Skip to main content

COLUMNS | Spring/Summer 2024

Page 1

COLUMNS

works in progress 1221 N Street, Suite 600 Lincoln, Nebraska 68508

Spring | Summer 2024

COMPANY NAME 1221 N Street, Suite 600 Lincoln, Nebraska 68508

Metropolitan Utilities District Sheridan Lutheran Outreach Construction Center 2 | Omaha, NE Center | Lincoln, NE A new 135,000-square-foot building to house field operations crews for the construction, distribution, central maintenance, stores, and transportation divisions of M.U.D. The building also contains an indoor parking garage for fleet vehicles. The structure is a combination of pre-engineered metal buildings and conventional steel framing with insulated precast concrete wall panels and insulated metal panel exteriors. There are four ancillary structures on site that complete the campus development. Estimated completion is scheduled for December 2025. This project is being completed in partnership with Holland Basham Architects.

A new 2-story building on the Sheridan Lutheran Church Campus. The 3,661-square-foot upper level will host numerous church outreach programs by means of a large community room, break-out lounges and community service based work spaces. The 4,575-square-foot lower level accommodates the church and outreach program storage needs. The design was inspired as a modern little sister to the church with a similar material palette and patterns. The single sloped, projecting roof line outreaches to the surrounding area, matching the goal of the outreach center for Sheridan Lutheran. Groundbreaking took place this spring and anticipated completion is scheduled for spring 2025.

S2age Living by Tabitha

making ideal happen Our design experts, innovators and problem solvers offer a complete spectrum of architecture, engineering, interior design and construction administration services.

davisdesign.com

Davis Design Celebrates the 2024 Solar Eclipse! Our Davis Design team joined together with others across the country to witness the amazing 2024 solar eclipse! It became more than just a celestial phenomenon; it was a chance to step outside, share laughs with colleagues under a partially darkened sky, and create lasting memories.

Nebco Fallbrook 700 | Lincoln, NE

Cherokee Regional Medical Center | Cherokee, IA

This new 2-story core and shell project has total of 43,300-squarefeet. It will be the newest high end, mixed-use building to be added to the thriving Fallbrook Town Center in Lincoln, Nebraska. The main level is anticipated to house restaurants and shops while the upper level will provide office space, with outdoor patios overlooking the town center and adjacent park. Construction is anticipated to start late summer 2024, with completion towards the end of 2025.

This first phase of projects for Cherokee Regional Medical Center (CRMC) includes a small 1,450-square-foot building addition to accommodate new sleep rooms for ambulance drivers and doctors as well as renovation of over 33,000-square-feet on the second and third floors, providing new Med/Surge and LDRP patient rooms. Mechanical and electrical design includes new chillers, chilled beams, air handlers, and new electrical distribution. This phase of the project is estimated to be complete in July 2025.

At Davis Design, we believe in fostering a sense of community and shared experiences to help build a team that thrives both inside and outside the office. The 2024 eclipse perfectly exemplified this philosophy. Here are a few photos taken by our employees highlighting the fun and camaraderie we shared on Eclipse Day 2024.

ARCHITECTURE ENGINEERING INTERIOR DESIGN CONSTRUCTION ADMINISTRATION


Turn static files into dynamic content formats.

Create a flipbook
COLUMNS | Spring/Summer 2024 by davisdesign.aei - Issuu