONNECTION TO STRUCTURAL BEAM

LITHIUM IONS

LITHIUM IONS

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

VOLTAGE SOURCE

COLORED GLASS PLANEL ALUMINUM FRAME

HIGH TRANSMISSION STATE (CLEAR)

VOLT

LOW TRANSMISSION STATE (DARKEN)

POWER OPERATED LOUVER SYSTEM STRUCTURAL BEAM

ELECTROLYTE

ELECTROLYTE

PASSIVE COUNTER ELECTRODE

PASSIVE COUNTER ELECTRODE STAINLESS STEEL SEAMDRAINAGE GRILLE

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT AND SOLAR

OUTDOOR CONCRETE ENERGY TRANSMITED FLOOR TILE WATERPROOFING FIXED TO CONCRETE SLAB LITHIUM

LITHIUM IONS

1”

3”

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

6”

LOUVER SYSTEM DETAIL

IONS

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR CONCRETE SLAB

4” DRAIN PIPE

VOLTAGE SOURCE

VOLTAGE SOURCE

0”

OUTDOOR CONCRETE FLOOR TILE

LOW TRANSMISSION STATE (DARKEN) WATERPROOFING FIXED

MECHANICAL EQUIPMENT

TO CONCRETE SLAB

BROADWAY BLVD.

ELECTROLYTE

ELECTROLYTE

CONCRETE SLAB

PASSIVE COUNTER ELECTRODE

PASSIVE COUNTER ELECTRODE

4” DRAIN PIPE

LIGHTING

POWER OPERATED LOUVER SYSTEM TINTED SKYLIGHT SYSTEM 0”

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT AND SOLAR ENERGY TRANSMITED

LITHIUM IONS

LITHIUM IONS

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

ACTIVE ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR

2”

6”

OBSERVATION WINDOW BIOLOGY WET LABORATORY

UPPER LEVEL 115’-0” SECTION PERSPECTIVE

W18X40 WIDE FLANGE

0’

VOLTAGE SOURCE

6”

TOP OF ROOF 130’-0”

STAINLESS STEEL SEAMDRAINAGE GRILLE

HIGH TRANSMISSION STATE (CLEAR)

2”

5’

VOLTAGE SOURCE

10’

20’

14” STRUCTURAL SQUARED TUBE COLUMN

CIRCULATION CORRIDOR

SOUTH ELEVATION 0’

SECTION PERSPECTIVE

STAINLESS STEEL SEAMDRAINAGE GRILLE

0’

OUTDOOR CONCRETE FLOOR TILE

5’

10’

15’

20’

30’

LONGITUDINAL SECTION 0’

15’

30’

60’

GROUND LEVEL 100’-0”

60’

WATERPROOFING FIXED TO CONCRETE SLAB

CONCRETE SLAB LONGITUDINAL SECTION

4” DRAIN PIPE

SOUTH ELEVATION 0’

0”

2”

15’

30’

0’

LONGITUDINAL SECTION 0’

15’

30’

60’

15’

LONGITUDINAL SECTION

VERTICAL GARDEN 0’ 30’

15’ 60’

60’

SMALL CLASSROOM

6” LOWER LEVEL 84’-0”

8” CONCRETE SLAB ON GRADE CONCRETE FOUNDATION

DETAILED SECTION AT ATRIUM NOT TO SCALE

LONGITUDINAL SECTION

LONGITUDINAL SECTION

0’

0’

15’

30’

15’ 60’

30’

60’

30’

60’


STAINLESS STEEL SEAMDRAINAGE GRILLE

LOWER LEVEL 84’-0”

OUTDOOR CONCRETE FLOOR TILE

8” CONCRETE SLAB ON GRADE

WATERPROOFING STAINLESS STEEL FIXED TO CONCRETE SEAMDRAINAGE GRILLE SLAB F.

CONCRETE FOUNDATION

OUTDOOR CONCRETE FLOOR TILE WATERPROOFING FIXED AASLAB TO CONCRETE CONCRETE SLAB

HORIZONTAL CIRCULATION PUBLIC SPACE LECTURE CLASSROOMS SCIENTIST OFFICES LABORATORIES

B.

4” DRAIN PIPE

B.

CONCRETE SLAB 0” B.

2”

6”

VERTICAL CIRCULATION

4” DRAIN PIPE

WARMER AREA 2” 6” TEMPERATE AREA WARMER AREA COOLER AREA

0”

TEMPERATE AREA COOLER AREA

HORIZONTAL CIRCULATION PUBLIC SPACE EXTRUDED ALUMINUM CAP WEATHERSEAL LECTURE CLASSROOMS INSULATED THERMOCHROMIC SCIENTIST OFFICES GLASS SYSTEM LABORATORIES

WARMER AREA TEMPERATE AREA COOLER AREA

SERVICE AREAS

B.

PROGRAM DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION

STRUCTURAL STEEL

SUPPORT VERTICAL CIRCULATION

WARMER AREA TEMPERATE AREA COOLER AREA

SERVICE AREAS

STEEL PLATE CONNECTION TO STRUCTURAL BEAM A.

COLORED GLASS PLANEL ALUMINUM FRAME POWER OPERATED LOUVER SYSTEM

STRUCTURAL BEAM PROGRAM DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION LIGHT COOLING

WARMER AREA LIGHT COOLING 1” 3”AVERAGE COOLING 6” TEMPERATE AREA AVERAGE COOLING COOLER AREA MAJOR COOLING

LIGHT COOLING AVERAGE COOLING MAJOR COOLING

COOLING COOLINGDISTRIBUTION DISTRIBUTION

MAJOR COOLING

COOLING COOLING DISTRIBUTION DISTRIBUTION COOLING DISTRIBUTION COOLING DISTRIBUTION

SECTION PERSPECTIVE

HEATDISTRIBUTION DISTRIBUTION 20’ 5’HEAT 10’

0’

SECTION PERSPECTIVE

HIGH TRANSMISSION STATE (CLEAR)

0’

5’

A.

LIGHT COOLING AVERAGE COOLING MAJOR COOLING

LOW TRANSMISSION STATE (DARKEN)

10’

20’

ELECTROLYTE

ELECTROLYTE

PASSIVE COUNTER ELECTRODE

PASSIVE COUNTER ELECTRODE

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT AND SOLAR ENERGY TRANSMITED

LIGHT COOLING COOLING LONGITUDINAL SECTION SOUTH ELEVATION LITHIUM IONS AVERAGE 0’ 15’ 30’ MAJOR COOLING 0’ 15’ ACTIVE 30’ 60’ ELECTROCHROMATIC LAYER TRANSPARENT CONDUCTOR COOLING COOLING DISTRIBUTION DISTRIBUTION

COOLING COOLINGDISTRIBUTION DISTRIBUTION

LITHIUM IONS

ACTIVE BUILDING ELEVATION ELECTROCHROMATIC LAYER 60’

NOT TO SCALE

T.

TRANSPARENT CONDUCTOR

S.

SOUTH ELEVATION 0’

U.

15’

LONGITUDINAL SECTION

VOLTAGE SOURCE 15’ 30’ 60’

0’

30’

VOLTAGE SOURCE

60’

R.

STAINLESS STEEL SEAMDRAINAGE GRILLE LONGITUDINAL OUTDOOR CONCRETE 0’FLOOR15’ TILE

SECTION

LONGITUDINAL SECTION 0’

30’

15’ 60’

30’

60’

WATERPROOFING FIXED TO CONCRETE SLAB

F.

LONGITUDINAL SECTION CONCRETE SLAB

0’

15’

30’

LONGITUDINAL SECTION

LONGITUDINAL SECTION60’ 0’ 15’ 60’ 30’

AA

4” DRAIN PIPE

0”

2”

6”

HORIZONTAL CIRCULATION PUBLIC SPACE LECTURE CLASSROOMS SCIENTIST OFFICES LABORATORIES VERTICAL CIRCULATION

B.

WARMER AREA TEMPERATE AREA COOLER AREAPROGRAM

NTAL CIRCULATION SPACE E CLASSROOMS ST OFFICES TORIES

DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION WARMER AREA TEMPERATE AREA COOLER AREA

L CIRCULATION AREAS

DISTRIBUTION

HEAT HEATDISTRIBUTION DISTRIBUTION WARMER AREA TEMPERATE AREA COOLER AREA

HEAT HEATDISTRIBUTION DISTRIBUTION SECTION PERSPECTIVE 0’

WARMER AREA TEMPERATE AREA COOLER AREA

SERVICE AREAS

B.

5’

10’

SECTION PERSPECTIVE 20’

WARMER AREA TEMPERATE AREA COOLER AREA

HEAT HEATDISTRIBUTION DISTRIBUTION


ATION PLAN 1'-0"

B

C

D

E

F

72' - 0" 10' - 0"

12' - 6"

13' - 6"

18' - 0"

18' - 0"

1 6' - 6"

1

28' - 6"

2

45' - 0"

2

3 10' - 0"

3

4

4

STEEL BEAM W8X36

WIDE FLANGE W12X36

A

B 12' - 0"

0'

C 12' - 6"

HOLLOW SQUARE 6' COLUMN HS8X8X1/4

2'

D 76' - 6" 13' - 6"

3" METAL DECK TO 12' SUPPORT ROOF

E 18' - 0"

F 18' - 0"

2' - 6"

1 6' - 6"

1

2

28' - 6"

2

45' - 0"

NG PLAN = 1'-0"

A

ELIXIR 3

3

EVOLO COMPETITION BUILDING PROTOTYPE FOR EMERGENCIES 4 2" REINFORCED STRIP FOOTING

0' 2' 6' 12' 1/2" STAINLESS STEEL BARS 48"x48"x18" ANCHORED TO THE GROUNG CONCRETE FOOTING STEEL SQUARE STRUCTURAL CAST IN PLACE CONCRETE COLUMN HS8X8/1/4" FOUNDATION WALL

4


STATE OF READINESS:

EARTHQUAKES

It is been more than a decade since sustainability targeting climate change has started to drive politics, economics, and even design. It is a problem that affects us all. The effect of climatic problems in the world is manifested in extreme temperatures, extinction of species and ecosystems, as well as more devastating natural disasters. Between all forms of devastation from natural events, earthquakes

are usually the most devastating and challenging to prognosticate. Cases like the earthquake in Haiti in 2010, Japan 2011, and most recently the 2015 earthquake in Mexico left massive social, economic and infrastructural challenges to overcome, but even more, striking thousands of fatalities that could have been prevented.

MAP OF DETECTABLE EARTHQUAKES 1990 - 2017

CLASSIFICATION OF MOVEMENT & DAMAGE

Not felt

1.0

Vibration Detected

2.0

3.0

Light Damage

4.0

5.0

Crack in Buildings

6.0

Buildings Collapse

7.0

8.0

Devastation & Deaths

9.0

ESTIMATED RECOVERY TIMELINE

Relief phase: 2 to 6 Months

Recovery phase: 12 Months

Rehabilitation phase: 12 to 24 Months

POTENTIAL NUMBER OF PEOPLE AFFECTED BY EARTHQUAKE

CITIES SUSCEPTIBLE TO NATURAL DISASTERS, SPECIALLY THE UNPREDICTABLE ONES, ARE NOT READY TO RESPOND

TOKYO, JAPAN 37 MILLION LOS, ANGELES CALIFORNIA 12.5 MILLION BUCARAMANGA, COLOMBIA 1.200,000

10.0


QUANTIFICATION OF RESOURCES IN THE EVENT OF A NATURAL DISASTER

8’-6” 1,360 ft3

20’-0”

8’-0”

42.5 ft

PERSPECTIVE ASSISTING 250,000 PEOPLE FOR 1 DAY REQUIRES....

Temporary Shelter Items Beds & Blankets 1 SC = 430 cots 1SC = 2,720 Blankets 1200 SC = Assist 250,000

Medical Supplies & Medicines 100,000 Lbs Medical & Surgical Supplies 6,200.000 Daily Doses of medication Could benefit approx. 200,000 people

Potable Water 1 SC = 43,470 Bottles of water 300 SC = Assist 250,000 / 1 day 300 SC = Assist 100,000 / 5 days

HEALTH

Understanding the locations, causes, and effects of earthquakes is just the beginning, not to stop them from happening, but to predict them and take action ahead of time to save lives. Countries and institutions reserve millions to help their people in the event of a disaster, but very few invest them to create visible solutions. The time in which money becomes actual help can take many forms and uses but most aggravating it takes time. A time that cost many lives. Being ready to serve is also part of mitigating damages. A facility that could perform as shelter, storage, the medical and scientific location has the potential to be exponentially more effective in rapid assistance that the traditional external aid. Additionally, it can mitigate the burden of intensive operations that could increase unnecessary logistical chaos.

Food 1 SC = 48 Cases of food (576 Meals) 68 SC = Assist 1.000.000 / 1 day 68 SC = Assist 200.000 / 5 days

FOOD

WATER LOGISTICS & TRANSPORTATION EDUCATION SHELTER

PROTECTION


PASSIVE MODE No emergency

INFORMATION CENTER

PARK

RECEIVING CRANE

NORTH BRANCH

+VEHICULAR ACCESS +RECEIVING CRANE +EFFECTIVE RECEIVING PROCESS +REDISTRIBUTION OF RESOURCES AT HIGHER LEVELS

VERTICAL CIRCULATION CORE EAST BRANCH

WEST BRANCH

+PEDESTRIAN ACCESS +INFORMATION POINT +UPPER LEVEL HOSPITAL

MAIN LEVEL PLAN NOT TO SCALE

+VEHICULAR EXIT +RECEIVING CRANE +TEMPORARY PARKING


EMERGENCY MODE Magnitude 8 Richter and/or other desaster

MEDICAL FACILITY

TEMPORARY LIVING

HOSPITAL ENTRY

STRUCTURAL CORE

EXPANSION JOINTS INSULATED GLAZING

EXPANSION CONTROL SYSTEMS

WEST BRANCH

+LOGISTICS OVERFLOW AREA - Emergency Housing - Emergency Vehicles Parking - Rapid Medical care - Park

LIGHTWEIGHT CAST-IN PLACE CONCRETE SLAB

STRUCTURAL CORES RETAINING AND ISOLATING PERIMETER WALL

ROLLING SUPPORT SYSTEM

STRUCTURAL CORE

TENSION-COMPRESSION STEEL BRACING SIMPLE/FRICTION SYSTEM MOVEMENT CONTROL

MAIN LEVEL PLAN NOT TO SCALE


EARTHQUAKE SCALE BUILDING RESPONSE TO MOVEMENT

2.0 - 3.0 FELT BY FEW PEOPLE

Program 40% 25% 20% 15%

Shelter Health Provisions Storage Education & Logistics

3.0 - 4.0 CEILING LIGHTS SWING

4.0 - 5.0 WALLS CRACK

STRUCTURE The building features 6 independent structural cores located around the perimeter of the building. The structural members rest in base isolators that allow the structure movement reduction.

5.0 - 6.0 FURNITURE MOVES SUB-STRUCTURE The substructure responds to the dynamic building form and includes seismic dampers that allow for structural members to expand and contract as necessary while maintaining structural integrity and ductility of the building.

6.0 - 7.0 SOME BUILDINGS COLLAPSE

7.0 - 8.0 MANY BUILDINGS ARE DESTROYED

8.0 or GREATER TOTAL OR PARTIAL DESTRUCTION OF BUILDINGS, BRIDGES AND ROADS.

BUILDING ENVELOP Solid and perforated aluminum cladding systems wrap the building at strategic areas, regulating light and temperature swings.

MOVEMENT REGULATION The tower implements modular steel expansion joins at each one of the structural cores. Additionally, slab to structure connections includes friction rolling systems and dampers that accommodate horizontal movements.


CONCRETE SLAB & FINISH FLOOR

HORIZONTAL STRUCTURAL FRAMING

CURTAIN WALL MULLION

VERTIICAL STRUCTURAL FRAMING DIAGONALLY BRACED STEEL COLUMNS

ALUMINUM CLADDING SYSTEM

EXPLODED AXONOMETRIC NOT TO SCALE

INSULATED CURTAIN WALL SYSTEM

STRUCTURE HOST

CONTROL JOINT

ALUMINUM CLADDING SYSTEM


DETAIL LOCATION

ELIXIR

“By failing to prepare, you are preparing to fail.” ~ Benjamin Franklin

and reserve millions to help their people in the event of a It is been more than a decade since sustainability targeting climate change Countries has started to institutions drive butproblems very few invest them to create visible solutions. The time in which politics, economics, and design. It is a problem that affects us all. The effect disaster, of climatic becomes in the world is manifested in extreme temperatures, extinction of species andmoney ecosystems, asactual well help can take many forms and uses but most aggravating it takes time. A time that cost many lives. as more devastating natural disasters.

ready serve is also part of mitigating damages. A facility that could Between all forms of devastation from natural events, earthquakes areBeing usually the tomost as shelter, devastating and challenging to prognosticate. Cases like the earthquake in perform Haiti in 2010, Japanstorage, the medical and scientific location has the potential to be exponentially 2011, and most recently the 2015 earthquake in Mexico left massive social, economic and more effective in rapid assistance that the traditional aid. Additionally, it can mitigate the burden of intensive operations that infrastructural challenges to overcome, but even more, striking thousands ofexternal fatalities that could could increase unnecessary logistical chaos. have been prevented. Understanding the locations, causes, and effects of earthquakes is just the beginning, not to stop them from happening, but to take action ahead of time to save lives and minimize the destructive and traumatic social impact.

MAP OF DETECTABLE EARTHQUAKES 1990 - 2017

INFORMATION CENTER

PARK

CLASSIFICATION OF MOVEMENT & DAMAGE

Not felt

Vibration Detected

1.0

2.0

3.0

Light Damage

4.0

5.0

6.0

Crack in Buildings

7.0

Buildings Collapse

Devastation & Deaths

8.0

9.0

10.0

QUANTIFICATION OF RESOURCES IN THE EVENT OF A NATURAL DISASTER TOKYO, JAPAN 37 MILLION

8’-6” 1,360 3ft

20’-0” 42.5 ft

PERSPECTIVE

RECEIVING CRANE

LOS, ANGELES CALIFORNIA 12.5 MILLION

8’-0”

ASSISTING 250,000 PEOPLE FOR 1 DAY REQUIRES....

BUCARAMANGA, COLOMBIA 1.200,000

Relief phase: Recovery phase: 2 to 6 Months 12 Months

Rehabilitation phase: 12 to 24 Months NORTH BRANCH

+VEHICULAR ACCESS +RECEIVING CRANE +EFFECTIVE RECEIVING PROCESS +REDISTRIBUTION OF RESOURCES AT HIGHER LEVELS

VERTICAL CIRCULATION CORE

WEST BRANCH

+PEDESTRIAN ACCESS +INFORMATION POINT +UPPER LEVEL HOSPITAL

Temporary Shelter Items Beds & Blankets 1 SC = 430 cots 1SC = 2,720 Blankets 600 SC = Assist 250,000

Medical Supplies & Medicines 100,000 Lbs Medical & Surgical Supplies 6,200.000 Daily Doses of medication Could benefit approx. 200,000 people

Potable Water 1 SC = 43,470 Bottles of water 75 SC = Assist 250,000 / 1 day 75 SC = Assist 50,000 / 5 days

EAST BRANCH

+VEHICULAR EXIT +RECEIVING CRANE +TEMPORARY PARKING

Food 1 SC = 43,470 Bottles of water 75 SC = Assist 250,000 / 1 day 75 SC = Assist 50,000 / 5 days

MAIN LEVEL PLAN NOT TO SCALE

RECESSED LIGHTING LAY-IN CEILING

STEEL ANGLE PLATES CURTAIN WALL MULLION INSULATED CURTAIN WALL SYSTEM DIAGONALLY BRACED STEEL COLUMNS STEEL ANGLE FINISH FLOOR 8” LIGHTWEIGHT CONCRETE SLAB 3” RIBBED FLOOR DECKING

18K6 OPEN-WEB JOIST 4’ O.C. SYNTHETIC RUBBER BEARING PAD STEEL GIRDER STEEL LEDGE

WALL SECTION SCALE: 1/4” = 1’-0”

ALUMINUM CLADDING PLYWOOD BACKING STEEL STUD WALL STEEL CONNECTING PLATES


SETBACK

0'

T.O. ROOF

ATION - WEST F.F. LEVEL = 1'-0"

2'

6'

12'

17' - 0"

CORNELL BIKE SHOP

BIKE REPAIR SHOP AT THE UNIVERSITY OF NEW MEXICO ALBUQUERQUE | NEW MEXICO 3,240 SF 0' - 0"

0'

1'

3'

6'


CORNELL BIKE SHOP CORNELL BIKE SHOP

F.F.

STANDING SEAM ZINC SHEET FIXED WITH CLIPS THROUH INSULATION

DIANA DURAN WATER PROOFING

A1 A105

METAL FASCIA

SECTION 1/8" = 1'-0"

ADDRESS| 114 CORNELL DIANA DURANDR SE ALBUQUERQUE, NM, 87106 MATERIAL| 20 MM STAINLESS STEEL CABLES,ADDRESS| TYP. STEEL WELDED AT PRIMARY STRUCTURE 114 CORNELL DR SE ALBUQUERQUE, NM, 87106 MATERIAL| INSULATED E -GLASS CURTAIN WALL STEEL 4" RIGID INSULATION

VAPOR BARRIER 22 GAUGE STEEL DECK

0'

1'

3'

6'

5' - 0" 50' - 0"

E1

SETBACK

WIDE FLANGE W12X26 5' - 0" 50' - 0"

PLYWOOD SHEETING

SETBACK

METAL CLADDING WATER PROOFING PLYWOOD SHEETING

6" METAL STUDS WITH BATT INSULATION IN BETWEEN PLYWOOD SHEETING VAPOR BARRIER

VAPOR BARRIER

5/8" GYP. BOARD WITH PAINT

POLISH CONCRETE 6" OF CAST -IN -PLACE REINFORCED CONCRETE

4" OF RIDIGID INSULATION WATER PROOFING

F2

GRANULAR FILL REINFORCED STRIP FOOTING 4" FOOTING DRAIN PIPE

C1 F2 A105

EARTH

CONCRETE FOOTING PRECEDENT STUDY |

SITE PLAN 1/16" = 1'-0"

SITE PLAN 1/16"T.O.=ROOF 1'-0"17' - 0"

T.O. ROOF

17' - 0"

T.O. ROOF

17' - 0"

T.O. ROOF

17' - 0"

F.F. LEVEL

0' - 0"

GEORGE POMPIDOU CENTER, PARIS FRANCE BY RENZO PIANO C1 A105

D1 SECTION PERSPECTIVE 12" = 1'-0"

SECTION PERSPECTIVE STANDING SEAM ZINC SHEET

NOT TO SCALE

STANDING SEAM ZINC SHEET

DAMP PROOFING

STANDING SEAM ZINC PLYWOOD SHEET SHEATING FIXED WITH CLIPS THROUH INSULATION

2" RIGID INSULATION

PLYWOOD SHEETING

METAL FLASHING STANDING SEAM ZINC

4"FIXED RIGIDWITH INSULATION CLIPS WIDE FLANGE BEAMSHEET W12X26 THROUH INSULATION VAPOR BARRIER FASCIA 22 GAUGEMETAL STEEL DECK WATER PROOFING 20 MM STAINLESS PLYWOOD SHEETING STEEL CABLES, TYP. WELDED PRIMARY 4" RIGID AT INSULATION STRUCTURE VAPOR BARRIER 22 GAUGE STEEL DECK INSULATED E -GLASS 20 MM STAINLESS CURTAIN WALL WELDED AT PRIMARY 6" METAL STUD STRUCTURE

STEEL CABLES, TYP. 6" BATT INSULATION

3/4" PLYWOOD SHEATHING VAPOR BARRIER 4" RIGID INSULATION

INSULATED E -GLASS POLISH CONCRETE VAPOR BARRIERCURTAIN WALL 6" OF CAST -IN -PLACE 3/4" PLYWOOD SHEATHING REINFORCED CONCRETE

1/4" GYPSUM 4" OFBOARD RIDIGID INSULATION METAL DROPPED DOWN WATER PROOFING VAPOR BARRIER ACOUSTIC CEILING

0' - 0"

F.F. LEVEL

0' - 0" E2

A1 A105

PLYWOOD SHEATHING

METAL FASCIA

1-1/2" METAL DECKING WATER PROOFING WIDE FLANGE BEAM W12X22

F.F. LEVEL

DAMP PROOFING

E1

SECTION 1/8" = 1'-0"

2" RIGID INSULATION F.F. LEVEL

1-1/2" METAL DECKING 0' W12X26 1' WIDE FLANGE

METAL FLASHING

3'

6'

0' - 0"

A1 A105

E2 WIDE FLANGE W12X26

METAL CLADDING WATER PROOFING PLYWOOD SHEETING WIDE FLANGE W12X26 6" METAL STUDS WITH BATT INSULATION IN BETWEEN

PLYWOOD SHEETING VAPOR BARRIER 5/8" GYP. BOARD WITH PAINT METAL CLADDING WATER PROOFING PLYWOOD SHEETING

6" METAL STUDS WITH BATT INSULATION IN BETWEEN PLYWOOD SHEETING VAPOR BARRIER 5/8" GYP. BOARD WITH PAINT

D2


T.O. ROOF

17' - 0" 1/8" / 1'-0"

ATION - SOUTH 6" = 1'-0"

F.F. LEVEL

0' - 0"

0'

2'

6'

12'

INTERIOR SHOP VIEW A

B

C

D

E

F

72' - 0" 10' - 0"

12' - 6"

13' - 6"

18' - 0"

18' - 0"

1 6' - 6"

1

2

2

28' - 6"

45' - 0"

110 RESTROOM 82 SF

101 REPAIR SHOP 1303 SF

111

112

OFFICE 113 SF

MECHANICAL 166 SF

3 10' - 6"

3

4

VEL FLOOR PLAN = 1'-0"

4

A

FLOOR PLAN NOT TO SCALE

B

C

D

0'

2'

E

6'

12'

F


4" FOOTING DRAIN PIPE 4" OF RIDIGID INSULATION EARTHTO ROOF CONNECTION1 WATER PROOFING WALL

C1

GRANULAR FILL 1 1/2" REINFORCED CONCRETE FOOTING STRIP FOOTING

= 1'-0"

4" FOOTING 1/4" GYPSUM BOARD DRAIN PIPE

D1 SECTION PERSPECTIVE 12" = 1'-0"

EARTH

3/4" PLYWOOD SHEATHING

D2 1/4" METAL CLADDING FACADE AIR GAP DAMP PROOFING 1" PLYWOOD SHEATHING 6" METAL STUDS 6" BATT INSULATION

1

VAPOR BARRIER

CONCRETE FOOTING

6" C -CHANNEL 6" C -CHANNEL

4" RIGID INSULATION

STANDING SEAM ZINC SHEET

3/4" PLYWOOD SHEATHING

DAMP PROOFING

PLYWOOD SHEATING WOOD BLOCKING

WOOD BLOCKING

2" RIGID INSULATION

METAL FLASHING WIDE FLANGE BEAM W12X26

DAMP PROOFING

1

A3 A101

PLYWOOD SHEATHING

SEALANT FLASHING

1-1/2" METAL DECKING WIDE FLANGE BEAM W12X22

2

STANDING SEAM ZINC SHEET

2" RIGID INSULATION

FIXED ALUMINIM WINDOW FRAME

1-1/2" METAL DECKING

LOW -E WINDOW GLAZING

WIDE FLANGE W12X26

STEEL SQUARE STRUCTURAL COLUMNSH 8X8X1/4

A3

2

3

A101

METAL FLASHING

4

2" POLISHED CONCRETE FINISH 6" SEALED CONCRETE. REINFORCED SLAB ON GRADRE

3

4" RIGID INSULATION SEALANT 2" POLISHED CONCRETE FINISH 6" SEALED CONCRETE. SLAB ON GRADE

6" BATT INSULATION

METAL CAP

6" METAL STUD

4" RIGID INSULATION 3/4" PLYWOOD SHEATHING VAPOR BARRIER

DAMP PROOFING

4

4" GRANULATED INDFILL

C2 F. 1

4" RIGID INSULATION

VAPOR BARRIER 3/4" PLYWOOD SHEATHING

EARTH 4" PVC DRAINAGE PIPE 3/4" DRAINAGE MAT

1/4" GYPSUM BOARD

4" RIGID INSULATION DAMP PROOFING

METAL DROPPED DOWN ACOUSTIC CEILING

4" GRANULATED INFILL EARTH

WALL TO ROOF CONNECTION NOT TO SCALE

1

ALL TO ROOF C

1/4" GYPSUM BOARD 3/4" PLYWOOD FOUNDATION SHEATHING

A1

VAPOR BARRIER 1 1/2" =

2

1/4" METAL CLADDING FACADE AIR GAP DAMP PROOFING 1" PLYWOOD SHEATHING

1'-0"

TO WALL1

6" METAL STUDS 6" BATT INSULATION 6" C -CHANNEL 6" C -CHANNEL

4" RIGID INSULATION 3/4" PLYWOOD SHEATHING WOOD BLOCKING

ST

3

WOOD BLOCKING

B2

SEALANT FLASHING FIXED ALUMINIM WINDOW FRAME

FR 4 1

ST

LOW -E WINDOW GLAZING STEEL SQUARE STRUCTURAL COLUMNSH 8X8X1/4

2" POLISHED CONCRETE FINISH 6" SEALED CONCRETE. REINFORCED SLAB ON GRADRE

4" RIGID INSULATION SEALANT 2" POLISHED CONCRETE FINISH 6" SEALED CONCRETE. SLAB ON GRADE

METAL CAP 4" RIGID INSULATION VAPOR BARRIER

DAMP PROOFING 4" GRANULATED INDFILL

1

2

EARTH 4" PVC DRAINAGE PIPE 3/4" DRAINAGE MAT

4" RIGID INSULATION DAMP PROOFING 4" GRANULATED INFILL EARTH

3

2" R

A1

FOUNDATION TO WALL1 1 1/2" = 1'-0"

A2

FO 4 1/1

2" R

A1

FOUNDATION TO WALL1 1 1/2" = 1'-0"

FOUNDATION TO WALL NOT TO SCALE

A2

FOU 1/1


C O M P E T I T I O N S


REVOLVING IDENTITIES UNDERGROUND BATH HOUSE

TEAM MEMBERS Diana Duran + Cesar Vargas


Expected Growth North Korea

South Korea

North Korea South Korea

DMZ Division

Forests

Grassland Fields

REVOLVING IDENTITIES A simple geometry with extensive meanings inspires the design of the bathhouse. The taegeuk is a symbol tied to the Korea culture. It is formed by two spiraling identities that represent equality, balance and the continuous cycle of life. This duality is expressed by the two entries facing East and West. Onr entry represents the warm experiences and the other the cold. The revolving circulation creates interior spaces that evoke perpetual motion where the two identities meet in a shared pool and come together as one. It is till you are in the shared pool, where you realize that you have only experience half of the journey...


SKYBRIDGE DESIGN COMPETITION

ALBUQUERQUE IS RICH IN CULTURE AND TRADITIONS. THIS BRIDGE REINFORCE THE CONTEMPORARY SIDE OF A GROWING CITY. ALBUQUERQUE IS RECOGNIZED AS ONE OF THE MOST CULTURALLY DIVERSE CITIES IN THE UNITED STATES. IT IS FULL OF COUNTLESS TRADITIONS AND CUSTOMS THAT PASSED OVER GENERATIONS, MAKING THEM PART OF THE UNIQUE TAPESTRY THAT IS THEIR PEOPLE. THE TEXTURE BRIDGE PANELS DRAW FROM TRADITIONAL PATTERNS AND DESIGNS ORIGINATED FROM POTTERY. THIS DESIGN WELCOMES LOCALS AND VISITORS TO ROUTE 66 AND NEW MEXICO.

PANEL ELEVATION STRUCTURAL FRAME AS NEEDED

HOTEL VIEW | RENDER

INTERIOR RENDER

SECTION | LIGHTING DIANA DURAN | TANIA NEVAREZ

SKY-BRIDGE COMPETITION

ALBUQUERQUE | NEW MEXICO BRIDGE PANEL DESIGN CONNECTING PRESBYTERIAN HOSPITAL WITH HOTEL ACROSS ROUTE 66 2ND PLACE TEAM MEMBERS Tania Nevarez + Diana Duran


SECTION

A

B

C

D

E

F

PANELS J-A HAVE A CUT ANGLE OF 2° PANELS K-M HAVE A CUT ANGLES OF 1.5° ADDITIONAL STRUCTURAL FRAMING AS NEEDED

OVERALL PANEL ELEVATION NOT TO SCALE

G

H

I

J

K

L

M

N


FELIX CANDELA COMPETITION CASA AGAVE TEQUILA & MEZCAL MUSEUM 2020

TEAM MEMBERS Tania Nevarez + Diana Duran + KeVaughn Harding


PROFESSIONAL WORK


THE CLASSICAL ACADEMY COLORADO SPRINGS | COLORADO 27,000 SF ADDITION | GYMNASIUM AND BAND ROOMS $7,500.000

INVOLVEMENT DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS


MONTE DEL SOL CHARTER SCHOOL SANTA FE | NEW MEXICO 20,000 SF ADDITION FEASIBILITY STUDY

INVOLVEMENT PROGRAMMING, CODE ANALYSIS


MULTI-COMPLEX MASTER PLAN WELLNESS CENTER & JUDICIAL COMPLEX TAOS PUEBLO | NEW MEXICO $40,000.000 MULTI-COMPLEX ON-GOING PROJECT

INVOLVEMENT DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS


OVERALL SITE PLAN


UPPER LEVEL PLAN NOT TO SCALE

ACTIVITY AREAS ADMINISTRATION MEN WOMEN CIRCULATION SERVICE

GROUND LEVEL PLAN NOT TO SCALE


RECEPTION AREA

OFFICE AND GYMNASIUM CORRIDOR


GYMNASIUM AND ELEVATED RUNNING TRACK

SECTION PERSPECTIVE


ELEVATE DOWNTOWN ALBUQUERQUE | NEW MEXICO MIX-USE | 144 RESIDENTIAL UNITS $30,000.000 USD | APROX 155,000 SF PURSUING LEED PLATINUM ACCREDITATION ON-GOING PROJECT

INVOLVEMENT DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, RENDERS


POOL HOUSE EXTERIOR


POOL AMENITIES


ROOF TOP & GRILL AREA


COMMUNITY GARDEN AT ROOF TOP


t h a n k

y o u


Turn static files into dynamic content formats.

Create a flipbook
PORTFOLIO 2020 by Diana Duran - Issuu