Skip to main content

Water & Wastewater Conveyance

Page 1


Conveyance

Moving water efficiently, safely, and sustainably

DCCM brings deep expertise in the design and management of water and wastewater conveyance systems, covering pipelines, pump stations, and force mains. The firm also provides openchannel and closed-conduit design for stormwater conveyance, delivering solutions that address both capacity and longterm infrastructure reliability. Our engineers develop efficient and secure infrastructure for the movement of water and wastewater, supporting both new developments and system upgrades. We address challenges such as utility conflicts, hydraulic performance, and constructability to deliver projects that minimize service disruptions and maximize operational reliability. Our approach includes detailed route analysis, utility coordination, and the use of advanced construction methods to ensure long-lasting results. By focusing on efficiency and resilience, we help clients maintain seamless conveyance networks that support community growth and environmental stewardship.

Services

– Large-diameter pipelines

– Channel design

– Pump and lift stations

– Conveyance canals

– Storage tanks

– SCADA systems

– Structural design

– Construction management

– Water distribution systems

– Wastewater collection systems

– Flow & hydraulic modeling

– Water distribution systems

– Wastewater collection systems

– Pipeline rehabilitation

– Trenchless technologies

– Deep shafts

– Tunnels

– Asset Management

Projects

STORMWATER CONVEYANCE TUNNELS STUDY, PHASE II

HARRIS COUNTY FLOOD CONTROL DISTRICT |

HARRIS COUNTY, TEXAS

The Phase II Tunnel Study is a CDBG-funded study to examine the feasibility of tunnel conveyance facilities to reduce flood risk in Harris County. The work included desktop studies to identify damage centers or zones of recurring flood impacts that could benefit from a stormwater tunnel conveyance system, as well as H&H modeling and analyses to inform the flows these linear conveyance features would need to carry to reduce flood risks.

108-INCH NORTHEAST TRANSMISSION LINE CITY OF HOUSTON

CITY OF HOUSTON | HOUSTON, TEXAS

DCCM provided final engineering design and construction phase services for 1.4 miles of 108inch water main from Aldine Westfield Road to Willis Street. The project was highly complex due to the water main’s size and the congested urban alignment, requiring evaluation of tunneling and open-cut alternatives to minimize impact on existing businesses. The project was completed at a total cost of $31 million.

BRAYS BAYOU CHANNEL MODIFICATIONS, DISCRETE SEGMENT 109

HARRIS COUNTY FLOOD CONTROL DISTRICT |

HARRIS COUNTY, TEXAS

DCCM evaluated the impacts of channel widening on eight bridge foundations and designed retaining walls to protect abutments and stabilize bayou banks. Services included structural analysis, PS&E, utility relocations, storm sewer flap gate box replacement, and updates to the IH 610 bridge report. DCCM compared alternatives and recommended a final design based on cost, constructability, safety, and aesthetics.

Turn static files into dynamic content formats.

Create a flipbook
Water & Wastewater Conveyance by DCCM - Issuu